Page 1 of 12 Mohammed Ali Ahmed Abdul Baky Objective Seeking a creative position what I have acquired through previous work experience, qualifications, as well as my educational background. Work experience September, 2002 Till March, 2014. Firm: AAW Consultant Engineers Co. From Nov-2015 to Now QS Section Head, Deputy Contracts Department Manager in Headquarter. Job Responsibilities: 1. To participate with head od design division in adopting the development plans for the department based on their acquired expertise through the follow up of projects due to their direct communication with the design personnal and projects management team. 2. Implement design sector policies and procedures, and attains goals, 3. Performs a managerial role for the section. 4. Assign team leader to new projects, in coordination with the department manager. 5. Provide technical advice to the QS section member if needed. 6. Review & approval the QS section work in coordination with the contract section head and vice versa. 7. Coordinate with team leaders the assignment of their members to ongoing projects, based on the work load and due dates. 8. Ensure and coordinate with the section team leaders that all deadline are met. 9. Decide on the section’s need for resource (human, software, furniture,…..etc). 10. Notify the department manager about the hours available for each project. 11. Determine the training needs for the employees in their section and enhance their qualifications. 12. Enhance and develop employees qualification in the section through training. 13. Follow the application of the Qualty Management System in the section (QMS). 14. Makes an annual evaluation of employees in their section. From Julay-2015 to Nov-2015 QS Team Leader in Headquarter. Job Responsibilities: 1. Implement design sector policies and procedures, and attains goals, 2. Assign the employees for new projects, in coordination with the Section head. 3. Provide technical advice to the QS section member if needed. 4. Review & approval the QS section work. 5. Coordinate with section head the assignment of the members to ongoing projects, based on the work load and due dates. 6. Ensure and coordinate with the section head that all deadline are met. 7. Follow the application of the Quality Management System in the section (QMS). 18 7art Raef, from Atiah Street, ElSa7el, Shoubra, Cairo, Egypt. Mobile : + 20 1122695021 Email:[email protected]
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1 of 12
Mohammed Ali Ahmed Abdul Baky
Objective Seeking a creative position what I have acquired through previous work experience,
qualifications, as well as my educational background.
Work
experience
September, 2002 Till March, 2014.
Firm: AAW Consultant Engineers Co.
From Nov-2015 to Now
QS Section Head, Deputy Contracts Department Manager in Headquarter. Job Responsibilities:
1. To participate with head od design division in adopting the development plans for the
department based on their acquired expertise through the follow up of projects due to their
direct communication with the design personnal and projects management team.
2. Implement design sector policies and procedures, and attains goals,
3. Performs a managerial role for the section.
4. Assign team leader to new projects, in coordination with the department manager.
5. Provide technical advice to the QS section member if needed.
6. Review & approval the QS section work in coordination with the contract section head and
vice versa.
7. Coordinate with team leaders the assignment of their members to ongoing projects, based
on the work load and due dates.
8. Ensure and coordinate with the section team leaders that all deadline are met.
9. Decide on the section’s need for resource (human, software, furniture,…..etc).
10. Notify the department manager about the hours available for each project.
11. Determine the training needs for the employees in their section and enhance their
qualifications.
12. Enhance and develop employees qualification in the section through training.
13. Follow the application of the Qualty Management System in the section (QMS).
14. Makes an annual evaluation of employees in their section.
From Julay-2015 to Nov-2015
QS Team Leader in Headquarter. Job Responsibilities:
1. Implement design sector policies and procedures, and attains goals,
2. Assign the employees for new projects, in coordination with the Section head.
3. Provide technical advice to the QS section member if needed.
4. Review & approval the QS section work.
5. Coordinate with section head the assignment of the members to ongoing projects, based on
the work load and due dates.
6. Ensure and coordinate with the section head that all deadline are met.
7. Follow the application of the Quality Management System in the section (QMS).
Senior QS Engineer in Headquarter. Job Responsibilities:
1. Preparation of contracts, including details regarding quantities of required materials in
accordance with final design drawing.
2. Assisting in establishing a client's requirements and undertaking feasibility studies.
3. Preparing and analysing costings for tenders.
4. Providing advice on contractual claims
5. Analysing outcomes and writing detailed progress reports
6. Valuing completed work and arranging payments;
From March-2014 to December -2014
Senior Quantity Surveyor Engineer
Title: Westown Infrastructure Trunk Package.
Country : 6th october, Giza, Egypt. Owner: SODIC.
Contractor : Hassan Allam for Construction
Brief Description of the Contract:
Construction of all external roads and infrastructure networks and utility services within
roads rights of way in the Westown project covering an area of 123 ha.
