Top Banner
P.Kumar. 0091 9551663310 [email protected]
29

Mr. P Kumar

Dec 15, 2016

Download

Documents

truongkhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Mr. P Kumar

P.Kumar.

0091 9551663310 [email protected]

Page 2: Mr. P Kumar

Remembering Dr. APJ Kalam

Page 3: Mr. P Kumar

EPCM - CONCEPT E --- Engineering P L F / C U F

P --- Procurement PERFORMANCE

C --- Construction O & M

M --- Management

ROI , IRR , DSCR , Debt : Equity

Detailed Project Report – Financial Closure

Capacity Utilisation Factor(CUF) =Energy measured (kWh) /

(365*24*installed capacity of the plant).

Page 4: Mr. P Kumar

Major Components of EPCM Site Selection and Feasibility Analysis

Design [ DC/AC ] & Detailed Engineering - BOM

Signing of Legal / Power Purchase Agreements

Civil / Structural / Electrical Drawings

CEIG/TNEB Approvals

Procurement of Materials / Execution Strategy

Installation of the Plant within the Time Schedule

Synchronization and Handing over of plant

TNEB / MNRE / TEDA Inspection

Page 5: Mr. P Kumar

Site Selection & Feasibility

VAO / DTCP / Statutory Approvals

Dry and Non Agricultural land / PCB /

Location of Substation and Transmission Grid

Approachability of the land from main road

Right Of Way Issues

Availability of Resources – Water / Elecy / House

Work force mobilization

Shadow Free Land , Data of flood and storm 20 years

Soil Test Report , Contour Mapping

Page 6: Mr. P Kumar

Base Foundation For Structure

Page 7: Mr. P Kumar
Page 8: Mr. P Kumar

Design & Detailed Engineering DC design

Structure Design according to Wind Speed

PV Syst layout of the plant

BOM preparation

Procurement plan

Site Mobilization Plan

Installation Plan

Commissioning Action Plan

Page 9: Mr. P Kumar

Civil Work Heat & Rain HOT TEMP > 45 DEG

RAIN / STORM // Weeds / Bushes //

Design of all erection structure - Module Mounting, lighting post, lightning arrestor

Design of trenches, water supply, Drainage etc…

Page 10: Mr. P Kumar

Internal Roads & Land levelling

Page 11: Mr. P Kumar

Structural Work Ground Mounted / Roof top / Stand Alone

Wind Load calculations

Selection of Structural Material /Hot Dip Galvanising

Structural Analysis for the load

Sasonal Tilting / Auto Tilting structure

Construction, supply and erection the mounting structures in the land

Page 12: Mr. P Kumar

Panel Mounting Structure

Page 13: Mr. P Kumar

DC Design DC Design Calculation

Shadow free analysis

String Combiner Box / MJB

DC BOM preparation

Panel layout diagram

PV SYST generation report

Generation Guarantee file

Page 14: Mr. P Kumar

Skilled Manpower

Page 15: Mr. P Kumar

S C A D A

No Network

No Signal

No Telephone

Line

Controls like

Tripping /

Closing Risky

Remote

Monitoring

Page 16: Mr. P Kumar

Site Works 24 x 7

Page 17: Mr. P Kumar

AC Design Selection of Inverters , Central vs String

LT Cable Design

LT Panel

Transformer Design

HT Cable Design

HT Panel

Relay & Control Panel

Synchronization Check Panel

Revenue Metering & Power Evacuation

Page 18: Mr. P Kumar

Central Inverter Heat & Sound

Page 19: Mr. P Kumar

Power Evacuation Delay in TNEB Works

Construction Power

Bay & Space Availability

Transmission Line Routing

Protection & Tripping Systems

Page 20: Mr. P Kumar

HT Cable Lying

Page 21: Mr. P Kumar

Conventional – LT & HT panel

Page 22: Mr. P Kumar

Compact SS & Power Evacuation

Grid

Availability

Fluctuations

Frequency

Lower

Monthly

Shutdown

Tripping

Feeders

Rain , Wind

Page 23: Mr. P Kumar

1 MWp - Solar Plant in Tamil Nadu

23

Page 24: Mr. P Kumar

600 kWp-Roof Mounted

24

Page 25: Mr. P Kumar

On RCC Roof

MRF, Chennai – 15.84 KW

KTV Foods, Chennai – 523KW

Reed Relays, Hosur – 50 KW BGS School, Bangalore – 50 KW

Page 26: Mr. P Kumar

On Metal Sheet and Asbestos Sheet Roofs

KTV Foods, Chennai – 523KW

Naga Mills, Dindugul – 600KW

Braga Industries, Chennai – 20KW

KTV Foods, Chennai – 523KW

Page 27: Mr. P Kumar

Quote – Thomas Alwa Edison

Page 28: Mr. P Kumar

We Provide Professional Practical Solar Solution.

Thank You !

Pls Contact

Kumar -

9551663310

[email protected]

Page 29: Mr. P Kumar

Technical Credentials NAME DESCRIPTION

P. Kumar

Vice President Engineering & Project.

Professional Engineer with 24 years of experience in Power PlantEngineering & Project Execution, Management, Operation & Maintenance.

2 Years in Auroville heading Renewable Power Sector.

15 Years served in Govt. Of Oman in charge of Power Generation &Distribution for Ministry of Defense.

Successfully Commissioned India’s FIRST 1 MWp Solar PV Plant underJNNSM Scheme .

Concept to Commisionning of more than 15 MW Solar Plants.

Team comprising of Team leader, EHS, Electrical installation andcommissioning engineers

29