This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Doc# E166719 V.1.01 QS - 1
MDLN/MDSN Display Quickstart Guide
Electro Industries/GaugeTechThe Leader In Power Monitoring and Smart Grid SolutionsElectro Industries/GaugeTechThe Leader In Power Monitoring and Smart Grid Solutions
MDLN/MDSN Display Quickstart Guide Contents of Display Kit
Display Dimensions
7 6 5 4
3 2 1 (1) Display
(2) Rear Module
(3) Power Supply
(4) RS485 Serial Cable (10 ft)
Mounting Hardware:
(5) anti-rotation tee
(6) socket wrench
(7) installation nut, attached to
the back of the display
[1.18in]30mm3.43mm
0.13in
[0.2
6in]
6.7m
m
[0.63in]16.2mm
[0.60in]15.3mm
[1.24in]31.5mm
[2.85in]72.6mm
[3.84in]97.6mm
[2.1
6in]
55m
m
[3.1
4in]
80m
m
0.22
mm
0.86
in
MDSN Dimensions
Doc# E166719 V.1.01 QS - 2
MDLN/MDSN Display Quickstart Guide
Electro Industries/GaugeTechThe Leader In Power Monitoring and Smart Grid SolutionsElectro Industries/GaugeTechThe Leader In Power Monitoring and Smart Grid Solutions
[1.20in]30.6mm
[1.57in]40.1mm
[4.64in]118mm
[3 .8
6in]
98.1
mm
[ 0.6
7in]
17.2
mm
[0.37in]9.5mm
[6.41in]163mm
[4.63in]117.7mm
[3.4
8in]
88.4
mm
[5.0
9in]
129.
4mm
22.1
mm
0.87
in[0.60in]15.3mm
[0.69in]17.5mm
[1.29in]32.8mm
[1.18in]30mm3.43mm
0.13in
[0.2
6in]
6.7m
m
MDLN Dimensions
MDSN/MDLN Back Dimensions
Doc# E166719 V.1.01 QS - 3
MDLN/MDSN Display Quickstart Guide
Electro Industries/GaugeTechThe Leader In Power Monitoring and Smart Grid SolutionsElectro Industries/GaugeTechThe Leader In Power Monitoring and Smart Grid Solutions
Mechanical Installation: Mount the unit in an enclosure that provides a clean, dry, and controlled environment (IP65f enclosure or UL508 4x, if indoors). 1. Create a panel cutout based on the charts below, and install the display from the front. You can use the tee insert to stop display rotation when you apply torque during installation. With the tee option, the rotating torque is 6Nm/53.10 in-lb. Without the tee option the rotating torque is 2.5Nm/ 22.12 in-lb.
Without Tee
With Tee
2. Insert the display module
(along with the tee insert if
you are using it) into the
panel hole.
3. Screw the nut using the
socket wrench with a
torque between 1.2 and
2 Nm/10.62 and 17.70
in-lb.
4. Insert and push the rear
module until it locks into
place.
Unit A (mm) A (in.) B (mm) (1)
B (in.) (1)
B (mm) (2)
B (in.) (2)
MDSNMDLN
+022.50
-0.30
+00.88
-0.011.5 to 6
0.06 to 0.23
3 to 6 0.11 to 0.23
The Material of the panel(1) Steel sheet (2) Fiberglass (minimum GF30)
IMPORTANT! For further display details and safety considerations, refer to the MP200 Metering System Installation and Operation Manual.
NOTE: To remove the rear module, press the yellow button on the top of the display to unlock it and pull the rear module away from the display module.
Doc# E166719 V.1.01 QS - 4
MDLN/MDSN Display Quickstart Guide
Electro Industries/GaugeTechThe Leader In Power Monitoring and Smart Grid SolutionsElectro Industries/GaugeTechThe Leader In Power Monitoring and Smart Grid Solutions
Communicating with the MP200 Metering System: You can connect to the MP200 metering
system through either the Com 3 RS485 port or the optional Com 1 RJ45 Ethernet port. The display
automatically detects the connection in use. Note that both the MP200 unit and the display need to
have specific settings to enable communication between them. The display is pre-programmed to
communicate with the MP200 metering system’s default IP address and RS485 Com port settings.
NOTE: If you have changed the MP 200 unit’s IP address or if you receive a communication error
message, follow the instructions in Chapter 10 of the MP200 Metering System Installation and