  • Day 3: Kitting & Packing and

    InstallationInstallation

  • Part I: Kitting & Packing

  • Introduction

    This document is intended to guide just for understanding of kitting

    & Packing in warehouse.

    The plan in the document is a draft version, and can be modified

    before starting the installation.

    It is one of the method for kitting & packing.

  • Table Of Contents

    Kitting & Packing

    Items for kitting & packing Warehouse layout High level view of kitting & packing Tools for kitting & packing Tools for kitting & packing Packing label plan Box stacking plan Box sizes & details for CDU & RRU

  • 1. Items for Kitting & PackingS NoS NoS NoS No Item CodeItem CodeItem CodeItem Code Material DescriptionMaterial DescriptionMaterial DescriptionMaterial Description U/MU/MU/MU/M QTY RequiredQTY RequiredQTY RequiredQTY Required QTY IssuedQTY IssuedQTY IssuedQTY Issued RemarksRemarksRemarksRemarks

    1 CDU BOX 1 1pcs eNB equipment2 RRU BOX 3 3pcs eNB equipment3 CSS(Cell Site switch)-Cisco BOX 1 1BOX Switch unit4 CDU Master Kit BOX 1 1BOX Installation material5 RRU Master Kit BOX 1 1BOX Installation material6 ANTENNA (17dBi-65) BOX 3 3BOX

    7 EB80-09200A Armored CPRI CABLE Alpha BOX 1 ( )M

    CPRI CABLEBeta BOX 1 ( )M

    Gamma BOX 1 ( )M

    RET Unit8 RET Unit pcs 3 3pcs RET 9 AISG Cable pcs 3 3pcs RET Cable

    10 CSS Accessory(IM materials) Pack 1 1Pack CSS Materials11 3811-001849 F-GV(0.6/1kV), 4 x 1C, Green M ( )M ( )M CDU GND12 3811-001850 F-GV(1kV), 6 x 1C, Green M ( )M ( )M GPS GND13 3802-001093 GPS CABLE(CNT-400) M ( )M ( )M GPS coaxial cable

    14 3811-001850 F-GV(1kV), 6 x 1C, Green

    Alpha M ( )M ( )M

    RRU GNDBeta M ( )M ( )M

    Gamma M ( )M ( )M

    15 EB80-05809A F-CV CABLE 6 x 2C(WHITE/BLACK)

    Alpha M ( )M ( )M

    RRU POWER CABLE Beta M ( )M ( )M

    Gamma M ( )M ( )M

  • 2. Kitting & Packing layout (Mumbai circle case)

    60mtr

    DU & RRH unit

    DU & RRH IMM

    aster kit

    CPRI cables

    RRH Power cable

    GND cable 4SQ

    GPS cable

    GND cable 6SQ

    30mtr

    CSS switch& Accessories

    Antenna&RET unit/cable

    22mtr

    4mtr Car trucking section

    Entrance

    Kitting & Packing Stacking area

    20mtr10mtr

    RJIL sectionRJIL sectionRJIL sectionRJIL section

  • High-level view

    Unload boxes from palette

    Unpack boxes (if required) in kitting area of warehousearea of warehouse

    Prepare installation kit in kitting area of warehouse

    7

  • 3. Materials for kitting & packing1. Material list

    No. Items Photo No. Items Photo

    1Transparent tape

    (2-inch & 4-inch)8 Box label sticker

    2Air bubble film

    (W: 4-inch)9 Oil marker pen

    3Stretch wrapping film

    (W: 24-inch)10

    Cable drum

    stands

    4Manual-dispensers

    for stretch wrapping11 Cable winder

    5 Cutter knife 12 Measure tape

    6 Scissor 13 Plastic string

    7 Cable cutter

  • 4. Packing label plan1. Packing label numbering

    Label Number Label Text Description

    1 CDU CDU Unit

    2 RRU-0 RRU Unit Alpha

    3 RRU-1 RRU Unit Beta

    4 RRU-2 RRU Unit Gamma

    5 CSS Cell Site switch-Cisco

    6 CDU Master Kit CDU Installation Material

    7 RRU Master Kit RRU Installation Material7 RRU Master Kit RRU Installation Material

    8 ANTENNA-0 RF Antenna Alpha

    9 ANTENNA-1 RF Antenna Beta

    10 ANTENNA-2 RF Antenna Gamma

    11 CPRI CABLE-0,1,2 Armored CPRI Cable Alpha, Beta, Gamma

    12 RET 3ea, AISG 3ea,CSS IM RET Unit & AISG cable and CSS IM

    13 RRH Power cable x ( )m F-CV CABLE 6mm2 x 2C(WHITE/BLACK)

    14

    DU ground 4mm2 x ( )m

    GPS ground 6mm2 x ( )m

    RRH ground 6mm2 x ( )m

    GPS coaxial x ( )m

    F-GV(0.6/1kV), 4mm2 x 1C, Green

    F-GV(1kV), 6mm2 x 1C, Green

    F-GV(1kV), 6mm2 x 1C, Green

    GPS CABLE(CNT-400)

  • CPRI Cable Boxes

    In First Phase of project

    For few sites material

    CPRI cable will be in the RRU box

    Each CPRI cable box contains 30m

    Remaining sites material

    CPRI cable boxes are independent from RRU box

    Each box will have cables of different lengths Each box will have cables of different lengths

    CPRI boxes are of same size (H122mm X L384mm X W365mm)

    for all sites.

    Depending on total CPRI cable length required, 1 to 3 boxes

    may be required per site. Pack ALL CPRI boxes for one site

    together in a single wrapping stretch film.

  • 4. Packing label plan

    2-1. CDU box label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details: : : :

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details: : : :

    60mm

    120mm

    90mm

    60mm1/14CDUCDUCDUCDU

    Kitting & Packing methodKitting & Packing methodKitting & Packing methodKitting & Packing method Wrapping with stretch wrapping film Put label sticker Put transparent tape on label sticker

    Side(1)

    Side(2)

    Label sticker should be put

    minimum 2 side of box

  • 4. Packing label plan

    2-2. RRU-0 box label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details: : : :

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details: : : :

    60mm

    120mm

    90mm

    60mm2/14RRURRURRURRU----0000

  • 4. Packing label plan

    2-3. RRU-1 box label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details: : : :

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details: : : :

    60mm

    120mm

    90mm

    60mm3/14RRURRURRURRU----1111

  • 4. Packing label plan

    2-4. RRU-2 box label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details::::

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details::::

    60mm

    120mm

    90mm

    60mm4/14RRURRURRURRU----2222

  • 4. Packing label plan

    2-5. CSS (Cell Site switch) Cisco(Cell Site switch) Cisco(Cell Site switch) Cisco(Cell Site switch) Cisco label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details::::

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details::::

    60mm

    120mm

    90mm

    60mm5/14CSS(Switch)CSS(Switch)CSS(Switch)CSS(Switch)

  • 4. Packing label plan

    2-6. CDU Master Kit label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details::::

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details::::

    60mm

    120mm

    90mm

    60mm6/14CDUCDUCDUCDU----Master KitMaster KitMaster KitMaster Kit

  • 4. Packing label plan

    2-7. RRU Master Kit label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details::::

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details::::

    60mm

    120mm

    90mm

    60mm7/14RRURRURRURRU----Master KitMaster KitMaster KitMaster Kit

  • 4. Packing label plan

    2-8. ANT-0 box label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details::::

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details::::

    60mm

    120mm

    90mm

    60mm8/14ANTANTANTANT----0000

  • 4. Packing label plan

    2-9. ANT-1 box label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details::::

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details::::

    60mm

    120mm

    90mm

    60mm9/14ANTANTANTANT----1111

  • 4. Packing label plan

    2-10. ANT-2 box label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details::::

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details::::

    60mm

    120mm

    90mm

    60mm10/14ANTANTANTANT----2222

  • 4. Packing label plan

    2-11. CPRI box label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details::::

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details::::

    60mm

    120mm

    90mm

    60mm11/14CPRI-0 ( ) MCPRI-1 ( ) M

    CPRI-2 ( ) M

  • 4. Packing label plan

    2-12. RET, AISG, CSS IM label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:

    Material detailsMaterial detailsMaterial detailsMaterial details::::

    250mm

    35mm

    25mm 120m

    mMaterial detailsMaterial detailsMaterial detailsMaterial details::::

    60mm

    120mm

    90mm

    60mm12/14RET 3 ea/ AISG 3 ea/RET 3 ea/ AISG 3 ea/RET 3 ea/ AISG 3 ea/RET 3 ea/ AISG 3 ea/CSS IMCSS IMCSS IMCSS IM

  • 4. Packing label plan

    2-13. Cable roll label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:Material details:Material details:Material details:Material details:

    250mm

    35mm

    25mm 120m

    mMaterial details:Material details:Material details:Material details:

    60mm

    120mm

    90mm

    60mm

    RRU Power x Alpha ( ) mRRU Power x Beta ( ) mRRU Power x Gamma ( ) m

    TOTAL ( ) m13/14

    Label stickerLabel stickerLabel stickerLabel sticker

    Kitting & Packing methodKitting & Packing methodKitting & Packing methodKitting & Packing method Make cable roll and tie with plastic strings Wrapping to be done cable roll thoroughly with bubble sheet Put label sticker on bubble sheet Put transparent tape on label sticker

    Make cable roll usingcable winder

  • 4. Packing label plan

    2-14. Cable roll label

    Site Name:Site Name:Site Name:Site Name:

    Site ID:Site ID:Site ID:Site ID:Material details:Material details:Material details:Material details:

    250mm

    35mm

    25mm 120m

    mMaterial details:Material details:Material details:Material details:

    60mm

    120mm

    90mm

    60mm

    DU ground 4mm x ( ) mGPS ground 6mm x ( ) mRRU ground 6mm x ( ) mGPS coaxial x ( ) m

