Detailed Energy Audit & Energy Efficiency Improvement and
Cost Redu
Energy Efficiency Improvement and Energy Cost Reduction in Tea
GardenCost Reduction in Tea Garden
Contact :MS Certification Services Pvt. Ltd.3/23, R.K.
Chatterjee Road, Kolkata-700 042Ph +91 33 2441 7656/7657Ph. +91-33-
2441 7656/7657 Mobile: 9433042739 / 9433098380E-mail:
[email protected]
[email protected]: www.mscertification.org
MS Certification Services Pvt. Ltd.
-
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
Our Mission
We are energy systems practitioners who always strive for the
sustainable development of our client firms by our specialized
participation of providing value added services in energy systems
participation of providing value added services in energy systems
development, cost reduction measures and productivity improvement
adding to the firms bottom line thereby increasing their financial
profitability, resource/wastages minimisation and ensuring
profitability, resource/wastages minimisation and ensuring
reduction of environment pollution thus making this earth a safe
place for the mankind.
MS Certification Services Pvt. Ltd.
-
Our Methodology :
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
MS CERTs multidisciplinary experts would visit the factory,
organise and conduct the entire electrical utilities and energy
system study in collaboration with and participation to the plant
Management and Engineers.
We would request the Management of the plant to identify a core
team from their plant personnel who would be associated with the MS
CERT team during the course of the study. This core team should
ideally have adequate experience and knowledge about the operations
and history of the major equipment installed in the facility. The
MS CERT team of energy professionals and this plant maintenance
engineers will form the AUDIT TEAM.
Energy audit will be carried out in two phases viz work through
audit and detail audit.
Phase-I: This will be the work through energy audit which
involves analysis of past data and visual inspection to carry out a
complete basic assessment of the energy management status at the
factory facilities to identify the focus areas of the
detailedmanagement status at the factory facilities to identify the
focus areas of the detailed energy audit. Phase-2: This will be the
detailed energy audit study which will involve instrumental
measurements, critical analysis and studies of the energy systems
and energy consuming equipment.
While carrying out the detail energy audit, MS CERT would also
review the existing equipment loading vis--vis thermal balance and
other relevant aspects that would have a bearing on the product
quality, energy consumption and wastages. Future expansion
programmes , if any, would be taken into account while making the
recommendations.
MS Certification Services Pvt. Ltd.
-
The scope of this proposed energy audit study would be:
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
Establishing present Specific Energy Consumption, SEC (kWh/MT of
product) and exploring opportunities toImprove SEC by improving
energy efficiency, establishing better control and curbing wasteful
usages in followingSystems. Inventories and study major energy
consuming systems and equipment in order of energy efficiency
improvement.
A) On Site Measurements & Trial on Electrical Distribution
System:
During energy audits of the selected units, the following
on-site measurements will be taken using portable energyaudit
instruments to assess the performance of the electrical system.
1. Demand mapping, power quality like harmonics, true RMS
voltage & current sine wave & power factor.2. Transformer
load & loss assessment 3. Loads of LT feeders of different
floors, unbalance voltage & current, neutral current, earth
leakage etc4. Assessment of motor loading in kW basis,
identification over size inefficient motors -drives, unbalance
voltage in
motor terminals 5. Performance test on DG set6. UPS wise load
assessment, harmonic distortion
A) On Site Measurements & Trial on Withering Trough,
Rolling, Boiler & Dryer System:1. Different measurements &
trial flow measurements, flue gas measurements, temperature, heat
mass balance & thereof identify scope of energy , g , p , y p
gy
savingsB) On Site Measurements & Trial on Illumination
System: LUX measurements, room dimension, lighting power density
& Lighting feeder.C) Compressed Air System: Free Air Delivery
test, Leak test, Load /unload power consumption etc. & thereof
identify scope of energy savingsD) Economic feasibility study and
design for investments necessary with associated pay back periods
via-a-vis benefits in respect to
implementation of optimal solutions. Recommend for employee
awareness programme, if needed.
