Notices and General Information RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2012 NOTICES AND GENERAL INFORMATION American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright © 2011 American Bureau of Shipping ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA
86
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MODU_nandgi_e

N o t i c e s a n d G e n e r a l I n f o r m a t i o n

RULES FOR BUILDING AND CLASSING

MOBILE OFFSHORE DRILLING UNITS 2012

NOTICES AND GENERAL INFORMATION

American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862

Copyright © 2011 American Bureau of Shipping ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA

Page 2: MODU_nandgi_e

ii ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

T a b l e o f C o n t e n t s

part Notices and General Information

CONTENTS Introduction..................................................................................................................... 1

TABLE 1 Applicable Editions of Booklets Comprising 2012 Rules ..........2 TABLE 2 Division and Numbering of Rules..............................................2

Rule Change Notice (2012)............................................................................................. 3

TABLE 3 Summary of Changes from the 2008 Rules..............................3 TABLE 4 Comparison of the Numbering System of the 2008 Rules

vs. 2012 Rules ........................................................................29

Page 3: MODU_nandgi_e

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 1

Notices and General Information

Introduction 1. The year 2012 edition of the Rules for Building and Classing Mobile Offshore Drilling Units

consists of the nine (9) booklets as shown in Table 1. The Rules have been reorganized, and a new Part 6 for equipment and machinery certification has been added. The survey requirements in the former Part 6 are now in Part 7, along with requirements for surveys during construction and for testing and trials. The cross-reference table in Table 4 shows the relationship between the 2008 numbering and the 2012 numbering. The purpose of the generic title ABS Rules for Conditions of Classification – Offshore Units and Structures (Part 1) is to reflect the expanded contents of PART 1, as a result of including consolidated requirements for “Classification” applicable to all types of offshore units, pipelines, risers, and other offshore structures, as specified in the Foreword to Part 1.

With regard to Part 2, the purpose of the generic title ABS Rules for Materials and Welding is to emphasize the common applicability of the requirements to ABS-classed vessels, other marine structures and their associated machinery, and thereby make PART 2 more readily a common “PART” of various ABS Rules and Guides, as appropriate.

2. The numbering system applied in the Rules is shown in Table 2.

3. The primary changes from the 2008 edition of the Rules are identified and listed in Table 3. The effective date of the indicated Rule Changes is 1 January 2012, unless specifically indicated otherwise.

4. The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following effective dates:

(2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993

5. Until the next edition of the Rules for Building and Classing Mobile Offshore Drilling Units is published, Rule Change Notices and/or Corrigenda, as necessary, will be published on the ABS website – www. eagle.org – only, and will be available free for downloading. It is not intended to publish hard copies of future Rule Change Notices and/or Corrigenda to existing Rules or Guides. The consolidated edition of the Rules for Building and Classing Mobile Offshore Drilling Units, which includes Rule Change Notices and/or Corrigenda using different colors for easy recognition will be published on the ABS website only when RCN and/or Corrigenda are issued.

6. The listing of CLASSIFICATION SYMBOLS AND NOTATIONS is available from the ABS website www.eagle.org for download.

Page 4: MODU_nandgi_e

Notices and General Information

2 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

TABLE 1 Applicable Editions of Booklets Comprising 2012 Rules

Notices and General Information 2012 Part 1: Rules for Conditions of Classification – Offshore Units and

Structures (1) 2012 (2)

Part 1: Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification – Offshore Units and Structures) (1)

2012

Part 2: Rules for Materials and Welding 2012 (2) Part 3: Hull Construction and Equipment 2012 Part 4: Machinery and Systems 2012 Part 5: Fire and Safety – Measures and Features 2012 Part 6: Rules for Equipment and Machinery Certification 2012 Part 7: Surveys 2012

Notes: 1 The requirements for conditions of classification are contained in the separate, generic ABS Rules for Conditions

of Classification (Part 1). Additional specific requirements are contained in Part 1 of these Rules.

2 The latest edition of these Rules is to be referred to. After 2012, these Rules may be downloaded from the ABS website at www.eagle.org, Rules and Guides, Downloads or may be ordered separately from the ABS Publications online catalog at www.eagle.org, Rules and Guides, Catalog.

TABLE 2 Division and Numbering of Rules

Division Number Part Part 1 Chapter Part 1, Chapter 1 Section Section 1-1-1 Subsection (see Note 1) 1-1-1/1 Paragraph (see Note 1) 1-1-1/1.1 Subparagraph 1-1-1/1.1.1 Item 1-1-1/1.1.1(a) Subitem 1-1-1/1.1.1(a)i) Appendix Appendix 1-1-A1

or Appendix 1-A1-1

Note:

1 An odd number (1, 3, 5, etc.) numbering system is used for the Rules. The purpose is to permit future insertions of even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having to renumber the existing text and associated cross-references, as applicable, within the Rules and associated process instructions, check sheets, etc.

Page 5: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 3

Rule Change Notice (2012)

TABLE 3 Summary of Changes from the 2008 Rules

EFFECTIVE DATE 1 January 2009 – shown as (2009)

Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification – Offshore Units and Structures 1-1-3/1.5.1 Ship-Type Drilling Units To modify the class notation for ship-type drilling units from Drilling

Unit to Drillship in order to clarify the type of drilling units receiving this notation.. (Incorporates Notice No. 1 to Part 1)

EFFECTIVE DATE 31 July 2009 – shown as (31 July 2009)

Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification – Offshore Units and Structures 1-1-5/1 Governmental and Other Regulations To comply with Articles 8(1) and 9 of Regulation (EC) No. 391/2009

on “Common rules and standards for ship inspection and survey organizations”. (Incorporates Notice No. 2 to Part 1)

1-1-5/5 Governmental Regulations To comply with Articles 8(1) and 9 of Regulation (EC) No. 391/2009 on “Common rules and standards for ship inspection and survey organizations”. (Incorporates Notice No. 2 to Part 1)

EFFECTIVE DATE 1 January 2010 – shown as (2010)

Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification – Offshore Units and Structures 1-1-A2/5.9 Terms and Conditions of the Request

for Product Type Approval and Agreement

To clarify the terms and conditions for Type Approval. (Incorporates Notice No. 3 to Part 1)

EFFECTIVE DATE 1 April 2010 – shown as (1 April 2010)

Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification – Offshore Units and Structures Section 1-1-6 IACS Audit To align the requirements with the IACS Quality System Certification

Scheme. (Incorporates Notice No. 4 to Part 1)

1-1-8/3 Notification and Availability for Survey

To align the requirements with the IACS Quality System Certification Scheme. (Incorporates Notice No. 4 to Part 1)

Page 6: MODU_nandgi_e

Notices and General Information

4 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

EFFECTIVE DATE 1 January 2011 – shown as (2011)

Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification – Offshore Units and Structures 1-1-3/1.9 Temporary Mooring Equipment

Symbol To define temporary mooring and position mooring on board mobile offshore drilling units for clarification in the application of symbols Á, Â and Ã. (Incorporates Notice No. 5 to Part 1)

1-1-3/1.11 Position Mooring Equipment and Systems

To define temporary mooring and position mooring on board mobile offshore drilling units for clarification in the application of symbols Á, Â and Ã. (Incorporates Notice No. 5 to Part 1)

1-1-3/5 Service Limitations To clarify the use of the class notation Restricted Service in offshore units, based on their operational characteristics, and to identify the conditions for unrestricted service specified in the MODU Rules. (Incorporates Notice No. 5 to Part 1)

1-1-3/25 Propulsion Machinery To reference to the definitions of self-propelled and non-self-propelled units. (Incorporates Notice No. 5 to Part 1)

1-1-7/7 Submissions To align the plan submission requirements with current ABS practice. (Incorporates Notice No. 5 to Part 1)

EFFECTIVE DATE 1 January 2011 – shown as (1 January 2011)

Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification – Offshore Units and Structures 1-1-3/25 Propulsion Machinery To provide a notation of AMS for non-self propelled MODU’s.

(Incorporates Notice No. 6 to Part 1)

EFFECTIVE DATE 1 August 2011 – shown as (1 August 2011)

Part/Para. No. Title/Subject Status/Remarks 1-1-1/5 Representations as to Classification To remove language that might be construed as providing a warranty.

(Incorporates Notice No. 7 to Part 1)

1-1-3/1 Drilling Units Built Under Survey To remove language that might be construed as providing a warranty. (Incorporates Notice No. 7 to Part 1)

1-1-4/9.7.5iii) (New)

Applicable Uses of Type Approved Products

To cover the situation where a component or product has been manufactured under an ABS Type Approved manufacturing process but unit certification has been obtained at the place of manufacture. (Incorporates Notice No. 7 to Part 1)

1-1-4/9.7.7 The Terms and Conditions for use of ABS Type Approved Product Logo

To provide a logo for products which have received a Product Design Assessment (PDA) but the manufacturer does not have a Manufacturing Assessment (MA) (Incorporates Notice No. 7 to Part 1)

EFFECTIVE DATE 1 September 2011 – shown as (1 September 2011)

Part/Para. No. Title/Subject Status/Remarks 1-1-8/1.3 Repairs To harmonize the Rules for Conditions of Classification – Offshore

Units and Structures with the Rules for Conditions of Classification for ships. (Incorporates Notice No. 8 to Part 1)

1-1-8/1.5 (New)

Suspension of Classification To harmonize the Rules for Conditions of Classification – Offshore Units and Structures with the Rules for Conditions of Classification for ships. (Incorporates Notice No. 8 to Part 1)

Page 7: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 5

EFFECTIVE DATE 1 January 2012 – shown as (1 January 2012)

Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification – Offshore Units and Structures 1-1-3/1.9 Anchoring (Temporary Mooring)

Equipment To clarify the requirements for anchoring (temporary mooring) equipment and the symbol Á.

1-1-3/1.11 Position Mooring Equipment and Systems

To clarify the requirements for position mooring equipment and systems and the symbols  and Ã.

1-1-3/9 Offshore Installations To specify that offshore installations are to be satisfactorily design reviewed and surveyed, and installed at an Owner’s specified operation site.

1-1-3/11 Floating Production Installations To specify that floating installations are to be satisfactorily design reviewed and surveyed, and installed at an Owner’s specified operation site and to provide a notation for floating installations on which ABS is not requested to class the topside production facilities.

1-1-3/19.1 Floating Installations To specify that the notations apply to topside facilities.

1-1-3/31 Drilling Systems To include the notation À CDS (N).

EFFECTIVE DATE 1 January 2009 – shown as (2009) (based on the contract date for new construction between builder and Owner)

Part/Para. No. Title/Subject Status/Remarks PART 3 Hull Construction and Equipment 3-1-3/5.7 Selection Criteria for ABS Grades of

Steel To reflect expansion of the thickness ranges and corresponding CVN impact requirements for the ordinary and higher strength hull steels in 2-1-2/Table 4 and 2-1-3/Table 4 of the ABS Rules for Materials and Welding. (Incorporates Notice No. 1)

3-1-3/5.9.2 CVN Requirements To reflect expansion of the thickness ranges and corresponding CVN impact requirements for the ordinary and higher strength hull steels in 2-1-2/Table 4 and 2-1-3/Table 4 of the ABS Rules for Materials and Welding. (Incorporates Notice No. 1)

3-1-3/Table 1 Material Selection Requirements for ABS Ordinary and Higher Strength Steels

To reflect expansion of the thickness ranges and corresponding CVN impact requirements for the ordinary and higher strength hull steels in 2-1-2/Table 4 and 2-1-3/Table 4 of the ABS Rules for Materials and Welding. To delete obsolete material grades CS and DS. (Incorporates Notice No. 1)

PART 4 Machinery and Systems 4-1-1/Table 2 Ambient Temperatures for

Unrestricted Service To base acceptance of materials for machinery on specified minimum identified air and sea temperatures. (Incorporates Notice No. 1)

4-2-6/5.5.1(e) (New)

Flexible Hoses To provide requirements governing the use of flexible hoses in fixed oxygen-acetylene systems. (Incorporates Notice No. 1)

4-2-6/9.3.3 (New)

Non Self-Propelled Units To clarify the starting air requirements for non self propelled units. (Incorporates Notice No. 1)

4-3-2/3.1.2 Capacity of Generators To clarify that after the emergency generator has been started (after a blackout), “other machinery” must be used in conjunction with the remaining main generators in order to start the propulsion machinery. (Incorporates Notice No. 1)

4-3-2/3.1.4 Starting from “Dead Ship” Condition To clarify that some sources of power are assumed not to be available and that the requirement would also be applicable to vessels with emergency batteries (with no emergency generator). (Incorporates Notice No. 1)

4-3-2/5.3 Emergency Power Supply To clarify the requirements. (Incorporates Notice No. 1)

Page 8: MODU_nandgi_e

Notices and General Information

6 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 4-3-2/5.7 Transitional Source of Power To align the requirements for the minimum emergency services required

to be supplied by the transitional source of power with 5.3.10 of the IMO MODU Code. (Incorporates Notice No. 1)

4-3-2/Table 1 Alarms and Safeguards for Emergency Diesel Engines

To provide clarification between the requirements in 4-3-2/Table 1 and those in 4-2-1/7.2 of the Steel Vessel Rules. (Incorporates Notice No. 1)

4-3-2/7.9 Harmonics To align the requirements with 4.9.2.2. of IEC 61892-1. (Incorporates Notice No. 1)

4-3-2/17.1.2 System Requirements To clarify the requirement for two separate feeders, to require an alarm when there is a loss of power in any one of the feeders, and to clarify an acceptable alternative arrangement when one feeder with a battery is provided. (Incorporates Notice No. 1)

4-3-2/19.1.2 Other Auxiliaries To align the requirements with Chapter 9.10.2 of the IMO MODU Code. (Incorporates Notice No. 1)

4-3-4/7.9.7 Terminals To align the requirements with current practice. (Incorporates Notice No. 1)

PART 5 Fire and Safety –Measures and Features 5-2-2/1.3.6 (New)

Connections To align the requirements with 9.4.15 of the IMO MODU Code and ABS practice. (Incorporates Notice No. 1)

5-2-3/1 Fixed Fire Fighting Systems To clarify the applicable standard for fixed fire fighting systems that are installed in excess of the Rule requirements. (Incorporates Notice No. 1)

5-3-1//9.3 Other Auxiliaries To align the requirements with 9.10.2 of the IMO MODU Code. (Incorporates Notice No. 1)

EFFECTIVE DATE 1 July 2009 – shown as (1 July 2009) (based on the contract date for new construction between builder and Owner)

Part/Para. No. Title/Subject Status/Remarks PART 4 Machinery and Systems 4-2-2/7.9 Manufacturing of Plastic Pipes To allow for consideration of the requirements in recognized standards

for plastic pipe manufacturing. (Incorporates Notice No. 2)

4-2-2/19 Fluid Power Cylinders To clarify the requirements and align them with the Steel Vessel Rules. (Incorporates Notice No. 2)

4-3-3/5.17.3 (New)

Electrical Cables for the Emergency Fire Pump

To align the requirements with IMO MSC Circular 1120. (Incorporates Notice No. 2)

5-2-3/5.11 Fixed High Expansion Foam Systems To reflect the use of MSC.1/Circ.1271 for High-Expansion Foam Systems that utilize inside air. (Incorporates Notice No. 2)

5-2-4/Table 1 Classification of Portable and Semi-portable Extinguishers

To align the requirements with Chapter 4, Paragraph 3.1.1.1 of the IMO FSS Code and to remove application of Halon fire extinguishers. (Incorporates Notice No. 2)

5-2-4/Table 2 Hand Portable Fire Extinguishers and Semi-portable Fire-Extinguishing Systems

To align the requirements with Chapter 4, Paragraph 3.1.1.1 of the IMO FSS Code. (Incorporates Notice No. 2)

Page 9: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 7

EFFECTIVE DATE 1 January 2010 – shown as (2010) (based on the contract date for new construction between builder and Owner)

Part/Para. No. Title/Subject Status/Remarks PART 3 Hull Construction and Equipment 3-1-1/3.1 Self-Elevating Drilling Unit To clarify the definition of self-elevating drilling unit in line with the

IMO MODU Code, Regulation 1.3.3 and IACS UR D2. (Incorporates Notice No. 3)

3-1-1/3.3 Column-Stabilized Drilling Unit To clarify the definition of self-elevating drilling unit in line with the IMO MODU Code, Regulation 1.3.4 and IACS UR D2. (Incorporates Notice No. 3)

3-1-2/1.5.4 Wave-induced Dynamic Responses To clarify that the requirements only apply to self-elevating drilling units in elevated condition. (Incorporates Notice No. 3)

3-1-A2 First Paragraph

<No Title> To clarify that the application of Appendix 3-1-A2 for deep water wave theory is not limited to water depths exceeding 300 ft, but the minimum water depth where the linear wave theory can be used is also dependent on the wave height and period. (Incorporates Notice No. 3)

3-2-4/5.11.5 Watertight Bracing Members To align the requirements with 2.6.14 of the IMO MODU Code. (Incorporates Notice No. 3)

3-3-1/7.3 Column-Stabilized Drilling Units To clarify that footings at the bottom of single columns are subject to the same extent of damage as the columns and to align the requirements with 3.5.2 of the IMO MODU Code. (Incorporates Notice No. 3)

PART 4 Machinery and Systems 4-2-3/1.1 Tank Vents and Overflows – General To align the requirements with Regulation 20 of the International

Convention on Load Lines (Incorporates Notice No. 3)

4-2-3/1.5 Height and Wall Thickness of Vent Pipes

To align the requirements with Regulation 20 of the International Convention on Load Lines and IACS UI LL36. (Incorporates Notice No. 3)

4-2-3/1.9.5 Vent Outlet Closing Devices To incorporate requirements for the vent closing devices in line with IACS UR P3. (Incorporates Notice No. 3)

4-2-5/11 (New)

Additional Measures for Oil Pollution Prevention

To incorporate requirements protection of fuel oil tanks in line with Regulation 12A, Annex I, MARPOL 73/78, as amended. (Incorporates Notice No. 3)

4-2-5/13 (New)

Class Notation – POT To recognize enhanced pollution prevention compliance of mobile offshore drilling units. (Incorporates Notice No. 3)

4-2-6/5.5.1(b) Piping Materials To align the requirements with NFPA 51, USCG Title 46 CFR 56.50-103, and BS 29593/ISO 9539. (Incorporates Notice No. 3)

4-3-1/Table 4 Primary Essential Services To incorporate additional services required to be ABS certified. (Incorporates Notice No. 3)

4-3-1/Table 5 Secondary Essential Services To incorporate additional services required to be ABS certified. (Incorporates Notice No. 3)

4-3-3/3.1.1(b) Equipment in Areas Protected by Local Fixed Pressure Water-spraying or Local Water-mist Fire Extinguishing System in Machinery Spaces

To clarify that the requirement for a degree of protection not less than IP 44 will apply only to electrical and electronic equipment intended for essential services when affected by the discharge of local application water-spray or water mist fire extinguishing systems. (Incorporates Notice No. 3)

4-3-4/1 Plans and Data to Be Submitted To clarify the requirements for essential machines of 100 kW and over. (Incorporates Notice No. 3)

4-3-4/3.1.1 Applications To document that rotating machines for services indicated in 4-3-4/Table 11 require ABS certification. (Incorporates Notice No. 3)

4-3-4/7.1.1 Applications To document that motor controllers, and motor control centers for services indicated in 4-3-4/Table 11 require ABS certification. (Incorporates Notice No. 3)

Page 10: MODU_nandgi_e

Notices and General Information

8 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 4-3-4/13.1.1 General To clarify the requirements regarding cable glands designed for use in

hazardous areas. (Incorporates Notice No. 3)

4-3-4/Table 11 (New)

Additional Services Requiring Electrical Equipment to be Designed, Constructed and Tested to the Requirements in Section 4-3-4

To incorporate additional services required to be ABS certified. (Incorporates Notice No. 3)

PART 5 Fire and Safety – Measures and Features 5-1-1/5.9 <No Title> To align the requirements with 9.2.5 of the IMO MODU Code.

(Incorporates Notice No. 3)

5-2-1/3.1 Plans and Specifications – General To ensure that the emergency fire pumps have sufficient lift capacity (NPSHR vs. NPSHA) and performance at limited suction conditions and to verify compliance with such requirements early in the design phase of the vessel. (Incorporates Notice No. 3)

EFFECTIVE DATE 1 January 2011 – shown as (2011) (based on the contract date for new construction between builder and Owner)

Part/Para. No. Title/Subject Status/Remarks PART 1 Conditions of Classification (Supplement to Rules for Conditions of Classification – Offshore

Units and Structures) 1-1-4/1 Hull and Design Data To align the plan submission requirements with current ABS practice.

(Incorporates Notice No. 4)

1-1-4/9 Submissions To align the plan submission requirements with current ABS practice. (Incorporates Notice No. 4)

1-1-5/1 First Paragraph

<No Title> To clarify the conditions for unrestricted service specified in the MODU Rules and the request for the details of the service restrictions, when applicable, to be placed in the Operating Manual. To remove references to a Limited Service notation (Incorporates Notice No. 4)

1-1-5/1.3vi) <No Title> To remove references to a Limited Service notation (Incorporates Notice No. 4)

PART 3 Hull Construction and Equipment 3-1-1/1.5 Self-Propelled Unit To clarify the definition of self-propelled units and to clarify the

process to confirm a unit as self-propelled or non-self-propelled. (Incorporates Notice No. 4)

3-1-1/1.7 Non-Self-Propelled Unit To clarify the definition of non-self-propelled units and to clarify the process to confirm a unit as self-propelled or non-self-propelled. (Incorporates Notice No. 4)

3-2-1/1.17 Fatigue Analysis To add surface-type unit for fatigue analysis. (Incorporates Notice No. 4)

3-2-2/13 (New)

Higher-strength Materials To introduce the material conversion coefficient to account for the use of higher-stress structural steels for stiffeners, beams, girders and webs in watertight bulkheads and flats and tank bulkheads and flats. (Incorporates Notice No. 4)

3-2-3/9 Hull Interface Structure with Legs To introduce a paragraph on the effects of friction on leg guides and to align the text with Section 4-1-3. (Incorporates Notice No. 4)

3-2-4/15 (New)

Higher-strength Materials To introduce the material conversion coefficient to account for the use of higher-stress structural steels for beams and girders on the upper structure of column-stabilized drilling units. (Incorporates Notice No. 4)

3-2-A3 (New)

Guide for the Allowable Stresses for Localized Highly-stressed Areas

To clarify the allowable stresses for fine mesh sizes of Finite Element Analyses intended for localized high stress areas in way of structural discontinuities. (Incorporates Notice No. 4)

3-4-1/3.3.5 Hull Interface Structure with Legs To provide the factor of safety for dynamic analysis methods based on the ratios of factor of safety between quasi-static method and dynamic method specified in API RP 2SK. (Incorporates Notice No. 4)

Page 11: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 9

Part/Para. No. Title/Subject Status/Remarks PART 4 Machinery and Systems 4-1-1/9 Plans and Data to be Submitted To align the plan submission requirements with current ABS practice.

(Incorporates Notice No. 4)

4-1-1/15 Ambient Temperature To clarify that, for unrestricted service, the offshore unit is to be designed for an ambient temperature of 0°C (32°F) or lower. (Incorporates Notice No. 4)

4-1-1/17 Materials Containing Asbestos To align the requirements with IMO Res. MSC.282(86), adopting SOLAS Reg II-1/3-5.2, which prohibits installation of materials containing asbestos on all ships or units (both new construction and existing vessels) after 1 January 2011. (Incorporates Notice No. 4)

Section 4-1-3 Jacking and Associated Systems To update the requirements for jacking systems per the Jacking System Ad-hoc Group, formed by ABS and industry representatives. (Incorporates Notice No. 4)

4-2-2/3.1 General Requirements To require that pumps used in fixed water-based, or equivalent, local application fire-fighting systems and the sprinkler system pump are to be also certified by the Surveyor at the manufacturer’s plant. (Incorporates Notice No. 4)

4-2-2/21.3 Valve Connections to Shell To align the requirements with other ABS Rules. (Incorporates Notice No. 4)

4-2-3/1.1 General To clarify the requirements regarding shutoff valves or closing devices in vent piping. (Incorporates Notice No. 4)

4-2-4/1.1 General To align the alternative bilge requirements for small compartments in surface-type units with the Steel Vessel Rules. (Incorporates Notice No. 4)

4-2-4/1.5 Direct Bilge Suctions To require a direct bilge suction to be fitted with a stop-check valve. (Incorporates Notice No. 4)

4-2-4/1.7 Emergency Bilge Suctions To clarify the requirements for emergency bilge suctions. (Incorporates Notice No. 4)

4-2-4/13.7.1(b) Controls and Indications To make a comprehensive list of control and indications required at the centralized ballast control station. (Incorporates Notice No. 4)

4-2-5/1.1.1 Tanks To incorporate requirements of IMO MSC.1/Circ.1322, which requires that boundary area of a fuel oil tank that is common with machinery spaces of category A be kept to a minimum. (Incorporates Notice No. 4)

4-2-5/Figure 1 Acceptable Fuel Oil Tanks Arrangements Inside Category A Machinery Spaces

To incorporate requirements of IMO MSC.1/Circ.1322, which requires that boundary area of a fuel oil tank that is common with machinery spaces of category A be kept to a minimum. (Incorporates Notice No. 4)

4-2-5/1.1.2 Spillage To incorporate requirements of IMO MSC.1/Circ.1322, which requires that boundary area of a fuel oil tank that is common with machinery spaces of category A be kept to a minimum. (Incorporates Notice No. 4)

4-2-5/3.9 Valves on Oil Tanks To clarify that the use of an electric, hydraulic or pneumatic system to keep the valve directly in the open position is not acceptable for tanks supplying fuel to diesel engines for essential or emergency services. (Incorporates Notice No. 4)

4-2-6/1.1 General To remove the necessity of remote closure on valves which are normally closed. (Incorporates Notice No. 4)

4-2-6/5.5.1(a) General To clarify that only high pressure oxygen and acetylene piping is to be certified as Group I piping. (Incorporates Notice No. 4)

4-2-6/9.5 Protective Devices for Starting-air Mains

To clarify that the protective devices for starting-air mains requirement applies to the case where starting air is directly injected into cylinders. (Incorporates Notice No. 4)

4-3-2/9.1.4 Back-up Protection To clarify the specific requirements for back-up fuse arrangements and cascade protection and to align the MODU Rules with the Steel Vessel Rules. (Incorporates Notice No. 4)

Page 12: MODU_nandgi_e

Notices and General Information

10 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 4-3-2/9.13.5 Undervoltage Protection and

Undervoltage Release To clarify that motors provided with undervoltage protection (UVP) will not automatically restart upon restoration of normal voltage, after a stoppage due to a low voltage condition or voltage failure condition. To clarify which motors are required to be provided with undervoltage release. (Incorporates Notice No. 4)

4-3-2/15.5.4 (New)

Jacking System To require a voice communication system between the central jacking control station and a location at each leg in self-elevating units. (Incorporates Notice No. 4)

PART 5 Fire and Safety – Measures and Features 5-1-1/1.5 Materials Containing Asbestos To align the requirements with IMO Res. MSC.282(86), adopting

SOLAS Reg II-1/3-5.2, which prohibits installation of materials containing asbestos on all ships or units (both new construction and existing vessels) after 1 January 2011. (Incorporates Notice No. 4)

5-1-1/3.15 <No Title> To clarify the requirements for structural fire protection of watertight doors and to incorporate IACS Unified Interpretation (UI) SC156, Section 4. (Incorporates Notice No. 4)

5-1-1/3.19 <No Title> To incorporate the requirements of SOLAS Chapter II-2/Reg 9.3.1 and 9.3.3 concerning pipe penetrations through A Class divisions. (Incorporates Notice No. 4)

5-1-1/Figure 1 Pipes Penetrating “A” Class Divisions

To incorporate the requirements of SOLAS Chapter II-2/Reg 9.3.1 and 9.3.3 concerning pipe penetrations through A Class divisions. (Incorporates Notice No. 4)

5-1-1/3.21 <No Title> To incorporate the requirements of SOLAS II-2, Regulation 9.3.2 for pipe penetrations through B Class divisions. (Incorporates Notice No. 4)

5-1-1/Figure 2 (New)

Pipes Penetrating “B” Class Divisions To incorporate the requirements of SOLAS II-2, Regulation 9.3.2 for pipe penetrations through B Class divisions. (Incorporates Notice No. 4)

5-1-1/5.23 <No Title> To incorporate the requirement of SOLAS II-2/Regulation 9.7.3. (Incorporates Notice No. 4)

5-1-1/Figure 3 (New)

Ventilation Ducts Penetrating “A” Class Divisions

To incorporate the requirement of SOLAS II-2/Regulation 9.7.3. (Incorporates Notice No. 4)

5-1-1/5.25 <No Title> To align the requirements with SOLAS II-2/9.7.2.1 (and the draft of 2009 IMO MODU Code 9.3.15). To add conditions under which the ventilation system for the galley may also serve the pantry (Incorporates Notice No. 4)

5-1-1/5.29 <No Title> To incorporate the requirements of SOLAS II-2/Reg 9.7.3.2. (Incorporates Notice No. 4)

5-1-1/Figure 4 (New)

Ventilation Ducts Penetrating “B” Class Divisions

To incorporate the requirements of SOLAS II-2/Reg 9.7.3.2. (Incorporates Notice No. 4)

5-1-1/5.41 (New)

<No Title> To clarify the use of air balance duct installation in line with IACS Unified Interpretation SC119. (Incorporates Notice No. 4)

5-2-3/9 Protection of Helicopter Decks and Refueling Facilities

To align the requirements with 9.11 of the IMO MODU Code ‘98, 2001 Consolidated Edition. (Incorporates Notice No. 4)

5-3-1/9.1 Ventilating Fans and Openings To require arrangements to permit the release of smoke, in the event of fire, from a machinery space of Category A. To incorporate SOLAS Reg. II-2/8.3. (Incorporates Notice No. 4)

Page 13: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 11

EFFECTIVE DATE 1 January 2012 – shown as (2012) (based on the contract date for new construction between builder and Owner)

Part/Para. No. Title/Subject Status/Remarks PART 1 Conditions of Classification (Supplement to Rules for Conditions of Classification – Offshore

Units and Structures) Section 1-1-4 Plans and Design Data to be

Submitted To move lists of plans and data to Parts 3 and 4. To clarify the application of requirements in other Rules and Guides for additional class notations.

1-1-5/1 <No Title> To clarify that the Operating Manual needs to be available in English.

1-1-5/1.3i) <No Title> To clarify the terminology on temperatures.

PART 3 Hull Construction and Equipment 3-1-1/3.1 Self-Elevating Drilling Unit To align the text with 1.3.47 of the 2009 IMO MODU Code.

3-1-1/25 (New)

Service Temperature To clarify the term “Service Temperature”, including an explanatory figure.

3-1-1/27 (New)

Wind Velocity or Speed To clarify the term “Wind Velocity”.

3-1-1/29 (New)

Critical Structural Areas To clarify the term “Critical Structural Areas”.

Section 3-1-2 (New)

Plans and Design Data to be Submitted

To move the requirements for submission of hull plans and design data into Part 3.

3-1-2/1 Last 2 Bullets

<No Title> To require this essential information on critical structural areas for maintenance/survey work and to clarify the terminology for temperatures.

3-1-3/1.1 General To clarify that the specified environmental conditions used in the design are to be recorded in the Operating Manual.

3-1-4/1.1 General To clarify the requirements and to remove reference to machinery materials in this structural section.

3-1-4/1.9 (New)

Service Temperature To clarify the maximum service temperature of units intended for unrestricted service.

3-1-4/5.1 General To include selection of material grades for surface-type drilling units and to clarify terminology on service temperature.

3-1-4/5.3 (New)

Material Application Categories To define the three material application categories used in the MODU Rules.

3-1-4/5.5 Selection Criteria for ABS Grades of Steel

To clarify the terminology on temperatures.

3-1-4/5.7.1 General To clarify the terminology on temperatures.

3-2-1/3.1 General To refer to the Drillship Guide for surface-type drilling units.

3-2-2/1.3 Scantlings To add reference to the Drillship Guide.

3-2-2/1.5 Protection of Steel Work To clarify that only hard coatings are permitted for protection of salt water ballast tanks and to advise about compliance with PSPC with the optional notation CPS.

3-2-2/7.1 General To add reference to the Drillship Guide.

3-2-2/7.7.2 Stiffeners To clarify the use of the equation for SM.

3-2-2/7.11 (New)

Openings To address the strength of watertight bulkheads in the way of openings for watertight doors, in accordance with 3-2-9/9.9 of the Steel Vessel Rules.

3-2-2/11.3 Lifeboat Platform To clarify that the strength requirements are intended for the supporting structure in the direct load path from the life saving appliances.

3-2-3/3 General Requirements for Materials and Scantlings

To clarify the structural elements considered Special, Primary, and Secondary Applications.

3-2-3/Figure 1 (New)

Typical Grades for Self-Elevating Drilling Units

To clarify the structural elements considered Special, Primary, and Secondary Applications.

Page 14: MODU_nandgi_e

Notices and General Information

12 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 3-2-4/1.7 Material Selection To clarify the structural elements considered Special, Primary, and

Secondary Applications.

3-2-4/Figure 1 (New)

Typical Grades for Column-Stabilized Drilling Units

To clarify the structural elements considered Special, Primary, and Secondary Applications.

3-2-5/3 Material Selection To clarify the structural elements considered Special, Primary, and Secondary Applications.

3-2-5/Figure 1 (New)

Typical Grades for Surface-Type Drilling Units

To clarify the structural elements considered Special, Primary, and Secondary Applications.

3-2-5/5.1 (New)

Hull Scantlings and Local Supporting Structure

To clarify the basis for design of hull structure.

3-2-5/5.3 (New)

Hull Girder Strength To clarify the requirements for longitudinal strength.

3-2-5/5.5 (New)

Structural Design and Analysis of the Hull

To define the methodology for structural design and analysis of the hull.

3-2-5/5.7 (New)

Fatigue Analysis To clarify the fatigue analysis requirements for surface-type drilling units.

3-2-5/5.9 (New)

Design Loads for Local Structures To define the impact loads for the forebody and deck loads to be used in the analyses.

3-2-5/5.11 (New)

Superstructures, Deckhouses and Helicopter Decks

To clarify the requirements for the design of superstructures, deckhouses, helicopter decks and other hull structures.

3-2-5/7 (New)

Dynamic Loading Approach To clarify the application of the DLA methodology to surface-type drilling units.

3-2-5/9 Drilling Well To clarify current practices regarding the scantlings of drilling well plating and the conditions to exempt cofferdams surrounding the drilling well.

3-2-5/11 Hatches To clarify application of requirements for small hatches on exposed fore deck.

3-2-A1/1.1 Column Stabilized Unit To align the Ice Class requirements with the revised Part 6, Chapter 1 of the Steel Vessel Rules.

3-2-A1/Table 1 Guidance for Ice Class Selection of Column-Stabilized Drilling Units

To align the Ice Class requirements with the revised Part 6, Chapter 1 of the Steel Vessel Rules.

3-2-A1/7 Clearance To align the Ice Class requirements with the revised Part 6, Chapter 1 of the Steel Vessel Rules.

3-2-A1/Table 3 Ice Pressure Factors To align the Ice Class requirements with the revised Part 6, Chapter 1 of the Steel Vessel Rules.

3-2-A1/11.3 Global Design Ice Load To align the Ice Class requirements with the revised Part 6, Chapter 1 of the Steel Vessel Rules.

3-2-A1/13.3 Local Scantlings To align the Ice Class requirements with the revised Part 6, Chapter 1 of the Steel Vessel Rules.

3-2-A3/1 Plated Structures To clarify the allowable stresses for higher tensile strength steel considering their grade.

3-3-1/3 Inclining Experiment To clarify how the results of the inclining experiment and lightweight survey are to be presented.

3-3-2/1.1 General To clarify metacentric height procedure requirements.

3-3-2/1.3.4 Alternatives for Treatment of Void Spaces

To define the systems referenced and to add the need to address the flooding of undrainable voids in the Operating Manual.

3-3-2/3.1 General To clarify the examples given.

3-3-2/3.3.1 Intact Stability Criteria To clarify the requirements and application.

3-3-2/3.5.1 Self-Elevating Units To define the minimum distance between effective watertight bulkheads assumed to be damaged in accordance with 3.5.6 of the 2009 IMO MODU Code.

Page 15: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 13

Part/Para. No. Title/Subject Status/Remarks 3-3-2/3.5.2 Column-Stabilized Units To define an alternative for extent of horizontal damage in columns

based on the minimum distance between effective watertight bulkheads assumed to be damaged.

3-3-2/3.5.3 Surface Type Units To define the minimum distance between effective watertight bulkheads assumed to be damaged in accordance with 3.5.2 of the 2009 IMO MODU Code.

3-3-2/3.7 Overturning Moment To update terminology and separate requirements for specific types of units.

3-3-2/3.9 Wind Tunnel Tests To clarify the extent of testing and the requirement to submit the testing program for review.

3-3-2/5.3.1 Internal Openings Used for Access While Afloat

To align the requirements with 3.6.5.2 of the 2009 IMO MODU Code.

3-3-A2/1.3 Design To use standard terminology from ABS Rules.

3-3-A2/7.1 Calculation Program To use standard terminology from ABS Rules and to clarify some items.

3-3-A2/9 Acceptable Tolerances To use standard terminology from ABS Rules and to clarify some items.

3-3-A2/Table 1 Acceptable Tolerances To update items for use in MODU stability.

3-4-1/1 General To require symbol Á as a condition of classification for self-propelled MODUs.

3-4-1/3 Temporary Mooring Equipment To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules for symbol Á.

3-4-1/5 Position Mooring Equipment To reference new Survey requirement for symbol Â.

3-4-1/9 (New)

Anchoring and Mooring Equipment To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules. Revised to include paragraph on single anchor arrangement for units with DPS-2 or DPS-3 notation intended for deepwater operations.

3-4-1/11 (New)

Equipment Mass and Size To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules.

3-4-1/Table 1 (New)

Values of Cs To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules.

3-4-1/13 (New)

Tests To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules.

3-4-1/15 (New)

Anchor Types To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules.

3-4-1/17 (New)

Windlass Support Structure and Cable Stopper

To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules.

3-4-1/Figure 1 (New)

Direction of Forces and Weight To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules.

3-4-1/Figure 2 (New)

Sign Convention To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules.

3-4-1/19 (New)

Hawse Pipes To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules.

3-4-1/Table 2 (New)

Equipment for Self-propelled Ocean-going Units

To incorporate and adapt the requirements from Section 3-5-1 of the Steel Vessel Rules.

PART 4 Machinery and Systems 4-1-1/1 (New)

Requirements for Classification To define the scope of the several Parts of the MODU Rules referring to equipment, machinery and systems.

4-1-1/1.1.1 (New)

General To specify that the design and construction of general drilling equipment are not subject to class requirements if they comply with a recognized standard.

4-1-1/1.1.2 (New)

Essential Systems to Unit Safety To identify safety systems and equipment needed to be reviewed and surveyed even if they are located in drilling areas or related to drilling systems and equipment.

Page 16: MODU_nandgi_e

Notices and General Information

14 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 4-1-1/1.1.3 (New)

References To provide references to other requirements applicable or related to drilling systems and equipment.

4-1-1/3 (New)

Definitions To include definitions for terms used in Part 4.

4-1-1/5 (New)

Machinery Plans To add general information on submission of machinery plans in line with Steel Vessel Rules and other ABS Rules and Guides.

4-1-1/7.1 Inclinations To clarify the application of the requirements for angles of inclination.

4-1-1/Table 2 Ambient Temperatures for Machinery, Equipment and Appliances in Units of Unrestricted Service

To clarify the terminology on temperatures.

4-1-1/7.13 (New)

Well Test Systems To clarify the application of the requirements for temporary and permanent well test systems installed on board MODUs.

4-1-1/Table 3 Primary Essential Services To clarify the terminology on temperatures.

4-1-1/Table 4 Secondary Essential Services To align Primary Essential and Secondary Essential services with the new definition introduced in 4-1-1/3.5.

4-1-2/1 (New)

Prime Movers To clarify requirements for certification of prime movers in line with 4-3-4/3 and the Steel Vessel Rules.

4-1-2/3 First Paragraph

<No Title> To specify that for drilling units without CDS notation, internal combustion engines used solely for drilling operations need not be of approved type and need not be inspected at the plant of manufacture.

4-1-2/3.9 Governor Control To reference requirements for operating governors of generator prime movers in Section 6-1-3.

4-1-2/9 (New)

Electrical Machinery and Equipment To clarify location of requirements for electrical machinery and equipment.

4-1-2/11 (New)

Certification of Machinery and Equipment

To clarify location of requirements for certification of machinery and equipment.

4-2-1/3 (New)

Definitions To add the definitions applicable to piping systems and to harmonize definitions of pressures and temperatures and updated throughout the text.

4-2-1/5 Classes of Piping Systems To update the piping Groups I and II to the piping Classes I, II and III used in other ABS Rules.

4-2-1/7.1 Plans To update the piping Groups I and II to the piping Classes I, II and III used in other ABS Rules.

4-2-1/11.7.1 Circulating Water Systems To clarify that molded expansion joints are permitted only in Class III sea water piping systems, in line with the Steel Vessel Rules.

4-2-1/11.7.2(b) <No Title> To clarify that the maximum working pressure of the system and not the MAWP is to be lower than the design pressure of the expansion joint determined by the burst test.

4-2-1/11.7.3 Fire Resistant Test To clarify that maximum service pressure means maximum working pressure of the system and that ISO 15540 and ISO 15541 can be used for this test, as the criteria are identical.

4-2-1/11.9 (New)

Metallic Bellow Type Expansion Joints

To add requirements for metallic bellow type expansion joints in line with the Steel Vessel Rules.

4-2-1/11.11 (New)

Pipe Joints To add requirements for pipe joints in line with the Steel Vessel Rules.

4-2-1/11.13 (New)

Mechanical Joints To add requirements for mechanical joints in line with the Steel Vessel Rules.

4-2-1/11.29 Flexible Hoses To align the requirements with the Steel Vessel Rules and to clarify that ISO 15540 and ISO 15541 can be used for this test, as the criteria are identical.

4-2-1/11.33.2 Boiler Flats To align the requirements with industry practice as the original IACS requirement in this regard (UR F35.2.1.4.2) is no longer applied by IACS.

Page 17: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 15

Part/Para. No. Title/Subject Status/Remarks 4-2-2/3 (New)

Certification of Piping Components To clarify location of requirements for certification of piping components.

4-2-2/5.1 Steel Pipe To update the piping Groups I and II to the piping Classes I, II and III used in other ABS Rules.

4-2-2/5.7.1 Design Pressure and Minimum Thickness

To clarify that the equations determine the design pressure as defined in 4-2-1/3.17 and that in the note, the actual working pressure is the actual maximum working pressure as defined in 4-2-1/3.19.

4-2-2/5.9 Design Pressure and Thickness – Alternative Consideration

To clarify that the equations determine the design pressure as defined in 4-2-1/3.17.

4-2-2/Table 1 Allowable Stress Values S for Piping To clarify terminology on temperature.

4-2-2/7.5.1 Internal Pressure To use the terminology defined in 4-2-1/3.19.

4-2-2/7.5.4 Temperature To clarify terminology on temperature.

4-2-2/7.7.1 Supports To clarify terminology on temperature.

4-2-2/7.9 Manufacturing of Plastic Pipes To use the terminology defined in 4-2-1/3.17.

4-2-2/7.13.4(b) <No Title> To use the terminology defined in 4-2-1/3.17.

4-2-2/7.15.4(b) <No Title> To use the terminology defined in 4-2-1/3.17.

4-2-2/9.3 Construction To update the piping Groups I and II to the piping Classes I, II and III used in other ABS Rules and to clarify the meaning of maximum pressure as maximum working pressure.

4-2-2/11.1 General To update the piping Groups I and II to the piping Classes I, II and III used in other ABS Rules and to clarify terminology on pressure and temperature.

4-2-2/15 Flanges To update the piping Groups I and II to the piping Classes I, II and III used in other ABS Rules.

4-2-2/19.1 General To use the terminology defined in 4-2-1/3.17.

4-2-2/19.3 Non-compliance with a Recognized Standard

To use the terminology defined in 4-2-1/3.17.

4-2-2/19.11 Exemptions To clarify the exemption of compliance with the Rule requirements when the fluid power cylinders are not within the scope of classification.