    14/14

    Label stickerLabel stickerLabel stickerLabel sticker

    Kitting & Packing methodKitting & Packing methodKitting & Packing methodKitting & Packing method Make cable roll and tie with plastic strings Wrapping to be done cable roll throughly with bubble sheet Put label sticker on bubble sheet Put transparent tape on label sticker

    Make cable roll usingcable winder

  • 5. Appendix Box size

    CDU boxRRU Master Kit

    CDU Master Kit

    Box type Dimension

    RRU Master kit W620 X L600 X H420

    CDU Master Kit W530 X L320 X H230

    RRU Box W580 X L500 X H215

    CDU Box W385 X L500 X H260

    Antenna W1260 X L410 X H240

    RRU box

    Antenna

  • 5. Appendix - Box details (DU)

    No. SNS CODE Description Specification Unit QTY REMARKS

    1 EB80-09369A RUBBER TAPE H0.8mm x D19mm x L 10m BLACK EA 1

    Box 1

    2 EB80-09370A VINYL TAPE H0.125mm x D19mm x L 8m BLACK EA 1

    3 EB80-09376A WEATHER RESISTANT CABLE TIE Nylon 66(Carbo A),CV 100W, L:104, W:2.5MAX.DIA:24,Tensile

    Strength 8KGPA 1

    4 EB80-09386A F-GV CABLE F-GV CABLE,6

    x 1C Green M L

    5 EB80-09379A F-GV CABLE F-GV CABLE 4

    x 1C Green M L

    6 EB80-09385A PRESSURE TERMINAL(2HOLE) COPPER PIPE,4SQ,S:16mm,D2:6.3,2hole EA 1

    7 EB80-09362A PRESSURE TERMINAL(2HOLE) COPPER PIPE,6SQ,D2:6.3, S:45, A:84 EA 1

    8 EB80-09352A BRASS BOLT M6, B:20L EA 2

    9 EB80-09353A BRASS NUT M6, C:11.5 EA 2

    IM materials

    Box 2

    9 EB80-09353A BRASS NUT M6, C:11.5 EA 2

    10 EB80-09360A PLAIN WASHER(BRASS) d : 6.3, D:11.5 EA 4

    11 EB80-09361A PLAIN WASHER(BRASS) d : 8.4, D:16.9 EA 4

    12 EB80-09367A SPRING WASHER(BRASS) d : 6.3, D:12.1 EA 4

    13 EB80-09354A HEAT SHRINK TUBE D:12mm, L:1000(GREEN) M 0.2

    14 EB80-09386A F-GV CABLE F-GV CABLE,6

    x 1C Green M L

    15 EB80-09365A PRESSURE TERMINAL Copper,RING TYPE,D : 32mm , D2 ; 17mm, D1:3.5mm, T:1 EA 1

    16 EB80-09362A PRESSURE TERMINAL(2HOLE) COPPER PIPE,6SQ,D2:6.3, S:45, A:84 EA 1

    17 EB80-09352A BRASS BOLT M6, B:20L EA 2

    18 EB80-09353A BRASS NUT M6, C:11.5 EA 2

    19 EB80-09360A PLAIN WASHER(BRASS) d : 6.3, D:11.5 EA 4

    20 EB80-09367A SPRING WASHER(BRASS) d : 6.3, D:12.1 EA 4

    21 EB80-09361A PLAIN WASHER(BRASS) d : 8.4, D:16.9 EA 4

    22 EB80-09354A HEAT SHRINK TUBE D:12mm, L:1000(GREEN) M 0.2

  • 5. Appendix - Box details (DU)

    No. SNS CODE Description Specification Unit QTY REMARKS

    23EB80-

    09383ATNC STRAIGHT CABLE PLUG 50, 11_TNC-50-7-18/133_NE EA 1 Box 3

    24EB80-

    09401AOPTICAL PATCH CODE LC/UPC to LC/UPC, INDOOR DUPLEX, L M L Box 4

    25EB80-

    09391AGPS CABLE LMR400, 50, L M L

    Box 5

    26EB80-

    09392AGPS ARRESTER 50, 800 ~ 2500Mhz, N-Fe to N-Fe, EA 1

    27EB80-

    09382AN STRAIGHT CABLE PLUG 50, 11_N-50-7-82/133_NE EA 1

    28EB80-

    09381AGPS CABLE ASS`Y ENVIROFLEX_316_D, N(M) to SMA(M), 1000mm SET 1

    29EB80-

    NAME PLATE 80x25x0.2t SET 2

    IM materials

    29EB80-

    09359ANAME PLATE 80x25x0.2t SET 2

    30EB80-

    09396AGPS ANTENNA

    GA-1575(CR), 1575.42 1 MHz, > 41 dBic, 25 mA (Max.), 1 x TNC

    FemaleEA 1 Box 6

    31EB80-

    09395AGPS PIPE SUS400, BAR: 6Tx50x400 SET 1

    Box 7

    32EB80-

    09371AGPS FIXING(UNIVERSAL) GPS FIXING (UNIVERSAL) SET 1

  • 5. Appendix - Box details (DU)

    CDU Master KitTotal Boxes 7nos.Total Boxes 7nos.

    CDU Box 1 & 2 CDU Box 3,4, 5, 6, 7

    1111 2222

    3333 44445555

    66667777

    GPSGPSGPSGPS

  • 5. Appendix - Box details (DU)

    CDU BOX 1

    RUBBER TAPE, VINYL TAPE,WEATHER RESISTANT CABLE TIE F-GV CABLE

    CDU BOX 2

    PRESSURE TERMINAL(2HOLE)PRESSURE TERMINAL(2HOLE) BRASS BOLTBRASS NUTPLAIN WASHER(BRASS)PLAIN WASHER(BRASS)SPRING WASHER(BRASS)HEAT SHRINK TUBEF-GV CABLEPRESSURE TERMINAL

    CDU BOX 3

    TNC STRAIGHT CABLE

    CDU BOX 4

    OPTICAL PATCH CORD PRESSURE TERMINAL

    PRESSURE TERMINAL(2HOLE) BRASS BOLTBRASS NUTPLAIN WASHER(BRASS)SPRING WASHER(BRASS)PLAIN WASHER(BRASS)HEAT SHRINK TUBE

    CDU BOX 6

    GPS ANTENNA

    CDU BOX 7

    GPS PIPEGPS FIXING(UNIVERSAL)CDU BOX 5

    GPS cable, GPS arrestor, CNT-400, GPS assembly

  • 5. Appendix - Box details (RRU)

    IM materialsNo. SNS CODE Description Specification Unit QTY

    REMARK

    S

    1 EB80-09384A INTERFACE CABLE LC/UPC(Tx), LC/APC(RX) -> LC/APC(RX),LC/UPC(TX), L( ..) SET 3 * L

    1 - 12 EB80-09380A 1/2" JUMPER CABLE 2m, DIN to N, Sucofeed 1/2"F,Macromelt,cap EA 12

    3 EB80-09368A BUTYL TAPE synthetic resin,40 X 3T,Distance : 0.5M EA 12

    4 NEW CODEUNIT MOUNTING

    BRACKET(WALL TYPE)

    hot rolled carbon steel T4.0,Bracket (341x135x72),Bakelite

    (135x24x5t),Bushing (M8),Washer(M8),HexSET 3 1 - 2

    5 EB80-09386A F-GV CABLE F-GV CABLE 6

    x 1C Green M 3 * L

    6 EB80-09378A PRESSURE TERMINAL(2HOLE) 6SQ,DIST:16mm, :6.3mm EA 3

    7 EB80-09362A PRESSURE TERMINAL(2HOLE) COPPER PIPE,6SQ,D2:6.3, S:45, W:9.8, T:1.8, A:84 EA 3

    8 EB80-09352A BRASS BOLT M6, B:20L EA 6

    4

    8 EB80-09352A BRASS BOLT M6, B:20L EA 6

    9 EB80-09353A BRASS NUT M6, C:11.5 EA 6

    10 EB80-09360A PLAIN WASHER(BRASS) d : 6.3, D:11.5 EA 12

    11 EB80-09367A SPRING WASHER(BRASS) d : 6.3, D:12.1 EA 12

    12 EB80-09361A PLAIN WASHER(BRASS) d : 8.4, D:16.9 EA 12

    13 EB80-09354A HEAT SHRINK TUBE D:12mm, L:1000(GREEN) M 0.3

  • 5. Appendix - Box details (RRU)

    IM materialsNo. SNS CODE Description Specification Unit QTY

    REMARK

    S

    14 EB80-09364A PRESSURE TERMINAL(RING TYPE) 6SQ, d2:4.4mm, d1:3.5mm, L:19.7mm EA 6

    4

    15 EB80-09356A HEAT SHRINK TUBE D:6mm, L:1000mm(BLUE) M 0.3

    16 EB80-09355A HEAT SHRINK TUBE D:6mm, L:1000mm(RED) M 0.3

    17 EB80-09359A NAME PLATE 80x25x0.2t SET 12

    18 EB80-09357A HEATING TUBE D:31mm, L:1000, BLACK M 2.4

    19 EB80-09358A HEATING TUBE D:41mm, L:1000, BLACK M 2.4

    20 EB80-09370A VINYL TAPE H0.125mm x D19mm x L 8m BLACK EA 1

    21 EB80-09375A VINYL TAPE H0.125mm x D19mm x L 20m YEOLLOW EA 1

    22 EB80-09373A VINYL TAPE H0.125mm x D19mm x L 20m RED EA 1

    23 EB80-09374A VINYL TAPE H0.125mm x D19mm x L 20m BLUE EA 1

    24 EB80-09372A VINYL TAPE H0.125mm x D19mm x L 15m GREEN EA 1

    25 EB80-09377A WEATHER RESISTANT CABLE TIENylon 66(Carbo A),CV 100W, L:315, W:4.8, MAX.DIA:86, Tensle Strenght

    55KG,CV150W~CV300WPA 1

    26 EB80-09369A RUBBER TAPE H0.8mm x D19mm x L 10m BLACK EA 1

  • 5. Appendix - Box details (RRU)

    RRU Master KitTotal Boxes 4nos.

