C:\Documents and Settings\Administrator\Desktop\MOU\MOU-updated 25-01-12.doc 1
NAGPUR IMPROVEMENT TRUST
DEVELOPMENT OF “NAGPUR METROPOLITAN AREA”
MEMORANDUM OF UNDERSTANDING (MOU)
FOR
DEVELOPMENT OF LANDS IN “NAGPUR METROPOLITAN AREA”, NAGPUR
BY
“ PUBLIC PARTICIPATION METHOD ” This Memorandum of Understanding (MOU) is executed at Nagpur on this ________ day of ____2012.
BETWEEN
The Nagpur Improvement Trust, a statutory body constituted under the provisions
of Nagpur Improvement Trust Act, 1936, having office at Sadar, Nagpur,
hereinafter in short referred to as the “NIT” (Party No. 1), which expression shall,
unless repugnant to the context or meaning thereof, always mean and include the
said NIT, acting through its Superintending Engineer (Metro) as the PARTY NO.1.
Shri _________________________ Resident of __________ Tehsil _________
District _________ hereinafter referred to as the “owner” (Party No. 2), which
expression shall, unless repugnant to the context or meaning thereof, always mean
and include anyone delegated to act as such and all its duly authorized executives,
power of attorney, legal heirs etc of the PARTY NO.2.
AND WHEREAS, the Government of Maharashtra, by Notification No.TPS-
1899/1191/CR-80/99/UD-13 dated 23rd July 1999 has declared the “Nagpur
Metropolitan Area” which includes 9 Tehsils & 726 Villages therein.
AND WHEREAS, Government of Maharashtra by Notification
No.NIT/2202/4025/CR-493/2002/UD-26 dated. 24/12/2002 has extended the
jurisdiction of Nagpur Improvement Trust to the Nagpur Metropolitan Area (Area
mentioned in Notification dated 23rd July 1999)
C:\Documents and Settings\Administrator\Desktop\MOU\MOU-updated 25-01-12.doc 2
AND WHEREAS, the Government of Maharashtra has appointed Nagpur
Improvement Trust (NIT) as ‘Special Planning Authority’ for Nagpur Metropolitan
Area, vide Notification No. TPS-2409/2890/CR-356/09/UD-9, Dt. 31/8/2010 under
section 40 (1) of the MRTP Act, 1966. The said Notification has been published in
the Government Gazette dated 2/9/2010.
AND WHEREAS, the Party No. 1 vide Board Resolution No. 18/1085
dt.22/02/2010 has decided to develop the “Nagpur Metropolitan Area by “Public
Participation Method” using the modified & improved “Improvement Scheme”
mechanism under NIT Act 1936 & has approved the “Process for preparing
Improvement Schemes” and “Policies undertaking the preparation of
Improvement Schemes” and Memo of Understanding (MOU) for development
of lands in Nagpur Metropolitan Area by Public Participation Method” vide
B.R. No. 29/1100 dated 28/09/2011. All the documents are part of this MOU
and enclosed herewith.
AND WHEREAS the Party No. 1 have powers under section 58 of NIT Act-1936
empowering it to enter into an agreement with any person for the acquisition by
purchase, lease or exchange by the Trust from such person of any land (within the
area comprised in a sanctioned scheme).
AND WHEREAS, the Party No. 1 has decided to develop KHADKA – KIRMITI –
SHIVMADKA – PANJARI – SUMTHANA, Tah.Hingna, Dist.Nagpur
Improvement Scheme on ‘Public Participation Method’ for planned development
under provisions of NIT Act 1936 vide NIT Board Resolution No. 8/1099 dated
30/08/2011.
AND WHEREAS the Party No. 1 has ‘Declared the Intention’ to carry out the
survey of the lands of KHADKA – KIRMITI – SHIVMADKA – PANJARI –
SUMTHANA Improvement Scheme in Tah.Hingna, Dist.Nagpur U/S 54-55 of
N.I.T. Act, 1936 which is published in the local news papers
_____________________ dated ___________and __________.informing the land
owners about the lands included in the Improvement Scheme and the approved
Process, Policies and draft MOU.
C:\Documents and Settings\Administrator\Desktop\MOU\MOU-updated 25-01-12.doc 3
AND WHEREAS the Party No. 2 is the owner of land / plot bearing Khasra
Nos.__________ Mouza _____________ Tehsil _____________ District Nagpur
in Nagpur Metropolitan Area included in the KHADKA – KIRMITI –
SHIVMADKA – PANJARI – SUMTHANA Improvement Scheme Tah.Hingna
admeasuring …….. sq.mtr./Ha.
That the Party No. 2 has read and understood the Process, Policy Document &
MOU and for, for preparation and subsequent implementation of the KHADKA –
KIRMITI – SHIVMADKA – PANJARI – SUMTHANA Improvement Scheme in
Nagpur Metropolitan Area on Public Participation Method, Party No. 2 hereby
gives his consent and enters into MOU with Party No. 1 as per section 58 of the
NIT Act 1936, the terms & conditions of which are reduced herein as under.
Now therefore this MOU witnesseth as follows
i. That Party No. 2 is giving its consent to Party No. 1 to participate in the KHADKA
– KIRMITI – SHIVMADKA – PANJARI – SUMTHANA Improvement Scheme in
Tah.Hingna, Dist.Nagpur.
ii. That Party No. 2 will comply with and adhere to the provisions of the Process
defined and approved by Party No. 1 which is also referred to in Clause 5 and
attached with this MOU.
iii. That Party No. 2 hereby permits Party No. 1 to undertake the Total Station Survey
within its land plot/premises; prepare the Master Plan and undertake the
reconstitution of the land comprised in the aforesaid Khasara Nos. belonging to him
/ her as per the approved Policy Document.
iv. That Party No. 2 will hand over 40% (or as may be applicable %) of the land to
Party No. 1 by way of exchange in lieu of the services, provided by the Party No.1
and as also for the grant of permission for change of user of the land and
development of the land as per the Scheme of Party No.1.
C:\Documents and Settings\Administrator\Desktop\MOU\MOU-updated 25-01-12.doc 4
The Party No.2 hereby declares that the land under the MOU is free from all
encumbrances. After the final agreement the 40% of the total land of Party No.2 in
the Scheme or as may be applicable % shall vest with the Party No.1 exclusively
for the purposes of the said Scheme. The Party No.2 shall render all the necessary
assistance required for transferring the land in the name of Party No.1 in the
records of revenue and land record authorities. The Party No.1 will then be free to
dispose off the land vested in it as per its rules and regulations; thereafter Party
No.2 will have no title over the said land and Party No.2 voluntarily agree to
relinquish its title, rights, claims of whatsoever nature on the land vested in Party
No.1. Party No.2 shall not be entitled to claim any monetary compensation for the
same.
v. That Party No. 2 will pay the ‘Net Demand’ towards the cost of development of the
said Scheme as per the schedule given in Policy No. 10 after sanction of said
Improvement Scheme by the Govt. under Section 44 of N.I.T. Act, 1936.
vi. That the Party No. 1 shall construct the stipulated infrastructure in the manner as
stated in Policy No. 10.
vii. The development works in the Scheme shall be limited to the amount of
development charges (Net demand) deposited by the land owners of the Scheme
with the Party No.1.
viii. That the development in the final plot (F.P.) shall be permitted in the manner
prescribed in the Policy Document.
ix. That the Party No. 1 will facilitate the process of updating of land records after the
IS is sanctioned by the State Government and the cost of this process is included in
the cost of developing the IS.
x. That the Party No. 2 will not sell the land in his / her possession after signing of
this MOU till the signing of the Final Agreement. If he / she sells the land after
signing the Final Agreement then the conditions of this MOU and the Final
Agreement will be binding on the new land owner. Sale of land in case, before final
C:\Documents and Settings\Administrator\Desktop\MOU\MOU-updated 25-01-12.doc 5
agreement may be void and the Party No.1 shall be free to acquire the land and/or
recover compensation, damages for breach of the terms and conditions of MOU.
xi. That the conditions mentioned in this MOU between Party No. 1 and 2, will
Mutatis Mutandis be applicable to the final agreement.
xii. That, in case any additional clauses/ modifications is required to this MOU, Final
Agreement or the Policy Document, it shall be executed in due course by mutual
consent of both the parties.
xiii. That all the matters differences, questions disputes arising out of present MOU
shall be referred and adjudicated upon by the Chairman, Nagpur Improvement
Trust. Interpretation of the Clauses of this MOU, the IS process and the Policy
Document by the Chairman NIT shall be final and binding on Party No. 2.
xiv. Any typographic error or arithmetical error in the MOU, shall not render it invalid.
Such an error shall be rectified by mutual consent of both the Parties.
xv. In case of breach of prescribed terms & conditions by either of the parties the
decision of the Chairman Nagpur Improvement Trust shall be final and binding on
both the parties.
xvi. That if due to any unforeseen reason the said Improvement Scheme is not executed
then the decision taken by the Chairman, Nagpur Improvement Trust in this regard
shall prevail.
xvii. That, Party No. 1 reserves the right to cancel this MOU at any point of time without
giving any reason thereof.
xviii. That this MOU is made in duplicate on a stamp paper of Rs.100/-. Each party to
this MOU has retained one stamped copy each.
C:\Documents and Settings\Administrator\Desktop\MOU\MOU-updated 25-01-12.doc 6
IN WITNESS Thereof, the parties hereto have set their respective hands and have
signed the present MOU on the day, date, month and the year mentioned herein above in
presence of the following attesting witnesses.
PARTY NO. 1
_______________________________________
_______________________________________
_______________________________________
SIGNED, SEALED BY
Superintending Engineer (Metro),
Nagpur Improvement Trust, Nagpur.
PARTY NO. 2
Name : Shri/ Smt. _______________________________
Age : _________________________________________
Occ : _________________________________________
Address : ______________________________________
In the presence of
Witness 1
Name : _______________________________
Age : ________________________________
Occ : ________________________________
Address : _____________________________
Witness 2
Name : _______________________________
Age : ________________________________
Occ : ________________________________
Address : _____________________________
C:\Documents and Settings\Administrator\Desktop\MOU\Notice of Improvement Scheme-English.doc
Nagpur Improvement Trust Station Road, Sadar, Nagpur 440 001
Phone no. 2533202, P.B.X. 2531431, 2531432, Fax no 0712 2531079
PUBLIC NOTICE (under section 54 & 55 of Nagpur Improvement Trust Act, 1936)
Survey of area comprised in the proposed Khadka-Kirmiti-Shivmadka-Sumthana, Improvement Scheme in Tahsil Hingna of Nagpur District.
Notice is hereby given u/s 54 & 55 of the NIT Act, 1936.
1. Whereas under the provisions of the Nagpur Improvement Trust Act, 1936, Nagpur Improvement Trust (NIT) has passed Board Resolution NO. 8/1099 on dt. 30 August, 2011 and has resolved to prepare Improvement Scheme viz Khadka-Kirmiti-Shivmadka-Sumthana, Tah. Hingna, Distt. Nagpur in a public-participatory manner with the land owners in the area.
2. All land owners are hereby informed that under the powers conferred upon it u/s 54 & 55 of the NIT Act, 1936 the NIT shall enter the lands and shall carryout the inspections, survey, measurement, take levels, setout boundaries and do any other thing which ever is necessary for the purpose of the said survey of the lands comprised in the proposed Improvement Scheme.
3. All the land owners are requested to submit land ownership records, layouts, hissa details and suggestions if any, within a period of 45 days from the publication of this notice at the office of Superintendent Engineer (Metro), Nagpur Improvement Trust, Station road, Sadar, Nagpur-01.
4. The Improvement Scheme boundary covers part villages of Khadka-Kirmiti-Shivmadka-Sumthana in Hingna Tehsil of Nagpur District. It includes a total area of 9.72 sq.km. The Index Plan showing boundaries of the proposed Improvement Scheme and the survey nos. of lands covered theirin are kept for inspections of public at the following offices on all working days during office hours.
C:\Documents and Settings\Administrator\Desktop\MOU\Notice of Improvement Scheme-English.doc
1. Divisional Commissioner, Nagpur Divisions, Old Secretariat Building Civil Lines, Nagpur-440 001
2. Superintending Engineer (Metro), Nagpur Improvement Trust, Station Road, Sadar, Nagpur-440 001
3. Collector, Nagpur, Collector Office, Civil Lines, Nagpur-01
4. Deputy Director, Town Planning, Nagpur Division, Nagpur
5. Chief Executive Officer, Zilla Parishad, Civil Lines, Nagpur-440 001
6. Tahsildar, Hingna, Tahsil Hingna, Distt. Nagpur
5. The process & policies along with draft Memorandum of Understanding for the preparation and implementation of the proposed Improvement Schemes are also available for inspection at the above mentioned offices.
6. All land owners are requested to sign Memorandum of Understanding within a period of 60 days from the date of publication of this notice in the News Papers to the office of Superintending Engineer (Metro), Nagpur Improvement Trust, Station Road, Sadar, Nagpur-440 001
7. NIT shall commence a Total Station survey of the area within next 7 (Seven) days. All the land owners are hereby requested to kindly cooperate NIT to carryout the survey works.