4-2-2/21.3 Valve Connections to Shell To clarify the requirements.

4-2-3/1.9.3 Protection for Fuel Oil and Lubricating Oil Tanks

To align the requirements with 4.8.5 of the 2009 IMO MODU Code.

4-2-4/1.1 General To clarify the definition of comparatively small compartments.

4-2-4/5.5 Manifolds, Cocks and Valve To align the requirements with the 2009 IMO MODU Code.

4-2-4/9.1.2 Branch Lines To adjust the intent of the requirement for small compartments.

4-2-3/13.5.2 Pump Performance To align the requirements with 4.10.4 of the 2009 IMO MODU Code.

4-2-3/13.7.1(b) Controls and Indications To align the requirements with 4.10.10 of the 2009 IMO MODU Code.

4-2-3/13.7.3(c) Disconnects To align the requirement with the 2009 IMO MODU Code, and to avoid the ambiguity whether the pumps or the pumps’ control system are to be disconnected from the power system.

4-2-3/13.7.4 Valve Position Indicating Systems To align the requirements with 4.10.17 of the 2009 IMO MODU Code.

4-2-5/1.1.4 Service and Settling Tanks To align the requirements with 4.8.6 of the 2009 IMO MODU Code.

4-2-5/9.1.3 <No Title> To define conditions for use of low flash point fuel in emergency service prime movers.

4-2-6/3.1 General To update the piping Groups I and II to the piping Classes I, II and III used in other ABS Rules and to clarify the exemption of compliance with the Rules for hydraulic systems which are not within the scope of classification.

4-2-6/3.17 Segregation of High Pressure Hydraulic Units

To use the terminology defined in 4-2-1/3.17.

Page 18: MODU_nandgi_e

Notices and General Information

16 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 4-2-6/5.5.1 General To update the piping Groups I and II to the piping Classes I, II and III

used in other ABS Rules.

4-2-6/5.5.2 Pressure Relief Devices To use the terminology defined in 4-2-1/3.17.

4-2-6/25 (New)

Raw Water System for Self-Elevating Units in Elevated Condition

To add requirements for raw water systems on self-elevating units in elevated condition based on current ABS practice.

4-3-1/5 Plans and Data to Be Submitted To add a reference to the new paragraph for hazardous areas.

4-3-2/5.1.1 Basic Requirement To clarify the arrangement of the emergency generator auxiliary systems.

4-3-2/5.1.2 Boundary To align the requirements with 5.4.3 of the 2009 IMO MODU Code.

4-3-2/5.3 First Paragraph

Emergency Power Supply To align the requirements with 4-8-2/5.5 of the Steel Vessel Rules.

4-3-2/5.3.1(f) <No Title> To align the requirements with 5.4.6.1.8 of the 2009 IMO MODU Code.

4-3-2/5.3.1(h) <No Title> To align the requirements with 5.4.6.1.8 of the 2009 IMO MODU Code.

4-3-2/5.3.3 Marking of Offshore Structures To align the requirements with 5.4.6.3 of the 2009 IMO MODU Code.

4-3-2/5.5.1 General To clarify that the angles of inclination referred to in this paragraph are in static condition and that the minimum angles of inclination defined in 4-1-1/7.1 are also applicable in this case.

4-3-2/5.5.2 Generator To clarify the arrangement of the emergency generator auxiliary systems and the use of low flashpoint fuels.

4-3-3/1.5 Electrical Equipment in Hazardous Areas

To add reference to hazardous areas definition.

4-3-3/3.5.4 Motors Below Decks To clarify that the suitability of the location where motors are installed below deck will be verified by the attending Surveyor.

4-3-3/9.1.1 General To align the requirements with 6.6.1 and 6.6.2 of the 2009 IMO MODU Code.

4-3-3/9.1.2 Electrical Equipment To align the requirements with 6.6.3 and 6.6.4 of the 2009 IMO MODU Code, except that certified electrical equipment other than the types listed under 4-3-3/9.1.2(b) will need special consideration.

4-3-3/9.1.3 (New)

Grouping and Temperature Class To align the requirements with 6.6.5, 6.6.6 and 6.6.7 of the 2009 IMO MODU Code.

4-3-3/Table 1 Minimum Degree of Protection To clarify the degree of protection required for the remote closure and monitoring of watertight doors, when the electrical equipment is below the worst damage waterline.

4-3-4/5 (New)

Computer Based Systems To align the requirements with 4-8-3/15 of the Steel Vessel Rules.

4-3-5/3.17.3 (New)

Cooling Systems for Machinery and Equipment

To make reference to cooling system requirements in Section 6-1-7.

4-3-5/7.1.1 (New)

Machinery Associated with Dynamic Positioning System

To align the requirements with 6.5.2 of the 2009 IMO MODU Code.

4-3-6/1.1 Hazardous Areas To align the requirements with 6.1 of the 2009 IMO MODU Code.

4-3-6/5.1 Hazardous Areas Zone 0 Include To align the requirements with 6.2.2 of the 2009 IMO MODU Code.

4-3-6/5.3vi) (New)

<No Title> To align the requirements with 6.2.3 of the 2009 IMO MODU Code.

4-3-6/5.5vi) <No Title> To align the requirements with 6.2.4 of the 2009 IMO MODU Code.

4-3-6/7.1i) <No Title> To align the requirements with 6.3.1.1 of the 2009 IMO MODU Code.

4-3-6/7.5i) <No Title> To align the requirements with 6.3.1.3 of the 2009 IMO MODU Code.

4-3-6/7.7 (New)

Ventilation Alarms To clarify the requirements for ventilation alarms related to hazardous areas based on IEC 60092-502.

4-3-6/7.9 (New)

Hold-back Devices To align the requirements with 6.3.3 of the 2009 IMO MODU Code.

4-3-6/9.3 Ventilation of Hazardous Areas To align the requirements with 6.4.1 of the 2009 IMO MODU Code.

Page 19: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 17

Part/Para. No. Title/Subject Status/Remarks 4-3-6/11 Machinery Installations in Hazardous

Areas To clarify the requirements. To add reference for requirements of electrical equipment and wiring in hazardous areas. To add paragraph to require safety devices in order to prevent overspeeding of internal combustion engines due to ingestion of flammable gas through the air intake. The distance of 15 m (50 ft) is based on API RP 505 for potential release of large amounts of gas, equivalent to the case of loading terminals.

PART 5 Fire and Safety – Measures and Features 5-1-1/1.7 (New)

Alternative Design and Arrangements To offer alternative methodology for the acceptance of novel designs, in line with 9.1 of the 2009 IMO MODU Code.

5-1-1/3.5 (New)

Details, Materials and Methods of Construction

To refer to the FTP Code and SOLAS, in line with 9.2.3 of the 2009 IMO MODU Code.

5-1-1/Table 1 Fire Integrity of Bulkheads Separating Adjacent Spaces

To align the requirements with Tables 9-1 and 9-2 of the 2009 IMO MODU Code. Note 3 in 5-1-1/Table 1 is expanded to address the case of bulkheads between adjacent spaces of the same category and purpose.

5-1-1/Table 2 Fire Integrity of Decks Separating Adjacent Spaces

To align the requirements with Tables 9-1 and 9-2 of the 2009 IMO MODU Code.

5-1-1/3.13 <No Title> To align the requirements with 9.2.7 of the 2009 IMO MODU Code.

5-1-1/3.17vi) (New)

<No Title> To align the requirements with 9.2.10 and 9.3.5 of the 2009 IMO MODU Code.

5-1-1/5.1 (New)

<No Title> To align the requirements with 9.3.1 of the 2009 IMO MODU Code.

5-1-1/5.3 (New)

<No Title> To align the requirements with 9.3.2 of the 2009 IMO MODU Code.

5-1-1/5.5 <No Title> To align the requirements with 9.3.3 of the 2009 IMO MODU Code.

5-1-1/5.7 <No Title> To clarify the material requirements for stairs.

5-1-1/5.9 <No Title> To align the requirements with 9.2.10 and 9.3.5 of the 2009 IMO MODU Code.

5-1-1/5.11 <No Title> To clarify that enclosed air spaces cannot communicate freely one deck with the next.

5-1-1/5.19 <No Title> To align the requirements with 9.3.10 of the 2009 IMO MODU Code.

5-1-1/5.21 <No Title> To align the requirements with 9.3.11 of the 2009 IMO MODU Code.

5-1-1/5.23 <No Title> To align the requirements with 9.3.12 of the 2009 IMO MODU Code.

5-1-1/5.27ii) <No Title> To align the requirements with 9.3.14.2 of the 2009 IMO MODU Code.

5-1-1/5.27 Last Paragraph

<No Title> To clarify minimum thickness for steel sheet sleeves and the arrangement in case of decks.

5-1-1/Figure 3 Ventilation Ducts Penetrating “A” Class Divisions

To clarify that a manual damper may be an option in lieu of the required automatic damper.

5-1-1/5.29 <No Title> To align the requirements with 9.3.15 of the 2009 IMO MODU Code.

5-1-1/5.29.1 <No Title> To clarify that other spaces associated to the galley in addition to the pantry are also subject to the same requirements.

5-1-1/5.37 <No Title> To apply the requirements to all galley exhaust ducts and to clarify the requirements of the fire damper arrangements in order to make the fixed fire extinguishing means effective.

5-1-1/5.47 <No Title> To clarify the conditions for acceptance of air balancing ducts.

5-2-2/1.1.1 Number of Pumps To refer to the new requirements for raw water systems in self-elevating drilling units as supply to fire main systems.

5-2-2/1.5.2 Hoses To align the hose length requirement with the Steel Vessel Rules.

5-2-4/1.1 Extinguishers To clarify the requirements for portable fire extinguishers as a minimum for class, which may be exceeded for compliance with the IMO MODU Code, special instructions by the Flag Administration, or due to the fire hazards on board.

Page 20: MODU_nandgi_e

Notices and General Information

18 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 5-2-4/3.1 Number To align the requirements with 9.13.3 of the 2009 IMO MODU Code.

5-2-4/3.3ii) <No Title> To align the requirements with 9.13.2 of the 2009 IMO MODU Code.

5-2-4/3.5 (New)

Recharging of Air Cylinders To align the requirements with 9.14 of the 2009 IMO MODU Code.

5-2-4/Table 1 Classification of Portable and Semi-portable Extinguishers

To align the requirements with Table 9-3 of the 2009 IMO MODU Code and MSC.1/Circ.1275 as referred to in 9.9.1 of the 2009 IMO MODU Code.

5-2-4/Table 2 Hand Portable Fire Extinguishers and Semi-portable Fire-Extinguishing Systems

To align the requirements with Table 9-3 of the 2009 IMO MODU Code and MSC.1/Circ.1275 as referred to in 9.9.1 of the 2009 IMO MODU Code.

5-2-5/1.1 Fire Detection and Alarm Systems To align the requirements with 9.10.1 of the 2009 IMO MODU Code.

5-2-5/3.1 (New)

Hydrogen Sulfide Detection and Alarm

To align the requirements with 9.12 of the 2009 IMO MODU Code.

5-3-1/1.1.4 (New)

<No Title> To align the requirements with 9.4.1.4 of the 2009 IMO MODU Code.

5-3-1/1.3.1 <No Title> To align the requirements with 9.4.2.1 of the 2009 IMO MODU Code.

5-3-1/1.3.2 <No Title> To align the requirements with 9.4.2.2 of the 2009 IMO MODU Code.

5-3-1/1.11 (New)

<No Title> To define the requirements for stairways and corridors to be accepted as escape routes in line with 13.3 of the FSS Code.

5-3-1/1.13 (New)

<No Title> To clarify the material requirements for escape routes and muster stations.

5-3-1/3 Means of Access and Egress To clarify the requirements.

Appendix 5-3-A1 (New)

Fiber Reinforced Plastic (FRP) Gratings

To provide requirements for the acceptance of FRP gratings.

PART 6 Material, Marine Equipment and Machinery Certification 6-1-1/1.3.1 CDS Notation (optional) To refer to the CDS Guide for certification of drilling equipment and

systems in units with CDS notation.

6-1-1/1.3.2 Drilling Units without CDS Notation To clarify verification of drilling system equipment and components in units without CDS notation.

6-1-1/3.1 Basic Requirements To adapt the text to product unit certification only and to clarify the requirements based on current practices.

6-1-1/3.3 (New)

Specific Requirements To list the products covered by Part 6, Chapter 1 and their related Sections.

6-1-1/3.5 (New)

Angles of Inclination To highlight the requirements for angles of inclination as indicated in 4-1-1/7.1 as applied also to vendor machinery and equipment.

6-1-1/3.7 (New)

Ambient Temperature To highlight the requirements for ambient temperature as indicated in 4-1-1/7.7 as applied also to vendor machinery and equipment.

6-1-1/3.9 (New)

Ambient Temperature To introduce requirements for certification of products on skids, similar to requirements for Floating Production Installations.

6-1-1/5 (New)

Design Review and Survey of Equipment and Machinery

To introduce general requirements for certification of products, specifically, to clarify general extent of survey requirements for unit certification.

6-1-1/7 (New)

Prototype Testing To introduce and clarify requirements for Prototype Testing.

6-1-1/9 (New)

Type Approval Program To provide minimum amount of information that supplements the administrative process of Type Approval program.

6-1-1/11 (New)

Manufacturer’s Guarantee To clarify manufacturer’s responsibility.

6-1-2/1 (New)

General To introduce and clarify requirements for Materials Certification and to supplement Part 2.

Page 21: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 19

Part/Para. No. Title/Subject Status/Remarks 6-1-2/3.1 (New)

Plating and Shapes To emphasize that structural plating and shapes are to be manufactured by an ABS approved mill and certified by a Surveyor attending the mill.

6-1-2/3.3 (New)

Seamless Steel Pipes or Novel Cast Nodes used as Special or Primary Application Structure of Legs for Self-Elevating Units

To clarify that seamless tubular members used as a “Primary” member (outer tubular members of the lattice leg chords) of a jack-up’s leg structure is to be treated same as a structural plating and require to be manufactured by an ABS approved mill and certified by attending Surveyor.

6-1-2/3.5 (New)

Seamless Steel Pipes used as Secondary Application Structure of Legs for Self-Elevating Units

To clarify that seamless tubular members used as a “Secondary” member (internal tubular members of the lattice leg chords) of a jackup’s leg structure need not be treated same as structural plating and do not require to be manufactured by an ABS approved mill and certified by attending Surveyor.

6-1-2/5 (New)

Material for Foundation Structures To clarify acceptance requirement of material for foundation structures.

6-1-2/7 (New)

Helideck Structure To clarify acceptance requirement of material for helideck structure.

6-1-2/9.1 (New)

General To align the requirements for watertight doors with 3.6.3 of the 2009 IMO MODU code and with 3-2-9/9.9 of the Steel Vessel Rules.

6-1-2/9.3 (New)

Sliding Watertight Doors To clarify the requirements for certification of sliding watertight doors and to align them with 3-2-9/9.11.

6-1-2/9.5 (New)

Dogged Watertight Doors To clarify the requirements for certification of dogged watertight doors.

6-1-3/3.1.3 (New)

Hot Surfaces To incorporate new requirements related to high pressure fuel delivery lines in line with 4.8.7.2 and 4.8.7.3 of the 2009 IMO MODU Code.

6-1-3/3.9 (New)

References To provide references for major requirements related to internal combustion engines in other sections of these Rules.

6-1-3/5 (New)

Survey and Certification To provide an explanation of the survey and certification requirements.

6-1-4/5 (New)

Survey and Certification To provide an explanation of the survey and certification requirements.

6-1-5/1.1 (New)

Application To clarify the application of the requirements, in line with the Steel Vessel Rules.

6-1-5/1.3 (New)

Grouping of Boilers and Pressure Vessels

To specify the grouping used in the Tables, in line with the Steel Vessel Rules.

6-1-5/3 (New)

Materials for Group I Boilers, Heaters, Pressure Vessels and Heat Exchangers

To make reference to Part 2 regarding material testing.

6-1-5/5 (New)

Survey and Certification To provide an explanation of the survey and certification requirements.

6-1-6/3 (New)

Pipes To provide specific requirements for pipes in line with the Steel Vessel Rules and current practices.

6-1-6/5 (New)

Piping Components other than Pipes To provide specific requirements for piping components other than pipes in line with the Steel Vessel Rules and current practices.

6-1-6/7 (New)

Survey and Certification To provide an explanation of the survey and certification requirements.

6-1-7/3.1 Rotating Machines of 100 kW and Over

To refer to services related to additional optional notations since 4-3-4/Table 11 has been removed.

6-1-7/3.3 Switchboards, Distribution Boards, Controllers, etc.

To refer to services related to additional optional notations since 4-3-4/Table 11 has been removed.

6-1-7/5.1.1 Applications To refer to services related to additional optional notations since 4-3-4/Table 11 has been removed.

6-1-7/5.9.1 Temperature Rises To change “duty” to “rating” as a term more used by the industry. To clarify the requirement of temperature rises for insulation material above 180°C (356°F).

Page 22: MODU_nandgi_e

Notices and General Information

20 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 6-1-7/5.13 Lubrication To refer to lubrication requirements in ship-type units.

6-1-7/5.15 (New)

Operating and Overspeed Governors for Generator Prime Movers

To refer to governor requirements for generator prime movers.

6-1-7/9.1.1 Applications To refer to services related to additional optional notations since 4-3-4/Table 11 has been removed.

6-1-7/9.1.2(f) Earthing To add reference for earthing related requirements of three-wire dual-voltage DC systems.

6-1-7/11.3 Temperature Rise To clarify the requirement of temperature rises for insulation material above 180°C (356°F).

6-1-7/17.3.5 Semiconductor Converters for Propulsion

To add reference for protection of semiconductor converter circuits.

6-1-7/19 (New)

Survey and Certification To provide an explanation of the survey and certification requirements.

Section 6-1-8 (New)

Fire and Safety – Equipment and Systems

To provide requirements for certification of fire and safety equipment and systems.

6-1-9/3.11 Specified Service Temperature To clarify terminology on temperature.

6-1-9/13.1 Bearings To clarify terminology on temperature.

6-1-9/13.5 Flexible Shock Pads To clarify terminology on temperature.

6-1-9/25 Survey and Certification To consolidate all the related survey and testing requirements and to clarify the attendance of the Surveyor.

Section 6-1-10 (New)

Anchoring System – Symbol Á To provide requirements for certification of anchoring systems.

The reference date which is indicated in the parentheses following the title of the requirement in this Part is the date that the requirement becomes effective [e.g., 6-2-1/3 “Definitions” (2010) is to apply for vessels undergoing survey on or after 1 January 2010]

EFFECTIVE DATE 1 January 2010 – shown as (2010)

Part/Para. No. Title/Subject Status/Remarks PART 6 Surveys 6-1-1 (New)

General To better outline ABS' general requirements for surveys during construction/fabrication at Vendor's Facility and Builder's Yard, for initial Classification. (Incorporates Notice No. 3)

6-1-2/9.1 Applications To document that rotating machines for services indicated in 4-3-4/Table 11 require ABS certification. (Incorporates Notice No. 3)

6-1-2/23.1 Applications To document that switchboards, motor controllers, and motor control centers for services indicated in 4-3-4/Table 11 require ABS certification. (Incorporates Notice No. 3)

6-2-1/1 (New)

Application To align the MODU Rules with the Steel Vessel Rules. (Incorporates Notice No. 3)

6-2-1/3 Definitions To clarify the definitions. (Incorporates Notice No. 3)

6-2-1/13 Incomplete Surveys To align the MODU Rules with the Steel Vessel Rules. (Incorporates Notice No. 3)

6-2-1/15 Lay-up and Reactivation To align the MODU Rules with the Steel Vessel Rules. (Incorporates Notice No. 3)

6-2-2 (New)

Survey Intervals To align the MODU Rules with the Steel Vessel Rules and to clarify the intervals applicable to MODUs classed for Unrestricted Service versus MODUs operating in Great Lakes Service. (Incorporates Notice No. 3)

Page 23: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 21

Part/Para. No. Title/Subject Status/Remarks 6-2-3/1 Special Surveys To clarify that the planning document is to require review by the

attending Surveyor, and not ABS head offices. (Incorporates Notice No. 3)

6-2-4/1.1.9 (New)

<No Title> To provide specific requirements regarding how to handle “Substantial Corrosion” during Annual Survey of Hull. (Incorporates Notice No. 3)

6-2-4/1.3 Corrosion Control Systems To clarify the mandatory requirements for Annual Surveys. (Incorporates Notice No. 3)

6-2-4/1.5 Alterations and Position of Load Lines

To clarify the mandatory requirements for Annual Surveys. (Incorporates Notice No. 3)

6-2-4/3 Annual Survey – Machinery and Electrical Systems

To clarify the mandatory requirements of Annual Survey of Machinery and Electrical Systems. (Incorporates Notice No. 3)

6-2-4/3.5 (New)

Preventative Maintenance Techniques To incorporate requirements for preventative maintenance techniques. (Incorporates Notice No. 3)

6-2-4/3.7 (New)

Examination during Overhaul To incorporate requirements for examination during overhaul. (Incorporates Notice No. 3)

6-2-4/3.9 (New)

Examination at Shorter Intervals To incorporate requirements for examination at shorter intervals. (Incorporates Notice No. 3)

6-2-4/5 (New)

Thrusters and Dynamic Positioning Systems

To incorporate requirements for thrusters and dynamic positioning systems. (Incorporates Notice No. 3)

6-2-5/1.1.9 <No Title> To provide specific requirements regarding how to handle “Substantial Corrosion” during Special Periodical Survey – Hull. (Incorporates Notice No. 3)

6-2-5/1.5.6 <No Title> To clarify that cans/mats would require internal and external examination. (Incorporates Notice No. 3)

6-2-5/3.5 Column-Stabilized Units To clarify that the close visual examination and NDT is required during SPS, not every DD/UWILD, and that NDT requirements for rigs over 15 years of age (>SPS #3) would be subjected to more extensive close visual examination and NDT. To clarify that Record Keeping is mandatory but Inspection Manual is not. (Incorporates Notice No. 3)

6-2-5/5 Special Periodical Survey – Machinery

To clarify the mandatory requirements of SPS of Machinery. (Incorporates Notice No. 3)

6-2-5/7 (New)

Special Periodical Survey – Electrical Equipment

To clarify the mandatory requirements of SPS of Electrical Systems. (Incorporates Notice No. 3)

6-2-5/9 Special Periodical Survey – Special Features (All Types)

To clarify the mandatory requirements of SPS of Special Features (mandatory for all rigs). (Incorporates Notice No. 3)

6-2-5/11 Thrusters and Dynamic Position Systems

To clarify the requirements for thrusters and dynamic position systems. (Incorporates Notice No. 3)

6-2-5/13 Units with Retractable Propulsion Thrusters

To clarify ABS acceptance of waiving internal examination of retractable thrusters. (Incorporates Notice No. 3)

6-2-6/1.3 Self-Elevating Units To clarify items subjected to close visual examination and NDT during UWILD, and introduced a new Note, which states conditions for postponing the underwater survey until next rig move. (Incorporates Notice No. 3)

6-2-6/1.9.3 External Portions of Propulsion Units To clarify that survey of external portions of propulsion units is applicable to all units. (Incorporates Notice No. 3)

6-2-A1/3.3.2v) <No Title> To include verification of weathertight doors. (Incorporates Notice No. 3)

6-2-A1/3.3.2x) <No Title> To remove requirements for radio installation and include verification of helideck. (Incorporates Notice No. 3)

Page 24: MODU_nandgi_e

Notices and General Information

22 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

EFFECTIVE DATE 1 January 2011 – shown as (2011)

Part/Para. No. Title/Subject Status/Remarks PART 6 Surveys 6-2-5/9.15 Self-Elevating Drilling Units – Leg

Jacking Systems To clarify the mandatory survey requirements of Jacking Systems. (Incorporates Notice No. 4)

EFFECTIVE DATE 1 January 2012 – shown as (2012)

Part/Para. No. Title/Subject Status/Remarks PART 7 Surveys 7-1-1/1 General To emphasize that requirements of subsequent Sections are to be done

to the satisfaction of the Surveyor.

7-1-1/5 Certification and Classification To explain issuance of the initial class certificate to a drilling unit and its validity.

7-1-2/3 Survey of Hull Structure and Outfitting

To explain the main survey and testing items required for hull structure and outfitting.

7-1-2/5 (New)

Material To reemphasize that traceability and selection of material is required to be verified by the Surveyor, and Part 3 is to be used to reference application of different structural categories on various types of drilling units.

7-1-2/11 Nondestructive Testing (NDT) To include newly defined NDT requirements.

7-1-2/11 Second Paragraph (New)

Nondestructive Testing (NDT) To clarify that the NDT plan is reviewed by the attending Surveyor, not an ABS Technical Office, must be accepted before NDT is commenced, and the Surveyor may witness NDT as deemed necessary.

7-1-2/11.5 (New)

NDT of Surface-Type Drilling Units To cover drill ships and requirement to specifically NDT within 0.6L matched the area subjected to gauging when the vessel is surveyed after construction.

7-1-2/11.9 (New)

NDT Personnel and Records To clarify the objective of the NDT department, minimum NDT qualification of NDT personnel, and maintenance of records.

7-1-2/Table 1 (New)

Nondestructive Testing (NDT) of Steel Structure Welds

To define extent and type of NDT required for each type of structural member.

7-1-2/13.1 Performance Standards for Protective Coatings (PSPC)

To explain the difference between optional Class service and new IMO requirements associated with ballast tanks on drilling units.

7-1-2/15 Survey of Load Line To explain the process for obtaining the Load Line Certificate.

7-1-2/17.1 (New)

Damage Conditions for Self-Elevating Units

To define where the assumed damage is assumed on self-elevating units.

7-1-2/Figure 1 (New)

Damage Conditions for Self-Elevating Units

To define where the assumed damage is assumed on self-elevating units.

7-1-2/17.3 (New)

Damage Conditions for Column-Stabilized Drilling Units

To define where the assumed damage is assumed on column-stabilized units.

7-1-2/Figure 2 (New)

Damage Conditions for Column-Stabilized Units

To define where the assumed damage is assumed on column-stabilized units.

7-1-2/17.5 (New)

Surface-Type Drilling Units To define where the assumed damage is assumed on surface-type units.

7-1-2/Figure 3 (New)

Damage Conditions for Surface-Type Units

To define where the assumed damage is assumed on surface-type units.

7-1-2/23.3 Testing of Watertight Boundaries, Tanks and Sliding Doors

To clarify how the testing of watertight sliding doors is to be carried out and accepted.

Page 25: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 23

Part/Para. No. Title/Subject Status/Remarks 7-1-2/23.9 Air Testing To clarify how the air test procedure should be carried out while safety

is maintained during test preparation and that alternative tests are to be agreed by the Surveyor.

7-1-2/23.11 Hose Testing To clarify where alternative test procedure may be allowed.

7-1-2/23.13 Flood Testing To clarify where flood testing is to be done and its alternative.

7-1-2/27 (New)

Hull Inspection and Maintenance Program (HIMP) (Optional)

To highlight the existence of ABS Hull Inspection and Maintenance Program.

7-1-3/3 (New)

Survey of Machinery, Piping, Pressure Vessels, and other Outfitting Items

To require the builder to have a Quality Control Program that covers all phases of the construction, testing and trials.

7-1-3/5.1 (New)

Material Tests and Inspection To clarify references to material tests and inspection requirements.

7-1-3/5.5 (New)

Minimum Angle of Inclination for Machinery

To remind the Surveyor of the limitation on angle of inclination.

7-1-3/5.7 (New)

Ambient Temperature for Machinery To remind the Surveyor of the limitation on ambient temperature.

7-1-3/7 (New)

Internal Combustion Engines To highlight the main items to be verified after installation of an engine certified in accordance with Part 6 of these Rules.

7-1-3/9 (New)

Piping To highlight the main items to be complied with for piping installed onboard.

7-1-3/11 (New)

Piping Installation Details To provide a listing of items that are required to be verified during survey of piping systems.

7-1-3/13 (New)

Metallic and Plastic Pipes To describe survey requirements for verifying compliance with 4-2-2/5 and 4-2-2/7.

7-1-3/15 (New)

Valves To describe the Surveyor’s verification of compliance with 4-2-2/9.

7-1-3/17 (New)

Pipe Fittings To describe the Surveyor’s verification of compliance with 4-2-2/11.

7-1-3/19 (New)

Flanges To describe the Surveyor’s verification of compliance with 4-2-2/15.

7-1-3/21 (New)

Fluid Power Cylinders To describe the Surveyor’s verification of compliance with 4-2-2/19.

7-1-3/23 First Paragraph (New)

Sea Inlets and Overboard Discharges To clarify that all inlets and overboard discharges are to be tested.

7-1-3/25 First Paragraph (New)

Scuppers and Drains on Surface-Type and Self-Elevating Drilling Units

To clarify that testing to be done preferably before launching of the hull.

7-1-3/27 First Paragraph (New)

Cooler Installations External to the Hull

To clarify that coolers are to be tested.

7-1-3/29 First Paragraph (New)

Penetrations Through Watertight Boundaries

To clarify that watertight penetrations are to be tested.

7-1-4/3 (New)

Jacking and Associated Systems To clarify that the certified jacking system is to be surveyed upon installation and before subjected to jacking trials.

7-1-4/5 (New)

Tank Vents and Overflows To clarify that all tank vents and overflows are required to be surveyed and tested when testing the tanks they are fitted on.

7-1-4/5.1 Progressive Flooding Consideration To emphasize the importance of verifying measures against progressive flooding during the survey of tanks/spaces after they are outfitted particularly with vents and overflows.

7-1-4/7 (New)

Sounding To clarify that sounding pipes are required to be surveyed and tested when examining and testing the tanks they are fitted on.

Page 26: MODU_nandgi_e

Notices and General Information

24 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 7-1-4/9 (New)

Bilge System To clarify that the bilge system is to be surveyed and tested.

7-1-4/11 (New)

Ballast System To clarify that the ballast system is to be surveyed and tested.

7-1-4/13 (New)

Fuel Oil System To clarify that the fuel oil system is to be surveyed and tested.

7-1-4/15 (New)

Low Flash Point Fuels To clarify that if low flash point fuel is used, verification for compliance with 4-2-5/9 of these Rules is required.

7-1-4/17 (New)

Lubricating Oil System To clarify that the lubricating oil system is to be surveyed and tested.

7-1-4/41.1.6 (New)

High Pressure Industrial Piping To clarify that the high pressure piping is a class requirement and not CDS.

7-1-4/41.1.7 All Piping Systems To indicate that verification of the piping working under normal operational condition can be done during the sea trials while verifying normal operation of the machinery of the drilling unit.

7-1-5/5.13 Deck and Bulkhead Penetrations To clarify that cable penetrations are to be examined and tested.

7-1-6/3 Main Source of Power To clarify that all power sources are subjected to examination and testing after installation.

7-1-6/9 (New)

Circuit Protection System To clarify that the Surveyor is to be satisfied with circuit protection system covered under Part 4 of these Rules.

7-1-6/11 (New)

Systems for Steering Gear Installed in Self-Propelled Units

To clarify that the steering ear is to be tested alongside (dockside) before commencement of the sea trial.

7-1-6/13 First Paragraph (New)

Lighting and Navigation Light Systems

To clarify that all lighting should be verified operational before commencement of the sea trial.

7-1-6/13.5 (New)

Obstruction Light System To clarify that all obstruction lights installed on the derrick and top of cranes are to be verified.

7-1-6/15 First Paragraph (New)

Interior Communication Systems To clarify that communication system is to be verified operational before commencement of the sea trial.

7-1-6/17 First Paragraph (New)

Manually Operated Alarms To clarify that all alarm systems are in satisfactory operational order before commencement of the sea trial.

7-1-6/19 First Paragraph (New)

Fire Protection and Fire Detection Systems

To clarify that all fire protection work is to be completed before commencement of the sea trial, and all fire detection systems should be operational for the sea trial.

7-1-6/21 First Paragraph (New)

Electrical System Testing To clarify that dockside testing of the entire electrical system should be complete before commencement of the sea trial.

7-1-6/21.13 (New)

Public Address (PA) & General Alarm (GA) Systems

To clarify that the system is operational before commencement of the sea trial.

7-1-6/21.15 (New)

Fire and Gas (F&G) Detection System

To clarify that the system is operational before commencement of the sea trial.

7-1-6/21.17 (New)

Electrical Equipment in Hazardous Areas

To clarify that the entire equipment in hazardous areas are to be surveyed.

7-1-6/21.19 (New)

Hazardous Area Doors, Ventilation and Alarms

To clarify that the survey of the hazardous areas includes verification of doors, ventilation and their associated alarms.

7-1-6/21.21 (New)

Mud Pit Level Alarm To clarify that the pit level alarms are class (not CDS) and should be tested.

7-1-6/21.23 (New)

Shutdown of Ventilation Fans and Openings

To clarify that the shutdown of ventilation systems are to be tested.

7-1-6/21.25 (New)

Emergency Shutdown System To clarify that the Emergency Shutdown System (ESD) is to be tested.

Page 27: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 25

Part/Para. No. Title/Subject Status/Remarks 7-1-6/21.27 (New)

Helicopter Deck Lighting To clarify that the helideck lighting system is to be verified and tested.

7-1-6/21.29 (New)

Navigation and Obstruction Lights To clarify that the obstruction lights are to be verified and tested.

7-1-8/1.1 (New)

Administration Certification To clarify that approval of passive fire protection may be done directly by the Flag Administration, who will issue the MODU Code Safety Certificate and that in such case, the ABS Surveyors are not required to survey fire protection per Subsection 5 of these Rules.

7-1-8/3 (New)

Survey of Fire and Safety Features To clarify general requirements of surveying the fire and safety features of the unit.

7-1-8/5.1.1 Construction Materials To clarify that steel must be certified per these Rules and material other than steel needs manufacturer’s affidavit/certificate.

7-1-8/5.1.2 Fire Integrity of Bulkheads and Decks To clarify that all bulkheads and decks must be examined before insulation is installed.

7-1-8/5.1.3 (New)

Fire Resistance of Bulkheads and Decks To supplement the design review requirements contained in 5-1-1/3.19 of these Rules.

7-1-8/5.1.4 Structural Fire Protection Details in way of Intersections, Joints and Penetrations

To supplement the design review requirements contained in 5-1-1/3.13 of these Rules.

7-1-8/5.1.5 (New)

Windows and Side-scuttles To supplement the design review requirements contained in 5-1-1/3.15 of these Rules.

7-1-8/5.1.6 Fire Doors To supplement the design review requirements contained in 5-1-1/3.17 of these Rules.

7-1-8/5.3 (New)

Protection of Accommodation Spaces, Service Spaces and Control Stations

To supplement the design review requirements contained in 5-1-1/5 of these Rules.

7-1-8/7.1 (New)

Fire Control Plan To clarify how to treat onboard Fire Control Plans.

7-1-8/7.3 (New)

Fire Pumps To supplement the design review requirements contained in 5-2-2/1.1 of these Rules.

7-1-8/7.5 (New)

Fire Main To supplement the design review requirements contained in 5-2-2/1.3 of these Rules.

7-1-8/7.7 (New)

Hydrants, Hoses, Nozzles and International Shore Connection

To supplement the design review requirements contained in 5-2-2/1.5 of these Rules.

7-1-8/9.1 (New)

Gas Smothering System To supplement the design review requirements contained in 5-2-3/3 of these Rules.

7-1-8/9.3 (New)

Foam System To supplement the design review requirements contained in 5-2-3/5 of these Rules.

7-1-8/9.5 (New)

Fixed Pressure Water Spraying Systems

To supplement the design review requirements contained in 5-2-3/7 of these Rules.

7-1-8/9.7 (New)

Protection of Helicopter Decks To supplement the design review requirements contained in 5-2-3/9 of these Rules.

7-1-8/9.9 (New)

Paint and Flammable Liquid Lockers To supplement the design review requirements contained in 5-2-3/11 of these Rules.

7-1-8/11.1 (New)

Portable Fire Extinguishers and Sand To supplement the design review requirements contained in 5-2-4/1 of these Rules.

7-1-8/11.3 (New)

Firefighter’s Outfit To supplement the design review requirements contained in 5-2-4/3 of these Rules.

7-1-8/13.1 (New)

Testing of Alarm Systems To supplement the design review requirements contained in 5-2-5/1.1 of these Rules.

7-1-8/15.1 (New)

Hydrogen Sulfide (H2S) Detection and Alarm System

To supplement the design review requirements contained in 5-2-5/1.1 of these Rules.

7-1-8/17.1 (New)

Means of Escape To supplement the design review requirements contained in 5-2-3/1 of these Rules and to clarify use of gratings in way of escape routes.

Page 28: MODU_nandgi_e

Notices and General Information

26 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 7-1-8/17.3 (New)

Means of Access and Egress To supplement the design review requirements contained in 5-2-3/3 of these Rules.

7-1-8/17.5 (New)

Guards and Rails To supplement the design review requirements contained in 5-2-3/5 of these Rules.

7-1-8/17.7 (New)

Emergency Control Stations To supplement the design review requirements contained in 5-2-3/7 of these Rules.

7-1-8/17.9 (New)

Arrangements in Machinery Space To supplement the design review requirements contained in 5-2-3/9 of these Rules.

7-1-8/17.11 (New)

Segregation of Fuel Oil Purifiers To supplement the design review requirements contained in 5-2-3/11 of these Rules.

7-1-8/17.13 (New)

Fire Precautions for Machinery Spaces To supplement the design review requirements contained in 5-2-3/15 of these Rules.

7-1-8/19.1 (New)

Arrangements and Services To supplement the design review requirements contained in 5-3-1/7 and 4-3-5/7 of these Rules.

7-1-9/1 (New)

General To clarify the purpose of Surveyor witnessing a sea trial.

7-1-9/3 (New)

Stability Test To clarify that a deadweight survey or an inclining experiment is required for every new drilling unit built to ABS class.

7-1-9/5 (New)

Safety To clarify that a Surveyor must ascertain the safety of the vessel before he/she agrees to board the vessel to witness the sea trial.

7-1-9/7 (New)

Hull Structure Testing To clarify that hull testing can be done at sea trial and its acceptance criteria.

7-1-9/9.1 Initial Jacking Test To clarify requirements after the initial jacking trial.

7-1-9/9.3 Moveable Cantilever and Skid Beam Testing

To clarify conditions of the test.

7-1-9/11.11 (New)

Fire Extinguishing System To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.13 (New)

Main Source of Power To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.15 (New)

Emergency Source of Power To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.17 (New)

Distribution System To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.19 (New)

Circuit Protection System To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.21 (New)

Lighting and Navigation Light Systems

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.23 (New)

Public Address (PA) and General Alarm (GA) Systems

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.25 (New)

Fire Protection and Fire Detection Systems

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.27 (New)

Gas Detection System To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/15.1 (New)

Anchoring/Mooring System Foundations

To include requirements for testing anchoring/mooring systems.

7-1-9/17 (New)

Dynamic Positioning System (DPS) To clarify the dynamic positioning trials required during new construction.

Appendix 7-1-A1 (New)

Mooring Equipment and Systems To identify minimum ABS requirements for mooring systems certified based on the requested Symbol.

Appendix 7-1-A2 (New)

Surveys of Computers for Stability Calculations

To provide requirements for surveys and testing to be carried out on onboard computers for stability calculations.

7-2-1/1.1 Chapter 2 Sections 1 through 10 To clarify application of Rules/Guides.

Page 29: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 27

Part/Para. No. Title/Subject Status/Remarks 7-2-1/3.13 Survey To add industry terms “Close Visual Inspection (CVI)” and “General

Visual Inspection (GVI)”.

7-2-1/3.21.1 (New)

Splash Zone (for Self-Elevating and Column Stabilized Units)

To add definition of “Splash Zone”.

7-2-1/7.7 (New)

Application of Rules To clarify application of the Rules when only repair is carried out to the drilling unit without modifying its design.

7-2-1/9.1 (New)

Application of Rules To clarify what constitutes a major or minor alteration, and the application of respective Rules.

7-2-1/15.3 Units Operating in Fresh Water To clarify that the requirements apply to drilling units not operating in open sea water as “unrestricted service” but accepted for “restricted service” in lakes or enclosed waters.

7-2-1/17 (New)

Onboard Drawings and Manuals To clarify what documents are required to be available onboard.

7-2-2/1.9.1 (New)

Self-Elevating Drilling Units – Drydocking Survey Interval Exceeding 36 Months

To clarify action to be taken on self-elevating drilling units where intervals between two drydocking period exceed the Rule required interval.

7-2-2/3 Units Operating in Fresh Water To clarify that the requirements apply to drilling units not operating in open sea water as “unrestricted service” but accepted for “restricted service” in lakes or enclosed waters.

7-2-3/1.1 (New)

Plan for UWILD To clarify who reviews the UWILD plan, etc.

7-2-3/1.3 (New)

Plan for Out-of-Water Drydocking and Special Periodical Survey

To clarify who reviews the Drydocking and Special Periodical Survey plans.

7-2-3/1.5.1 Critical Structural Areas To clarify requirements of onboard drawing showing Critical Structural Areas to be referenced during the pre-planning meeting.

7-2-4/1.1.10(a) (New)

Performance Standards for Protective Coatings (PSPC)

To highlight requirements for Corrosion Control Systems and to mention PSPC.

7-2-4/1.1.14 (New)

HIMP Notation (optional) To require HIMP to be confirmed during Annual Survey – Hull.

7-2-4/1.3 Surface-Type Units To clarify that this is in addition to general requirement listed under 7-2-4/1.1.

7-2-4/1.5 Self-Elevating Units To clarify that this is in addition to general requirement listed under 7-2-4/1.1.

7-2-4/1.7 Column-Stabilized Units To clarify that this is in addition to general requirement listed under 7-2-4/1.1.

7-2-5/1.1.6 Hull Attachments for Anchoring and Mooring System

To correct items to be examined.

7-2-5/1.9 (New)

Onboard Computers for Stability Calculations

To be consistent with Annual Surveys.

7-2-5/3.3 Close-Up Survey and Nondestructive Testing on Self-Elevating Units

To clarify that 100% CVI plus extensive NDT is required and that fatigue analysis is not always required unless otherwise requested by ABS.

7-2-5/3.3iii) <No Title> To clarify why such area is to be examined and subjected to NDT. 7-2-5/3.3iv) <No Title> To remind that the leg-mat connection is a “Special” unless the modified

design has resulted in moving fatigue sensitive area to another location. 7-2-5/3.3.1 Special Survey No. 3 and Subsequent

Special Surveys To make the requirements effective at the 3rd Special Periodical Survey and not after the 3rd Special Periodical Survey and to clarify that the fatigue analysis is not always required unless otherwise requested by ABS.

7-2-5/3.5 Close-Up Survey and Nondestructive Testing on Column-Stabilized Units

To clarify that 100% CVI plus extensive NDT is required.

7-2-5/3.5.1 Special Survey No. 3 and Subsequent Special Surveys

To make the requirements effective at the 3rd Special Periodical Survey and not after the 3rd Special Periodical Survey and to clarify that the fatigue analysis is not always required unless otherwise requested by ABS.

Page 30: MODU_nandgi_e

Notices and General Information

28 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Part/Para. No. Title/Subject Status/Remarks 7-2-5/3.9 (New)

Thickness Measurement (Gauging) To explain requirements of gauging, wastage, etc.

7-2-5/Table 1 Thickness Gauging Requirements for Surface-Type Units

To align the gauging requirement and the definitions of Special, Primary, and Secondary Application Structures.

7-2-5/Table 2 Thickness Gauging Requirements for Self-Elevating Units

To add definition of “Splash Zone”.

7-2-5/Table 3 Thickness Gauging Requirements for Column-Stabilized Units

To add definition of “Splash Zone”.

7-2-5/5.3.4 (New)

Bilge and Ballast System, and other Systems

To clarify that all bilge and ballast systems are to be operationally tested at each Special Periodical Survey – Machinery.

7-2-5/5.3.5 Machinery Foundations To clarify that the not every machinery foundation is a concern for ABS unless it is suspect.

7-2-5/7.3.6 (New)

Accumulator Batteries To align the requirements with the Steel Vessel Rules.

7-2-6/1.3iii) <No Title> To clarify why such area is to be examined and subjected to NDT. 7-2-6/1.3iv) <No Title> To remind that the leg-mat connection is a “Special” unless the modified

design has resulted in moving fatigue sensitive area to another location. 7-2-6/3.7 (New)

Crediting UWILD on a Self-Elevating Drilling Unit without Completing the Examination of Spudcans/Mat

To clarify how the incomplete UWILD on self-elevating drilling units may be treated by the Surveyor.