    4444

    1111

    2222

    33334444

    Boxes 1, 2 & 3 are for 3 Boxes 1, 2 & 3 are for 3 Boxes 1, 2 & 3 are for 3 Boxes 1, 2 & 3 are for 3 RRUs & box 4 is common RRUs & box 4 is common RRUs & box 4 is common RRUs & box 4 is common for all the RRUsfor all the RRUsfor all the RRUsfor all the RRUs

  • 5. Appendix - Box details (RRU)

    1111----1111 1111----2222

    RRU Box 1-2

    UNIT MOUNTING BRACKET(WALL TYPE)RRU Box 1-1

    INTERFACE CABLE1/2" JUMPER CABLEPUTYL TAPE

  • 5. Appendix - Box details (RRU)

    RRU Box 4

    F-GV CABLE

    PRESSURE TERMINAL(2HOLE)

    PRESSURE TERMINAL(2HOLE)

    BRASS BOLT

    BRASS NUT

    PLAIN WASHER(BRASS)

    SPRING WASHER(BRASS)

    PLAIN WASHER(BRASS)

    HEAT SHRINK TUBE

    PRESSURE TERMINAL(RING TYPE)

    HEAT SHRINK TUBE

    HEAT SHRINK TUBEHEAT SHRINK TUBE

    NAME PLATE

    HEATING TUBE

    HEATING TUBE

    VINYL TAPE

    VINYL TAPE

    VINYL TAPE

    VINYL TAPE

    VINYL TAPE

    WEATHER RESISTANT CABLE TIE

    RUBBER TAPE

  • Part II: Installation

  • Pre-Requisites: Safety First

    Post warningwarningwarningwarning signssignssignssigns in areas where high-voltage cables are installed Post offoffoffoff limitlimitlimitlimit signssignssignssigns in areas where accidents are most expected. With guardrails or fences, blockblockblockblock openopenopenopen areasareasareasareas such as connecting

    parts, roof, and scaffold Make sure to wear protectiveprotectiveprotectiveprotective gear gear gear gear such as gloves, shoes, harness,

    etc. Do not wear metal objects Do not wear metal objects Do not wear metal objects Do not wear metal objects such as Watch, Ring, Etc. Do not look into the optical cablesDo not look into the optical cablesDo not look into the optical cablesDo not look into the optical cables as the laser beams are harmful Do not look into the optical cablesDo not look into the optical cablesDo not look into the optical cablesDo not look into the optical cables as the laser beams are harmful

    for the eyes.

  • Pre-requisites for Installation

    The system DC power must be switched off before installation

    Check that you have

    Site information (address, key access, contact person, etc.)

    All required tools for installation (especially torque driver & hexagonal

    crimping tool)

    Approved RFE1 Checklist

    Check if TGB is installed or not, if not report to the Samsung

    Check site environment

    Power supply check

    Feasibility of installation

  • Installation Work Flow

  • Installation Tool list

  • Installation Tool list

  • System Cable Diagram

    [IGB]

  • Part II: InstallationPart II: Installation

    B) Installation of CDU

  • CDU Specs

  • CDU Specs (2)

  • CDU Views

    UAMA Card

    L9CA Card

    Fan

  • Steps in CDU Installation

    CDU Mounting

    Roxtec Arrangement

    GroundingGrounding

    Power connection

    Backhaul connection

  • ODC Layout

    CDU Position

    2-Door ODC: 35, 36

    3-Door ODC: 29, 30

  • CDU Mounting: Horizontal

  • Horizontal CDU Installation: Front View

  • CDU Mounting: Vertical Vertical Vertical Vertical

    Air OUT Top

    [D

    [D[D

    [D-

    --

    -01]

    01] 01]

    01] SEMS

    Vertical fixation for CDU system

    Air flow should be in

    this direction for

    vertical installation

    Air IN Bottom

    NOTE : When the CDU system is fixed vertically, it should be placed after consideration for air flow.

    * M6 SEMS Torque : 33.28~44.92 kgf.cm

  • Vertical CDU Installation: Front View

  • Steps in CDU Installation

    Mounting the CDU

    Roxtec Arrangement

    GroundingGrounding

    Power connection

    Backhaul connection

  • Roxtec Configuration

    Original Shape Final Shape

    No air-gaps

    between

    Roxtec

    gland strips

  • Steps in CDU Installation

    Mounting the CDU

    Roxtec arrangement

    Grounding

    Power connection

    Backhaul connection

  • CDU Grounding: High Level View

    Prepare ground cable

    Connect to CDU rear side

    [MGB]/[IGB]

    CDU Rear View

    Connect to MGB (IGB)

    [D

    [D[D

    [D-

    --

    -02]

    02] 02]

    02] Ground Cable

  • Pressure Terminal for Grounding : 2-Hole

    Single hole pressure terminal is official for the earth cable connection.

    In case of 2-hole pressure terminal material in the IM kit box, connect as below picture.

  • CDU Grounding: Preparing the Grounding Cable

    Video link

  • CDU Grounding: Connecting to CDU

    Connecting to CDU system

    CDU Rear Side

    Heat Shrink Tube

    [D

    [D[D

    [D-

    --

    -10]

    10] 10]

    10]

    Ground Cable

    [D

    [D[D

    [D-

    --

    -02]

    02] 02]

    02]

    Pressure Terminal

    [D

    [D[D

    [D-

    --

    -03]

    03] 03]

    03]

    Connect the 4 pressure terminal and

    the heat shrink tube at the end of the

    ground cable.

    [Pressure terminal]

    4, 2 holes, hole diameter: 6.3mm,

    hole gap 16mm

    SEMS(M5x15L)

    * The screw is included in CDU

    hole gap 16mm

    Align the pressure terminal connected on

    the CDU-side ground cable to the ground

    terminal mounting hole on the rear side of

    the CDU and fix it with the M5 SEMS.

    * M5 SEMS Torque : 20~30 kgf.cm

  • CDU Grounding: Connecting to MGB

    MGB Connecting

    * M6 Brass Bolt/Nut Torque: 29.98kgf.cm (Tolerance +-10%)

  • Steps in CDU Installation

    Mounting the CDU

    Roxtec arrangement

    Grounding

    Power connection

    Backhaul connection

  • CDU DC Power Connection: High-level view

    Prepare Power cables

    Connect to DCDB

    Connect power cable to CDU with assembled side facing CDU

  • CDU Power Connection: Connecting to DCDB

    Connecting to DCDB

    [D-23] [D-22]

    Heat Shrink Tube

    [CDU] [DCDB]

    [D-20]

    DC Power Cable Assembly

    Heat Shrink

    Tube

    Heat Shrink TubeHeat Shrink Tube

  • CDU Power Connection: DCDB end

    [D

    [D[D

    [D-

    --

    -20]

    20] 20]

    20]

    DC Power Cable Assembly

    to CDU

    Delta DCDB

    Delta DCDBDelta DCDB

    Delta DCDB

    (4CL/8NCL)

    (4CL/8NCL)(4CL/8NCL)

    (4CL/8NCL)

    GE DCDB

    GE DCDBGE DCDB

    GE DCDB

    (4CL/8NCL)

    (4CL/8NCL)(4CL/8NCL)

    (4CL/8NCL)

    Emerson DCDB

    Emerson DCDBEmerson DCDB

    Emerson DCDB

    (4CL/8NCL)

    (4CL/8NCL)(4CL/8NCL)

    (4CL/8NCL)

    RTN Bar(Red)

    CB(Blue)

    CB(Blue)

    RTN Bar(Red)

    [DCDB][DCDB][DCDB][DCDB](Note)

    (Note) (Note)

    (Note)

    Do not remove common cable.

    Do not remove common cable.Do not remove common cable.

    Do not remove common cable.

    -

    --

    -48V cable(black/blue shrink) should be installed with Common cable.

    48V cable(black/blue shrink) should be installed with Common cable.48V cable(black/blue shrink) should be installed with Common cable.

    48V cable(black/blue shrink) should be installed with Common cable.

    CB(Blue)RTN Bar(Red)

  • CDU Power Connection: DCDB end

    [DCDB Side] I[DCDB Side] I[DCDB Side] I[DCDB Side] Installation for DC Power Cablenstallation for DC Power Cablenstallation for DC Power Cablenstallation for DC Power Cable

    To -48[V] Circuit Breaker

    Power Cable(AWG 12, UL 1015-LF 2.5mm2 x 2C)

    Power Cable(AWG 12, UL 1015-LF 2.5mm2 x 2C)

    200mm

    To RTN (GND Port)

    To -48[V] Circuit Breaker

    To RTN (GND Port)

    Power Cable(AWG 12, UL 1015-LF 2.5mm2 x 2C)

    12 mm 200mm

    Power Cable(AWG 12, UL 1015-LF 2.5mm2 x 2C)

    To RTN (GND Port)

    To -48[V] Circuit Breaker

  • CDU Power Connection: DCDB end

    Can use two 10A (1

    CDU, 1 RRU) and two

    25A MCBs (2 RRUs)

    available IIIInstallation for DCDBnstallation for DCDBnstallation for DCDBnstallation for DCDBCritical Non - Critical

    The capacity of circuit breaker is

    The capacity of circuit breaker is The capacity of circuit breaker is

    The capacity of circuit breaker is

    required as below.

    required as below.required as below.

    required as below.

    -

    --

    - CDU : 16 [A]

    CDU : 16 [A] CDU : 16 [A]

    CDU : 16 [A]

    -

    --

    - Each RRU :

    Each RRU : Each RRU :

    Each RRU : 16[A]

    16[A]16[A]

    16[A]

    CDU

    RRU#0

    RRU#1

    RRU#2

    MAIN

  • CDU Power Connection: Connecting to CDU

    Connecting to CDU system

    Power Cable Connector

    SPD

    M6 SEMS

    Connect the power connector

    (combination D-sub connector)

    assembled on the cable to the

    power input connector on the

    front left of the CDU.