After conducting the study, MS CERT would come out with specific
solutions on power systemAfter conducting the study, MS CERT would
come out with specific solutions on power system improvement and
identified energy conservation opportunities (ECOs). The ECOs would
be clearly segregated as
1. ECOs with immediate pay back2. ECOs with a pay back < 1
year3. ECOs with a pay back between 1 and 2 years.
MS Certification Services Pvt. Ltd.
-
MS CERTs Team and Strength
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
MS CERT has a multi-professional, highly qualified, long
experienced and trained team comprising of engineers,
professionally certified energy auditors, BEE (Govt. Of India) of
handling assignments in all sectors of energy usages.
It is fully equipped with required instruments tools and
tackles. The team used to effectively undertake energy audit
activitiesith th i ti fwith the given time frame.
The energy experts works in collaboration with and participation
of the clients professionals. During the energy audit study they
also shares the energy management concepts and procedures with
professionals of the client.
Time Frame:The on site historic and operational data collection,
instrumental measurements and comprehensive energy audit study will
take about 1 to 3 weeks time. The analysis of the study findings
would be done in MS CERTs Kolkata office. This is expected to take
about 3 weeks time.
The deliverables:A detailed draft report with recommendations
for improvements, would be presented to the client within 3 weeks
after completion of the on-site study. The final energy audit
report would be prepared addressing all queries, views and opinions
and would be submitted within 7 days after
having response from the client.
MS Certification Services Pvt. Ltd.
-
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
Process- Tea Making
MS Certification Services Pvt. Ltd.
-
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
Energy Auditor Measures Air Velocity and Flow Measurements at
Withering Troughs
MS Certification Services Pvt. Ltd.
-
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
Energy Auditor Measures Electrical Parameters
MS Certification Services Pvt. Ltd.
-
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
Our Associate Certified Energy Auditors, BEEgy ,
ANJAN MAJUMDAR
BEE REG. NO.-EA 0167
SATYAJIT HAZRA
BEE REG. NO.-EA 2141
SUPARNO RANJAN MAJUMDAR
BEE REG. NO.-EA 8973
MS Certification Services Pvt. Ltd.
-
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
ENERGY SAVING OPPORTUNITIES & MONETARY BENEFITSENERGY SAVING
OPPORTUNITIES & MONETARY BENEFITS
Electrical System a) Line Loss Reduction & Demand Reduction
By Load Point Power Factor Correction up to 30% b) Voltage &
Line Current Balancing 1 to 5% (Depending on unbalancing)) g g ( p
g g)c) Use of Energy Efficient Motor for Efficiency Improvement up
to 10%d) Use of Energy Efficient Starter 5 to 10%Withering Trough
System
a) Fan Efficiency Improvement up to 15%b) Application Renewable
Energy for Hot Air Generation up to 30%) P C t l & O ti i ti i
PLC 5 t 10%c) Process Control & Optimization using PLC 5 to
10%
Boiler System a) Efficiency Improvement By Maintaining Proper
Air/Fuel up to 20%b) Waste Heat Recovery from flue gas up to 15%c)
Thermal radiation loss minimization in boiler structure up to 10%d)
Steam loss minimization in pipe line valve & trap up to 5%d)
Steam loss minimization in pipe line, valve & trap up to 5%e)
Condensate Recovery up to 10% Dryer System
a) Efficiency Improvement By Energy Balance up to 10%b) Waste
Heat Recovery 2 to 5%c) Fan efficiency Improvement up to 30%
Lighting System
a) Lighting Efficacy Improvement up to 60%b) Lighting voltage
optimization up to 20% DG Set/Gas based Set- Waste Heat Recovery
15%
MS Certification Services Pvt. Ltd.
-
Detailed Energy Audit & Energy Efficiency Improvement and
Cost Reduction
Expected Benefits out of Energy Audit study and implementation
of recommended schemes:
Plant performance & productivity improvement,
Energy / Product cost reduction thereby organizations
profitability improvement,
Around 15 to 20% of energy saving is possible Around 15 to 20%
of energy saving is possible.
Plant / equipment life enhancement,
Adherence to Social commitment by reducing environmental
pollution,p ,
Saving precious and depleteable non-conventional energy
resources
Sustainable business mission.
MS Certification Services Pvt. Ltd.
ISONote