8. The above information is also available on the Nagpur Improvement Trust website www.nitnagpur.org
Sd/-
(Pravin Darade) Chairman
Nagpur Improvement Trust
C:\Documents and Settings\Administrator\Desktop\MOU\Notice of Improvement Scheme-Marathi.doc - 16.1.12
Ukkxiwj lq/kkj izU;klUkkxiwj lq/kkj izU;klUkkxiwj lq/kkj izU;klUkkxiwj lq/kkj izU;kl LVs’ku jksM] lnj] ukxiwj&440001LVs’ku jksM] lnj] ukxiwj&440001LVs’ku jksM] lnj] ukxiwj&440001LVs’ku jksM] lnj] ukxiwj&440001----
nwj/ouh dz- 2533202] ih-ch-,Dl 2531431] 2531432] QWDl ua-07122531079
tkghj lwpuktkghj lwpuktkghj lwpuktkghj lwpuk ¼ukxiwj lq/kkj izU;kl vf/kfu;e 1936 P;k dye 54 o 55 varxZr½¼ukxiwj lq/kkj izU;kl vf/kfu;e 1936 P;k dye 54 o 55 varxZr½¼ukxiwj lq/kkj izU;kl vf/kfu;e 1936 P;k dye 54 o 55 varxZr½¼ukxiwj lq/kkj izU;kl vf/kfu;e 1936 P;k dye 54 o 55 varxZr½
[kMdk&fdjfeVh&f’koeMdk&lqeBk.kk lq/kkj ;kstuk] rgfl[kMdk&fdjfeVh&f’koeMdk&lqeBk.kk lq/kkj ;kstuk] rgfl[kMdk&fdjfeVh&f’koeMdk&lqeBk.kk lq/kkj ;kstuk] rgfl[kMdk&fdjfeVh&f’koeMdk&lqeBk.kk lq/kkj ;kstuk] rgfly fgax.kk] ftYgk ukxiwj y fgax.kk] ftYgk ukxiwj y fgax.kk] ftYgk ukxiwj y fgax.kk] ftYgk ukxiwj e/khy varxZr tkxkaps losZ{k.k dj.;kckcre/khy varxZr tkxkaps losZ{k.k dj.;kckcre/khy varxZr tkxkaps losZ{k.k dj.;kckcre/khy varxZr tkxkaps losZ{k.k dj.;kckcr----
uk-lq-iz- vf/kfu;e&1936 P;k dye 54 o 55 varxZr lwfpr dj.;kr ;srs dh]
1- T;kvFkhZ] ukxiwj lq/kkj izU;kl vf/kfu;e&1936 P;k izko/kkukvarxZr ukxiwj lq/kkj izU;kl fo’oLr eaMGkus Bjko dz- 8@1099 fn- 30 vkWxLV] 2011 vUo;s Bjko ikfjr d:u turk&lgHkkx rRokoj [kMdk&fdjfeVh&f’koeMdk&lqeBk.kk lq/kkj ;kstuk r;kj dj.;kps Bjfoys vkgs-
2- ;k ;kstusvarxZr vlysY;k loZ tehu ekydkauk ;kOnkjs dGfo.;kr ;srs dh] uk-lq-iz- vf/kfu;e&1936 P;k dye 54 o 55 P;k izkIr vf/kdkjkvarxZr ukxiwj lq/kkj izU;klOnkjs izLrkfor lq/kkj ;kstusdfjrk mDr tkxkaps fujh{k.k] losZ{k.k] ekstekis] ysOgy ?ks.ks] vk[k.kh dj.ks o losZ{k.kkdfjrk vU; vko’;d dkes dj.;kr ;s.kkj vkgsr-
3- loZ tehu ekydkauk fouarh dj.;kr ;srs dh] R;kauh R;kaP;k tfeuhaps lacaf/kr ekydhps nLrkost] vfHkU;kl fgLlk i=d o lwpuk vlY;kl ;k tkghj lwpusps fnukaadkiklwu 45 fnolkaps vkar v/kh{kd vfHk;ark ¼esVªks½] ukxiwj lq/kkj izU;kl] LVs’ku jksM] lnj] ukxiwj&1 ;kapsdMs lknj djkO;kr-
4- izLrkfor lq/kkj ;kstusps lhesvarxZr ukxiwj ftYg;krhy fgax.kk rgflyhrhy [kMdk&fdjfeVh&f’koeMdk&lqeBk.kk ;k xkokarhy Hkkx’k% tfeuhapk lekos’k vkgs- ;kr vankts 9-72 pkS- fd-eh-¼972 gsDVj½ {ks=QGkpk lekos’k vkgs- izLrkfor ;kstuspk lhekn’kZd udk’kk o R;kr lekfo”V gks.kk&;k tfeuhaps lOgsZ dzekad gs tursP;k fujh{k.kkdfjrk [kkyhy dk;kZy;kae/;s dk;kZy;hu fno’kh o dk;kZy;hu osGsr miyC/k jkgrhy-
C:\Documents and Settings\Administrator\Desktop\MOU\Notice of Improvement Scheme-Marathi.doc - 16.1.12
¼1½ foHkkxh; vk;qDr] ukxiwj foHkkx] tqus lfpoky; bekjr]
flOghy ykbZUl] ukxiwj & 440 001-
¼2½ v/kh{kd vfHk;ark ¼esVªks½] ukxiwj lq/kkj izU;kl] LVs’ku jksM] lnj ukxiwj& 440 001-
¼3½ ftYgkf/kdkjh] ukxiwj] ftYgkf/kdkjh dk;kZy;] flOghy ykbZUl] ukxiwj & 440 001-
¼4½ milapkyd] uxj jpuk] ukxiwj foHkkx] ukxiwj-&440001-
¼5½ eq[; dk;Zdkjh vf/kdkjh] ftYgk ifj”kn] flOghy ykbZUl] ukxiwj & 440 001-
¼6½ rgflynkj] fgax.kk] rgfly fgax.kk] ft- ukxiwj-
5- izLrkfor lq/kkj ;kstuk jkcfo.;kdfjrkph izfdz;k (Process) o /kksj.k (Policies) rlsp lkeatL; djkjukE;kps (MOU) izk:i fujh{k.kkdfjrk ojhy dk;kZy;akr miyC/k vkgsr-
6- loZ tehu ekydkauk fouarh dj.;kr ;srs dh] R;kauh mijksDr tkghj lwpuk orZekui=kr izfl/n >kY;kps fnukadkiklwu 60 fnolkaps vkar lkeatL; djkjukek (MOU) d:u v/kh{kd vfHk;ark ¼esVªks½] LVs’ku jksM] lnj] ukxiwj ;kapsdMs lknj djkok
7- ukxiwj lq/kkj izU;klOnkjs mDr {ks=kps VksVy LVs’ku lOgsZ{k.k iq<hy 7 fnolkaps dkyko/khr lq: dj.;kr ;sbZy- mDr losZ{k.k dj.;kdfjrk ukxiwj lq/kkj izU;klyk lgdk;Z djkos v’kh fouarh loZ tehu ekydkauk dj.;kr ;sr vkgs-
8- mDr ekfgrh ukxiwj lq/kkj izU;klP;k ladsrLFkG www.nitnagpur.org oj miyC/k vkgs-
Lok@&
¼izoh.k njkMs½ ¼izoh.k njkMs½ ¼izoh.k njkMs½ ¼izoh.k njkMs½ lHkkirh
ukxiwj lq/kkj izU;kl] ukxiwj-
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
Village: Kirmati
1 Vadhai Devrao Mahadev
Chatale Indubai Kisna
Santosh Mahadev Vadhai
Ramesh Mahadev Vadhai
Jangale Tai Lakshman
Shalik Mahadev Urfe
Yamuna Mahadev Urfe
Class-1 1 29500 29500
2 Government Govt 2 2100 2100
3 Dekate Mira Ramchandra
Dekate Vasudev Ramchandra
Sorte Kantabai Bansidhar
Dekate Ramesh Ramchandra
Pagote Nalini Ashok
Dekate Pramod Ramchandra
Parate Shubhangi Devaji
Bhushan Vinod Dekate
Mayuri Vonod Dekate
Shalini Vinod Dekate
Class-1 3 47000 47000
4 Government Govt 4 2600 2600
5 Gautre Parasram Bakaram Class-1 5/1 18200 38400
6 Agrawal Anil Rameshwarlalji
Agrawal Rajesh Mohanlalji
Agrwal Vinod Makhhanlalji
Class-1 5/2 20200
7 Gautre Doma Parashuram
Gautre Devnath Parashuram
Gautre Gunwant Parashuram
Class-1 6/1 18200 38400
8 Agrawal Anil Rameshwarlalji
Agrawal Rajesh Mohanlalji
Agrwal Vinod Makhhanlalji
Class-1 6/2 20200
9 Moharle Vaman Ajabrao
Moharle Naresh Ajabrao
Chaudhari Dinu Vitthalrao
Moharle Manda Ajabrao
Moharle Sangeeta Ajabrao
Moharle Yamubai Ajabrao
Class-2 7 8100 8100
DRAFT IMPROVEMENT SCHEME NO 7,NAGPUR
KIRMATI-PANJARI-SHIVMADKHA-SUMTHANA-KHADKA
TABLE 1 : AREA STATEMENT
000000HCP Design and Project Management, Ahmadabad 0000001
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
10 Dharmik Madhav Narayan
Dharmik Annaji Narayan
Dharmik Manohar Narayan
Vakade Anjana Ramkrishna
Parate Kausalya Marotrao
Vakade Shakuntala Tulshiram
Sorate Kamal Devidas
Parate Bebi Vasantrao
Dekate Rukhma maroti
Dharmik Janardan Yadnyeshwar
Dharmik Chandrakant Yadnyeshwar
Dharmik Sunil Yadnyeshwar
Dharmik Anusaya Yadnyeshwar
Dekate Nirmala Ramesh
Devikar Pramila Krishnarao
Nagpurkar Papita Kishor
Class-2 8 10100 10100
11 Vadhai Ramdas Urkuda
Aade Suresh Jagoji
Chatale Nanda Chindhuji
Shende Mangala Gajanan
Moharle Maya kavdu
Aade Sudhakar Jagoji
Class-2 9 7600 7600
12 Vadhai Yashvantrao Jairam Class-2 11 8800 8800
13 Vadhai Yashvanta Jairam Class-2 12 8800 8800
14 Vadhai Deepak Ramesh
Vadhai Satish Ramesh
Vadhai Vanita Ramesh
Vadhai Mira Ramesh
Vadhai Madhuri Ramesh
Vadhai Chhayabai Ramesh
Class-2 13 9700 9700
15 Vadhai Devrao Mahadev
Chatale Indubai Kisna
Santosh Mahadev Vadhai
Ramesh Mahadev Vadhai
Jangathe Tai Lakshman
Shalik Mahadev Urfe Vadagu
Yamuna Vadagu Urfe Mahadev
Class-2 14 14900 14900
16 Selwante Rambhau Daulat Class-2 15 14000 14000
17 Dekate Mira Ramchandra
Dekate Vasudev Ramchandra
Sorte Kantabai Bansidhar
Dekate Ramesh Ramchandra
Pagote Nalini Ashok
Dekate Pramod Ramchandra
Parate Shubhangi Devaji
Bhushan Vinod Dekate
Mayuri Vonod Dekate
Shalini Vinod Dekate
Class-2 16 14600 14600
18 From Grace Reality (India) Pvt. Ltd.-
Prashant Pralhadrao Mule
Class-1 17/A 8100 48800
000000HCP Design and Project Management, Ahmadabad 0000002
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
19 Vadhai Ramdas Urkuda
Aade Suresh Jagoji
Chatale Nanda Chindhuji
Shende Mangala Gajanan
Moharle Maya kavdu
Aade Sudhakar Jagoji
Class-2 17/B 40700
20 Multani Shyam Hari Class-1 18/1 15000 23500
21 Multani Shyam Hari Class-1 18/2 8500
22 Aaltankar Lakshman Varlu Class-2 19 17300 17300
23 Selaraka Rakesh Ashok
Agrawal Venugopal Chaturbhuj
Class-1 20/1 11300 40200
24 Aaltankar Suresh Aatmarao
Harinkhede Umashankar Tatuji
Class-1 20/2 14400
25 Selaraka Rakesh Ashok
Agrawal Venugopal Chaturbhuj
Class-1 20/3 14500
26 Aaltankar Lakshman Varlu Class-1 21 7300 7300
27 Sisodiya Deepak Gulabsingh Class-1 22/1 13300 24300
28 Sisodiya Deepak Gulabsingh Class-1 22/2 11000
29 Sisodiya Deepak Gulabsingh Class-1 23 24300 24300