    Connect the power cable M6 SEMS

    [D

    [D[D

    [D-

    --

    -20]

    20] 20]

    20]

    DC Power Cable

    Assembly

    Connect the power cable

    assembly to the power connector

    with the correct polarity (RTN, -

    48V).

    Heat shrink tube color:

    RTN_red/-48V_blue.

    * M6 SEMS Torque : 33.28~49.92 kgf.cm

    * M6 SEMS Torque : 33.28~49.92 kgf.cm * M6 SEMS Torque : 33.28~49.92 kgf.cm

    * M6 SEMS Torque : 33.28~49.92 kgf.cm

  • Steps in CDU Installation

    Mounting the CDU

    Roxtec Arrangement

    Grounding

    Power connection

    Backhaul connection

  • CDU Backhaul Connection: CDU endIf Black multi-mode SFP is found, please return it to Samsung

    contact person after replacing it with Blue single-mode SFP

    Connecting to backhaul cable (Optic)Connect the backhaul cable (optic-

    single mode) from the

    switch/router to BH2 and BH3 ports

    of the CDU UAMA board.

    General Case : Optic single cable

    Connect the CDU-side connectors

    (LC/UPC) of the cable to the BH2

    and BH3 ports of the CDU UAMA

    board.

    SFP module should be Blue for single-mode fiber. If it is Black, it is

    for multi-mode fiber and will NOT work (there are 700 CDUs with

    multi-mode SFP)

  • Part II: InstallationPart II: Installation

    C) Installation of CSS

  • CSS Installation Materials

  • CSS Specs

  • CSS Front View & Ports

    Front View

  • Steps in CSS Installation

    CSS Mounting

    CSS CSS Grounding

    CSS Power connection

  • Attaching the CSS Rack-mounting brackets

  • Mounting the CSS on Rack

  • Steps in CSS Installation

    CSS Mounting

    CSS CSS Grounding

    CSS Power connection

  • CSS Grounding

    To IGB

  • CSS Grounding: Preparing Ground wire

  • Steps in CSS Installation

    CSS Mounting

    CSS CSS Grounding

    CSS Power connection

  • CSS Power Connection

    Two 3-pin

    power

    cables. Use cables. Use

    two 16A

    MCBs.

  • Warnings!

  • CDU Backhaul Connection: CSS end

    Use port 9x

    at the CSS

    CSS

    Use port

    BH2 at the

    CDU

    CDU

  • Part II: InstallationD) Installation of GPS

  • Steps in GPS Installation

    Preparing GPS Connector

    Installation of GPS Arrestor

    Installation of GPS Antenna

    Connecting the GPS

  • GPS Connection: High-level view

    [D

    [D[D

    [D-

    --

    -11] ~ [D19]

    11] ~ [D19]11] ~ [D19]

    11] ~ [D19]

    Connection of

    Connection of Connection of

    Connection of GPS Ground Cable

    [MGB]

    [D

    [D[D

    [D-

    --

    -25]

    25] 25]

    25] GPS Antenna

    [D

    [D[D

    [D-

    --

    -30]

    30] 30]

    30] RG-316D Cable-1

    [D

    [D[D

    [D-

    --

    -27]

    27] 27]

    27] GPS Cable(CNT-400)[D

    [D[D

    [D-

    --

    -28]

    28] 28]

    28] GPS Arrestor

    N-MaleTNC-Male

  • H&S Connector SpecsH&S Connector SpecsH&S Connector SpecsH&S Connector Specs

  • H&S NH&S NH&S NH&S N----Type Connector: Assembly ProcedureType Connector: Assembly ProcedureType Connector: Assembly ProcedureType Connector: Assembly Procedure

  • H&S N-Type Connector: Assembly Procedure (2)

  • H&S N-Type Connector

  • H&S N-Type Connector: Assembly Procedure

  • H&S N-Type Connector: Assembly Procedure (2)

  • GPS Connection: Preparing GPS Connector

  • GPS Connection: Preparing GPS Connector

  • GPS Connection: Preparing GPS Connector Video

  • Steps in GPS Installation

    Preparing GPS Connector

    Installation of GPS Arrestor

    Installation of GPS Antenna

    Connecting the GPS

  • GPS Connection: Installing GPS Arrestor

    Installation for GPS ArrestorInstallation for GPS ArrestorInstallation for GPS ArrestorInstallation for GPS Arrestor[D

    [D[D

    [D-

    --

    -28]

    28] 28]

    28]

    GPS ArrestorGPS Cable(CNT-400)

    [D

    [D[D

    [D-

    --

    -27]

    27] 27]

    27]

    [D

    [D[D

    [D-

    --

    -12]

    12]12]

    12]

    Pressure Terminal

    N-Male Connector

    [D

    [D[D

    [D-

    --

    -30]

    30] 30]

    30]

    RG-316D Cable-1

    GPS Arrestor Grounding

    GPS Arrestor GroundingGPS Arrestor Grounding

    GPS Arrestor Grounding

    GPS Arrestor to GPS

    GPS Arrestor to GPS GPS Arrestor to GPS

    GPS Arrestor to GPS

    Antenna (CNT

    Antenna (CNTAntenna (CNT

    Antenna (CNT-

    --

    -400)

    400)400)

    400)

    GPS Arrestor to CDU

    GPS Arrestor to CDU GPS Arrestor to CDU

    GPS Arrestor to CDU

    (RG

    (RG(RG

    (RG-

    --

    -316D)

    316D)316D)

    316D)

  • GPS Connection: Installing GPS Arrestor

    GPS Arrestor position will be different for 2-door & 3-door ODC.

  • Steps in GPS Installation

    Preparing GPS Connector

    Installation of GPS Arrestor

    Installation of GPS Antenna

    Connecting the GPS

  • Installation point of GPS antenna can be classified

    into top and bottom point. It is recommended that

    GPS antenna is installed at top point of RF antenna.

    RF Antenna

    GPS Antenna

    RF Antenna center axis

    Not allowed area for GPS Antenna

    XX Case#Case#Case#Case#1111)))) MountMountMountMount onononon thethethethe toptoptoptop positionpositionpositionposition ofofofof RFRFRFRF antennaantennaantennaantenna

    1) GPS antenna should be installed higher than the RF antenna.

    It should have sky clearance

    2) GPS antenna should be behind the RF antenna at >110

    degrees from main lobe axis in the horizontal plane

    [Top View]

    [Top View][Top View]

    [Top View]

    GPS AntennaRRU

    RF Antenna

    GPS Antenna Installation(1)

    Note : It is prohibited to installation of GPS antenna on the back side of RF antenna.

    3) It should be installed within protection angle of the lightning

    protection umbrella.

    4) Minimum distance between RF antenna top point

    and GPS antenna head should be 500mm

    5) It is recommended that GPS antenna be installed in the south

    direction so that the GPS is located on the back side of

    the structure (i.e. RTT, GBT)

    RF Antenna center axis

    Available area of GPS Antenna

  • [Less than 30M ][Less than 30M ][Less than 30M ][Less than 30M ]Lightning Rod

    45

    45

    23 23

    [More than 30M ][More than 30M ][More than 30M ][More than 30M ]

    In case the height of structure is more than 30M from the ground, lightning-protection umbrella angle should be

    23 degrees.

    (If it is difficult to satisfy the above conditions, lightning arrestor installation angle should be set to the nearest value such that all equipments are covered under the lightning protection umbrella.)

    GPS Antenna Installation(1)

    RF Antenna

    RRU

    GPS Antenna

    M

    i

    n

    i

    m

    u

    m

    5

    0

    0

    m

    m

    RF Antenna

    RRU

    GPS Antenna

    M

    i

    n

    i

    m

    u

    m

    5

    0

    0

    m

    m

  • [Top View]

    [Top View][Top View]

    [Top View]

    GPS Antenna

    RRU

    RF Antenna GPS Antenna

    RF Antenna center axis

    Not allowed area for GPS Antenna

    XX Case#2) Mount on the bottom position

    of RF antenna

    1) GPS antenna should be installed higher than the

    RF antenna. It should have sky clearance

    2) GPS antenna should be behind the RF antenna at

    >110 degrees from main lobe axis in the horizontal

    plane

    GPS Antenna Installation(2)

    [Top View]

    [Top View][Top View]

    [Top View]

    RRU

    RF Antenna

    Note : It is prohibited to installation of GPS antenna on the back side of RF antenna.

    RF Antenna center axisAvailable area of GPS Antenna

    3) It should be installed within protection angle of

    the lightning protection umbrella.

    4) Minimum distance between RF antenna bottom

    point and GPS antenna head should be 2m

    5) It is recommended that the GPS antenna be

    installed in the south direction so that the GPS is

    located on the back side of the structure (RTT,

    GBT, etc.)

  • [Less that 30M ]

    [Less that 30M ][Less that 30M ]

    [Less that 30M ]

    RF Antenna

    RRU

    Lightning Rod

    45 45

    RF AntennaRRU

    23 23

    [More than 30M]

    [More than 30M][More than 30M]

    [More than 30M]

    GPS Antenna Installation(2)

    M

    i

    n

    i

    m

    u

    m

    2

    M

    GPS Antenna GPS Antenna

    M

    i

    n

    i

    m

    u

    m

    2

    M

    In case the height of structure is more than 30M from the ground, lightning-protection umbrella angle

    should be 23 degrees.(If it is difficult to satisfy the above conditions, lightning arrestor installation

    angle should be set to the nearest value such that all equipments are covered under the lightning

    protection umbrella.)

