MSD Pipe Rating Program MSD Pipe Rating Program AQUA SALUBRIS AQUA SALUBRIS
22

MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Jan 22, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

MSD Pipe Rating ProgramMSD Pipe Rating Program

AQUA SALUBRISAQUA SALUBRIS

Page 2: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Pipe Rating ProgramPipe Rating Program

What is it?What is it?

A new, A new, proactive proactive program used to define program used to define and develop rehabilitation projects.and develop rehabilitation projects.

The usual The usual reactivereactive approach is to approach is to rehabilitate an entire line after significant rehabilitate an entire line after significant problems have occurred.problems have occurred.

Page 3: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Pipe Rating ProgramPipe Rating Program

Purpose: To get the Biggest (and Quickest) Purpose: To get the Biggest (and Quickest) Bang for the Buck. This method should Bang for the Buck. This method should prove quicker and more efficient than our prove quicker and more efficient than our Basin Rehabilitation Projects.Basin Rehabilitation Projects.

Focuses Rehabilitation Dollars where they Focuses Rehabilitation Dollars where they are most needed – whether at a single are most needed – whether at a single point repair or a traditional D&R project.point repair or a traditional D&R project.

Page 4: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Pipe Rating ProgramPipe Rating Program

Brief HistoryBrief History

Over the past 10 years MSD has had an aggressive rehabilitation program, Over the past 10 years MSD has had an aggressive rehabilitation program, having funded over $111 million since FY93, primarily through traditional having funded over $111 million since FY93, primarily through traditional approaches. approaches.

Pipe Rating was developed as a progression of our Basin Rehabilitation and Pipe Rating was developed as a progression of our Basin Rehabilitation and Preventative Maintenance Programs. To date MSD has completed the first Preventative Maintenance Programs. To date MSD has completed the first “London Road Pilot Basin” project @ “London Road Pilot Basin” project @ 23,000 LF23,000 LF and is 71% finished with our and is 71% finished with our second basin project, “Tomahawk Basin” @ second basin project, “Tomahawk Basin” @ 49,000 LF49,000 LF. The total cost will . The total cost will be about be about $6.5 million$6.5 million..

Each of these basin-wide projects was divided into three phases for speed: Each of these basin-wide projects was divided into three phases for speed: 1) Lining on both private property and public R/W; 1) Lining on both private property and public R/W; 2) D&R in public R/W; and 2) D&R in public R/W; and 3) D&R on private property 3) D&R on private property

Page 5: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Pipe Rating ProgramPipe Rating Program

Brief History (Cont’d)Brief History (Cont’d)

Basin-Wide Rehabilitation, though comprehensive, is both time-and-Basin-Wide Rehabilitation, though comprehensive, is both time-and-capital intensive, taking 3-5 years to develop and complete a project. capital intensive, taking 3-5 years to develop and complete a project. With sixty-nine sub-basins within the District, this approach is too slow. With sixty-nine sub-basins within the District, this approach is too slow.

Seeking higher levels of efficiency, MSD developed a program which Seeking higher levels of efficiency, MSD developed a program which targets hot-spots. This program also dovetails with our new State targets hot-spots. This program also dovetails with our new State Collection System Permit (at the time only the fourth such permit in Collection System Permit (at the time only the fourth such permit in the State).the State).

MSD is now required to rehabilitate at least 50,000 LF per year. In prior MSD is now required to rehabilitate at least 50,000 LF per year. In prior years we have exceeded over 90,000 LF, though this is being ramped years we have exceeded over 90,000 LF, though this is being ramped down over time.down over time.

Page 6: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Pipe Rating ProgramPipe Rating Program

How was it started?How was it started?

A special group was formulated which was A special group was formulated which was comprised of several levels of staff comprised of several levels of staff including GIS, System Services, including GIS, System Services, engineering, and management. engineering, and management.

This “Vertical Team” helped to garner This “Vertical Team” helped to garner support from all levels within MSD and to support from all levels within MSD and to gather as diverse an input as possible.gather as diverse an input as possible.

Page 7: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Pipe Rating ProgramPipe Rating Program

Elements Used: Elements Used:

1) CCTV information1) CCTV information2) Defect Scoring System2) Defect Scoring System3) GIS Database Software3) GIS Database Software4) Sanitary Sewer Overflow (SSO) history4) Sanitary Sewer Overflow (SSO) history5) Engineering analysis5) Engineering analysis

These components are combined to generate These components are combined to generate specific projects for problem lines.specific projects for problem lines.