30 Gupta Kailas Motilal
Gupta Lakshmikant Motilal
Gupta Dharmendra Motilal
Gupta Gangabai Motilal
Gupta Kanchan Kamaljit
Gupta Amit Rajendra
Gupta Mangalabai Rajendra
Class-2 24 23100 23100
31 Government Govt 25 1500 1500
32 Government Govt 26 900 900
33 Ratan Sagar Satyanarayan
Jaiswal Sanjay Anand
Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devraoji
Class-1 27/A 3500 29800
34 Ratan Sagar Satyanarayan
Jaiswal Sanjay Anand
Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devraoji
Class-1 27/B 26300
35 Agrawal Uma Gopal
Thombare Shobha Gajananrao
Dadhe Gopal Madhukarrao
Tijare Ravindra Shamrao
Class-1 28/1 13800 66400
36 Anurag Sultansingh Karnavat Class-1 28/1A 16200
37 Tamgadge Vitthalrao Kacharuji Class-1 28/2 18200
38 From Metro Vision Reality - Dhiraj
Mohan Jaiswal
Nikhilesh Ramesh Goyanka
Class-1 28/3 10000
39 Tamgadge Gautam Vitthalrao Class-1 28/4 8200
40 Meshram Rupa Rambhau Class-1 29/A 5500 22100
000000HCP Design and Project Management, Ahmadabad 0000003
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
41 Meshram Rupa Rambhau Class-2 29/B 16600
42 Nimje Abhay Ramesh Class-1 30 16200 16200
43 Jalan Shankarlal Bhagwatiprasad
Pithesaria Vijaykumar Ramavtar
Jalan Manikchand Bhagwatiprasad
Jalan Pawankumar Bhagwatiprasad
Class-1 31 23800 23800
44 Jalan Shankarlal Bhagwatiprasad
Pithesaria Vijaykumar Ramavtar
Jalan Manikchand Bhagwatiprasad
Jalan Pawankumar Bhagwatiprasad
Class-1 32/1 13800 23800
45 Jalan Shankarlal Bhagwatiprasad
Pithesaria Vijaykumar Ramavtar
Jalan Manikchand Bhagwatiprasad
Jalan Pawankumar Bhagwatiprasad
Class-1 32/2 10000
46 Shaikh Jabbar
Sardar Shete
Class-2 33 18800 18800
47 Bhoyar Jayant Manohar Class-2 34 11300 11300
48 Ganjurde Maroti Motiram
Chandekar Triveni Jagoba
Gavre Anjanabai Pundalik
Chandekar Sarswatabai Jagoba
Class-2 35/1 9000 75800
49 Ganjurde Naresh Maroti Class-2 35/2 22400
50 Ganjurde Prakash Maroti Class-2 35/3 22400
51 Ansingkar Vijay Dinkar Class-1 35/4 8100
52 Ansingkar Anjali Vijay Class-1 35/5 13900
53 Kambale Prabhakarrao Mahadevraoji Class-1 36/1 42800 63000
54 Thul Tarachand Dharamdas Class-1 36/2 20200
55 Pande Jayant Prabhakarao Class-1 41 17500 17500
56 Shambharkar Ramkrishna Arjun
Mendhe Shantabai Dashrath
Mendhe Sulochana Baliram
Dhabarde Jhibli Haridas
Class-2 42 32100 32100
57 Shambharkar Dnyaneshwar Baliram
Shambharkar Kausalyabai Baliram
Class-1 43 34200 34200
58 Rathi Govinda Gopaldasji Class-1 51 12100 12100
59 Shambharkar Amrut Upasrao Class-2 61 13300 13300
60 Bhagat Dheeraj Prabhuji
Bhagat Suraj Prabhuji
Class-1 62 10700 10700
61 Vadhai Ramdas Urkuda
Gurnule Bhaurao Namdeo
Aade Suresh Jagoji
Chatale Nanda Chindhuji
Shende Mangala Gajanan
Moharle Maya kavdu
Aade Sudhakar Jagoji
Class-2 63 28700 28700
62 Vadhai Shalik Vadgu Class-1 64 43000 43000
63 Shambharkar Ramkrishna Arjun Class-2 65 26200 26200
64 Narayan Anokhelal Nayak Class-1 69 19100 19100
000000HCP Design and Project Management, Ahmadabad 0000004
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
65 Vadhai Ramdas Urkuda
Aade Suresh Jagoji
Chatale Nanda Chindhuji
Shende Mangala Gajanan
Moharle Maya kavdu
Aade Sudhakar Jagoji
Class-1 75 50400 50400
66 Selwante Shantaram Daulat Class-2 76/1 14600 26600
67 Vadhai Santosh Vadaguji
Vadhai Deepak Ramesh
Vadhai Satish Ramesh
Vadhai Vanita Ramesh
Vadhai Mira Ramesh
Vadhai Madhuri Ramesh
Vadhai Chhayabai Ramesh
Class-2 76/2 12000
68 Narad Yadavrao Natthuji Class-2 77 13100 13100
69 Agrawal Anil Rameshwarlalji
Agrawal Rajesh Mohanlalji
Agrwal Madhusudan Makhhanlalji
Class-1 78 14600 14600
70 Shende Chhabutai Surendra Class-1 79/1 17500 27700
71 Shende Chhabutai Surendra Class-1 79/2 10200
72 Mundhda Sushil Shrivallabh Class-1 80/1 10800 20800
73 Mundhda Sushil Shrivallabh
Gandhi Sanjay Ambadas
Class-1 80/2 10000
74 Jilhare Manohar Kakaji
Jilhare Arun Kakaji
Jilhare Gunwanta Kakaji
Class-2 82/2 26300 38400
75 Patil Devkabai Shankarrao Class-1 84 14100 14100
76 Vadhai Shalik Vadgu Class-2 86 14000 14000
77 Suresh Anokhelal Nayak
Anil Ganeshlal Gaur
Anju Ramesh Gangotri
Guddi/Charusheela Vinod Gaur
Anand Narayan Nayak
Manoj Narayan Nayak
Chetan Narayan Nayak
Shital Narayan Nayak
Jamuna Narayan Nayak
Class-2 87 47600 47600
78 Vadhai Santosh Vadagu
Vadhai Shalik Vadagu
Vadhai Deepak Ramesh
Vadhai Satish Ramesh
Vadhai Vanita Ramesh
Vadhai Mira Ramesh
Vadhai Madhuri Ramesh
Vadhai Chhayabai Ramesh
Class-2 92 45700 45700
79 Vadhai Santosh Vadguji Class-2 93 27300 27300
80 Moharle Bhaurao Narayan Class-1 96/1 12100 24300
81 Yasim Jumma Shaikh
Mustak Jumma Shaikh
Class-1 100 25700 25700
000000HCP Design and Project Management, Ahmadabad 0000005
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
82 Thakur Mewalal Rameshwar
Thakur Rajendrasingh Mewalal
Thakur Rajeshsing Mewalal
Thakur Mishrilal Rameshwar
Class-1 101 10100 10100
83 Panjurne Shrikrishna Yadavrao
Panjurne Dnyaneshwar Yadavrao
Panjurne Ramesh Yadavrao
Panjurne Chandrakant Yadavrao
Bundhe Maya Babanrao
Class-1 102 14800 14800
84 From Rameshkumar Golchha & sons -
Golchha Rameshkumar Kesharichand
Class-1 103 14800 14800
85 Panjurne Nathhu Lakshman Class-2 109 16600 16600
86 Lonare Pundalik Nagorao Class-2 110 17200 17200
87 Shaikh Turab Rahemtulla
Shaikh Gulab Rahemtulla
Shaikh Vahab Rahemtulla
Shaikh Nabi Rahemtulla
Shaikh Mehboob Rahemtulla
Shaikh Habib Rahemtulla
Shaikh Jaitunbi Rahemtulla
Shaikh Salima Majjit
Class-1 111 21200 21200
88 Pande Jayant Prabhakarao Class-1 112/1 11700 23400
89 Vasake Narayan Vishwanath
Vasake Gangubai Vishwanath
Class-1 112/2 11700
90 Jilhare Manohar Kakaji
Jilhare Arun Kakaji
Class-1 114 23400 23400
91 Selvante Shantaram Daulat
Selvante Rambhau Daulat
Babhade Subhadra Gajanan
Dahake Bebibai Devidas
Class-1 115 11700 11700
92 Ganjurde Maroti Motiram
Chandekar Triveni Jagoba
Tapare Anjanabai Pundalik
Chandekar Sarswatabai Jagoba
Class-1 118/1 9600 59600
93 Ganjurde Sheshrao Maroti Class-2 118/2 25000
94 Ganjurde Arun Maroti Class-2 118/3 25000
95 Sathavane Rekha Prabhakarrao Class-1 128 16200 16200
96 Narad Bebi Yadorao Class-2 129/1 19200 27500
97 Narad Eknath Yadorao Class-2 129/2 8300
98 Government - Maharashtra - Jhudpi Govt 130 2500 2500
99 Narad Eknath Yadorao Class-2 131 7600 7600
100 Shende Chhabutai Surendra Class-1 132 7500 7500
000000HCP Design and Project Management, Ahmadabad 0000006
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
101 Vadhai Yashvant Jairam
Gurnule Jainabai Namdeo
Gurnule Yashodabai Namdeo
Gurnule Subhadra Ramaji
Gautre Kausalya Yadorao
Gautre Rajeram Anandrao
Gautre Lakshman Anandrao
Gautre Govindrao Anandrao
Gautre Sakubai Anandrao
Class-1 133 9000 9000
102 Kochar Anil Gyanchand
Selaraka Nita Navin
Class-1 134 14000 14000
103 Nimje Bebi Ramaji
Nimje Chandrakant Govindrao
Class-1 135 15100 15100
104 Government Govt 136 1200 1200
105 Mendhe Ramakant Govindrao Class-1 137 5000 5000
106 Jangathe Devrao Narayan Class-1 138 5000 5000
107 Shende Seema Kodadrao
Jangathe Sunita Motiram
Moharle Lalita Ravindra
Class-1 139 4900 4900
108 Aaltankar Santoshrao Vithoba Class-1 140 12200 12200
109 Aaltankar Santoshrao Vithoba Class-1 141 37800 37800
110 Firange Vishwanath Ramaji Class-1 142/1 34100 68300
111 Firange Usha Vishwanath Class-1 142/2 34200
112 Kochar Anil Gyanchand
Selaraka Mona Mayur
Class-1 143 8100 8100
113 Kochar Kanchan Anil
Selaraka Nita Navin
Class-1 144 8100 8100
114 Pande Seema Jayvantrao Class-1 145/1 20100 60600
115 Pande Padma Prabhakarrao Class-1 145/2 13100
116 Pande Jaiwantrao Prabhakarao
H.U.F.