  • GPS Connection: Installing GPS Antenna

    TNC-Female

    Clamp Fixing Screw

    Insulator

    Clamp

    Heat Shrink Tube(Jelly Type)

    [D

    [D[D

    [D-

    --

    -25]

    25] 25]

    25] GPS Antenna

    [D

    [D[D

    [D-

    --

    -26]

    26] 26]

    26] TNC-Male Connector

    [D

    [D[D

    [D-

    --

    -27]

    27] 27]

    27] GPS Cable(CNT-400)

    Installation for GPS AntennaInstallation for GPS AntennaInstallation for GPS AntennaInstallation for GPS Antenna

    More than 200 mm

    GPS Fixing Pipe

    Binder CableInsulator

    CNT

    CNTCNT

    CNT-

    --

    -400 Cable

    400 Cable400 Cable

    400 Cable(GPS Arrestor ~ GPS Antenna)

    (GPS Arrestor ~ GPS Antenna)(GPS Arrestor ~ GPS Antenna)

    (GPS Arrestor ~ GPS Antenna)

    (Without Amplifier: Max. 100 m/With Amplifier: Max. 200 m)

    (Without Amplifier: Max. 100 m/With Amplifier: Max. 200 m)(Without Amplifier: Max. 100 m/With Amplifier: Max. 200 m)

    (Without Amplifier: Max. 100 m/With Amplifier: Max. 200 m)

    GPS Fixing Pipe

    * SMA

    * SMA* SMA

    * SMA-

    --

    -Male Connector Torque : 2.5 kgf.cm

    Male Connector Torque : 2.5 kgf.cmMale Connector Torque : 2.5 kgf.cm

    Male Connector Torque : 2.5 kgf.cm

    * N

    * N* N

    * N-

    --

    -Male Connector Torque

    Male Connector Torque Male Connector Torque

    Male Connector Torque : 20 kgf.cm

    : 20 kgf.cm: 20 kgf.cm

    : 20 kgf.cm

    * TNC

    * TNC* TNC

    * TNC-

    --

    -Male Connector Torque

    Male Connector TorqueMale Connector Torque

    Male Connector Torque : 9 kgf.cm

    : 9 kgf.cm: 9 kgf.cm

    : 9 kgf.cm

    (Tolerance

    (Tolerance (Tolerance

    (Tolerance

    10%)

    10%)10%)

    10%)

    Two types of GPS antennas as below can be used.

    Two types of GPS antennas as below can be used.Two types of GPS antennas as below can be used.

    Two types of GPS antennas as below can be used.

    [D

    [D[D

    [D-

    --

    -25]

    25]25]

    25]

    GA

    GAGA

    GA-

    --

    -1575CR

    1575CR1575CR

    1575CR

    (Cone Type)

    (Cone Type)(Cone Type)

    (Cone Type)

    [D

    [D[D

    [D-

    --

    -25a]

    25a]25a]

    25a]

    GA

    GAGA

    GA-

    --

    -1575

    15751575

    1575

    (Dome Type)

    (Dome Type)(Dome Type)

    (Dome Type)

    [GPS cable with banding loss]

    [GPS cable with banding loss][GPS cable with banding loss]

    [GPS cable with banding loss]

    [D

    [D[D

    [D-

    --

    -27]

    27] 27]

    27]

    GPS Cable(CNT-400)

    Binder Cable

  • Steps in GPS Installation

    Preparing GPS Connector

    Installation of GPS Arrestor

    Installation of GPS Antenna

    Connecting the GPS

  • GPS Connection: Installing GPS Antenna

    SMA-Female

    Connection of GPS Assembly Connection of GPS Assembly Connection of GPS Assembly Connection of GPS Assembly

    SMA-Female

    SMA-Male

    [D

    [D[D

    [D-

    --

    -30]

    30] 30]

    30]

    RG-316D Cable-1

  • Part II: InstallationE) Labeling & Tagging: CDU, GPS, CSS

  • 15mm15mm

    CDU to DCDB/ RJIL

    ( )

    30mm 30mm30mm

    CDU to DCDB/ RJIL

    ( )

    DCDB to CDU/ RJIL

    ( )

    DCDB to CDU/ RJIL

    ( )

    CDU to CSS/ RJIL

    ( )CDU to CSS/ RJIL

    30mm 30mm30mm

    Cable wrap space

    Cable wrap spaceCable wrap space

    Cable wrap space

    CSS to CDU/ RJIL

    ( )

    CSS to CDU/ RJIL

    ( )

    CDU 9mm

    12mm

    12mm12mm

    12mm

    180mm

    Folding point

    Cable wrap space

    Cable wrap spaceCable wrap space

    Cable wrap space

    MCB label & Cable label in ODC

    5mm

    10mm

    15mm15mm

    RRU-1

    RRU-2

    ( )CDU to CSS/ RJIL

    ( )

    CDU to Arrestor/ RJIL

    ( )CDU to Arrestor/ RJIL

    ( )

    Arrestor to CDU/ RJIL

    ( )

    Cable

    Cable Cable

    Cable

    wrap

    wrap wrap

    wrap

    space

    spacespace

    space

    Folding point

    30mm 30mm

    ( )( )

    30mm 30mm

    CDU

    RRU-0

    15mm

    9mm

    Arrestor to CDU/ RJIL

    ( )

    75mm 75mm

    9mm

    9mm

    9mm

    15mm

    Cable

    Cable Cable

    Cable

    wrap

    wrap wrap

    wrap

    space

    spacespace

    space

  • CDU Backhaul & GPS Labeling

    Cable Name Labeling Point Quantity (each)

    DC Power cableCDU DC Power 1

    DCDB 1

    Backhaul cableCSS side end 1

    CDU side end 1

    GPS Cable (RG-316D)CDU GPS Port 1

    GPS Arrestor 1

    [CDU DC power]

    [CDU DC power][CDU DC power]

    [CDU DC power]

    CDU Power Side

    CDU Power SideCDU Power Side

    CDU Power Side CDU to DCDB / RJIL CDU to DCDB / RJIL

    DCDB to CDU / RJIL CDU to DCDB / RJIL

    [Label folding point]

    [Backhaul]

    [Backhaul][Backhaul]

    [Backhaul]

    CDU Side

    CDU SideCDU Side

    CDU Side

    [GPS]

    [GPS][GPS]

    [GPS]

    GPS Cable

    GPS CableGPS Cable

    GPS Cable

    [Backhaul]

    [Backhaul][Backhaul]

    [Backhaul]

    Cisco Switch Side

    Cisco Switch SideCisco Switch Side

    Cisco Switch Side

    CDU to CSS / RJIL CDU to CSS / RJIL

    CSS to CDU / RJIL CSS to CDU / RJIL

    CDU to Arrestor / RJIL CDU to Arrestor / RJIL

    DCDB to CDU / RJIL CDU to DCDB / RJIL

    Arrestor to CDU / RJIL Arrestor to CDU / RJIL

  • CDU Ground Cable Tagging

    Cable name Color CodeTagging

    Plan

    CDU Ground Black Two StringGPS(Arrestor) Ground

    GPS(Arrestor) GroundGPS(Arrestor) Ground

    GPS(Arrestor) Ground

    GPS Ground(Arrestor)

    Black Three String

    CDU Ground

    CDU GroundCDU Ground

    CDU Ground

  • DCDB Labeling

    Category Type Sector Label Title

    CDUCritical

    - CDU

    RRU

    Alpha RRU-0

    Non Critical

    Beta RRU-1

    Gamma RRU-2

    CDU RRU-0RRU-1 RRU-2

  • Part II: InstallationPart II: Installation

    F) Installation of RRU

  • RRU Topics

    RRU Specifications

    RRU Views

    RRU External Interfaces

    Installation Pre-requisites

    Installation Tools

    Installing System RRU Installing System RRU

    Cabling Work Flow Grounding

    Power

    External Interfaces

  • RRU Remote Radio Unit Specs

    Air Specification : TD-LTE

    Operating Frequency: 2300~2400 MHz

    Channel Bandwidth: 20 MHz

    RF Power per Sector: 40 W (4Tx Path)

    Interface between CDU and RRU Interface: CPRI

    Holdover: 24 hours

    Rated Voltage: -48 V DC (Tolerance: -40~-57 V)

    Rated Current: - Max. current in transmission

    period: 7.3 A @ -48 V DC

    Unit Size (mm): 340(W) 106(D) 425(H) Weight (kg, Max.): 14

    Temperature Condition): -10~50 C Dust and waterproof rating: IP65

  • RRU Views

    * All units are in mm

  • RRU External Interfaces

  • RRU External Interfaces

  • Remote Radio Unit Installation

    Pre-requisites

  • RRU Mount Types

    RRU

    Pole Wall Pole Mount

    U ClampUniversal

    Clamp

    Wall Mount

  • RRU Installation

    RRU Installation using U-Clamp Type

  • Parts/Tools required for U-type Installation

  • Steps for RRU Installation

    Step 1: Check the distance between CDU and RRU for CPRI

    cable installation.

    Step 2: Before placing the system, mark the position where the system will be

    installed and also the positions where anchor bolts will be fixed

    using an ink line or a pen.

  • Assembling the Pole Mounting Bracket for U-type

    Step 3Step 3Step 3Step 3: Fix the pole mounting bracket to the pole as shown below:

  • Fixing Unit Mounting Bracket to RRU_U-Clamp Type

    Step 4: Fix the unit mounting bracket to the RRU as shown below:

  • Fixing Unit Mounting Bracket to RRU_U-Clamp Type

    Using the bakelites and fasteners, fix RRU and the unit mounting bracket together.

  • Fixing RRU to Pole

    Step 5: Fix the unit mounting bracket that is fixed to RRU to the pole mounting bracket as follows:a. Hang the hook of the unit mounting bracket over the hook

    groove of the pole mounting bracket

  • Fixing RRU to Pole

    b. Using the fasteners, fix firmly unit mounting bracket and the pole mounting bracket together.

