Top Banner
MSD II Week 6 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System
19

MSD II Week 6 Update

Dec 31, 2015

Download

Documents

MSD II Week 6 Update. P13265: Motorcycle Safety Lighting and Portable Electronics Charging System. Mike: Action Items Status. Lens Covers Incomplete Still waiting on shell Bike Wiring Harness/ Tx Box In Progress (almost complete) Test fit on bike, confirmed fit w/no permanent mods. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MSD II Week 6 Update

MSD II Week 6 UpdateP13265: Motorcycle Safety Lighting and Portable Electronics Charging System

Page 2: MSD II Week 6 Update

Mike: Action Items Status

• Lens Coverso Incompleteo Still waiting on shell

• Bike Wiring Harness/ Tx Boxo In Progress (almost complete)o Test fit on bike, confirmed fit w/no permanent mods.

• Wireless XBee Testo Completeo Captured waveforms from bike for all light sources

• Assist Tyler with Shello In Progress

Page 3: MSD II Week 6 Update

Mike: Action Items Status

Page 4: MSD II Week 6 Update

Mike: Next Steps for Week 7

• Finish board population w/TJ ~5 hrs

• Edit/ complete Tech Report ~ 10 Hours

• Assist Tyler with Shell~ 10 Hours

• Begin lens covers? ~5 hrs

Page 5: MSD II Week 6 Update

Tyler: Action Items Status

• Finish New Moldo In Progresso More, various setbacks, near completion

• Shell Assemblyo Incomplete:o Pending completion of new shell

• Poster Worko Incomplete:o All time this week was dedicated to getting the mold

done.

Page 6: MSD II Week 6 Update

Tyler: Next Steps for Week 7

• Shell/Backpack Assembly ~ 15 Hours

• Tech Paper ~ 4 Hours

• Complete Assembly Plan ~ 4 Hourso Will be completed as backpack is assembled

• Poster Work ~ 6 Hours

Page 7: MSD II Week 6 Update

Ben: Action Items Status

• Electronics boxo Finished but must be narrowed before gluing

• Quick Connecto Testing was performed this weekend, with the length of the male end

confirmed (along with the mounting of the female end).

Page 8: MSD II Week 6 Update

Ben: Next Steps for Week 7

• Reduce box width- 5 hourso Must reduce the width of the top piece, bottom

piece, both short sides, and redrill top in new corners

• Install standoffs- ~2 hourso Placement of all standoffs must be precise

• Tech papero I will write my section for Friday

Page 9: MSD II Week 6 Update

Eric: Action Item Status

• MSP430 Developmento Incomplete, In Progress, Complete:o Explain

• Board Build and Testingo Incomplete, In Progress, Complete:o Explain

Page 10: MSD II Week 6 Update

Eric: Next Steps for Week 7

• NS #1 ~ # Hourso Explain

• NS #2 ~ # Hourso Explain

• NS #3 ~ # Hourso Explain

Page 11: MSD II Week 6 Update

TJ: Action Items Status

• Populate PCBso In Progress:o Should have adapters today and will complete final

rework Friday afternoon

• Test XBee's in Lab and on Bikeo In Progress:o Dev Kit issues resolved with current limiting resistorso Bike signals captures and will be replicated in lab

• EDGE Updateo In Progresso Site cleanup and more formatting additions

Page 12: MSD II Week 6 Update

TJ: Next Steps for Week 7• Populate and Debug PCBs ~ 10 Hours

o Finish all rework and go through Test Plan

• XBee Lab Test ~ 2 Hourso Replicate motorcycle signals and ensure correct

signal transmission

• Assemble Tech Paper Rough Draft ~ 5 Hourso Put together segments and add additional

information

Page 13: MSD II Week 6 Update

Killian: Action Items Status

• Refine Sketcheso Completeo Sketches, done, scanned into photoshop and started

to apply gradient. Initial linework for illustrator renderings has begun, need to group sections and start to apply color/gradients

• Backpack Assemblyo In progresso Cut out a bunch of the cross sections, getting control

panel 3-D printed

• Poster Layouto In progresso Discussed gameplan with Tyler and Mike

Page 14: MSD II Week 6 Update
Page 15: MSD II Week 6 Update

https://www.facebook.com/photo.php?v=10201084405291756&ref=notif&notif_t=video_tag

Page 16: MSD II Week 6 Update

Killian: Next Steps for Week 7

• Complete Photoshop and Illustrator Renderings ~ 6 Hourso Just need to finish applying everything and possibly

do a few other sketches of inserting items (phone, laptop, tablet)

• Assist with Assembly ~ 7 Hourso Help with shell shaping and vacuum forming,

painting control panel

• Draw up Outlines of Poster, begin inserting text and graphics ~ 3 Hourso Hope to have a pretty set layout by next week

Page 17: MSD II Week 6 Update

Major Week 7 Action Items

Mike - Complete Tx Box Tyler - Backpack Assembly Ben - Finish Electronics box, quick connect Eric - TJ - Populate and Debug PCBs Killian - Renderings and Assembly

Page 18: MSD II Week 6 Update

Lessons Learned

• Mike

• Tylero Make sure to double check other peoples work

thoroughly if your work is dependent on theirs. It's not okay to assume the thought of every problem that could arise.

• Beno Double check offset calculations

Page 19: MSD II Week 6 Update

Lessons Learned cont.

• Eric

• TJo SMT population takes a long time and first revisions

of boards often need to be reworked and modified for prototyping applications

• Killiano You can print two items at once with 3-D printers, 3-

D printing quality is very limited in the innovation center