Class-1 145/3 27400
117 Shirshikar Seema Govindrao Class-2 146 26600 26600
118 Kubde Gangaram Maroti Class-2 147/1 12100 26700
119 Lonbaile Vimal Madhukar
Lonbaile Pundlik Madhukar
Lonbaile Rekha Madhukar
Class-2 147/2 14600
120 Madankar Vasanta Nago
Mahakalkar Kausal Bhaurao
Surkar Kamala Nilkanth
Class-2 148 14500 14500
121 Divte Jageshwar Mahadevrao Class-1 149 14400 14400
122 Hatwar Rajesh Madhukarrao
Dhate Prakash Manoharrao
Aakre Vaishali Pavanrao
Sarode Meena Kishor
Dhate Harshali Prakash
Class-1 150 24200 24200
123 Sorte Mahadev Gariba Class-2 159/1 18700 37400
124 Sorte Suresh Mahadev Class-2 159/2 18700
125 From Grace Reality (India) Pvt. Ltd.-
Prashant Pralhadrao Mule
Class-1 161 101600 101600
000000HCP Design and Project Management, Ahmadabad 0000007
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
126 Mahendra Motilal Tavri
Ravindra Shamrao Vijare
Class-1 162/1 25000 107900
127 Indrakumar Ghisulal Kejdiwal
Hemlata Niranjan Devecha
Sachin Banvarilal Bagadiya
Ajit Madhavrao Gopghed
Madhav Shankarrao Kahalekar
Gopal Rameshchandra Agrawal
Vinayak Nilkanth Aaltankar
Class-1 162/2A 12200
128 Harikisan Hajarilal Gupta Class-1 162/1A 12600
129 Harikisan Hajarilal Gupta Class-1 162/2A 25800
130 Manish Vasantrao Tupkar Naik
Chand Wazir Shaikh
Class-1 162/2B 32300
131 Gurnule Jayvant Narayan
Gurnule Ashok Narayan
Gurnule Sheshrao Narayan
Gurnule Tikaram Nagorao
Class-1 163 19500 19500
132 From Nirmal Iron Trading Company
Pvt. Ltd. - Vinod Makhhanlal Agrawal
Rajesh Mohanlalji Agrawal
Anil Rameshwarlalji Agrawal
Class-1 164 16600 16600
133 From Nirmal Iron Trading Company
Pvt. Ltd. - Vinod Makhhanlal Agrawal
Rajesh Mohanlalji Agrawal
Anil Rameshwarlalji Agrawal
Class-1 165 22700 22700
134 Sampat Bhiva Shambharkar
Saku Sonba Bhagat
Pradip Baburao Shambharkar
Raju Bapurao Shambharkar
Kusumtai Dnyaneshwar Ganor
Ratnmala Chakrapal Bulkode
Shevantabai Bapurao Shambharkar
Prakash Hiraman Shambharkar
Ujjwala chhota Motghare
Hirabai Hiraman Shambharkar
Vilas Yashwant Shambharkar
Kailas Yashwant Shambharkar
Nalini Moreshwar Junghare
Nirmala Yashwant Shambharkar
Dashrath Shankar Kambale
Purushottam Shankar Kambale
Chhaya Govinda Ganvir
Antakala Narayan Dongare
Class-2 166 26600 26600
135 Aboli Vivek Pathak
Vivek Ashokrao Pathak
Class-1 167/1 11400 39400
136 Aboli Vivek Pathak
Vivek Ashokrao Pathak
Class-1 167/2 14000
137 Aboli Vivek Pathak
Vivek Ashokrao Pathak
Class-1 167/3 14000
138 Ramkrishna Ramaji Aambatkar Class-2 168/1 8100 16200
000000HCP Design and Project Management, Ahmadabad 0000008
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
139 Govinda Ramaji Aambatkar Class-1 168/2 8100
140 Prakash Ishwardas Balani Class-1 169/1 19200 48000
141 From Grace Reality (India) Pvt. Ltd.-
Prashant Pralhadrao Mule
From Mahalakshmi Builders - Deepak
Gulabsingh Sisodiya
Class-1 169/2 28800
142 Shakuntala Umashankar Gupta Class-1 170 9000 9000
143 Prakash Ishwardas Balani Class-1 171 20200 20200
144 Anil Gyanchand Kochar
Navin Amichandji Selaraka
Class-1 172 8800 8800
145 Government Govt 173 2600 2600
146 Dadhe Kamlesh Chandrashekhar Class-1 10 32700 32700
147 Dadhe Kamlesh Chandrashekhar Class-1 37 18200 18200
148 Dadhe Kamlesh Chandrashekhar Class-1 38 18200 18200
149 Dadhe Kamlesh Chandrashekhar Class-1 39 8700 8700
150 Dadhe Kamlesh Chandrashekhar Class-1 40 8800 8800
151 Tavri Mahendra Motilal
Chatterjee Sabyasachi Subrato
Tijare Ravindra Shyamrao
Class-1 49 44300 44300
152 Malhotra Rasmitsingh Ajitsingh
Dudhani Maheshkumar
Ghanshyamdas
Class-1 50 44200 44200
153 Malhotra Rasmitsingh Ajitsingh
Dudhani Maheshkumar
Ghanshyamdas
Class-1 52 44300 44300
000000HCP Design and Project Management, Ahmadabad 0000009
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
154 Dadhe Kamlesh Chandrashekhar Class-1 53 24900 24900
155 Dadhe Kamlesh Chandrashekhar Class-1 54 18000 18000
156 Dadhe Kamlesh Chandrashekhar Class-1 55 32400 32400
157 Dadhe Kamlesh Chandrashekhar Class-1 56 24900 24900
158 Dadhe Kamlesh Chandrashekhar Class-1 57 14400 14400
159 Pande Seema Jayvantrao Class-1 44 12100 12100
160 Pande Seema Jayvantrao Class-1 45 14000 14000
161 Pande Jayant Prabhakarao Class-1 46 14100 14100
162 Pande Jayant Prabhakarao Class-1 47 14000 14000
163 Pande Jayant Prabhakarao Class-1 48 19500 19500
164 Valke Harichandra Namdeo
Valke Vaman Namdeo
Valke Narendra Namdeo
Valke Nareshchandra Namdeo
Class-2 58 21900 21900
165 Valke Dnyaneshwar Tukaram
Thul Kisnabai Kartik
Thul Vacchhlabai Sopan
Patil Chandrabhagabai Tukaram
Kawade Narmada Ghanshyam
Kalamkar Asha Rameshwar
Class-2 59 21900 21900
166 Agrawal Sanjay Gaurishankar Class-1 60 28200 28200
167 Agrawal Sanjay Gaurishankar Class-1 66 16200 16200
168 Agrawal Sanjay Gaurishankar Class-1 67 16200 16200
169 Agrawal Kavita Sanjay Class-2 68 20600 20600
170 Agrawal Sanjay Gaurishankar Class-1 70 8200 8200
171 Agrawal Sanjay Gaurishankar Class-1 71 8100 8100
172 Agrawal Sanjay Gaurishankar Class-1 74 11200 11200
173 Vadhai Sudhakar Ramdas Class-1 83/1 17500 35100
174 Vadhai Prabhakar Ramdas Class-1 83/2 17600
175 Haji Sadik Haji Farukh Kacchhi (Bavla) Class-1 85 33300 33300
176 Jaiswal Ankit Sanjay
Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devrao
Class-1 72 14800 14800
177 Jaiswal Sanjay Anand
Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devrao
Class-1 73 11200 11200
178 Vasake Narayan Vishwanath
Vasake Dashrath Ramchandra
Moharle Chindhabai Kojiram
Class-2 116 11600 11600
179 Moharle Kamal Jaluramaji
Vasake Narayan Vishwanath
Class-2 117 11500 11500
180 Itankar Devrao Ramchandra Class-1 120/1 8200 24800
181 Itankar Prabhakar Ramchandra Class-1 120/2 16600
182 Itankar Prabhakar Ramchandra Class-1 121/1 8700 24900
183 Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devrao
Class-1 121/2 16200
184 Itankar Devrao Ramchandra Class-1 122 24900 24900
185 Sonkusre Vasanta Jagobaji Class-1 123/1 18200 71900
000000HCP Design and Project Management, Ahmadabad 00000010
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
186 Darade Kishor Somaji Class-1 123/2 19300
187 Itankar Namdeo Shamrao Class-2 123/3 17200
188 Itankar Ganesh Shamrao Class-2 123/4 17200
189 Gupta Aatmashankar Punnalal
Gupta Ganeshprasad Punnalal
Gupta Ramesh Punnalal
Gupta Mahesh Punnalal
Gupta Kalavantibai Punnalal
Gupta Govindprasad Lalaji
Class-1 124/1 11200 47300
190 Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devrao
Class-1 124/2 12100
191 Moharle Kavadu Narayan
Moharle Bhaurao Narayan
Moharle Vasanta Narayan
Class-1 124/3 12000
192 Moharle Kavadu Narayan
Moharle Bhaurao Narayan
Moharle Vasanta Narayan
Class-1 124/4 12000
193 Deshmukh Madhusudan
Mahadevrao
Aaltankar Umesh Sukhdevrao
Aahuja Sanjay Khubchand
Class-1 125 12900 12900
194 Bavne Dinesh Ramesh Class-1 126 11900 11900
195 Aaltankar Subhadrabai Ghanshyam
Aaltankar Vitthal Ghanshyam
Aaltankar Vijaya Ghanshyam
Aaltankar Anjaree Ghanshyam
Class-1 127 22600 22600
196 Lonbaile Hiraman Bhanudas
Lonbaile Raju Bhanudas
Gautre Sangita Ramaji
Lonbaile Kamlabai Bhanudas
Class-1 151/1 13700 26300
197 Narad Yadavrao Natthuji Class-2 151/2 12600
198 Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devrao
Class-1 152/1 14200 24300
199 Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devrao
Class-1 152/2 10100
200 Mendhe Chandrakant Govindrao
Itankar Lumeshwar Devrao
Class-1 153/1 12200 37200
201 Pohar Ratan Babulalji Class-1 153/2 25000
202 Badve Divakar Gendlal Class-1 154 25200 25200
203 Itankar Mahadev Tanbaji
Itankar Sunil Mahadev
Class-1 155/1 16200 48500
204 Itankar Prashant Mahadev
Itankar Kausalyabai Mahadev
Class-1 155/2 16200
205 Itankar Abhay Mahadev Class-1 155/3 16100
206 Ashtankar Jijabai Suresh
Ashtankar Aakash Suresh
A.P.K. Jijabai
Suresh Ashtankar
Class-1 156/1 20000 32400
207 Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devrao
Class-1 156/2 12400
000000HCP Design and Project Management, Ahmadabad 00000011
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
208 Chadhha Gulshankumar Madanlal
Itankar Lumeshwar Devrao
Class-1 157 13000 13000
209 Shetya Daddha Gulab
Shetya Jabbar Gulab
Shetya Mustafa Gulab
Shetya Saibaj Gulab
Shetya Nagina Gulab
Class-1 158 13000 13000
210 Chadhha Tilakraj Indrajit
Itankar Lumeshwar Devrao
Class-1 160 12200 12200
211 From Karishma Developers Pvt. Ltd -
Rohinton Jehangir Batliwala
Class-1 81 24300 24300
212 From Karishma Developers Pvt. Ltd -
Rohinton Jehangir Batliwala
Class-1 82/1 12100
213 From Karishma Developers Pvt. Ltd -
Rohinton Jehangir Batliwala
Class-1 88 32100 32100
214 From Karishma Developers Pvt. Ltd -
Rohinton Jehangir Batliwala
Class-1 89 7500 7500
215 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 90 11500 11500
216 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 91 32000 32000
217 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 94 16200 16200
218 From Riverstone Developers Pvt. Ltd. -
Rohinton Batliwala Da. Jehangir
Batliwala
Class-1 95/1 20200 63800
219 From Riverstone Developers Pvt. Ltd. -
Rohinton Jehangir Batliwala
Class-1 95/2 11200
220 From Riverstone Developers Pvt. Ltd. -
Rohinton Jehangir Batliwala
Class-1 95/3 13100
221 From Riverstone Developers Pvt. Ltd. -
Rohinton Jehangir Batliwala
Class-1 95/4 9200
222 From Riverstone Developers Pvt. Ltd. -
Rohinton Jehangir Batliwala
Class-1 95/5 10100
223 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 96/2 12200
224 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 97 13400 13400
225 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 98/1 8100 16200
226 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 98/2 8100
227 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 99 11800 11800
228 From Karishma Developers -
Rohinton Jehangir Batliwala
Class-1 113/1 13500 40300
229 From Karishma Developers -
Rohinton Jehangir Batliwala
Class-1 113/2 26800
000000HCP Design and Project Management, Ahmadabad 00000012
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
230 From Nihira Developers - Ujwala
Narendra Dhanvijay
From Vastu Consultant Developers -
Narendra Balkrishnaji Dhanvijay
Vitthal Govinda Sonule
Class-1 104 10000 10000
231 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 105 17100 17100
232 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 106 9600 9600
233 Panjurne Deepak Baliram Class-1 107 8100 8100
234 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 108/1 17200 68200
235 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 108/2 17000
236 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 108/3 17800
237 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 108/4 16200
238 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 119/1 16200 31900
239 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 119/2 15700
Village: Panjari
240 Bhagat Kartik Vitthal
Bhagat Himkat Vitthal
Bhagat Janabai Vitthal
Chikate Manorama Shalikram
Kambale Mandabai Dashrath
Jivane Sunita Baban
Modak Vanita Bhimrao
Meshram Kavita Dinesh
Class-2 189/1 24300 48600
241 Bhagat Shava Govinda Class-2 189/2 24300
242 Chaudhari Nirmala Baba Class-2 190 46400 46400
243 Chhaya Haribhau Padole Class-1 191/1 13000 26000
244 Chhaya Haribhau Padole Class-1 191/2 13000
245 Kawarati Deshi Shankar
Kawarati Dashrath Jivtya
Gangubai Jodhakh Sidam
Rukhmabai Jodhakh Sidam
Girjabai Salam
Class-2 192 8300 8300
246 Kawarati Deshi Shankar
Kawarati Dashrath Jivtya
Gangubai Jodhakh Sidam
Rukhmabai Jodhakh Sidam
Girjabai Salam
Class-2 193 20600 20600
000000HCP Design and Project Management, Ahmadabad 00000013
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
247 Pradeep Hemraj Dhanule
Mahesh Hemraj Dhanule
Gayatribai Lavkesh Sevke
Geetabai Hemraj Dhanule
Class-1 195/1 66700 86900
248 Pushpabai Chandrabhanji Chaudhary Class-1 195/2 20200
249 Chhaya Haribhau Padole Class-1 196 11600 11600
250 Gaikwad Dilip Tulashiramji Class-1 197/1 14400 28700
251 Gaikwad Dilip Tulashiramji Class-1 197/2 14300
252 From Riverstone Developers Pvt. Ltd. -
Rohinton Jehangir Batliwala
