Top Banner
www.mrecm.com MAORUI STEEL SOLUTION PROVIDER
36

MRSS Presentation

Apr 15, 2017

Download

Documents

Leo Kong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MRSS Presentation

www.mrecm.com

MAORUI

STEEL SOLUTION PROVIDER

Page 2: MRSS Presentation

Yangzhou Maorui Steel Structure Engineering Co., Ltd is a private own company, Maorui Steel setup its headquarter in Yangzhou city and setup 15000 M2 fabrication base in Yancheng City in 2014, The company focus only on oversea market, Served various of clients and projects over 12 different countries. Quality & Schedule is always our priority during the project execution, We can comply with different fabrication standards, Such as EN1090, ASTM and AS/ZN. Meanwhile the company obtained key certification as an international steel fabricator, such as ISO 9001, ISO14001, EN1090,AN/ZN and ASTM.

COMPANY

Page 3: MRSS Presentation

LOCATION Maorui Steel headquarters located in historic Yangzhou city Jiangsu province, Which is 90 minutes away from Shanghai by bullet train and 90 minutes away from Nanjing by car. Maorui fabrication based located in Yancheng city Jiangsu province, Which is 90 minutes away from port city Lianyungang and 4 hours away from Shanghai by car. Airport around: Headquarters: Shanghai, Nanjing Fabrication: Lianyungang, Yancheng Port around: Lianyungang port: 90 minutes away Shanghai port: 4 hours away Binhuai port: 35 minutes away

Page 4: MRSS Presentation

CREDIT

Maorui has a low risk of default according to our previous project history, because of this the company have very good relations with the cooperated bank: Bank of China, and we obtained a “AAA” credit from Bank of China, with credit limit up to 2.6 million US dollars. With such limit, We can issue different bonds according to project requirements, Such as advance payment bond, Performance bond and Warranty Bond to secure all project’s quality, schedule, If any items been affected due to quality or schedule, Maorui will repair or replace the effected items at sight.

Page 5: MRSS Presentation

CAPABILITY In house structure and detailing engineers, We have our own fabrication shop and project mgmt team, Maorui obtained the ability of EPC in scope, Combined as following : Structure design and analysis

3D modeling

2D assembly and erection drawing

Project Procurement

Steel Fabrication & Surface Treatment

Project Execution Management

International Logistic

Site Erection Management

E P C

Page 6: MRSS Presentation

DIRECTION

With stable team, technique support and project management system. Maorui only focus on oversea markets, running 100% export business, The entire team understand the requirements of projects very well, Our main markets are: Oceania

South Asia Middle East

Africa

Latin America

Page 7: MRSS Presentation

INDUSTRY

Maorui is 100% export company, We only focus on oversea markets, Our main clients are located in South Asia, Oceania and mid east. We are passion to serve following industries: Industrial Manufacturing

Mining and Metal

Petrochemical

Commercial Building

Low/high rise building

Packing System

Power Plant

Page 8: MRSS Presentation

PRODUCT

Maorui can perform different type of structures with accurate machinery, We get the ability to serve wide range of projects in different industries. The structure type covers:

Hot rolled profiles ( H, C, L, □, ○ )

Build-up H sections

Build-up box items

Star columns/ Lattice column

Truss Sections / Conveyors

Pipe rack

Platforms , Handrails & Ladders

Plate work

Page 9: MRSS Presentation

CAPACITY With manpower of 140 people, around 110 shop workers, With average experience of 5 years in steel fabrication, All welders are certified under AWS D1.1, EN1090 and AS/NZ 1554.1. Blasting to Sa 2.5 or SP10 according to project specification. Fully automation equipments are performed on fabrication. Main Structure: 1000 Tons/Month Secondary Structure: 350 Tons/Month

Annual Capacity

8000-8200 Tons

Page 10: MRSS Presentation

SOFTWARE

In order to meet the requirements of our scope, which covers structure design, structure analysis, 3D modeling, connection design, project fabrication and management, We are using following software to serve clients: PKPM structure design & analysis

Tekla (Xsteel) version 17 or 19

Auto CAD 2014

Microsoft project center

Page 11: MRSS Presentation

EXTRA SERVICE

Through the whole project execution, Maorui offers professional service to our clients and project owners on every tiny details , which give great contribution to smooth the project. Fully English communication English drawings and documents

Free project conversion Management Record

Free representative office

Always ready to visit clients

Material Conversion Advantages:

1. Great saving on cost. 2. Reduce project schedule 3. Better quality control 4. Sequential delivery

Page 12: MRSS Presentation

PROJECT ENGINE

Maorui always take Inspection & Test Plan (ITP), Project Status Report (PSR) and Non-block communication as our three key engines to guide the project on all activities, We always stay close to client’s requirements and project specification. With ITP, We locked project execution according to project specification and client’s requirements. With PSR, We share all project information with client and keep transparent on everything. With non-block communication, we work with client as one real team to turn over the project.