7-2-6/3.9 (New)

Incomplete UWILD over a Five-Year Period – Self-Elevating Drilling Units

To what will be required when UWILD of a self-elevating drilling unit located at one site (without any rig move) cannot be completed within a five-year period.

7-2-7/1 Ocean Transit Wet Tow To clarify the requirements. 7-2-7/3 (New)

Ocean Transit Dry Tow To introduce requirements for ocean transit dry tow.

Appendix 7-2-A2 (New)

Survey of Temporary Modular Units To explain what surveys should be performed on temporary modular units.

Appendix 7-2-A3 (New)

Modification of a Self-Elevating Drilling Unit to Become Site-Specific Fixed Offshore Installation

To clarify the minimum amount of surveys to be performed on a unit that is converted into a site-specific fixed offshore unit.

Page 31: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 29

TABLE 4 Comparison of the Numbering System of the 2008 Rules vs. 2012 Rules

MODU 2008 Title MODU 2012 Part 1 Conditions of Classification

Whole Part In the list below, references to the ABS Rules for Conditions of Classification – Offshore Units and Structures (Part 1) are given as “CC 1-1-X/Y.Y.Y” and references to Part 1 of the MODU Rules are given as “1-1-X/Y.Y.Y”.

Part 1 and “Generic” Part 1

Part 1 Rules for Conditions of Classification (Generic Part 1) Part 1 Chapter 1 Section 1

Rules for Conditions of Classification Scope and Conditions of Classification Classification

CC 1-1-1 Classification CC 1-1-1 CC 1-1-1/1 Process CC 1-1-1/1 CC 1-1-1/1a) --- CC 1-1-1/1a) CC 1-1-1/1b) --- CC 1-1-1/1b) CC 1-1-1/1c) --- CC 1-1-1/1c) CC 1-1-1/1d) --- CC 1-1-1/1d) CC 1-1-1/3 Certificates and Reports CC 1-1-1/3 CC 1-1-1/3.1 --- CC 1-1-1/3.1 CC 1-1-1/3.3 --- CC 1-1-1/3.3 CC 1-1-1/3.5 --- CC 1-1-1/3.5 CC 1-1-1/3.7 --- CC 1-1-1/3.7 CC 1-1-1/5 Representations as to Classification CC 1-1-1/5 CC 1-1-1/7 Scope of Classification CC 1-1-1/7 Part 1 Chapter 1 Section 2

Rules for Conditions of Classification Scope and Conditions of Classification Suspension and Cancellation of Classification

CC 1-1-2 Suspension and Cancellation of Classification CC 1-1-2 CC 1-1-2/1 General CC 1-1-2/1 CC 1-1-2/1.1 --- CC 1-1-2/1.1 CC 1-1-2/1.3 --- CC 1-1-2/1.3 CC 1-1-2/3 Notice of Surveys CC 1-1-2/3 CC 1-1-2/5 Special Notations CC 1-1-2/5 CC 1-1-2/7 Suspension of Class CC 1-1-2/7 CC 1-1-2/7.1 --- CC 1-1-2/7.1 CC 1-1-2/7.3 --- CC 1-1-2/7.3 CC 1-1-2/7.5 --- CC 1-1-2/7.5 CC 1-1-2/7.5i) --- CC 1-1-2/7.5i) CC 1-1-2/7.5ii) --- CC 1-1-2/7.5ii) CC 1-1-2/7.5iii) --- CC 1-1-2/7.5iii) CC 1-1-2/7.7 --- CC 1-1-2/7.7 CC 1-1-2/7.9 --- CC 1-1-2/7.9 CC 1-1-2/7.11 --- CC 1-1-2/7.11 CC 1-1-2/7.11i) --- CC 1-1-2/7.11i) CC 1-1-2/7.11ii) --- CC 1-1-2/7.11ii) CC 1-1-2/7.11iii) --- CC 1-1-2/7.11iii) CC 1-1-2/7.13 --- CC 1-1-2/7.3 CC 1-1-2/7.15 --- CC 1-1-2/7.15 CC 1-1-2/7.15i) --- CC 1-1-2/7.15i) CC 1-1-2/7.15ii) --- CC 1-1-2/7.15ii) CC 1-1-2/7.15iii) --- CC 1-1-2/7.15iii) CC 1-1-2/9 Lifting of Suspension CC 1-1-2/9 CC 1-1-2/9.1 --- CC 1-1-2/9.1 CC 1-1-2/9.3 --- CC 1-1-2/9.3 CC 1-1-2/9.5 --- CC 1-1-2/9.5 CC 1-1-2/11 Cancellation of Class CC 1-1-2/11 CC 1-1-2/11.1 --- CC 1-1-2/11.1 CC 1-1-2/11.3 --- CC 1-1-2/11.3 CC 1-1-2/11.5 --- CC 1-1-2/11.5 CC 1-1-2/13 Alternative Procedures CC 1-1-2/13

Page 32: MODU_nandgi_e

Notices and General Information

30 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 Part 1 Chapter 1 Section 3

Rules for Conditions of Classification Scope and Conditions of Classification Classification Symbols and Notations

CC 1-1-3 Classification Symbols and Notations CC 1-1-3 CC 1-1-3/1 Drilling Units Built Under Survey CC 1-1-3/1 CC 1-1-3/1.1 Self-Elevating Drilling Units CC 1-1-3/1.1 CC 1-1-3/1.3 Column-Stabilized Units CC 1-1-3/1.3 CC 1-1-3/1.5 Surface-Type Drilling Units CC 1-1-3/1.5 CC 1-1-3/1.5.1 Ship-Type Drilling Units CC 1-1-3/1.5.1 CC 1-1-3/1.5.2 Barge-Type Drilling Units CC 1-1-3/1.5.2 CC 1-1-3/1.7 Other Types of Drilling Units CC 1-1-3/1.7 CC 1-1-3/1.9 Temporary Mooring Equipment Symbol CC 1-1-3/1.9 CC 1-1-3/1.11 Position Mooring Equipment and Systems CC 1-1-3/1.11 CC 1-1-3/1.11.1 Symbol  CC 1-1-3/1.11.1 CC 1-1-3/1.11.2 Symbol à CC 1-1-3/1.11.2 CC 1-1-3/3 Special Purpose Units CC 1-1-3/3 CC 1-1-3/5 Service Limitations CC 1-1-3/5 CC 1-1-3/7 Units Not Built Under Survey CC 1-1-3/7 CC 1-1-3/9 Offshore Installations CC 1-1-3/9 CC 1-1-3/11 Floating Production Installations CC 1-1-3/11 CC 1-1-3/13 Liftboats CC 1-1-3/13 CC 1-1-3/15 Subsea Pipeline Systems CC 1-1-3/15 CC 1-1-3/17 Subsea Riser Systems CC 1-1-3/17 CC 1-1-3/19 Facilities on Offshore Installations CC 1-1-3/19 CC 1-1-3/19.1 Floating Installations CC 1-1-3/19.1 CC 1-1-3/19.3 Fixed Installations CC 1-1-3/19.3 CC 1-1-3/21 Single Point Moorings CC 1-1-3/21 CC 1-1-3/23 Offshore LNG Terminals CC 1-1-3/23 CC 1-1-3/25 Propulsion Machinery CC 1-1-3/25 CC 1-1-3/27 Thrusters CC 1-1-3/27 CC 1-1-3/29 Dynamic Positioning Systems CC 1-1-3/29 CC 1-1-3/31 Drilling Systems CC 1-1-3/31 CC 1-1-3/33 Ice Strengthening CC 1-1-3/33 Part 1 Chapter 1 Section 4

Rules for Conditions of Classification Scope and Conditions of Classification Rules for Classification

CC 1-1-4 Rules for Classification CC 1-1-4 CC 1-1-4/1 Application of Rules CC 1-1-4/1 CC 1-1-4/1.1 General CC 1-1-4/1.1 CC 1-1-4/1.3 Application CC 1-1-4/1.3 CC 1-1-4/3 Effective Date of Rule Change CC 1-1-4/3 CC 1-1-4/3.1 Effective Date CC 1-1-4/3.1 CC 1-1-4/3.3 Implementation of Rule Changes CC 1-1-4/3.3 CC 1-1-4/3.3.1 General CC 1-1-4/3.3.1 CC 1-1-4/3.3.2 Date of Contract for Construction CC 1-1-4/3.3.2 CC 1-1-4/3.3.3 Series of Units and Optional Units CC 1-1-4/3.3.3 CC 1-1-4/3.3.3i) --- CC 1-1-4/3.3.3i) CC 1-1-4/3.3.3ii) --- CC 1-1-4/3.3.3ii) CC 1-1-4/3.3.4 Additional Optional Units CC 1-1-4/3.3.4 CC 1-1-4/5 Other Conditions CC 1-1-4/5 CC 1-1-4/7 Installations Not Covered by the Rules CC 1-1-4/7 CC 1-1-4/9 Alternatives CC 1-1-4/9 CC 1-1-4/9.1 General CC 1-1-4/9.1 CC 1-1-4/9.3 National Standards CC 1-1-4/9.3 CC 1-1-4/9.5 Other Rules CC 1-1-4/9.5 CC 1-1-4/9.7 ABS Type Approval Program CC 1-1-4/9.7 CC 1-1-4/9.7.1 Type Approval CC 1-1-4/9.7.1 CC 1-1-4/9.7.2 Unit Certification CC 1-1-4/9.7.2 CC 1-1-4/9.7.2i) --- CC 1-1-4/9.7.2i) CC 1-1-4/9.7.2ii) --- CC 1-1-4/9.7.2ii) CC 1-1-4/9.7.2iii) --- CC 1-1-4/9.7.2iii) CC 1-1-4/9.7.2iv) --- CC 1-1-4/9.7.2iv) CC 1-1-4/9.7.2v) --- CC 1-1-4/9.7.2v)

Page 33: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 31

MODU 2008 Title MODU 2012 CC 1-1-4/9.7.3 Product Type Approval CC 1-1-4/9.7.3 CC 1-1-4/9.7.4 Approval on Behalf of Administrations CC 1-1-4/9.7.4 CC 1-1-4/9.7.5 Applicable Uses of Type approved Products CC 1-1-4/9.7.5 CC 1-1-4/9.7.5) --- CC 1-1-4/9.7.5) CC 1-1-4/9.7.5i) --- CC 1-1-4/9.7.5i) CC 1-1-4/9.7.5ii) --- CC 1-1-4/9.7.5ii) CC 1-1-4/9.7.5iii) --- CC 1-1-4/9.7.5iii) CC 1-1-4/9.7.6 Definitions CC 1-1-4/9.7.6 CC 1-1-4/9.7.7 The Terms and Conditions for Use of ABS Type Approved Product Logo CC 1-1-4/9.7.7 CC 1-1-4/9.7.7i) --- CC 1-1-4/9.7.7i) CC 1-1-4/9.7.7ii) --- CC 1-1-4/9.7.7ii) CC 1-1-4/9.7.7iii) --- CC 1-1-4/9.7.7iii) CC 1-1-4/9.7.7iv) --- CC 1-1-4/9.7.7iv) CC 1-1-4/9.7.7v) --- CC 1-1-4/9.7.7v) CC 1-1-4/9.7.7vi) --- CC 1-1-4/9.7.7vi) CC 1-1-4/9.7.7vii) --- CC 1-1-4/9.7.7vii) CC 1-1-4/9.7.7viii) --- CC 1-1-4/9.7.7viii) CC 1-1-4/9.7.7ix) --- CC 1-1-4/9.7.7ix) CC 1-1-4/11 Novel Features CC 1-1-4/11 CC 1-1-4/13 Risk Evaluations for Alternative Arrangements and Novel Features CC 1-1-4/13 Part 1 Chapter 1 Section 5

Rules for Conditions of Classification Scope and Conditions of Classification Other Regulations

CC 1-1-5 Other Regulations CC 1-1-5 CC 1-1-5/1 Governmental and Other Regulations CC 1-1-5/1 CC 1-1-5/3 Other International Conventions or Codes CC 1-1-5/3 CC 1-1-5/5 Governmental Regulations CC 1-1-5/5 CC 1-1-5/5.1 Governmental Authorization CC 1-1-5/5.1 CC 1-1-5/5.3 European Commission CC 1-1-5/5.3 Part 1 Chapter 1 Section 6

Rules for Conditions of Classification Scope and Conditions of Classification IACS Audit

CC 1-1-6 IACS Audit CC 1-1-6 Part 1 Chapter 1 Section 7

Rules for Conditions of Classification Scope and Conditions of Classification Plans and Data to be Submitted

CC 1-1-7 Plans and Data to be Submitted CC 1-1-7 CC 1-1-7/1 Hull and Design Data CC 1-1-7/1 CC 1-1-7/3 Machinery Plans CC 1-1-7/3 CC 1-1-7/5 Calculations CC 1-1-7/5 CC 1-1-7/7 Additional Plans CC 1-1-7/7 CC 1-1-7/9 Submissions CC 1-1-7/9 Part 1 Chapter 1 Section 8

Rules for Conditions of Classification Scope and Conditions of Classification Conditions for Surveys After Construction

CC 1-1-8 Conditions for Surveys After Construction CC 1-1-8 CC 1-1-8/1 Damage, Failure and Repair CC 1-1-8/1 CC 1-1-8/1.1 Examination and Repair CC 1-1-8/1.1 CC 1-1-8/1.3 Repairs CC 1-1-8/1.3 CC 1-1-8/1.5 Suspension of Classification CC 1-1-8/1.5 CC 1-1-8/1.7 Representation CC 1-1-8/1.7 CC 1-1-8/3 Notification and Availability for Survey CC 1-1-8/3 CC 1-1-8/5 Attendance at Port State Request CC 1-1-8/5 CC 1-1-8/7 Safety Management System CC 1-1-8/7 Part 1 Chapter 1 Section 9

Rules for Conditions of Classification Scope and Conditions of Classification Fees

CC 1-1-9 Fees CC 1-1-9 Part 1 Chapter 1 Section 10

Rules for Conditions of Classification Scope and Conditions of Classification Disagreement

CC 1-1-10 Disagreement CC 1-1-10 CC 1-1-10/1 Rules CC 1-1-10/1

Page 34: MODU_nandgi_e

Notices and General Information

32 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 CC 1-1-10/3 Surveyors CC 1-1-10/3 Part 1 Chapter 1 Section 11

Rules for Conditions of Classification Scope and Conditions of Classification Limitation of Liability

CC 1-1-11 Limitation of Liability CC 1-1-11 Part 1 Chapter 1 Section 12

Rules for Conditions of Classification Scope and Conditions of Classification Hold Harmless

CC 1-1-12 Hold Harmless CC 1-1-12 Part 1 Chapter 1 Section 13

Rules for Conditions of Classification Scope and Conditions of Classification Time Bar to Legal Action

CC 1-1-13 Time Bar to Legal Action CC 1-1-13 Part 1 Chapter 1 Section 14

Rules for Conditions of Classification Scope and Conditions of Classification Arbitration

CC 1-1-14 Arbitration CC 1-1-14 Part 1 Chapter 1 Appendix 1

Rules for Conditions of Classification Scope and Conditions of Classification Classification Symbols and Notations

CC 1-1-A1 Classification Symbols and Notations CC 1-1-A1 Part 1 Chapter 1 Appendix 2

Rules for Conditions of Classification Scope and Conditions of Classification ABS Type Approval Program

CC 1-1-A2 ABS Type Approval Program CC 1-1-A2 CC 1-1-A2/1 General CC 1-1-A2/1 CC 1-1-A2/3 Limitations CC 1-1-A2/3 CC 1-1-A2/5 Process CC 1-1-A2/5 CC 1-1-A2/5.1 Design Assessment (DA) CC 1-1-A2/5.1 CC 1-1-A2/5.1.1 Design Evaluation CC 1-1-A2/5.1.1 CC 1-1-A2/5.1.2 Survey and/or Testing of Prototype or Production Units CC 1-1-A2/5.1.2 CC 1-1-A2/5.1.3 Design Assessment Certificate CC 1-1-A2/5.1.3 CC 1-1-A2/5.1.4 Product Design Assessment, Limited CC 1-1-A2/5.1.4 CC 1-1-A2/5.1.4i) --- CC 1-1-A2/5.1.4i) CC 1-1-A2/5.1.4ii) --- CC 1-1-A2/5.1.4ii) CC 1-1-A2/5.3 Manufacturing Assessment (MA) CC 1-1-A2/5.3 CC 1-1-A2/5.3.1 Quality Assurance Standard CC 1-1-A2/5.3.1 CC 1-1-A2/5.3.1(a) Acceptable Quality Standard (AQS) CC 1-1-A2/5.3.1(a) CC 1-1-A2/5.3.1(b) Recognized Quality Standard (RQS) CC 1-1-A2/5.3.1(b) CC 1-1-A2/5.3.1(c) Quality Manual CC 1-1-A2/5.3.1(c) CC 1-1-A2/5.3.2 Quality Control CC 1-1-A2/5.3.2 CC 1-1-A2/5.3.3 Manufacturing Assessment Certificate (MA) CC 1-1-A2/5.3.3 CC 1-1-A2/5.3.3i) --- CC 1-1-A2/5.3.3i) CC 1-1-A2/5.3.3ii) --- CC 1-1-A2/5.3.3ii) CC 1-1-A2/5.3.3iii) --- CC 1-1-A2/5.3.3iii) CC 1-1-A2/5.3.4 Confirmation of Type Approval (CTA) CC 1-1-A2/5.3.4 CC 1-1-A2/5.5 Product Quality Assurance Certification (PQA) CC 1-1-A2/5.5 CC 1-1-A2/5.7 Certificates CC 1-1-A2/5.7 CC 1-1-A2/5.7.1 Unit-Certification CC 1-1-A2/5.7.1 CC 1-1-A2/5.7.1(a) Products Covered by Product Quality Assurance (1-1-A2/5.5) CC 1-1-A2/5.7.1(a) CC 1-1-A2/5.7.1(b) Products Covered by Manufacturing Assessment (1-1-A2/5.3) CC 1-1-A2/5.7.1(b) CC 1-1-A2/5.7.2 Issuance and Updating of Certificates CC 1-1-A2/5.7.2 CC 1-1-A2/5.7.2(a) Issuance of Certificates CC 1-1-A2/5.7.2(a) CC 1-1-A2/5.7.2(b) Changes to Design, Procedures and Regulations other than ABS Rules CC 1-1-A2/5.7.2(b) CC 1-1-A2/5.7.2(c) Changes to ABS Rules CC 1-1-A2/5.7.2(c) CC 1-1-A2/5.7.2(d) Website Entry CC 1-1-A2/5.7.2(d) CC 1-1-A2/5.7.3 Acceptability of Type Approved Products CC 1-1-A2/5.7.3 CC 1-1-A2/5.7.4 Renewal CC 1-1-A2/5.7.4 CC 1-1-A2/5.7.4i) --- CC 1-1-A2/5.7.4i) CC 1-1-A2/5.7.4ii) --- CC 1-1-A2/5.7.4ii) CC 1-1-A2/5.7.4iii) --- CC 1-1-A2/5.7.4iii) CC 1-1-A2/5.7.5 Overdue Audit CC 1-1-A2/5.7.5 CC 1-1-A2/5.9 Terms and Conditions of the Request for Product Type Approval and Agreement CC 1-1-A2/5.9

Page 35: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 33

MODU 2008 Title MODU 2012 CC 1-1-A2/5.9.1 Agreement CC 1-1-A2/5.9.1 CC 1-1-A2/5.9.2 Representation as to Product Type Approval CC 1-1-A2/5.9.2 CC 1-1-A2/5.9.3 Suspension of Certification CC 1-1-A2/5.9.3 CC 1-1-A2/5.9.4 Validity CC 1-1-A2/5.9.4 CC 1-1-A2/5.9.5 Disagreement CC 1-1-A2/5.9.5 CC 1-1-A2/5.9.6 Limitation CC 1-1-A2/5.9.6 CC 1-1-A2/5.9.7 Hold Harmless CC 1-1-A2/5.9.7 CC 1-1-A2/5.9.8 Arbitration CC 1-1-A2/5.9.8 CC 1-1-A2/5.9.9 Time Bar to Legal Action CC 1-1-A2/5.9.9 CC 1-1-A2/5.9.10 Limitation of Liability CC 1-1-A2/5.9.10 CC 1-1-A2/5.9.11 Scope of Certification CC 1-1-A2/5.9.11 CC 1-1-A2/Figure 1 Process of the Type Approval Program CC 1-1-A2/Figure 1 Part 1 Conditions of Classification (MODU Rules Supplement) Part 1 Chapter 1 Section 1

Conditions of Classification Scope and Conditions of Classification Classification

1-1-1 Classification 1-1-1 Part 1 Chapter 1 Section 2

Conditions of Classification Scope and Conditions of Classification Classification Symbols and Notations

1-1-2 Classification Symbols and Notations 1-1-2 Part 1 Chapter 1 Section 3

Conditions of Classification Scope and Conditions of Classification Rules for Classification

1-1-3 Rules for Classification 1-1-3 1-1-3/1 Application of Rules 1-1-3/1 1-1-3/1.1 General 1-1-3/1.1 1-1-3/1.3 Application 1-1-3/1.3 Part 1 Chapter 1 Section 4

Conditions of Classification Scope and Conditions of Classification Plans and Data to be Submitted

1-1-4 Plans and Design Data to be Submitted 1-1-4

1-1-4/1 Hull and Design Data 1-1-4/1 3-1-2/1

1-1-4/3 Machinery Plans 1-1-4/3 1-1-4/5 Calculations 3-1-2/3 1-1-4/7 Additional Plans 1-1-4/5 1-1-4/9 Submissions 1-1-4/7 Part 1 Chapter 1 Section 5

Conditions of Classification Scope and Conditions of Classification Operating Manual

1-1-5 Operating Manual 1-1-5 1-1-5/1 --- 1-1-5/1 1-1-5/1.1 --- 1-1-5/1.1 1-1-5/1.3 --- 1-1-5/1.3 1-1-5/1.3i) --- 1-1-5/1.3i) 1-1-5/1.3ii) --- 1-1-5/1.3ii) 1-1-5/1.3iii) --- 1-1-5/1.3iii) 1-1-5/1.3iv) --- 1-1-5/1.3iv) 1-1-5/1.3v) --- 1-1-5/1.3v) 1-1-5/1.3vi) --- 1-1-5/1.3vi) 1-1-5/1.5 --- 1-1-5/1.5 1-1-5/1.5i) --- 1-1-5/1.5i) 1-1-5/1.5ii) --- 1-1-5/1.5ii) 1-1-5/1.5iii) --- 1-1-5/1.5iii) 1-1-5/1.5iv) --- 1-1-5/1.5iv) 1-1-5/1.5v) --- 1-1-5/1.5v) 1-1-5/1.5vi) --- 1-1-5/1.5vi) 1-1-5/1.5vii) --- 1-1-5/1.5vii) 1-1-5/1.5viii) --- 1-1-5/1.5viii) 1-1-5/1.5ix) --- 1-1-5/1.5ix) 1-1-5/1.5x) --- 1-1-5/1.5x)

Page 36: MODU_nandgi_e

Notices and General Information

34 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 1-1-5/1.5xi) --- 1-1-5/1.5xi) 1-1-5/1.5xii) --- 1-1-5/1.5xii) 1-1-5/1.7 --- 1-1-5/1.7 1-1-5/1.9 --- 1-1-5/1.9 1-1-5/1.11 --- 1-1-5/1.11 1-1-5/1.13 --- 1-1-5/1.13

1-1-5/1.15 --- 1-1-5/1.15 1-1-5/3

Part 1 Chapter 1 Section 6

Conditions of Classification Scope and Conditions of Classification Construction Booklet

1-1-6 Construction Booklet 7-1-2/25 Part 2 Rules for Materials and Welding Whole Part Part 2 remains unchanged. Generic Part 2 Part 3 Chapter 1 Section 1

Hull Construction and Equipment General Definitions

3-1-1 Definitions 3-1-1 3-1-1/1 General 3-1-1/1 3-1-1/1.1 Unit 3-1-1/1.1 3-1-1/1.3 Drilling Unit 3-1-1/1.3 3-1-1/1.5 Self-Propelled Unit 3-1-1/1.5 3-1-1/1.7 Non-Self-Propelled Unit 3-1-1/1.7 3-1-1/3 Types of Drilling Unit 3-1-1/3 3-1-1/3.1 Self-elevating Drilling Unit 3-1-1/3.1 3-1-1/3.3 Column-stabilized Drilling Unit 3-1-1/3.3 3-1-1/3.3.1 Semi-submersible Drilling Unit 3-1-1/3.3.1 3-1-1/3.3.2 Submersible Drilling Unit 3-1-1/3.3.2 3-1-1/3.5 Surface-type Drilling Unit 3-1-1/3.5 3-1-1/3.5.1 Ship-type Drilling Unit 3-1-1/3.5.1 3-1-1/3.5.2 Barge-type Drilling Unit 3-1-1/3.5.2 3-1-1/3.7 Other Types of Drilling Unit 3-1-1/3.7 3-1-1/5 Dimensions 3-1-1/5 3-1-1/5.1 General 3-1-1/5.1 3-1-1/5.3 Draft 3-1-1/5.3 3-1-1/7 Water Depth 3-1-1/7 3-1-1/9 Molded Base Line 3-1-1/9 3-1-1/11 Bulkhead Deck 3-1-1/11 3-1-1/13 Freeboard Deck 3-1-1/13 3-1-1/15 Lightweight 3-1-1/15 3-1-1/16 Total Elevated Load 3-1-1/16 3-1-1/17 Mode of Operation 3-1-1/17 3-1-1/17.1 Normal Drilling Condition 3-1-1/17.1 3-1-1/17.3 Severe Storm Condition 3-1-1/17.3 3-1-1/17.5 Transit Condition 3-1-1/17.5 3-1-1/19 Weathertight 3-1-1/19 3-1-1/21 Watertight 3-1-1/21 3-1-1/23 Systems of Measurement 3-1-1/23 Part 3 Chapter 1 Section 2

Hull Construction and Equipment General Environmental Loadings

3-1-2 Environmental Loadings 3-1-3 3-1-2/1 Loading Criteria 3-1-3/1 3-1-2/1.1 General 3-1-3/1.1 3-1-2/1.3 Wind Loadings 3-1-3/1.3 3-1-2/1.3.1 General 3-1-3/1.3.1 3-1-2/1.3.2 Wind Pressure 3-1-3/1.3.2 3-1-2/1.3.3 Wind Force 3-1-3/1.3.3 3-1-2/1.3.3(a) --- 3-1-3/1.3.3(a) 3-1-2/1.3.3(b) --- 3-1-3/1.3.3(b) 3-1-2/1.3.3(c) --- 3-1-3/1.3.3(c) 3-1-2/1.3.3(d) --- 3-1-3/1.3.3(d) 3-1-2/1.3.3(e) --- 3-1-3/1.3.3(e)

Page 37: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 35

MODU 2008 Title MODU 2012 3-1-2/1.5 Wave Loadings 3-1-3/1.5 3-1-2/1.5.1 General 3-1-3/1.5.1 3-1-2/1.5.2 Determination of Wave Loads 3-1-3/1.5.2 3-1-2/1.5.3 Morison’s Equation 3-1-3/1.5.3 3-1-2/1.5.4 Wave-Induced Dynamic Responses 3-2-3/5.9 3-1-2/1.7 Current Loading 3-1-3/1.7 3-1-2/1.7.1 Current Associated with Waves 3-1-3/1.7.1 3-1-2/1.7.2 Drag Force 3-1-3/1.7.2 3-1-2/1.9 Loadings due to Vortex Shedding 3-1-3/1.9 3-1-2/1.11 Gravity and Functional Loads 3-1-3/1.11 3-1-2/1.11.1 General 3-1-3/1.11.1 3-1-2/1.11.2 Combinations of Gravity and Functional Loads for Design 3-1-3/1.11.2 3-1-2/1.11.3 Deck Loadings 3-1-3/1.11.3 3-1-2/Table 1 Values of Cs 3-1-3/Table 1 3-1-2/Table 2 Values of Ch 3-1-3/Table 2 3-1-2/Figure 1 Current Velocity Profile 3-1-3/Figure 1 Part 3 Chapter 1 Section 3

Hull Construction and Equipment General Material Selection

3-1-3 Material Selection 3-1-4 3-1-3/1 Materials 3-1-4/1

3-1-3/1.1 General 3-1-4/1.1 4-1-1/7.11

3-1-3/1.3 Characteristics 3-1-4/1.3 3-1-3/1.5 Toughness 3-1-4/1.5 3-1-3/1.7 Materials Other than Steel 3-1-4/1.7 3-1-3/3 Hull Steel Grades 3-1-4/3 3-1-3/3.1 Ordinary and Higher Strength Steel 3-1-4/3.1 3-1-3/3.3 Quenched and Tempered Steel 3-1-4/3.3 3-1-3/3.5 Additional Requirements 3-1-4/3.5 3-1-3/3.7 Other Grades 3-1-4/3.7 3-1-3/5 Selection of Grades 3-1-4/5 3-1-3/5.1 General 3-1-4/5.1 3-1-3/5.3 Self-Elevating Units 3-2-3/3.1 3-1-3/5.3.1 Secondary Application Structure (Least Critical) 3-2-3/3.1.1 3-1-3/5.3.2 Primary Application Structure (Intermediate) 3-2-3/3.1.2 3-1-3/5.3.3 Special Application Structure (Most Critical) 3-2-3/3.1.3 3-1-3/5.5 Column-Stabilized Units 3-2-4/1.7 3-1-3/5.5.1 Secondary Application Structure (Least Critical) 3-2-4/1.7.1 3-1-3/5.5.2 Primary Application Structure (Intermediate) 3-2-4/1.7.2 3-1-3/5.5.3 Special Application Structure (Most Critical) 3-2-4/1.7.3 3-1-3/5.7 Selection Criteria for ABS Grades of Steel 3-1-4/5.5 3-1-3/5.9 Criteria for Other Steels 3-1-4/5.7 3-1-3/5.9.1 General 3-1-4/5.7.1 3-1-3/5.9.2 CVN Requirements 3-1-4/5.7.2 3-1-3/5.9.3 CVN Temperatures 3-1-4/5.7.3 3-1-3/5.9.4 Extra High Strength Steels 3-1-4/5.7.4 3-1-3/5.9.5 Alternative Requirements 3-1-4/5.7.5 3-1-3/5.9.5i) --- 3-1-4/5.7.5i) 3-1-3/5.9.5ii) --- 3-1-4/5.7.5ii) 3-1-3/5.9.5iii) --- 3-1-4/5.7.5iii) 3-1-3/5.9.5iv) --- 3-1-4/5.7.5iv) 3-1-3/Table 1 Material Selection Requirements for ABS Ordinary and Higher Strength Steels 3-1-4/Table 1 Part 3 Chapter 1 Appendix 1

Hull Construction and Equipment General Shallow Water Wave Theory

3-1-A1 Shallow Water Wave Theory 3-1-A1 3-1-A1/1 Equations 3-1-A1/1 3-1-A1/3 Nomenclature 3-1-A1/3 3-1-A1/5 Example 3-1-A1/5 3-1-A1/7 Compute 3-1-A1/7 3-1-A1/Figure 1 Ratio of Crest Elevation to Wave Height – SI and Metric Units 3-1-A1/Figure 1 3-1-A1/Figure 1 Ratio of Crest Elevation to Wave Height – U.S. Units 3-1-A1/Figure 1

Page 38: MODU_nandgi_e

Notices and General Information

36 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 3-1-A1/Figure 2 Relative Wave Height – SI and Metric Units 3-1-A1/Figure 2 3-1-A1/Figure 2 Relative Wave Height – U.S. Units 3-1-A1/Figure 2 3-1-A1/Figure 3 Wave Length Correction Factor – SI and Metric Units 3-1-A1/Figure 3 3-1-A1/Figure 3 Wave Length Correction Factor – U.S. Units 3-1-A1/Figure 3 3-1-A1/Figure 4 Drag Force Factor – SI and Metric Units 3-1-A1/Figure 4 3-1-A1/Figure 4 Drag Force Factor – U.S. Units 3-1-A1/Figure 4 3-1-A1/Figure 5 Ratio of Drag Force Lever to Still Water Depth – SI and Metric Units 3-1-A1/Figure 5 3-1-A1/Figure 5 Ratio of Drag Force Lever to Still Water Depth – U.S. Units 3-1-A1/Figure 5 3-1-A1/Figure 6 Inertial Force Factor – SI and Metric Units 3-1-A1/Figure 6 3-1-A1/Figure 6 Inertial Force Factor – U.S. Units 3-1-A1/Figure 6 3-1-A1/Figure 7 Ratio of Inertial Force Lever to Still Water Depth – SI and Metric Units 3-1-A1/Figure 7 3-1-A1/Figure 7 Ratio of Inertial Force Lever to Still Water Depth – U.S. Units 3-1-A1/Figure 7 3-1-A1/Figure 8 Ratio Total Force to Drag Force– SI and Metric Units 3-1-A1/Figure 8 3-1-A1/Figure 8 Ratio Total Force to Drag Force – U.S. Units 3-1-A1/Figure 8 3-1-A1/Figure 9 Angular Position of Maximum Moment – SI and Metric Units 3-1-A1/Figure 9 3-1-A1/Figure 9 Angular Position of Maximum Moment – U.S. Units 3-1-A1/Figure 9 Part 3 Chapter 1 Appendix 2

Hull Construction and Equipment General Wave Theory for Deep Water

3-1-A2 Wave Theory for Deep Water 3-1-A2 3-1-A2/1 Surface Wave Equation 3-1-A2/1 3-1-A2/3 Equations for Water Velocity 3-1-A2/3 3-1-A2/5 Equations for Water Acceleration 3-1-A2/5 3-1-A2/7 Equation for Dynamic Pressure 3-1-A2/7 3-1-A2/9 Example of Determining Inertia Force in Deep Water 3-1-A2/9 3-1-A2/11 Caisson 3-1-A2/11 3-1-A2/13 Drag Force in Deep Water 3-1-A2/13 3-1-A2/15 Recommended Mass Factors 3-1-A2/15 3-1-A2/15I Two Dimensional Values of Cm 3-1-A2/15I 3-1-A2/15II Three Dimensional Correction to Cm 3-1-A2/15II 3-1-A2/15III Application 3-1-A2/15III 3-1-A2/15IV Nomenclature 3-1-A2/15IV Part 3 Chapter 1 Appendix 3

Hull Construction and Equipment General Guide for Material Selection for ABS Grades of High Strength Quenched and Tempered Steel

3-1-A3 Guide for Material Selection for ABS Grades of High Strength Quenched and Tempered Steel 3-1-A3

3-1-A3/1 General 3-1-A3/1 3-1-A3/3 Chemical Composition 3-1-A3/3 3-1-A3/5 Mechanical Properties 3-1-A3/5 3-1-A3/7 Heat Treatment 3-1-A3/7

3-1-A3/Table 1 Chemical Composition for ABS Grades of High Strength Quenched and Tempered Steels 3-1-A3/Table 1

3-1-A3/Table 2 Mechanical Properties Requirements for ABS Grades of High Strength Quenched and Tempered Steels 3-1-A3/Table 2

3-1-A3/Table 2A Elongation Requirements for Alternative B Specimen 3-1-A3/Table 2A 3-1-A3/Table 3 Material Selection Guidelines for ABS Quenched and Tempered Steel Grades 3-1-A3/Table 3 Part 3 Chapter 2 Section 1

Hull Construction and Equipment Hull Structures and Arrangements Structural Analysis

3-2-1 Structural Analysis 3-2-1 3-2-1/1 Structural Analysis 3-2-1/1 3-2-1/1.1 Analysis of Primary Structure 3-2-1/1.1 3-2-1/1.1i) --- 3-2-1/1.1i) 3-2-1/1.1ii) --- 3-2-1/1.1ii) 3-2-1/1.3 Consideration of Local Stresses 3-2-1/1.3 3-2-1/1.5 Combination of Stress Components 3-2-1/1.5 3-2-1/1.7 Consideration of Buckling 3-2-1/1.7 3-2-1/1.9 Determination of Bending Stresses 3-2-1/1.9 3-2-1/1.9.1 Effective Flange Area 3-2-1/1.9.1 3-2-1/1.9.2 Eccentric Axial Loading 3-2-1/1.9.2 3-2-1/1.11 Determination of Shear Stresses 3-2-1/1.11 3-2-1/1.13 Stress Concentration 3-2-1/1.13

Page 39: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 37

MODU 2008 Title MODU 2012 3-2-1/1.15 Analysis and Details of Structural Connections 3-2-1/1.15 3-2-1/1.15i) --- 3-2-1/1.15i) 3-2-1/1.15ii) --- 3-2-1/1.15ii) 3-2-1/1.15iii) --- 3-2-1/1.15iii) 3-2-1/1.15iv) --- 3-2-1/1.15iv 3-2-1/1.17 Fatigue Analysis 3-2-1/1.17 3-2-1/1.19 Plastic Analysis 3-2-1/1.19 3-2-1/3 Allowable Stresses 3-2-1/3 3-2-1/3.1 General 3-2-1/3.1 3-2-1/3.3 Individual Stresses 3-2-1/3.3 3-2-1/3.5 Buckling Considerations 3-2-1/3.5 3-2-1/3.7 Members Subjected to Combined Axial Load and Bending 3-2-1/3.7 3-2-1/3.7.1 --- 3-2-1/3.7.1 3-2-1/3.7.2 --- 3-2-1/3.7.2 3-2-1/3.9 Column Buckling Stresses 3-2-1/3.9 3-2-1/3.9.1 Overall Buckling 3-2-1/3.9.1 3-2-1/3.9.2 Local Buckling 3-2-1/3.9.2 3-2-1/3.11 Equivalent Stress Criteria for Plated Structures 3-2-1/3.11 Part 3 Chapter 2 Section 2

Hull Construction and Equipment Hull Structures and Arrangements Common Structures

3-2-2 Common Structures 3-2-2 3-2-2/1 General 3-2-2/1 3-2-2/1.1 Materials 3-2-2/1.1 3-2-2/1.3 Scantlings 3-2-2/1.3 3-2-2/1.5 Surface-Type Drilling Units --- 3-2-2/1.7 Protection of Steel Work 3-2-2/1.5 3-2-2/3 Helicopter Deck 3-2-2/3 3-2-2/3.1 General 3-2-2/3.1 3-2-2/3.3 Structure 3-2-2/3.3 3-2-2/3.3.1 Overall Distributed Loading 3-2-2/3.3.1 3-2-2/3.3.2 Helicopter Landing Impact Loading 3-2-2/3.3.2 3-2-2/3.3.3 Stowed Helicopter Loading 3-2-2/3.3.3 3-2-2/3.3.4 Loading due to Motion of Unit 3-2-2/3.3.4 3-2-2/5 Structures Supporting the Drilling Derrick 3-2-2/5 3-2-2/5.1 Substructures 3-2-2/5.1 3-2-2/5.1.1 Individual Loads 3-2-2/5.1.1 3-2-2/5.1.2 Combined Loads 3-2-2/5.1.2 3-2-2/5.3 Substructure Supporting Arrangement 3-2-2/5.3 3-2-2/7 Watertight Bulkheads and Watertight Flats 3-2-2/7 3-2-2/7.1 General 3-2-2/7.1 3-2-2/7.3 Plating 3-2-2/7.3 3-2-2/7.5 Stiffeners and Beams 3-2-2/7.5 3-2-2/7.7 Corrugated Bulkheads 3-2-2/7.7 3-2-2/7.7.1 Plating 3-2-2/7.7.1 3-2-2/7.7.2 Stiffeners 3-2-2/7.7.2 3-2-2/7.7.3 End Connections 3-2-2/7.7.3 3-2-2/7.9 Girders and Webs 3-2-2/7.9 3-2-2/7.9.1 Strength Requirements 3-2-2/7.9.1 3-2-2/7.9.2 Proportions 3-2-2/7.9.2 3-2-2/7.9.3 Tripping Brackets 3-2-2/7.9.3 3-2-2/9 Tank Bulkheads and Tank Flats 3-2-2/9 3-2-2/9.1 General 3-2-2/9.1 3-2-2/9.3 Plating 3-2-2/9.3 3-2-2/9.5 Stiffeners and Beams 3-2-2/9.5 3-2-2/9.7 Corrugated Bulkheads 3-2-2/9.7 3-2-2/9.9 Girders and Webs 3-2-2/9.9 3-2-2/9.9.1 Strength Requirements 3-2-2/9.9.1 3-2-2/9.9.2 Proportions 3-2-2/9.9.2 3-2-2/9.9.3 Tripping Brackets 3-2-2/9.9.3 3-2-2/9.11 Drainage and Air Escape 3-2-2/9.11 3-2-2/11 Appurtenant Structure 3-2-2/11 3-2-2/11.1 General 3-2-2/11.1

Page 40: MODU_nandgi_e

Notices and General Information

38 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 3-2-2/11.3 Lifeboat Platform 3-2-2/11.3 3-2-2/11.5 Crane Pedestal and Foundation 3-2-2/11.5 3-2-2/11.7 Pipe Racks 3-2-2/11.7 3-2-2/13 Higher-strength Materials 3-2-2/13 3-2-2/13.1 General 3-2-2/13.1 3-2-2/13.3 Watertight Bulkheads and Flats and Tank Bulkheads and Flats 3-2-2/13.3 3-2-2/Table 1 Allowable Factors of Safety Based on Fy for Helicopter Decks 3-2-2/Table 1 3-2-2/Table 2 Thickness and Flange Width of Brackets and Knees 3-2-2/Table 2 3-2-2/Table 3 Values of Q 3-2-2/Table 3 3-2-2/Figure 1 Corrugated Bulkhead 3-2-2/Figure 1 3-2-2/Figure 2 Corrugated Bulkhead End Connections 3-2-2/Figure 2 Part 3 Chapter 2 Section 3

Hull Construction and Equipment Hull Structures and Arrangements Self-Elevating Drilling Units

3-2-3 Self-Elevating Drilling Units 3-2-3 3-2-3/1 Application 3-2-3/1 3-2-3/3 General Requirements for Scantlings 3-2-3/3.3 3-2-3/5 Units Elevated Modes 3-2-3/5 3-2-3/5.1 General 3-2-3/5.1 3-2-3/5.3 Safety Against Overturning 3-2-3/5.3 3-2-3/5.3.1 Nominal Loading Conditions for Calculation of Safety Against Overturning 3-2-3/5.3.1 3-2-3/5.3.1(a) Normal Drilling Condition 3-2-3/5.3.1(a) 3-2-3/5.3.1(b) Severe Storm Condition 3-2-3/5.3.1(b) 3-2-3/5.5 Wave Clearance 3-2-3/5.5 3-2-3/5.7 Preload 3-2-3/5.7 3-2-3/5.7.1 Capability 3-2-3/5.7.1 3-2-3/5.7.2 Leg Strength 3-2-3/5.7.2 3-2-3/7 Legs 3-2-3/7 3-2-3/7.1 Legs in Elevated Condition 3-2-3/7.1 3-2-3/7.1.1 Leg Types 3-2-3/7.1.1 3-2-3/7.1.2 Leg Scantlings 3-2-3/7.1.2 3-2-3/7.1.3 Spudcan-Soil Interaction 3-2-3/7.1.3 3-2-3/7.1.4 Sea Bed Conditions 3-2-3/7.1.4 3-2-3/7.3 Legs in the Transit Condition 3-2-3/7.3 3-2-3/7.3.1 Legs in Field Transit Condition 3-2-3/7.3.1 3-2-3/7.3.2 Legs in Severe Storm Transit Condition 3-2-3/7.3.2 3-2-3/9 Hull Interface Structure with Legs 3-2-3/9 3-2-3/11 Hull Structure 3-2-3/11 3-2-3/13 Spudcan and Bottom Mat 3-2-3/13 3-2-3/13.1 Spudcan 3-2-3/13.1 3-2-3/13.1.1 General 3-2-3/13.1.1 3-2-3/13.1.2 Afloat Mode Loading Conditions 3-2-3/13.1.2 3-2-3/13.1.2i) --- 3-2-3/13.1.2i) 3-2-3/13.1.2i)a) Plating 3-2-3/13.1.2i)a) 3-2-3/13.1.2i)b) Stiffeners 3-2-3/13.1.2i)b) 3-2-3/13.1.2i)c) Girders 3-2-3/13.1.2i)c) 3-2-3/13.1.2ii) --- 3-2-3/13.1.2ii) 3-2-3/13.1.2ii)a) Plating 3-2-3/13.1.2ii)a) 3-2-3/13.1.2ii)b) Stiffeners 3-2-3/13.1.2ii)b) 3-2-3/13.1.2ii)c) Girders 3-2-3/13.1.2ii)c) 3-2-3/13.1.3 Elevated Mode Loading Conditions 3-2-3/13.1.3 3-2-3/13.1.3i) Preload Condition 3-2-3/13.1.3i) 3-2-3/13.1.3ii) Normal Operating and Severe Storm Conditions 3-2-3/13.1.3ii) 3-2-3/13.1.3ii)a) --- 3-2-3/13.1.3ii)a) 3-2-3/13.1.3ii)b) --- 3-2-3/13.1.3ii)b) 3-2-3/13.3 Bottom Mat 3-2-3/13.3 3-2-3/15 Deckhouses 3-2-3/15 3-2-3/15.1 General 3-2-3/15.1 3-2-3/15.3 Design Head 3-2-3/15.3 3-2-3/15.5 Plating 3-2-3/15.5 3-2-3/15.7 Stiffeners 3-2-3/15.7 3-2-3/15.9 House Sides 3-2-3/15.9 3-2-3/15.11 End Attachment 3-2-3/15.11