Class-1 194 55900 55900
Village: Shivmadkha
253 Gupta Sudeshchandra Babulalji Class-1 32 16700 16700
254 Devghare Radhabai Mahadev Class-1 33 8300 8300
255 Kumbhare Laxman Chintaman Class-1 34A/1 8300 34200
256 Kumbhare Chaituji Chintaman
Kumbhare Laxman Chintaman
Kumbhare Eknath Chintamn
Kumbhare Namdev Chintaman
Class-1 34B,34A 13000
257 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 34A/3 12900
258 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 35/1 8300 16600
259 Sonkusale Ishwar Chintaman Class-2 35/2 8300
260 Aadmane Purshottam Shamrao
Pramila Sharadrao Rahate
Class-1 36A 22500 22500
261 Gupta Subhashchandra Babulalji Class-1 38 12100 12100
262 Gupta Sudeshchandra Babulalji Class-1 39/1 18500 30600
263 Gupta Sudeshchandra Babulalji Class-1 39/2 12100
264 Gupta Anilkumar Kishorisharan Class-1 40 8100 8100
265 Gupta Sudeshchandra Babulalji Class-1 41 16200 16200
266 Sadhawane Homeshwar Gangaramji Class-1 42 14500 14500
267 Gupta Sudeshchandra Babulalji Class-1 43 17400 17400
268 From Ramnath Reality Pvt. Ltd.
Gupta Sudeshchandra Babulalji
Class-1 44 17300 17300
269 From Ramnath Reality Pvt. Ltd.
Gupta Sudeshchandra Babulalji
Class-1 45 12100 12100
270 From Ramnath Reality Pvt. Ltd.
Gupta Sudeshchandra Babulalji
Class-1 46/1 14100 22500
271 From Ramnath Reality Pvt. Ltd.
Gupta Sudeshchandra Babulalji
Class-1 46/2 8400
272 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 54 12100 12100
273 Aadmane Deepak Gulabrao Class-1 55/1 20300 69700
274 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 55/1A 33400
275 Aadmane Deepak Gulabrao Class-1 55/2 16000
276 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 56 10100 10100
000000HCP Design and Project Management, Ahmadabad 00000014
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
277 Kumbhare Chaituji Chintaman
Kumbhare Laxman Chintaman
Kumbhare Eknath Chintamn
Kumbhare Namdev Chintaman
Class-1 59 22300 22300
278 Barapatre Krishna Ramaji Class-2 60/B 4900 38600
279 Kamble Madhuri Yashwant Class-2 61/B 4800 4800
280 Ingale Krishna Baliram
Ingale Keshav Baliram
Class-1 67/1 12600 31600
281 Bebi urf Subhadra Dipak Sette
Lata Arun Jaiswal
Devendra Arun Jaiswal
Vijayendra Arun Jaiswal
Kanchan Vikas Jaiswal
Class-1 67/2 10700
282 Lata Arun Jaiswal
Devendra Arun Jaiswal
Vijayendra Arun Jaiswal
Kanchan Vilas Jaiswal
3 67/3 8300
283 Asarabi Shaikh Abbas
Khursheed Begum Rashid Shaikh
Hafija Vald Shaikh Abbas
Shobha Niranjan Dekate
Class-1 68 13000 13000
284 Pimpalkar Chandrakant Baburao
Pimpalkar Avinash Baburao
Pimpalkar Pramod Baburao
Pimpalkar Sharad Baburao
Pimpalkar Prakash Baburao
Class-2 69 24300 24300
285 Shobhabai Niranjan Dekate Class-2 70/1 10000 58600
286 Nimaje Muralidhar Vamanrao Class-1 70/2 16200
287 Shobhabai Niranjan Dekate Class-1 70/3 8100
288 Shobhabai Niranjan Dekate Class-1 70/4 16200
289 Muralidhar Vamanrao Nimaje Class-1 70/5 8100
290 Dhavale Kisan Doma Class-1 71 12100 12100
291 Rangari Satyabhamabai Rajaram Class-2 72 29900 29900
292 Rimatai Ghanshayam Lonare
Shital Ghanshayam Lonare
Rajat Ghanshayam Lonare
Naresh Mahadev Ashtankar
Tulasabai Chandrabhan Ashtankar
Subhash Chandrabhan Ashtankar
Dhomeshwar Chandrabhan
Ashtankar
Class-2 73 10500 10500
293 Aadmane Purshottam Shamrao
Pramila Sharadrao Rahate
Class-2 36B 40600 40600
294 Gupta Sudeshchandra Babulalji Class-1 37 16500 16500
295 Gupta Sudeshchandra Babulalji Class-1 47 45300 45300
296 Aadmane Narayan Govinda Class-1 48/1 19200 38500
297 Aadmane Vidyadhar Narayan Class-1 48/2 19300
298 Gupta Satishchandra Babulalji Class-1 49 12100 12100
299 Gupta Satishchandra Babulalji Class-1 50 16100 16100
300 Gupta Satishchandra Babulalji Class-1 51 16200 16200
000000HCP Design and Project Management, Ahmadabad 00000015
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
301 Ajit Dhananjay Dharmik
Rohini Rajesh Khapre
Class-1 52/2 12400 31400
302 Tadpillewar Vasudev Krishnarao
Tadpillewar Indubai Vamanrao
Punnajwar Lata Vinod
Komejwar Vijaya Ravi
Tadpillewar Madhuri Vamanrao
Tadpillewar Bharati Vamanrao
Pille Saraswati Ravi
Class-2 53 39200 39200
303 Gupta Sudeshchandra Babulalji Class-1 65 12100 12100
304 Ingale Krishna Baliram
Ingale Keshav Baliram
Class-1 66/1 28800 41600
305 Gupta Satishchandra Babulalji Class-1 66/2 12800
306 Rimatai Ghanshyam Lonare
Shital Ghanshyam Lonare
Rajat Ghanshyam Lonare
A.P.K. Rimatai Ghanshyam Lonare
Naresh Mahadev Ashtankar
Tulasabai Chandrabhan Ashtankar
Subhash Chandrabhan Ashtankar
Ghomeshwar Chandrabhan
Ashtankar
Class-2 74 14000 14000
307 Ninave Gajendra Pandhari
Ninave Nivrutti Ramaji
Class-2 75 29100 29100
308 Bhusari Maroti Mahadev Class-2 76 16200 16200
309 Gupta Sudeshchandra Babulalji Class-2 77 18300 18300
000000HCP Design and Project Management, Ahmadabad 00000016
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
310 Durge Narayan Mahadev
Durge Laxman Mahadev
Durge Harishchandra Shankar
Durge Satyafula Ramkrishna
Shivarkar Jaya Shankar
Karluke Kamal Ashok
Kisnabai Shankar Durge
Class-2 78 4200 4200
311 Durge Bapurao Rajeram
Durge Gulabrao Rajeram
Durge Ishwar Rajeram
Durge Ganpat Rajeram
Bhange Parvati Balwantrao
Durge Bayana Rajeram
Durge Haridas Suryabhan
Durge Lalita Suryabhan
Gupta Anilkumar Kishorisharan
Class-1 84 8000 8000
312 Gupta Subhashchandra Babulalji Class-1 85 15600 15600
313 Puran Kishor Mokha
Kishor Shivdanmal Mokha
Class-1 86/1 13200 17200
314 Puran Kishor Mokha
Kishor Shivdanmal Mokha
Class-1 86/2 4000
315 Abhijeet Madhusudan Sapkal Class-1 87 20500 20500
316 Gupta Sudeshchandra Babulalji Class-1 88 17300 17300
317 Bebi Shankarrao Sonule Class-2 89 8400 8400
318 Dekate Shankar Maroti
Dekate Vasanta Maroti
Dekate Sheshrao Maroti
Dekate Janabai Pandurang
Dekate Namdev Pandurang
Dekate Niranjan Pandurang
Dekate Subhash Pandurang
Mira Haribhau Barapatre
Indu Suresh Baraptre
Sonabai Rambhau Nandanwar
Subhadra Dashrath Prachand
Kamal Narayan Prachand
Tara Anandrao Lohgaonkar
Dekate Janabai Marotrao
Vinesh Narayan Dekate
Nitin Narayan Dekate
Varsha Ravi Parate
Milind Manoher Dekate
Amol Manoher Dekate
Jyoti Raju Khapkar
Indu Manohar Dekate
Class-2 94 32700 32700
319 Government - Maharashtra - Jhudpi Govt 95 2800 2800
320 Government - Maharashtra - Jhudpi Govt 96 500 500
321 Mohurale Vasanta Narayan
Pravin Vajravallabh Chandak
Nikunj Ghanshyam Chandak
Class-1 52/1 19000
000000HCP Design and Project Management, Ahmadabad 00000017
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
322 Gurnule Mainabai Narayan
Gurnule Jayantrao Narayan
Gurnule Sheshrao Narayan
Gurnule Ashok Narayan
Usha Manik Mandade
Shakun Sudhakar Lonbaile
Pushpa Prabhakar Nikude
Tikaram Nagorao Gurnule
Pushpa Nagorao Gurnule
From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 57 24600 24600
323 Dhavle Mahadev Domaji
From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 58/A 8900 13700
324 From Sadashiv Vyapar Pvt Ltd -
Golchha Rameshkumar Kesharichand
Class-1 58/B 4800
325 Barapatre Krishna Ramaji Class-1 60/A 33700
326 Kamble Madhuri Yashwant Class-1 61/A 11300
327 Moharale Nandkishor Vasanta
Chandrashekhar Narayan Bodakhe
Class-2 62 24700 24700
328 Mahure Subhash Ganpat Class-1 63 10000 10000
329 Mahure Nagorao Narayan
Mahure Anusaya V Ganpatrao
Mahure Gunvantrao Ganpatrao
Mahure Subhash Ganpatrao
Mahure Sudhakar Ganpatrao
Leelabai Jagnnath Ranade
Class-1 64 19000 19000
Village: Sumthana
330 130 NA NA
331 131 NA NA
332 129 NA NA
Village: Khadka
333 Yogesh Harmanbhai Patel
Jagdish Manibhai Manswata
Vivek Shankarrao Jadhav
Abhishek Surendra Golchha
Class-1 31 59300 59300
334 Baba Manik Meher NA 58/2 17000 75400
335 Sajjan Chaturbhuj Jain
Vinod Chaturbhuj Jain
Surendra Chaturbhuj Jain
Rajendra Premchand Jain
Class-1 58/3 20200
336 Sajjan Chaturbhuj Jain
Vinod Chaturbhuj Jain
Surendra Chaturbhuj Jain
Rajendra Premchand Jain
Class-1 58/4 10600
337 Deepak Dharampal Jain
Ruchika Girish Jain
Class-1 59 16000 16000
000000HCP Design and Project Management, Ahmadabad 00000018
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
338 Manju Sajjan Jain
Suman Vinod Jain
Shikha Surendra Jain
Sunita Rajendra Jain
Class-1 60 12100 12100
339 Sajjan Chaturbhuj Jain
Vinod Chaturbhuj Jain
Surendra Chaturbhuj Jain
Rajendra Premchand Jain
Class-1 62/1 19100 35300
340 Manju Sajjan Jain
Suman Vinod Jain
Shikha Surendra Jain
Sunita Rajendra Jain
Class-1 62/2 16200
341 Sajjan Chaturbhuj Jain
Vinod Chaturbhuj Jain
Surendra Chaturbhuj Jain
Rajendra Premchand Jain
Class-1 63 12300 12300
342 Sajjan Chaturbhuj Jain
Vinod Chaturbhuj Jain
Surendra Chaturbhuj Jain
Rajendra Premchand Jain
Class-1 64 12100 12100
343 Manju Sajjan Jain
Suman Vinod Jain
Shikha Surendra Jain
Sunita Rajendra Jain
Class-1 65/1 12100 30600
344 Manju Sajjan Jain
Suman Vinod Jain
Shikha Surendra Jain
Sunita Rajendra Jain
Class-1 65/2 18500
345 Sajjan Chaturbhuj Jain
Vinod Chaturbhuj Jain
Surendra Chaturbhuj Jain
Rajendra Premchand Jain
Class-1 66 39600 39600
346 Sajjan Chaturbhuj Jain
Vinod Chaturbhuj Jain
Surendra Chaturbhuj Jain
Rajendra Premchand Jain
Class-1 67 12500 12500
347 Sajjan Chaturbhuj Jain
Vinod Chaturbhuj Jain
Surendra Chaturbhuj Jain
Rajendra Premchand Jain
Class-1 68 18600 18600
348 Dekate Ganesh Shriram Class-1 70 19400 19400
349 Government - Maharashtra - Jhudpi Govt 73 20900 20900
000000HCP Design and Project Management, Ahmadabad 00000019
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
350 Mohd. Aarif Khan Class-1 96/1 17100 25400
351 Irshad Jumma Shaikh A.P.K.Irshad Class-1 96/2 8300
352 Government - Maharashtra - Jhudpi Govt 97 34400 34400
353 Dalvi Suryakant Narayan
Dalvi Pushpabai Rameshrao
Asha Ganesh Balapurkar
Class-2 120 3600 3600
354 Mehune Sitabai Mahadev
Mehune Narendra Mahadev
Class-1 121/1 8100 33300
355 Mak Developers Ltd Class-1 121/2 12100
356 Sushma Shyam Borele Class-1 121/3 13100
357 Chourasiya Shyamalata Omkant Class-1 122 4400 4400
358 Prakash Shamrao Nimne
Dnyandev Shyamrao Nimne
Chhaya Dhanraj Nikhare
Class-2 126 1600 1600
359 Ramesh Raghav Reddy Class-1 127 2400 2400
360 Madhu Lalitkumar Jain Class-1 132 5600 5600
361 Prakash Shamrao Nimne
Dnyandev Shyamrao Nimne
Chhaya Dhanraj Nikhare
Class-2 133 11600 11600
362 Nimje Sheshrao Mahadev
Nimje Ghanshyam Mahadev
Nimje Ramkrishna Mahadev
Nimje Shriram Mahadev
Nimje Muktabai Mahadev
Class-2 134 11300 11300
363 Sunil Vasant Pol Class-1 137 20800 20800
364 Sunil Vasant Pol Class-1 138/1 8300 33300
365 Sunil Vasant Pol Class-1 138/2 16900
366 Sunil Vasant Pol Class-1 138/3 8100
367 Kisan Ramchandra Mahalodhi Class-1 139/1 21000 42000
368 Dhanraj Ramchandra Mahalodhi Class-1 139/2 21000
369 Seema Jayant Pande Class-1 144 19300 19300
370 Sadruddin Karamali Punjani
Jafarali Kasam Bhai Gilani
Abdul Kareem Mohammad Ali Hirani
Nurallah Jafarbhai Ajani
Class-1 156/1
172/1
172/2B
713 50516
371 Laxman Ramchandra Mahalodhi Class-1 156/2 17000
372 Sadruddin Karamali Punjani
Jafarali Kasambhai Gilani
Abdul Kareem Mohammad Ali Hirani
Nurallah Jafarbhai Ajani
Class-1 172/2B
172/1
156/1=159
11741
373 Government - Maharashtra - Jhudpi Govt 163 21100 21100
374 Government - Maharashtra - Jhudpi Govt 164 18100 18100
375 Government - Maharashtra - Jhudpi Govt 165 8100 8100
376 Vishal Rameshkumar Agrawal Class-1 166/35 9447 9447
377 Ibrahim Ilahi Pathan
Rafiq Ilahi Pathan
Class-1 168 6000 6000
000000HCP Design and Project Management, Ahmadabad 00000020
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
378 From Tirupati Developers - Prashant
Manoharrao Bongirwar
Rahul Arunrao Aganlawar
Class-1 169/48 5142 5142
379 Pathan Ibrahim Ilahi
Pathan Safi Ilahi
Class-1 170 4200 4200
380 Tanesh Nathhu
Sumati J Kisan Sirsikar
Bayabai Nathhu Bisjar
Class-1 171 20200 20200
381 Sadruddin Karamali Punjani
Jafarali Kasam Bhai Gilani
Abdul Kareem Mohammad Ali Hirani
Nurallah Jafarbhai Ajani
Class-1 172/1
156/1
172/2B=158
5662
382 Arun Tekchand Behre
Jagdish Tekchand Behre
Class-1 172/2A 15400
383 Government - Aabadi Govt 174 20700 20700
384 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 69 59600 59600