  • Fixing RRU to Pole

    Fasteners

  • RRU Mount Types

    RRU

    Pole Wall Pole Mount

    U ClampUniversal

    Clamp

    Wall Mount

  • RRU Universal Bracket Mounting High Level

    [R

    [R[R

    [R-

    --

    -02]

    02] 02]

    02]

    Pole Mount Bracket

    Assembly (Universal Bracket)

    [R

    [R[R

    [R-

    --

    -01]

    01] 01]

    01]

    Unit Mounting Bracket Assembly

    *

    * *

    * M8 Hex. Bolt/Nut Torque

    M8 Hex. Bolt/Nut Torque M8 Hex. Bolt/Nut Torque

    M8 Hex. Bolt/Nut Torque : 122 kgf.cm

    : 122 kgf.cm: 122 kgf.cm

    : 122 kgf.cm (Tolerance

    10%)* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm

    * M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm

    * M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm

  • RRU Universal Bracket Mounting

    UUUUnit Mountnit Mountnit Mountnit Mounting ing ing ing Bracket(Universal Bracket)Bracket(Universal Bracket)Bracket(Universal Bracket)Bracket(Universal Bracket) FixationFixationFixationFixation M8 Insulation BushingM8 Plain WasherM8 Spring WasherM8 Hex. Nut

    [R

    [R[R

    [R-

    --

    -02]

    02] 02]

    02] Universal Mount Bracket Assembly [R[R[R[R----01] 01] 01] 01] Unit Mounting Bracket Assembly

    M12 Stud BoltM12 Plain WasherM12 Spring WasherM12 Hex. Nut

    M12 Plain WasherM12 Spring WasherM12 Hex. Nut

  • RRU Universal Bracket Mounting

    Installation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyM12 Hex. BoltM12 Plain Washer

    Note: Use proper torque while mounting universal bracket on the

    pole. Excessive force may cause bending of the bracket check

    side view of bracket to make sure it is not bent

    Pole Mounting Bracket hook

    Unit Mounting Bracket Hook M12 Hex. Nut

    M12 Spring WasherM12 Plain Washer

  • Advantage of Universal Bracket: Angular Pole

    NOTE: Universal Bracket can be used at the angular as well as the tubular pole.

  • RRU Mount Types

    RRU

    Pole Wall Pole Mount

    U ClampUniversal

    Clamp

    Wall Mount

  • RRU Installation Steps

    [R

    [R[R

    [R-

    --

    -01]

    01] 01]

    01]

    Unit Mounting Bracket Assembly

    [R

    [R[R

    [R-

    --

    -02b]

    02b] 02b]

    02b]

    Unit Mounting Bracket

    (Wall Type)

    * M8 Hex. Bolt/Nut Torque

    * M8 Hex. Bolt/Nut Torque * M8 Hex. Bolt/Nut Torque

    * M8 Hex. Bolt/Nut Torque : 122 kgf.cm

    : 122 kgf.cm: 122 kgf.cm

    : 122 kgf.cm (Tolerance

    (Tolerance (Tolerance

    (Tolerance

    10%)

    10%)10%)

    10%)

    * M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm

    * M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm

    * M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm

  • RRU Installation Steps

    Unit Mounting Bracket(Wall Type) Unit Mounting Bracket(Wall Type) Unit Mounting Bracket(Wall Type) Unit Mounting Bracket(Wall Type) FixationFixationFixationFixation

    7

    0

    m

    m

    Drill bit : 17mm

    Drill bit : 17mmDrill bit : 17mm

    Drill bit : 17mm

    Anchor Bolt

    Hole(14)

    198mm

    M12 Washer(Plain, Spring)

    M12 Strong Anchor

    Drill bit : 17mm

    Drill bit : 17mmDrill bit : 17mm

    Drill bit : 17mm

    Hole depth

    Hole depthHole depth

    Hole depth : 55mm

    : 55mm: 55mm

    : 55mm

    Marking to anchor bolt position

    Unit MountingBracket

    M12 Hex. Bolt

    [R

    [R[R

    [R-

    --

    -02b]

    02b] 02b]

    02b] U

    UU

    Unit Mounting Bracket (Wall Type)

  • RRU Installation Steps

    Unit MountingBracket Upper furrow

    M830L Hex. Bolt

    Bakelite(5T)

    Unit Mounting Bracket

    Bakelite(5T)

    Installation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket Assembly

    M8 x 30L Hex. Bolt

    M8 Plain Washer

    M8 Insulation BushingBakelite(5T)

    M8 Spring Washer

  • Work Flow for Cabling

  • RRU earth connection

    RJIL Plan1) GBM/GBT/RTT(Delta) sites: Provide TGB by RJIL2) RTP site: No TGB provide

    Lightning rodLightning rod is

    directly connected

    to the pole

    (Without Ground

    bar)

    RRU Ground

    However, some case even GBM/GBT/RTT(Delta)

    sites may not be found the TGB, then RRU ground

    cable has to be connected to OGB directly.

    If, different site condition compare to RFI report

    about TGB existence, SOLPAR should report to

    TGBOGB

    In case of no TGB on the pole or Tower

    about TGB existence, SOLPAR should report to

    Samsung . This case may not be able to install the

    ground cable due to cable shortage

  • RRU & CPRI Ground Cable Connection

    SEMS(M6x12L, 2EA)

    CPRI forPressure Terminal

    RRU Ground Cable

    RRU forPressure Terminal

    Cable Tie

    /OGB[R

    [R[R

    [R-

    --

    -03] ~ [R

    03] ~ [R03] ~ [R

    03] ~ [R-

    --

    -11]

    11] 11]

    11] Connection of

    Connection of Connection of

    Connection of Ground Cable[TGB]

    [R

    [R[R

    [R-

    --

    -03]

    03] 03]

    03] Ground Cable

    CPRI Cable[CDU][CDU][CDU][CDU]

    CPRI

    Ground

    Cable

    CPRI Ground Cable

    CPRI Ground Cable

    RRU Ground Cable

    * M6 SEMS Torque : 33.28~49.92 kgf.cm

    * M6 SEMS Torque : 33.28~49.92 kgf.cm * M6 SEMS Torque : 33.28~49.92 kgf.cm

    * M6 SEMS Torque : 33.28~49.92 kgf.cm

  • RRU Insulation Test

    [Strong Anchor fixing

    [Strong Anchor fixing[Strong Anchor fixing

    [Strong Anchor fixing Hex. Bolt]

    Hex. Bolt]Hex. Bolt]

    Hex. Bolt]

    [RRU fixing

    [RRU fixing[RRU fixing

    [RRU fixing Hex. Bolt]

    Hex. Bolt]Hex. Bolt]

    Hex. Bolt]

    [Stud

    [Stud[Stud

    [Stud Bolt]

    Bolt]Bolt]

    Bolt]

    [RRU fixing Hex. Bolt]

    [RRU fixing Hex. Bolt][RRU fixing Hex. Bolt]

    [RRU fixing Hex. Bolt]

    Indication standard :

    Indication standard : Indication standard :

    Indication standard :

    more than 500V/100M

    more than 500V/100Mmore than 500V/100M

    more than 500V/100M

    [U

    [U[U

    [U-

    --

    -Bolt]

    Bolt]Bolt]

    Bolt]

    [RRU fixing Hex. Bolt]

    [RRU fixing Hex. Bolt][RRU fixing Hex. Bolt]

    [RRU fixing Hex. Bolt]

  • Work Flow for Cabling

  • RRU Power Cabling: High-level view

    [R

    [R[R

    [R-

    --

    -16]

    16] 16]

    16]

    Heat

    Shrink

    Tube

    [R

    [R[R

    [R-

    --

    -15]

    15] 15]

    15] Heat Shrink Tube

    [DCDB][DCDB][DCDB][DCDB]

    [R

    [R[R

    [R-

    --

    -12]

    12] 12]

    12] DC Power Cable Assembly 3 RRU (1Sector / 1RRU)Heat Shrink Tube

  • RRU Power Cabling: Preparing cable

    Power Cabling & ConnectingPower Cabling & ConnectingPower Cabling & ConnectingPower Cabling & Connecting80 mm

    Power Cable(AWG8, F-CV 6mm2 x 2C)RTN

    -48V

    M

    a

    x

    .

    1

    3

    .

    5

    m

    m

    Power Cable(AWG8, F-CV 6mm2 x 2C)

    7 mm 73 mm

    Power Cable(AWG8, F-CV 6mm2 x 2C)

    15 mm11mm

    90 mm

    64mm

    [RRU]

    [R

    [R[R

    [R-

    --

    -13]

    13] 13]

    13]

    PRESSURE TERMINAL

    [R

    [R[R

    [R-

    --

    -12]

    12] 12]

    12] DC Power Cable Assembly

    Fully insert the rain-proof

    filler to the cable gland

    body, and tighten the

    cable gland nut using a

    torque wrench with torque

    value 30 kgf.cm.

    * Note: For RRU

    * Note: For RRU* Note: For RRU

    * Note: For RRU-

    --

    -DCDB connection please refer DCDB connection page

    DCDB connection please refer DCDB connection pageDCDB connection please refer DCDB connection page

    DCDB connection please refer DCDB connection page

  • After CABLE Termination length

    Power cable cover

    should be projected

    10mm from floor of

    window inside

    RTN

    RTNRTN

    RTN

    -

    --

    -48V

    48V48V

    48V

    RTN

    RTNRTN

    RTN

    -

    --

    -48V

    48V48V

    48V

    Power Gland

    Power Gland Nut

    Power Gland NutPower Gland Nut

    Power Gland Nut

    10mm

  • RRU Power Cabling: Connecting to RRU

  • RRU Power Cable > 70m: Use jumpers

    3) Jumper Cable1) Main Cable

    2) Junction under 15mm Jumper kit1. Main cable provides the

    facility with materials

    2. Junction & Jumper cable Tues

    kit code for all known materials.

    (EP96 kit code, 6 kind)

    147

    14.7 ~ 15.4mm

    60mm

    10mm

    AWG 8

    AWG 8AWG 8

    AWG 8

    100mm

    200mm 3m or 5m

  • RRU Power Cable > 70m: Cabling Process

    100mm

    200mm

    1) Main cable to the cutting 2) Main cable Main cable Main cable Main cable - cable ends and cut 15mm.

