Day 3: Kitting & Packing and Installation
Oct 02, 2015
Day 3: Kitting & Packing and
InstallationInstallation
Part I: Kitting & Packing
Introduction
This document is intended to guide just for understanding of kitting
& Packing in warehouse.
The plan in the document is a draft version, and can be modified
before starting the installation.
It is one of the method for kitting & packing.
Table Of Contents
Kitting & Packing
Items for kitting & packing Warehouse layout High level view of kitting & packing Tools for kitting & packing Tools for kitting & packing Packing label plan Box stacking plan Box sizes & details for CDU & RRU
1. Items for Kitting & PackingS NoS NoS NoS No Item CodeItem CodeItem CodeItem Code Material DescriptionMaterial DescriptionMaterial DescriptionMaterial Description U/MU/MU/MU/M QTY RequiredQTY RequiredQTY RequiredQTY Required QTY IssuedQTY IssuedQTY IssuedQTY Issued RemarksRemarksRemarksRemarks
1 CDU BOX 1 1pcs eNB equipment2 RRU BOX 3 3pcs eNB equipment3 CSS(Cell Site switch)-Cisco BOX 1 1BOX Switch unit4 CDU Master Kit BOX 1 1BOX Installation material5 RRU Master Kit BOX 1 1BOX Installation material6 ANTENNA (17dBi-65) BOX 3 3BOX
7 EB80-09200A Armored CPRI CABLE Alpha BOX 1 ( )M
CPRI CABLEBeta BOX 1 ( )M
Gamma BOX 1 ( )M
RET Unit8 RET Unit pcs 3 3pcs RET 9 AISG Cable pcs 3 3pcs RET Cable
10 CSS Accessory(IM materials) Pack 1 1Pack CSS Materials11 3811-001849 F-GV(0.6/1kV), 4 x 1C, Green M ( )M ( )M CDU GND12 3811-001850 F-GV(1kV), 6 x 1C, Green M ( )M ( )M GPS GND13 3802-001093 GPS CABLE(CNT-400) M ( )M ( )M GPS coaxial cable
14 3811-001850 F-GV(1kV), 6 x 1C, Green
Alpha M ( )M ( )M
RRU GNDBeta M ( )M ( )M
Gamma M ( )M ( )M
15 EB80-05809A F-CV CABLE 6 x 2C(WHITE/BLACK)
Alpha M ( )M ( )M
RRU POWER CABLE Beta M ( )M ( )M
Gamma M ( )M ( )M
2. Kitting & Packing layout (Mumbai circle case)
60mtr
DU & RRH unit
DU & RRH IMM
aster kit
CPRI cables
RRH Power cable
GND cable 4SQ
GPS cable
GND cable 6SQ
30mtr
CSS switch& Accessories
Antenna&RET unit/cable
22mtr
4mtr Car trucking section
Entrance
Kitting & Packing Stacking area
20mtr10mtr
RJIL sectionRJIL sectionRJIL sectionRJIL section
High-level view
Unload boxes from palette
Unpack boxes (if required) in kitting area of warehousearea of warehouse
Prepare installation kit in kitting area of warehouse
7
3. Materials for kitting & packing1. Material list
No. Items Photo No. Items Photo
1Transparent tape
(2-inch & 4-inch)8 Box label sticker
2Air bubble film
(W: 4-inch)9 Oil marker pen
3Stretch wrapping film
(W: 24-inch)10
Cable drum
stands
4Manual-dispensers
for stretch wrapping11 Cable winder
5 Cutter knife 12 Measure tape
6 Scissor 13 Plastic string
7 Cable cutter
4. Packing label plan1. Packing label numbering
Label Number Label Text Description
1 CDU CDU Unit
2 RRU-0 RRU Unit Alpha
3 RRU-1 RRU Unit Beta
4 RRU-2 RRU Unit Gamma
5 CSS Cell Site switch-Cisco
6 CDU Master Kit CDU Installation Material
7 RRU Master Kit RRU Installation Material7 RRU Master Kit RRU Installation Material
8 ANTENNA-0 RF Antenna Alpha
9 ANTENNA-1 RF Antenna Beta
10 ANTENNA-2 RF Antenna Gamma
11 CPRI CABLE-0,1,2 Armored CPRI Cable Alpha, Beta, Gamma
12 RET 3ea, AISG 3ea,CSS IM RET Unit & AISG cable and CSS IM
13 RRH Power cable x ( )m F-CV CABLE 6mm2 x 2C(WHITE/BLACK)
14
DU ground 4mm2 x ( )m
GPS ground 6mm2 x ( )m
RRH ground 6mm2 x ( )m
GPS coaxial x ( )m
F-GV(0.6/1kV), 4mm2 x 1C, Green
F-GV(1kV), 6mm2 x 1C, Green
F-GV(1kV), 6mm2 x 1C, Green
GPS CABLE(CNT-400)
CPRI Cable Boxes
In First Phase of project
For few sites material
CPRI cable will be in the RRU box
Each CPRI cable box contains 30m
Remaining sites material
CPRI cable boxes are independent from RRU box
Each box will have cables of different lengths Each box will have cables of different lengths
CPRI boxes are of same size (H122mm X L384mm X W365mm)
for all sites.
Depending on total CPRI cable length required, 1 to 3 boxes
may be required per site. Pack ALL CPRI boxes for one site
together in a single wrapping stretch film.