385 From Riverstone Developers Pvt. Ltd. -
Rohinton Jehangir Batliwala
Class-1 71 53500 53500
386 From Riverstone Developers Pvt. Ltd. -
Rohinton Jehangir Batliwala
Class-1 72 43300 43300
387 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 82/1 9700 18000
388 From Town & Country Reality -
Rohinton Jehangir Batliwala
Class-1 83/1 8100 18000
389 Nitin Mahavir Sharma
Sachin Mahavir Sharma
Class-1 1/1 25200 34300
390 From Tarangan Developers Pvt. Ltd. -
Prashant Babasaheb Vasade
Class-1 1/2 9100
391 Ranvanve Venutai Motibaba Class-2 2 1200 1200
392 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 3/1 A 25200 49300
393 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 3/1 B 16000
394 Balvindarsingh Indrajitsingh Nair Class-1 3/2 8100
395 Government - Aabadi Govt 4 8600 8600
396 Seema Arjit Khan
Aalif Mustafa
Aarjat Khan
Islammulla Khan
Class-1 5 14800 14800
397 Aatif Mustafa Khan Class-1 6 5400 5400
398 Parag Mofatraj Munot Class-1 7 6300 6300
399 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 8 17200 17200
400 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 9 4200 4200
000000HCP Design and Project Management, Ahmadabad 00000021
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
401 Parag Mofatraj Munot Class-1 10 16100 16100
402 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 11 8000 8000
403 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 12 9900 9900
404 Aatif Mustafa Khan Class-1 13 10900 10900
405 Seema Arjit Khan
Aarjat Khan Islammulla
Suyash Mehrin Arjit Khan
Class-1 14 29600 29600
406 Seema Arjit Khan Class-1 15 10100 10100
407 Shrikant Balkrishnan Krisnamurti
Ganesh Vyankatramana Shankaran
Shankar Shekhar vald Picchai
Shankaran
Class-1 16 10100 10100
408 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 17 16100 16100
409 Roshan Pravinkumar Agrawal
Satish Banwarilal Gadodiya
Manoj Jagdish Modi
Class-1 18 19600 19600
410 Abhijeet Madhusudan Sapkal Class-2 19/1 10000 47100
411 Shantabai Dharma Shende
Anandrao Dharma Shende
Chandrabhan Dharma Shende
Pramila Bhaurao Shende
Ranjit Bhaurao Shende
Deepak Bhaurao Shende
Sachin Bhaurao Shende
Class-2 19/2 37100
412 Bhartee Tejram Beghaliya Class-2 20 16200 16200
413 Ramchandra Dhondaba Mohurle Class-2 21 29300 29300
414 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 22 10000 10000
415 Government - Maharashtra - Jhudpi Govt 23 3000 3000
416 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 24/1 28900 60500
417 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 24/2 15800
418 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 24/3 15800
419 Government - Maharashtra - Jhudpi Govt 25 26600 26600
420 Parag Mofatraj Munot Class-1 26 11400 11400
421 Parag Mofatraj Munot Class-1 27 11800 11800
422 Sitaram Sharma
Bijal Sharma
Class-1 28/1 11900 20000
423 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 28/2 8100
424 Parag Mofatraj Munot Class-1 29 16400 16400
425 Parag Mofatraj Munot Class-1 30 22400 22400
000000HCP Design and Project Management, Ahmadabad 00000022
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
426 Shantabai Harbaji Hetam
Gangadharrao Dodkuji Ramteke
Class-1 55 16200 16200
427 Government - Maharashtra - Jhudpi Govt 56 16300 16300
428 Shalini Vipul Gupta
Anita Atul Gupta
Class-1 57 10300 10300
429 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 58/1 27600
430 Shankar Ramaji Ninave Class-1 74/1 18800 67500
431 Dnyaneshwar Ramaji Ninave Class-1 74/2 18800
432 Ashok Ramaji Ninave Class-1 74/3 18800
433 Digambar Ramaji Ninave Class-1 74/4 11100
434 Sudhakar Jairam Sharma
Ishwar Jairam Sharma
Chandrashekhar Jairam Sharma
Class-1 75/1 24700 32800
435 Hanan Bashir Ladha Class-1 75/2 8100
436 Rateeram Bijal Sharma Class-1 76/1 25900 51700
437 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 76/2 25800
438 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 77 8200 8200
439 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 78 13000 13000
440 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 79 8600 8600
441 Durgabai Kisan Shivankar Class-1 80/1 11600 23700
442 Durgabai Kisan Shivankar Class-1 80/2 12100
443 Government - Maharashtra - Jhudpi Govt 81 14400 14400
444 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 82/2 8300
445 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 83/2 9900
446 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 84 16100 16100
447 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 85 11100 11100
448 Vipul Ramsharan Gupta
Atul Ramsharan Gupta
Class-1 86 9100 9100
449 Vipul Ramsharan Gupta
Ravi Radheshyam Khandelwar
Class-1 87 16100 16100
450 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 88 14500 14500
451 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 89 14500 14500
452 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 90 16100 16100
453 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 91 8100 8100
454 Government - Maharashtra - Jhudpi
Jungle
Govt 92 18500 18500
000000HCP Design and Project Management, Ahmadabad 00000023
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
455 Ragit Sitaram Shravan
Ragit Bhaurao Shravan
Ragit Pushanjali Pandurang
Class-2 93 43600 43600
456 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 94 10100 10100
457 Shaikh Ashfaq Jumma
Shaikh Mushtaq Jumma A.P.K.Irshad
Shaikh
Mohd. Aslam Mohd. Rafiq
Class-1 95/2 32300 64700
458 Shaikh Ashfaq Jumma
Shaikh Mushtaq Jumma A.P.K.Irshad
Shaikh
Mohd. Aslam Mohd. Rafiq
Class-1 95/1 32400
459 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 98 8500 8500
460 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 99 39500 39500
461 Govarkar Babarao Shravan
Govarkar Nandu Shravan
GovarkarRajendra Shravan
Govarkar Kisnabai Shravan
Manda Nilakanth Kakde
Class-2 100 6100 6100
462 Govarkar Babarao Shravan
Govarkar Nandu Shravan
GovarkarRajendra Shravan
Govarkar Kisnabai Shravan
Manda Nilakanth Kakde
Class-2 101 21400 21400
463 Gurpreet Real Estate & Construction Class-1 102 12100 12100
464 Gurpreet Real Estate & Construction
Pvt Ltd.
Class-1 103/1 10800 18000
465 Gunwanta Ganpat Mahure Class-1 103/2 7200
466 Gurpreet Real Estate & Construction
Pvt Ltd.
Class-1 104 19200 19200
467 Government - Maharashtra - Jhudpi Govt 105 24300 24300
468 Gurpreet Real Estate & Construction
Pvt Ltd.
Class-1 106 2600 2600
469 Rajesh Hiralal Gupta Class-1 107/1 12000 20100
470 Mahure Keshav Narayan Class-1 107/2 8100
471 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 108 10000 10000
472 Mahure Pundalik Narayan Class-1 109 20100 20100
473 Lekurvale Shantabai Chandrakant Class-1 110 20100 20100
474 From Ambar Orchards Pvt. Ltd.-
Shyam Nandkishor Agrawal
Class-1 111 16000 16000
475 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 112 16100 16100
476 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 113/1 22100 32100
477 From Azure Tree Enviro Farms
Pvt.Ltd. -Shyam Nandkishor Agrawal
Class-1 113/2 10000
000000HCP Design and Project Management, Ahmadabad 00000024
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
478 Shobha Manohar Gandhi
Durga Govind Bang
Devrao Hiralal Mhaisavar
Ravishankar Hiralal Mhaisavar
Mirabai Bhimrao Raghate
Rekhabai Kishor Machhle
Kundabai Hiralal Mhaisawar
Class-2 114 58600 58600
479 Padmesh Devdatta Gupta Class-1 115 9000 9000
480 Chourasiya Shyamalata Omkant Class-1 116/1 13600 27200
481 From Azure Tree Orchards Pvt.Ltd. -
Shyam Nandkishor Agrawal
Class-1 116/2 13600
482 Mak Developers Ltd Class-1 117/1 17400 27400
483 Mak Developers Ltd Class-1 117/2 10000
484 Gurpreet Real Estate & Construction Class-1 118 24300 24300
485 Gurpreet Real Estate & Construction Class-1 119 20200 20200
486 Sajjan Chaturbhuj Jain
Vinod Chaturbhuj Jain
Surendra Chaturbhuj Jain
Rajendra Premchand Jain
Class-1 173/1A 12100 43300
487 Vishal Rajeshkumar Agrawal Class-1 173/1B 23100
488 Subhashchandra Jwalaprasad Jham
Urmila Subhashchandra Jham
Class-1 173/2 8100
489 Shaikh Mahammad Shaikh Suleman Class-1 123 1000 1000
490 Ramesh Raghav Reddy Class-1 124 1000 1000
491 Manoj Natthuji Wankhede
Nayana Manoj Wankhede
Class-2 125 1400 1400
492 Chandrakant Bhaganwandas Wasani
Ashok Bhagawandas Wasani
Class-1 128 7200 7200
493 Hiralal Ramprasad Gupta Class-1 129 16000 16000
494 Ratnesh Prabhat Jaiswal
Rakesh Jawahar Jaiswal
Class-1 130 10800 10800
495 Madhu Lalitkumar Jain Class-1 131 18100 18100
496 Manoj Natthuji Wankhede
Nayana Manoj Wankhede
Class-1 135/1 18000 18000
497 Ashtankar Kavdu Pundalik Class-2 135/2 18200 18200
498 Madhu Lalitkumar Jain Class-1 136 20800 20800
499 Sunil Vasant Pol Class-1 145/1 19300 62800
500 Madhu Lalitkumar Jain Class-1 145/2 31400
501 Sunil Vasant Pol Class-1 145/3 12100
502 Madhu Lalitkumar Jain Class-1 146 15400 15400
503 Sunil Vasant Pol Class-1 147/1 31500 63500
504 Sunil Vasant Pol Class-1 147/2 32000
505 Madhu Lalitkumar Jain Class-1 148/1 42800 65000
506 Madhu Lalitkumar Jain Class-1 148/2 22200
507 Madhu Lalitkumar Jain Class-1 149 26800 26800
508 Ashtakar Sudhakar Vasudev Class-2 150 11300 11300
509 Madhu Lalitkumar Jain Class-1 151 18700 18700
000000HCP Design and Project Management, Ahmadabad 00000025
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
510 Shobhabai Hariramji Warade
Sumitrabai Vasudevrao Bawale
Kishor Yashawantrao Hatwar
Class-1 152 16200 16200
511 Sunil Vasant Pol Class-1 153 8100 8100
512 Madhu Lalitkumar Jain Class-1 154 8100 8100
513 Sunil Vasant Pol Class-1 155 33900 33900
514 Sunil Dulichand Hiranwar
Manoj Dulichand Hiranwar
Chandrakant Dulichand Hiranwar
Class-1 157 45300 45300
515 Government - Maharashtra - Jhudpi Govt 158 29600 29600
516 Dulichand Bhuraji Hiranwar Class-1 159 43900 43900
517 Government - Maharashtra - Jhudpi Govt 160 18900 18900
518 Basantibai Dulichand Hiranwar Class-1 161 8400 8400
519 Government - Maharashtra - Jhudpi Govt 162 2600 2600
520 Salim Sadruddin Punjani
Nurallah Sadruddin Geelani
Munish Abdul Panjawani
Class-1 140 11400 11400
521 Salim Sadruddin Punjani
Nurallah Sadruddin Geelani
Munish Abdul Panjawani
Class-1 141 9400 9400
522 Shobha Niranjan Dekate Class-1 142/1 11900 74900
523 Shobha Niranjan Dekate Class-1 142/2 10000
524 Shobha Niranjan Dekate Class-2 142/2A 11400
525 Shobha Niranjan Dekate Class-1 142/2B 11400
526 Dalvi Suryakant Narayan
Gaikwad Pushpabai Rameshrao
Asha Ganesh Balapurkar
Class-2 142/3 30200
527 Dalvi Suryakant Narayan
Gaikwad Pushpabai Rameshrao
Asha Ganesh Balapurkar
Class-2 143 59700 59700
Total Area (sq m) 8915905 8904605
000000HCP Design and Project Management, Ahmadabad 00000026
No. Name Tenure Khasra No.Area as per
7x12 (sq m)
7/12 Total
(sq m)
Sum of Hissas of
Col 5
1 2 3 4 5 6
A FINAL AREA OF PLOTS -11300
B AREA UNDER RIVER
C AREA UNDER NALIA ROAD
D AREA UNDER RING ROAD
E AREA UNDER EXISTING ROAD
F TOTAL SCHEME AREA (A+B+C+D+E)
G TOTAL SCHEME AREA AS PER
COMPUTER POLYGON
H DIFFERENCE (G-F)
I DIFF. BETWEEN TOTAL SCHEME
AREA AS PER SITE
000000HCP Design and Project Management, Ahmadabad 00000027
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\Final Policy Document for IS.doc 1
Final Policy Document for the Preparation of Improvement Schemes The Improvement Schemes (IS) will be prepared on the basis of following set of policies: Policy No. 1 Total Station Survey of the IS Area
• A topographical Total Station Survey of the entire area declared under the IS will be carried out using the total station survey equipment. The survey will capture the following details: o Existing roads (major and minor) with CD works, bridges etc. o Bund lines / fences / plot divisions o Levels o Existing structures o Power supply lines o Wells o Water courses
• A representative of Land Record Department (LRD) will remain present during the
total station survey. • In case of land plots with Hissas for which there are no map records with SLR /
Tehsildar, it is advisable that a representative of the land owner remains present at the time of the total station survey and indicates these on site to the survey team.