The infrastructure works include completion of all related structural and mechanical
works of road works, water supply and fire-fighting system, Irrigation system, sewerage
collection system, storm water drainage system, electrical distribution system, street
lighting and, telecommunications system.
Contract Amount: L.E. 60 million.
Title: Uptown Cairo – Package 17A.
Country : Al Mokattam, Cairo, Egypt. Owner: Emaar Misr.
Project Management: Turner Internaional.
Contractor : Rowad Modern Engineer.
Brief Description of the Contract:
The package of 17A is an infrastructure services in uptown cairo project which include
excution, completion, maintinance and handing over of all related structural and
mechanical works which is divided in tow parts as follow:
1. Ground Water Resevoir 10,000 Cum.
2. HDPE water line 780 ML.
Contract Amount: L.E. 55 million.
Responsibilities include:
- Prepare the accumulative progress as a guide to project management either in
connection with any contract or sub-contract.
- Prepare monthly payment application to be submitted to Employer according to
accumulative progress.
- Valuation the project progress and advice from time to time on cost management, or
value management.
- To carry out such other duties as may properly be those of a Quantity Surveyor.
- Evaluate and review submitted contractual claims;
- Maintaining awareness of the different building contracts in current use;
- Preparing the final payment application
Page 3 of 12
September, 2002 Till March, 2014.
Firm: Societe Egyptienne D’Entreprises – SEDE,
From July-2013 to Now
Senior Estimator for the following Tenders in Kingdom of Saudi Arabia Title: P&C of Potable Water Pump Station and Storage Tanks.
Contract No. 108-C01.
Estimated Tender Value: SR 199’546’408.99
Owner: Royal Commission for Jubail and Yanbu, Royal Commission in Jubail
Engineer : Suadi Consulting Services
Brief Description of the Contract:
The works to be included in the current construction contract are the following:
• 4 numbers 42,500 m³ each, 80 m dia Potable and Process Water Storage Tanks. • Pump Station Building for 205,000 m³/day capacity with the equipment for Phase 1. • Chlorination Room for ultimate capacity with equipment for Phase 1. • Supporting Facilities for ultimate requirement • Electrical Substation and prime rated generating system • All Associated Mechanical Pipe work • Three points Potable Water Truck Filling Station • Guard House and control gates for facility and tank filling station. • Site work including roads, natural grading & storm drainage, potable water, sanitary and security fence • Area lighting and power distribution • Telecommunication system • Additional site preparation work for future expansion phases.
- From Dec-2012 to May-2013
Senior Estimator for the following Tenders in Sultantae of Oman Title: Water Transmission Pipeline from the Water Treatment of Wadi Dayqah Dam at
Mazari in Willayat Qurayyat to Deem Reservior in Muscat Governorate.
Contract No. 135/2012.
Estimated Tender Value: Omani Rial 32’222’746.655
Estimated Alternative Tender Value: Omani Rial 31’765’095.67
Owner: Public Authority for Electricity & Water, Sultanate of Oman.
Engineer : Yas Consulting Engineers LLC
Brief Description of the Contract:
The proposed project components are summarized as follows
Construction of potable water transmission pipeline of 1200 mm bore mild steel from the TWT to a pumping station (PS2), approximate length 14.5 km. - Construction of 400 mm bore DI, potable water pipeline from the Hayl-al-Ghaf branch point to the terminations at the Hayl-al-Ghaf falaj and water reservoir approximate length 4.8 km. - Construction of 700 mm bore DI, potable water pipeline from the Daghmar branch point to the bifurcation at Qarib, approximate length 4.4 km. - Construction of 600 mm bore DI, potable water pipeline from the Qarib branch point to the Quriyat reservoir , approximate length 3.7 km. - Construction of 600 mm bore DI, potable water pipeline from the Qarib branch point to the Daghmar irrigation break head tank, approximate length 2.7 km. - Construction of 2,000 m³ Daghmar irrigation (break head) RCC tank to feed the distribution system. - Construction of the irrigation distribution pipelines in 600/400/300 mm bore ductile iron
Page 4 of 12
to supply potable water to the Daghmar area for irrigation purposes, approximate lengths 4.5km of 600mm, 2.9km of 400mm and 6.6 km of 300 mm. - Construction of irrigation distribution and interconnecting pipes from the distribution pipelines to provide a replacement supply to individual irrigated landholdings in the Daghmar area, total length some 37.1 km. - Design and construction of a pumping station 2 (PS2) on the main transmission line, including the supply and installation of all pumping plant and provision for future expansion (PS2b). - Design and construction of building services provisions to buildings designed by the Engineer. - Construction of potable water transmission pipeline of 1600 mm bore mild steel to the existing delivery main at deem reservoir, with flow measurement and control of transfer, approximate length 32.6 km. - Design and construction of all control, instrumentation and SCADA for the entire Scheme (i.e. PS2, ,DIT, Quriat Reservoir and Hail Al Ghaf reservoir and Falaj, and Deem) including communications cabling, and data acquisition. System shall be designed and constructed for interfacing with control centre at Baushar, Muscat as well as selected information to be transferred to WTW facility. - Testing, commissioning of the Works.