4. Packing label plan
2-1. CDU box label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details: : : :
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details: : : :
60mm
120mm
90mm
60mm1/14CDUCDUCDUCDU
Kitting & Packing methodKitting & Packing methodKitting & Packing methodKitting & Packing method Wrapping with stretch wrapping film Put label sticker Put transparent tape on label sticker
Side(1)
Side(2)
Label sticker should be put
minimum 2 side of box
4. Packing label plan
2-2. RRU-0 box label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details: : : :
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details: : : :
60mm
120mm
90mm
60mm2/14RRURRURRURRU----0000
4. Packing label plan
2-3. RRU-1 box label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details: : : :
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details: : : :
60mm
120mm
90mm
60mm3/14RRURRURRURRU----1111
4. Packing label plan
2-4. RRU-2 box label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details::::
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details::::
60mm
120mm
90mm
60mm4/14RRURRURRURRU----2222
4. Packing label plan
2-5. CSS (Cell Site switch) Cisco(Cell Site switch) Cisco(Cell Site switch) Cisco(Cell Site switch) Cisco label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details::::
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details::::
60mm
120mm
90mm
60mm5/14CSS(Switch)CSS(Switch)CSS(Switch)CSS(Switch)
4. Packing label plan
2-6. CDU Master Kit label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details::::
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details::::
60mm
120mm
90mm
60mm6/14CDUCDUCDUCDU----Master KitMaster KitMaster KitMaster Kit
4. Packing label plan
2-7. RRU Master Kit label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details::::
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details::::
60mm
120mm
90mm
60mm7/14RRURRURRURRU----Master KitMaster KitMaster KitMaster Kit
4. Packing label plan
2-8. ANT-0 box label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details::::
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details::::
60mm
120mm
90mm
60mm8/14ANTANTANTANT----0000
4. Packing label plan
2-9. ANT-1 box label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details::::
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details::::
60mm
120mm
90mm
60mm9/14ANTANTANTANT----1111
4. Packing label plan
2-10. ANT-2 box label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details::::
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details::::
60mm
120mm
90mm
60mm10/14ANTANTANTANT----2222
4. Packing label plan
2-11. CPRI box label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details::::
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details::::
60mm
120mm
90mm
60mm11/14CPRI-0 ( ) MCPRI-1 ( ) M
CPRI-2 ( ) M
4. Packing label plan
2-12. RET, AISG, CSS IM label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:
Material detailsMaterial detailsMaterial detailsMaterial details::::
250mm
35mm
25mm 120m
mMaterial detailsMaterial detailsMaterial detailsMaterial details::::
60mm
120mm
90mm
60mm12/14RET 3 ea/ AISG 3 ea/RET 3 ea/ AISG 3 ea/RET 3 ea/ AISG 3 ea/RET 3 ea/ AISG 3 ea/CSS IMCSS IMCSS IMCSS IM
4. Packing label plan
2-13. Cable roll label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:Material details:Material details:Material details:Material details:
250mm
35mm
25mm 120m
mMaterial details:Material details:Material details:Material details:
60mm
120mm
90mm
60mm
RRU Power x Alpha ( ) mRRU Power x Beta ( ) mRRU Power x Gamma ( ) m
TOTAL ( ) m13/14
Label stickerLabel stickerLabel stickerLabel sticker
Kitting & Packing methodKitting & Packing methodKitting & Packing methodKitting & Packing method Make cable roll and tie with plastic strings Wrapping to be done cable roll thoroughly with bubble sheet Put label sticker on bubble sheet Put transparent tape on label sticker
Make cable roll usingcable winder
4. Packing label plan
2-14. Cable roll label
Site Name:Site Name:Site Name:Site Name:
Site ID:Site ID:Site ID:Site ID:Material details:Material details:Material details:Material details:
250mm
35mm
25mm 120m
mMaterial details:Material details:Material details:Material details:
60mm
120mm
90mm
60mm
DU ground 4mm x ( ) mGPS ground 6mm x ( ) mRRU ground 6mm x ( ) mGPS coaxial x ( ) m
14/14