Policy No. 2 Base Map, Area Statements and Ownership Status in the IS Area
• The Base Map will be prepared by superimposing the ‘Resurvey Sheets’ at 1:1000 obtained from Dy. SLR on the physical survey.
• For each land plot the areas from the 7 x 12 documents obtained from the respective
Tehsildar / Revenue Department will be taken as final. • Upon superimposing the Resurvey Sheets on the physical survey of the IS area, the
onsite possession of the land plots will be obtained. The areas obtained from the 7 x 12 records and from the site will be compared. If the difference between 7 x 12 and site measurement is within 5%, the area in the 7 x 12 document will be treated as final. In case the discrepancies are too large (greater than 5%), these will be submitted to the LRD for resolution. LRD’s decision will be final and binding.
• In case lands, plots where there are hissas, the areas from the 7 x 12 documents will be
taken as final. As the physical demarcation of hissas is not available at any point, first a request will be made to the owners to submit these immediately to NIT, upon declaration of intention for survey of IS. In some instances the hissa divisions are demarcated on the site (by the way of fences/bunds), these will be measured during the Total Station Survey. Also during the Total Station Survey the land owners will be requested to be available on site to show their hissas; and an officer/representative of the LRD will be present during the total station survey. Here the hissas will be measured from the survey (fences / bund lines or as indicated by the owners) and areas will be reconciled with the 7 x 12 document. If the difference between 7 x 12 and site measurement is within 5%, the area in the 7 x 12 document will be treated as final. In
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\Final Policy Document for IS.doc 2
case the discrepancies are too large (greater than 5%), these will be submitted to the LRD for resolution. LRD’s decision will be final and binding.
• Both the Base Map and the Area Statement will be certified by the LRD. Policy No. 3 Plot Reconstitution and Deduction *
• Land will be appropriated from each land parcel and will be used to provide for roads, social amenities & utilities, open spaces, housing for weaker section and land bank for N.I.T. for commercial & residential purpose. A tentative break-up of the percentages for this is given in the table below. It may please be noted that, the % given in the table are indicative and for the purpose of guidance only. However, the actual % may vary for each individual IS depending on its viability.
Note: %s are for guidance and can change a bit depending how much land is available and the political
feasibility of the I.S. • All the land plots will be ‘reconstituted’ – that is each plot will be reshaped in a manner
appropriate for development and given access. The original khasra plot will be termed as ‘original plot or OP’ and the final reconstituted plot will be termed as ‘final plot or FP’. As far as possible the location of the final plot or FP will be retained close to its original location unless a specific planning concern warrants its shift. In case such a situation arises, NIT reserves the right to locate the plots.
• A hissa with a separate 7 x 12 document will be treated as an OP. In case the hissa
divisions are not available then tentatively the FP will be allocated within or in the vicinity of the OP.
• All original plots (OPs) with the same land owner and same rights / encumbrances stated
in the 7 x 12 document and lying within one revenue village will be consolidated, that is treated as OP and preferably be given a single consolidated FP.
Policy No. 4 Ownership Rights and Encumbrances
• All owners listed in the 7 x 12 documents will be treated as the legal and rightful owners of the land plot. Updations will be incorporated in the IS upon submission of updated 7 x 12 documents.
• All the rights on the revenue records that is the 7 x 12 document will be transferred to
the final reconstituted plot.
No. Detail % A Land returned to the Owner 60
B Land appropriation by NIT in the IS 40 1 Roads 15
2 Amenities and utilities 5 3 Open space/green space 7 4 Housing for weaker section 3 5 Land bank – Residential/Commercial 10
C Total 100
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\Final Policy Document for IS.doc 3
• Once the IS is sanctioned by the State Government, NIT will hand over the final plan
with the reconstituted plots to the LRD for mutation of the records. The Owners will receive a new 7 x 12 document for the FP in lieu of the OP which is the original khasra number held by him / her. The cost of this process will be included in the cost of developing the IS.
Policy No. 5(a) Applicable DCRs
• The provisions of Development Control Rules of R.P./B & C Class Municipal Councils and Nagpur City shall be applicable till the New Development Control Rules for the Metro Region comes into force.
• If the FP is greater than 0.4 ha in area, then the layout regulations will apply. The land
owner will apply to NIT for the approvals as per the applicable DCRs. The land owner will carry out internal development within the FP at his/her own cost as per the specifications of NIT.
• The land owner / FP owner will be responsible for obtaining all permissions and
requisite ‘No Objection Certificates’ required for the development of the Final Plot. • The land owner will submit layout development / building plans to NIT as per
applicable Development Control Rules till the New Development Control Regulations for the Metro Region come into force.
• The land owner will have to pay necessary charges as per the rules for the sanction of
building plans and commencing any construction activity on plots. • NIT will not sanction any layout plans / building plans till the landowner / developer pay
the full and final amount of the Net Demand.
Policy No. 5(b) Environmental Clearance and Provision of STPs • Environmental clearances applicable as per the Environment Protection Act, 1986 and
other prevailing law shall be necessary on the F.P. • No individual STPs will have to be provided by the FP owners as this will be a part of
the overall infrastructure in the Development Plan of Metro Region that will be implemented by NIT.
Policy No. 6(a) Type of Infrastructure Services to be Provided in the I.S.
• The following infrastructure services that will be provided by NIT in the IS Area: o Construction WBM & ashphalted Roads (asphalted) o Laying of Water Pipeline o Laying of Sewer line o Laying of Storm water drains
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\Final Policy Document for IS.doc 4
o Development of open spaces o Construction of Mini S.T.P.
• This infrastructure will not include the infrastructure within the FP of the land owner.
The land owner will be responsible for all the required infrastructure within his/ her FP as the prevalent norms stipulated in the prevalent DCRs, NIT and relevant applicable regulations.
• Regarding electrification the landowners have to pay the charges as demanded by
MSEDCL. 6(b) (I) Policy for Release of Plots
i) After the final agreement the land owner will have to get his/her layout plan approved on F.P. as per applicable DCR if the F.P. area exceeds 0.4 Ha.
ii) Land owner will have to obtain N.A. permission from competent authority of the
Revenue Department as per provisions of Maharashtra land Revenue Code, 1966.
iii) The land owner have to enter into development agreement with N.I.T. for layout
on F.P.
iv) The land owner will be entitled for release of 50% plots after the execution of development agreement. Remaining 50% plots shall be released in due course as per T & C of the agreement in proportion to development works in the layout.
(II) Group Housing Scheme Layouts
After execution of development agreement on F.P. of the Group Housing Scheme layout the N.I.T. will sanction the building plans regardless of the development of the layout. Initially 50% Flats/Tenaments shall be released for sale and remaining 50% Flats/Tenaments shall be released proportionate to development in the layout and subject to T & C of the development agreement.
(III) S.D. & Supervision Charges For the layout sanctioned on the F.P. area, nominal Security Deposit @ Rs.10,000/- per Acre only and nominal supervision charges @ Rs.5,000/- per Acre shall be payable by land owner at the time of development agreement of F.P.
Policy No. 7 Valuation of Land
• All original plots or OPs will be valued at the Govt. Ready Recknor rates. This will be called the ‘original plot (OP) value’ .
• Land compensation for the % of the land appropriated from the land owners will be
computed at ready reckoner rates.
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\Final Policy Document for IS.doc 5
Policy No. 8 Computing the Cost of Developing the IS, Increment in Land Value, Contribution and Net Demand
• As NIT will be implementing the Scheme and developing the infrastructure there will an increase in the land values. NIT will recover a part of this to finance the cost of developing this infrastructure and the IS in the form of ‘Net Demand’.
• The total ‘Costs of developing the I.S.’ will be estimated as follows :
1. Costs of developing the infrastructure listed in Policy No. 6 will be estimated. 2. Some amount of administrative costs for preparing and implementing the IS will be
considered. This will include the cost of mutating the final records by the LRD, Nagpur.
3. NIT will also have to compensate the land owners for the land appropriated for the purposes outlined in Policy No.3 Plot Reconstitution and Deduction. Hence the ‘Land Compensation’ to be paid to each land owner will be computed. The total compensation to be paid to the land owners will also be considered as an input to the cost of developing the IS.
• As NIT will effect infrastructure improvements in the IS area and undertake better
planning, there will be an increase in the land values. The increase in the land values of each of the FPs will be estimated and the total ‘Increment in the Land Value’ that will accrue to the land owner will be computed.
• Half of this increment will be appropriated by NIT as ‘Contribution’ towards the IS. • Next NIT will deduct the Land Compensation to be paid to each land owner from the
Contribution and compute the ‘Net Demand’ on each FP. • The net demand will depend on % of land appropriated and land value where the % of
land deducted is lower the Net Demand will be higher. Policy No.9 Payment of Net Demand
• The land owner will pay the ‘net demand’ to NIT. This can be as per the following instalment schedule:
No. Instalment Time 1 1st Instalment (25%) Along with signing of the Final Agreement and
approval of the IS by the State Government. 2 2nd Instalment (25%) At 6 months from the date of sanction by State
Government. 3 3rd Instalment (25%) At 9 months from the date of sanction by State
Government. 4 4th Instalment (20%) At 12 months from the date of sanction by State
Government. 5 5th and final Instalment
(5%) On issue of development permission by NIT.
Note :- The land owners are at liberty to pay amount of Net demand in one stroke.
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\Final Policy Document for IS.doc 6
• In case there is a delay by the land owners to pay the instalments, an interest at an annual rate of 15% will be charged.
• NIT shall not sanction any development on the final plot till the land owner has paid the
entire ‘Net Demand’. Policy No. 10 Construction of the Infrastructure by NIT
NIT shall commence the construction of roads within six months from the date of sanction of IS by the State Government. The remaining infrastructure will be constructed in a phased manner. Policy No. 11 Maintenance of the Infrastructure Created
NIT shall develop the above mentioned infrastructure and hand it over to the respective Local Authorities / Gram Panchayats for maintenance. The respective Local Authorities / Gram Panchayats will levy the maintenance charges as per their rules and regulations from the FP owners. Policy No. 12 Mechanism to Implement the IS
The mechanism to implement the proposals of the IS in the spirit of ‘Public – Private Partnership’ is the understanding and agreement between the land owners and NIT. This is institutionalized & legalized by way of MOU and agreements that will be executed at two stages in the process of preparing the IS. 1 MOU between NIT and Land Owner The ‘Memorandum of Understanding (MOU)’ will be executed at the beginning of preparation of the IS – within 60 days of the declaration to carry out out survey U/S 54-55 of the N.I.T. Act 1966 of the lands of the I.S. This would essentially be an understanding between the land owner and NIT to the effect that the land owner understands the polices & benefits of undertaking the IS; is giving consent to NIT to undertake the IS and is agreeing to hand over 40% or as may be decided by N.I.T.of the land in lieu of service provided and land required for public purpose uses (Policy No. 3) at the time of signing the Final Agreement. A copy of the Final Policy Document. 2 Final Agreement between NIT and Land Owner The ‘Final Agreement’ will be executed within 60 days of approval of the IS by the State Government. This agreement essentially gives the details of the final plot to be returned to the land owner, the net demand to be paid by the land owner, his / her development rights, land vested with NIT for public purpose and general conditions. The land shall vest in N.I.T. free of all encumbrances for the purpose of important scheme and the land owner will have no claim of whatsoever nature in future over the land vested in N.I.T. Policy No. 13 Formats to Present the IS – Drawings and Statements
A new of formats to present the IS proposals in the form of drawings and statements is prepared. These are indicated below :
No. Map / Table No. Particular 1 Map No. 1 Base Map showing the khasra numbers and khasra
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\Final Policy Document for IS.doc 7
boundaries reconciled with the Total Station Survey certified by LRD, Nagpur
2 Map No. 1A Base Map showing the various categories as described below:
o Approved and constructed layouts. o Approved and un-built. o Unapproved but built upon. o NA plots with no layouts or construction. o Village settlement o Agricultural plots.