    15mm

    15mm

    3) Jumper kit Jumper kit Jumper kit Jumper kit cable ends and cut 15mm.

    15mm

    15mm

    4) Put a cross cable to be prepared.

  • RRU Power Cable > 70m: Cabling Process

    < Heat Shrink Tube _ Panduit_ HST1.1 6 -3Y >

    5) Heat Shrink Tube is inserted into the long cable.

    6) After you cross the cables are crimped to Splice.

    < Splicer/Reducer _ Panduit _ SR-2-xy>

  • RRU Power Cable > 70m: Cabling Process

    7) Go to the Splice point of the Heat Shrink Tube, is the shrink.

    < PVC Tape >< Butyl Tape >

    8) Butyl Tape PVC Tape, then into the first wound is closed.

    &&&&

  • Work Flow for Cabling

  • CPRI Cabling High-level view

    [R[R[R[R----18] 18] 18] 18] CPRI Cable

    3 RRU (1Sector / 1RRU)

    - CDU RRU

    -

    Connector Color

    BootColor

    Connector Color

    BootColor

    TX Blue Red Blue Blue

    RX Green Blue Green Red RX Green Blue Green Red

  • CPRI Connection at RRU

    CPRI Optic Cabling(RRU)CPRI Optic Cabling(RRU)CPRI Optic Cabling(RRU)CPRI Optic Cabling(RRU)[Tx]

    LC/UPC -Blue

    [Rx] LC/APC -Red

    6

    0

    m

    m

    [R

    [R[R

    [R-

    --

    -18]

    18] 18]

    18]

    CPRI Cable

    Install Window

    Install Window Screw

    Waterproof Filler

    Cable Gland Nut

    [R

    [R[R

    [R-

    --

    -18]

    18] 18]

    18] CPRI Cable(CDU Interface)

    CPRI Cable

    (CDU Interface)

  • CPRI Connection at CDU

    Connector(LC/APC, Green)

    L9CA L0~2 Port

    Connector(LC/UPC, Blue)

    Connecting to CPRI cable(CDU)Connecting to CPRI cable(CDU)Connecting to CPRI cable(CDU)Connecting to CPRI cable(CDU)

    CDU Port

    CDU PortCDU Port

    CDU Port

    Sector-A Sector-B Sector-C

    Port-0 Port-1 Port-2

    To each sector (RRU)

    * Note: When you close the install window,

    * Note: When you close the install window, * Note: When you close the install window,

    * Note: When you close the install window,

    screws should be tightened to the torque

    screws should be tightened to the torque screws should be tightened to the torque

    screws should be tightened to the torque

    value

    value value

    value of 12.0kgf.cm specified in the order.

    of 12.0kgf.cm specified in the order.of 12.0kgf.cm specified in the order.

    of 12.0kgf.cm specified in the order.

    * Install Window Screw Torque

    * Install Window Screw Torque * Install Window Screw Torque

    * Install Window Screw Torque : 12 kgf.cm

    : 12 kgf.cm: 12 kgf.cm

    : 12 kgf.cm (Tolerance

    (Tolerance (Tolerance

    (Tolerance

    10%)

    10%)10%)

    10%)

    * Cable Gland(CPRI_M20) Torque : 30 kgf.cm

    * Cable Gland(CPRI_M20) Torque : 30 kgf.cm* Cable Gland(CPRI_M20) Torque : 30 kgf.cm

    * Cable Gland(CPRI_M20) Torque : 30 kgf.cm (Tolerance

    (Tolerance (Tolerance

    (Tolerance

    10%)

    10%)10%)

    10%)

  • CPRI earth pressure terminal Lots of CPRI cable were supplied to the old model. In case of this,

    earth pressure terminal should replaced with new models pressure terminal.

    Cut old cable lug & replace with new pressure terminal

    Old typeOld typeOld typeOld type----1111 Old typeOld typeOld typeOld type----2222

  • Work Flow for Cabling

  • RET Cable High-level view

    [RF Antenna]

    [RF Antenna][RF Antenna]

    [RF Antenna]

    RET Connector

    RET Cable Assembly

    RET Cable AssemblyRET Cable Assembly

    RET Cable Assembly

    RETu

    RETuRETu

    RETu

  • RET Connection at RRU End

    Install for RET CableInstall for RET CableInstall for RET CableInstall for RET Cable

    RET Connector

    RET Cable Assembly

  • Part II: InstallationG) Installation of RF Antennas

  • Antenna Views

    Upper Fixing Clamp

    Upper Guide Clamp

    Pole

    Lower Guide Clamp

    Main Radiation Direction

    Lower Fixing Clamp

    Lower Guide Clamp

    Antenna Input Port

    RETu

  • Antenna Mounting

    40-90 mm

    Attaching Base station Antenna on Poles Using Clamps

    14 mm

    * Torque : 239.7 ~ 270.3 kgf.cm

    * Torque : 239.7 ~ 270.3 kgf.cm * Torque : 239.7 ~ 270.3 kgf.cm

    * Torque : 239.7 ~ 270.3 kgf.cm

    (23.5~26.5 Nm)

    (23.5~26.5 Nm)(23.5~26.5 Nm)

    (23.5~26.5 Nm)

  • Antenna Mechanical Tilt

    Measure

    using Tilt-

    meter

    Mechanical down tilt (In the case of tilting)

    14 mm

    Indicators for Mechanical tilt

    * Torque : 239.7 ~ 270.3 kgf.cm

    * Torque : 239.7 ~ 270.3 kgf.cm * Torque : 239.7 ~ 270.3 kgf.cm

    * Torque : 239.7 ~ 270.3 kgf.cm

    (23.5~26.5 Nm)

    (23.5~26.5 Nm)(23.5~26.5 Nm)

    (23.5~26.5 Nm)

  • RF Jumper Cabling: High-level View

    [RRU][RRU][RRU][RRU][Antenna][Antenna][Antenna][Antenna]

    Cable Tie

    [R

    [R[R

    [R-

    --

    -20]

    20] 20]

    20] 1/2" Jumper Cable

    Cable Tie

    Cable Tie

  • RF Jumper Cabling : VSWR

    Connect the RF jumpers at the bottom before pulling the antenna up the tower

    Do a VSWR check on the RF jumpers using VSWR meter before pulling up the antenna

    The acceptable value of VSWR is less than 1.3 The acceptable value of VSWR is less than 1.3

    Attach these VSWR logs to ATP_11a document

  • RF Jumper Connecting & Cabling

    RF Antenna

    Din Type-Female7/16 in. Din Type-Male Connector

    [R

    [R[R

    [R-

    --

    -20]

    20] 20]

    20] 1/2" Jumper Cable

    RF Jumper Cabling & ConnectingRF Jumper Cabling & ConnectingRF Jumper Cabling & ConnectingRF Jumper Cabling & Connecting

    [R

    [R[R

    [R-

    --

    -20]

    20] 20]

    20] 1/2" Jumper Cable

    N Type-Male Connector

    [R

    [R[R

    [R-

    --

    -20]

    20] 20]

    20] 1/2" Jumper Cable

    * N Type

    * N Type* N Type

    * N Type-

    --

    -Male Connector Torque : 20 kgf.cm

    Male Connector Torque : 20 kgf.cmMale Connector Torque : 20 kgf.cm

    Male Connector Torque : 20 kgf.cm (Tolerance

    (Tolerance (Tolerance

    (Tolerance

    10%)

    10%)10%)

    10%)

    * Din Type

    * Din Type* Din Type

    * Din Type-

    --

    -Male Connector Torque

    Male Connector Torque Male Connector Torque

    Male Connector Torque : 200 kgf.cm

    : 200 kgf.cm: 200 kgf.cm

    : 200 kgf.cm (Tolerance

    (Tolerance (Tolerance

    (Tolerance

    10%)

    10%)10%)

    10%)

  • RF Jumper Cable: Min Bending Radius

    RF Jumper Cable Connection at Antenna Connection AreaS

    t

    r

    a

    i

    g

    h

    t

    c

    a

    b

    l

    e

    s

    e

    c

    t

    i

    o

    n

    RF Antenna Connect a 1/2 in. Jumper line to the RF antenna.

    - If excessive force is applied to the connector

    assembled to the antenna port or cable, it may

    cause poor contact or damage because the straight

    S

    t

    r

    a

    i

    g

    h

    t

    c

    a

    b

    l

    e

    M

    i

    n

    .

    r

    a

    d

    i

    u

    s

    o

    f

    c

    u

    r

    v

    a

    t

    u

    r

    e

    R cable section is not long enough.

    - Min. Radius Manufacturer

    1/2 in. Feeder Line 125 mm LS

  • RF Jumper Cabling: Example of Smooth Bend

  • RET Installation

    Remove the MET Protective cap from the antenna.R1

    MET Protective cap

    R2 Remove the RET Protective cap from the RETu.

    RETProtective cap

    Assemble RET unit on ground before pulling the antenna up the tower

    R3 R4

    Dont RemoveThe MET Knob.

    *MET Knob(Black color)

    Check the MET knob. Aligned with the bossed shape of the MET housing.