Label stickerLabel stickerLabel stickerLabel sticker
Kitting & Packing methodKitting & Packing methodKitting & Packing methodKitting & Packing method Make cable roll and tie with plastic strings Wrapping to be done cable roll throughly with bubble sheet Put label sticker on bubble sheet Put transparent tape on label sticker
Make cable roll usingcable winder
5. Appendix Box size
CDU boxRRU Master Kit
CDU Master Kit
Box type Dimension
RRU Master kit W620 X L600 X H420
CDU Master Kit W530 X L320 X H230
RRU Box W580 X L500 X H215
CDU Box W385 X L500 X H260
Antenna W1260 X L410 X H240
RRU box
Antenna
5. Appendix - Box details (DU)
No. SNS CODE Description Specification Unit QTY REMARKS
1 EB80-09369A RUBBER TAPE H0.8mm x D19mm x L 10m BLACK EA 1
Box 1
2 EB80-09370A VINYL TAPE H0.125mm x D19mm x L 8m BLACK EA 1
3 EB80-09376A WEATHER RESISTANT CABLE TIE Nylon 66(Carbo A),CV 100W, L:104, W:2.5MAX.DIA:24,Tensile
Strength 8KGPA 1
4 EB80-09386A F-GV CABLE F-GV CABLE,6
x 1C Green M L
5 EB80-09379A F-GV CABLE F-GV CABLE 4
x 1C Green M L
6 EB80-09385A PRESSURE TERMINAL(2HOLE) COPPER PIPE,4SQ,S:16mm,D2:6.3,2hole EA 1
7 EB80-09362A PRESSURE TERMINAL(2HOLE) COPPER PIPE,6SQ,D2:6.3, S:45, A:84 EA 1
8 EB80-09352A BRASS BOLT M6, B:20L EA 2
9 EB80-09353A BRASS NUT M6, C:11.5 EA 2
IM materials
Box 2
9 EB80-09353A BRASS NUT M6, C:11.5 EA 2
10 EB80-09360A PLAIN WASHER(BRASS) d : 6.3, D:11.5 EA 4
11 EB80-09361A PLAIN WASHER(BRASS) d : 8.4, D:16.9 EA 4
12 EB80-09367A SPRING WASHER(BRASS) d : 6.3, D:12.1 EA 4
13 EB80-09354A HEAT SHRINK TUBE D:12mm, L:1000(GREEN) M 0.2
14 EB80-09386A F-GV CABLE F-GV CABLE,6
x 1C Green M L
15 EB80-09365A PRESSURE TERMINAL Copper,RING TYPE,D : 32mm , D2 ; 17mm, D1:3.5mm, T:1 EA 1
16 EB80-09362A PRESSURE TERMINAL(2HOLE) COPPER PIPE,6SQ,D2:6.3, S:45, A:84 EA 1
17 EB80-09352A BRASS BOLT M6, B:20L EA 2
18 EB80-09353A BRASS NUT M6, C:11.5 EA 2
19 EB80-09360A PLAIN WASHER(BRASS) d : 6.3, D:11.5 EA 4
20 EB80-09367A SPRING WASHER(BRASS) d : 6.3, D:12.1 EA 4
21 EB80-09361A PLAIN WASHER(BRASS) d : 8.4, D:16.9 EA 4
22 EB80-09354A HEAT SHRINK TUBE D:12mm, L:1000(GREEN) M 0.2
5. Appendix - Box details (DU)
No. SNS CODE Description Specification Unit QTY REMARKS
23EB80-
09383ATNC STRAIGHT CABLE PLUG 50, 11_TNC-50-7-18/133_NE EA 1 Box 3
24EB80-
09401AOPTICAL PATCH CODE LC/UPC to LC/UPC, INDOOR DUPLEX, L M L Box 4
25EB80-
09391AGPS CABLE LMR400, 50, L M L
Box 5
26EB80-
09392AGPS ARRESTER 50, 800 ~ 2500Mhz, N-Fe to N-Fe, EA 1
27EB80-
09382AN STRAIGHT CABLE PLUG 50, 11_N-50-7-82/133_NE EA 1
28EB80-
09381AGPS CABLE ASS`Y ENVIROFLEX_316_D, N(M) to SMA(M), 1000mm SET 1
29EB80-
NAME PLATE 80x25x0.2t SET 2
IM materials
29EB80-
09359ANAME PLATE 80x25x0.2t SET 2
30EB80-
09396AGPS ANTENNA
GA-1575(CR), 1575.42 1 MHz, > 41 dBic, 25 mA (Max.), 1 x TNC
FemaleEA 1 Box 6
31EB80-
09395AGPS PIPE SUS400, BAR: 6Tx50x400 SET 1
Box 7
32EB80-
09371AGPS FIXING(UNIVERSAL) GPS FIXING (UNIVERSAL) SET 1
5. Appendix - Box details (DU)
CDU Master KitTotal Boxes 7nos.Total Boxes 7nos.
CDU Box 1 & 2 CDU Box 3,4, 5, 6, 7
1111 2222
3333 44445555
66667777
GPSGPSGPSGPS
5. Appendix - Box details (DU)
CDU BOX 1
RUBBER TAPE, VINYL TAPE,WEATHER RESISTANT CABLE TIE F-GV CABLE
CDU BOX 2
PRESSURE TERMINAL(2HOLE)PRESSURE TERMINAL(2HOLE) BRASS BOLTBRASS NUTPLAIN WASHER(BRASS)PLAIN WASHER(BRASS)SPRING WASHER(BRASS)HEAT SHRINK TUBEF-GV CABLEPRESSURE TERMINAL
CDU BOX 3
TNC STRAIGHT CABLE
CDU BOX 4
OPTICAL PATCH CORD PRESSURE TERMINAL
PRESSURE TERMINAL(2HOLE) BRASS BOLTBRASS NUTPLAIN WASHER(BRASS)SPRING WASHER(BRASS)PLAIN WASHER(BRASS)HEAT SHRINK TUBE
CDU BOX 6
GPS ANTENNA
CDU BOX 7
GPS PIPEGPS FIXING(UNIVERSAL)CDU BOX 5
GPS cable, GPS arrestor, CNT-400, GPS assembly
5. Appendix - Box details (RRU)
IM materialsNo. SNS CODE Description Specification Unit QTY
REMARK
S
1 EB80-09384A INTERFACE CABLE LC/UPC(Tx), LC/APC(RX) -> LC/APC(RX),LC/UPC(TX), L( ..) SET 3 * L
1 - 12 EB80-09380A 1/2" JUMPER CABLE 2m, DIN to N, Sucofeed 1/2"F,Macromelt,cap EA 12
3 EB80-09368A BUTYL TAPE synthetic resin,40 X 3T,Distance : 0.5M EA 12
4 NEW CODEUNIT MOUNTING
BRACKET(WALL TYPE)
hot rolled carbon steel T4.0,Bracket (341x135x72),Bakelite
(135x24x5t),Bushing (M8),Washer(M8),HexSET 3 1 - 2
5 EB80-09386A F-GV CABLE F-GV CABLE 6
x 1C Green M 3 * L
6 EB80-09378A PRESSURE TERMINAL(2HOLE) 6SQ,DIST:16mm, :6.3mm EA 3
7 EB80-09362A PRESSURE TERMINAL(2HOLE) COPPER PIPE,6SQ,D2:6.3, S:45, W:9.8, T:1.8, A:84 EA 3
8 EB80-09352A BRASS BOLT M6, B:20L EA 6
