    Refineries Division Head Quarter - HS&E DEPARTMENT 1

    DISASTER MANAGEMENT

    OPERATIONS TO HANDLE MS TANK

    FIRE AT GUJARAT REFINERY

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    2/16

    Refineries Division Head Quarter - HS&E DEPARTMENT 2

    At 03.30 hrs , Central Industrial Security Force (CISF) guard at pipeline station in

    the refinery felt the smell of hydro-carbon. On receiving information, PipelineShift Engineer and CISF guards at Pipeline station (Koyali-Ahemedabad Pipeline

    - KAPL) and Gantry moved towards the Motor Spirit (MS) tank farm and

    observed the Tank 76 overflowing and vapor clouds all around. The CISF guard

    reported this incident to CISF Inspector at main gate , who, in turn, informed

    Refinery Shift Manager (RSM). After informing RSM, the CISF inspector rushed

    to site of incident in a jeep. Fire broke out at 03.50 hrs soon the jeep reached the

    site. Fire started first in Tank no. 76 (5000 KL nominal capacity) and another MS

    tank (no. 78) of identical capacity located in the same dyke, also got ignited

    within no time.

    Investigations revealed that the incident took place because of operational errorin making the line-up connections for circulation of Tank 76 causing overflow of

    the tank. Ignition of MS vapors was provided by the jeep.

    THE INCIDENT

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    3/16

    Refineries Division Head Quarter - HS&E DEPARTMENT 3

    Since Gujarat refinery is processing /handling/ storing large volume of

    inflammable hydrocarbons, elaborate fire protection systems by way of fixed andmobile fire fighting equipments as per norms have been provided.

    Fire fighting facilities of neighboring industries like Petrochemical, fertilizer and

    other industries are also available under mutual aid scheme.

    Detailed On-site Disaster plan is available for the whole refinery.

    Offsite Disaster plan is available.

    Central Control Room (CCR) has also been set up by the contributory efforts &

    manpower arranged by major industries in the area. This CCR functions round

    the clock.

    Periodic Disaster mock drills with full involvement of all members of CCR /

    concerned agencies for handling various emergency scenario in the area are

    conducted.

    FIRE PROTECTION / DISASTER MANAGEMENT SYSTEM

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    4/16

    Refineries Division Head Quarter - HS&E DEPARTMENT 4

    On receipt of fire call at main fire station, first turn out of 2 foam tenders, one

    each from both the fire stations moved out under the leadership of Fire & Safety

    Officer.

    Subsequently second turn out of 2 foam tenders along with a foam nurser

    reached at the scene of fire.

    Fire & Safety Manager and other personnel from township reached the fire site

    followed by Executive Director (ED), General Manager (GM) and officials from

    other department.

    Fire Crew carried out the following operations on reaching at fire site :

    - Cooling of 2 nos. tanks (on fire) & 2 nos. adjacent tanks started.

    - 4 nos. fixed water monitors operated.

    - Semi-fixed foam system of TK 76 & 78 ( on fire) operated.

    - One Jeep was found under fire; fire was extinguished and jeep was

    pushed away to a safer location.

    Mutual Aid Industries & CCR were informed and industries reported

    immediately at the scene of fires.

    IMMEDIATE ACTIONS TAKEN

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    5/16

    Refineries Division Head Quarter - HS&E DEPARTMENT 5

    After initial control and lining up of fire fighting operation, stock of the situation

    was reviewed and specific action oriented strategy was chalked out under the

    leadership of ED & GM and in consultation with fire chief of Gujarat Refinery,

    Petrochemical, Gujarat State Fertilizer Corporation (GSFC), Baroda Municipal

    Corporation (BMC).

    Main aim was to contain the fire within TK. 76 & 78 (on fire) dyke area and

    protection of other facilities in nearby areas such as valve manifold, other tanks,

    pipeline terminal, TEL shed etc.

    Strategy adopted was to divide the available fire crews in three groups withspecific task in containing the fire within dyke area of Tank 76 & 78 (on fire) and

    ultimately extinguishing it without any further damage.

    STRATEGY ADOPTED

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    6/16

    Refineries Division Head Quarter - HS&E DEPARTMENT 6

    Actions taken based on this review meeting were as follows:

    - Continuous cooling of Tank 83 & 84 (adjacent tanks) and intermittent foam

    application on the roof of Tank 83 & 84. The job was assigned to a group of firecrew from Petrochemical with assistance from Operations Dept. of Gujarat

    Refinery.

    - Fire fighting in Tank 76 & 78 ( on fire) and tank dyke area along with creating

    a fire water curtain between TK 76 & 78 ( on fire) and TK- 83 & 84 (adjacent

    tanks ) side & beyond. This job was assigned to 2nd group of fire crew (Gujarat

    Refinery & GSFC).

    - There is a valve manifold located in the eastern side of TK 76 & 78 (on fire)

    dyke. This valve manifold was very critical. Protection of valve manifold was

    prime aim as the receipt & dispatch of MS from Gujarat Refinery is fully

    dependent on this valve manifold. Besides, in case of manifold caught fire, there

    could be a possibility of spreading the fire to other areas viz., Tetra Ethyl Lead

    (TEL) blending plant, followed by Wagon loading gantries. The 3rd group of fire

    crew (Gujarat Refinery + Baroda Fire Brigade / Heavy water / Western railway)

    was assigned the responsibility to look after the manifold.

