MONITORING INSTAL REBAR BOREPILE P4 MAIN ROAD KODE DIA (mm) LENGTH (mm) a b c d A1 32 12.000 A2 32 7.600 A3 32 12.000 A4 32 2.400 B1 13 3.142 B2 13 3.146 B3 13 3.154 BOREPILE P3 MAIN ROAD KODE DIA (mm) LENGTH (mm) a b c d A1 32 9.300 A1-2 32 12.000 A2 32 6.600 A3 32 12.000 A4 32 2.700 A5 32 3.000 B1 13 3.142 B2 13 3.146 B3 13 3.154 BOREPILE P2 MAIN ROAD KODE DIA (mm) ENGTH (mm) a b c d A1 32 A2 32 A3 32 A4 32 B1 13 3.142 B2 13 3.146 B3 13 3.154 BOREPILE P1 MAIN ROAD
23

Monitoring Instal Rebar Bore Pile

Dec 07, 2015

Download

Documents

Wiwit Surya Jr.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Monitoring Instal Rebar Bore Pile

MONITORING INSTAL REBAR

BOREPILE P4 MAIN ROAD

KODE DIA (mm) LENGTH (mm) TOTAL (mm)a b c d

A1 32 12.000 12.000A2 32 7.600 7.600A3 32 12.000 12.000A4 32 2.400 2.400B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

BOREPILE P3 MAIN ROAD

KODE DIA (mm) LENGTH (mm) TOTAL (mm)a b c d

A1 32 9.300 9.300A1-2 32 12.000 12.000A2 32 6.600 6.600A3 32 12.000 12.000A4 32 2.700 2.700A5 32 3.000 3.000B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

BOREPILE P2 MAIN ROAD

KODE DIA (mm)LENGTH (mm)

TOTAL (mm)

a b c dA1 32A2 32A3 32A4 32B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

BOREPILE P1 MAIN ROAD

Page 2: Monitoring Instal Rebar Bore Pile

KODE DIA (mm) LENGTH (mm) TOTAL (mm)a b c d

A1 32 8.300 8.300A1-2 32 12.000 12.000A2 32 3.700 3.700A3 32 2.700 2.700B1 13 3.142 3.142B2 13 3.146 3.146

BOREPILE P5 MAIN ROAD

KODE DIA (mm) LENGTH (mm) TOTAL (mm)a b c d

A1 32 12.000 12.000A2 32 2.600 2.600A3 32 9.400 9.400A4 32 3.000 3.000B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

BOREPILE P6B MAIN ROAD

KODE DIA (mm) LENGTH (mm) TOTAL (mm)a b c d

A1 32 7.300 7.300A1-2 32 12.000 12.000A2 32 6.000 6.000A3 32 12.000 12.000A4 32 4.400 4.400B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

BOREPILE P7 MAIN ROAD

KODE DIA (mm) LENGTH (mm) TOTAL (mm)a b c d

A1 32A2 32A3 32A4 32

Page 3: Monitoring Instal Rebar Bore Pile

B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

BOREPILE P8 MAIN ROAD

KODE DIA (mm) LENGTH (mm) TOTAL (mm)a b c d

A1 32A2 32A3 32A4 32B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

BOREPILE P9 MAIN ROAD

KODE DIA (mm) LENGTH (mm) TOTAL (mm)a b c d

A1 32A2 32A3 32A4 32B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

Page 4: Monitoring Instal Rebar Bore Pile

JUMLAH KG

25 1893.894 191.918 606.048 121.21

91 297.9041 134.3919 62.44

TOTAL : 3307.7819846.66

JUMLAH KG

13 763.2412 909.07

4 166.668 606.048 22.508 25.01

81 265.1641 134.3929 95.30

TOTAL : 2987.3717924.20

JUMLAH KG

0.000.000.000.000.000.000.00

Page 5: Monitoring Instal Rebar Bore Pile

JUMLAH KG

13 681.1712 909.0712 280.3012 204.5471 232.4338 124.56

TOTAL : 2432.054864.10

JUMLAH KG

32 2424.1816 262.6216 949.47

8 151.51121 396.11

26 85.2218 59.15

TOTAL : 4328.2525969.52

JUMLAH KG

13 599.1012 909.07

4 151.518 606.04 8 36.67

61 199.6946 150.7832 105.16

TOTAL : 2758.0216548.11

JUMLAH KG

0.000.000.000.00

Page 6: Monitoring Instal Rebar Bore Pile

0.000.000.00

JUMLAH KG

0.000.000.000.000.000.000.00

JUMLAH KG

0.000.000.000.000.000.000.00

Page 7: Monitoring Instal Rebar Bore Pile

Monitoring Instal Rebar Ramp off

Instal Rebar Ramp off P1A

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 7.300 7.300A1-2 32 12.000 12.000A2 32 12.000 12.000A3 32 12.000 12.000A4 13 4.700 4.700A5 13 2.300 2.300B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