    Detail

    MET(Bossed shape)

    RET

  • RET Installation: Post Check

    After RET installation return the 41 size spanner to the

    concerned Samsung contact person

  • Part II: InstallationH) Cable Tagging, Labeling & Weatherproofing

  • Weatherproofing Process

    1) Insulation tape layer from top to bottom

    2) Butyl tape layer from top to bottom

    3) Insulation tape layer first top to 3) Insulation tape layer first top to bottom, then bottom to top

    4) Cable ties at top and bottom

  • Step 1- Insulation Tape

    10mm Gap

    60mm (Insulation

    Tape)

  • Step 2 - Butyl Tape

    80mm 60mm

    10mm

    Connector

    Connector Nut

    80mm

    (Butyl Tape)

    60mm (Insulation Tape)

    10mm

    Butyl

    Tape

    Butyl Tape

    10~20mm

    Connector

    Heat Shrink Tube

  • Step 3 - Insulation Tape

    100mm (Insulation Tape) (Insulation Tape)

  • Step 4 Cable tie

    80mm (Cable Tie start point & end start point & end point

  • 1. RF feeder cable New process

    Insulation tape Cable tie

    Butyl tape

    Insulation tape

    Completed

  • 2. RET cable

    No weather-proofing required for

    RET/AISG cable connectors

    Antenna sideAntenna sideAntenna sideAntenna side

    RRH sideRRH sideRRH sideRRH side

  • 3. RF Cable Tagging

    Sector RF Cable Color Code

    Alpha Path#0 Blue / Yellow(One String)

    Alpha Sector

    Alpha SectorAlpha Sector

    Alpha Sector Beta Sector

    Beta SectorBeta Sector

    Beta Sector Gamma Sector

    Gamma SectorGamma Sector

    Gamma Sector

    Alpha Path#0 Blue / Yellow(One String)

    Path#1 Blue / Yellow(Two String)

    Path#2 Blue / Yellow(Three String)

    Path#3 Blue / Yellow(Four String)

    Beta Path#0 Red / Yellow(One String)

    Path#1 Red / Yellow(Two String)

    Path#2 Red / Yellow(Three String)

    Path#3 Red / Yellow(Four String)

    Gamma Path#0 Green / Yellow(One String)

    Path#1 Green / Yellow(Two String)

    Path#2 Green / Yellow(Three String)

    Path#3 Green / Yellow(Four String)

  • RRU Cable TagsSector Cable Color Code

    Alpha Ground, AISG(RET) Blue

    Beta Ground, AISG(RET) Red

    Gamma Ground, AISG(RET) Green

    Alpha Sector(RRU)(GND, AISG)

    Beta Sector(RRU)(GND, AISG)

    Gamma Sector(RRU)(GND, AISG)

  • AISG (RET) Cable Tagging

    Alpha Sector(Antenna)

    Alpha Sector(Antenna)Alpha Sector(Antenna)

    Alpha Sector(Antenna)

    (AISG cable)

    (AISG cable)(AISG cable)

    (AISG cable)

    Beta Sector(Antenna)

    Beta Sector(Antenna)Beta Sector(Antenna)

    Beta Sector(Antenna)

    (AISG cable)

    (AISG cable)(AISG cable)

    (AISG cable)

    Gamma Sector(Antenna)

    Gamma Sector(Antenna)Gamma Sector(Antenna)

    Gamma Sector(Antenna)

    (AISG cable)

    (AISG cable)(AISG cable)

    (AISG cable)

    Ground Cable Tagging

    Ground Cable TaggingGround Cable Tagging

    Ground Cable Tagging

  • Cable Name Plates

    Cable name Tagging point Qty (ea)

    RRU POWER Alpha / Beta / Gamma , End to End 6 (3Sector)RRU CPRI Alpha / Beta / Gamma , End to End 6 (3Sector)

    GPS FEEDER CNT-400 Cable, End to End 2

    Length & Site name should be written by using a permanent

    marking pen.

    Name plate should be lapped on the label sticker.

    Length & Site name should be written by using a permanent marking

    pen.

    Name plate should be lapped on the label sticker.

    Length & Site name should be written by using a permanent marking

    pen.

    Name plate should be lapped on the label sticker.

  • Cable Name Plate Positions

    Name plates for BoQ #1,2 and

    3 are in old format. BoQ #4

    onwards will be in new format.

    Samsung will provide the

    labels.

    For the older formats, SolPar

    [GPS Antenna]

    [GPS Antenna][GPS Antenna]

    [GPS Antenna]

    [L8HU]

    [L8HU][L8HU]

    [L8HU]

    Optic Cable (CPRI)

    Optic Cable (CPRI)Optic Cable (CPRI)

    Optic Cable (CPRI)

    Power Cable (L8HU)

    Power Cable (L8HU)Power Cable (L8HU)

    Power Cable (L8HU)

    GPS

    GPSGPS

    GPS

    CNT

    CNTCNT

    CNT-

    --

    -400 Cable

    400 Cable400 Cable

    400 Cable

    Name Plate [R[R[R

    [R-

    --

    -16]

    16] 16]

    16] Name Plate [D[D[D

    [D-

    --

    -30]

    30] 30]

    30]

    For the older formats, SolPar

    has to paste new label formats

    on existing name plates at the

    site.

    SolPar must put transparent

    tape on the labels.

    [GPS Arrestor]

    [GPS Arrestor][GPS Arrestor]

    [GPS Arrestor]

    [DCDB Panel]

    [DCDB Panel][DCDB Panel]

    [DCDB Panel]

    RG

    RGRG

    RG-

    --

    -316D Cable

    316D Cable316D Cable

    316D Cable

    (GPS)

    (GPS)(GPS)

    (GPS)

    Optic Cable (CPRI)

    Optic Cable (CPRI)Optic Cable (CPRI)

    Optic Cable (CPRI)

    Name Plate [R[R[R

    [R-

    --

    -18]

    18] 18]

    18]

  • Part II: InstallationPart II: Installation

    I) Key Points to Remember

  • Torque Values Master Table

    Sl. No Unit Connector Type Torque Value (Kgf.cm) Purpose

    1 CDU M6 SEMS 33.28-44.92 To fix at 19'' rack

    2 CDU M6 SEMS 20-30 CDU Grounding at CDU end

    3 CDU M6 Brass Bolt/Nut 29.98 (+-10%) CDU Grounding at MGB end

    4 GPS Antenna SMA-male 2.5 Connectivity at CDU end

    5 GPS Antenna N-Male 20 Connectivity at GPS arrester end

    6 GPS Antenna TNC-male 9 Connectivity GPS Ant. End

    7 RRU

    U-Type

    Clamp(M12) 390-400 RRU Installation7 RRU Clamp(M12) 390-400 RRU Installation

    8 RRU M8 Bolt 122 (+-10%) RRU Insulation with Bakelite

    9 RRU M6 SEMS 33.28-49.92 CPRI Grounding

    10 RRU M4 SEMS 9.52-14.28 Power Cable

    11 RRU Window Screw 12 Install Window Screw

    12 RRU M25 30 Cable Gland(Power)

    13 RRU M20 30 Cable Gland(CPRI)

    14 Antenna 14mm bolt 239.7-270.3 Ant. Mounting

    15 RF Jumper N-Male 20 At RRU end

    16 RF Jumper Din-Male 200 Connectivity at Antenna end

    17 RET AISG Cable 183.6-204 Connectivity at RET end

  • Cables running through cable tray

    Alpha Gamma

    CPRI cable

    Beta

    Grounding

    cable

    Power cable

    Label

    ODC

    OGB

  • Cables points to remember

    Cables for each sector should be tied together with no crossing over no crossing over no crossing over no crossing over into the other sector

    Run cables without crossing and periodic ties all the way from RRU to ODC as shown in the previous slideprevious slide

    Use colored insulation tapes inside the cable tray to differentiate cables in each sector. (Blue for Alpha, Red for Beta and Green for Gamma)

  • CPRI earth pressure terminal

    Lots of CPRI cable[3,143 sites] were supplied to the old model. In case of this,earth pressure terminal should replaced with new models pressure terminal.

    Cut old cable lug & replace with new pressure terminal

    Old typeOld typeOld typeOld type----1111 Old typeOld typeOld typeOld type----2222

  • 2-hole ground pressure terminal

    Single hole pressure terminal is official for the earth cable connection.

    In case of 2-hole pressure terminal material in the IM kit box, connect as below picture.

  • RRU grounding connection

    If there is no TGB on the antenna pole, RRU ground cable should be connectedon OGB directly.

    Lightning rodLightning rod is

    Directly connect to pole

    (Without Ground bar)

    RRU

    Ground bar

    TGBOGB

    TGB is fixed by U-Bolt

    &

    TGB is connect to MGB

    Directly connect to

    Ground

    (Without Ground bar)

    In case of no TGB on the pole.

  • Cables

    Bends in cables should be smooth, NOT sharp. Follow minimum bending radius restrictions

    No crossing over of cables

    Do not leave any power-cables exposed

    Cover cable tray with packing after installation

  • Connectors

    Ensure all steps have been followed in GPS connectorization If connector with clamping ring was used, make sure that the

    clamp ring was installed with hexagonal crimping tool

    Tighten all connectors with the appropriate torque values

    Do not leave gaps (especially check RET unit-to-antenna connection & RRU connections)

    All screws should be fastened tight Keep the waterKeep the waterKeep the waterKeep the water----proof caps and rubber packingproof caps and rubber packingproof caps and rubber packingproof caps and rubber packing to secure

    the unused ports

  • Antenna

    While pulling antenna up to the tower, tie the rope at the antenna clamps

    Tie the top and bottom ends so antenna does not swing

    Keep rope at enough distance from tower

    Two people - one at bottom and one at the top - to ensure that antenna does not touch anything on its way up

  • Antenna Pulling Technique

  • RRU

    While pulling RRU up to the tower, tie the rope at the center so that the RRU does not swing

    Keep rope at enough distance from tower

    Two people - one at bottom and one at the top - to ensure that RRU does not touch anything on its way upensure that RRU does not touch anything on its way up

  • Post-Installation Check

    Remove any debris produced during the work and clean up the installation site. Make sure to clean the rack clean the rack clean the rack clean the rack before leaving the site. Remove boxes, pieces of cable from the site and discard them suitably Do NOT leave any waste at the site

    Any remaining material after installation (e.g. cable, tools) should be returned to the concerned Samsung contact personAny remaining material after installation (e.g. cable, tools) should be returned to the concerned Samsung contact person

    Double-check each and every aspect of the installation. Fill out the Site Installation ChecklistSite Installation ChecklistSite Installation ChecklistSite Installation Checklist

  • Gamsahapnida

    Thank You