mosaic park ARLINGTON COUNTY
O C U L U S
Final Master Plan
Phase 1 Master Plan - Phase 1
Phase 1 Phases 1 & 2 Conceptual Site Plan – January 2012
Phase 1 Conceptual Site Plan – March 2012
Phase 1 Grading Plan
O C U L U S Interactive Water Feature – Combination of Jets
O C U L U S Interactive Water – Water Plate
O C U L U S Wood Platform Seating
O C U L U S Paving Options: Concrete (Exposed Aggregate & Saw-cut Joints)
O C U L U S Paving Options: Stone
O C U L U S Green Energy Comparison
Wind Solar
Cost: $18,000 per column (6 solar panels per column)
Cost: $22,000 per turbine
Output: 1580 kWh per year Output: 875 kWh per year