Instal Rebar Ramp off P2A

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 12.000 12.000A2 32 6.600 6.600A3 32 12.000 12.000A4 32 12.000 12.000A5 32 3.700 3.700B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

Instal Rebar Ramp off P3A

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 12.000 12.000A2 32 8.600 8.600A3 32 12.000 12.000A4 32 3.100 3.100B1 13 3.142 3.142B2 13 3.146 3.146

TOTAL (mm)

TOTAL (mm)

TOTAL (mm)

Page 8: Monitoring Instal Rebar Bore Pile

B3 13 3.154 3.154

Instal Rebar Ramp off P4A

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 8.300 8.300A1-2 32 12.000 12.000A2 32 5.600 5.600A3 32 12.000 12.000A4 32 10.400 10.400B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

Instal Rebar Ramp off P5A

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 8.300A1-2 32 12.000A2 32 3.700A3 32 2.900A4 32 9.100B1 13 3.142B2 13 3.146B3 13 3.154

KODE DIA (mm) LENGTH (mm)a b c d

A1 32A2 32

TOTAL (mm)

TOTAL (mm)

TOTAL (mm)

Page 9: Monitoring Instal Rebar Bore Pile

A3 32A4 32B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

KODE DIA (mm) LENGTH (mm)a b c d

A1 32A2 32A3 32A4 32B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

KODE DIA (mm) LENGTH (mm)a b c d

A1 32A2 32A3 32A4 32B1 13 3.142 3.142B2 13 3.146 3.146B3 13 3.154 3.154

TOTAL (mm)

TOTAL (mm)

Page 10: Monitoring Instal Rebar Bore Pile

Rebar Waste Ramp off P1A

JUMLAH KG KODE DIA (mm) JUMLAH KG

20 921.69 A1 32 4.700 5 148.3520 1515.11 A1-2 32 0 0 0.0020 1515.11 A2 32 0 0 0.0010 757.56 A3 32 0 0 0.0010 48.97 A4 32 2.600 5 13.5410 23.96 A5 32 1 1 1.0461 199.69 B1 13 0 0 0.0071 232.72 B2 13 0 0 0.0056 184.02 B3 13 0 0 0.00

Total : 5398.8321595.33

Rebar Waste Ramp off P2A

JUMLAH KG KODE DIA (mm) JUMLAH KG

30 2272.67 A1 32 0 0 0.003 125.00 A2 32 5.400 3 102.27

12 909.07 A3 32 0 0 0.0012 909.07 A4 32 0 0 0.0012 46.26 A5 32 0.9 4 3.7591 297.90 B1 13 0 0 0.0036 118.00 B2 13 0 0 0.0062 203.74 B3 13 0 0 0.00

Total : 4881.6919526.76

Rebar Waste Ramp off P3A

JUMLAH KG KODE DIA (mm) JUMLAH KG

40 3030.22 A1 32 0.0020 1085.83 A2 32 0 0 0.0010 757.56 A3 32 0 0 0.0010 195.70 A4 32 0 0 0.00

111 363.37 B1 13 0.0036 118.00 B2 13 0 0 0.00

LENGTH (mm)

LENGTH (mm)

LENGTH (mm)

Page 11: Monitoring Instal Rebar Bore Pile

42 138.02 B3 13 0 0 0.00Total : 5688.69

22754.77

Rebar Waste Ramp off P4A

JUMLAH KG KODE DIA (mm) JUMLAH KG

15 785.96 A1 32 3.700 52 1214.6115 1136.33 A1-2 32 0 0 0.00

3 106.06 A2 32 0 0 0.0012 909.07 A3 32 1 0 0.0012 130.03 A4 32 1.600 12 20.0081 265.16 B1 13 0 0 0.0041 134.39 B2 13 0 0 0.0052 170.88 B3 13 0 0 0.00

Total : 3637.8814551.50

Rebar Waste Ramp off P5A

JUMLAH KG KODE DIA (mm) JUMLAH KG

15 785.96 A1 32 3.700 52 1214.6110 757.56 A1-2 32 0 0 0.00

2 46.72 A2 32 0 0 0.002 36.62 A3 32 0 0 0.008 459.58 A4 32 9.100 24 227.55

71 232.43 B1 13 0 0 0.0036 118.00 B2 13 0 0 0.0016 52.58 B3 13 0 0 0.00

Total : 2489.449957.75

223.082 -516.39518.59017

JUMLAH KG

0.00 9.4380.00 2622.095

LENGTH (mm)

LENGTH (mm)