4
8 EB80-09352A BRASS BOLT M6, B:20L EA 6
9 EB80-09353A BRASS NUT M6, C:11.5 EA 6
10 EB80-09360A PLAIN WASHER(BRASS) d : 6.3, D:11.5 EA 12
11 EB80-09367A SPRING WASHER(BRASS) d : 6.3, D:12.1 EA 12
12 EB80-09361A PLAIN WASHER(BRASS) d : 8.4, D:16.9 EA 12
13 EB80-09354A HEAT SHRINK TUBE D:12mm, L:1000(GREEN) M 0.3
5. Appendix - Box details (RRU)
IM materialsNo. SNS CODE Description Specification Unit QTY
REMARK
S
14 EB80-09364A PRESSURE TERMINAL(RING TYPE) 6SQ, d2:4.4mm, d1:3.5mm, L:19.7mm EA 6
4
15 EB80-09356A HEAT SHRINK TUBE D:6mm, L:1000mm(BLUE) M 0.3
16 EB80-09355A HEAT SHRINK TUBE D:6mm, L:1000mm(RED) M 0.3
17 EB80-09359A NAME PLATE 80x25x0.2t SET 12
18 EB80-09357A HEATING TUBE D:31mm, L:1000, BLACK M 2.4
19 EB80-09358A HEATING TUBE D:41mm, L:1000, BLACK M 2.4
20 EB80-09370A VINYL TAPE H0.125mm x D19mm x L 8m BLACK EA 1
21 EB80-09375A VINYL TAPE H0.125mm x D19mm x L 20m YEOLLOW EA 1
22 EB80-09373A VINYL TAPE H0.125mm x D19mm x L 20m RED EA 1
23 EB80-09374A VINYL TAPE H0.125mm x D19mm x L 20m BLUE EA 1
24 EB80-09372A VINYL TAPE H0.125mm x D19mm x L 15m GREEN EA 1
25 EB80-09377A WEATHER RESISTANT CABLE TIENylon 66(Carbo A),CV 100W, L:315, W:4.8, MAX.DIA:86, Tensle Strenght
55KG,CV150W~CV300WPA 1
26 EB80-09369A RUBBER TAPE H0.8mm x D19mm x L 10m BLACK EA 1
5. Appendix - Box details (RRU)
RRU Master KitTotal Boxes 4nos.
4444
1111
2222
33334444
Boxes 1, 2 & 3 are for 3 Boxes 1, 2 & 3 are for 3 Boxes 1, 2 & 3 are for 3 Boxes 1, 2 & 3 are for 3 RRUs & box 4 is common RRUs & box 4 is common RRUs & box 4 is common RRUs & box 4 is common for all the RRUsfor all the RRUsfor all the RRUsfor all the RRUs
5. Appendix - Box details (RRU)
1111----1111 1111----2222
RRU Box 1-2
UNIT MOUNTING BRACKET(WALL TYPE)RRU Box 1-1
INTERFACE CABLE1/2" JUMPER CABLEPUTYL TAPE
5. Appendix - Box details (RRU)
RRU Box 4
F-GV CABLE
PRESSURE TERMINAL(2HOLE)
PRESSURE TERMINAL(2HOLE)
BRASS BOLT
BRASS NUT
PLAIN WASHER(BRASS)
SPRING WASHER(BRASS)
PLAIN WASHER(BRASS)
HEAT SHRINK TUBE
PRESSURE TERMINAL(RING TYPE)
HEAT SHRINK TUBE
HEAT SHRINK TUBEHEAT SHRINK TUBE
NAME PLATE
HEATING TUBE
HEATING TUBE
VINYL TAPE
VINYL TAPE
VINYL TAPE
VINYL TAPE
VINYL TAPE
WEATHER RESISTANT CABLE TIE
RUBBER TAPE
Part II: Installation
Pre-Requisites: Safety First
Post warningwarningwarningwarning signssignssignssigns in areas where high-voltage cables are installed Post offoffoffoff limitlimitlimitlimit signssignssignssigns in areas where accidents are most expected. With guardrails or fences, blockblockblockblock openopenopenopen areasareasareasareas such as connecting
parts, roof, and scaffold Make sure to wear protectiveprotectiveprotectiveprotective gear gear gear gear such as gloves, shoes, harness,
etc. Do not wear metal objects Do not wear metal objects Do not wear metal objects Do not wear metal objects such as Watch, Ring, Etc. Do not look into the optical cablesDo not look into the optical cablesDo not look into the optical cablesDo not look into the optical cables as the laser beams are harmful Do not look into the optical cablesDo not look into the optical cablesDo not look into the optical cablesDo not look into the optical cables as the laser beams are harmful
for the eyes.
Pre-requisites for Installation
The system DC power must be switched off before installation
Check that you have
Site information (address, key access, contact person, etc.)
All required tools for installation (especially torque driver & hexagonal
crimping tool)
Approved RFE1 Checklist
Check if TGB is installed or not, if not report to the Samsung
Check site environment
Power supply check
Feasibility of installation
Installation Work Flow
Installation Tool list
Installation Tool list
System Cable Diagram
[IGB]
Part II: InstallationPart II: Installation
B) Installation of CDU
CDU Specs
CDU Specs (2)
CDU Views
UAMA Card
L9CA Card
Fan
Steps in CDU Installation
CDU Mounting
Roxtec Arrangement
GroundingGrounding
Power connection
Backhaul connection
ODC Layout
CDU Position
2-Door ODC: 35, 36
3-Door ODC: 29, 30
CDU Mounting: Horizontal
Horizontal CDU Installation: Front View
CDU Mounting: Vertical Vertical Vertical Vertical
Air OUT Top
[D
[D[D
[D-
--
-01]
01] 01]
01] SEMS
Vertical fixation for CDU system
Air flow should be in
this direction for
vertical installation
Air IN Bottom
NOTE : When the CDU system is fixed vertically, it should be placed after consideration for air flow.
