Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

Dec 10, 2015

Download

Documents

Nathan Baker
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

Molise Energy and Environment PlanMolise Energy and Environment Plan

Regional Plan Regional Plan for Energy and Environment for Energy and Environment approved in 2006approved in 2006

Page 2: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

Most of the energy Most of the energy used in the Region used in the Region Molise comes from Molise comes from

traditional fuels.traditional fuels.

Page 3: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

ENEA CCEI Campobasso - Biblioteca Albino - 22 aprile 2009 - Dott. Giovanni Iannantuono 3

Thermoelectric energy from fossil fuelsYear 2007 – 1.247 MW

5.179,7 GWh = 93,5%

Page 4: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

ENEA CCEI Campobasso - Biblioteca Albino - 22 aprile 2009 - Dott. Giovanni Iannantuono 4

Thermoelectric Energy from renewable sources

Year 2007 – 41 MW

92,6 GWh = 1,7 %

Further 87 MW

Page 5: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

ENEA CCEI Campobasso - Biblioteca Albino - 22 aprile 2009 - Dott. Giovanni Iannantuono 5

Hydro-electric Energy Year 2007 – 84,70 MW

120,4 GWh = 2,2%

Further 3 MW

The plants are located along the Biferno river

Page 6: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

The Region Molise The Region Molise intends to develope also intends to develope also

the wind energy…but the wind energy…but where these plants can where these plants can

be installed to safeguard be installed to safeguard the environment?the environment?

Page 7: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

7

The wind mapThe wind map

Page 8: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

8

Very high areasVery high areas

Page 9: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

Inhabited CentresInhabited Centres

Page 10: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

10

Protected AreasProtected Areas

Page 11: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

11

ForestsForests

Page 12: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

Possible Location for Wind TurbinesPossible Location for Wind Turbines

Page 13: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

ENEA CCEI Campobasso - Biblioteca Albino - 22 aprile 2009 - Dott. Giovanni Iannantuono 13

Electric Energy from wind turbinesYear 2007 – 98,7 MW

145,1 GWh = 2,6%

Further 401,2 MW

Authorized Turbines

362 out of 545 scheduled by LR 15

Requests for futher

3500 MW, more than 2000 turbines

Page 14: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

14

Page 15: Molise Energy and Environment Plan Regional Plan for Energy and Environment Regional Plan for Energy and Environment approved in 2006 approved in 2006.

Conclusions:

Foster the development of photovoltaic plants

Foster the development of solar panels

Foster the development of wind plants

Not by financing the plants but by financing the quantity of energy produced by renewable sources.