From June -2012 to Dec -2012
Senior Project Engineer for the Following Project in United Arab Emarites. Title: Water Supply System for Fulairah Distribution Network Lot A
EPC Contract No. N-7396/A Owner: Abu Dhabi Transmission & Despatch Company (TRANSCO)
Engineer : ILF Consulting Engineers LLC
Brief Description of the Contract:
EPC works for Water Supply System for Fujairah Distribution Network – New Qidfa Pump Station QPS-2 (1) Construction of the new pump station QPS-2, including survey and soil investigation and all necessary civil, electrical, mechanical and ICT works. (2) Hydraulic design for the complete Water Distribution Network. (3) Overall System responsibility for design, functionality and operability. This includes but is not limited to the hydraulic calculations for the entire proposed Fujairah Distribution Network (Lot A, Lot B and Lot C), the overall system operation and control philosophy and the necessary coordination works between the Lot A contractor and the Lot B/C contractors. (4) Interface coordination with other Contractors, with TRANSCO, FEWA, Fujairah Municipality, other Authorities and Owners and all existing facilities (especially with the QPS-1 facilities and the new tanks from SWRO Plant) (5) Control and communication system for the complete system, including full integration and functional responsibility (6) Supply of fibre optic cable for Lot B and Lot C. (7) Any other works as defined in detail in the specification. Amount: AED 223,783,168.18
Page 5 of 12
From Oct-2010 to June-2012
Senior Estimator for the following Tenders in Sultantae of Oman Title: Construction of Water Distribution Networks for Bisiya, Al Ma’amur, Al Habbi and
Ten Surrounding Villages in Dakhiliyyah Region
Contract No. 342/2011.
Estimated Tender Value: Omani Rial 140.240,139,14
Owner: Public Authority for Electricity & Water, Sultanate of Oman.
Engineer : Energoprojekt – Entel (EPE)
Brief Description of the Contract:
The proposed project components are summarized as follows
A. Procurement, construction and commissioning of water distribution networks with
pertaining structures, equipment, etc.
* Water distribution networks for the above areas are divided into the three zones as
follows:
1. Zone 1: This zone includes Wadi Quriyat, Saloot and Al Dhaby Villages. Approximate
length of DI pipeline dia from DN 400 up to DN 200 is 41 km & HDPE 140 km from
dia DN 315 up to DN 125.Ductile iron (K9) pipeline with class 16 bar fittings
2. Zone 2: This zone includes Bisiya, Al Haisha, Ghushaibah and Al Fal Villages.
Approximate length of DI pipeline dia DN 400 is 14.2 km & HDPE 110 km from dia
DN 250 up to DN 125.
3. Zone 3: This zone includes Al Ma’amur, Al Habbi, Al Suwayh, Al Qabidiyah, Al
Muameer and Al Hafeer Villages. Approximate length of DI pipeline dia DN 400 and
DN 300 is 9 km & HDPE 140 km from dia DN 250 up to DN 125.
B. Procurement, construction and commissioning of service water reservoirs with
pertaining structures, equipment, etc. at the following locations: 1. Zone 1 Wadi Quriyat Reservoir capacity of 1,500 m3.
2. Zone 2 Bisiya Reservoir capacity of 4,000 m3.
3. Zone 3 Al Ma’amur Reservoir capacity of 5,000 m3.
C. Procurement, construction and commissioning of two Tanker Filling Stations with
pertaining structures, equipment, etc.
D. Procurement, construction and commissioning of administration compound with
pertaining structures, equipment, etc.
E. Procurement, installation and commissioning of SCADA system
Title: Water Supply Scheme for AI Ajaiz, Abu Madabi and Hayma in AI Wusta Region
Estimated Tender Value (Alternative Offer): Omani Rial 50,481,487.387
Owner: Public Authority for Electricity & Water, Sultanate of Oman.