* M6 SEMS Torque : 33.28~44.92 kgf.cm
Vertical CDU Installation: Front View
Steps in CDU Installation
Mounting the CDU
Roxtec Arrangement
GroundingGrounding
Power connection
Backhaul connection
Roxtec Configuration
Original Shape Final Shape
No air-gaps
between
Roxtec
gland strips
Steps in CDU Installation
Mounting the CDU
Roxtec arrangement
Grounding
Power connection
Backhaul connection
CDU Grounding: High Level View
Prepare ground cable
Connect to CDU rear side
[MGB]/[IGB]
CDU Rear View
Connect to MGB (IGB)
[D
[D[D
[D-
--
-02]
02] 02]
02] Ground Cable
Pressure Terminal for Grounding : 2-Hole
Single hole pressure terminal is official for the earth cable connection.
In case of 2-hole pressure terminal material in the IM kit box, connect as below picture.
CDU Grounding: Preparing the Grounding Cable
Video link
CDU Grounding: Connecting to CDU
Connecting to CDU system
CDU Rear Side
Heat Shrink Tube
[D
[D[D
[D-
--
-10]
10] 10]
10]
Ground Cable
[D
[D[D
[D-
--
-02]
02] 02]
02]
Pressure Terminal
[D
[D[D
[D-
--
-03]
03] 03]
03]
Connect the 4 pressure terminal and
the heat shrink tube at the end of the
ground cable.
[Pressure terminal]
4, 2 holes, hole diameter: 6.3mm,
hole gap 16mm
SEMS(M5x15L)
* The screw is included in CDU
hole gap 16mm
Align the pressure terminal connected on
the CDU-side ground cable to the ground
terminal mounting hole on the rear side of
the CDU and fix it with the M5 SEMS.
* M5 SEMS Torque : 20~30 kgf.cm
CDU Grounding: Connecting to MGB
MGB Connecting
* M6 Brass Bolt/Nut Torque: 29.98kgf.cm (Tolerance +-10%)
Steps in CDU Installation
Mounting the CDU
Roxtec arrangement
Grounding
Power connection
Backhaul connection
CDU DC Power Connection: High-level view
Prepare Power cables
Connect to DCDB
Connect power cable to CDU with assembled side facing CDU
CDU Power Connection: Connecting to DCDB
Connecting to DCDB
[D-23] [D-22]
Heat Shrink Tube
[CDU] [DCDB]
[D-20]
DC Power Cable Assembly
Heat Shrink
Tube
Heat Shrink TubeHeat Shrink Tube
CDU Power Connection: DCDB end
[D
[D[D
[D-
--
-20]
20] 20]
20]
DC Power Cable Assembly
to CDU
Delta DCDB
Delta DCDBDelta DCDB
Delta DCDB
(4CL/8NCL)
(4CL/8NCL)(4CL/8NCL)
(4CL/8NCL)
GE DCDB
GE DCDBGE DCDB
GE DCDB
(4CL/8NCL)
(4CL/8NCL)(4CL/8NCL)
(4CL/8NCL)
Emerson DCDB
Emerson DCDBEmerson DCDB
Emerson DCDB
(4CL/8NCL)
(4CL/8NCL)(4CL/8NCL)
(4CL/8NCL)
RTN Bar(Red)
CB(Blue)
CB(Blue)
RTN Bar(Red)
[DCDB][DCDB][DCDB][DCDB](Note)
(Note) (Note)
(Note)
Do not remove common cable.
Do not remove common cable.Do not remove common cable.
Do not remove common cable.
-
--
-48V cable(black/blue shrink) should be installed with Common cable.
48V cable(black/blue shrink) should be installed with Common cable.48V cable(black/blue shrink) should be installed with Common cable.
48V cable(black/blue shrink) should be installed with Common cable.
CB(Blue)RTN Bar(Red)
CDU Power Connection: DCDB end
[DCDB Side] I[DCDB Side] I[DCDB Side] I[DCDB Side] Installation for DC Power Cablenstallation for DC Power Cablenstallation for DC Power Cablenstallation for DC Power Cable
To -48[V] Circuit Breaker
Power Cable(AWG 12, UL 1015-LF 2.5mm2 x 2C)
Power Cable(AWG 12, UL 1015-LF 2.5mm2 x 2C)
200mm
To RTN (GND Port)
To -48[V] Circuit Breaker
To RTN (GND Port)
Power Cable(AWG 12, UL 1015-LF 2.5mm2 x 2C)
12 mm 200mm
Power Cable(AWG 12, UL 1015-LF 2.5mm2 x 2C)
To RTN (GND Port)
To -48[V] Circuit Breaker
CDU Power Connection: DCDB end
Can use two 10A (1
CDU, 1 RRU) and two
25A MCBs (2 RRUs)
available IIIInstallation for DCDBnstallation for DCDBnstallation for DCDBnstallation for DCDBCritical Non - Critical
The capacity of circuit breaker is
The capacity of circuit breaker is The capacity of circuit breaker is
The capacity of circuit breaker is
required as below.
required as below.required as below.
required as below.
-
--
- CDU : 16 [A]
CDU : 16 [A] CDU : 16 [A]
CDU : 16 [A]
-
--
- Each RRU :
Each RRU : Each RRU :
Each RRU : 16[A]
16[A]16[A]
16[A]
CDU
RRU#0
RRU#1
RRU#2
MAIN
CDU Power Connection: Connecting to CDU
Connecting to CDU system
Power Cable Connector
SPD
M6 SEMS
Connect the power connector
(combination D-sub connector)
assembled on the cable to the
power input connector on the
front left of the CDU.
Connect the power cable M6 SEMS
[D
[D[D
[D-
--
-20]
20] 20]
20]
DC Power Cable
Assembly
Connect the power cable
assembly to the power connector
with the correct polarity (RTN, -
48V).