Page 41: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 39

MODU 2008 Title MODU 2012 3-2-3/15.13 Racking Resistance 3-2-3/15.13 3-2-3/17 Structures Supporting the Drilling Derrick 3-2-3/17 3-2-3/Figure 1 Typical Hull Construction 3-2-3/Figure 2 Part 3 Chapter 2 Section 4

Hull Construction and Equipment Hull Structures and Arrangements Column-Stabilized Drilling Units

3-2-4 Column-stabilized Drilling Units 3-2-4 3-2-4/1 General 3-2-4/1 3-2-4/1.1 Application 3-2-4/1.1 3-2-4/1.3 Special Considerations Regarding Stresses 3-2-4/1.3 3-2-4/1.3i) --- 3-2-4/1.3i) 3-2-4/1.3ii) --- 3-2-4/1.3ii) 3-2-4/1.5 Effect of Mooring Forces on Local Structure 3-2-4/1.5 3-2-4/3 Upper Structure 3-2-4/3 3-2-4/3.1 General 3-2-4/3.1 3-2-4/3.3 Deck Plating 3-2-4/3.3 3-2-4/3.3.1 General 3-2-4/3.3.1 3-2-4/3.3.2 Storage Area Decks 3-2-4/3.3.2 3-2-4/3.3.3 Decks in way of Tanks 3-2-4/3.3.3 3-2-4/3.3.4 Provision for Fork-Lift Trucks 3-2-4/3.3.4 3-2-4/3.5 Beams 3-2-4/3.5 3-2-4/3.7 Girders 3-2-4/3.7 3-2-4/3.7.1 Strength Requirements 3-2-4/3.7.1 3-2-4/3.7.2 Proportions 3-2-4/3.7.2 3-2-4/3.7.3 Tripping Brackets 3-2-4/3.7.3 3-2-4/3.9 Stanchions and Pillars 3-2-4/3.9 3-2-4/3.9.1 Permissible Load 3-2-4/3.9.1 3-2-4/3.9.2 Length 3-2-4/3.9.2 3-2-4/3.9.3 Calculated Load 3-2-4/3.9.3 3-2-4/3.9.4 Pillars Under the Tops of Tanks 3-2-4/3.9.4 3-2-4/3.11 Non-buoyant Upper Structure Not Subjected to Wave Loading 3-2-4/3.11 3-2-4/3.13 Buoyant Upper Structure 3-2-4/3.13 3-2-4/3.15 Upper Structure Subjected to Wave Loading 3-2-4/3.15 3-2-4/5 Columns, Lower Hulls and Footings 3-2-4/5 3-2-4/5.1 General 3-2-4/5.1 3-2-4/5.3 Scantlings of Framed Shells 3-2-4/5.3 3-2-4/5.3.1 Tank Space 3-2-4/5.3.1 3-2-4/5.3.2 Void Compartment Spaces 3-2-4/5.3.2 3-2-4/5.3.3 Areas Subject to Wave Immersion 3-2-4/5.3.3 3-2-4/5.3.4 Minimum Scantlings 3-2-4/5.3.4 3-2-4/5.5 Scantlings of Unframed Shells 3-2-4/5.5 3-2-4/5.7 Scantlings of Structural Flats 3-2-4/5.7 3-2-4/5.9 Additional Structural Requirements 3-2-4/5.9 3-2-4/5.9.1 Provision for Wave and Current Loadings 3-2-4/5.9.1 3-2-4/5.9.2 Provision for Frame Action 3-2-4/5.9.2 3-2-4/5.9.3 Consideration for High Local Loadings 3-2-4/5.9.3 3-2-4/5.9.3i) --- 3-2-4/5.9.3i) 3-2-4/5.9.3ii) --- 3-2-4/5.9.3ii) 3-2-4/5.9.3iii) --- 3-2-4/5.9.3iii) 3-2-4/5.9.3iv) --- 3-2-4/5.9.3iv) 3-2-4/5.9.4 Scouring Consideration 3-2-4/5.9.4 3-2-4/5.9.4i) --- 3-2-4/5.9.4i) 3-2-4/5.9.4ii) --- 3-2-4/5.9.4ii) 3-2-4/5.9.4iii) --- 3-2-4/5.9.4iii) 3-2-4/5.11 Bracing Members 3-2-4/5.11 3-2-4/5.11.1 General 3-2-4/5.11.1 3-2-4/5.11.2 Loading Conditions 3-2-4/5.11.2 3-2-4/5.11.3 Effect of Wave Impact 3-2-4/5.11.3 3-2-4/5.11.4 Reinforcement of Tubular Bracing Members 3-2-4/5.11.4 3-2-4/5.11.5 Watertight Bracing Members 3-2-4/5.11.5 3-2-4/5.13 Openings in Columns 3-2-4/5.13 3-2-4/7 Deckhouses 3-2-4/7 3-2-4/7.1 General 3-2-4/7.1

Page 42: MODU_nandgi_e

Notices and General Information

40 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 3-2-4/7.1.1 Deckhouses on an Upper Structure Not Subjected to Wave Loading 3-2-4/7.1.1 3-2-4/7.1.2 Deckhouses on an Upper Structure Subjected to Wave Loading 3-2-4/7.1.2 3-2-4/7.1.3 Deckhouses on a Buoyant Upper Structure 3-2-4/7.1.3 3-2-4/7.3 Storage Tanks on Upper Structure 3-2-4/7.3 3-2-4/9 Wave Clearance 3-2-4/9 3-2-4/9.1 Afloat Modes of Operation 3-2-4/9.1 3-2-4/9.3 On-bottom Modes of Operation 3-2-4/9.3 3-2-4/11 Structural Redundancy 3-2-4/11 3-2-4/11.1 Assumed Damage 3-2-4/11.1 3-2-4/11.3 Analysis 3-2-4/11.3 3-2-4/11.3i) --- 3-2-4/11.3i) 3-2-4/11.3ii) --- 3-2-4/11.3ii) 3-2-4/11.5 Upper Structure 3-2-4/11.5 3-2-4/13 Structures Supporting the Drilling Derrick 3-2-4/13 3-2-4/15 Higher-strength Materials 3-2-4/15 3-2-4/15.1 General 3-2-4/15.1 3-2-4/15.3 Upper Structure 3-2-4/15.3 3-2-4/Table 1 Values of Q 3-2-4/Table 1 Part 3 Chapter 2 Section 5

Hull Construction and Equipment Hull Structures and Arrangements Surface-Type Drilling Units

3-2-5 Surface-type Drilling Units 3-2-5 3-2-5/1 General 3-2-5/1 3-2-5/3 Hull Scantlings --- 3-2-5/3.1 General --- 3-2-5/3.3 Drilling Well 3-2-5/9 3-2-5/3.5 Hatches 3-2-5/11 3-2-5/3.7 Concentrated Loads 3-2-5/5.9.2 3-2-5/3.9 Effect of Mooring Forces on Local Structure 3-2-5/13 3-2-5/5 Structures Supporting the Drilling Derrick --- Part 3 Chapter 2 Section 6

Hull Construction and Equipment Hull Structures and Arrangements Welding, Forming & Weld Design – Weld Design

3-2-6 Welding, Forming and Weld Design – Weld Design 3-2-6 3-2-6/1 Fillet Welds 3-2-6/1 3-2-6/1.1 Plans and Specifications 3-2-6/1.1 3-2-6/1.3 Tee Connections 3-2-6/1.3 3-2-6/1.3.1 Size of Fillet Welds 3-2-6/1.3.1 3-2-6/1.3.2 Length and Arrangement of Fillet 3-2-6/1.3.2 3-2-6/1.3.3 Intermittent Welding at Intersection 3-2-6/1.3.3 3-2-6/1.3.4 Welding of Longitudinals to Plating 3-2-6/1.3.4 3-2-6/1.3.5 Stiffeners and Webs to Hatch Covers 3-2-6/1.3.5 3-2-6/1.5 Tee-type End Connections 3-2-6/1.5 3-2-6/1.7 Ends of Unbracketed Stiffeners 3-2-6/1.7 3-2-6/1.9 Reduced Weld Size 3-2-6/1.9 3-2-6/1.9.1 Controlled Gaps 3-2-6/1.9.1 3-2-6/1.9.2 Deep Penetration Welds 3-2-6/1.9.2 3-2-6/1.11 Lapped Joints 3-2-6/1.11 3-2-6/1.11.1 Overlapped End Connections 3-2-6/1.11.1 3-2-6/1.11.2 Overlapped Seams 3-2-6/1.11.2 3-2-6/1.13 Plug Welds or Slot Welds 3-2-6/1.13 3-2-6/3 Full or Partial Penetration Corner or Tee Joints 3-2-6/3 3-2-6/5 Alternatives 3-2-6/5 3-2-6/7 Welding for Machinery Components 4-1-1/7.11 3-2-6/Table 1 Weld Factors 3-2-6/Table 1 Part 3 Chapter 2 Section 7

Hull Construction and Equipment Hull Structures and Arrangements Welding, Forming & Weld Design – Production Welding

3-2-7 Welding, Forming and Weld Design – Production Welding 7-1-2/9 3-2-7/1 General 7-1-2/9 3-2-7/3 Thickness in Excess of 50 mm (2 in.) 7-1-2/9.1 3-2-7/5 Extent of Inspection of Welds --- 3-2-7/5.1 General 7-1-2/9.3

Page 43: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 41

MODU 2008 Title MODU 2012 3-2-7/5.3 Extent and Method 7-1-2/11.7 3-2-7/5.3.1 Self-elevating Units 7-1-2/11.3 3-2-7/5.3.2 Column-stabilized Units 7-1-2/11.1 3-2-7/5.3.3 Nondestructive Inspection Plan 7-1-2/11 3-2-7/7 Acceptance Criteria 7-1-2/11.11 3-2-7/9 Fillet Welds 7-1-2/9.5 3-2-7/9.1 Workmanship 7-1-2/9.5 3-2-7/9.3 Special Precautions 7-1-2/9.5 Part 3 Chapter 2 Appendix 1

Hull Construction and Equipment Hull Structures and Arrangements Guide for Strengthening of Mobile Offshore Drilling Units for Navigation in Ice

3-2-A1 Guide for Strengthening of Mobile Offshore Drilling Units for Navigation in Ice 3-2-A1 3-2-A1/1 Application 3-2-A1/1 3-2-A1/1.1 Column Stabilized Unit 3-2-A1/1.1 3-2-A1/1.3 Units of Other Type 3-2-A1/1.3 3-2-A1/1.3.1 Surface Units 3-2-A1/1.3.1 3-2-A1/1.3.2 Self-elevating Units 3-2-A1/1.3.2 3-2-A1/1.5 Novel Features 3-2-A1/1.5 3-2-A1/3 Ice Class Selection 3-2-A1/3 3-2-A1/5 Ice Waterline 3-2-A1/5 3-2-A1/7 Clearance 3-2-A1/7 3-2-A1/9 Ice Belt 3-2-A1/9 3-2-A1/11 Design Ice Loads 3-2-A1/11 3-2-A1/11.1 Design Ice Pressure 3-2-A1/11.1 3-2-A1/11.3 Global Design Ice Load 3-2-A1/11.3 3-2-A1/13 Structural Evaluation 3-2-A1/13 3-2-A1/13.1 Global Evaluation 3-2-A1/13.1 3-2-A1/13.3 Local Scantlings 3-2-A1/13.3 3-2-A1/15 Other Requirements 3-2-A1/15 3-2-A1/Table 1 Guidance for Ice Class Selection of Column Stabilized Drilling Units 3-2-A1/Table 1

3-2-A1/Table 2 Definition of Ice Conditions of Broken First-year Ice Versus Concentration and Thickness 3-2-A1/Table 2

3-2-A1/Table 3 Ice Pressure Factors 3-2-A1/Table 3 3-2-A1/Figure 1 Ice Belt Areas 3-2-A1/Figure 1 Part 3 Chapter 2 Appendix 2

Hull Construction and Equipment Hull Structures and Arrangements Response Analysis – Guide for Selecting Design Waves for Structural Analysis of Column-Stabilized Drilling Units (Twin-Hull Semi-Submersible)

3-2-A2 Response Analysis – Guide for Selecting Design Waves for Structural Analysis of Column-Stabilized Drilling Units (Twin-Hull Semi-Submersible) 3-2-A2

3-2-A2/1 General 3-2-A2/1 3-2-A2/1.1 Introduction 3-2-A2/1.1 3-2-A2/3 Global Hydrodynamic Load Characteristics 3-2-A2/3 3-2-A2/3.1 General 3-2-A2/3.1 3-2-A2/3.1i) --- 3-2-A2/3.1i) 3-2-A2/3.1ii) --- 3-2-A2/3.1ii) 3-2-A2/3.1iii) --- 3-2-A2/3.1iii) 3-2-A2/3.1iv) --- 3-2-A2/3.1iv) 3-2-A2/3.1v) --- 3-2-A2/3.1v) 3-2-A2/3.3 Split Force Between Pontoons 3-2-A2/3.3 3-2-A2/3.3i) --- 3-2-A2/3.3i) 3-2-A2/3.3ii) --- 3-2-A2/3.3ii) 3-2-A2/3.3iii) --- 3-2-A2/3.3iii) 3-2-A2/3.5 Twisting Pitch Moment About Transverse Horizontal Axis 3-2-A2/3.5 3-2-A2/3.5i) --- 3-2-A2/3.5i) 3-2-A2/3.5ii) --- 3-2-A2/3.5ii) 3-2-A2/3.7 Longitudinal Shear Force Between Pontoons 3-2-A2/3.7 3-2-A2/3.9 Longitudinal and Transverse Accelerations of Deck Mass 3-2-A2/3.9 3-2-A2/3.11 Vertical Wave Bending Moment on the Pontoon 3-2-A2/3.11 3-2-A2/3.11i) --- 3-2-A2/3.11i) 3-2-A2/3.11ii) --- 3-2-A2/3.11ii) 3-2-A2/5 Selecting Design Waves by the Stochastic Method 3-2-A2/5 3-2-A2/5.1 General 3-2-A2/5.1 3-2-A2/5.3 Analytical Approach 3-2-A2/5.3

Page 44: MODU_nandgi_e

Notices and General Information

42 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 3-2-A2/5.3.1 --- 3-2-A2/5.3.1 3-2-A2/5.3.2 --- 3-2-A2/5.3.2 3-2-A2/5.3.3 --- 3-2-A2/5.3.3 3-2-A2/5.3.4 --- 3-2-A2/5.3.4 3-2-A2/5.3.5 --- 3-2-A2/5.3.5 3-2-A2/5.3.6 --- 3-2-A2/5.3.6 3-2-A2/5.3.7 --- 3-2-A2/5.3.7 3-2-A2/5.3.8 --- 3-2-A2/5.3.8 3-2-A2/5.3.9 --- 3-2-A2/5.3.9 3-2-A2/5.5 Irregular Sea Steepness 3-2-A2/5.5 3-2-A2/7 Selecting Design Waves by the Deterministic Method 3-2-A2/7 3-2-A2/7.1 General 3-2-A2/7.1 3-2-A2/7.3 Analytical Approach 3-2-A2/7.3 3-2-A2/7.3i) --- 3-2-A2/7.3i) 3-2-A2/7.3ii) --- 3-2-A2/7.3ii) 3-2-A2/7.3iii) --- 3-2-A2/7.3iii) 3-2-A2/7.3iv) --- 3-2-A2/7.3iv) 3-2-A2/7.3v) --- 3-2-A2/7.3v) 3-2-A2/7.5 Regular Wave Steepness 3-2-A2/7.5 Part 3 Chapter 2 Appendix 3

Hull Construction and Equipment Hull Structures and Arrangements Guide for the Allowable Stresses for Localized Highly-Stressed Areas

3-2-A3 Guide for the Allowable Stresses for Localized Highly-Stressed Areas 3-2-A3 3-2-A3/1 Plated Structures 3-2-A3/1 Part 3 Chapter 3 Section 1

Hull Construction and Equipment Subdivision and Stability Stability and Watertight/Weathertight Integrity

3-3-1 Stability and Watertight/Weathertight Integrity 3-3-1, 3-3-2 3-3-1/1 Stability 3-3-2/1 3-3-1/1.1 General 3-3-2/1.1 3-3-1/1.3 Stability Afloat 3-3-2/1.3 3-3-1/1.3.1 Intact Stability 3-3-2/1.3.1

3-3-1/1.3.2 Damage Stability 3-3-2/1.3.2 3-3-2/1.3.3

3-3-1/1.3.2(a) --- 3-3-2/1.3.2(a) 3-3-1/1.3.2(b) --- 3-3-2/1.3.2(b) 3-3-1/1.3.2(b)i) --- 3-3-2/1.3.2(b)i) 3-3-1/1.3.2(b)ii) --- 3-3-2/1.3.2(b)ii) 3-3-1/1.3.2(b)iii) --- 3-3-2/1.3.2(b)iii) 3-3-1/1.3.2(c) --- 3-3-2/1.3.2(c) 3-3-1/1.3.3 Alternatives for Treatment of Void Spaces 3-3-2/1.3.4 3-3-1/1.3.3(a) --- 3-3-2/1.3.4(a) 3-3-1/1.3.3(b) --- 3-3-2/1.3.4(b) 3-3-1/1.5 Lightweight and Center of Gravity 3-3-1/3 3-3-1/3 Stability Criteria 3-3-2/3 3-3-1/3.1 General 3-3-2/3.1 3-3-1/3.3 Righting Moment 3-3-2/3.3 3-3-1/3.3.1 Intact Stability Criteria 3-3-2/3.3.1 3-3-1/3.3.2 Damage Stability Criteria 3-3-2/3.3.2 3-3-1/3.3.3 Residual Stability Criteria – Column Stabilized Units 3-3-2/3.3.4 3-3-1/3.3.3(a) --- 3-3-2/3.3.4(a) 3-3-1/3.3.3(b) --- 3-3-2/3.3.4(b) 3-3-1/3.3.4 Residual Stability Criteria – Self-Elevating Units 3-3-2/3.3.3 3-3-1/3.5 Overturning Moment 3-3-2/3.7 3-3-1/3.7 Wind Tunnel Tests 3-3-2/3.9 3-3-1/3.9 Alternative Stability Criteria 3-3-2/3.11 3-3-1/3.9.1 General 3-3-2/3.11.1 3-3-1/3.9.2 Guidelines 3-3-2/3.11.2 3-3-1/3.9.2i) --- 3-3-2/3.11.2i) 3-3-1/3.9.2ii) --- 3-3-2/3.11.2ii) 3-3-1/3.9.2iii) --- 3-3-2/3.11.2iii) 3-3-1/3.9.2iv) --- 3-3-2/3.11.2iv) 3-3-1/3.9.2v) --- 3-3-2/3.11.2v)

Page 45: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 43

MODU 2008 Title MODU 2012 3-3-1/3.9.2vi) --- 3-3-2/3.11.2vi) 3-3-1/3.9.3 Alternative Intact Stability Criteria 3-3-2/3.11.3 3-3-1/5 Load Line 3-3-1/1 3-3-1/7 Extent of Damage for Damage Stability Studies 3-3-2/3.5 3-3-1/7.1 Self-Elevated Drilling Units 3-3-2/3.5.1 3-3-1/7.1i) --- 3-3-2/3.5.1i) 3-3-1/7.1ii) --- 3-3-2/3.5.1ii) 3-3-1/7.3 Column-stabilized Drilling Units 3-3-2/3.5.2 3-3-1/7.3i) --- 3-3-2/3.5.2i) 3-3-1/7.3ii) --- 3-3-2/3.5.2ii) 3-3-1/7.3iii) --- 3-3-2/3.5.2iii) 3-3-1/7.3iv) --- 3-3-2/3.5.2iv) 3-3-1/7.3v) --- 3-3-2/3.5.2v) 3-3-1/7.5 Surface-Type Drilling Units 3-3-2/3.5.3 3-3-1/7.5i) --- 3-3-2/3.5.3i) 3-3-1/7.5ii) --- 3-3-2/3.5.3ii) 3-3-1/9 Watertight/Weathertight Integrity 3-3-2/5 3-3-1/9.1 Weathertight Integrity 3-3-2/5.1 3-3-1/9.3 Watertight Integrity 3-3-2/5.3 3-3-1/9.3.1 Internal Openings Used for Access While Afloat 3-3-2/5.3.1 3-3-1/9.3.1(a) --- 3-3-2/5.3.1(a) 3-3-1/9.3.1(b) --- 3-3-2/5.3.1(b) 3-3-1/9.3.1(c) --- 3-3-2/5.3.1(c) 3-3-1/9.3.2 Internal Openings Secured Closed While Afloat 3-3-2/5.3.2 3-3-1/9.3.2(a) --- 3-3-2/5.3.2(a) 3-3-1/9.3.2(b) --- 3-3-2/5.3.2(b) 3-3-1/9.3.2(c) --- 3-3-2/5.3.2(c) 3-3-1/9.3.2(d) --- 3-3-2/5.3.2(d) 3-3-1/9.3.3 External Openings Used While Afloat 3-3-2/5.3.3 3-3-1/9.3.3(a) --- 3-3-2/5.3.3(a) 3-3-1/9.3.3(b) --- 3-3-2/5.3.3(b) 3-3-1/9.3.3(c) --- 3-3-2/5.3.3(c) 3-3-1/9.3.4 External Openings Secured Closed While Afloat 3-3-2/5.3.4 3-3-1/9.5 Penetrations 3-3-2/5.5 3-3-1/11 Onboard Computers for Stability Calculations 3-3-2/7 3-3-1/Figure 1 Intact Stability Curve 3-3-2/Figure 1 3-3-1/Figure 2 Damage Stability Curve 3-3-2/Figure 2

3-3-1/Figure 3A Residual Damage Stability Requirements for Column-Stabilized Units – Collision Damage 3-3-2/Figure 4A

3-3-1/Figure 3B Residual Damage Stability Requirements for Column-Stabilized Units – Remote Flooding 3-3-2/Figure 4B

3-3-1/Figure 4 Residual Damage Stability Requirements for Self-Elevating Units 3-3-2/Figure 3 3-3-1/Figure 5 Minimum Weathertight Integrity Requirements for Column Stabilized Units 3-3-2/Figure 5 Part 3 Chapter 3 Appendix 1

Hull Construction and Equipment Subdivision and Stability Guide for the Application of Dynamic Response Based Intact Stability Criteria for Column-Stabilized Mobile Offshore Drilling Units

3-3-A1 Guide for the Application of Dynamic Response Based Intact Stability Criteria for Column-stabilized Mobile Offshore Drilling Units 3-3-A1

3-3-A1/1 Introduction 3-3-A1/1 3-3-A1/3 Definitions and Symbols 3-3-A1/3 3-3-A1/5 General 3-3-A1/5 3-3-A1/5.1 Scope 3-3-A1/5.1 3-3-A1/5.3 Conditions for Compliance 3-3-A1/5.3 3-3-A1/5.5 Dynamic-response-based Criteria 3-3-A1/5.5 3-3-A1/7 Dynamic-response-based Criteria 3-3-A1/7 3-3-A1/7.1 Criteria 3-3-A1/7.1 3-3-A1/7.1.1 Capsizing 3-3-A1/7.1.1 3-3-A1/7.1.2 Downflooding 3-3-A1/7.1.2 3-3-A1/7.3 Conditions of Assessment 3-3-A1/7.3 3-3-A1/7.3.1 --- 3-3-A1/7.3.1 3-3-A1/7.3.2 --- 3-3-A1/7.3.2 3-3-A1/7.3.3 --- 3-3-A1/7.3.3 3-3-A1/7.3.4 --- 3-3-A1/7.3.4

Page 46: MODU_nandgi_e

Notices and General Information

44 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 3-3-A1/9 Determination of Dynamic Response 3-3-A1/9 3-3-A1/9.1 Empirical Approximations 3-3-A1/9.1 3-3-A1/9.1.1 Maximum Dynamic Response Angle, θmax 3-3-A1/9.1.1 3-3-A1/9.1.2 Reduction in Downflooding Distance, RDFD 3-3-A1/9.1.2 3-3-A1/9.3 Application Limits of Empirical Approximations 3-3-A1/9.3 3-3-A1/9.3.1 Geometric Parameters 3-3-A1/9.3.1 3-3-A1/9.3.2 Operating Parameters 3-3-A1/9.3.2 3-3-A1/9.5 Direct Calculation 3-3-A1/9.5 3-3-A1/Figure 1 Capsize Criteria Format 3-3-A1/Figure 1 3-3-A1/Figure 2 Downflooding Criteria Concepts 3-3-A1/Figure 2 Part 3 Chapter 3 Appendix 1a

Hull Construction and Equipment Subdivision and Stability Sample Calculations

3-3-A1a Sample Calculations 3-3-A1a 3-3-A1a/1 Capsize Criteria Assessment (Metric Units) 3-3-A1a/1 3-3-A1a/3 Downflooding Criteria Assessment (Metric Units) 3-3-A1a/3 Part 3 Chapter 3 Appendix 1b

Hull Construction and Equipment Subdivision and Stability Direct Analysis of Dynamic Motion Responses

3-3-A1b Direct Analysis of Dynamic Motion Responses 3-3-A1b 3-3-A1b/1 General 3-3-A1b/1 3-3-A1b/3 Analysis Methods and Theoretical Background 3-3-A1b/3 3-3-A1b/5 Analysis Conditions 3-3-A1b/5 3-3-A1b/5.1 Environmental Conditions 3-3-A1b/5.1 3-3-A1b/5.3 Heading 3-3-A1b/5.3 3-3-A1b/5.5 Hydrodynamic Coefficients 3-3-A1b/5.5 3-3-A1b/5.7 Radii of Gyration 3-3-A1b/5.7 3-3-A1b/5.9 Mooring Arrangement 3-3-A1b/5.9 3-3-A1b/7 Representation of Environment 3-3-A1b/7 3-3-A1b/7.1 Wind Loads 3-3-A1b/7.1 3-3-A1b/7.3 Wave Loads 3-3-A1b/7.3 3-3-A1b/7.5 Current Effects 3-3-A1b/7.5 3-3-A1b/9 Results of Analyses and Format 3-3-A1b/9 3-3-A1b/9i) --- 3-3-A1b/9i) 3-3-A1b/9ii) --- 3-3-A1b/9ii) 3-3-A1b/9iii) --- 3-3-A1b/9iii) 3-3-A1b/11 Model Tests 3-3-A1b/11 3-3-A1b/11i) --- 3-3-A1b/11i) 3-3-A1b/11ii) --- 3-3-A1b/11ii) 3-3-A1b/11iii) --- 3-3-A1b/11iii) 3-3-A1b/11iv) --- 3-3-A1b/11iv) Part 3 Chapter 3 Appendix 1c

Hull Construction and Equipment Subdivision and Stability Environmental Conditions and Representations

3-3-A1c Environmental Conditions and Representations 3-3-A1c 3-3-A1c/1 General 3-3-A1c/1 3-3-A1c/3 ABS Average Measured Wind Spectrum 3-3-A1c/3 3-3-A1c/5 Wave Spectra 3-3-A1c/5 3-3-A1c/5.1 Fetch-limited Regions 3-3-A1c/5.1 3-3-A1c/5.3 Open Seas 3-3-A1c/5.3 3-3-A1c/Figure 1 Joint Probabilities of Occurrence of Wind Speed and Wave Height 3-3-A1c/Figure 1 Part 3 Chapter 3 Appendix 2

Hull Construction and Equipment Subdivision and Stability Onboard Computers for Stability Calculations

3-3-A2 Onboard Computers for Stability Calculations 3-3-A2 3-3-A2/1 General 3-3-A2/1 3-3-A2/1.1 Scope 3-3-A2/1.1 3-3-A2/1.3 Design 3-3-A2/1.3 3-3-A2/3 Calculation Systems 3-3-A2/3 3-3-A2/5 Types of Stability Software 3-3-A2/5 3-3-A2/7 Functional Requirements 3-3-A2/7 3-3-A2/7.1 Calculation Program 3-3-A2/7.1 3-3-A2/7.3 Direct Damage Stability Calculation 3-3-A2/7.3

Page 47: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 45

MODU 2008 Title MODU 2012 3-3-A2/7.5 Warning 3-3-A2/7.5 3-3-A2/7.7 Data Printout 3-3-A2/7.7 3-3-A2/7.9 Date and Time 3-3-A2/7.9 3-3-A2/7.11 Information of Program 3-3-A2/7.11 3-3-A2/7.13 Units 3-3-A2/7.13 3-3-A2/9 Acceptable Tolerances 3-3-A2/9 3-3-A2/9.1 Calculation Program of the Approved Stability Information 3-3-A2/9.1 3-3-A2/9.3 Independent Program for Assessment of Stability 3-3-A2/9.3 3-3-A2/11 Approval Procedure 3-3-A2/11 3-3-A2/11.1 Conditions of Approval of the Onboard Computers for Stability Calculations 3-3-A2/11.1 3-3-A2/11.3 General Approval (optional) 3-3-A2/11.3 3-3-A2/11.5 Specific Approval 3-3-A2/11.5 3-3-A2/13 Operation Manual 3-3-A2/13 3-3-A2/15 Installation Testing 7-1-A2/7

3-3-A2/17 Periodical Testing 7-2-4/1.1.15 7-2-5/1.9

3-3-A2/19 Other Requirements 7-1-A2/9 3-3-A2/Table 1 Acceptable Tolerances 3-3-A2/Table 1 Part 3 Chapter 4 Section 1

Hull Construction and Equipment Equipment Position Mooring Systems and Equipment

3-4-1 Position Mooring Systems and Equipment 3-4-1 3-4-1/1 General 3-4-1/1 3-4-1/3 Temporary Mooring Equipment 3-4-1/3 3-4-1/5 Position Mooring Equipment 3-4-1/5 3-4-1/7 Position Mooring System 3-4-1/7 Part 3 Chapter 4 Appendix 1

Hull Construction and Equipment Equipment Guide for Position Mooring Systems

3-4-A1 Guide for Position Mooring Systems 3-4-A1 3-4-A1/1 General 3-4-A1/1 3-4-A1/1.1 --- 3-4-A1/1.1 3-4-A1/3 Anchoring Systems 3-4-A1/3 3-4-A1/3.1 General 3-4-A1/3.1 3-4-A1/3.3 Design 3-4-A1/3.3 3-4-A1/3.3.1 --- 3-4-A1/3.3.1 3-4-A1/3.3.1i) --- 3-4-A1/3.3.1i) 3-4-A1/3.3.1ii) --- 3-4-A1/3.3.1ii) 3-4-A1/3.3.1iii) --- 3-4-A1/3.3.1iii) 3-4-A1/3.3.2 --- 3-4-A1/3.3.2 3-4-A1/3.3.3 --- 3-4-A1/3.3.3 3-4-A1/3.3.4 --- 3-4-A1/3.3.4 3-4-A1/3.3.4(a) --- 3-4-A1/3.3.4(a) 3-4-A1/3.3.4(b) --- 3-4-A1/3.3.4(b) 3-4-A1/3.3.5 --- 3-4-A1/3.3.5 3-4-A1/3.3.5(a) Operating Intact 3-4-A1/3.3.5(a) 3-4-A1/3.3.5(b) Operating Damaged 3-4-A1/3.3.5(b) 3-4-A1/3.3.5(c) Operating Transient 3-4-A1/3.3.5(c) 3-4-A1/3.3.5(d) Severe Storm Intact 3-4-A1/3.3.5(d) 3-4-A1/3.3.5(e) Severe Storm Damaged 3-4-A1/3.3.5(e) 3-4-A1/3.3.5(f) Severe Storm Transient 3-4-A1/3.3.5(f) 3-4-A1/3.3.6 --- 3-4-A1/3.3.6 3-4-A1/3.3.7 --- 3-4-A1/3.3.7 3-4-A1/3.3.8 --- 3-4-A1/3.3.8 3-4-A1/3.3.9 --- 3-4-A1/3.3.9 3-4-A1/5 Equipment 3-4-A1/5 3-4-A1/5.1 Winches and Windlasses 3-4-A1/5.1 3-4-A1/5.1.1 --- 3-4-A1/5.1.1 3-4-A1/5.1.2 --- 3-4-A1/5.1.2 3-4-A1/5.1.3 --- 3-4-A1/5.1.3 3-4-A1/5.3 Fairleads and Sheaves 3-4-A1/5.3 3-4-A1/5.3.1 --- 3-4-A1/5.3.1 3-4-A1/7 Anchor Lines 3-4-A1/7

Page 48: MODU_nandgi_e

Notices and General Information

46 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 3-4-A1/7.1 --- 3-4-A1/7.1 3-4-A1/7.3 --- 3-4-A1/7.3 3-4-A1/7.5 --- 3-4-A1/7.5 3-4-A1/9 Anchors 3-4-A1/9 3-4-A1/9.1 --- 3-4-A1/9.1 3-4-A1/9.3 --- 3-4-A1/9.3 3-4-A1/11 Quality Control 3-4-A1/11 3-4-A1/11.1 --- 3-4-A1/11.1 3-4-A1/13 Control Stations 3-4-A1/13 3-4-A1/13.1 --- 3-4-A1/13.1 3-4-A1/13.3 --- 3-4-A1/13.3 3-4-A1/13.5 --- 3-4-A1/13.5 Part 4 Chapter 1 Section 1

Machinery and Systems Machinery, Equipment, and Their Installation General

4-1-1 General 4-1-1, 6-1-1 4-1-1/1 Machinery and Equipment 6-1-1/1.1 4-1-1/3 Drilling Equipment 6-1-1/1.3 4-1-1/5 Certification of Machinery 6-1-1/3 4-1-1/5.1 Basic Requirements 6-1-1/3.1 4-1-1/5.3 Type Approval Program 6-1-1/9.5 4-1-1/5.5 Non-mass Produced Machinery 6-1-1/9.9 4-1-1/5.7 Details of Certification of Some Representative Products 6-1-1/3.3 4-1-1/7 Inclinations 4-1-1/7.1

4-1-1/9 Plans and Data to be Submitted 4-1-2/7 4-3-6/3

4-1-1/10 Blackout and Dead Ship Condition --- 4-1-1/10.1 Blackout 4-1-1/3.11 4-1-1/10.3 Dead Ship Condition 4-1-1/3.9 4-1-1/10.3i) --- 4-1-1/3.9i) 4-1-1/10.3ii) --- 4-1-1/3.9ii) 4-1-1/11 Dead Ship start 4-1-1/7.3 4-1-1/13 Unattended Machinery Spaces 4-1-1/7.5

4-1-1/15 Ambient Temperature 3-1-4/1.9 4-1-1/7.7

4-1-1/17 Materials Containing Asbestos 4-1-1/7.9 4-1-1/Table 1 Angle of Inclination 4-1-1/Table 1 4-1-1/Table 2 Ambient Temperatures for Unrestricted Service 4-1-1/Table 2 Part 4 Chapter 1 Section 2

Machinery and Systems Machinery, Equipment, and Their Installation Rotating Machinery

4-1-2 Rotating Machinery 4-1-2 4-1-2/1 Drilling Units Without Propulsion Machinery --- 4-1-2/3 Internal Combustion Engines Designed for Drilling Operations 4-1-2/3 4-1-2/3.1 Crankcase Ventilation 4-1-2/3.1 4-1-2/3.1.1 General 4-1-2/3.1.1 4-1-2/3.1.2 Piping Arrangement 4-1-2/3.1.2 4-1-2/3.3 Explosion Relief Valves 4-1-2/3.3 4-1-2/3.3.1 General 4-1-2/3.3.1 4-1-2/3.3.2 Location of Valves 4-1-2/3.3.2 4-1-2/3.3.3 Additional Valves Required 4-1-2/3.3.3 4-1-2/3.5 Fire Extinguishing Systems for Scavenge Manifolds 4-1-2/3.5 4-1-2/3.7 Warning Notices 4-1-2/3.7 4-1-2/3.9 Governor Control 4-1-2/3.9 Part 4 Chapter 1 Section 3

Machinery and Systems Machinery, Equipment, and Their Installation Jacking and Associated Systems

4-1-3 Jacking and Associated Systems 6-1-9 4-1-3/1 General 6-1-9/1 4-1-3/3 Definitions 6-1-9/3 4-1-3/3.1 Jacking System 6-1-9/3.1 4-1-3/3.3 Holding Mechanism 6-1-9/3.3 4-1-3/3.5 Rack and Pinion Jacking System 6-1-9/3.5

Page 49: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 47

MODU 2008 Title MODU 2012 4-1-3/3.7 Yoke and Pin Jacking System 6-1-9/3.7 4-1-3/3.9 Fixation System 6-1-9/3.9 4-1-3/3.11 Specified Service Temperature 6-1-9/3.11 4-1-3/3.13 Jacking Unit Rated Capacity 6-1-9/3.13 4-1-3/3.15 Lifting Capacity per Leg 6-1-9/3.15 4-1-3/5 Plans and data to be Submitted 6-1-9/5 4-1-3/7 Failure Modes and Effects Analysis (FMEA) 6-1-9/7 4-1-3/9 Material 6-1-9/9 4-1-3/9.1 Toughness 6-1-9/9.1 4-1-3/11 Strength Analysis 6-1-9/11 4-1-3/13 Mechanical Components 6-1-9/13 4-1-3/13.1 Bearings 6-1-9/13.1 4-1-3/13.3 Brakes 6-1-9/13.3 4-1-3/13.5 Flexible Shock Pads 6-1-9/13.5 4-1-3/15 Electrical Power System 6-1-9/15 4-1-3/17 Hydraulic System 6-1-9/17 4-1-3/19 Control, Monitoring, and Alarm System 6-1-9/19 4-1-3/21 Inspection and Material Testing 6-1-9/25.1 4-1-3/23 Low Temperature Operation 6-1-9/21 4-1-3/25 Jacking Systems of Novel Design 6-1-9/23 4-1-3/Table 1 Charpy V-Notch (CVN) Impact Requirements for Steel Materials 6-1-9/Table 1 Part 4 Chapter 1 Section 4

Machinery and Systems Machinery, Equipment, and Their Installation Thrusters and Dynamic Positioning Systems

4-1-4/1 Thrusters and Dynamic Positioning Systems 4-1-2/5 Part 4 Chapter 2 Section 1

Machinery and Systems Pumps and Piping Systems General

4-2-1 General 4-2-1, 7-1-3 4-2-1/1 General Requirements 4-2-1/1 4-2-1/1.1 Damage Stability 4-2-1/1.1 4-2-1/1.3 Segregation of Piping System 4-2-1/1.3 4-2-1/1.5 Piping Groups 4-2-1/5 4-2-1/3 Plans and Data to be Submitted 4-2-1/7 4-2-1/3.1 Plans 4-2-1/7.1 4-2-1/3.3 All Piping Systems 4-2-1/7.3 4-2-1/3.5 Booklet of Standard Details 4-2-1/7.5 4-2-1/5 Material Tests and Inspection 4-2-1/9 4-2-1/5.1 Specifications and Purchase Orders 4-2-1/9.1 4-2-1/5.3 Special Materials 4-2-1/9.3 4-2-1/7 General Installation Details 4-2-1/11

4-2-1/7.1 Protection 4-2-1/11.1 7-1-3/11.3

4-2-1/7.3 Pipes Near Switchboards 4-2-1/11.3 7-1-3/11.5

4-2-1/7.5 Expansion and Contraction Stresses 4-2-1/11.5 7-1-3/11.7

4-2-1/7.7 Molded Expansion Joints 4-2-1/11.7 4-2-1/7.7.1 Circulating Water Systems 4-2-1/11.7.1 4-2-1/7.7.2 Oil Systems 4-2-1/11.7.2 4-2-1/7.7.2(a) --- 4-2-1/11.7.2(a) 4-2-1/7.7.2(b) --- 4-2-1/11.7.2(b) 4-2-1/7.7.2(c) --- 4-2-1/11.7.2(c) 4-2-1/7.7.2(d) --- 4-2-1/11.7.2(d) 4-2-1/7.7.3 Fire Resistant Test 4-2-1/11.7.3 4-2-1/7.9 Bulkhead, Deck or Tank-Top Penetrations 4-2-1/11.15 4-2-1/7.11 Collision Bulkhead Penetration 4-2-1/11.17 4-2-1/7.13 Sluice Valves and Cocks 4-2-1/11.19 4-2-1/7.15 Relief Valves 4-2-1/11.21 4-2-1/7.15.1 Exceptions 4-2-1/11.21.1 4-2-1/7.17 Common Overboard Discharges 4-2-1/11.23 4-2-1/7.19 Remote Operation 4-2-1/11.25 4-2-1/7.21 Standard or Extra Heavy Pipe 4-2-1/3.9 4-2-1/7.23 Instruments 4-2-1/11.27

Page 50: MODU_nandgi_e

Notices and General Information

48 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-2-1/7.23.1 Temperature 4-2-1/11.27.1 4-2-1/7.23.2 Pressure 4-2-1/11.27.2 4-2-1/7.25 Hose 4-2-1/11.29

4-2-1/7.27 Control of Static Electricity 4-2-1/11.31 7-1-3/11.29

4-2-1/7.29 Leakage Containment 4-2-1/11.33 4-2-1/7.29.1 Oil Leaks 4-2-1/11.33.1 4-2-1/7.29.2 Boiler Flats 4-2-1/11.33.2 Part 4 Chapter 2 Section 2

Machinery and Systems Pumps and Piping Systems Pumps, Pipes, Valves, and Fittings

4-2-2 Pumps, Pipes, Valves and Fittings 4-2-2, 6-1-6, 7-1-3 4-2-2/1 General 4-2-2/1 4-2-2/1.1 Service Conditions 4-2-2/1.1 4-2-2/1.3 Standards for Valves, Fittings and Flanges 4-2-2/1.3 4-2-2/3 Pumps 6-1-6/7.3.2 4-2-2/3.1 General Requirements 6-1-6/7.3.2 4-2-2/5 Metallic Piping 4-2-2/5 4-2-2/5.1 Test and Inspection Group I Piping 6-1-6/7.1 4-2-2/5.3 Steel Pipe 4-2-2/5.1 4-2-2/5.3.1 Seamless Pipe --- 4-2-2/5.3.2 Welded Pipe --- 4-2-2/5.3.3 Fuel-oil Pipe 4-2-2/5.1.1 4-2-2/5.5 Copper Pipe 4-2-2/5.3 4-2-2/5.7 Brass Pipe 4-2-2/5.5 4-2-2/5.9 Design 4-2-2/5.7 4-2-2/5.9.1 Maximum Allowable Working Pressure and Minimum Thickness 4-2-2/5.7.1

