ALL TABLES OF MORT&H ( 5 th REVISION) FROM CLAUSE 700 CLAUSE TO 3100 COLLATED BY V. VENKATA NARAYANA DEPUTY EXECUTIVE ENGINEER ROADS & BUILDINGS, A.P. vvnhighways.blogspot.in [email protected]
Nov 28, 2015
ALL TABLES OF
MORT&H ( 5th REVISION)
FROM CLAUSE 700 CLAUSE TO 3100
COLLATED BY
V. VENKATA NARAYANA
DEPUTY EXECUTIVE ENGINEER
ROADS & BUILDINGS, A.P.
vvnhighways.blogspot.in
Tables of SECTION 700 ::
GEOSYNTHETICS
Tables of SECTION 800 ::
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
Tables of SECTION 900 ::
QUALITY CONTROL FOR ROAD WORKS
Tables of SECTION 1000 ::
MATERIALS FOR STRUCTURES
Tables of SECTION 1200 ::
WELL FOUNDATIONS
Tables of SECTION 1500 ::
FORMWORK
Tables of SECTION 1700 :: STRUCTURAL CONCRETE
Tables of SECTION 1800 :: PRESTRESSING
Tables of SECTION 1900 :: STRUCTURAL STEEL
Tables of SECTION 2000 :: BEARINGS
Tables of SECTION 2400 :: SURFACE AND SUBSURFACE GEOTECHNICAL INVESTIGATION
Tables of SECTION 2500 :: RIVER TRAINING AND PROTECTION WORK
Tables of SECTION 2600 :: EXPANSION JOINTS
Tables of SECTION 2800 :: REPAIR O STRUCTURES
Tables of SECTION 3100 :: REINFORCED SOIL