Heat shrink tube color:
RTN_red/-48V_blue.
* M6 SEMS Torque : 33.28~49.92 kgf.cm
* M6 SEMS Torque : 33.28~49.92 kgf.cm * M6 SEMS Torque : 33.28~49.92 kgf.cm
* M6 SEMS Torque : 33.28~49.92 kgf.cm
Steps in CDU Installation
Mounting the CDU
Roxtec Arrangement
Grounding
Power connection
Backhaul connection
CDU Backhaul Connection: CDU endIf Black multi-mode SFP is found, please return it to Samsung
contact person after replacing it with Blue single-mode SFP
Connecting to backhaul cable (Optic)Connect the backhaul cable (optic-
single mode) from the
switch/router to BH2 and BH3 ports
of the CDU UAMA board.
General Case : Optic single cable
Connect the CDU-side connectors
(LC/UPC) of the cable to the BH2
and BH3 ports of the CDU UAMA
board.
SFP module should be Blue for single-mode fiber. If it is Black, it is
for multi-mode fiber and will NOT work (there are 700 CDUs with
multi-mode SFP)
Part II: InstallationPart II: Installation
C) Installation of CSS
CSS Installation Materials
CSS Specs
CSS Front View & Ports
Front View
Steps in CSS Installation
CSS Mounting
CSS CSS Grounding
CSS Power connection
Attaching the CSS Rack-mounting brackets
Mounting the CSS on Rack
Steps in CSS Installation
CSS Mounting
CSS CSS Grounding
CSS Power connection
CSS Grounding
To IGB
CSS Grounding: Preparing Ground wire
Steps in CSS Installation
CSS Mounting
CSS CSS Grounding
CSS Power connection
CSS Power Connection
Two 3-pin
power
cables. Use cables. Use
two 16A
MCBs.
Warnings!
CDU Backhaul Connection: CSS end
Use port 9x
at the CSS
CSS
Use port
BH2 at the
CDU
CDU
Part II: InstallationD) Installation of GPS
Steps in GPS Installation
Preparing GPS Connector
Installation of GPS Arrestor
Installation of GPS Antenna
Connecting the GPS
GPS Connection: High-level view
[D
[D[D
[D-
--
-11] ~ [D19]
11] ~ [D19]11] ~ [D19]
11] ~ [D19]
Connection of
Connection of Connection of
Connection of GPS Ground Cable
[MGB]
[D
[D[D
[D-
--
-25]
25] 25]
25] GPS Antenna
[D
[D[D
[D-
--
-30]
30] 30]
30] RG-316D Cable-1
[D
[D[D
[D-
--
-27]
27] 27]
27] GPS Cable(CNT-400)[D
[D[D
[D-
--
-28]
28] 28]
28] GPS Arrestor
N-MaleTNC-Male
H&S Connector SpecsH&S Connector SpecsH&S Connector SpecsH&S Connector Specs
H&S NH&S NH&S NH&S N----Type Connector: Assembly ProcedureType Connector: Assembly ProcedureType Connector: Assembly ProcedureType Connector: Assembly Procedure
H&S N-Type Connector: Assembly Procedure (2)
H&S N-Type Connector
H&S N-Type Connector: Assembly Procedure
H&S N-Type Connector: Assembly Procedure (2)
GPS Connection: Preparing GPS Connector
GPS Connection: Preparing GPS Connector
GPS Connection: Preparing GPS Connector Video
Steps in GPS Installation
Preparing GPS Connector
Installation of GPS Arrestor
Installation of GPS Antenna
Connecting the GPS
GPS Connection: Installing GPS Arrestor
Installation for GPS ArrestorInstallation for GPS ArrestorInstallation for GPS ArrestorInstallation for GPS Arrestor[D
[D[D
[D-
--
-28]
28] 28]
28]
GPS ArrestorGPS Cable(CNT-400)
[D
[D[D
[D-
--
-27]
27] 27]
27]
[D
[D[D
[D-
--
-12]
12]12]
12]
Pressure Terminal
N-Male Connector
[D
[D[D
[D-
--
-30]
30] 30]
30]
RG-316D Cable-1
GPS Arrestor Grounding
GPS Arrestor GroundingGPS Arrestor Grounding
GPS Arrestor Grounding
GPS Arrestor to GPS
GPS Arrestor to GPS GPS Arrestor to GPS
GPS Arrestor to GPS
Antenna (CNT
Antenna (CNTAntenna (CNT
Antenna (CNT-
--
-400)
400)400)
400)
GPS Arrestor to CDU
GPS Arrestor to CDU GPS Arrestor to CDU
GPS Arrestor to CDU
(RG
(RG(RG
(RG-
--
-316D)
316D)316D)
316D)
GPS Connection: Installing GPS Arrestor
GPS Arrestor position will be different for 2-door & 3-door ODC.
Steps in GPS Installation
Preparing GPS Connector
Installation of GPS Arrestor
Installation of GPS Antenna
Connecting the GPS
Installation point of GPS antenna can be classified
into top and bottom point. It is recommended that
GPS antenna is installed at top point of RF antenna.
RF Antenna
GPS Antenna
RF Antenna center axis
Not allowed area for GPS Antenna
XX Case#Case#Case#Case#1111)))) MountMountMountMount onononon thethethethe toptoptoptop positionpositionpositionposition ofofofof RFRFRFRF antennaantennaantennaantenna
1) GPS antenna should be installed higher than the RF antenna.
It should have sky clearance
2) GPS antenna should be behind the RF antenna at >110
degrees from main lobe axis in the horizontal plane
[Top View]
[Top View][Top View]
[Top View]
GPS AntennaRRU
RF Antenna
GPS Antenna Installation(1)
Note : It is prohibited to installation of GPS antenna on the back side of RF antenna.