Page 13: MRSS Presentation

EXECUTION

ITP We will make independent ITP for every project, Which include commercial,

engineering, technique, shop management, fabrication, flow management, QC inspection and logistics. Meanwhile if client have their own ITP template, We will adjusting accordingly. When project finish, MRB (manufacturing record book) will be filed and send to client.

Page 14: MRSS Presentation

EXECUTION PRS After contract signed, Internal kick offer meeting will be held to clarify the

project scope , schedule and specification, meanwhile a full time project manager will be assigned to liaise client and internal team, make sure all information flow timely. Official kick off meeting be held, either in client’s office or in our factory office, during project execution. We have three levels of communication to secure the project schedule: daily check off list, weekly project progress overview and monthly project conclusion. PRS report have to send to client twice per week and necessary actions need to take to make sure the forward on project.

Page 15: MRSS Presentation

EXECUTION

X-Order X-order is another way of saying engineering changes, which is

common happen during project execution, We have standard procedures to manage such activities, All departments will take the right actions to make sure such changes been executed accordingly. Due to such change, there will be schedule and cost impacted, so project manager need to confirm the cost and re-schedule the affected items with client or the representatives.

Client notify engineering change

to Maorui

Project manager confirm area and

volume

Notify engineering ,QC and fabrication

dept to hold

Project manager confirm the

affected schedule and cost

Notify admin dept to claim back old

drawings

Engineering / fabrication

separate the affected items

Engineering dept Re-issue drawing to

shop

Fabrication dept restart the affected

item fabrication

Project manager confirmed cost and

schedule

Page 16: MRSS Presentation

EXECUTION

QC Team Maorui has a skilled QC team who can perform most of the inspections

in house, Such as raw material receiving, cutting, fitting, welding, NDT ( VT, PT, MT, UT), painting and packing, Only RT are now outsourced to an independent third party. The team perform the inspection work and communication in a professional way. All of them are certified under various of inspection procedures, such as CWI, ASNT Level 2, NACE Level 2, etc. All of their inspection record will be a part of MRB and send to client.

Page 17: MRSS Presentation

EXECUTION

Tag System Maorui has two type of tags used during the project execution,

One is yellow tag and the other is red tag.

Yellow Tag is a warning on the work performance, while red tag is out notification ( Internal NCR), Like football game. Using of these two tags we can evaluate the workers performance which is connected with their monthly salary.

Warning Tag --- Actions : 1. Team lead take the record. 2. Give instruction of correcting the affected items at sight. 3. Evaluate worker’s monthly performance. 4. Performance connected with worker’s monthly salary. 5. Make training plan for often happen warning issues.

Out Tag --- Actions: 1. Team lead take the record 2. QC issue internal NCR 3. Fabrication team separate the affected items. 4. Fabrication team give correct plan proposal. 5. Technique team and client confirm the proposal. 6. Fabrication team take the correct action. 7. Worker receive a fin. 8. Worker monthly mark down. 9. Make training plan

Page 18: MRSS Presentation

EXECUTION

Material Sourcing We offer free project material conversion to

clients, while from time to time, certain regions only accept ASTM Grade A36.A572, EN S275,S355 or other standard material, via supply chain management, We establish good relationship with certain oversea mills or their China office, who can supply the required raw material with right quantity. Such as JFE Japan, JFE Shanghai, HYUNDAI Korea, HYUNDAI Shanghai, CSC Dragon Taiwan, Arcelormittal Luxembourg, Arcelormittal Shanghai. With lead time range from 45 to 60 days.

Page 19: MRSS Presentation

EXECUTION

Welding As an international steel fabricator, We can comply with different

standards on welding, Such as American standard AWS D1.1, European Standard EN 1090 and ISO 3834, Australia/ New Zealand standard AS/NZ 1554.1. Certified PQR, WPS and welders always ready to perform on different project.

Welding process can be performed in our shop: FCAW, GMAW, SAW, SMAW

Page 20: MRSS Presentation

EXECUTION

Trial Assembly We offer trial assembly on different type of structure,

especially on platform, plate work and certain critical connections. It is according to project requirements, Such action may happen before painting, HDG or after HDG, to ensure the every member can fit together and make sure onsite erection work go smoothly.