    STRATEGY ADOPTED

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    7/16Refineries Division Head Quarter - HS&E DEPARTMENT 7

    While the battle of fire fighting near TK 76 / 78 (on fire) was being fought by fire

    fighting personnel and other employees, large no. of other personnel from

    various departments / agencies worked with equal dedication to support this

    marathon operation as under:

    Fire Water Supply:

    Supply of adequate fire water at the scene of fire was most essential for

    successful fire fighting operation. This was done in an excellent way by Power &

    Utility Dept. in close co-ordination with Fire & Safety Control room and fire

    marshal at the fire site.

    Food Services:

    Food services were arranged uninterrupted by Gujarat Refinery Canteen till thefire was completely extinguished. Time to time snacks, cold drinks, water was

    served by the canteen boys to all personnel at the fire site.

    SUPPORT SERVICES

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    8/16Refineries Division Head Quarter - HS&E DEPARTMENT 8

    Refuelling of Fire Vehicles:

    Mech Maint. arranged for on the spot refuelling of all fire vehicles throughout

    the fire fighting operation. This was carried out in very smooth way, without any

    scarcity at any time.

    Arrangement of Casual labourers :

    Casual labourers were made available by Civil Dept. to help replacing of empty

    fire vehicles with foam compound, putting sand bags for making temporary

    routes and other miscellaneous jobs of cleaning / house-keeping etc.

    Installation of additional foam monitors :

    4 additional High Volume Long Range (HVLR) monitors were installed during

    the fire fighting operation with the excellent help from Project / Mech.

    Maintenance and outside agencies of Baroda.

    SUPPORT SERVICES

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    9/16Refineries Division Head Quarter - HS&E DEPARTMENT 9

    Arrangement of Foam Compound:

    Around 1 lakh litres of foam compound was arranged by Materials Dept. after

    the occurrence of fire incident. The foam compound was arranged not only from

    nearby industries and Baroda based foam compound suppliers but also from

    Bombay based foam compound suppliers, Bharat Petroleum Corporation Limited

    (BPCL) and Mathura Refinery.

    Medical Assistance :

    2 nos. of ambulance with 8 nos. of staff moving round the clock extended all

    medical helps e.g. supply / application of soframycin cream on the faces and

    putting drops in the eyes of fighting crew, distributing chewable medicines etc.

    This help was besides round the clock arrangements in the hospital for receiving

    any casualty.

    Handling of Press Media & Other Govt. Officials:

    Time to time briefing to Press / Media with latest information and also receiving

    the Govt. officials and dignitaries and explaining them the situation of fire fighting

    was handled amicably and in professional manner by ED/GM with the help of

    Public Relation Dept. This action helped in avoiding any panic in nearby localities

    and adverse publicity.

    SUPPORT SERVICES

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    10/16Refineries Division Head Quarter - HS&E DEPARTMENT 10

    Security:

    - Commandant & Asst. commandant were camping at the site during fire fighting

    operation.

    - Traffic control / movement of vehicles and personnel to & fro from scene of fire

    was controlled effectively by CISF personnel. This was done keeping in view the

    objective of ensuring unobstructed movement of vehicles & personnel required at

    fire site and not allowing the spectators to just assemble near the site.

    - Besides the CISF personnel on normal duty, other CISF jawans helped the fire

    crew in various fire fighting operations.

    SUPPORT SERVICES

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    11/16Refineries Division Head Quarter - HS&E DEPARTMENT 11

    - After the final extinguishment of fire in tank on 5.8.95 at 7 AM, cooling

    operation was continued till 1300 hrs of 6.8.95 as smouldering / smoke emission

    was continuing.

    - Simultaneously, actions were taken for removal of damaged pipelines and

    restoring operation of Fluidized Catalytic Cracking (FCC) Unit and MS dispatch

    operation without much delay.

    - Team work of Process, Engineering Services and Project / Maintenance /Production departments made this difficult task feasible in short time.

    REHABILITATION AND RESTORING DESPATCH OPERATION

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    12/16Refineries Division Head Quarter - HS&E DEPARTMENT 12

    GUJARAT REFINERY

    FIRE & SAFETY DEPARTMENT

    MAJOR FIRE INCIDENT IN TANK FARMON 4TH AUGUST 1995, AT 0350 HRS, A MAJOR FIRE

    BROKE OUT IN TWO MOTOR SPRIT TANKS

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    13/16Refineries Division Head Quarter - HS&E DEPARTMENT 13

    GUJARAT REFINERY

    FIRE & SAFETY DEPARTMENT

    BOTH TANKS WERE POSING DANGER TO

    NEARBY TANKS

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    14/16Refineries Division Head Quarter - HS&E DEPARTMENT 14

    GUJARAT REFINERY

    FIRE & SAFETY DEPARTMENT

    FIRE FIGHTING IN FULL SWING

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    15/16Refineries Division Head Quarter - HS&E DEPARTMENT 15

    15

    GUJARAT REFINERY

    FIRE & SAFETY DEPARTMENT

    TANKS AFTER FIRE

    http://iocl.com/index.asp
  • 7/27/2019 MSTankFireatGujRef.mr.Bhowmick..IOCL

    16/16Refineries Division Head Quarter - HS&E DEPARTMENT 16

    THANK YOU

    http://iocl.com/index.asp