3) It should be installed within protection angle of the lightning
protection umbrella.
4) Minimum distance between RF antenna top point
and GPS antenna head should be 500mm
5) It is recommended that GPS antenna be installed in the south
direction so that the GPS is located on the back side of
the structure (i.e. RTT, GBT)
RF Antenna center axis
Available area of GPS Antenna
[Less than 30M ][Less than 30M ][Less than 30M ][Less than 30M ]Lightning Rod
45
45
23 23
[More than 30M ][More than 30M ][More than 30M ][More than 30M ]
In case the height of structure is more than 30M from the ground, lightning-protection umbrella angle should be
23 degrees.
(If it is difficult to satisfy the above conditions, lightning arrestor installation angle should be set to the nearest value such that all equipments are covered under the lightning protection umbrella.)
GPS Antenna Installation(1)
RF Antenna
RRU
GPS Antenna
M
i
n
i
m
u
m
5
0
0
m
m
RF Antenna
RRU
GPS Antenna
M
i
n
i
m
u
m
5
0
0
m
m
[Top View]
[Top View][Top View]
[Top View]
GPS Antenna
RRU
RF Antenna GPS Antenna
RF Antenna center axis
Not allowed area for GPS Antenna
XX Case#2) Mount on the bottom position
of RF antenna
1) GPS antenna should be installed higher than the
RF antenna. It should have sky clearance
2) GPS antenna should be behind the RF antenna at
>110 degrees from main lobe axis in the horizontal
plane
GPS Antenna Installation(2)
[Top View]
[Top View][Top View]
[Top View]
RRU
RF Antenna
Note : It is prohibited to installation of GPS antenna on the back side of RF antenna.
RF Antenna center axisAvailable area of GPS Antenna
3) It should be installed within protection angle of
the lightning protection umbrella.
4) Minimum distance between RF antenna bottom
point and GPS antenna head should be 2m
5) It is recommended that the GPS antenna be
installed in the south direction so that the GPS is
located on the back side of the structure (RTT,
GBT, etc.)
[Less that 30M ]
[Less that 30M ][Less that 30M ]
[Less that 30M ]
RF Antenna
RRU
Lightning Rod
45 45
RF AntennaRRU
23 23
[More than 30M]
[More than 30M][More than 30M]
[More than 30M]
GPS Antenna Installation(2)
M
i
n
i
m
u
m
2
M
GPS Antenna GPS Antenna
M
i
n
i
m
u
m
2
M
In case the height of structure is more than 30M from the ground, lightning-protection umbrella angle
should be 23 degrees.(If it is difficult to satisfy the above conditions, lightning arrestor installation
angle should be set to the nearest value such that all equipments are covered under the lightning
protection umbrella.)
GPS Connection: Installing GPS Antenna
TNC-Female
Clamp Fixing Screw
Insulator
Clamp
Heat Shrink Tube(Jelly Type)
[D
[D[D
[D-
--
-25]
25] 25]
25] GPS Antenna
[D
[D[D
[D-
--
-26]
26] 26]
26] TNC-Male Connector
[D
[D[D
[D-
--
-27]
27] 27]
27] GPS Cable(CNT-400)
Installation for GPS AntennaInstallation for GPS AntennaInstallation for GPS AntennaInstallation for GPS Antenna
More than 200 mm
GPS Fixing Pipe
Binder CableInsulator
CNT
CNTCNT
CNT-
--
-400 Cable
400 Cable400 Cable
400 Cable(GPS Arrestor ~ GPS Antenna)
(GPS Arrestor ~ GPS Antenna)(GPS Arrestor ~ GPS Antenna)
(GPS Arrestor ~ GPS Antenna)
(Without Amplifier: Max. 100 m/With Amplifier: Max. 200 m)
(Without Amplifier: Max. 100 m/With Amplifier: Max. 200 m)(Without Amplifier: Max. 100 m/With Amplifier: Max. 200 m)
(Without Amplifier: Max. 100 m/With Amplifier: Max. 200 m)
GPS Fixing Pipe
* SMA
* SMA* SMA
* SMA-
--
-Male Connector Torque : 2.5 kgf.cm
Male Connector Torque : 2.5 kgf.cmMale Connector Torque : 2.5 kgf.cm
Male Connector Torque : 2.5 kgf.cm
* N
* N* N
* N-
--
-Male Connector Torque
Male Connector Torque Male Connector Torque
Male Connector Torque : 20 kgf.cm
: 20 kgf.cm: 20 kgf.cm
: 20 kgf.cm
* TNC
* TNC* TNC
* TNC-
--
-Male Connector Torque
Male Connector TorqueMale Connector Torque
Male Connector Torque : 9 kgf.cm
: 9 kgf.cm: 9 kgf.cm
: 9 kgf.cm
(Tolerance
(Tolerance (Tolerance
(Tolerance
10%)
10%)10%)
10%)
Two types of GPS antennas as below can be used.
Two types of GPS antennas as below can be used.Two types of GPS antennas as below can be used.
Two types of GPS antennas as below can be used.