Page 8: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Pipe Rating ProgramPipe Rating Program How Does the Process Work?How Does the Process Work?

1) A line segment is first cleaned and CCTV’d, as a part of MSD’s 1) A line segment is first cleaned and CCTV’d, as a part of MSD’s Preventative Maintenance Program. MSD is required to clean 10% Preventative Maintenance Program. MSD is required to clean 10% of our system each year, in accordance with our new collection of our system each year, in accordance with our new collection system permit.system permit.

MSD has CCTV’d over 32 basins totaling MSD has CCTV’d over 32 basins totaling *** 2,073,030 LF ( 43% of our total system *** *** 2,073,030 LF ( 43% of our total system ***

@ 900 miles+) as of June 2003.@ 900 miles+) as of June 2003.

2) Each 2) Each structuralstructural defect noted in the video inspection is given a defect noted in the video inspection is given a defect score, in accordance with MSD’s standardized scoring defect score, in accordance with MSD’s standardized scoring system. Defects are then embedded within the GIS database, system. Defects are then embedded within the GIS database, with appropriate scores attached.with appropriate scores attached.

Page 9: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

HAND-OUTHAND-OUT

Page 10: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

MSD Structural Defect ScoresMSD Structural Defect Scores

CodeCode DescriptionDescription Score Score

CCCC Circumferential CrackCircumferential Crack 2020 CLCL Longitudinal CrackLongitudinal Crack 2020 CMCM Multiple CracksMultiple Cracks 3030 COHCOH Corrosion HeavyCorrosion Heavy 5050 COLCOL Corrosion LightCorrosion Light 2020 COMCOM Corrosion MediumCorrosion Medium 3030 DD Deformed SewerDeformed Sewer 6565 FCFC Circumferential Fracture Circumferential Fracture 4040 FLFL Longitudinal FractureLongitudinal Fracture 4040 FMFM Multiple FracturesMultiple Fractures 6060 HLHL Hole LargeHole Large 5050 HPHP Hole PatchedHole Patched 55 HSHS Hole SmallHole Small 2525 JDLJDL Joint Displaced LargeJoint Displaced Large 3030 JDMJDM Joint Displaced MediumJoint Displaced Medium 55 OJLOJL Open Joint LargeOpen Joint Large 3030 OJMOJM Open Joint MediumOpen Joint Medium 1010 XX Collapsed PipeCollapsed Pipe 100100

These scores are based on MSD’s standardized These scores are based on MSD’s standardized SewerSewerCondition Classification ManualCondition Classification Manual.. Scores are weighted Scores are weightedAccording to MSD priorities.According to MSD priorities.

Page 11: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Pipe Rating ProgramPipe Rating Program How Does the Process Work? (cont’d)How Does the Process Work? (cont’d)

3) Upon quantifying all 3) Upon quantifying all structuralstructural defects within a defects within a pipe segment, three defect ratings are generated pipe segment, three defect ratings are generated in our GIS: in our GIS:

I) Peak Defect RatingI) Peak Defect Rating II) Mean Defect RatingII) Mean Defect Rating III) Mean Pipeline RatingIII) Mean Pipeline Rating

Also, a fourth component is added for prior overflow Also, a fourth component is added for prior overflow history:history:

IV) SSO RatingIV) SSO Rating

Page 12: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

HAND-OUTHAND-OUT

Page 13: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Peak DefectMean DefectMean PipelineSSO's

RATING

MAP COLOR CODE RATING RATING RATING

Pink < 2.0000 1 < 2.00000 1 0.01063 0.50000 1 1 5

Peach 2.00001 15.00000 2 2.00001 6.00000 2 0.50001 0.90000 2 2 6

15.00001 30.00000 3 6.00001 11.00000 3 0.90001 1.70000 3 3 7

Red 30.00001 50.00000 4 11.00001 17.00000 4 1.70001 3.00000 4 4 8

Burnt 50.00001 100.00000 5 17.00001 100.00000 5 3.00001 9.26471 5 5 9

SSO's RATING

The number of SSO's that have occurred on a pipe segment (MH to MH).

The associated pipe rating value assigned to the defect score or SSO count.

Example: A given segment of pipe has a number of defects resulting in scores within the above shaded ranges (as scored by the CCTV inspection). The pipe has also had one SSO per Work Order History, therefore the Pipe Rating of this segment is : 3+2+2+5=12

The total sum of defects score divided by the number of defects.