4-2-2/5.9.2 Pipe Bending 4-2-2/5.7.2 7-1-3/11.1

4-2-2/5.11 Working Pressure and Thickness – Alternative Consideration 4-2-2/5.9 4-2-2/7 Plastic Pipes 4-2-2/7 4-2-2/7.1 General 4-2-2/7.1 4-2-2/7.3 Plans and Data to be Submitted 4-2-2/7.3 4-2-2/7.3.1 General Information 4-2-2/7.3.1 4-2-2/7.3.2 Drawings and Supporting Documentation 4-2-2/7.3.2 4-2-2/7.3.3 Materials 4-2-2/7.3.3 4-2-2/7.5 Design 4-2-2/7.5 4-2-2/7.5.1 Internal Pressure 4-2-2/7.5.1 4-2-2/7.5.2 External Pressure 4-2-2/7.5.2 4-2-2/7.5.3 Axial Strength 4-2-2/7.5.3 4-2-2/7.5.3(a) --- 4-2-2/7.5.3(a) 4-2-2/7.5.3(b) --- 4-2-2/7.5.3(b) 4-2-2/7.5.4 Temperature 4-2-2/7.5.4 4-2-2/7.5.5 Impact Resistance 4-2-2/7.5.5 4-2-2/7.5.6 Fire Endurance 4-2-2/7.5.6 4-2-2/7.5.6i) --- 4-2-2/7.5.6i) 4-2-2/7.5.6ii) --- 4-2-2/7.5.6ii) 4-2-2/7.5.6iii) --- 4-2-2/7.5.6iii) 4-2-2/7.5.6i) --- 4-2-2/7.5.6i) 4-2-2/7.5.6ii) --- 4-2-2/7.5.6ii) 4-2-2/7.5.6iii) --- 4-2-2/7.5.6iii) 4-2-2/7.5.6iv) --- 4-2-2/7.5.6iv) 4-2-2/7.5.6v) --- 4-2-2/7.5.6v) 4-2-2/7.5.7 Flame Spread 4-2-2/7.5.7 4-2-2/7.5.7(a) Plastic Pipes 4-2-2/7.5.7(a) 4-2-2/7.5.7(b) Multi-core Metallic Tubes Sheathed by Plastic Materials 4-2-2/7.5.7(b) 4-2-2/7.5.8 Electrical Conductivity 4-2-2/7.5.8 4-2-2/7.5.8(a) --- 4-2-2/7.5.8(a) 4-2-2/7.5.8(b) --- 4-2-2/7.5.8(b)

4-2-2/7.5.8(c) --- 4-2-2/7.5.8(c) 7-1-3/13.5.3iv)

4-2-2/7.5.8(d) --- 4-2-2/7.5.8(d)

4-2-2/7.5.9 Marking 4-2-2/7.5.9 7-1-3/13.5.2

Page 51: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 49

MODU 2008 Title MODU 2012 4-2-2/7.7 Installation of Plastic Piping 4-2-2/7.7 4-2-2/7.7.1 Supports 4-2-2/7.7.1 4-2-2/7.7.1(a) --- 4-2-2/7.7.1(a) 4-2-2/7.7.1(b) --- 7-1-3/13.5.3i) 4-2-2/7.7.1(c) --- 7-1-3/13.5.3i) 4-2-2/7.7.1(d) --- 4-2-2/7.7.1(b) 4-2-2/7.7.1(e) --- 4-2-2/7.7.1(c)

4-2-2/7.7.2 External Loads 4-2-2/7.7.2 7-1-3/13.5.2

4-2-2/7.7.3 Plastic Pipe Connections 7-1-3/13.5.3iii) 4-2-2/7.7.3(a) --- 7-1-3/13.5.3iii) 4-2-2/7.7.3(b) --- 7-1-3/13.5.3iii) 4-2-2/7.7.3(c) --- 7-1-3/13.5.3iii) 4-2-2/7.7.3(d) --- 7-1-3/13.5.3iii) 4-2-2/7.7.4 Electrical Conductivity 7-1-3/13.5.3iv) 4-2-2/7.7.4(a) --- 7-1-3/13.5.3iv) 4-2-2/7.7.4(b) --- 7-1-3/13.5.3iv) 4-2-2/7.7.5 Shell Connections 4-2-2/7.7.3 4-2-2/7.7.6 Bulkhead and Deck Penetrations 4-2-2/7.7.4 4-2-2/7.7.6(a) --- 4-2-2/7.7.4(a) 4-2-2/7.7.6(b) --- 4-2-2/7.7.4(b) 4-2-2/7.7.6(c) --- 4-2-2/7.7.4(c) 4-2-2/7.7.7 Application of Fire Protecting Coatings 7-1-3/13.5.3vii) 4-2-2/7.9 Manufacturing of Plastic Pipes 4-2-2/7.9 4-2-2/7.11 Plastic Pipe Bonding Procedure Qualification 4-2-2/7.11 4-2-2/7.11.1 Procedure Qualification Requirements 4-2-2/7.11.1 4-2-2/7.11.1(a) --- 4-2-2/7.11.1(a) 4-2-2/7.11.1(a)i) --- 4-2-2/7.11.1(a)i) 4-2-2/7.11.1(a)ii) --- 4-2-2/7.11.1(a)ii) 4-2-2/7.11.1(a)iii) --- 4-2-2/7.11.1(a)iii) 4-2-2/7.11.1(a)iv) --- 4-2-2/7.11.1(a)iv) 4-2-2/7.11.1(a)v) --- 4-2-2/7.11.1(a)v) 4-2-2/7.11.1(a)vi) --- 4-2-2/7.11.1(a)vi) 4-2-2/7.11.1(a)vii) --- 4-2-2/7.11.1(a)vii) 4-2-2/7.11.1(b) 4-2-2/7.11.1(b) 4-2-2/7.11.2 Procedure Qualification Testing 4-2-2/7.11.2 4-2-2/7.11.2(a) --- 4-2-2/7.11.2(a) 4-2-2/7.11.2(b) --- 4-2-2/7.11.2(b) 4-2-2/7.11.2(b)i) --- 4-2-2/7.11.2(b)i) 4-2-2/7.11.2(b)ii) --- 4-2-2/7.11.2(b)ii) 4-2-2/7.11.2(c) --- 4-2-2/7.11.2(c)

4-2-2/7.13 Test by the Manufacturer - Fire Endurance Testing of Plastic Piping in dry Conditions (For Level 1 and Level 2) 4-2-2/7.13

4-2-2/7.13.1 Test Method 4-2-2/7.13.1 4-2-2/7.13.1(a) --- 4-2-2/7.13.1(a) 4-2-2/7.13.1(b) --- 4-2-2/7.13.1(b) 4-2-2/7.13.1(b)i) --- 4-2-2/7.13.1(b)i) 4-2-2/7.13.1(b)ii) --- 4-2-2/7.13.1(b)ii) 4-2-2/7.13.1(b)iii) --- 4-2-2/7.13.1(b)iii) 4-2-2/7.13.1(b)iv) --- 4-2-2/7.13.1(b)iv) 4-2-2/7.13.1(c) --- 4-2-2/7.13.1(c) 4-2-2/7.13.2 Test Specimen 4-2-2/7.13.2 4-2-2/7.13.2(a) --- 4-2-2/7.13.2(a) 4-2-2/7.13.2(b) --- 4-2-2/7.13.2(b) 4-2-2/7.13.2(c) --- 4-2-2/7.13.2(c) 4-2-2/7.13.2(d) --- 4-2-2/7.13.2(d) 4-2-2/7.13.2(e) --- 4-2-2/7.13.2(e) 4-2-2/7.13.2(f) --- 4-2-2/7.13.2(f) 4-2-2/7.13.3 Test Condition 4-2-2/7.13.3 4-2-2/7.13.4 Acceptance Criteria 4-2-2/7.13.4 4-2-2/7.13.4(a) --- 4-2-2/7.13.4(a) 4-2-2/7.13.4(b) --- 4-2-2/7.13.4(b) 4-2-2/7.13.4(c) --- 4-2-2/7.13.4(c)

Page 52: MODU_nandgi_e

Notices and General Information

50 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012

4-2-2/7.15 Test by the Manufacturer - Fire Endurance Testing of Water-Filled Plastic Piping (For Level 3) 4-2-2/7.15

4-2-2/7.15.1 Test Method 4-2-2/7.15.1 4-2-2/7.15.1(a) --- 4-2-2/7.15.1(a) 4-2-2/7.15.1(b) --- 4-2-2/7.15.1(b) 4-2-2/7.15.1(c) --- 4-2-2/7.15.1(c) 4-2-2/7.15.1(d) --- 4-2-2/7.15.1(d) 4-2-2/7.15.1(e) --- 4-2-2/7.15.1(e) 4-2-2/7.15.2 Test Specimen 4-2-2/7.15.2 4-2-2/7.15.2(a) --- 4-2-2/7.15.2(a) 4-2-2/7.15.2(b) --- 4-2-2/7.15.2(b) 4-2-2/7.15.2(c) --- 4-2-2/7.15.2(c) 4-2-2/7.15.2(d) --- 4-2-2/7.15.2(d) 4-2-2/7.15.2(e) --- 4-2-2/7.15.2(e) 4-2-2/7.15.2(f) --- 4-2-2/7.15.2(f) 4-2-2/7.15.2(g) --- 4-2-2/7.15.2(g) 4-2-2/7.15.3 Test Conditions 4-2-2/7.15.3 4-2-2/7.15.3(a) --- 4-2-2/7.15.3(a) 4-2-2/7.15.3(b) --- 4-2-2/7.15.3(b) 4-2-2/7.15.3(c) --- 4-2-2/7.15.3(c) 4-2-2/7.15.4 Acceptance Criteria 4-2-2/7.15.4 4-2-2/7.15.4(a) --- 4-2-2/7.15.4(a) 4-2-2/7.15.4(b) --- 4-2-2/7.15.4(b) 4-2-2/7.17 Test by Manufacturer – Flame Spread 4-2-2/7.17 4-2-2/7.17.1 Test Method 4-2-2/7.17.1 4-2-2/7.17.1(a) --- 4-2-2/7.17.1(a) 4-2-2/7.17.1(b) --- 4-2-2/7.17.1(b) 4-2-2/7.17.1(c) --- 4-2-2/7.17.1(c) 4-2-2/7.17.1(d) --- 4-2-2/7.17.1(d) 4-2-2/7.17.1(e) --- 4-2-2/7.17.1(e) 4-2-2/7.17.1(f) --- 4-2-2/7.17.1(f) 4-2-2/7.17.1(g) --- 4-2-2/7.17.1(g) 4-2-2/7.17.1(h) --- 4-2-2/7.17.1(h) 4-2-2/7.17.1(i) --- 4-2-2/7.17.1(i) 4-2-2/7.19 Testing by Manufacturer – General 4-2-2/7.19 4-2-2/9 Valves 4-2-2/9 4-2-2/9.1 General 4-2-2/9.1 4-2-2/9.1.1 Standard Valves 4-2-2/9.1.1 4-2-2/9.1.2 Non-Standard Valves 4-2-2/9.1.2 4-2-2/9.3 Construction 4-2-2/9.3 4-2-2/9.5 Hydrostatic Test and Identification 4-2-2/9.5 4-2-2/11 Pipe Fittings 4-2-2/11 4-2-2/11.1 General 4-2-2/11.1 4-2-2/11.3 Hydrostatic Test and Identification 4-2-2/11.3 4-2-2/11.5 Nonstandard Fittings 4-2-2/11.5 4-2-2/11.7 Mechanical Joints 7-1-3/17.5 4-2-2/13 Welded Nonstandard Valves and Fittings 4-2-2/13 4-2-2/15 Flanges 4-2-2/15 4-2-2/15.1 General 4-2-2/15.1 4-2-2/15.3 Group I Piping Flanges 4-2-2/15.3 4-2-2/15.3.1 Steel Pipe 4-2-2/15.3.1 4-2-2/15.3.2 Nonferrous Pipe 4-2-2/15.3.2 4-2-2/15.5 Group II Piping Flanges 4-2-2/15.5 4-2-2/17 Material of Valves and Fittings 4-2-2/17 4-2-2/17.1 General 4-2-2/17.1 4-2-2/17.3 Forged or Cast Steel 4-2-2/17.3 4-2-2/17.5 Cast Iron 4-2-2/17.5 4-2-2/17.7 Nonferrous 4-2-2/17.7 4-2-2/17.9 Ductile (Nodular) Iron 4-2-2/17.9 4-2-2/19 Fluid Power Cylinders 4-2-2/19 4-2-2/19.1 General 4-2-2/19.1 4-2-2/19.3 Non-compliance with a Recognized Standard 4-2-2/19.3 4-2-2/19.3i) --- 4-2-2/19.3i) 4-2-2/19.3ii) --- 4-2-2/19.3ii)

Page 53: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 51

MODU 2008 Title MODU 2012 4-2-2/19.3iii) --- 4-2-2/19.3iii) 4-2-2/19.5 Materials 4-2-2/19.5 4-2-2/19.5i) --- 4-2-2/19.5i) 4-2-2/19.5ii) --- 4-2-2/19.5ii) 4-2-2/19.5iii) --- 4-2-2/19.5iii) 4-2-2/19.7 Rudder Actuators 4-2-2/19.7 4-2-2/19.9 Cylinders below Pressures or Temperatures Indicated in 4-2-2/19.1 4-2-2/19.9 4-2-2/19.11 Independently Manufactured and Assembled Units 4-2-2/19.11 4-2-2/21 Sea Inlets and Overboard Discharges 4-2-2/21 4-2-2/21.1 Installation 4-2-2/21.1 4-2-2/21.3 Valve Connection to Shell 4-2-2/21.3 4-2-2/21.5 Materials 4-2-2/21.5 4-2-2/21.7 Shell Reinforcement 4-2-2/21.7

4-2-2/21.9 Sea-Water Inlet and Discharge Valves 4-2-2/21.9 7-1-3//23.3

4-2-2/21.9i) --- 7-1-3//23.3i) 4-2-2/21.9ii) --- 7-1-3//23.3ii) 4-2-2/21.9iii) --- 7-1-3//23.3iii) 4-2-2/21.9.1 Column Stabilized Units 4-2-2/21.9.1 4-2-2/21.9.2 Self Elevating and Surface Type Units 4-2-2/21.9.2 4-2-2/21.9.3 Self Elevating Units 4-2-2/21.9.3 4-2-2/21.11 Sea Chests 4-2-2/21.11 4-2-2/23 Scuppers and Drains on Surface-type and Self-Elevating Units 4-2-2/23 4-2-2/23.1 Discharges through the Shell 4-2-2/23.1 4-2-2/23.1.1 --- 4-2-2/23.1.1 4-2-2/23.1.2 --- 4-2-2/23.1.2 4-2-2/23.1.3 --- 4-2-2/23.1.3 4-2-2/23.3 Scuppers and Discharges below the Freeboard Deck – Shell Penetration 4-2-2/23.3 4-2-2/23.5 Scuppers from Superstructures or Deckhouses 4-2-2/23.5 4-2-2/27 Cooler Installation External to the Hull 4-2-2/27 4-2-2/27.1 General 4-2-2/27.1 4-2-2/27.3 Integral Keel Cooler Installation 4-2-2/27.3 4-2-2/27.5 Non-integral Keel Cooler Installation 4-2-2/27.5 4-2-2/29 Penetration Throughout Watertight Boundaries 4-2-2/29 4-2-2/29.1 Ventilating Systems 4-2-2/29.1 4-2-2/29.1i) --- 4-2-2/29.1i) 4-2-2/29.1ii) --- 4-2-2/29.1ii) 4-2-2/29.3 Internal Drain System 4-2-2/29.3 4-2-2/29.3.1 --- 4-2-2/29.3.1 4-2-2/29.3.2 --- 4-2-2/29.3.2 4-2-2/Table 1 Allowable Stress Values S for Piping N/mm2

4-2-2/Table 1 4-2-2/Table 2 Fire Endurance Requirements Matrix 4-2-2/Table 2 4-2-2/Table 3 Standards for Plastic Pipes – Typical Requirements for All System 4-2-2/Table 3

4-2-2/Table 4 Standards for Plastic Pipes – Additional Requirements Depending on Service and/or Location of Piping 4-2-2/Table 4

4-2-2/Figure 1 Fire Endurance Burner Assembly 4-2-2/Figure 1 4-2-2/Figure 2 Fire Endurance Test Stand With Mounted Sample 4-2-2/Figure 2 Part 4 Chapter 2 Section 3

Machinery and Systems Pumps and Piping Systems Tanks Vents and Overflows

4-2-3 Tank Vents and Overflows 4-2-3 4-2-3/1 Tank Vents and Overflows 4-2-3/1 4-2-3/1.1 General 4-2-3/1.1 4-2-3/1.3 Progressive Flooding Consideration 4-2-3/1.3 4-2-3/1.5 Height and Wall Thickness of Vent Pipes 4-2-3/1.5 4-2-3/1.5.1 Vents Exposed to Weather 4-2-3/1.5.1 4-2-3/1.5.2 Vents not Exposed to Weather 4-2-3/1.5.2 4-2-3/1.7 Size 4-2-3/1.7 4-2-3/1.9 Termination of Vent Pipes 4-2-3/1.9 4-2-3/1.9.1 Termination on or Above Freeboard Deck 4-2-3/1.9.1 4-2-3/1.9.2 Termination in Machinery Spaces 4-2-3/1.9.2 4-2-3/1.9.3 Protection for Fuel Oil and Lubricating Oil Tanks 4-2-3/1.9.3 4-2-3/1.9.4 Fuel Oil Tanks Vent Outlets 4-2-3/1.9.4 4-2-3/1.9.5 Vent Outlet Closing Devices 4-2-3/1.9.5

Page 54: MODU_nandgi_e

Notices and General Information

52 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-2-3/1.9.5(a) General 4-2-3/1.9.5(a) 4-2-3/1.9.5(b) Design 4-2-3/1.9.5(b) 4-2-3/1.9.5(b)i) --- 4-2-3/1.9.5(b)i) 4-2-3/1.9.5(b)ii) --- 4-2-3/1.9.5(b)ii) 4-2-3/1.9.5(b)iii) --- 4-2-3/1.9.5(b)iii) 4-2-3/1.9.5(b)iv) --- 4-2-3/1.9.5(b)iv) 4-2-3/1.9.5(b)v) --- 4-2-3/1.9.5(b)v) 4-2-3/1.9.5(b)vi) --- 4-2-3/1.9.5(b)vi) 4-2-3/1.9.5(b)vii) --- 4-2-3/1.9.5(b)vii) 4-2-3/1.9.5(b)viii) --- 4-2-3/1.9.5(b)viii) 4-2-3/1.9.5(b)ix) --- 4-2-3/1.9.5(b)ix) 4-2-3/1.9.5(c) Materials 4-2-3/1.9.5(c) 4-2-3/1.9.5(c)i) --- 4-2-3/1.9.5(c)i) 4-2-3/1.9.5(c)ii) --- 4-2-3/1.9.5(c)ii) 4-2-3/1.9.5(c)iii) --- 4-2-3/1.9.5(c)iii) 4-2-3/1.9.5(c)iv) --- 4-2-3/1.9.5(c)iv) 4-2-3/1.9.5(d) Type Testing 4-2-3/1.9.5(d) 4-2-3/1.9.5(d)i) --- 4-2-3/1.9.5(d)i) 4-2-3/1.9.5(d)ii) --- 4-2-3/1.9.5(d)ii) 4-2-3/1.9.5(d)iii) --- 4-2-3/1.9.5(d)iii) 4-2-3/1.11 Overflow Pipes 4-2-3/1.11 4-2-3/3 Sounding Arrangements 4-2-3/3 4-2-3/3.1 General 4-2-3/3.1 4-2-3/3.3 Sounding Pipes 4-2-3/3.3 4-2-3/3.3.1 Oil Tanks 4-2-3/3.3.1 4-2-3/3.3.2 Other Tanks 4-2-3/3.3.2 4-2-3/3.3.3 Ignition of Spillage 4-2-3/3.3.3 4-2-3/3.3.3(a) Fuel Oil Tanks 4-2-3/3.3.3(a) 4-2-3/3.3.3(a)i) --- 4-2-3/3.3.3(a)i) 4-2-3/3.3.3(a)ii) --- 4-2-3/3.3.3(a)ii) 4-2-3/3.3.3(a)iii) --- 4-2-3/3.3.3(a)iii) 4-2-3/3.3.3(b) Lubricating Oil Tanks 4-2-3/3.3.3(b) 4-2-3/3.3.3(b)i) --- 4-2-3/3.3.3(b)i) 4-2-3/3.3.3(b)ii) --- 4-2-3/3.3.3(b)ii) 4-2-3/3.5 Gauge Glasses 4-2-3/3.5 4-2-3/3.7 Level Indicating Device 4-2-3/3.7 Part 4 Chapter 2 Section 4

Machinery and Systems Pumps and Piping Systems Bilge and Ballast Systems and Tanks

4-2-4 Bilge and Ballast Systems and Tanks 4-2-4 4-2-4/1 General Arrangement of Bilge and Ballast Systems for Surface Type Units 4-2-4/1 4-2-4/1.1 General 4-2-4/1.1 4-2-4/1.3 Number of Bilge Pumps 4-2-4/1.3 4-2-4/1.5 Direct Bilge Suctions 4-2-4/1.5 4-2-4/1.7 Emergency Bilge Suctions 4-2-4/1.7

4-2-4/3 General Arrangement for Bilge Systems for Column-Stabilized Units and Self Elevating Units 4-2-4/3

4-2-4/3.1 Permanent Systems 4-2-4/3.1 4-2-4/3.3 Void Compartments 4-2-4/3.3 4-2-4/3.5 Chain Lockers 4-2-4/3.5 4-2-4/3.7 Bilge Alarm 4-2-4/3.7 4-2-4/5 Bilge Piping (All Units) 4-2-4/5 4-2-4/5.1 General 4-2-4/5.1 4-2-4/5.3 Installation 4-2-4/5.3 4-2-4/5.5 Manifolds, Cocks, and Valves 4-2-4/5.5 4-2-4/5.7 Common-main-type Bilge System 4-2-4/5.7 4-2-4/5.9 Strainers 4-2-4/5.9 4-2-4/5.11 Gravity Drains 4-2-4/5.11 4-2-4/5.13 Bilge Suctions from Hazardous Areas 4-2-4/5.13 4-2-4/5.15 Exceptions 4-2-4/5.15 4-2-4/7 Bilge Pumps (All Units) 4-2-4/7 4-2-4/7.1 General 4-2-4/7.1 4-2-4/7.3 Arrangement and Capacity 4-2-4/7.3 4-2-4/9 Size of Bilge Suctions 4-2-4/9

Page 55: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 53

MODU 2008 Title MODU 2012 4-2-4/9.1 Surface Type Units 4-2-4/9.1 4-2-4/9.1.1 Main Line 4-2-4/9.1.1 4-2-4/9.1.2 Branch Line 4-2-4/9.1.2 4-2-4/9.1.3 Main Line Reduction 4-2-4/9.1.3 4-2-4/9.1.4 Size Limits 4-2-4/9.1.4 4-2-4/9.3 Column-Stabilized Units and Self-Elevating Units 4-2-4/9.3 4-2-4/9.3.1 Main Line 4-2-4/9.3.1 4-2-4/9.3.2 Branch Line 4-2-4/9.3.2 4-2-4/9.3.3 Size Limits 4-2-4/9.3.3 4-2-4/11 Ballast Piping (All Units) 4-2-4/11 4-2-4/11.1 General 4-2-4/11.1 4-2-4/11.3 Installation 4-2-4/11.3 4-2-4/11.5 Controls for Ballast Tank Valves 4-2-4/11.5 4-2-4/11.7 Exceptions 4-2-4/11.7 4-2-4/13 Ballasting Systems for Column-Stabilized Units 4-2-4/13 4-2-4/13.1 General 4-2-4/13.1 4-2-4/13.1i) --- 4-2-4/13.1i) 4-2-4/13.1ii) --- 4-2-4/13.1ii) 4-2-4/13.3 Manifolds 4-2-4/13.3 4-2-4/13.5 Pumps 4-2-4/13.5 4-2-4/13.5.1 Number 4-2-4/13.5.1 4-2-4/13.5.2 Pump Performance 4-2-4/13.5.2 4-2-4/13.7 Ballast Control Features 4-2-4/13.7 4-2-4/13.7.1 Centralized Control Station 4-2-4/13.7.1 4-2-4/13.7.1(a) Location 4-2-4/13.7.1(a) 4-2-4/13.7.1(b) Controls and Indications 4-2-4/13.7.1(b) 4-2-4/13.7.1(b)i) --- 4-2-4/13.7.1(b)i) 4-2-4/13.7.1(b)ii) --- 4-2-4/13.7.1(b)ii) 4-2-4/13.7.1(b)iii) --- 4-2-4/13.7.1(b)iii) 4-2-4/13.7.1(b)iv) --- 4-2-4/13.7.1(b)iv) 4-2-4/13.7.1(b)v) --- 4-2-4/13.7.1(b)v) 4-2-4/13.7.1(b)vi) --- 4-2-4/13.7.1(b)vi) 4-2-4/13.7.1(b)vii) --- 4-2-4/13.7.1(b)vii) 4-2-4/13.7.1(b)viii) --- 4-2-4/13.7.1(b)viii) 4-2-4/13.7.1(b)ix) --- 4-2-4/13.7.1(b)ix) 4-2-4/13.7.1(b)x) --- 4-2-4/13.7.1(b)x) 4-2-4/13.7.1(b)xi) --- 4-2-4/13.7.1(b)xi) 4-2-4/13.7.1(c) Communication 4-2-4/13.7.1(c) 4-2-4/13.7.1(d) Back-up Station 4-2-4/13.7.1(d) 4-2-4/13.7.2 Independent Local Control 4-2-4/13.7.2 4-2-4/13.7.3 Safety Futures 4-2-4/13.7.3 4-2-4/13.7.3(a) Independence 4-2-4/13.7.3(a) 4-2-4/13.7.3(a)i) All Systems 4-2-4/13.7.3(a)i) 4-2-4/13.7.3(a)ii) Pump/Valve Control System 4-2-4/13.7.3(a)ii) 4-2-4/13.7.3(b) Dual Power Source 4-2-4/13.7.3(b) 4-2-4/13.7.3(c) Disconnects 4-2-4/13.7.3(c) 4-2-4/13.7.3(d) Electronic Systems 4-2-4/13.7.3(d) 4-2-4/13.7.3(e) Valve Controls 4-2-4/13.7.3(e) 4-2-4/13.7.4 Valve Positioning Indicating System 4-2-4/13.7.4 4-2-4/13.7.5 Draft Indicating System 4-2-4/13.7.5 4-2-4/13.7.6 Tank Level indicating System 4-2-4/13.7.6 Part 4 Chapter 2 Section 5

Machinery and Systems Pumps and Piping Systems Fuel Oil Systems and Tanks

4-2-5 Fuel Oil Systems and Tanks 4-2-5, 6-1-3 4-2-5/1 Fuel Oil Piping System – General 4-2-5/1 4-2-5/1.1 Arrangement 4-2-5/1.1 4-2-5/1.1.1 Tanks 4-2-5/1.1.1 4-2-5/1.1.1(a) Structural Tanks 4-2-5/1.1.1(a) 4-2-5/1.1.1(b) Free Standing Tanks 4-2-5/1.1.1(b) 4-2-5/1.1.2 Spillage 4-2-5/1.1.2 4-2-5/1.1.3 Sounding Arrangements 4-2-5/1.1.3

4-2-5/1.1.4 Service and Settlings Tanks 4-2-5/1.1.4 4-2-3/1.9.3

Page 56: MODU_nandgi_e

Notices and General Information

54 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-2-5/1.3 Piping, Valves and Fittings 4-2-5/1.3 4-2-5/1.5 Oil Heating Arrangements 4-2-5/1.5 4-2-5/1.5.1 Oil Heaters 4-2-5/1.5.1 4-2-5/1.5.2 Tanks 4-2-5/1.5.2 4-2-5/1.7 Fuel Oil Purifiers 4-2-5/1.7 4-2-5/3 Fuel Oil Transfer and Filling 4-2-5/3 4-2-5/3.1 General 4-2-5/3.1 4-2-5/3.3 Heating Coils 4-2-5/3.3 4-2-5/3.5 Pipes in Oil Tanks 4-2-5/3.5 4-2-5/3.7 Control Valves or Cocks 4-2-5/3.7 4-2-5/3.9 Valves on Oil Tanks 4-2-5/3.9 4-2-5/3.9i) --- 4-2-5/3.9i) 4-2-5/3.9ii) --- 4-2-5/3.9ii) 4-2-5/3.9iii) --- 4-2-5/3.9iii) 4-2-5/5 Fuel-oil Service System for Boilers 4-2-5/5 4-2-5/7 Fuel-oil Service System for Internal Combustion Engines 4-2-5/7 4-2-5/7.1 Fuel-oil Pumps and Oil Heaters 4-2-5/7.1 4-2-5/7.1.1 Transfer Pumps 4-2-5/7.1.1 4-2-5/7.1.2 Booster Pumps 4-2-5/7.1.2 4-2-5/7.1.3 Heaters 4-2-5/7.1.3 4-2-5/7.3 Oil Tanks and Drains for Fuel Oil Systems 4-2-5/7.3 4-2-5/7.5 Fuel-oil Pressure Piping 4-2-5/7.5 4-2-5/7.7 Fuel-oil Injection System 4-2-5/7.7 4-2-5/7.7.1 General 4-2-5/7.7.1

4-2-5/7.7.2 Piping Between Injection Pump and Injectors 4-2-5/7.7.2 6-1-3/3.1

4-2-5/7.7.2(a) Injection Piping 6-1-3/3.1.1 4-2-5/7.7.2(b) Fuel Oil Return Piping 6-1-3/3.1.2 4-2-5/7.9 Piping Between Booster Pump and Injection Pumps 4-2-5/7.9 4-2-5/9 Low Flash Point Fuels 4-2-5/9 4-2-5/9.1 General 4-2-5/9.1 4-2-5/9.1.1 --- 4-2-5/9.1.1 4-2-5/9.1.2 --- 4-2-5/9.1.2 4-2-5/9.1.3 --- 4-2-5/9.1.3 4-2-5/9.3 Fuel Heating 4-2-5/9.3 4-2-5/9.5 Fuel-tank Vents 4-2-5/9.5 4-2-5/11 Additional Measures for Oil Pollution Prevention 4-2-5/11 4-2-5/11.1 General 4-2-5/11.1 4-2-5/11.1.1 Application 4-2-5/11.1.1 4-2-5/11.1.2 Submission of Plans 4-2-5/11.1.2 4-2-5/11.3 Tank Protection Requirements 4-2-5/11.3 4-2-5/11.3.1 General 4-2-5/11.3.1 4-2-5/11.3.2 Protective Location of Tanks 4-2-5/11.3.2 4-2-5/11.3.2(a) Deterministic Approach 4-2-5/11.3.2(a) 4-2-5/11.3.2(a)i) --- 4-2-5/11.3.2(a)i) 4-2-5/11.3.2(a)ii) --- 4-2-5/11.3.2(a)ii) 4-2-5/11.3.2(a)iii) --- 4-2-5/11.3.2(a)iii) 4-2-5/11.3.2(a)iv) --- 4-2-5/11.3.2(a)iv) 4-2-5/11.3.2(b) Probabilistic Approach 4-2-5/11.3.2(b) 4-2-5/13 Class Notation – POT 4-2-5/13 4-2-5/13i) --- 4-2-5/13i) 4-2-5/13ii) --- 4-2-5/13ii) 4-2-5/Figure 1 Acceptable Fuel Oil Tanks Arrangements Inside Category A Machinery Spaces 4-2-5/Figure 1 Part 4 Chapter 2 Section 6

Machinery and Systems Pumps and Piping Systems Other Piping Systems and Tanks

4-2-6 Other Piping Systems and Tanks 4-2-6 4-2-6/1 Lubricating Oil Systems 4-2-6/1 4-2-6/1.1 General 4-2-6/1.1 4-2-6/1.3 Sight Flow Glasses 4-2-6/1.3 4-2-6/1.5 Turbines and Reduction Gears 4-2-6/1.5 4-2-6/1.7 Internal Combustion Engines and Reduction Gear 4-2-6/1.7 4-2-6/1.7.1 Lubricating Oil Pumps 4-2-6/1.7.1 4-2-6/1.7.2 Filters 4-2-6/1.7.2

Page 57: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 55

MODU 2008 Title MODU 2012 4-2-6/1.7.3 Low Oil Pressure Alarm 4-2-6/1.7.3 4-2-6/1.7.4 Drain Pipes 4-2-6/1.7.4 4-2-6/1.9 Electrical Machinery 4-2-6/1.9 4-2-6/3 Hydraulic Systems 4-2-6/3 4-2-6/3.1 General 4-2-6/3.1 4-2-6/3.3 Valves 4-2-6/3.3 4-2-6/3.3.1 General 4-2-6/3.3.1 4-2-6/3.3.2 Relief Valves 4-2-6/3.3.2 4-2-6/3.5 Piping 4-2-6/3.5 4-2-6/3.7 Pipe Fittings 4-2-6/3.7 4-2-6/3.7.1 Non-standard Fittings 4-2-6/3.7.1 4-2-6/3.7.2 Split Flanges 4-2-6/3.7.2 4-2-6/3.7.3 Straight Thread O Rings Connections 4-2-6/3.7.3 4-2-6/3.7.4 Tapered Threaded Connections 4-2-6/3.7.4 4-2-6/3.9 Hose 4-2-6/3.9 4-2-6/3.11 Accumulators 4-2-6/3.11 4-2-6/3.13 Fluid Power Cylinders 4-2-6/3.13 4-2-6/3.15 Design Pressure 4-2-6/3.15 4-2-6/3.17 Segregation of High Pressure Hydraulic Units 4-2-6/3.17 4-2-6/5 Fixed Oxygen – Acetylene Installations 4-2-6/5 4-2-6/5.1 Application 4-2-6/5.1 4-2-6/5.3 Gas Storage 4-2-6/5.3 4-2-6/5.3.1 Storage of Gas Cylinders 4-2-6/5.3.1 4-2-6/5.3.1(a) Storage Room 4-2-6/5.3.1(a) 4-2-6/5.3.1(b) Open Area 4-2-6/5.3.1(b) 4-2-6/5.3.1(c) Piping Passing Through Storage Room or Area 4-2-6/5.3.1(c) 4-2-6/5.3.2 Ventilation of Storage Room 4-2-6/5.3.2 4-2-6/5.3.3 Electrical Installation in Storage Room 4-2-6/5.3.3 4-2-6/5.5 Piping System Components 4-2-6/5.5 4-2-6/5.5.1 Pipe and Fittings 4-2-6/5.5.1 4-2-6/5.5.1(a) General 4-2-6/5.5.1(a) 4-2-6/5.5.1(b) Piping Materials 4-2-6/5.5.1(b) 4-2-6/5.5.1(c) Design Pressure 4-2-6/5.5.1(c) 4-2-6/5.5.1(d) Pipe Joints 4-2-6/5.5.1(d) 4-2-6/5.5.1(e) Flexible Hoses 4-2-6/5.5.1(e) 4-2-6/5.5.2 Pressure Relief Devices 4-2-6/5.5.2 4-2-6/5.5.3 System Arrangements 4-2-6/5.5.3 4-2-6/5.5.4 Gas Cylinders 4-2-6/5.5.4 4-2-6/7 Fuel Storage for Helicopter Facilities 4-2-6/7 4-2-6/7.1 General 4-2-6/7.1 4-2-6/7.1.1 Isolation 4-2-6/7.1.1 4-2-6/7.1.2 Hazardous Areas 4-2-6/7.1.2 4-2-6/7.1.2(a) Ventilation Capacity 4-2-6/7.1.2(a) 4-2-6/7.1.2(b) Exhaust Ventilation Duct and Fan 4-2-6/7.1.2(b) 4-2-6/7.1.2(c) Dewatering System 4-2-6/7.1.2(c) 4-2-6/7.1.3 Fuel Storage Tank Construction 4-2-6/7.1.3 4-2-6/7.1.4 Fuel Storage Tank Vents 4-2-6/7.1.4 4-2-6/7.1.5 Fuel Storage Tank Valves 4-2-6/7.1.5 4-2-6/7.3 Spill Containment 4-2-6/7.3 4-2-6/7.3.1 --- 4-2-6/7.3.1 4-2-6/7.3.2 --- 4-2-6/7.3.2 4-2-6/7.3.3 --- 4-2-6/7.3.3 4-2-6/9 Starting-air Systems 4-2-6/9 4-2-6/9.1 Design and Construction 4-2-6/9.1 4-2-6/9.3 Starting-air Capacity 4-2-6/9.3 4-2-6/9.3.1 Diesel Propulsion 4-2-6/9.3.1 4-2-6/9.3.2 Diesel-Electric Propulsion 4-2-6/9.3.2 4-2-6/9.3.3 Non Self-Propelled Units 4-2-6/9.3.3 4-2-6/9.5 Protective Devices for Starting Air Mains 4-2-6/9.5 4-2-6/11 Cooling Water Systems for Internal Combustion Engines 4-2-6/11 4-2-6/11.1 General 4-2-6/11.1 4-2-6/11.3 Sea Suctions 4-2-6/11.3 4-2-6/11.5 Strainers 4-2-6/11.5 4-2-6/11.7 Circulating Water Pumps 4-2-6/11.7

Page 58: MODU_nandgi_e

Notices and General Information

56 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-2-6/13 Exhaust System 4-2-6/13 4-2-6/13.1 Exhaust Lines 4-2-6/13.1 4-2-6/13.3 Exhaust Gas Temperature 4-2-6/13.3 4-2-6/15 Valves in Atomizing Lines 4-2-6/15 4-2-6/17 Helicopter Deck Drainage Arrangements 4-2-6/17 4-2-6/19 Boilers and Associated Piping 4-2-6/19 4-2-6/21 Steering Gear Piping 4-2-6/21 4-2-6/23 Gas Turbine Piping 4-2-6/23 Part 4 Chapter 3 Section 1

Machinery and Systems Electrical Installations General

4-3-1 General 4-3-1, 6-1-7 4-3-1/1 Applications 4-3-1/1 4-3-1/3 Definitions 4-3-1/3 4-3-1/3.1 Earthed Distribution System 4-3-1/3.1

4-3-1/3.3 Essential Services 4-3-1/3.3 4-1-1/3.5

4-3-1/3.5 Explosion-proof (Flameproof) Equipment 4-3-1/3.5 4-3-1/3.5i) --- 4-3-1/3.5i) 4-3-1/3.5ii) --- 4-3-1/3.5ii) 4-3-1/3.7 Hazardous Area (Hazardous Location) 4-3-1/3.7 4-3-1/3.9 Hull-return System 4-3-1/3.9 4-3-1/3.11 Intrinsically-safe 4-3-1/3.11 4-3-1/3.11.1 Category "ia" 4-3-1/3.11.1 4-3-1/3.13 Increased Safety 4-3-1/3.13 4-3-1/3.15 Non-Periodic Duty Rating 4-3-1/3.15 4-3-1/3.17 Non-sparking Fan 4-3-1/3.17 4-3-1/3.19 Periodic Duty Rating 4-3-1/3.19 4-3-1/3.21 Portable Apparatus 4-3-1/3.21 4-3-1/3.23 Pressurized Equipment 4-3-1/3.23 4-3-1/3.25 Semi-enclosed Space 4-3-1/3.25 4-3-1/3.27 Separate Circuit 4-3-1/3.27 4-3-1/3.29 Short Circuit 4-3-1/3.29 4-3-1/3.31 Short-time Rating 4-3-1/3.31 4-3-1/5 Plans and Data to be Submitted 4-3-1/5 4-3-1/7 Standard Distribution System 4-3-1/7 4-3-1/9 Voltage and Frequency Variations 4-3-1/9 4-3-1/11 Materials 4-3-1/11 4-3-1/12 Grounding Arrangements 4-3-1/13 4-3-1/13 Insulation Material 6-1-7/1.1 4-3-1/13.1 Class A Insulation 6-1-7/1.1.1 4-3-1/13.3 Class B Insulation 6-1-7/1.1.2 4-3-1/13.5 Class E Insulation 6-1-7/1.1.3 4-3-1/13.7 Class F Insulation 6-1-7/1.1.4 4-3-1/13.9 Class H Insulation 6-1-7/1.1.5 4-3-1/13.11 Insulation for Temperature Above 180°C (356°F) 6-1-7/1.1.6 4-3-1/15 Degree of Protection for Enclosure 4-3-1/15 4-3-1/17 Temperature Ratings 4-3-1/17 4-3-1/17.1 General 4-3-1/17.1 4-3-1/17.3 Reduced Ambient Temperature 4-3-1/17.3 4-3-1/17.3.1 Environmentally Controlled Spaces 4-3-1/17.3.1 4-3-1/17.3.1i) --- 4-3-1/17.3.1i) 4-3-1/17.3.1ii) --- 4-3-1/17.3.1ii) 4-3-1/17.3.1iii) --- 4-3-1/17.3.1iii) 4-3-1/17.3.1iv) --- 4-3-1/17.3.1iv) 4-3-1/17.3.2 Rating of Cables 4-3-1/17.3.2 4-3-1/17.3.3 Ambient Temperature Control Equipment 4-3-1/17.3.3 4-3-1/19 Clearances and Creepage Distances 4-3-1/19 4-3-1/Table 1 Voltage and Frequency Variations 4-3-1/Table 1 4-3-1/Table 2 Degree of Protection – Indicated by the First Characteristic Numeral 4-3-1/Table 2 4-3-1/Table 3 Degree of Protection - Indicated by the Second Characteristic Numeral 4-3-1/Table 3 4-3-1/Table 4 Primary Essential Services 4-1-1/Table 3 4-3-1/Table 5 Secondary Essential Services 4-1-1/Table 4

Page 59: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 57

MODU 2008 Title MODU 2012 Part 4 Chapter 3 Section 2

Machinery and Systems Electrical Installations Drilling Unit Systems

4-3-2 Drilling Unit Systems 4-3-2, 7-1-6 4-3-2/1 Plans and Data to be Submitted 4-3-2/1 4-3-2/1.1 Wiring 4-3-2/1.1 4-3-2/1.1.1 Systems 4-3-2/1.1.1 4-3-2/1.1.2 Data for Wiring Systems 4-3-2/1.1.2 4-3-2/1.3 Short-circuit Data 4-3-2/1.3 4-3-2/1.5 Protective Device Coordination 4-3-2/1.5 4-3-2/1.7 Load Analysis 4-3-2/1.7 4-3-2/3 Drilling Unit Main Service Source of Power 4-3-2/3 4-3-2/3.1 Power Supply by Generators 4-3-2/3.1 4-3-2/3.1.1 Number of Generators 4-3-2/3.1.1 4-3-2/3.1.2 Capacity of Generators 4-3-2/3.1.2 4-3-2/3.1.3 Multiple Generators 4-3-2/3.1.3 4-3-2/3.1.4 Starting from "Dead Ship" Condition 4-3-2/3.1.4 4-3-2/3.1.5 Fuel Capacity for Generator Prime Mover 4-3-2/3.1.5 4-3-2/3.1.6 System Arrangement 4-3-2/3.1.6 4-3-2/3.1.6(a) General 4-3-2/3.1.6(a) 4-3-2/3.1.6(b) Single Generator Operation 4-3-2/3.1.6(b) 4-3-2/3.1.6(c) Multiple Generator Operation 4-3-2/3.1.6(c) 4-3-2/3.3 Generator Driven by Propulsion Unit 4-3-2/3.3 4-3-2/3.3.1 Constant Speed Drive 4-3-2/3.3.1 4-3-2/3.3.1i) --- 4-3-2/3.3.1i) 4-3-2/3.3.1ii) --- 4-3-2/3.3.1ii) 4-3-2/3.3.1iii) --- 4-3-2/3.3.1iii) 4-3-2/3.3.2 Variable Speed Drive 4-3-2/3.3.2 4-3-2/3.3.2i) --- 4-3-2/3.3.2i) 4-3-2/3.3.2ii) --- 4-3-2/3.3.2ii) 4-3-2/3.3.2iii) --- 4-3-2/3.3.2iii) 4-3-2/3.3.2iv) --- 4-3-2/3.3.2iv) 4-3-2/3.3.2v) --- 4-3-2/3.3.2v) 4-3-2/3.5 Sizing of AC Generator 4-3-2/3.5 4-3-2/5 Emergency Source of Power 4-3-2/5 4-3-2/5.1 General 4-3-2/5.1 4-3-2/5.1.1 Basic Requirement 4-3-2/5.1.1 4-3-2/5.1.2 Boundary 4-3-2/5.1.2 4-3-2/5.1.3 Alternative Arrangements 4-3-2/5.1.3 4-3-2/5.1.3i) --- 4-3-2/5.1.3i) 4-3-2/5.1.3ii) --- 4-3-2/5.1.3ii) 4-3-2/5.1.3iii) --- 4-3-2/5.1.3iii) 4-3-2/5.1.3iv) --- 4-3-2/5.1.3iv) 4-3-2/5.1.3v) --- 4-3-2/5.1.3v) 4-3-2/5.3 Emergency Power Supply 4-3-2/5.3 4-3-2/5.3.1 Emergency Lighting 4-3-2/5.3.1 4-3-2/5.3.1(a) --- 4-3-2/5.3.1(a) 4-3-2/5.3.1(b) --- 4-3-2/5.3.1(b) 4-3-2/5.3.1(c) --- 4-3-2/5.3.1(c) 4-3-2/5.3.1(d) --- 4-3-2/5.3.1(d) 4-3-2/5.3.1(e) --- 4-3-2/5.3.1(e) 4-3-2/5.3.1(f) --- 4-3-2/5.3.1(f) 4-3-2/5.3.1(g) --- 4-3-2/5.3.1(g) 4-3-2/5.3.1(h) --- 4-3-2/5.3.1(h) 4-3-2/5.3.2 Navigation Lights and Signals 4-3-2/5.3.2 4-3-2/5.3.3 Marking of Offshore Structures 4-3-2/5.3.3 4-3-2/5.3.4 Internal Communications 4-3-2/5.3.4 4-3-2/5.3.5 Fire and Gas Detection and Alarm Systems 4-3-2/5.3.5 4-3-2/5.3.6 Emergency Signals 4-3-2/5.3.6 4-3-2/5.3.7 Blow-Out Preventer (BOP) and Well Disconnection 4-3-2/5.3.7 4-3-2/5.3.8 Fire Pump and Fire Extinguishing Systems 4-3-2/5.3.8 4-3-2/5.3.9 Diving Equipment 4-3-2/5.3.9 4-3-2/5.3.10 Column-Stabilized Units 4-3-2/5.3.10 4-3-2/5.3.10(a) --- 4-3-2/5.3.10(a)