Engineer: Mott MacDonald, Sultanate of Oman Brief Description of the Contract:
- The scope of work includes inter olia civil and building works, procurement, construction
and testing; Mechanical and Electrical Plant and Services (M&E Plant) design, engineering,
manufacture, inspection and testing at the maker's works and at site, packing for export
shipment, insurance, delivery to site, unloading, complete erection, site testing, start up,
commissioning, pelionnance testing; putting into operation, training of PAEW staff (or
others) assigned to operate the Works, and maintenance support during the defects liability
period.
Page 10 of 12
Junior Estimator for the following Tenders in Kingdom of Saudi Arabia.
Title: YANBU – MADINA PHASE 3 (WATER TRANSMISSION SYSTEM - TENDER
NO. C-933 – B2)
Estimated Tender Value: Saudi Rial 628,922,669.800
Owner: Saline Water Conversion Corporation – Kingdom of Saudi Arabia
Engineer: ILF Consulting Engineers Brief Description of the Contract:
Project will provide the Engineering, Procurement & Construction (EPC) includes installation,
testing, commissioning, and initial maintenance of the Water Transmission Main for YANBU –
MADINA PHASE 3 as follows: - The scope of the Yanbu Madina Phase 3 Water Transmission System is to transport the
additional quantity of potable water, which will be produce at the Yanbu Desalination Plants
(Phase 1, 2 &3), to the Madina area, the Yanbu area, the Hanakiyah area, the Coastal area and
to the Mahd area. - Transport and Installation of Pipes for The Madina Hanakiyah Feeder Line (MHFL) with a
length of 47.9 km from HPS to STS with 24” steel pipes and with a length of 45.8 km
between STS and HTS with 28” steel pipes. - Transport and Installation of Pipes for The Madina Mahd Feeder Line (MMFL) with a length
of 29.2 km from the YMML-3 tap-off to MPS with 32” steel pipes and with a length of 202.3
km from MPS to MAT with 83.6 km 28” steel pipes and 118.7 km 24” steel pipes. - The tap-off stations at the MMFL for the supply of the various cities and areas, namely Al
Asheerah, Yotamah, Wadi Al Faraa, Al Akhal, Al Suwarqiyah, Al Oquilah. - The tap-off station at the MHFL for the supply of the various cities and areas, namely
Oweinah. - 7 No Tanker Filling station at end of each Tap-off (2 - 8 Filling Arms .(
- 7 No Steel Ground Tank at each Tanker Filling station capacity (1,000m³).
- 7No Electrical Buildings at each Tanker Filling station . - 4No Line valve chambers, 341 air chambers and 320 washout chambers on the main lines . - Major & Minor Wadi protection for 5 km on the pipeline
- Tunnels under the road 2 Km long. - Works of the soil investigation and reporting. - 12000 m³ of Concrete, 1,200 Tons of Steel Reinforcement. - Mechanical and Electrical Works. - SCADA works . - Electrical works.
Technical & Estimator Engineer for the following Projects in Sultantae of Oman.
From Dec-2009 to Oct-2010
Title: Water Supply Schemes to ADAM - AD Dakhliya Region
Contract No. 258/08. Owner: Public Authority for Electricity & Water, Sultanate of Oman.
Engineer : Energoprojekt – Entel (EPE)
Brief Description of the Contract:
- Supply, construction, testing and commissioning of 85 km of D.I water transmission
pipelines of diameters from 300 mm to 600mm .
- Supply, construction, testing and commissioning of 55 km of HDPE water distribution
network of diameters from 110 mm to 250mm.
- All associated reinforced structures along the pipeline such as Air Valve Chambers, Wash
Page 11 of 12
out Chambers, Line Valve Chambers, Connection Chember, Fire Hydrants , thrust blocks,
Protection of Pipeline in Wadis & NDRC, etc
- Construction of 2 Nos. of 1200 & 5500 m³ capacity ground reservoirs complete with piping
works and associated buildings.
- Construction of 2 Nos. Tanker Filling station having water tower 30 m³ capacity each
complete with piping works.
- Construction of 2 No. Chlorination Building complete with wiring, control system and
associated Chlorination System.
- Connection to the Existing Over-Head Grids for Power Supply
- Laying of Fibre Optic Cable
Amount: Omani Rials 14,300,000.00
From Sep-2006 to Oct-2009
Title: Construction of Transmission Pipelines, Pumping Stations, Transmission Reservoirs
& Associated Buildings
Contract No. 136/2005
Owner: Public Authority for Electricity & Water, Sultanate of Oman.
Engineer (Design): PARSONS International & Co. LLC.