Page 12: Monitoring Instal Rebar Bore Pile

0.000.00 280.000.00 280.00 4.205333 5

43

JUMLAH KG

0.000.000.000.000.000.000.00

JUMLAH KG

0.000.000.000.000.000.000.00

Page 13: Monitoring Instal Rebar Bore Pile

132.655

403.01

133.63

536.64

Page 14: Monitoring Instal Rebar Bore Pile

33

10

Page 15: Monitoring Instal Rebar Bore Pile

Ramp off P5a

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 8.300 8.300A1-2 32 12.000 12.000A2 32 3.700 3.700A3 32 2.900 2.900A4 32 9.100 9.100B1 13 12.000 12.000B2 13 12.000 12.000

Ramp off P4a

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 8.300 8.300A1-2 32 12.000 12.000A2 32 5.600 5.600A3 32 12.000 12.000A4 32 10.400 10.400B1 13 12.000 12.000B2 13 12.000 12.000B3 13 12.000 12.000

Ramp off P3a

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 12.000 12.000A2 32 8.600 8.600A3 32 12.000 12.000

TOTAL (mm)

TOTAL (mm)

TOTAL (mm)

Page 16: Monitoring Instal Rebar Bore Pile

A4 32 3.100 3.100B1 13 12.000 12.000B2 13 12.000 12.000B3 13 12.000 12.000

Ramp off P2a

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 12.000 12.000A2 32 6.600 6.600A3 32 12.000 12.000A4 32 12.000 12.000A5 32 3.700 3.700B1 13 12.000 12.000B2 13 12.000 12.000B3 13 12.000 12.000

Ramp off P1a

KODE DIA (mm) LENGTH (mm)a b c d

A1 32 7.300 7.300A1-2 32 12.000 12.000A2 32 12.000 12.000A3 32 12.000 12.000A4 32 4.700 4.700A5 32 2.300 2.300B1 13 12.000 12.000B2 13 12.000 12.000B3 13 12.000 12.000

TOTAL (mm)

TOTAL (mm)

Page 17: Monitoring Instal Rebar Bore Pile

JUMLAH KG

15 785.9610 757.56

2 46.722 36.628 459.58

29 362.5814 175.04

Volume : 2624.05Total : 10496.18

JUMLAH KG

15 785.9615 1136.33

3 106.0612 909.0712 787.8629 362.5811 137.5310 125.03

Volume : 4350.41Total : 17401.63

JUMLAH KG

40 3030.2220 1085.8310 757.56

Page 18: Monitoring Instal Rebar Bore Pile

10 195.7029 362.5811 137.5314 175.04

Volume : 5744.45Total : 22977.79

JUMLAH KG

30 2272.673 125.00

12 909.0712 909.0712 280.3029 362.5814 175.0415 187.54

Volume : 5221.24Total : 20884.97

JUMLAH KG

20 921.6920 1515.1120 1515.1110 757.5610 296.7110 145.19829 362.5814 175.0415 187.54

Volume : 5876.53Total : 23506.11

Page 19: Monitoring Instal Rebar Bore Pile

Main Road P10a

KODE DIA (mm) LENGTH (mm) JUMLAHa b c d

A1 32 9.300 9.300 13A1-2 32 12.000 12.000 12A2 32 12.000 9.100 12A3 32 12.000 3.142 81A4 13 4.700 3.146 53

Main Road P11a

KODE DIA (mm) LENGTH (mm) JUMLAHa b c d

A1 32 7.300 7.300 14A1-2 32 12.000 12.000 16A2 32 6.600 6.600 8A3 32 12.000 12.000 8A4 32 4.400 4.400 8B1 13 3.142 3.142 61B2 13 3.146 3.146 51B3 13 3.154 3.154 29

Main road P12a

KODE DIA (mm) LENGTH (mm) JUMLAHa b c d

A1 32 7.300 8.300 13A1-2 32 12.000 12.000 12A2 32 7.600 7.600 4A3 32 12.000 12.000 8A4 32 3.700 3.700 8A5 32 6.000 6.000 8B1 13 3.142 3.142 71B2 13 3.146 3.146 51B3 13 3.154 3.154 39

Main road P13a

TOTAL (mm)

TOTAL (mm)

TOTAL (mm)

Page 20: Monitoring Instal Rebar Bore Pile

KODE DIA (mm) LENGTH (mm) JUMLAHa b c d

A1 32 9.300 9.300 13A1-2 32 12.000 12.000 12A2 32 12.000 12.000 12A3 32 6.400 6.400 8B1 13 3.142 3.142 81B2 13 3.146 3.146 66B3 13 3.154 3.154 19

TOTAL (mm)

Page 21: Monitoring Instal Rebar Bore Pile

KG

763.24909.07689.38265.16173.72

KG

645.181212.09

333.32606.04222.22199.69167.17

95.30

KG

681.17909.07191.91606.04186.86

303.022232.43167.17128.16

Page 22: Monitoring Instal Rebar Bore Pile

KG

763.24909.07909.07323.22265.16216.33

62.44

Page 23: Monitoring Instal Rebar Bore Pile

Monitoring Besi

No

1