Page 60: MODU_nandgi_e

Notices and General Information

58 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-3-2/5.3.10(b) --- 4-3-2/5.3.10(b) 4-3-2/5.3.11 Self-propelled Drilling Units 4-3-2/5.3.11 4-3-2/5.3.11(a) --- 4-3-2/5.3.11(a) 4-3-2/5.3.11(b) --- 4-3-2/5.3.11(b) 4-3-2/5.3.11(c) --- 4-3-2/5.3.11(c) 4-3-2/5.3.11(d) --- 4-3-2/5.3.11(d) 4-3-2/5.3.12 Other Emergency Services 4-3-2/5.3.12 4-3-2/5.3.12(a) --- 4-3-2/5.3.12(a) 4-3-2/5.3.12(b) --- 4-3-2/5.3.12(b) 4-3-2/5.3.12(c) --- 4-3-2/5.3.12(c) 4-3-2/5.5 Emergency Sources 4-3-2/5.5 4-3-2/5.5.1 General 4-3-2/5.5.1 4-3-2/5.5.2 Generator 4-3-2/5.5.2 4-3-2/5.5.2i) --- 4-3-2/5.5.2i) 4-3-2/5.5.2ii) --- 4-3-2/5.5.2ii) 4-3-2/5.5.2iii) --- 4-3-2/5.5.2iii) 4-3-2/5.5.3 Accumulator Battery 4-3-2/5.5.3 4-3-2/5.5.3i) --- 4-3-2/5.5.3i) 4-3-2/5.5.3ii) --- 4-3-2/5.5.3ii) 4-3-2/5.5.3iii) --- 4-3-2/5.5.3iii) 4-3-2/5.5.4 Emergency Generator for Non-emergency Services 4-3-2/5.5.4 4-3-2/5.7 Transitional Source of Power 4-3-2/5.7 4-3-2/5.7i) --- 4-3-2/5.7i) 4-3-2/5.7ii) --- 4-3-2/5.7ii) 4-3-2/5.9 Emergency Switchboard 4-3-2/5.9 4-3-2/5.9.1 General 4-3-2/5.9.1 4-3-2/5.9.2 Emergency Switchboard for Generator 4-3-2/5.9.2 4-3-2/5.9.3 Accumulator Battery 4-3-2/5.9.3 4-3-2/5.9.4 Interconnect Feeder Between Emergency and Main Switchboard 4-3-2/5.9.4 4-3-2/5.9.5 Disconnection of Non-emergency Circuits 4-3-2/5.9.5 4-3-2/5.11 Ballast Pumps 4-3-2/5.11 4-3-2/5.13 Arrangement for Periodic Testing 4-3-2/5.13 4-3-2/5.15 Starting Arrangement for Emergency Generator Sets 4-3-2/5.15 4-3-2/5.15.1 Cold Conditions 4-3-2/5.15.1 4-3-2/5.15.2 Number of Starts 4-3-2/5.15.2 4-3-2/5.15.3 Charging of Stored Energy 4-3-2/5.15.3 4-3-2/5.15.3(a) --- 4-3-2/5.15.3(a) 4-3-2/5.15.3(b) --- 4-3-2/5.15.3(b) 4-3-2/5.15.3(c) --- 4-3-2/5.15.3(c) 4-3-2/5.15.4 Manual Starting 4-3-2/5.15.4 4-3-2/5.17 Alarms and Safeguards for Emergency Diesel Engines 4-3-2/5.17 4-3-2/5.17.1 Information to be Submitted 4-3-2/5.17.1 4-3-2/5.17.2 Alarms and Safeguards 4-3-2/5.17.2 4-3-2/5.17.2(a) --- 4-3-2/5.17.2(a) 4-3-2/5.17.2(b) --- 4-3-2/5.17.2(b) 4-3-2/5.17.2(c) --- 4-3-2/5.17.2(c) 4-3-2/5.17.2(d) --- 4-3-2/5.17.2(d) 4-3-2/5.17.2(e) --- 4-3-2/5.17.2(e) 4-3-2/5.17.2(f) --- 4-3-2/5.17.2(f) 4-3-2/5.19 Requirements by the Governmental Authority 4-3-2/5.19 4-3-2/7 Distribution System 4-3-2/7 4-3-2/7.1 Drilling Unit Main Service Distribution System 4-3-2/7.1 4-3-2/7.1.1 General 4-3-2/7.1.1 4-3-2/7.1.2 Method of Distribution 4-3-2/7.1.2 4-3-2/7.1.3 Through-feed Arrangement 4-3-2/7.1.3 4-3-2/7.1.4 Motor Control Center 4-3-2/7.1.4 4-3-2/7.1.5 Motor Branch Circuit 4-3-2/7.1.5 4-3-2/7.1.6 Power Supply Through Transformer and Converters 4-3-2/7.1.6 4-3-2/7.1.6(a) Continuity of Supply 4-3-2/7.1.6(a) 4-3-2/7.1.6(b) Arrangements 4-3-2/7.1.6(b) 4-3-2/7.1.6(c) Transformers and Converters for Battery Charger 4-3-2/7.1.6(c) 4-3-2/7.1.6(c)i) --- 4-3-2/7.1.6(c)i) 4-3-2/7.1.6(c)ii) --- 4-3-2/7.1.6(c)ii) 4-3-2/7.1.6(c)iii) --- 4-3-2/7.1.6(c)iii)

Page 61: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 59

MODU 2008 Title MODU 2012 4-3-2/7.1.7 Heating Appliances 4-3-2/7.1.7 4-3-2/7.3 Hull Return System 4-3-2/7.3 4-3-2/7.3.1 General 4-3-2/7.3.1 4-3-2/7.3.1i) --- 4-3-2/7.3.1i) 4-3-2/7.3.1ii) --- 4-3-2/7.3.1ii) 4-3-2/7.3.1iii) --- 4-3-2/7.3.1iii) 4-3-2/7.3.2 Final Subcircuits and Earth Wires 4-3-2/7.3.2 4-3-2/7.5 Earthed Distribution Systems 4-3-2/7.5 4-3-2/7.7 External or Shore Power Supply Connection 4-3-2/7.7 4-3-2/7.7.1 General 4-3-2/7.7.1 4-3-2/7.7.2 Earthing Terminal 4-3-2/7.7.2 4-3-2/7.7.3 Indicators 4-3-2/7.7.3 4-3-2/7.7.4 Polarity or Phase Sequence 4-3-2/7.7.4

4-3-2/7.7.5 Information Plate 4-3-2/7.7.5 7-1-6/7.7.1

4-3-2/7.7.6 Securing of Trailing Cable 7-1-6/7.7.2 4-3-2/7.7 Harmonics 4-3-2/7.7 4-3-2/9 Circuit Protection System 4-3-2/9 4-3-2/9.1 System Design 4-3-2/9.1 4-3-2/9.1.1 General 4-3-2/9.1.1 4-3-2/9.1.1i) --- 4-3-2/9.1.1i) 4-3-2/9.1.1ii) --- 4-3-2/9.1.1ii) 4-3-2/9.1.1iii) --- 4-3-2/9.1.1iii) 4-3-2/9.1.1i) --- 4-3-2/9.1.1i) 4-3-2/9.1.1ii) --- 4-3-2/9.1.1ii) 4-3-2/9.1.2 Protection Against Short-circuit 4-3-2/9.1.2 4-3-2/9.1.2(a) Protective Devices 4-3-2/9.1.2(a) 4-3-2/9.1.2(b) Rated Short-circuit Breaking Capacity 4-3-2/9.1.2(b) 4-3-2/9.1.2(c) Rated Short-circuit Making capacity 4-3-2/9.1.2(c) 4-3-2/9.1.3 Protection Against Overload 4-3-2/9.1.3 4-3-2/9.1.3(a) Circuit Breaks 4-3-2/9.1.3(a) 4-3-2/9.1.3(b) Fuses 4-3-2/9.1.3(b) 4-3-2/9.1.3(c) Rating 4-3-2/9.1.3(c) 4-3-2/9.1.3(d) Indication 4-3-2/9.1.3(d) 4-3-2/9.1.4 Back-up Protection 4-3-2/9.1.4 4-3-2/9.1.4(a) Back-up Fuse Arrangement 4-3-2/9.1.4(a) 4-3-2/9.1.4(b) Cascade Protection 4-3-2/9.1.4(b) 4-3-2/9.1.5 Coordinated Tripping 4-3-2/9.1.5 4-3-2/9.1.5(a) --- 4-3-2/9.1.5(a) 4-3-2/9.1.5(b) --- 4-3-2/9.1.5(b) 4-3-2/9.1.5(c) --- 4-3-2/9.1.5(c) 4-3-2/9.3 Protection for Generators 4-3-2/9.3 4-3-2/9.3.1 General 4-3-2/9.3.1 4-3-2/9.3.2 Trip Setting for Coordination 4-3-2/9.3.2 4-3-2/9.3.3 Load-shedding Arrangements 4-3-2/9.3.3 4-3-2/9.3.3(a) Provision for Load Shedding Arrangements 4-3-2/9.3.3(a) 4-3-2/9.3.3(a)i) --- 4-3-2/9.3.3(a)i) 4-3-2/9.3.3(a)ii) --- 4-3-2/9.3.3(a)ii) 4-3-2/9.3.3(b) Services Not Allowed for Shedding 4-3-2/9.3.3(b) 4-3-2/9.3.3(b)i) --- 4-3-2/9.3.3(b)i) 4-3-2/9.3.3(b)ii) --- 4-3-2/9.3.3(b)ii) 4-3-2/9.3.3(b)iii) --- 4-3-2/9.3.3(b)iii) 4-3-2/9.3.4 Emergency Generator 4-3-2/9.3.4 4-3-2/9.5 Protection for Alternating Current (AC) Generators 4-3-2/9.5 4-3-2/9.5.1 Short-time Delay Trip 4-3-2/9.5.1 4-3-2/9.5.2 Parallel Operation 4-3-2/9.5.2 4-3-2/9.5.2(a) Instantaneous Trip 4-3-2/9.5.2(a) 4-3-2/9.5.2(b) Reverse Power Protection 4-3-2/9.5.2(b) 4-3-2/9.5.2(c) Undervoltage Protection 4-3-2/9.5.2(c) 4-3-2/9.7 Protection for Direct Current (DC) Generators 4-3-2/9.7 4-3-2/9.7.1 Instantaneous Trip 4-3-2/9.7.1 4-3-2/9.7.2 Parallel Operation 4-3-2/9.7.2 4-3-2/9.7.2(a) Reverse Current Protection 4-3-2/9.7.2(a) 4-3-2/9.7.2(b) Generator Ammeter Shunts 4-3-2/9.7.2(b)

Page 62: MODU_nandgi_e

Notices and General Information

60 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-3-2/9.7.2(c) Undervoltage Protection 4-3-2/9.7.2(c) 4-3-2/9.9 Protection for Accumulator Batteries 4-3-2/9.9 4-3-2/9.11 Protection for External or Shore Power Supply 4-3-2/9.11 4-3-2/9.11.1 General 4-3-2/9.11.1 4-3-2/9.11.2 Interlocking Arrangement 4-3-2/9.11.2 4-3-2/9.13 Protection for Motor Branch Circuits 4-3-2/9.13 4-3-2/9.13.1 General 4-3-2/9.13.1 4-3-2/9.13.2 Direct-current Motor Branch Circuits 4-3-2/9.13.2 4-3-2/9.13.3 Alternating-current Motor Branch Circuits 4-3-2/9.13.3 4-3-2/9.13.4 Motor Running Protection 4-3-2/9.13.4 4-3-2/9.13.5 Undervoltage Protection and Undervoltage Release 4-3-2/9.13.5 4-3-2/9.13.5i) --- 4-3-2/9.13.5i) 4-3-2/9.13.5ii) --- 4-3-2/9.13.5ii) 4-3-2/9.13.6 Jacking Gear Motors 4-3-2/9.13.6 4-3-2/9.15 Protection for Transformer Circuits 4-3-2/9.15 4-3-2/9.15.1 Setting for Overcurrent Device 4-3-2/9.15.1 4-3-2/9.15.2 Parallel Operation 4-3-2/9.15.2 4-3-2/9.17 Protection for Meters, Pilot Lamps, and Control Circuits 4-3-2/9.17 4-3-2/11 Systems for Steering Gear Installed in Self-propelled Units 4-3-2/11 4-3-2/11.1 Power Supply Feeder 4-3-2/11.1 4-3-2/11.3 Protection for Steering Gear Motor Circuit 4-3-2/11.3 4-3-2/11.3.1 Short Circuit Protection 4-3-2/11.3.1 4-3-2/11.3.1(a) Direct Current (DC) Motors 4-3-2/11.3.1(a) 4-3-2/11.3.1(b) Alternating Current (AC) Motors 4-3-2/11.3.1(b) 4-3-2/11.3.1(c) Fuses as Motor-feeder Protection 4-3-2/11.3.1(c) 4-3-2/11.3.2 Undervoltage Release 4-3-2/11.3.2 4-3-2/11.5 Emergency Power Supply 4-3-2/11.5 4-3-2/11.7 Controls, Instrumentation, and Alarms 4-3-2/11.7 4-3-2/13 Lighting and Navigation Light Systems 4-3-2/13 4-3-2/13.1 Lighting System 4-3-2/13.1 4-3-2/13.1.1 Main Lighting System 4-3-2/13.1.1 4-3-2/13.1.2 System Arrangement 4-3-2/13.1.2 4-3-2/13.1.2(a) Main Lighting System 4-3-2/13.1.2(a) 4-3-2/13.1.2(b) Emergency Lighting System 4-3-2/13.1.2(b) 4-3-2/13.1.3 Lighting Circuits in Machinery Space and Accommodation Spaces 4-3-2/13.1.3 4-3-2/13.1.4 Protection for Lighting Circuits 4-3-2/13.1.4 4-3-2/13.3 Navigation Light System 4-3-2/13.3 4-3-2/13.3.1 Feeders 4-3-2/13.3.1 4-3-2/13.3.2 Navigation Light Indicator 4-3-2/13.3.2 4-3-2/13.3.3 Protection 4-3-2/13.3.3 4-3-2/15 Interior Communication Systems 4-3-2/15 4-3-2/15.1 Navigation Bridge 4-3-2/15.1 4-3-2/15.1.1 General 4-3-2/15.1.1 4-3-2/15.1.2 Engine Order Telegraph 4-3-2/15.1.2 4-3-2/15.3 Main Propulsion Control Stations 4-3-2/15.3 4-3-2/15.5 Voice Communications 4-3-2/15.5 4-3-2/15.5.1 Propulsion and Steering Control Stations 4-3-2/15.5.1 4-3-2/15.5.2 Communication in Case of an Emergency 4-3-2/15.5.2 4-3-2/15.5.3 Elevator 4-3-2/15.5.3 4-3-2/15.5.4 Jacking System 4-3-2/15.5.4 4-3-2/15.5.5 Independence of Power Supply Circuit 4-3-2/15.5.5 4-3-2/15.7 Emergency and Interior-communication Switchboard 4-3-2/15.7 4-3-2/15.9 Public Address System 4-3-2/15.9 4-3-2/15.9.1 System Requirements 4-3-2/15.9.1 4-3-2/15.9.2 Minimum Sound Levels 4-3-2/15.9.2 4-3-2/15.9.2i) --- 4-3-2/15.9.2i) 4-3-2/15.9.2ii) --- 4-3-2/15.9.2ii) 4-3-2/15.9.3 Emergency Source of Power 4-3-2/15.9.3 4-3-2/15.9.4 Public Address System Combined with General Alarm System 4-3-2/15.9.4 4-3-2/17 Manually Operated Alarms 4-3-2/17 4-3-2/17.1 General Emergency Alarm Systems 4-3-2/17.1 4-3-2/17.1.1 General 4-3-2/17.1.1 4-3-2/17.1.2 System Requirements 4-3-2/17.1.2 4-3-2/17.1.2(a) --- 4-3-2/17.1.2(a)

Page 63: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 61

MODU 2008 Title MODU 2012 4-3-2/17.1.2(b) --- 4-3-2/17.1.2(b) 4-3-2/17.1.2(c) --- 4-3-2/17.1.2(c) 4-3-2/17.1.2(d) --- 4-3-2/17.1.2(d) 4-3-2/17.1.2(e) --- 4-3-2/17.1.2(e) 4-3-2/17.1.2(f) --- 7-1-6/17.1i) 4-3-2/17.1.2(g) --- 7-1-6/17.1ii)

4-3-2/17.3 Engineers’ Alarm 4-3-2/17.3 7-1-6/17.3

4-3-2/17.5 Refrigerated Space Alarm 4-3-2/17.5 4-3-2/17.7 Elevator 4-3-2/17.7 4-3-2/19 Fire Protection and Fire Detection Systems 4-3-2/19 4-3-2/19.1 Emergency Stop 4-3-2/19.1 4-3-2/19.1.1 Ventilation System 4-3-2/19.1.1 4-3-2/19.1.1(a) General 4-3-2/19.1.1(a) 4-3-2/19.1.1(b) Machinery Space Ventilation 4-3-2/19.1.1(b) 4-3-2/19.1.1(c) Ventilation Other Than Machinery Spaces 4-3-2/19.1.1(c) 4-3-2/19.1.2 Other Auxiliaries 4-3-2/19.1.2 4-3-2/19.3 Fire Detection and Alarm System 4-3-2/19.3 4-3-2/Table 1 Alarms and Safeguards for Emergency Diesel Engines 4-3-2/Table 1 Part 4 Chapter 3 Section 3

Machinery and Systems Electrical Installations Drilling Unit Installation

4-3-3 Drilling Unit Installation 4-3-3, 6-1-7, 7-1-5 4-3-3/1 Plans and Data to be Submitted 4-3-3/1 4-3-3/1.1 Booklet of Standard Details 4-3-3/1.1 4-3-3/1.3 Arrangement of Electrical Equipment 4-3-3/1.3 4-3-3/1.5 Electrical Equipment in Hazardous Areas 4-3-3/1.5 4-3-3/1.7 Emergency Shutdown Procedure 4-3-3/1.7 4-3-3/1.9 Maintenance Schedule of Batteries 4-3-3/1.9 4-3-3/3 Equipment Installation and Arrangement 4-3-3/3 4-3-3/3.1 General Consideration 4-3-3/3.1 4-3-3/3.1.1 Equipment Location 4-3-3/3.1.1 4-3-3/3.1.1(a) General 4-3-3/3.1.1(a)

4-3-3/3.1.1(b) Equipment in Areas Protected by Local Fixed Pressure Water-spraying or Local Water-mist Fire Extinguishing System in Machinery Spaces 4-3-3/3.1.1(b)

4-3-3/3.1.2 Protection from Bilge Water 7-1-5/7.13.2

4-3-3/3.1.3 Accessibility 6-1-7/1.3 7-1-5/7.13.3

4-3-3/3.3 Generators 4-3-3/3.3 4-3-3/3.5 Drilling Unit Main Service Motors 4-3-3/3.5 4-3-3/3.5.1 General 4-3-3/3.5.1 4-3-3/3.5.2 Pump Motors 4-3-3/3.5.2 4-3-3/3.5.3 Motors on Weather Decks 4-3-3/3.5.3 4-3-3/3.5.4 Motors Below Decks 4-3-3/3.5.4 4-3-3/3.7 Accumulator Batteries 4-3-3/3.7 4-3-3/3.7.1 General 4-3-3/3.7.1 4-3-3/3.7.2 Battery Installation and Arrangement 4-3-3/3.7.2 4-3-3/3.7.2(a) Large Batteries 4-3-3/3.7.2(a) 4-3-3/3.7.2(b) Moderate-size Batteries 4-3-3/3.7.2(b) 4-3-3/3.7.2(c) Small Batteries 4-3-3/3.7.2(c) 4-3-3/3.7.2(d) Low-hydrogen-emission Battery Installations 4-3-3/3.7.2(d) 4-3-3/3.7.2(d)i) --- 4-3-3/3.7.2(d)i) 4-3-3/3.7.2(d)ii) --- 4-3-3/3.7.2(d)ii) 4-3-3/3.7.2(e) Battery Trays 4-3-3/3.7.2(e) 4-3-3/3.7.2(f) Identification of Battery Types 4-3-3/3.7.2(f) 4-3-3/3.7.3 Ventilation 4-3-3/3.7.3 4-3-3/3.7.3(a) Battery Rooms 4-3-3/3.7.3(a) 4-3-3/3.7.3(b) Battery Lockers 4-3-3/3.7.3(b) 4-3-3/3.7.3(c) Deck Boxes 4-3-3/3.7.3(c) 4-3-3/3.7.3(d) Small Battery Boxes 4-3-3/3.7.3(d) 4-3-3/3.7.4 Protection from Corrosion 4-3-3/3.7.4 4-3-3/3.7.5 Maintenance of Batteries 4-3-3/3.7.5 4-3-3/3.7.5(a) Maintenance Schedule of Batteries 4-3-3/3.7.5(a) 4-3-3/3.7.5(b) Procedure of Maintenance 4-3-3/3.7.5(b)

Page 64: MODU_nandgi_e

Notices and General Information

62 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-3-3/3.7.6 Replacement of Batteries 4-3-3/3.7.6 4-3-3/3.9 Switchboard 4-3-3/3.9 4-3-3/3.11 Distribution Boards 4-3-3/3.11 4-3-3/3.11.1 Location and Protection 4-3-3/3.11.1 4-3-3/3.11.2 Switchboard-type Distribution Boards 4-3-3/3.11.2 4-3-3/3.11.3 Safety-type Panels 4-3-3/3.11.3 4-3-3/3.13 Motor Controllers and Control Centers 4-3-3/3.13 4-3-3/3.13.1 Location and Installation 4-3-3/3.13.1 4-3-3/3.13.2 Disconnecting Arrangement 4-3-3/3.13.2 4-3-3/3.13.2(a) Device 4-3-3/3.13.2(a) 4-3-3/3.13.2(b) Location 4-3-3/3.13.2(b) 4-3-3/3.13.2(c) Locking Means 4-3-3/3.13.2(c) 4-3-3/3.13.2(d) Identification Plate 4-3-3/3.13.2(d) 4-3-3/3.13.2(e) Open and Close Indications 4-3-3/3.13.2(e) 4-3-3/3.13.3 Indicating-light Circuits 4-3-3/3.13.3 4-3-3/3.15 Resistors for Control Apparatus 4-3-3/3.15 4-3-3/3.17 Lighting Fixtures 4-3-3/3.17 4-3-3/3.19 Heating Equipment 4-3-3/3.19 4-3-3/3.21 Magnetic Compasses 4-3-3/3.21 4-3-3/3.23 Portable Equipment and Outlets 4-3-3/3.23 4-3-3/3.25 Receptacles and Plugs of Different Ratings 4-3-3/3.25 4-3-3/3.27 Installation Requirements for Recovery from Dead Ship Condition 4-3-3/3.27 4-3-3/3.29 Services Required to be Operable Under a Fire Condition 4-3-3/3.29 4-3-3/3.29i) --- 4-3-3/3.29i) 4-3-3/3.29ii) --- 4-3-3/3.29ii) 4-3-3/3.29iii) --- 4-3-3/3.29iii) 4-3-3/3.29iv) --- 4-3-3/3.29iv) 4-3-3/3.29v) --- 4-3-3/3.29v) 4-3-3/3.29vi) --- 4-3-3/3.29vi) 4-3-3/3.29vii) --- 4-3-3/3.29vii) 4-3-3/3.29viii) --- 4-3-3/3.29viii) 4-3-3/3.29ix) --- 4-3-3/3.29ix) 4-3-3/3.31 High Fire Risk Areas 4-3-3/3.31 4-3-3/3.31i) --- 4-3-3/3.31i) 4-3-3/3.31ii) --- 4-3-3/3.31ii) 4-3-3/3.31iii) --- 4-3-3/3.31iii) 4-3-3/3.31iv) --- 4-3-3/3.31iv) 4-3-3/5 Cable Installation 4-3-3/5 4-3-3/5.1 General Consideration 4-3-3/5.1 4-3-3/5.1.1 Continuity of Cabling 4-3-3/5.1.1 4-3-3/5.1.2 Choice of Cables 4-3-3/5.1.2 4-3-3/5.1.3 Cable Voltage Drop for New Installation 4-3-3/5.1.3 4-3-3/5.1.4 Restricting Locating of Cabling 4-3-3/5.1.4 4-3-3/5.1.5 Means of Drainage from Cable Enclosures 4-3-3/5.1.5 4-3-3/5.1.6 High Voltage Cables 4-3-3/5.1.6 4-3-3/5.1.7 Paint on Cables 7-1-5/5.1 4-3-3/5.1.8 Cable Installation above High Voltage Switchgear and Control-Gear 4-3-3/5.1.7

4-3-3/5.3 Insulation Resistance for New Installation 4-3-3/5.3 7-1-5/5.3

4-3-3/5.5 Protection for Electro-magnetic Induction 4-3-3/5.5 4-3-3/5.5.1 Multiple Conductor Cables 4-3-3/5.5.1 4-3-3/5.5.2 Single Conductor Cables 4-3-3/5.5.2 4-3-3/5.5.2(a) --- 4-3-3/5.5.2(a) 4-3-3/5.5.2(b) --- 4-3-3/5.5.2(b) 4-3-3/5.5.2(c) --- 4-3-3/5.5.2(c) 4-3-3/5.5.3 Non-shielded Signal Cables 4-3-3/5.5.3 4-3-3/5.7 Joints and Sealing 4-3-3/5.7 4-3-3/5.9 Support and Bending 4-3-3/5.9

4-3-3/5.9.1 Support and Fixing 4-3-3/5.9.1 7-1-5/5.9.1

4-3-3/5.9.1(a) --- 7-1-5/5.9.1(a) 4-3-3/5.9.1(b) --- 7-1-5/5.9.1(b) 4-3-3/5.9.1(c) --- 7-1-5/5.9.1(c) 4-3-3/5.9.1(d) --- 7-1-5/5.9.1(d)

Page 65: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 63

MODU 2008 Title MODU 2012 4-3-3/5.9.1(e) --- 7-1-5/5.9.1(e)

4-3-3/5.9.2 Bending Radius 4-3-3/5.9.2 7-1-5/5.9.2

4-3-3/5.9.3 Plastic Cable Trays and Protective Casings 4-3-3/5.9.3 7-1-5/5.9.3

4-3-3/5.9.3(a) Installations 4-3-3/5.9.3(a) 4-3-3/5.9.3(b) Safe Working Load 4-3-3/5.9.3(b) 4-3-3/5.9.3(c) Cable Occupation Ratio in Protective Casing 7-1-5/5.9.3 4-3-3/5.9.3(d) Hazardous Areas 4-3-3/5.9.3(c) 4-3-3/5.9.3(e) Type Testing 4-3-3/5.9.3(d) 4-3-3/5.11 Cable Run and Bunches 4-3-3/5.11 4-3-3/5.11.1 Reduction of Current Rating 4-3-3/5.11.1 4-3-3/5.11.2 Clearance and Segregation 4-3-3/5.11.2 4-3-3/5.11.3 Cable of Lower Conductor Temperature 4-3-3/5.11.3

4-3-3/5.13 Deck and Bulkhead Penetrations 4-3-3/5.13 7-1-5/5.13

4-3-3/5.15 Mechanical Penetrations 4-3-3/5.15 7-1-5/5.15

4-3-3/5.15.1 Metallic Armor 4-3-3/5.15.1 7-1-5/5.15.1

4-3-3/5.15.2 Conduit Pipe or Structural Shapes 4-3-3/5.15.2 7-1-5/5.15.2

4-3-3/5.17 Emergency and Essential Feeders 4-3-3/5.17 4-3-3/5.17.1 Location 4-3-3/5.17.1

4-3-3/5.17.2 Services Necessary Under a Fire Condition 4-3-3/5.17.2 7-1-5/5.17.1

4-3-3/5.17.2(a) --- 4-3-3/5.17.2(a) 4-3-3/5.17.2(b) --- 4-3-3/5.17.2(b) 4-3-3/5.17.2(c) --- 4-3-3/5.17.2(c) 4-3-3/5.17.3 Electrical Cables for the Emergency Fire Pump 4-3-3/5.17.3

4-3-3/5.17.4 Requirements by the Governmental Authority 4-3-3/5.17.4 7-1-5/5.17.2

4-3-3/5.19 Mineral Insulated Cables 7-1-5/5.19 4-3-3/5.21 Fiber Optic Cables 7-1-5/5.21 4-3-3/5.23 Battery Room 4-3-3/5.19 4-3-3/5.25 Paneling and Dome Fixtures 7-1-5/5.25 4-3-3/5.27 Sheathing and Structural Insulation 7-1-5/5.27 4-3-3/5.29 Splicing of Electrical Cables 4-3-3/5.21 4-3-3/5.29.1 Basis of Approval 4-3-3/5.21.1 4-3-3/5.29.2 Installation 7-1-5/5.29.1 4-3-3/5.29.3 Protection 7-1-5/5.29.2 4-3-3/5.31 Splicing of Fiber Optic Cables 4-3-3/5.23 4-3-3/5.33 Cable Junction Box 4-3-3/5.25 4-3-3/5.33.1 --- 4-3-3/5.25.1 4-3-3/5.33.2 --- 4-3-3/5.25.2 4-3-3/5.33.3 --- 4-3-3/5.25.3 4-3-3/5.33.3(a) --- 4-3-3/5.25.3(a) 4-3-3/5.33.3(b) --- 4-3-3/5.25.3(b) 4-3-3/5.33.3(c) --- 4-3-3/5.25.3(c) 4-3-3/5.33.4 --- 4-3-3/5.25.4 4-3-3/5.33.5 --- 7-1-5/5.33 4-3-3/7 Earthing 4-3-3/7 4-3-3/7.1 General 4-3-3/7.1 4-3-3/7.1i) --- 4-3-3/7.1i) 4-3-3/7.1ii) --- 4-3-3/7.1ii) 4-3-3/7.1iii) --- 4-3-3/7.1iii) 4-3-3/7.3 Permanent Equipment 4-3-3/7.3 4-3-3/7.5 Connections 4-3-3/7.5 4-3-3/7.5.1 General 4-3-3/7.5.1 4-3-3/7.5.2 Earthed Distribution System 4-3-3/7.5.2 4-3-3/7.5.3 Connection to Hull Structure 4-3-3/7.5.3 4-3-3/7.7 Portable Cords 4-3-3/7.7 4-3-3/7.9 Cable Metallic Covering 4-3-3/7.9 4-3-3/9 Equipment and Installation in Hazardous Areas 4-3-3/9

Page 66: MODU_nandgi_e

Notices and General Information

64 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-3-3/9.1 General Consideration 4-3-3/9.1 4-3-3/9.1.1 General 4-3-3/9.1.1 4-3-3/9.1.2 Electrical Equipment 4-3-3/9.1.2 4-3-3/9.1.2(a) Zone 0 Areas 4-3-3/9.1.2(a) 4-3-3/9.1.2(b) Zone 1 Areas 4-3-3/9.1.2(b) 4-3-3/9.1.2(b)i) --- 4-3-3/9.1.2(b)i) 4-3-3/9.1.2(b)ii) --- 4-3-3/9.1.2(b)ii) 4-3-3/9.1.2(b)iii) --- 4-3-3/9.1.2(b)iii) 4-3-3/9.1.2(b)iv) --- 4-3-3/9.1.2(b)iv) 4-3-3/9.1.2(b)v) --- 4-3-3/9.1.2(b)v) 4-3-3/9.1.2(b)vi) --- 4-3-3/9.1.2(b)vi) 4-3-3/9.1.2(c) Zone 2 Areas 4-3-3/9.1.2(c) 4-3-3/9.1.2(c)i) --- 4-3-3/9.1.2(c)i) 4-3-3/9.1.2(c)ii) --- 4-3-3/9.1.2(c)ii) 4-3-3/9.1.2(c)iii) --- 4-3-3/9.1.2(c)iii) 4-3-3/9.1.3 Cables Installation 4-3-3/9.1.4

4-3-3/9.1.4 Lighting Circuits 4-3-3/9.1.5 7-1-7/9.1.2

4-3-3/9.1.5 Permanent Warning Plates 7-1-7/9.1.3 4-3-3/9.3 Certified-safe Type and Pressurized Equipment and Systems 4-3-3/9.3 4-3-3/9.3.1 Installation Approval 4-3-3/9.3.1 4-3-3/9.3.2 Intrinsically-safe System 4-3-3/9.3.2 4-3-3/9.3.2(a) Separation 4-3-3/9.3.2(a) 4-3-3/9.3.2(b) Physical Barrier 4-3-3/9.3.2(b) 4-3-3/9.3.2(c) Nameplate 7-1-7/9.3.1 4-3-3/9.3.2(d) Replacement 4-3-3/9.3.2(c) 4-3-3/9.3.3 Pressurized Equipment 4-3-3/9.3.3 4-3-3/9.5 Paint Stores 4-3-3/9.5 4-3-3/9.5.1 General 4-3-3/9.5.1 4-3-3/9.5.1i) --- 4-3-3/9.5.1i) 4-3-3/9.5.1ii) --- 4-3-3/9.5.1ii) 4-3-3/9.5.1iii) --- 4-3-3/9.5.1iii) 4-3-3/9.5.1iv) --- 4-3-3/9.5.1iv) 4-3-3/9.5.1v) --- 4-3-3/9.5.1v) 4-3-3/9.5.2 Open Area Near Ventilation Openings 4-3-3/9.5.2 4-3-3/9.5.3 Enclosed Access Spaces 4-3-3/9.5.3 4-3-3/9.5.3i) --- 4-3-3/9.5.3i) 4-3-3/9.5.3ii) --- 4-3-3/9.5.3ii) 4-3-3/9.5.3iii) --- 4-3-3/9.5.3iii) 4-3-3/9.7 Non-sparking Fans 4-3-3/9.7 4-3-3/9.7.1 Design Criteria 4-3-3/9.7.1 4-3-3/9.7.1(a) Air Gap 4-3-3/9.7.1(a) 4-3-3/9.7.1(b) Protection Screen 4-3-3/9.7.1(b) 4-3-3/9.7.2 Materials 4-3-3/9.7.2 4-3-3/9.7.2(a) Impeller and its Housing 4-3-3/9.7.2(a) 4-3-3/9.7.2(b) Electrostatic Charges 4-3-3/9.7.2(b) 4-3-3/9.7.2(c) Acceptance Combination of Materials 4-3-3/9.7.2(c) 4-3-3/9.7.2(c)i) --- 4-3-3/9.7.2(c)i) 4-3-3/9.7.2(c)ii) --- 4-3-3/9.7.2(c)ii) 4-3-3/9.7.2(c)iii) --- 4-3-3/9.7.2(c)iii) 4-3-3/9.7.2(c)iv) --- 4-3-3/9.7.2(c)iv) 4-3-3/9.7.2(d) Unacceptable Combination of Materials 4-3-3/9.7.2(d) 4-3-3/9.7.2(d)i) --- 4-3-3/9.7.2(d)i) 4-3-3/9.7.2(d)ii) --- 4-3-3/9.7.2(d)ii) 4-3-3/9.7.2(d)iii) --- 4-3-3/9.7.2(d)iii) 4-3-3/9.7.3 Type Test 4-3-3/9.7.3 4-3-3/Table 1 Minimum Degree of protection 4-3-3/Table 1 4-3-3/Table 2 Minimum Bending Radii of Cables 7-1-5/Table 1 4-3-3/Table 3 Size of Earth-continuity Conductors and Earthing Connections 4-3-3/Table 2

4-3-3/Figure 1 Example of Protected Area, Adjacent Area of Direct Spray and Adjacent Area where Water May Extend 4-3-3/Figure 1

4-3-3/Figure 2 Cables within High Fire Risk Areas 4-3-3/Figure 2

Page 67: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 65

MODU 2008 Title MODU 2012 Part 4 Chapter 3 Section 4

Machinery and Systems Electrical Installations Machinery and Equipment

4-3-4 Machinery and Equipment 4-3-4, 6-1-3, 6-1-7 4-3-4/1 Plans and Data to Be Submitted 6-1-7/3 4-3-4/1.1 Rotating Machines of 100 kW and Over 6-1-7/3.1 4-3-4/1.3 Switchboards, Distribution Boards, Controllers, etc. 6-1-7/3.3 4-3-4/3 Rotating Machines 6-1-7/5 4-3-4/3.1 General 6-1-7/5.1 4-3-4/3.1.1 Applications 6-1-7/5.1.1 4-3-4/3.1.2 Certification on Basis of an Approved Quality Assurance Program 6-1-7/5.1.2 4-3-4/3.1.3 References 6-1-7/5.1.3 4-3-4/3.1.3(a) Inclination 6-1-7/5.1.3(a) 4-3-4/3.1.3(b) Insulation Material 6-1-7/5.1.3(b) 4-3-4/3.1.3(c) Capacity of Generators 6-1-7/5.1.3(c) 4-3-4/3.1.3(d) Power Supply by Generator 6-1-7/5.1.3(d) 4-3-4/3.1.3(e) Protection for Generator Circuits 6-1-7/5.1.3(e) 4-3-4/3.1.3(f) Protection for Motor Circuits 6-1-7/5.1.3(f) 4-3-4/3.1.3(g) Installation 6-1-7/5.1.3(g) 4-3-4/3.1.3(h) Protection Enclosures and its Selection 6-1-7/5.1.3(h) 4-3-4/3.3 Insulation Resistance Measurement 6-1-7/5.3 4-3-4/3.5 Overload and Overcurrent Capacity 6-1-7/5.5 4-3-4/3.5.1 AC Generators 6-1-7/5.5.1 4-3-4/3.5.2 AC Motors 6-1-7/5.5.2 4-3-4/3.5.2(a) Overcurrent Capacity 6-1-7/5.5.2(a) 4-3-4/3.5.2(b) Overload Capacity 6-1-7/5.5.2(b) 4-3-4/3.5.2(c) Overload Capacity for Synchronous Motors 6-1-7/5.5.2(c) 4-3-4/3.7 Dielectric Strength of Insulation 6-1-7/5.7 4-3-4/3.7.1 Application 6-1-7/5.7.1 4-3-4/3.7.2 Standard Voltage Test 6-1-7/5.7.2 4-3-4/3.7.3 Direct Current Test 6-1-7/5.7.3 4-3-4/3.9 Temperature Rating 6-1-7/5.9 4-3-4/3.9.1 Temperature Rises 6-1-7/5.9.1 4-3-4/3.9.1(a) Continuous Rating Machines 6-1-7/5.9.1(a) 4-3-4/3.9.1(b) Short-time Rating Machines 6-1-7/5.9.1(b) 4-3-4/3.9.1(c) Periodic Duty Rating Machines 6-1-7/5.9.1(c) 4-3-4/3.9.1(d) Non-Periodic Duty Rating Machines 6-1-7/5.9.1(d) 4-3-4/3.9.1(e) Insulation Material Above 180°C (356°F) 6-1-7/5.9.1(e) 4-3-4/3.9.2 Ambient Temperature 6-1-7/5.9.2 4-3-4/3.11 Construction and Assembly 6-1-7/5.11 4-3-4/3.11.1 Enclosure, Frame and Pedestals 6-1-7/5.11.1 4-3-4/3.11.2 Shafts and Couplings 6-1-7/5.11.2 4-3-4/3.11.3 Circulating Current 6-1-7/5.11.3 4-3-4/3.11.4 Rotating Exciters 6-1-7/5.11.4 4-3-4/3.11.5 Insulation of Winding 6-1-7/5.11.5 4-3-4/3.11.6 Protection Against Cooling Water 6-1-7/5.11.6 4-3-4/3.11.7 Moisture-condensation Prevention 6-1-7/5.11.7 4-3-4/3.11.8 Terminal Arrangements 6-1-7/5.11.8 4-3-4/3.11.9 Nameplates 6-1-7/5.11.9 4-3-4/3.13 Lubrication 6-1-7/5.13 4-3-4/3.15 Turbines for Generators 6-1-3/3.3 4-3-4/3.15.1 Operating Governor 6-1-3/3.3.1 4-3-4/3.15.1(a) Transient Frequency Variations 6-1-3/3.3.1(a) 4-3-4/3.15.1(a)i) --- 6-1-3/3.3.1(a)i) 4-3-4/3.15.1(a)ii) --- 6-1-3/3.3.1(a)ii) 4-3-4/3.15.1(b) Speed Variation in Steady State 6-1-3/3.3.1(b) 4-3-4/3.15.1(c Emergency Generator Prime Mover 6-1-3/3.3.1(c) 4-3-4/3.15.2 Overspeed Governor 6-1-3/3.3.2 4-3-4/3.15.3 Power Output of Gas Turbines 6-1-3/3.3.3 4-3-4/3.17 Diesel Engines for Generators 6-1-3/3.5 4-3-4/3.17.1 Operating Governor 6-1-3/3.5.1 4-3-4/3.17.1(a) Transient Frequency Variations 6-1-3/3.5.1(a) 4-3-4/3.17.1(a)i) --- 6-1-3/3.5.1(a)i) 4-3-4/3.17.1(a)ii) --- 6-1-3/3.5.1(a)ii)