3 Table No. 1 Owners list and area statement certified by LRD Nagpur 4 Map No. 2 Base map showing original plots Map No. 3 Map showing original plots, final plots, roads and
appropriated plots Map No. 4 Map showing final plots, roads and appropriated plots Map No. 5A Map showing road network / hierarchy Map No. 5B Map showing water supply network Map No. 5C Map showing sewerage network & S.T.P. Map No. 5D Map showing storm water drainage network Map No. 5E Map showing open spaces Table No. 2 Percentage deduction table indicating the area of land
deducted from each land plot Table No. 3 List of plots with areas under various uses appropriated by
NIT Table No. 4 IS summary – total number of OPs, FPs, areas under
various public purpose, roads etc Table No. 5 Total cost of preparing and implementing the IS Table No. 6 Estimate for cost of physical infrastructure works Table No. 6A Cost of road development Table No. 6B Cost of water supply works Table No. 6C Cost of sewerage works & S.T.P. Table No. 6D Cost of storm water network Table No. 6E Cost of developing open spaces
Policy No. 14 Other Applicable Taxes Etc.
• All applicable taxes, charges free and cess on the original khasra plots be applicable on the FP after the approval of the IS.
• The land owner will pay Property Tax and other taxes/charges as leviable by the concerned Gram Panchayat.
• The land owner will pay the revenue assessment as leviable by the revenue department on the FP after the approval of the IS.
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\FInal Process for IS.doc 1
A Process to Prepare Improvement Schemes in the Nagpur Metro Region under the provisions of the NIT Act 1936.
The steps to undertake each Improvement Scheme (IS) are as below. A brief description of each step along with supporting explanatory notes is given below: Step – 1 NIT shall Initiate & Approve the decision to frame the IS as per Section 36 (1) • NIT will approve:
o The decision to prepare a particular IS o Proceed with the process of preparing the IS
Step – 2 NIT to prepare IS as per Section 28/29/30/31/32/33/34/35/35A The following Steps – 2a, 2b 2c & 2d are the actions taken by the NIT following the Board Resolution to prepare an IS. Step – 2a Issue a Public Notice Under Section 54 and 55 in Local Newspapers of wide Circulation • A Public Notice under Section 54 and 55 will be published in one or more local
newspapers. • The Public Notice will also be displayed at the Head Office of NIT and in other
prominent places in Nagpur. • The Public Notice will state the following:
o NIT has resolved to prepare the particular IS. o NIT will carry out surveys and measurements for the lands included in the IS. o Request the land owners to submit land ownership records, layouts, hissa details
and suggestions, if any, within a period of 45 days from the publication of the Notice at the office of Superintendent Engineer (Metro), Nagpur Improvement Trust, Station road, Sadar, Nagpur. If these are not submitted then the available documents will be used to establish ownerships and plots areas.
o The plan of proposed IS boundary showing the khasra numbers of the included lands and a list of the same will be kept open for inspection at the following offices during office working hours: 1. Divisional Commissioner, Nagpur Divisions, Old Secretariat Building
Civil Lines, Nagpur-440 001 2. Superintending Engineer (Metro), Nagpur Improvement Trust, Station
Road, Sadar, Nagpur-440 001 3. Collector, Nagpur, Collector Office, Civil Lines, Nagpur-01 4. Deputy Director, Town Planning, Nagpur Division, Nagpur-01 5. Chief Executive Officer, Zilla Parishad, Civil Lines, Nagpur-440 001 6. Tahsildar, Hingna, Tahsil Hingna, Distt. Nagpur
o The process and policies along with draft Memorandum of Understanding (MOU) for the preparation of the proposed IS will also be available at the above mentioned office for inspection1.
o Request the land owners to submit the MOU within a period of 60 days from date of publication of the Public Notice at the office of Superintendent Engineer (Metro), Nagpur Improvement Trust, Station road, Sadar, Nagpur.
1 The mechanism to implement the IS is legalized by the way of a MOU between the land owner and NIT and subsequently a Final Agreement between the land owner and NIT.
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\FInal Process for IS.doc 2
o NIT shall commence total station survey of the IS area within next 7 days and all the land owners are requested to cooperate with NIT to carry out the survey work.
Step – 2b Dispatch a copy of the Public Notice under Section 54 & 55 to the State Government for Information • NIT will send a copy of the Public Notice under Section 54 & 55 to the State
Government for information. • A plan of the area which is proposed to be included in the IS, process, policies along
with draft MOU for the preparation of the proposed IS will also be sent to the State Government for information.
Step – 2c Intimate the Zilla Parishads and Gram Panchayats • NIT will send a copy of the Public Notice under Section 54 & 55 to the respective Zilla
Parishads and Gram Panchayats. Step – 2d Keep the Copy of Plan of IS and Relevant Documents open for Inspection • A copy of the area which is proposed to be included in the IS, process and policies along
with draft MOU and for the preparation of the proposed IS will be kept open for public inspection at the offices listed in the Public Notice under Section 54 & 55 for a period of 60 days.
• Consideration shall be given to the suggestion and objections if any. Step – 3 NIT to prepare IS as per Section 38 The following Steps – 3a, 3b, 3c, 3d & 3e are the actions taken by the NIT after issuing the Public Notice under Section 54 & 55. Step – 3a Prepare the Draft Area Statement, Base Map and List of Owners for the IS Area • Procure the following records:
o 7 x12 (from Tehsildar / Revenue Department). o Village maps (Ekatrikaran maps) at 1:5000 scale. o Resurvey sheets (from Dy. SLR) at Scale 1:1000. o NA TP layouts (from Collector Office).
• Prepare a draft area statement from the 7 x 12 documents for all the khasra numbers • Digitize and overlay the ‘resurvey sheets’ obtained from the Dy. SLR on Google
satellite images to obtain a consolidated map. Fit/match the khasra lines on the image and verify the area with as indicated in the 7 x 12 documents.
• Insert the NA TP layout on the khasras. • Tentatively mark the hissa subdivision as obtained from the 7 x 12 records on the
satellite image wherever possible. Step – 3b Conduct Total Station Survey of IS Area • Submit a list of khasra numbers with areas from the 7 x 12 documents to the Land
Record Department (LRD). • LRD to assess the measurement fee and NIT to pay the measurement fee. • Commence a detailed and accurate survey of the ground situation using Total Station
Survey As per Policy No. 1. • During the survey, a representative from the Land Record Department (LRD) will be
present, if necessary.
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\FInal Process for IS.doc 3
Step – 3c Finalize the Area Statement, Base Map and List of Owners of the IS Area • Overlay the ‘resurvey sheets’ obtained from the Dy. SLR on the total station survey
drawing to obtain the area under possession and finalize the areas as per Policy No. 2: Base Map, Area Statements and Ownership Status in the IS Area in the Policy Document.
• LRD will certify both the area statement and the base map. • Prepare a final list of land owners from the 7 x 12 documents and information from
Tehsildar / Patwari of the village. These will keep getting updated as the process of preparing the IS moves forward particularly during & after the land Owners Meeting.
Step – 3d Prepare Conceptual Plan for Draft IS • Prepare conceptual plan on the approved base map and as per the approved policies. • Keep in view the following aspects:
o Topography and site conditions o Regional plan proposals o Development plan proposals (forth coming) o Specific uses such as quarries and archeologically important sites. o Highway buffer zones o PWD roads o Government lands o NA TP permissions
• The IS will be termed as Draft IS at this stage. • Prepare volume of the Draft IS with the drawing and the support documents / reports for
approval of NIT Board in the prescribed format in the Policy Document. Step – 3e Review of Conceptual Plan of Draft IS by NIT Board • The Draft IS proposals will be placed before the NIT Board for review. • The Draft IS may be modified if required. Step – 4 NIT to publish the notice of the IS as per Section Sec: 39 (1), (2) • The Draft IS plan will be published by NIT. • A Public Notice to this effect will be prepared. • The Public Notice will state
o An IS has been prepared o Boundaries of the area comprised in the IS o Place at which particulars of the IS, map of the area and proposals of the IS can
be seen along with statements of redistribution of land and ‘Net Demand2’. • NIT shall publish the Notice in Gazette and every week for 3 consecutive weeks in local
newspapers. • The notice will state that a meeting of all land owners will be held on a particular date,
time and location. Step – 5 NIT to send Notices Within a period of 30 days from the date of publication under Section 39 NIT will send two notices simultaneously to the land owners:
2 For definition of Net Demand see Policy No. 8 in the Policy Document.
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\FInal Process for IS.doc 4
Notice 1: Under Section: 41 (1), (2), (3) for consent for acquisition by agreement as per Section 58 of NIT Act, 1936. This notice shall state - • The NIT proposes to appropriate land by consent in the IS and recover ‘Net Demand’
for the purposes of carrying out the IS • The land owner can submit their objections / suggestions within a period of 60 days
from the date of the service of the notice. Notice 2: Notice to intimate the land owners about the owners meeting to explain the proposals of the IS. This notice shall state - • Details of final plot – area, land appropriated and the ‘Net Demand’. • The date, time and place of the Owners Meeting. • The place the where the configuration of the final plots and other proposals of the IS can
be seen. • The owners can send in objections and suggestion within a period of 60 days from the
date of service of the notice and 45 days from the Owners Meeting. Step – 6 Owners Meeting • The Owners Meeting will be held at the office of NIT or a premise owned / hired by NIT
which can accommodate all the land owners within 15 days from the date of service of the notice under Section 41
• NIT will explain the proposals of the draft IS to the owners • The land owners will get to review a copy of the Final Agreement that will be executed
between them and NIT. • Land owners can give their representation in writing within 45 days from the Owners
Meeting. Step – 7 Affected Land Owners to make Representation to NIT on the Draft IS as per Section 41 (2) • Within 60 days from the notification under section 39 or Serving of notice under Sec 41
(2), or within 45 days from the Owners Meeting, the land owners shall make a representation to NIT in writing.
Step – 8 Modifications to the Draft IS Plan after Owners Meeting • NIT will consider the representations made by the land owners. • All the representations will be systematically listed and remarks will be made whether to
consider them or not, stating the reasons by NIT. • NIT may modify the proposals of the IS to accommodate the representations received. Step – 9 NIT Board to Approve the State Government Submission • NIT Board will approve the submission to the State Government for sanction. • The submission shall include:
o IS details – drawings and support documents o All representations made by the land owners o Statement of response by NIT to each representation o Signed MOU by land owners
D:\Halcrow data & correspondence\TPS_ IS & Concept Notes for DP\CD Improvement Scheme\FInal Process for IS.doc 5
Step – 10 NIT to submit the IS to the State Government for sanction as per Section 43 (1), (2) • The submission shall include:
o IS details – drawings and support documents o All representations made by the land owners o Statement of response by NIT to each representation o Signed MOU by land Owners
Step – 11 Response by State Government a) State Government sanctions b) State Government may suggest minor modifications c) State Government may suggest major modifications d) State Government refuses to sanction Step – 12 Response by NIT a) NIT proceeds to steps 13 to 17 b) NIT incorporates the modifications and proceeds to steps 13 to 17 c) NIT to prepare the IS again and repeat steps 1 to 11 Step – 13 NIT to publish the submission of IS to State Government for sanction in Official Gazette and Newspapers as per Section 43 (4) • NIT will publish a notice to this effect in the local newspapers and Gazette for 2
consecutive weeks. Step – 14 State Government sanctions the IS as per Section 44 (1)and issues notification in the Official Gazette for the implementation of the IS by NIT as per Section 45 (1) Step – 15 NIT to Issues Notices to land owners to submit Final Agreements • After sanction of the IS by the State Government, NIT will issues notices to the land
owners to sign the Final Agreements at NIT within a period of 60 days from the date of notification in the Official Gazette.
Step – 16 NIT to acquire lands of the land owners unwilling to participate in the IS • NIT shall proceed to acquire the land owners who have not submitted the MOUs and
Final Agreements. • NIT shall submit the proposal to the Collector, Nagpur for land acquisition for
implementing the IS • The entire proceedings of the land acquisition shall be completed within a period of 3
years from the date of sanction of the IS. Step – 17 NIT to get the IS Land Records updated • Upon receipt of the Final Agreements and completion of 60 days from the date of
sanction of the IS NIT will submit the entire sanctioned IS documents to the Collector / LRD to update the land records – new 7 x 12 documents for the FPs will be prepared and issued to the land owners. The old 7 x 12 documents will cease to exist.