NOTE: The defect scores come from the CCTV inspection of each line segment. Each defect found (an offset joint for example) is assigned a value, based on severity, from MSD's standard scoring system.

Highest score in any specified segment of pipe.

PEAK DEFECT MEAN DEFECT MEAN PIPELINE

The total sum of defects score divided by the length of the pipe segment.

Page 14: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Pipe Rating ProgramPipe Rating Program

Then What?Then What?

This pipe rating is then used to flag the “worst-of-the-worst” This pipe rating is then used to flag the “worst-of-the-worst” pipes within a rated basin. As the rating is done via the GIS pipes within a rated basin. As the rating is done via the GIS database, it occurs quickly.database, it occurs quickly.

Once flagged, an engineer will further review CCTV footage of Once flagged, an engineer will further review CCTV footage of the segment, then evaluate rehabilitation options for the the segment, then evaluate rehabilitation options for the highest (meaning worst) rated pipes, by reviewing videos of highest (meaning worst) rated pipes, by reviewing videos of each flagged segment then determining the most each flagged segment then determining the most economical rehabilitation methods.economical rehabilitation methods.

All CCTV information is stored digitally and can be quickly All CCTV information is stored digitally and can be quickly retrieved for further analysis. An additional benefit of this retrieved for further analysis. An additional benefit of this format is that maintenance personnel can also quickly format is that maintenance personnel can also quickly review CCTV information as needed.review CCTV information as needed.

Page 15: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

HAND-OUTHAND-OUT

Page 16: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Map Showing Map Showing Peak DefectPeak Defect Rating Rating

Page 17: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Map Showing Map Showing Mean DefectMean Defect Rating Rating

Page 18: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Map Showing Map Showing Mean Pipeline Mean Pipeline RatingRating

Page 19: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

Projects for FY04Projects for FY04

In the first year of this program, MSD has added five pipe-In the first year of this program, MSD has added five pipe-rated projects to the FY04 CIP:rated projects to the FY04 CIP:

Four are Point Repair type projects, while one is a Four are Point Repair type projects, while one is a traditional D&R due to the number of severe defects in traditional D&R due to the number of severe defects in several segments. Total estimated cost is $273,250.several segments. Total estimated cost is $273,250.

This program is organic and will re-prioritize over time as This program is organic and will re-prioritize over time as new data is received and other pipes are rated. There has new data is received and other pipes are rated. There has been a good correlation between pipes with high ratings been a good correlation between pipes with high ratings and real-time maintenance problems.and real-time maintenance problems.

To Date, over 737,536 LF of sewer has been rated by this To Date, over 737,536 LF of sewer has been rated by this program. Approx. 276,849 LF have been added to MSD’s 10 program. Approx. 276,849 LF have been added to MSD’s 10 year CIP.year CIP.

Page 20: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

5/27/2003 F. Roger Watson & J enny Konwinski

TOTAL PROJECT

LINEAL FEETPROJECT NAME

TOTAL ESTIMATED COST

Project No.

Ju

ly

Au

gu

st

Se

pte

mb

er

Oc

tob

er

No

ve

mb

er

De

ce

mb

er

Ja

nu

ary

Fe

bru

ary

Ma

rch

Ap

ril

Ma

y

Ju

ne

Ap

pro

x. L

.F.