Page 68: MODU_nandgi_e

Notices and General Information

66 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-3-4/3.17.1(a)iii) --- 6-1-3/3.5.1(a)iii) 4-3-4/3.17.1(b) Frequency Variations in Steady State 6-1-3/3.5.1(b) 4-3-4/3.17.1(c) Emergency Generator Prime Movers 6-1-3/3.5.1(c) 4-3-4/3.17.2 Overspeed Governor 6-1-3/3.5.2 4-3-4/3.19 Alternating-current (AC) Generators 6-1-7/5.17 4-3-4/3.19.1 Control and Excitation of Generators 6-1-7/5.17.1 4-3-4/3.19.2 Voltage Regulation 6-1-7/5.17.2 4-3-4/3.19.2(a) Voltage Regulators 6-1-7/5.17.2(a) 4-3-4/3.19.2(b) Variation from Rated Voltage – Steady Conditions 6-1-7/5.17.2(b) 4-3-4/3.19.2(c) Variation from Rated Voltage – Transient Conditions 6-1-7/5.17.2(c) 4-3-4/3.19.2(d) Short Circuit Conditions 6-1-7/5.17.2(d) 4-3-4/3.19.3 Parallel Operation 6-1-7/5.17.3 4-3-4/3.19.3(a) Reactive Load Sharing 6-1-7/5.17.3(a) 4-3-4/3.19.3(b) Load Sharing 6-1-7/5.17.3(b) 4-3-4/3.19.3(c) Facilities for Load Adjustment 6-1-7/5.17.3(c) 4-3-4/3.21 Direct-current (DC Generators 6-1-7/5.19 4-3-4/3.21.1 Control and Excitation of Generators 6-1-7/5.19.1 4-3-4/3.21.1(a) Field Regulations 6-1-7/5.19.1(a) 4-3-4/3.21.1(b) Polarity of Series Windings 6-1-7/5.19.1(b) 4-3-4/3.21.1(c) Equalizer Connections 6-1-7/5.19.1(c) 4-3-4/3.21.2 Voltage Regulation 6-1-7/5.19.2 4-3-4/3.21.2(a) Shunt or Stabilized Shunt-wound Generator 6-1-7/5.19.2(a) 4-3-4/3.21.2(b) Compound-wound Generator 6-1-7/5.19.2(b) 4-3-4/3.21.2(c) Automatic Voltage Regulators 6-1-7/5.19.2(c) 4-3-4/3.21.3 Parallel Operation 6-1-7/5.19.3 4-3-4/3.21.3(a) Stability 6-1-7/5.19.3(a) 4-3-4/3.21.3(b) Load Sharing 6-1-7/5.19.3(b) 4-3-4/3.21.3(c) Tripping of Circuit Breaker 6-1-7/5.19.3(c) 4-3-4/5 Accumulator Batteries 6-1-7/7 4-3-4/5.1 General 6-1-7/7.1 4-3-4/5.1.1 Application 6-1-7/7.1.1 4-3-4/5.1.2 Sealed Type Batteries 6-1-7/7.1.2 4-3-4/5.1.3 References 4-3-4/3.1 4-3-4/5.1.3(a) Emergency Service 4-3-4/3.1.1 4-3-4/5.1.3(b) Protection of Batteries 4-3-4/3.1.2 4-3-4/5.1.3(c) Battery Installation 4-3-4/3.1.3 4-3-4/5.1.3(d) Cable Installation 4-3-4/3.1.4 4-3-4/5.3 Construction and Assembly 6-1-7/7.3 4-3-4/5.3.1 Cells and Fillings Plugs 6-1-7/7.3.1 4-3-4/5.3.2 Crates and Trays 6-1-7/7.3.2 4-3-4/5.3.3 Nameplate 6-1-7/7.3.3 4-3-4/5.5 Engine-starting Battery 4-3-4/3.3 4-3-4/7 Switchboards, Distribution Boards, Controllers, etc. 6-1-7/9 4-3-4/7.1 General 6-1-7/9.1 4-3-4/7.1.1 Applications 6-1-7/9.1.1 4-3-4/7.1.1(a) Switchboards 6-1-7/9.1.1(a) 4-3-4/7.1.1(b) Motor Controllers 6-1-7/9.1.1(b) 4-3-4/7.1.1(c) Motor Control Centers 6-1-7/9.1.1(c) 4-3-4/7.1.1(d) Battery Charger Units and Uninterruptible Power System (UPS) Units 6-1-7/9.1.1(d) 4-3-4/7.1.1(e) Distribution Boards 6-1-7/9.1.1(e) 4-3-4/7.1.2 References 6-1-7/9.1.2 4-3-4/7.1.2(a) Inclination 6-1-7/9.1.2(a) 4-3-4/7.1.2(b) Emergency Switchboard 6-1-7/9.1.2(b) 4-3-4/7.1.2(c) Circuit Breakers 6-1-7/9.1.2(c) 4-3-4/7.1.2(d) Feeder Protection 6-1-7/9.1.2(d) 4-3-4/7.1.2(e) Hull Return and Earthed Distribution System 6-1-7/9.1.2(e) 4-3-4/7.1.2(f) Earthing 6-1-7/9.1.2(f) 4-3-4/7.1.2(g) Installation 6-1-7/9.1.2(g) 4-3-4/7.1.2(h) Protection Enclosures and its Selection 6-1-7/9.1.2(h) 4-3-4/7.3 Insulation Resistance Measurement 6-1-7/9.3 4-3-4/7.5 Dielectric Strength of Insulation 6-1-7/9.5 4-3-4/7.5i) --- 6-1-7/9.5i) 4-3-4/7.5ii) --- 6-1-7/9.5ii) 4-3-4/7.5.1 Production-line Apparatus 6-1-7/9.5.1

Page 69: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 67

MODU 2008 Title MODU 2012 4-3-4/7.5.2 Devices with Low Insulation Strength 6-1-7/9.5.2 4-3-4/7.7 Construction and Assembly 6-1-7/9.7 4-3-4/7.7.1 Enclosure and Assemblies 6-1-7/9.7.1 4-3-4/7.7.2 Dead Front 6-1-7/9.7.2 4-3-4/7.7.3 Mechanical Strength 6-1-7/9.7.3 4-3-4/7.7.4 Mechanical Protection 6-1-7/9.7.4 4-3-4/7.9 Bus Bars, Wiring and Contacts 6-1-7/9.9 4-3-4/7.9.1 Design 6-1-7/9.9.1 4-3-4/7.9.2 Operating Temperature of Bus Bars 6-1-7/9.9.2 4-3-4/7.9.3 Short Circuit Rating 6-1-7/9.9.3 4-3-4/7.9.4 Internal Wiring 6-1-7/9.9.4 4-3-4/7.9.5 Arrangement 6-1-7/9.9.5 4-3-4/7.9.5(a) Accessibility 6-1-7/9.9.5(a) 4-3-4/7.9.5(b) Locking of Connections 6-1-7/9.9.5(b) 4-3-4/7.9.5(c) Soldered Connections 6-1-7/9.9.5(c) 4-3-4/7.9.6 Clearances and Creepage Distances 6-1-7/9.9.6 4-3-4/7.9.7 Terminals 6-1-7/9.9.7 4-3-4/7.11 Control and Protection Devices 6-1-7/9.11 4-3-4/7.11.1 Circuit-disconnecting Devices 6-1-7/9.11.1 4-3-4/7.11.1(a) Systems Exceeding 55 Volts 6-1-7/9.11.1(a) 4-3-4/7.11.1(b) Systems of 55 Volts and Less 6-1-7/9.11.1(b) 4-3-4/7.11.1(c) Disconnected Devices 6-1-7/9.11.1(c) 4-3-4/7.11.2 Arrangement of Equipment 6-1-7/9.11.2 4-3-4/7.11.2(a) Air Circuit Breakers 6-1-7/9.11.2(a) 4-3-4/7.11.2(b) Voltage Regulators 6-1-7/9.11.2(b) 4-3-4/7.11.2(c) Equipment Operated in High Temperature 6-1-7/9.11.2(c) 4-3-4/7.11.2(d) Accessibility to Fuses 6-1-7/9.11.2(d) 4-3-4/7.11.2(e) Protective Devices for Instruments 6-1-7/9.11.2(e) 4-3-4/7.11.2(f) Wearing Parts 6-1-7/9.11.2(f) 4-3-4/7.11.3 Markings 6-1-7/9.11.3 4-3-4/7.13 Switchboards 6-1-7/9.13 4-3-4/7.13.1 Handrails 6-1-7/9.13.1 4-3-4/7.13.2 Main Bus Bar Sub-division 6-1-7/9.13.2 4-3-4/7.13.3 Equalizer Circuit for Direct-current (D.C.) Generators 6-1-7/9.13.3 4-3-4/7.13.3(a) Equalizer Main Circuit 6-1-7/9.13.3(a) 4-3-4/7.13.3(b) Equalizer Bus Bar 6-1-7/9.13.3(b) 4-3-4/7.13.4 Equipment and Instrumentation 6-1-7/9.13.4 4-3-4/7.15 Motor Controllers and Control Centers 6-1-7/9.15 4-3-4/7.15.1 Enclosures and Assemblies 6-1-7/9.15.1 4-3-4/7.15.2 Disconnect Switches and Circuits Breakers 6-1-7/9.15.2 4-3-4/7.15.3 Auto-starters 6-1-7/9.15.3 4-3-4/7.17 Battery Systems and Uninterruptible Power Systems (UPS) 6-1-7/9.17 4-3-4/7.17.1 Definitions 6-1-7/9.17.1 4-3-4/7.17.2 Battery Charging Rate 6-1-7/9.17.2 4-3-4/7.17.3 Discharge Protection 6-1-7/9.17.3 4-3-4/7.17.4 Design and Construction 6-1-7/9.17.4 4-3-4/7.17.4(a) Construction 6-1-7/9.17.4(a) 4-3-4/7.17.4(b) Operation 6-1-7/9.17.4(b) 4-3-4/7.17.4(c) Type 6-1-7/9.17.4(c) 4-3-4/7.17.4(d) Continuity of Supply 6-1-7/9.17.4(d) 4-3-4/7.17.4(e) Monitoring and Alarming 6-1-7/9.17.4(e) 4-3-4/7.17.5 Location 4-3-4/3.5 4-3-4/7.17.5(a) Location 4-3-4/3.5.1 4-3-4/7.17.5(b) Ventilation 4-3-4/3.5.2 4-3-4/7.17.5(c) Battery Installation 4-3-4/3.5.3 4-3-4/7.17.6 Performance 4-3-4/3.7 4-3-4/7.17.6(a) Duration 4-3-4/3.7.1 4-3-4/7.17.6(b) Battery Capacity 4-3-4/3.7.2 4-3-4/7.17.6(c) Recharging 4-3-4/3.7.3 4-3-4/7.17.7 Testing and Survey 6-1-7/19.9 4-3-4/7.17.7(a) Surveys --- 4-3-4/7.17.7(b) Testing 6-1-7/19.9 4-3-4/7.17.7(c) Test upon Power Input Failure 6-1-7/19.9 4-3-4/9 Transformers 6-1-7/11

Page 70: MODU_nandgi_e

Notices and General Information

68 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-3-4/9.1 General 6-1-7/11.1 4-3-4/9.1.1 Applications 6-1-7/11.1.1 4-3-4/9.1.2 References 6-1-7/11.1.2 4-3-4/9.1.2(a) Power Supply Arrangements 6-1-7/11.1.2(a) 4-3-4/9.1.2(b) Protections 6-1-7/11.1.2(b) 4-3-4/9.1.2(c) Protection Enclosures and its Selection 6-1-7/11.1.2(c) 4-3-4/9.1.3 Forced Cooling Arrangement (Air or Liquid) 6-1-7/11.1.3 4-3-4/9.3 Temperature Rise 6-1-7/11.3 4-3-4/9.5 Construction and Assembly 6-1-7/11.5 4-3-4/9.5.1 Windings 6-1-7/11.5.1 4-3-4/9.5.2 Terminals 6-1-7/11.5.2 4-3-4/9.5.3 Nameplate 6-1-7/11.5.3 4-3-4/9.5.4 Prevention of the Accumulation of Moisture 6-1-7/11.5.4 4-3-4/11 Other Electric and Electronics Devices 6-1-7/13 4-3-4/11.1 Circuit Breakers 6-1-7/13.1 4-3-4/11.1.1 General 6-1-7/13.1.1 4-3-4/11.1.2 Mechanical property 6-1-7/13.1.2 4-3-4/11.1.3 Isolation 6-1-7/13.1.3 4-3-4/11.3 Fuses 6-1-7/13.3 4-3-4/11.5 Semiconductor Converters 6-1-7/13.5 4-3-4/11.5.1 General 6-1-7/13.5.1 4-3-4/11.5.2 Cooling Arrangement 6-1-7/13.5.2 4-3-4/11.5.3 Accessibility 6-1-7/13.5.3 4-3-4/11.5.4 Nameplate 6-1-7/13.5.4 4-3-4/11.7 Cable Junction Boxes 6-1-7/13.7 4-3-4/11.7.1 General 6-1-7/13.7.1 4-3-4/11.7.2 Design and Construction 6-1-7/13.7.2 4-3-4/13 Cables and Wires 4-3-4/7 4-3-4/13.1 Cable Construction 4-3-4/7.1 4-3-4/13.1.1 General 4-3-4/7.1.1 4-3-4/13.1.2 Flame Retarded Property 4-3-4/7.1.2 4-3-4/13.1.2(a) Standards 4-3-4/7.1.2(a) 4-3-4/13.1.2(a)i) --- 4-3-4/7.1.2(a)i) 4-3-4/13.1.2(a)ii) --- 4-3-4/7.1.2(a)ii) 4-3-4/13.1.2(a)iii) --- 4-3-4/7.1.2(a)iii) 4-3-4/13.1.2(b) Alternative Arrangement 4-3-4/7.1.2(b) 4-3-4/13.1.3 Fire Resistant Property 4-3-4/7.1.3 4-3-4/13.1.4 Insulating Material 4-3-4/7.1.4 4-3-4/13.1.5 Armor for Single-conductor Cables 4-3-4/7.1.5 4-3-4/13.1.6 Fabric Optic Cables 4-3-4/7.1.6 4-3-4/13.3 Portable and Flexing Electric Cables 4-3-4/7.3 4-3-4/13.5 Mineral-isolated Metal-sheathed Cable 4-3-4/7.5 4-3-4/Table 1 Factory Testing Schedule for Generators and Motors ≥ 100 kW (135 hp) 6-1-7/Table 2 4-3-4/Table 2 Dielectric Strength Test for Rotating Machines 6-1-7/Table 3 4-3-4/Table 3 Limits of Temperature Rise for Air-Cooled Rotating Machines 6-1-7/Table 4 4-3-4/Table 4 Nameplates 6-1-7/Table 5

4-3-4/Table 5 Factory Testing Schedule for Switchboards, Chargers, Motor Control Centers, and Controllers 6-1-7/Table 6

4-3-4/Table 6 Clearance and Creepage Distance for Switchboards, Distribution Boards, Chargers, Motor Control Centers, and Controllers 6-1-7/Table 7

4-3-4/Table 7 Equipment and Instrumentation for Switchboard 6-1-7/Table 8 4-3-4/Table 8 Temperature Rise for Transformers 6-1-7/Table 9 4-3-4/Table 9 Types of Cable Insulation 4-3-4/Table 1 4-3-4/Table 10 Maximum Current Carrying Capacity for Insulated Copper Wires and Cables 4-3-4/Table 2

4-3-4/Table 11 Additional Services Requiring Electrical Equipment to be Designed, Constructed and Tested to the Requirements in Section 4-3-4

6-1-7/3.3 6-1-7/5.1.1

4-3-4/Figure 1 Limiting Curves for Loading 4-stroke Diesel Engine Step-by-step from No-load to Rated Power as Function of the Brake Mean Effective Pressure 6-1-3/Figure 1

Part 4 Chapter 3 Section 5

Machinery and Systems Electrical Installations Specialized Installations

4-3-5 Specialized Installations 4-3-5, 6-1-3. 6-1-7

4-3-5/1 High Voltage System 4-3-5/1 6-1-7/15

Page 71: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 69

MODU 2008 Title MODU 2012

4-3-5/1.1 General 4-3-5/1.1 6-1-7/15.1

4-3-5/1.1.1 Application 4-3-5/1.1.1 6-1-7/15.1.1

4-3-5/1.1.2 Standard Voltages 4-3-5/1.1.2 4-3-5/1.1.3 Air Clearance and Creepage Distance 4-3-5/1.1.3 4-3-5/1.1.3(a) Air Clearance 4-3-5/1.1.3(a) 4-3-5/1.1.3(b) Creepage Distance 4-3-5/1.1.3(b) 4-3-5/1.3 System Design 4-3-5/1.3 4-3-5/1.3.1 Selective Coordination 4-3-5/1.3.1 4-3-5/1.3.2 Earthed Neutral Systems 4-3-5/1.3.2 4-3-5/1.3.2(a) Neutral Earthing 4-3-5/1.3.2(a) 4-3-5/1.3.2(b) Equipment 4-3-5/1.3.2(b) 4-3-5/1.3.3 Neutral Disconnection 4-3-5/1.3.3 4-3-5/1.3.4 Hull Connection of Earthing Impedance 4-3-5/1.3.4 4-3-5/1.3.5 Earth Fault Detection 4-3-5/1.3.5 4-3-5/1.3.6 Number and Capacity of Transformers 4-3-5/1.3.6

4-3-5/1.5 Circuit Breakers and Switches – Auxiliary Circuit Power Supply Systems for Operating Energy 4-3-5/1.5

4-3-5/1.5.1 Source and Capacity of Power Supply 4-3-5/1.5.1 4-3-5/1.5.2 Number of External Sources of Stored Energy 4-3-5/1.5.2 4-3-5/1.7 Circuit Protection 4-3-5/1.7 4-3-5/1.7.1 Protection of Generator 4-3-5/1.7.1 4-3-5/1.7.2 Protection of Power Transformers 4-3-5/1.7.2 4-3-5/1.7.2(a) Coordinated Trips of Protective Devices 4-3-5/1.7.2(a) 4-3-5/1.7.2(a)i) --- 4-3-5/1.7.2(a)i) 4-3-5/1.7.2(a)ii) --- 4-3-5/1.7.2(a)ii) 4-3-5/1.7.2(b) Load Shedding Arrangements 4-3-5/1.7.2(b) 4-3-5/1.7.2(c) Protection from Electrical Disturbance 4-3-5/1.7.2(c) 4-3-5/1.7.2(d) Detection of Phase-to-Phase Internal Faults 4-3-5/1.7.2(d) 4-3-5/1.7.2(e) Protection from Earth-Faults 4-3-5/1.7.2(e) 4-3-5/1.7.2(f) Transformers Arranged in Parallel 4-3-5/1.7.2(f) 4-3-5/1.7.3 Voltage Transformers for Control and Instrumentation 4-3-5/1.7.3 4-3-5/1.7.4 Fuses 4-3-5/1.7.4 4-3-5/1.7.5 Over Voltage Protection 4-3-5/1.7.5 4-3-5/1.7.5i) --- 4-3-5/1.7.5i) 4-3-5/1.7.5ii) --- 4-3-5/1.7.5ii) 4-3-5/1.7.5iii) --- 4-3-5/1.7.5iii) 4-3-5/1.9 Equipment Installation and Arrangement 4-3-5/1.9 4-3-5/1.9.1 Degree of Protection 4-3-5/1.9.1 4-3-5/1.9.2 Protective Arrangements 4-3-5/1.9.2 4-3-5/1.9.2(a) Interlocking Arrangements 4-3-5/1.9.2(a) 4-3-5/1.9.2(b) Warning Plates 4-3-5/1.9.2(b) 4-3-5/1.9.3 Cables 4-3-5/1.9.3 4-3-5/1.9.3(a) Runs of Cables 4-3-5/1.9.3(a) 4-3-5/1.9.3(b) Segregation 4-3-5/1.9.3(b) 4-3-5/1.9.3(c) Installation Arrangement 4-3-5/1.9.3(c) 4-3-5/1.9.3(d) Termination and Splices 4-3-5/1.9.3(d) 4-3-5/1.9.3(e) Marking 4-3-5/1.9.3(e) 4-3-5/1.9.3(f) Test after Installation 4-3-5/1.9.3(f) 4-3-5/1.11 Machinery and Equipment 6-1-7/15.3 4-3-5/1.11.1 Rotating Machines 6-1-7/15.3.1 4-3-5/1.11.1(a) Protection 6-1-7/15.3.1(a) 4-3-5/1.11.1(b) Windings 6-1-7/15.3.1(b) 4-3-5/1.11.1(c) Temperature Detectors 6-1-7/15.3.1(c) 4-3-5/1.11.1(d) (No Text) --- 4-3-5/1.11.1(e) Space Heater 6-1-7/15.3.1(d) 4-3-5/1.11.1(f) Tests 6-1-7/19.19 4-3-5/1.11.2 Switchgear and Control-gear Assemblies 6-1-7/15.3.2 4-3-5/1.11.2(a) Protection 6-1-7/15.3.2(a) 4-3-5/1.11.2(b) Mechanical Construction 6-1-7/15.3.2(b) 4-3-5/1.11.2(c) Configuration 6-1-7/15.3.2(c) 4-3-5/1.11.2(d) Clearance and Creepage Distances 6-1-7/15.3.2(d) 4-3-5/1.11.2(e) Locking Facilities 6-1-7/15.3.2(r)

Page 72: MODU_nandgi_e

Notices and General Information

70 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-3-5/1.11.2(f) Shutters 6-1-7/15.3.2(f) 4-3-5/1.11.2(g) Earthing and Short-circuiting 6-1-7/15.3.2(g) 4-3-5/1.11.2(h) Tests 6-1-7/19.21 4-3-5/1.11.3 Transformers 6-1-7/15.3.3 4-3-5/1.11.3(a) Application 6-1-7/15.3.3(a) 4-3-5/1.11.3(b) Plans 6-1-7/15.3.3(b) 4-3-5/1.11.3(c) Enclosure 6-1-7/15.3.3(c) 4-3-5/1.11.3(d) Space Heater 6-1-7/15.3.3(d) 4-3-5/1.11.3(e) Testing 6-1-7/19.23 4-3-5/1.11.3(e)i) --- 6-1-7/19.23i) 4-3-5/1.11.3(e)ii) --- 6-1-7/19.23ii) 4-3-5/1.11.3(f) Nameplate 6-1-7/19.23 4-3-5/1.11.4 Cables 4-3-5/1.11 4-3-5/1.11.4(a) Standards 4-3-5/1.11 4-3-5/3 Electric Propulsion System 4-3-5/3 4-3-5/3.1 General 4-3-5/3.1 4-3-5/3.1.1 Application 4-3-5/3.1.1 4-3-5/3.1.2 Plans and Data to be Submitted 4-3-5/3.1.2 4-3-5/3.3 System Design 4-3-5/3.3 4-3-5/3.3.1 General 4-3-5/3.3.1 4-3-5/3.3.2 Generating Capacity 4-3-5/3.3.2 4-3-5/3.3.3 Power Management System 4-3-5/3.3.3 4-3-5/3.3.4 Regenerative Power 4-3-5/3.3.4 4-3-5/3.3.5 Harmonics 4-3-5/3.3.5 4-3-5/3.5 Propulsion Power Supply Systems 4-3-5/3.5 4-3-5/3.5.1 Propulsion Generators 4-3-5/3.5.1 4-3-5/3.5.1(a) Power Supply 4-3-5/3.5.1(a) 4-3-5/3.5.1(b) Single System 4-3-5/3.5.1(b) 4-3-5/3.5.1(c) Multiple System 4-3-5/3.5.1(c) 4-3-5/3.5.1(d) Excitation System 4-3-5/3.5.1(d) 4-3-5/3.5.1(e) Features for Other Services 4-3-5/3.5.1(e) 4-3-5/3.5.2 Propulsion Excitation 4-3-5/3.5.2 4-3-5/3.5.2(a) Excitation Circuits 4-3-5/3.5.2(a) 4-3-5/3.5.2(b) Field Circuits 4-3-5/3.5.2(b) 4-3-5/3.5.2(c) Drilling Unit's Service Generator Connections 4-3-5/3.5.2(c) 4-3-5/3.5.3 Semiconductor Converters 4-3-5/3.5.3 4-3-5/3.5.3(a) --- 4-3-5/3.5.3(a) 4-3-5/3.5.3(b) --- 4-3-5/3.5.3(b) 4-3-5/3.5.3(c) --- 4-3-5/3.5.3(c) 4-3-5/3.7 Circuit Protection 4-3-5/3.7 4-3-5/3.7.1 Settings 4-3-5/3.7.1 4-3-5/3.7.2 Direct-current (DC) Propulsion Circuits 4-3-5/3.7.2 4-3-5/3.7.2(a) Circuit Protection 4-3-5/3.7.2(a) 4-3-5/3.7.2(b) Protection for Reversal of the Rotation 4-3-5/3.7.2(b) 4-3-5/3.7.3 Excitation Circuits 4-3-5/3.7.3 4-3-5/3.7.4 Reduction of Magnetic Fluxes 4-3-5/3.7.4 4-3-5/3.7.5 Semiconductor Converters 4-3-5/3.7.5 4-3-5/3.7.5(a) Overvoltage Protection 4-3-5/3.7.5(a) 4-3-5/3.7.5(b) Overcurrent Protection 4-3-5/3.7.5(b) 4-3-5/3.7.5(c) Short-circuit Protection 4-3-5/3.7.5(c) 4-3-5/3.7.5(d) Filter Circuits 4-3-5/3.7.5(d) 4-3-5/3.7.6 Direct-current (DC) Propulsion Motors Supplied by Semiconductor Converters 4-3-5/3.7.6 4-3-5/3.9 Protection for Earth Leakage 4-3-5/3.9 4-3-5/3.9.1 Main Propulsion Circuits 4-3-5/3.9.1 4-3-5/3.9.2 Excitation Circuits 4-3-5/3.9.2 4-3-5/3.9.3 Alternating-current (AC) Systems 4-3-5/3.9.3 4-3-5/3.9.4 Direct-current (DC) Systems 4-3-5/3.9.4 4-3-5/3.11 Electric Propulsion Control 4-3-5/3.11 4-3-5/3.11.1 General 4-3-5/3.11.1 4-3-5/3.11.2 Automatic and Remote Control System 4-3-5/3.11.2 4-3-5/3.11.3 Testing and Inspection 6-1-7/19.17 4-3-5/3.11.4 Initiation of Control 4-3-5/3.11.3 4-3-5/3.11.5 Emergency Stop 4-3-5/3.11.4 4-3-5/3.11.6 Prime Mover Control 4-3-5/3.11.5

Page 73: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 71

MODU 2008 Title MODU 2012 4-3-5/3.11.7 Control Power Failure 4-3-5/3.11.6 4-3-5/3.11.8 Protection 4-3-5/3.11.7 4-3-5/3.11.9 Interlocks 4-3-5/3.11.8 4-3-5/3.13 Instrumentation at the Control Station 4-3-5/3.13 4-3-5/3.13.1 Indication, Display and Alarms 4-3-5/3.13.1 4-3-5/3.13.1(a) For AC Systems 4-3-5/3.13.1(a) 4-3-5/3.13.1(b) For DC Systems 4-3-5/3.13.1(b) 4-3-5/3.13.1(c) For Electric Slip Couplings 4-3-5/3.13.1(c) 4-3-5/3.13.2 Indication of Propulsion System Status 4-3-5/3.13.2 4-3-5/3.13.2(a) “Ready for Operation” 4-3-5/3.13.2(a) 4-3-5/3.13.2(b) “Faulty” 4-3-5/3.13.2(b) 4-3-5/3.13.2(c) “Power Limitation” 4-3-5/3.13.2(c) 4-3-5/3.15 Equipment Installation and Arrangement 4-3-5/3.15 4-3-5/3.15.1 General 4-3-5/3.15.1 4-3-5/3.15.2 Accessibility and Facilities for Repairs 4-3-5/3.15.2 4-3-5/3.15.2(a) Accessibility 6-1-7/17.1.3 4-3-5/3.15.2(b) Facility for Supporting 4-3-5/3.15.2(a) 4-3-5/3.15.2(c) Slip couplings 4-3-5/3.15.2(b) 4-3-5/3.15.3 Semiconductor Converters 4-3-5/3.15.3 4-3-5/3.15.4 Propulsion Cables 4-3-5/3.15.4 4-3-5/3.17 Machinery and equipment 6-1-7/17 4-3-5/3.17.1 Material Tests 6-1-4/3 4-3-5/3.17.2 Temperature Rating 6-1-7/17.1.1 4-3-5/3.17.3 Protection Against Moisture Condensation 6-1-7/17.1.1 4-3-5/3.17.4 Prime Movers 6-1-3/3.7 4-3-5/3.17.4(a) Capability 6-1-3/3.7.1 4-3-5/3.17.4(b) Speed Control 6-1-3/3.7.2 4-3-5/3.17.4(c) Manual Controls 6-1-3/3.7.3 4-3-5/3.17.4(d) Parallel Operation 6-1-3/3.7.4 4-3-5/3.17.4(e) Protection for Regenerated Power 6-1-3/3.7.5 4-3-5/3.17.5 Rotating Machines for Propulsion 6-1-7/17.3.1 4-3-5/3.17.5(a) Ventilation and Protection 6-1-7/17.3.1(a) 4-3-5/3.17.5(b) Fire-extinguishing Systems 6-1-7/17.3.1(b) 4-3-5/3.17.5(c) Air Coolers 6-1-7/17.3.1(c) 4-3-5/3.17.5(d) Temperature Sensors 6-1-7/17.3.1(d) 4-3-5/3.17.6 Propulsion Generators 6-1-7/17.3.2 4-3-5/3.17.7 Direct-current (DC) Propulsion Motors 6-1-7/17.3.3 4-3-5/3.17.7(a) Rotors 6-1-7/17.3.3(a) 4-3-5/3.17.7(b) Overspeed Protection 6-1-7/17.3.3(b) 4-3-5/3.17.8 Electric Couplings 6-1-7/17.3.4 4-3-5/3.17.8(a) General 6-1-7/17.3.4(a) 4-3-5/3.17.8(b) Accessibility for Repairs 6-1-7/17.3.4(b) 4-3-5/3.17.8(c) Temperature Rating 6-1-7/17.3.4(c) 4-3-5/3.17.8(d) Excitation 6-1-7/17.3.4(d) 4-3-5/3.17.8(e) Control Equipment 6-1-7/17.3.4(e) 4-3-5/3.17.8(f) Nameplates 6-1-7/17.3.4(f) 4-3-5/3.17.9 Semiconductor Converters for Propulsion 6-1-7/17.3.5 4-3-5/3.17.9(a) General 6-1-7/17.3.5(a) 4-3-5/3.17.9(b) Testing and Inspection 6-1-7/19.13 4-3-5/3.17.9(c) Forced Cooling 6-1-7/17.3.5(b) 4-3-5/3.17.9(d) Additional Requirements for Water Cooled Converters 6-1-7/17.3.5(c) 4-3-5/3.17.10 Reactors and Transformers for Semiconductor Converters 6-1-7/17.3.6 4-3-5/3.17.10(a) General 6-1-7/17.3.6(a) 4-3-5/3.17.10(b) Voltage Regulation 6-1-7/17.3.6(b) 4-3-5/3.17.10(c) High Temperature Alarm 6-1-7/17.3.6(c) 4-3-5/3.17.11 Switches 4-3-5/3.17.2 4-3-5/3.17.11(a) General Design 4-3-5/3.17.2(a) 4-3-5/3.17.11(b) Generator and Motor Switches 4-3-5/3.17.2(b) 4-3-5/3.17.11(c) Field Switches 4-3-5/3.17.2(c) 4-3-5/3.17.12 Propulsion Cables 6-1-7/17.3.7 4-3-5/3.17.12(a) Conductors 6-1-7/17.3.7(a) 4-3-5/3.17.12(b) Insulation Materials 6-1-7/17.3.7(b) 4-3-5/3.17.12(c) Braided Metallic Armor and Impervious Metallic Sheaths 6-1-7/17.3.7(c) 4-3-5/3.17.12(d) Inner Wiring 6-1-7/17.3.7(d)

Page 74: MODU_nandgi_e

Notices and General Information

72 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 4-3-5/3.17.12(e) Testing 6-1-7/19.15 4-3-5/5 Three-wire Dual-voltage DC System 4-3-5/5 4-3-5/5.1 Three-wire DC Drilling Unit's Generator 4-3-5/5.1 4-3-5/5.3 Neutral Earthing 4-3-5/5.3 4-3-5/5.3.1 Main Switchboard 4-3-5/5.3.1 4-3-5/5.3.2 Emergency Switchboard 4-3-5/5.3.2 4-3-5/5.5 Size of Neutral Conductor 4-3-5/5.5 4-3-5/7 Systems Associated with Drilling Operations 4-3-5/7 4-3-5/7.1 Emergency Shutdown Facilities 4-3-5/7.1 4-3-5/7.1.1 Shutdown Arrangements 4-3-5/7.1 4-3-5/7.1.2 Operation After Shutdown 4-3-5/7.1.2 4-3-5/7.1.2i) --- 4-3-5/7.1.2i) 4-3-5/7.1.2ii) --- 4-3-5/7.1.2ii) 4-3-5/7.1.2iii) --- 4-3-5/7.1.2iii) 4-3-5/7.1.2iv) --- 4-3-5/7.1.2iv) 4-3-5/7.1.2v) --- 4-3-5/7.1.2v) Part 4 Chapter 3 Section 6

Machinery and Systems Machinery, Equipment, and Their Installation Hazardous Areas

4-3-6 Hazardous Areas 4-3-6 4-3-6/1 Definitions 4-3-6/1 4-3-6/1.1 Hazardous Areas 4-3-6/1.1 4-3-6/1.3 Enclosed Space 4-3-6/1.3 4-3-6/1.5 Semi-Enclosed Location 4-3-6/1.5 4-3-6/3 Classification of Areas 4-3-6/5 4-3-6/3.1 Hazardous Areas Zone 0 include 4-3-6/5.1 4-3-6/3.1i) --- 4-3-6/5.1i) 4-3-6/3.1ii) --- 4-3-6/5.1ii) 4-3-6/3.1iii) --- 4-3-6/5.1iii) 4-3-6/3.3 Hazardous Areas Zone 1 include 4-3-6/5.3 4-3-6/3.3i) --- 4-3-6/5.3i) 4-3-6/3.3ii) --- 4-3-6/5.3ii) 4-3-6/3.3iii) --- 4-3-6/5.3iii) 4-3-6/3.3iv) --- 4-3-6/5.3iv) 4-3-6/3.3v) --- 4-3-6/5.3v) 4-3-6/3.5 Hazardous Areas Zone 2 include 4-3-6/5.5 4-3-6/3.5i) --- 4-3-6/5.5i) 4-3-6/3.5ii) --- 4-3-6/5.5ii) 4-3-6/3.5iii) --- 4-3-6/5.5iii) 4-3-6/3.5iv) --- 4-3-6/5.5iv) 4-3-6/3.5v) --- 4-3-6/5.5v) 4-3-6/3.5vi) --- 4-3-6/5.5vi) 4-3-6/3.5vii) --- 4-3-6/5.5vii) 4-3-6/3.5viii) --- 4-3-6/5.5viii) 4-3-6/3.5ix) --- 4-3-6/5.5ix)

4-3-6/5 Openings, Access, and Ventilation Conditioning Affecting the Extent of Hazardous Zones 4-3-6/7

4-3-6/5.1 Enclosed Space with Direct Access to any Zone 1 Location 4-3-6/7.1 4-3-6/5.1i) --- 4-3-6/7.1i) 4-3-6/5.1ii) --- 4-3-6/7.1ii) 4-3-6/5.1iii) --- 4-3-6/7.1iii) 4-3-6/5.3 Enclosed Space with Direct Access to any Zone 2 Location 4-3-6/7.3 4-3-6/5.3i) --- 4-3-6/7.3i) 4-3-6/5.3ii) --- 4-3-6/7.3ii) 4-3-6/5.3iii) --- 4-3-6/7.3iii) 4-3-6/5.5 Enclosed Space with Access to any Zone 1 Location 4-3-6/7.5 4-3-6/5.5i) --- 4-3-6/7.5i) 4-3-6/5.5ii) --- 4-3-6/7.5ii) 4-3-6/5.5iii) --- 4-3-6/7.5iii) 4-3-6/7 Ventilation 4-3-6/9 4-3-6/7.1 General 4-3-6/9.1 4-3-6/7.3 Ventilation of Hazardous Areas 4-3-6/9.3 4-3-6/7.5 Ventilation of Non-Hazardous Areas 4-3-6/9.5 4-3-6/9 Machinery Installations 4-3-6/11

Page 75: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 73

MODU 2008 Title MODU 2012 4-3-6/9.1 General 4-3-6/11 4-3-6/9.3 Hazardous Areas 4-3-6/11 4-3-6/Figure 1 Hazardous Zones 4-3-6/Figure 1 4-3-6/Figure 2 Hazardous Zones 4-3-6/Figure 2 4-3-6/Figure 3 Hazardous Zones 4-3-6/Figure 3 Part 5 Chapter 1 Section 1

Fire and Safety – Measures and Features Passive Fire Protection General

5-1-1 General 5-1-1 5-1-1/1 General 5-1-1/1 5-1-1/1.1 Administrative Review 5-1-1/1.1 5-1-1/1.3 ABS Review 5-1-1/1.3 5-1-1/1.5 Materials Containing Asbestos 5-1-1/1.5 5-1-1/3 Structural Fire Protection 5-1-1/3 5-1-1/3.1 Construction Materials 5-1-1/3.1 5-1-1/3.3 Alternate Materials 5-1-1/3.3 5-1-1/3.5 Fire Integrity of Bulkheads and Decks 5-1-1/3.7 5-1-1/3.7 Application of Tables 5-1-1/3.9 5-1-1/3.7.1 --- 5-1-1/3.9.1 5-1-1/3.7.2 --- 5-1-1/3.9.2 5-1-1/3.7.2(1) --- 5-1-1/3.9.2(1) 5-1-1/3.7.2(2) --- 5-1-1/3.9.2(2) 5-1-1/3.7.2(3) --- 5-1-1/3.9.2(3) 5-1-1/3.7.2(4) --- 5-1-1/3.9.2(4) 5-1-1/3.7.2(5) --- 5-1-1/3.9.2(5) 5-1-1/3.7.2(6) --- 5-1-1/3.9.2(6) 5-1-1/3.7.2(7) --- 5-1-1/3.9.2(7) 5-1-1/3.7.2(8) --- 5-1-1/3.9.2(8) 5-1-1/3.7.2(9) --- 5-1-1/3.9.2(9) 5-1-1/3.7.2(10) --- 5-1-1/3.9.2(10) 5-1-1/3.7.2(11) --- 5-1-1/3.9.2(11) 5-1-1/3.9 --- 5-1-1/3.11 5-1-1/3.11 --- 5-1-1/3.13 5-1-1/3.13 --- 5-1-1/3.15 5-1-1/3.15 --- 5-1-1/3.17 5-1-1/3.15i) --- 5-1-1/3.17i) 5-1-1/3.15ii) --- 5-1-1/3.17ii) 5-1-1/3.15iii) --- 5-1-1/3.17iii) 5-1-1/3.15iv) --- 5-1-1/3.17iv) 5-1-1/3.15v) --- 5-1-1/3.17v) 5-1-1/3.17 --- 5-1-1/3.19 5-1-1/3.17i) --- 5-1-1/3.19i) 5-1-1/3.17ii) --- 5-1-1/3.19ii) 5-1-1/3.17iii) --- 5-1-1/3.19iii) 5-1-1/3.19 --- 5-1-1/3.21 5-1-1/3.21 --- 5-1-1/3.23 5-1-1/3.21i) --- 5-1-1/3.23i) 5-1-1/3.21ii) --- 5-1-1/3.23ii) 5-1-1/3.21iii) --- 5-1-1/3.23iii) 5-1-1/5 Protection of Accommodation Spaces, Service Spaces and Control Stations 5-1-1/5 5-1-1/5.1 --- 5-1-1/5.7

5-1-1/5.3 --- 5-1-1/5.9 5-1-1/3.17vi)

5-1-1/5.5 --- 5-1-1/5.9 5-1-1/5.7 --- 5-1-1/5.11 5-1-1/5.9 --- 5-1-1/5.13 5-1-1/5.11 --- 5-1-1/5.15 5-1-1/5.13 --- 5-1-1/5.17 5-1-1/5.13i) --- 5-1-1/5.17i) 5-1-1/5.13ii) --- 5-1-1/5.17ii) 5-1-1/5.13iii) --- 5-1-1/5.17iii) 5-1-1/5.15 --- 5-1-1/5.19 5-1-1/5.17 --- 5-1-1/5.21 5-1-1/5.19 --- 5-1-1/5.23

Page 76: MODU_nandgi_e

Notices and General Information

74 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 5-1-1/5.21 --- 5-1-1/5.25 5-1-1/5.21i) --- 5-1-1/5.25i) 5-1-1/5.21ii) --- 5-1-1/5.25ii) 5-1-1/5.21iii) --- 5-1-1/5.25iii) 5-1-1/5.23 --- 5-1-1/5.27 5-1-1/5.23i) --- 5-1-1/5.27i) 5-1-1/5.23ii) --- 5-1-1/5.27ii) 5-1-1/5.23iii) --- 5-1-1/5.27iii) 5-1-1/5.25 --- 5-1-1/5.29 5-1-1/5.25i) --- 5-1-1/5.29i) 5-1-1/5.25ii) --- 5-1-1/5.29ii) 5-1-1/5.25iii) --- 5-1-1/5.29iii) 5-1-1/5.25iv) --- 5-1-1/5.29v) 5-1-1/5.25v) --- 5-1-1/5.29vi) 5-1-1/5.25.1 --- 5-1-1/5.29.1 5-1-1/5.25.1i) --- 5-1-1/5.29.1i) 5-1-1/5.25.1ii) --- 5-1-1/5.29.1ii) 5-1-1/5.25.1iii) --- 5-1-1/5.29.1iii) 5-1-1/5.25.1iv) --- 5-1-1/5.29.1iv) 5-1-1/5.25.1v) --- 5-1-1/5.29.1v) 5-1-1/5.25.1vi) --- 5-1-1/5.29.1vi) 5-1-1/5.27 --- 5-1-1/5.31 5-1-1/5.27i) --- 5-1-1/5.31i) 5-1-1/5.27ii) --- 5-1-1/5.31ii) 5-1-1/5.27iii) --- 5-1-1/5.31iii) 5-1-1/5.27iv) --- 5-1-1/5.31iv) 5-1-1/5.27v) --- 5-1-1/5.31v) 5-1-1/5.29 --- 5-1-1/5.33

5-1-1/5.31 --- 5-1-1/5.35 5-1-1/5.37

5-1-1/5.31i) --- 5-1-1/5.37i) 5-1-1/5.31ii) --- 5-1-1/5.37ii) 5-1-1/5.31iii) --- 5-1-1/5.37iii) 5-1-1/5.31iv) --- 5-1-1/5.37iv) 5-1-1/5.33 --- 5-1-1/5.39 5-1-1/5.35 --- 5-1-1/5.41 5-1-1/5.37 --- 5-1-1/5.43 5-1-1/5.37i) --- 5-1-1/5.43i) 5-1-1/5.37ii) --- 5-1-1/5.43ii) 5-1-1/5.37iii) --- 5-1-1/5.43iii) 5-1-1/5.39 --- 5-1-1/5.45 5-1-1/5.41 --- 5-1-1/5.47 5-1-1/5.41i) --- 5-1-1/5.47i) 5-1-1/5.41ii) --- 5-1-1/5.47ii) 5-1-1/5.41iii) --- 5-1-1/5.47iii) 5-1-1/5.41iv) --- 5-1-1/5.47iv) 5-1-1/Table 1 Fire Integrity of Bulkheads Separating Adjacent Spaces 5-1-1/Table 1 5-1-1/Table 2 Fire Integrity of Decks Separating Adjacent Spaces 5-1-1/Table 2 5-1-1/Figure 1 Pipes Penetrating “A” Class Divisions 5-1-1/Figure 1 5-1-1/Figure 2 Pipes Penetrating “B” Class Divisions 5-1-1/Figure 2 5-1-1/Figure 3 Ventilation Ducts Penetrating “A” Class Divisions 5-1-1/Figure 3 5-1-1/Figure 4 Ventilation Ducts Penetrating “B” Class Divisions 5-1-1/Figure 4 Part 5 Chapter 2 Section 1

Fire and Safety – Measures and Features Active Fire Protection Systems and Equipment General

5-2-1/1 Governmental Authority 5-2-1/1 5-2-1/3 Plans and Specifications 5-2-1/3 5-2-1/3.1 General 5-2-1/3.1 5-2-1/3.3 Fire Control Plans 5-2-1/3.3

Page 77: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 75

MODU 2008 Title MODU 2012 Part 5 Chapter 2 Section 2

Fire and Safety – Measures and Features Active Fire Protection Systems and Equipment Fixed Fire Fighting Systems