Page 21: MRSS Presentation

EXECUTION

Surface Treatment Maorui have in-house automatic and manual

blasting facility to remove rust from steel, Blast to Sa2.5 or SP 10, with 2000M2 space only for painting activity. We are using Juton, International, Hempel or required brand of paint. Paint system: Zinc Rich Epoxy Primer, Epoxy mid coat, polyurethane top coat, DFT 150 DFT. If requires hot dip galvanize (HDG), we have our qualified vender , HDG standard following ASTM A123, AS/NZ 4680 or EN ISO 1461.

Page 22: MRSS Presentation

EXECUTION

Packing As our project all go overseas, So we formed our international packing

method to fit container shipment and bulk shipment, which been proved success in the activity. Keep elements such as shipping rack, pearl wool, fumigation wood, rubber, nylon belt etc.

Page 23: MRSS Presentation

EXECUTION

Loading & Shipping Our logistic term normally under FCA,FOB,

CFR and CIF, Because of this, we worked out standard loading and shipping method for international shipment, Steel can be shipped by truck, 40 ft HQ container, 40 ft open top container , container rack or bulk shipment, We have the solution and experience for all type of loading and shipping.

Page 24: MRSS Presentation

PROJECT

NSRP Petrochemical Plant

Project Location: Vietnam Project Contractor: SK E & C Engineering: ASTM Code Detailing: ASTM Code Material: GB Q235B, Q345B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 720 Tons Total Weight: 7200 Tons

Page 25: MRSS Presentation

PROJECT

Hongkong Parking Garage

Project Location: Hongkong Project Contractor: SKANSKA Engineering: ASTM Code Detailing: ASTM Code Material: GB Q235B, Q345B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 1300 Tons

Page 26: MRSS Presentation

PROJECT

Tunisia Workshop

Project Location: Tunisia Project Contractor: PIRECO Engineering: EN Code Detailing: EN Code Material: GB Q235B, Q345B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 760 Tons

Page 27: MRSS Presentation

PROJECT

Amino Acid Factory

Project Location: Indonesia Project Contractor: Samsung Engineering: ASTM Code Detailing: ASTM Code Material: GB Q235B, Q345B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 1600 Tons

Page 28: MRSS Presentation

EXECUTOR

YAMAL LNG Plant

Project Location: Russia Project Contractor: Technip & JGC Engineering: EN Code Detailing: EN Code Material: EN S355NL,S355ML Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 31000 Tons

Page 29: MRSS Presentation

EXECUTOR

Point Wilson Project

Project Location: Australia Project Contractor: Brightwaters Engineering: AS/NZ Code Detailing: AS/NZ Code Material: GB Q235B, Q345B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 1300 Tons

Page 30: MRSS Presentation

EXECUTOR

Philippine Ateneo University

Project Location: Philippine Davao Project Contractor: HR construction Engineering: ASTM Code Detailing: ASTM Code Material: GB Q345B, Q235B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 5500 Tons

Page 31: MRSS Presentation

EXECUTOR

Singapore Aircraft Hanger

Project Location: Philippine Clark Project Contractor: ASI Engineering: ASTM Code Detailing: ASTM Code Material: GB Q235B,Q390B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 1500 Tons

Page 32: MRSS Presentation

EXECUTOR

Saipem Karimun Yard Expansion

Project Location: Indonesia Karimun Project Contractor: Saipem Engineering: GB Code Detailing: ASTM Code Material: GB Q235B, Q345B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 1300 Tons

Page 33: MRSS Presentation

EXECUTOR

TSK HRSG Power Plant

Project Location: Bangladesh Project Contractor: CMI Engineering: ASTM Code Detailing: ASTM Code Material: GB Q235B, Q345B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 500 Tons

Page 34: MRSS Presentation

EXECUTOR

GSI Refinery Plant

Project Location: Doha Qatar Project Contractor: Cadre Engineering: ASTM Code Detailing: ASTM Code Material: GB Q235B, Q345B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 1200 Tons

Page 35: MRSS Presentation

EXECUTOR

PNG Center

Project Location: PNG Project Contractor: Naima Group Engineering: ASTM Code Detailing: ASTM Code Material: GB Q235B, Q345B Scope: Detailing and Fabrication Structure: Main structure Secondary Structure Total Weight: 8300 Tons

Page 36: MRSS Presentation

Attitude Is Everything

THANK YOU