1999186 10,850 Grassy Branch Int. $1,205,300 10,850 $1,205,300

2002055 9,000 Lake Louise Interceptor $1,144,200

2001170 5,500 Low er Ross Creek Int. $1,937,990 5,500 $1,937,990

2002056 6,380 Low er Smith Mill Creek Int. $1,463,000

2000122 5,300 Merrimon Ave. / Reed Creek Int. $2,445,889 2500.00 $1,153,721

2002057 2,000 Middle Beaverdam Creek Int. $513,000 500.00 $128,250

1999187 5,014 Tomahaw k Interceptor $1,028,650 5014.00

2001171 6,540 Upper Ross Creek Int. Phase I & 2 $599,075

2002058 8,547 Lake Julian WW Int. Ph. 1 $1,302,500 3200.00 $487,656

2002059 1,886 Reed Creek WW Int. (CDM #9) $427,700 500.00 $113,388

2002069 3,600 Shelburn Road WW (CDM #2) $498,250

2002061 1,055 Anvil Knitw ear $57,750 555.00 $57,750

2002157 3,203 Broadw ay @ Five Points $556,500 500.00 $86,872

2000125 1,820 Broadw ay Avenue $283,500 607.00 $94,552

2003021 2,169 Brucemont Place Ph. 2 $515,250

2003022 374 Depot Street @ Nasty Br. $126,000

2003023 700 Glenview Rd. $112,750 700.00 $112,750

2002029 2,530 Heyw ood Road $329,700 2530.00 $329,700

2000126 2,251 Hi-Alta Avenue $263,500 2251.00 $263,500

2001172 1,062 Hilliard-Short Coxe Ave. $150,900 1062.00 $150,900

2001175 4,845 Lakey Gap Road - Ph. I & 2 $271,250

2003024 1,000 Larchmont Rd. $119,850

2003025 450 Lenox Street $91,500

2003026 2,000 Nesbitt Drive $267,500

2001178 670 Roberts Street $131,500 670.00 $131,500

2002172 315 Russel Avenue $37,200 315.00 $37,200

2000130 B 25,587 Tomahaw k Basin Ph. 2 $2,540,000 6587.00 $2,540,000

2000130 C 13,900 Tomahaw k Basin Ph. 3 $1,399,250

1998200 3,875 Waters Road AMP $498,300

2000129 1,920 Weaverville Main Street $196,150 1920.00 $196,150

2003049 251 PRP - Lake Julian - Basin #32 $7,000 251.00 $7,000

2003050 150 PRP - Linw ood / Biltmore - Basin #34 $7,000 150.00 $7,000

2003051 1,324 PRP - Royal Pines - Basin #47 $188,000 500.00 $70,997

2003052 298 PRP - Skyland - Basin #48 $12,500 298.00 $12,500

2003053 322 PRP - W. Ash / Smith Mill - Basin #68 $58,750 322.00 $58,750

136,688 LF Total Costs - General Rehab - 10 Yr CIP $20,787,154 47,282 $9,183,426

2002062 Black Mtn. 575 Blue Ridge Road PSR $99,750

2003027 Asheville 250 Sw indale Avenue PSR $39,950 250 $39,950

2002063 Asheville 560 Winding Rd. PSR $87,800 370 $58,011

1,385 LF Total Costs - Private Rehab - 10 yr CIP $227,500 620 $97,961

2002213 Buncombe Co. 6,040 Long Shoals Rd. NCDOT $906,000

6,040 LF Total Costs - Reimbursement Projects - 10 Yr. CIP $906,000 0 $0

3,498 Misc. Emergency Point Repair Projects $262,350 2,098 $157,350

3,498 LF Total Costs - Treatment Plant - 10 Yr CIP $262,350 2,098 $157,350

Total Pipe Rated Generated General Projects 205,616 $25,702,000

Total Pipe Rated Generated Point Repair Proj. 70,873 $8,859,125

424,100 LF Total Cost - 10 Year CIP Projects $56,744,129 $50,000 $9,438,737

PRIVATE SEWER REHABILITATION

INTERCEPTOR AND INFLOW / INFILTRATION REHABILITATION PROJECTS

EMERGENCY POINT REPAIRS & DEVELOPER REHABILITATION PROJECTS

10 Year Capital Improvements Program Projects -- FY 2003 through FY 2013Date :

2003 10 Year CIP ListMetropolitan Sewerage District of Buncombe County, NC

2028 Riverside Drive, Asheville, NC 28804

North Carolina Department of Water Quality - Permit No. WQCS00004

FY 03/04

Total LF - 10 Year CIP Projects

Total LF - General Rehab - 10 Yr CIP

Total LF -Reimbursement Projects - !0 Year Total LF/ Costs - 10 Yr CIP FY 03/04

REIMBURSEMENT PROJECTS

10 Year CIP Projects

Total LF/ Costs - 10 Yr CIP FY 03/04

Total LF - Private Rehab - 10 Yr Total LF/ Costs - 10 Yr CIP FY 03/04

Total LF/ Costs - 10 Yr CIP FY 02/03Total LF - Treatment Plants - 10 Yr CIP

Prepared By:

Page 21: MSD Pipe Rating Program AQUA SALUBRIS. Pipe Rating Program What is it? What is it? A new, proactive program used to define and develop rehabilitation.

In May of 2003, MSD received an AMSA In May of 2003, MSD received an AMSA National Environmental Achievement Award National Environmental Achievement Award for the Pipe Rating Program. This program for the Pipe Rating Program. This program was developed solely with MSD in-house staff was developed solely with MSD in-house staff and off-the-shelf software.and off-the-shelf software.

MSD and Los Angeles were the only two MSD and Los Angeles were the only two utilities in the nation to receive this award.utilities in the nation to receive this award.