5-2-2 Fixed Fire Fighting Systems 5-2-2 5-2-2/1 Fire Main Systems 5-2-2/1 5-2-2/1.1 Fire Pumps 5-2-2/1.1 5-2-2/1.1.1 Number of Pumps 5-2-2/1.1.1 5-2-2/1.1.2 Location of Pumps 5-2-2/1.1.2 5-2-2/1.1.2(a) Location 5-2-2/1.1.2(a) 5-2-2/1.1.2(a)i) --- 5-2-2/1.1.2(a)i) 5-2-2/1.1.2(a)ii) --- 5-2-2/1.1.2(a)ii) 5-2-2/1.1.2(a)iii) --- 5-2-2/1.1.2(a)iii) 5-2-2/1.1.2(b) Remote Operation 5-2-2/1.1.2(b) 5-2-2/1.1.3 Type of Pumps 5-2-2/1.1.3 5-2-2/1.1.4 Pressure 5-2-2/1.1.4 5-2-2/1.1.5 Pump Capacity 5-2-2/1.1.5 5-2-2/1.1.5(a) General 5-2-2/1.1.5(a) 5-2-2/1.1.5(b) Ship-type Drilling Units 5-2-2/1.1.5(b) 5-2-2/1.1.5(b)i) Total Pump Capacity 5-2-2/1.1.5(b)i) 5-2-2/1.1.5(b)ii) Individual Pump Capacity 5-2-2/1.1.5(b)ii) 5-2-2/1.1.6 Relief Valves 5-2-2/1.1.6 5-2-2/1.1.7 Intermediate Tank Water Supply 5-2-2/1.1.7 5-2-2/1.1.7(a) Tank Capacity 5-2-2/1.1.7(a) 5-2-2/1.1.7(b) Features 5-2-2/1.1.7(b) 5-2-2/1.1.7(b)i) --- 5-2-2/1.1.7(b)i) 5-2-2/1.1.7(b)ii) --- 5-2-2/1.1.7(b)ii) 5-2-2/1.1.7(b)iii) --- 5-2-2/1.1.7(b)iii) 5-2-2/1.1.8 Pressurized Main Water supply 5-2-2/1.1.8 5-2-2/1.3 Fire Main 5-2-2/1.3 5-2-2/1.3.1 Size 5-2-2/1.3.1 5-2-2/1.3.2 Cocks or Valves 5-2-2/1.3.2 5-2-2/1.3.3 Isolation 5-2-2/1.3.3 5-2-2/1.3.4 Cold Weather Protection 5-2-2/1.3.4 5-2-2/1.3.5 Materials 5-2-2/1.3.5 5-2-2/1.3.6 Connections 5-2-2/1.3.6 5-2-2/1.5 Hydrants, Hoses, and Nozzles 5-2-2/1.5 5-2-2/1.5.1 Hydrants 5-2-2/1.5.1 5-2-2/1.5.2 Hoses 5-2-2/1.5.2 5-2-2/1.5.3 Nozzles 5-2-2/1.5.3 5-2-2/1.5.4 International Shore Connection 5-2-2/1.5.4 5-2-2/Figure 1 International Shore Connection 5-2-2/Figure 1 Part 5 Chapter 2 Section 3

Fire and Safety – Measures and Features Active Fire Protection Systems and Equipment Additional Fixed Fire Fighting Systems

5-2-3 Additional Fixed Firefighting Systems 5-2-3 5-2-3/1 Fixed Firefighting Systems 5-2-3/1 5-2-3/1i) --- 5-2-3/1i) 5-2-3/1ii) --- 5-2-3/1ii) 5-2-3/1iii) --- 5-2-3/1iii) 5-2-3/1iv) --- 5-2-3/1iv) 5-2-3/1v) --- 5-2-3/1v) 5-2-3/3 Gas Smothering 5-2-3/3 5-2-3/3.1 General 5-2-3/3.1 5-2-3/3.1.1 Storage 5-2-3/3.1.1 5-2-3/3.1.2 Design 5-2-3/3.1.2 5-2-3/3.1.3 Alarm 5-2-3/3.1.3 5-2-3/3.1.3(a) Electric 5-2-3/3.1.3(a) 5-2-3/3.1.3(b) Pneumatic 5-2-3/3.1.3(b) 5-2-3/3.1.4 Controls 5-2-3/3.1.4 5-2-3/3.3 Carbon Dioxide Systems 5-2-3/3.3 5-2-3/5 Foam 5-2-3/5 5-2-3/5.1 Fixed High Pressure Expansion Foam System 5-2-3/5.1 5-2-3/5.3 Low Expansion Foam System 5-2-3/5.3

Page 78: MODU_nandgi_e

Notices and General Information

76 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 5-2-3/5.3.1 Application 5-2-3/5.3.1 5-2-3/5.3.2 Design 5-2-3/5.3.2 5-2-3/7 Fixed Pressure Water Spraying System 5-2-3/7 5-2-3/9 Protection of Helicopter Decks and Refueling Facilities 5-2-3/9 5-2-3/9.1 General 5-2-3/9.1 5-2-3/9.3 Firefighting Systems 5-2-3/9.3 5-2-3/9.3.1 Hoses and Nozzles 5-2-3/9.3.1 5-2-3/9.3.2 Portable Extinguisher 5-2-3/9.3.2 5-2-3/9.3.3 Back-up System 5-2-3/9.3.3 5-2-3/9.3.4 Fixed-Foam System 5-2-3/9.3.4 5-2-3/11 Paint and Flammable Liquid Lockers 5-2-3/11

5-2-3/11.1 Lockers of 4 m2 (43 ft2) or More Floor Area and Lockers with Access to Accommodation Spaces 5-2-3/11.1

5-2-3/11.1i) --- 5-2-3/11.1i) 5-2-3/11.1ii) --- 5-2-3/11.1ii) 5-2-3/11.1iii) --- 5-2-3/11.1iii) 5-2-3/11.1iv) --- 5-2-3/11.1iv)

5-2-3/11.3 Lockers of Less Than 4 m2 (43 ft2) Floor Area Having no Access to Accommodation Spaces 5-2-3/11.3

Part 5 Chapter 2 Section 4

Fire and Safety – Measures and Features Active Fire Protection Systems and Equipment Portable Fire Fighting Systems

5-2-4 Portable Fire Fighting Systems 5-2-4 5-2-4/1 Portable Fire Extinguishers and Sand 5-2-4/1 5-2-4/1.1 Extinguishers 5-2-4/1.1 5-2-4/1.3 Sand 5-2-4/1.3 5-2-4/3 Fireman's Outfit 5-2-4/3 5-2-4/3.1 Number 5-2-4/3.1 5-2-4/3.3 Breathing Apparatus 5-2-4/3.3 5-2-4/3.3i) --- 5-2-4/3.3i) 5-2-4/3.3ii) --- 5-2-4/3.3ii) 5-2-4/3.5 Lifeline 5-2-4/3.7 5-2-4/3.7 Safety lamp and Axe 5-2-4/3.9 5-2-4/3.9 Boots and Gloves 5-2-4/3.11 5-2-4/3.11 Helmet 5-2-4/3.13 5-2-4/3.13 Protective Clothing 5-2-4/3.15 5-2-4/Table 1 Classification of Portable and Semi-portable Extinguishers 5-2-4/Table 1 5-2-4/Table 2 Hand Portable Fire Extinguishers and Semi-portable Fire-Extinguishing Systems 5-2-4/Table 2 Part 5 Chapter 2 Section 5

Fire and Safety – Measures and Features Active Fire Protection Systems and Equipment Fire and Gas Detection

5-2-5 Fire and Gas Detection 5-2-5 5-2-5/1 Other Fire Protection Requirements 5-2-5/1 5-2-5/1.1 Fire Detection and Alarm Systems 5-2-5/1.1 5-2-5/1.3 General Alarm 5-2-5/1.3 5-2-5/1.5 Mud tanks Level Alarm 5-2-5/1.5 5-2-5/1.7 Ventilation System Alarms 5-2-5/1.7 5-2-5/3 Gas Detection and Alarm Systems 5-2-5/3 5-2-5/3i) --- 5-2-5/3i) 5-2-5/3ii) --- 5-2-5/3ii) 5-2-5/3iii) --- 5-2-5/3iii) 5-2-5/3iv) --- 5-2-5/3iv) 5-2-5/3v) --- 5-2-5/3v) Part 5 Chapter 3 Section 1

Fire and Safety – Measures and Features Outfitting General

5-3-1/1 Means of Escape 5-3-1/1 5-3-1/1.1 --- 5-3-1/1.1 5-3-1/1.1.1 --- 5-3-1/1.1.1 5-3-1/1.1.2 --- 5-3-1/1.1.2 5-3-1/1.1.3 --- 5-3-1/1.1.3 5-3-1/1.3 --- 5-3-1/1.3 5-3-1/1.3.1 --- 5-3-1/1.3.1

Page 79: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 77

MODU 2008 Title MODU 2012 5-3-1/1.3.2 --- 5-3-1/1.3.2 5-3-1/1.5 --- 5-3-1/1.5 5-3-1/1.7 --- 5-3-1/1.7 5-3-1/1.9 --- 5-3-1/1.9 5-3-1/3 Means of Access and Egress 5-3-1/3 5-3-1/5 Guards and Rails 5-3-1/5 5-3-1/5.1 Floor Deck Areas and Openings 5-3-1/5.1 5-3-1/5.3 Helicopter Landing Deck 5-3-1/5.3 5-3-1/7 Emergency Control Station 5-3-1/7 5-3-1/9 Arrangements in Machinery Space 5-3-1/9 5-3-1/9.1 Ventilation Fans and Openings 5-3-1/9.1 5-3-1/9.1.1 General 5-3-1/9.1.1 5-3-1/9.1.2 Release of Smoke from Machinery Space 5-3-1/9.1.2 5-3-1/9.3 Other Auxiliaries 5-3-1/9.3 5-3-1/9.5 Oil Tank Suction Pipes 5-3-1/9.5 5-3-1/9.7 Oil Fuel Units 5-3-1/9.7 5-3-1/11 Segregation of Fuel Oil Purifiers 5-3-1/11 5-3-1/11i) --- 5-3-1/11i) 5-3-1/11ii) --- 5-3-1/11ii) 5-3-1/11iii) --- 5-3-1/11iii) 5-3-1/11iv) --- 5-3-1/11iv) 5-3-1/13 Rotary Table Area 5-3-1/13 5-3-1/15 Fire Precautions for Machinery Spaces 5-3-1/15 5-3-1/15i) --- 5-3-1/15i) 5-3-1/15ii) --- 5-3-1/15ii) 5-3-1/15iii) --- 5-3-1/15iii) 5-3-1/15iv) --- 5-3-1/15iv) Part 6 Chapter 1 Section 1

Surveys Surveys During Construction General

6-1-1 General 6-1-1, 7-1-1, 7-1-2 6-1-1/1 General 7-1-1/1 6-1-1/3 Construction Surveys ---

6-1-1/3.1 Structure Fabrication/Erection 7-1-1/3.1 7-1-2/3

6-1-1/3.1.1 Surveys on Steel Structures --- 6-1-1/3.1.1(a) Quality Control Program 7-1-2/3 6-1-1/3.1.1(b) Material Quality and Traceability 7-1-2/5.1 6-1-1/3.1.1(c) Steel Forming 7-1-2/5.5 6-1-1/3.1.1(d) Welder Qualification and Record 7-1-2/7 6-1-1/3.1.1(e) Welding Procedure Specifications and Qualifications 7-1-2/7 6-1-1/3.1.1(f) Weld Inspection 7-1-2/9 6-1-1/3.1.1(g) Tolerances and Alignments 7-1-2/9 6-1-1/3.1.1(h) Corrosion Control System --- 6-1-1/3.1.1(i) Tightness and Hydrostatic Testing Procedures 7-1-2/23.1 6-1-1/3.1.1(j) Nondestructive Testing 7-1-2/11 6-1-1/5 Survey of Equipment ---

6-1-1/5.1 General 6-1-1/5.3 7-1-1/3

6-1-1/5.3 Survey at Vendor's Shop 6-1-1/5.3 Part 6 Chapter 1 Section 2

Surveys Surveys During Construction Testing and Trials

6-1-2 Testing and Trials 6-1-3, 6-1-6, 6-1-7, 7-1-2, 7-1-4, 7-1-6, 7-1-9

6-1-2/1 Watertight Bulkhead Testing --- 6-1-2/1.1 General 7-1-2/23.3 6-1-2/1.3 Hose Testing 7-1-2/23.11 6-1-2/1.5 Air Testing 7-1-2/23.9 6-1-2/3 Tank Bulkhead Testing --- 6-1-2/3.1 General 7-1-2/23.3 6-1-2/3.3 Hydrostatic Testing 7-1-2/23.5 6-1-2/3.5 Air Testing 7-1-2/23.9

Page 80: MODU_nandgi_e

Notices and General Information

78 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 6-1-2/3.7 Structural Testing 7-1-2/23.7 6-1-2/5 Jacking Gear 6-1-3/25.3 6-1-2/5.1 Prototype Test 6-1-3/25.3 6-1-2/5.3 Prior to the Test 6-1-3/25.3i) 6-1-2/5.5 Test 6-1-3/25.3ii) 6-1-2/5.7 Subsequent to the Test 6-1-3/25.3iii) 6-1-2/7 Initial Jacking Test 7-1-9/9.1 6-1-2/9 Rotating Machines – Testing and Inspection --- 6-1-2/9.1 Applications --- 6-1-2/9.1.1 Machines of 100 kW and Over 6-1-7/19.1 6-1-2/9.1.2 Machines Below 100 kW 6-1-7/5.1.1 6-1-2/9.1.3 Other Machines --- 6-1-2/9.3 Special Testing Arrangements --- 6-1-2/11 Moveable Cantilever and Skid Beam Testing 7-1-9/9.3 6-1-2/13 Metallic Piping Systems Pressure Tests 7-1-4/41.1 6-1-2/13.1 Fuel-oil Service System 7-1-4/41.1.1 6-1-2/13.3 Fuel-oil Suction and Transfer Lines 7-1-4/41.1.2 6-1-2/13.5 Starting-air Piping 7-1-4/41.1.3 6-1-2/13.7 Hydraulic Power Piping 7-1-4/41.1.4 6-1-2/13.9 All Piping 7-1-4/41.1.7 6-1-2/13.11 Specific Systems 7-1-4/41.1.5 6-1-2/13.13 Hydrostatic Tests of Shell Valves 7-1-4/41.5 6-1-2/13.15 Pneumatic Tests in Lieu of Hydrostatic Tests 7-1-4/41.3 6-1-2/15 Pump Hydrostatic Test 6-1-6/7.3.2(a) 6-1-2/17 Pump Capacity Test 6-1-6/7.3.2(b) 6-1-2/18 Relief Valve Capacity Test 6-1-6/7.3.2(c) 6-1-2/19 Plastic Piping Testing On Board After Installation 7-1-4/41.7 6-1-2/21 Fixed Oxygen-Acetylene Installations Testing 7-1-4/41.9 6-1-2/23 Switchboards, Distribution Boards, Controllers, etc. – Testing and Inspection --- 6-1-2/23.1 Applications --- 6-1-2/23.1.1 Switchboards 6-1-7/19.5 6-1-2/23.1.2 Motor Controllers 6-1-7/19.7 6-1-2/23.1.3 Motor Control Centers 6-1-7/19.7

6-1-2/23.1.4 Battery Charger Units, Uninterruptible Power System (UPS) Units, and Distribution Boards 6-1-7/19.9

6-1-2/23.1.5 Test Items --- 6-1-2/23.2 Special Testing Arrangements --- 6-1-2/25 Transformers – Testing 6-1-7/19.11 6-1-2/25i) --- 6-1-7/19.11i) 6-1-2/25ii) --- 6-1-7/19.11ii) 6-1-2/25iii) --- 6-1-7/19.11iii) 6-1-2/27 Electrical Service Trials ---

6-1-2/27.1 Electrical Installation for Drilling Unit Main Services 7-1-6/21 7-1-9/11.7

6-1-2/27.3 Communication Facilities 7-1-9/11.9 6-1-2/29 Trials for Self-Propelled Drilling Units 7-1-9/13 6-1-2/29.1 Full Power 7-1-9/13.1 6-1-2/29.3 Reduced Power 7-1-9/13.3 6-1-2/29.5 Machinery Operation 7-1-9/13.5 6-1-2/31 Trials for Non Self-Propelled Drilling Units 7-1-9/11 6-1-2/33 Dock and Sea Trials 7-1-9/1 Part 6 Chapter 2 Section 1

Surveys Surveys After Construction Conditions for Surveys After Construction

6-2-1 Conditions for Surveys After Construction 7-2-1 6-2-1/1 Application 7-2-1/1 6-2-1/1.1 Chapter 2 Sections 1 through 10 7-2-1/1.1 6-2-1/3 Definitions 7-2-1/3 6-2-1/3.1 Ballast Tank 7-2-1/3.1 6-2-1/3.3 Corrosion 7-2-1/3.3 6-2-1/3.5 Corrosion Control System 7-2-1/3.5 6-2-1/3.7 Critical Structural Areas 7-2-1/3.7 6-2-1/3.9 Girth Belt (Transverse Section) 7-2-1/3.9 6-2-1/3.11 Panel 7-2-1/3.11

Page 81: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 79

MODU 2008 Title MODU 2012 6-2-1/3.13 Survey 7-2-1/3.13 6-2-1/3.15 Representative Spaces/Tanks 7-2-1/3.15 6-2-1/3.17 Spaces 7-2-1/3.17 6-2-1/3.19 Suspect Areas 7-2-1/3.19 6-2-1/3.21 Wind and Water Strakes 7-2-1/3.21 6-2-1/5 Notification and Availability for Survey 7-2-1/5 6-2-1/7 Damage, Failure and Repair 7-2-1/7 6-2-1/7.1 Examination and Repair 7-2-1/7.1 6-2-1/7.3 Repairs 7-2-1/7.3 6-2-1/7.5 Representation 7-2-1/7.5 6-2-1/9 Alterations 7-2-1/9 6-2-1/11 Welding and Replacement of Materials 7-2-1/11 6-2-1/11.1 Ordinary and Higher Strength Structural Steels 7-2-1/11.1 6-2-1/11.3 Special Materials 7-2-1/11.3 6-2-1/13 Incomplete Surveys 7-2-1/13 6-2-1/15 Lay-up and Reactivation 7-2-1/15 6-2-1/15.1 Units for Unrestricted Service 7-2-1/15.1 6-2-1/15.3 Units in Great Lakes Service 7-2-1/15.3 Part 6 Chapter 2 Section 2

Surveys Surveys After Construction Survey Intervals

6-2-2 Survey Intervals 7-2-2 6-2-2/1 Units – Unrestricted Service 7-2-2/1 6-2-2/1.1 Annual Surveys 7-2-2/1.1 6-2-2/1.3 Special Periodical Surveys 7-2-2/1.3 6-2-2/1.5 Continuous Surveys 7-2-2/1.5 6-2-2/1.7 In-line Surveys 7-2-2/1.7 6-2-2/1.9 Drydocking Survey or Equivalent 7-2-2/1.9 6-2-2/1.9.1 Underwater Inspection in Lieu of Drydocking Survey 7-2-6/3 6-2-2/1.11 Tail Shaft Surveys 7-2-2/1.11 6-2-2/1.11.1 Water-Lubricated Bearings in Fresh Water Exclusively 7-2-2/1.11.1 6-2-2/1.11.2 Water-Lubricated Bearings in Fresh Water and Sea Water 7-2-2/1.11.2 6-2-2/1.11.2(a) Single Screw 7-2-2/1.11.2(a) 6-2-2/1.11.2(b) Multiple Screw 7-2-2/1.11.2(b) 6-2-2/1.11.2(c) Continuous Liner or Equivalent 7-2-2/1.11.2(c) 6-2-2/1.11.2i) --- 7-2-2/1.11.2i) 6-2-2/1.11.2ii) --- 7-2-2/1.11.2ii) 6-2-2/1.11.3 Oil-Lubricated Bearings 7-2-2/1.11.3 6-2-2/1.11.4 Extensions – Water-Lubricated Bearings 7-2-2/1.11.4 6-2-2/1.11.4(a) Extension up to Three (3) Months 7-2-2/1.11.4(a) 6-2-2/1.11.4(b) Extension up to One (1) Year 7-2-2/1.11.4(b) 6-2-2/1.11.5 Extensions – Oil-Lubricated Bearings 7-2-2/1.11.5 6-2-2/1.11.5(a) Extension up to Three (3) Months 7-2-2/1.11.5(a) 6-2-2/1.11.5(b) Extension up to One (1) Year 7-2-2/1.11.5(b) 6-2-2/1.11.5(c) Extensions not Exceeding Five (5) Years 7-2-2/1.11.5(c) 6-2-2/1.13 Auxiliary Boiler Surveys 7-2-2/1.13 6-2-2/3 Units – Great Lakes Service 7-2-2/3 Part 6 Chapter 2 Section 3

Surveys Surveys After Construction Survey Pre-planning

6-2-3 Survey Pre-planning 7-2-3

6-2-3/1 Special Surveys, Drydocking Surveys, and Underwater Inspections in Lieu of Drydocking 7-2-3/1

Part 6 Chapter 2 Section 4

Surveys Surveys After Construction Annual Surveys

6-2-4 Annual Surveys 7-2-4 6-2-4/1 Annual Survey – Hull 7-2-4/1 6-2-4/1.1 All Types of Mobile Offshore Drilling Units 7-2-4/1.1 6-2-4/1.1.1 --- 7-2-4/1.1.1 6-2-4/1.1.2 --- 7-2-4/1.1.1 6-2-4/1.1.3 --- 7-2-4/1.1.2 6-2-4/1.1.4 --- 7-2-4/1.1.3

Page 82: MODU_nandgi_e

Notices and General Information

80 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 6-2-4/1.1.5 --- 7-2-4/1.1.4 6-2-4/1.1.6 --- 7-2-4/1.1.5 6-2-4/1.1.7 --- 7-2-4/1.1.6 6-2-4/1.1.8 --- 7-2-4/1.1.7 6-2-4/1.1.9 --- 7-2-4/1.1.8 6-2-4/1.3 Corrosion Control Systems 7-2-4/1.1.10 6-2-4/1.5 Alterations and Position of Load Lines 7-2-4/1.1.11 6-2-4/1.7 Surface-type Units 7-2-4/1.3 6-2-4/1.9 Self-elevating Units 7-2-4/1.5 6-2-4/1.11 Column-stabilized Units 7-2-4/1.7 6-2-4/3 Annual Survey – Machinery and Electrical Systems 7-2-4/3 6-2-4/3.1 Non-self-propelled Units 7-2-4/3.1 6-2-4/3.3 Self-propelled Units 7-2-4/3.3 6-2-4/3.5 Preventative Maintenance Techniques 7-2-4/3.5 6-2-4/3.7 Examination during Overhaul 7-2-4/3.7 6-2-4/3.9 Examination at Shorter Intervals 7-2-4/3.9 6-2-4/5 Thrusters and Dynamic Positioning Systems 7-2-4/5 Part 6 Chapter 2 Section 5

Construction Surveys After Construction Special Periodical Surveys

6-2-5 Special Periodical Surveys 7-2-5 6-2-5/1 Special Periodical Survey – Hull No. 1 7-2-5/1 6-2-5/1.1 General – All Types of Mobile Offshore Drilling Units 7-2-5/1.1 6-2-5/1.1.1 --- 7-2-5/1.1.1

6-2-5/1.1.2 ---

7-2-5/1.1.2 7-2-5/1.1.3 7-2-5/1.1.4 7-2-5/1.1.5

6-2-5/1.1.3 --- 7-2-5/1.1.6 6-2-5/1.1.4 --- 7-2-5/1.1.7 6-2-5/1.1.5 --- 7-2-5/1.1.8 6-2-5/1.1.6 --- 7-2-5/1.1.9 6-2-5/1.1.7 --- 7-2-5/1.1.10 6-2-5/1.1.8 --- 7-2-5/1.1.11

6-2-5/1.1.9 --- 7-2-5/1.1.12 7-2-5/1.1.13

6-2-5/1.3 Surface-type Units 7-2-5/1.3 6-2-5/1.3.1 --- 7-2-5/1.3.1 6-2-5/1.5 Self-elevating Units 7-2-5/1.5 6-2-5/1.5.1 --- 7-2-5/1.5.1 6-2-5/1.5.2 --- 7-2-5/1.5.2 6-2-5/1.5.3 --- 7-2-5/1.5.3 6-2-5/1.5.4 --- 7-2-5/1.5.4 6-2-5/1.5.5 --- 7-2-5/1.5.5 6-2-5/1.5.6 --- 7-2-5/1.5.6 6-2-5/1.7 Column-stabilized Units 7-2-5/1.7 6-2-5/3 Special Survey No. 2 and Subsequent 7-2-5/3 6-2-5/3.1 General 7-2-5/3.1 6-2-5/3.3 Thickness Gauging Requirements 7-2-5/3.9 6-2-5/3.5 Nondestructive Testing --- 6-2-5/3.5.1 Column-Stabilized Units 7-2-5/3.5 6-2-5/3.5.1i) --- 7-2-5/3.5i) 6-2-5/3.5.1ii) --- 7-2-5/3.5ii) 6-2-5/3.5.1iii) --- 7-2-5/3.5iii) 6-2-5/3.5.1iv) --- 7-2-5/3.5iv) 6-2-5/3.5.1v) --- 7-2-5/3.5v) 6-2-5/3.5.1vi) --- 7-2-5/3.5vi) 6-2-5/3.5.1vii) --- 7-2-5/3.5vii) 6-2-5/3.5.2 Self-Elevating Units 7-2-5/3.3 6-2-5/3.5.2i) --- 7-2-5/3.3i) 6-2-5/3.5.2ii) --- 7-2-5/3.3ii) 6-2-5/3.5.2iii) --- 7-2-5/3.3iii) 6-2-5/3.5.2iv) --- 7-2-5/3.3iv) 6-2-5/3.5.3 Record Keeping 7-2-5/3.7

Page 83: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 81

MODU 2008 Title MODU 2012 6-2-5/3.5.3i) --- 7-2-5/3.7i) 6-2-5/3.5.3ii) --- 7-2-5/3.7ii) 6-2-5/5 Special Periodical Survey – Machinery 7-2-5/5 6-2-5/5.1 Correlation with Special Periodical Survey – Hull 7-2-5/5.1

6-2-5/5.3 Parts to be Examined 7-2-5/5.3 7-2-5/5.5

6-2-5/5.3.1 --- 7-2-5/5.3.1

6-2-5/5.3.2 --- 7-2-5/5.3.2 7-2-5/5.3.3 7-2-5/5.3.4

6-2-5/5.3.3 --- 7-2-5/5.3.5 6-2-5/5.3.4 --- 7-2-5/5.3.6 6-2-5/7 Special Periodical Survey – Electrical Equipment 7-2-5/7 6-2-5/7.1 Correlation with Special Periodical Surveys – Hull 7-2-5/7.1 6-2-5/7.3 Parts to be Examined 7-2-5/7.3 6-2-5/7.3.1 --- 7-2-5/7.3.1 6-2-5/7.3.2 --- 7-2-5/7.3.2 6-2-5/7.3.3 --- 7-2-5/7.3.3 6-2-5/7.3.4 --- 7-2-5/7.3.4 6-2-5/7.3.5 --- 7-2-5/7.3.5 6-2-5/7.3.6 --- 7-2-5/7.3.7 6-2-5/7.5 Self Propelled Units – Main Propulsion Apparatus 7-2-5/7.5 6-2-5/7.7 Major Repairs 7-2-5/7.7 6-2-5/9 Special Periodical Survey – Special Features (All Types) 7-2-5/9 6-2-5/9.1 Correlation with Special Periodical Surveys – Hull Hazardous Areas 7-2-5/9.1 6-2-5/9.3 Hazardous Areas 7-2-5/9.3 6-2-5/9.5 Remote Shutdown Arrangements 7-2-5/9.5 6-2-5/9.7 Passive Fire Protection System 7-2-5/9.7 6-2-5/9.9 Active Fire Protection Systems and Equipment 7-2-5/9.9 6-2-5/9.11 Outfitting 7-2-5/9.11 6-2-5/9.13 Piping Systems Supporting the Drilling System 7-2-5/9.13 6-2-5/9.15 Self-Elevating Drilling Units – Leg Jacking Systems 7-2-5/9.15 6-2-5/11 Thrusters and Dynamic Position Systems 7-2-5/11 6-2-5/13 Units with Retractable Propulsion Thrusters 7-2-5/13 6-2-5/Table 1 Thickness Gauging Requirements for Surface-type Units 7-2-5/Table 1 6-2-5/Table 2 Thickness Gauging Requirements for Self-elevating Units 7-2-5/Table 2 6-2-5/Table 3 Thickness Gauging Requirements for Column-Stabilized Units 7-2-5/Table 3 Part 6 Chapter 2 Section 6

Surveys Surveys After Construction Drydocking Surveys or Equivalent

6-2-6 Drydocking Survey or Equivalent 7-2-6 6-2-6/1 Parts to be Examined 7-2-6/1 6-2-6/1.1 Surface-type Units (Ship or Barge Type Units) 7-2-6/1.1 6-2-6/1.3 Self-Elevating Units 7-2-6/1.3 6-2-6/1.3i) --- 7-2-6/1.3i) 6-2-6/1.3ii) --- 7-2-6/1.3ii) 6-2-6/1.3iii) --- 7-2-6/1.3iii) 6-2-6/1.3iv) --- 7-2-6/1.3iv) 6-2-6/1.3v) --- 7-2-6/1.3v) 6-2-6/1.5 Column-Stabilized Units 7-2-6/1.5 6-2-6/1.7 Ballast and Preload Spaces – All Units 7-2-6/1.7 6-2-6/1.7.1 Surface-Type Units 7-2-6/1.7.1 6-2-6/1.7.2 Self-Elevating Units 7-2-6/1.7.2 6-2-6/1.7.3 Column-stabilized Units 7-2-6/1.7.3 6-2-6/1.9 All Units 7-2-6/1.9 6-2-6/1.9.1 Internal Examinations of Tanks and Voids 7-2-6/1.9.1 6-2-6/1.9.2 Sea Valves 7-2-6/1.9.2 6-2-6/1.9.3 External Portions of Propulsion Units 7-2-6/1.9.3 6-2-6/3 Underwater Inspection in Lieu of Drydocking (UWILD) 7-2-6/3 6-2-6/3.1 Conditions 7-2-6/3.1 6-2-6/3.1.1 Limitations 7-2-6/3.1.1 6-2-6/3.1.2 Thickness Gauging and Nondestructive Testing 7-2-6/3.1.2 6-2-6/3.1.3 Plans and Data 7-2-6/3.1.3 6-2-6/3.1.4 Underwater Conditions 7-2-6/3.1.4

Page 84: MODU_nandgi_e

Notices and General Information

82 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 6-2-6/3.3 Physical Features 7-2-6/3.3 6-2-6/3.3.1 Stern Bearing 7-2-6/3.3.1 6-2-6/3.3.2 Rudder Bearings 7-2-6/3.3.2 6-2-6/3.3.3 Sea Suctions 7-2-6/3.3.3 6-2-6/3.3.4 Sea Valves 7-2-6/3.3.4 6-2-6/3.5 Procedures 7-2-6/3.5 6-2-6/3.5.1 Exposed Areas 7-2-6/3.5.1 6-2-6/3.5.2 Underwater Areas 7-2-6/3.5.2 6-2-6/3.5.3 Damage Areas 7-2-6/3.5.3 6-2-6/3.7 Alternatives 7-2-6/3.11 Part 6 Chapter 2 Section 7

Surveys Surveys After Construction Specific Survey on Self-Elevating Units After Ocean Transit Tow

6-2-7 Specific Survey on Self-elevating Units After Ocean Transit Tow 7-2-7 Part 6 Chapter 2 Section 8

Surveys Surveys After Construction Tail Shaft Surveys

6-2-8 Tail Shaft Surveys 7-2-8 6-2-8i) --- 7-2-8i) 6-2-8ii) --- 7-2-8ii) 6-2-8iii) --- 7-2-8iii) 6-2-8iv) --- 7-2-8iv) Part 6 Chapter 2 Section 9

Surveys Surveys After Construction Boiler Surveys

6-2-9 Boiler Surveys 7-2-9 6-2-9/1 Parts to be Examined 7-2-9/1 6-2-9/1.1 --- 7-2-9/1.1 6-2-9/1.3 --- 7-2-9/1.3 6-2-9/1.5 --- 7-2-9/1.5 6-2-9/1.7 --- 7-2-9/1.7 Part 6 Chapter 2 Section 10

Surveys After Construction Surveys After Construction Automatic and Remote-control Systems

6-2-10 Automatic and Remote-control Systems 7-2-10 6-2-10/1 Annual Survey 7-2-10/1 6-2-10/3 Special Periodical Surveys 7-2-10/3 6-2-10/3.1 Control Actuators 7-2-10/3.1 6-2-10/3.3 Electrical 7-2-10/3.3 6-2-10/3.5 Unattended Plants 7-2-10/3.5 6-2-10/5 Repairs or Alternatives 7-2-10/5 Part 6 Chapter 2 Appendix 1

Surveys Surveys After Construction Guide for Lay-up and Reactivation of Laid-up Mobile Offshore Drilling Units

6-2-A1 Guide for Lay-up and Reactivation of Laid-up Mobile Offshore Drilling Units 7-2-A1 6-2-A1/1 Guide for Lay-up of Mobile Offshore Drilling Units 7-2-A1/1 6-2-A1/1.1 Lay-up Requirements 7-2-A1/1.1 6-2-A1/1.1i) --- 7-2-A1/1.1i) 6-2-A1/1.1ii) --- 7-2-A1/1.1ii) 6-2-A1/1.1iii) --- 7-2-A1/1.1iii) 6-2-A1/1.3 Safety and Protection 7-2-A1/1.3 6-2-A1/1.3i) --- 7-2-A1/1.3i) 6-2-A1/1.3ii) --- 7-2-A1/1.3ii) 6-2-A1/1.3iii) --- 7-2-A1/1.3iii) 6-2-A1/1.3iv) --- 7-2-A1/1.3iv) 6-2-A1/1.3v) --- 7-2-A1/1.3v) 6-2-A1/1.3vi) --- 7-2-A1/1.3vi) 6-2-A1/1.3vii) --- 7-2-A1/1.3vii) 6-2-A1/1.3viii) --- 7-2-A1/1.3viii) 6-2-A1/1.3ix) --- 7-2-A1/1.3ix) 6-2-A1/1.3x) --- 7-2-A1/1.3x) 6-2-A1/1.3xi) --- 7-2-A1/1.3xi) 6-2-A1/1.3xii) --- 7-2-A1/1.3xii)

Page 85: MODU_nandgi_e

Notices and General Information

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012 83

MODU 2008 Title MODU 2012 6-2-A1/1.3xiii) --- 7-2-A1/1.3xiii) 6-2-A1/1.3xiv) --- 7-2-A1/1.3xiv) 6-2-A1/1.3xv) --- 7-2-A1/1.3xv) 6-2-A1/1.3xvi) --- 7-2-A1/1.3xvi) 6-2-A1/1.5 Preservation and Maintenance 7-2-A1/1.5 6-2-A1/1.5.1 Hull and Deck Equipment 7-2-A1/1.5.1 6-2-A1/1.5.1(a) --- 7-2-A1/1.5.1(a) 6-2-A1/1.5.1(b) --- 7-2-A1/1.5.1(b) 6-2-A1/1.5.1(c) --- 7-2-A1/1.5.1(c) 6-2-A1/1.5.1(d) --- 7-2-A1/1.5.1(d) 6-2-A1/1.5.1(e) --- 7-2-A1/1.5.1(e) 6-2-A1/1.5.1(f) --- 7-2-A1/1.5.1(f) 6-2-A1/1.5.1(g) --- 7-2-A1/1.5.1(g) 6-2-A1/1.5.1(h) --- 7-2-A1/1.5.1(h) 6-2-A1/1.5.1(i) --- 7-2-A1/1.5.1(i) 6-2-A1/1.5.1(j) --- 7-2-A1/1.5.1(j) 6-2-A1/1.5.1(k) --- 7-2-A1/1.5.1(k) 6-2-A1/1.5.1(l) --- 7-2-A1/1.5.1(l) 6-2-A1/1.5.1(m) --- 7-2-A1/1.5.1(m) 6-2-A1/1.5.1(n) --- 7-2-A1/1.5.1(n) 6-2-A1/1.5.1(o) --- 7-2-A1/1.5.1(o) 6-2-A1/1.5.1(p) --- 7-2-A1/1.5.1(p) 6-2-A1/1.5.1(q) --- 7-2-A1/1.5.1(q) 6-2-A1/1.5.1(r) --- 7-2-A1/1.5.1(r) 6-2-A1/1.5.2 Machinery Spaces, Machinery, and Drilling Equipment 7-2-A1/1.5.2 6-2-A1/1.5.2(a) --- 7-2-A1/1.5.2(a) 6-2-A1/1.5.2(b) --- 7-2-A1/1.5.2(b) 6-2-A1/1.5.2(c) --- 7-2-A1/1.5.2(c) 6-2-A1/1.5.2(d) --- 7-2-A1/1.5.2(d) 6-2-A1/1.5.2(e) --- 7-2-A1/1.5.2(e) 6-2-A1/1.5.2(f) --- 7-2-A1/1.5.2(f) 6-2-A1/1.5.2(g) --- 7-2-A1/1.5.2(g) 6-2-A1/1.5.2(h) --- 7-2-A1/1.5.2(h) 6-2-A1/1.5.2(i) --- 7-2-A1/1.5.2(i) 6-2-A1/1.5.3 Boilers 7-2-A1/1.5.3 6-2-A1/1.5.3(a) --- 7-2-A1/1.5.3(a) 6-2-A1/1.5.3(b) --- 7-2-A1/1.5.3(b) 6-2-A1/1.5.4 Boiler Stack Openings 7-2-A1/1.5.4 6-2-A1/1.5.5 Electrical Installation 7-2-A1/1.5.5 6-2-A1/1.5.5(a) --- 7-2-A1/1.5.5(a) 6-2-A1/1.5.5(b) --- 7-2-A1/1.5.5(b) 6-2-A1/1.5.5(c) --- 7-2-A1/1.5.5(c) 6-2-A1/1.5.5(d) --- 7-2-A1/1.5.5(d) 6-2-A1/1.5.5(e) --- 7-2-A1/1.5.5(e) 6-2-A1/1.5.5(f) --- 7-2-A1/1.5.5(f) 6-2-A1/1.5.5(g) --- 7-2-A1/1.5.5(g) 6-2-A1/1.5.5(h) --- 7-2-A1/1.5.5(h) 6-2-A1/1.5.5(i) --- 7-2-A1/1.5.5(i) 6-2-A1/1.5.6 Tensioning System and Heave Compensators 7-2-A1/1.5.6 6-2-A1/1.5.7 Lay-up Site and Mooring Arrangements 7-2-A1/1.5.7 6-2-A1/1.5.7(a) Lay-up Site Considerations 7-2-A1/1.5.7(a) 6-2-A1/1.5.7(a)i) --- 7-2-A1/1.5.7(a)i) 6-2-A1/1.5.7(a)ii) --- 7-2-A1/1.5.7(a)ii) 6-2-A1/1.5.7(a)iii) --- 7-2-A1/1.5.7(a)iii) 6-2-A1/1.5.7(a)iv) --- 7-2-A1/1.5.7(a)iv) 6-2-A1/1.5.7(a)v) --- 7-2-A1/1.5.7(a)v) 6-2-A1/1.5.7(a)vi) --- 7-2-A1/1.5.7(a)vi) 6-2-A1/1.5.7(a)vii) --- 7-2-A1/1.5.7(a)vii) 6-2-A1/1.5.7(a)viii) --- 7-2-A1/1.5.7(a)viii) 6-2-A1/1.5.7(a)ix) --- 7-2-A1/1.5.7(a)ix) 6-2-A1/1.5.7(a)x) --- 7-2-A1/1.5.7(a)x) 6-2-A1/1.5.7(a)xi) --- 7-2-A1/1.5.7(a)xi) 6-2-A1/1.5.7(b) Mooring Arrangements Considerations 7-2-A1/1.5.7(b) 6-2-A1/1.5.7(b)i) --- 7-2-A1/1.5.7(b)i)

Page 86: MODU_nandgi_e

Notices and General Information

84 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2008 Title MODU 2012 6-2-A1/1.5.7(b)ii) --- 7-2-A1/1.5.7(b)ii) 6-2-A1/1.5.7(b)iii) --- 7-2-A1/1.5.7(b)iii) 6-2-A1/1.5.7(b)iv) --- 7-2-A1/1.5.7(b)iv) 6-2-A1/1.5.7(b)iv)a) --- 7-2-A1/1.5.7(b)iv)a) 6-2-A1/1.5.7(b)iv)b) --- 7-2-A1/1.5.7(b)iv)b) 6-2-A1/1.5.7(b)iv)c) --- 7-2-A1/1.5.7(b)iv)c) 6-2-A1/1.5.7(b)iv)d) --- 7-2-A1/1.5.7(b)iv)d) 6-2-A1/1.5.7(b)v) --- 7-2-A1/1.5.7(b)v) 6-2-A1/1.5.7(b)vi) --- 7-2-A1/1.5.7(b)vi) 6-2-A1/1.5.7(b)vii) --- 7-2-A1/1.5.7(b)vii) 6-2-A1/1.5.7(b)viii) --- 7-2-A1/1.5.7(b)viii) 6-2-A1/1.5.7(b)ix) --- 7-2-A1/1.5.7(b)ix) 6-2-A1/1.5.7(b)x) --- 7-2-A1/1.5.7(b)x) 6-2-A1/1.5.7(b)xi) --- 7-2-A1/1.5.7(b)xi) 6-2-A1/1.5.7(b)xii) --- 7-2-A1/1.5.7(b)xii) 6-2-A1/1.5.7(b)xiii) --- 7-2-A1/1.5.7(b)xiii) 6-2-A1/3 Guide for Reactivation of Laid-up Mobile Offshore Drilling Units 7-2-A1/3 6-2-A1/3.1 Reactivation Survey Status 7-2-A1/3.1 6-2-A1/3.1i) --- 7-2-A1/3.1i) 6-2-A1/3.1ii) --- 7-2-A1/3.1ii) 6-2-A1/3.1iii) --- 7-2-A1/3.1iii) 6-2-A1/3.3 Hull and Outfit 7-2-A1/3.3 6-2-A1/3.3.1 Drydocking Survey 7-2-A1/3.3.1 6-2-A1/3.3.2 Witnessing of Functional Testing or Verification of Fitness for Service 7-2-A1/3.3.2 6-2-A1/3.3.2i) --- 7-2-A1/3.3.2i) 6-2-A1/3.3.2ii) --- 7-2-A1/3.3.2ii) 6-2-A1/3.3.2iii) --- 7-2-A1/3.3.2iii) 6-2-A1/3.3.2iv) --- 7-2-A1/3.3.2iv) 6-2-A1/3.3.2v) --- 7-2-A1/3.3.2v) 6-2-A1/3.3.2vi) --- 7-2-A1/3.3.2vi) 6-2-A1/3.3.2vii) --- 7-2-A1/3.3.2vii) 6-2-A1/3.3.2viii) --- 7-2-A1/3.3.2viii) 6-2-A1/3.3.2ix) --- 7-2-A1/3.3.2ix) 6-2-A1/3.3.2x) --- 7-2-A1/3.3.2x) 6-2-A1/3.3.2xi) --- 7-2-A1/3.3.2xi) 6-2-A1/3.3.2xii) --- 7-2-A1/3.3.2xii) 6-2-A1/3.5 Machinery and Drilling Equipment 7-2-A1/3.5 6-2-A1/3.5i) --- 7-2-A1/3.5i) 6-2-A1/3.5ii) --- 7-2-A1/3.5ii) 6-2-A1/3.5iii) --- 7-2-A1/3.5iii) 6-2-A1/3.5iv) --- 7-2-A1/3.5iv) 6-2-A1/3.5v) --- 7-2-A1/3.5v) 6-2-A1/3.5vi) --- 7-2-A1/3.5vi) 6-2-A1/3.5vii) --- 7-2-A1/3.5vii) 6-2-A1/3.5viii) --- 7-2-A1/3.5viii) 6-2-A1/3.5ix) --- 7-2-A1/3.5ix) 6-2-A1/3.5x) --- 7-2-A1/3.5x) 6-2-A1/3.5xi) --- 7-2-A1/3.5xi) 6-2-A1/3.5xii) --- 7-2-A1/3.5xii) 6-2-A1/3.5xiii) --- 7-2-A1/3.5xiii) 6-2-A1/3.7 Electrical 7-2-A1/3.7 6-2-A1/3.7i) --- 7-2-A1/3.7i) 6-2-A1/3.7ii) --- 7-2-A1/3.7ii) 6-2-A1/3.7iii) --- 7-2-A1/3.7iii) 6-2-A1/3.9 Tensioner System and Motion Compensator 7-2-A1/3.9 6-2-A1/3.11 Control and Instrumentation 7-2-A1/3.11 6-2-A1/3.13 Trial 7-2-A1/3.13 6-2-A1/3.15 Documentation and Certification 7-2-A1/3.15 6-2-A1/3.15i) --- 7-2-A1/3.15i) 6-2-A1/3.15ii) --- 7-2-A1/3.15ii) 6-2-A1/3.15iii) --- 7-2-A1/3.15iii)