[D
[D[D
[D-
--
-25]
25]25]
25]
GA
GAGA
GA-
--
-1575CR
1575CR1575CR
1575CR
(Cone Type)
(Cone Type)(Cone Type)
(Cone Type)
[D
[D[D
[D-
--
-25a]
25a]25a]
25a]
GA
GAGA
GA-
--
-1575
15751575
1575
(Dome Type)
(Dome Type)(Dome Type)
(Dome Type)
[GPS cable with banding loss]
[GPS cable with banding loss][GPS cable with banding loss]
[GPS cable with banding loss]
[D
[D[D
[D-
--
-27]
27] 27]
27]
GPS Cable(CNT-400)
Binder Cable
Steps in GPS Installation
Preparing GPS Connector
Installation of GPS Arrestor
Installation of GPS Antenna
Connecting the GPS
GPS Connection: Installing GPS Antenna
SMA-Female
Connection of GPS Assembly Connection of GPS Assembly Connection of GPS Assembly Connection of GPS Assembly
SMA-Female
SMA-Male
[D
[D[D
[D-
--
-30]
30] 30]
30]
RG-316D Cable-1
Part II: InstallationE) Labeling & Tagging: CDU, GPS, CSS
15mm15mm
CDU to DCDB/ RJIL
( )
30mm 30mm30mm
CDU to DCDB/ RJIL
( )
DCDB to CDU/ RJIL
( )
DCDB to CDU/ RJIL
( )
CDU to CSS/ RJIL
( )CDU to CSS/ RJIL
30mm 30mm30mm
Cable wrap space
Cable wrap spaceCable wrap space
Cable wrap space
CSS to CDU/ RJIL
( )
CSS to CDU/ RJIL
( )
CDU 9mm
12mm
12mm12mm
12mm
180mm
Folding point
Cable wrap space
Cable wrap spaceCable wrap space
Cable wrap space
MCB label & Cable label in ODC
5mm
10mm
15mm15mm
RRU-1
RRU-2
( )CDU to CSS/ RJIL
( )
CDU to Arrestor/ RJIL
( )CDU to Arrestor/ RJIL
( )
Arrestor to CDU/ RJIL
( )
Cable
Cable Cable
Cable
wrap
wrap wrap
wrap
space
spacespace
space
Folding point
30mm 30mm
( )( )
30mm 30mm
CDU
RRU-0
15mm
9mm
Arrestor to CDU/ RJIL
( )
75mm 75mm
9mm
9mm
9mm
15mm
Cable
Cable Cable
Cable
wrap
wrap wrap
wrap
space
spacespace
space
CDU Backhaul & GPS Labeling
Cable Name Labeling Point Quantity (each)
DC Power cableCDU DC Power 1
DCDB 1
Backhaul cableCSS side end 1
CDU side end 1
GPS Cable (RG-316D)CDU GPS Port 1
GPS Arrestor 1
[CDU DC power]
[CDU DC power][CDU DC power]
[CDU DC power]
CDU Power Side
CDU Power SideCDU Power Side
CDU Power Side CDU to DCDB / RJIL CDU to DCDB / RJIL
DCDB to CDU / RJIL CDU to DCDB / RJIL
[Label folding point]
[Backhaul]
[Backhaul][Backhaul]
[Backhaul]
CDU Side
CDU SideCDU Side
CDU Side
[GPS]
[GPS][GPS]
[GPS]
GPS Cable
GPS CableGPS Cable
GPS Cable
[Backhaul]
[Backhaul][Backhaul]
[Backhaul]
Cisco Switch Side
Cisco Switch SideCisco Switch Side
Cisco Switch Side
CDU to CSS / RJIL CDU to CSS / RJIL
CSS to CDU / RJIL CSS to CDU / RJIL
CDU to Arrestor / RJIL CDU to Arrestor / RJIL
DCDB to CDU / RJIL CDU to DCDB / RJIL
Arrestor to CDU / RJIL Arrestor to CDU / RJIL
CDU Ground Cable Tagging
Cable name Color CodeTagging
Plan
CDU Ground Black Two StringGPS(Arrestor) Ground
GPS(Arrestor) GroundGPS(Arrestor) Ground
GPS(Arrestor) Ground
GPS Ground(Arrestor)
Black Three String
CDU Ground
CDU GroundCDU Ground
CDU Ground
DCDB Labeling
Category Type Sector Label Title
CDUCritical
- CDU
RRU
Alpha RRU-0
Non Critical
Beta RRU-1
Gamma RRU-2
CDU RRU-0RRU-1 RRU-2
Part II: InstallationPart II: Installation
F) Installation of RRU
RRU Topics
RRU Specifications
RRU Views
RRU External Interfaces
Installation Pre-requisites
Installation Tools
Installing System RRU Installing System RRU
Cabling Work Flow Grounding
Power
External Interfaces
RRU Remote Radio Unit Specs
Air Specification : TD-LTE
Operating Frequency: 2300~2400 MHz
Channel Bandwidth: 20 MHz
RF Power per Sector: 40 W (4Tx Path)
Interface between CDU and RRU Interface: CPRI
Holdover: 24 hours
Rated Voltage: -48 V DC (Tolerance: -40~-57 V)
Rated Current: - Max. current in transmission
period: 7.3 A @ -48 V DC
Unit Size (mm): 340(W) 106(D) 425(H) Weight (kg, Max.): 14
Temperature Condition): -10~50 C Dust and waterproof rating: IP65
RRU Views
* All units are in mm
RRU External Interfaces
RRU External Interfaces
Remote Radio Unit Installation
Pre-requisites
RRU Mount Types
RRU
Pole Wall Pole Mount
U ClampUniversal
Clamp
Wall Mount
RRU Installation
RRU Installation using U-Clamp Type
Parts/Tools required for U-type Installation
Steps for RRU Installation
Step 1: Check the distance between CDU and RRU for CPRI
cable installation.
Step 2: Before placing the system, mark the position where the system will be
installed and also the positions where anchor bolts will be fixed
using an ink line or a pen.
Assembling the Pole Mounting Bracket for U-type
Step 3Step 3Step 3Step 3: Fix the pole mounting bracket to the pole as shown below:
Fixing Unit Mounting Bracket to RRU_U-Clamp Type
Step 4: Fix the unit mounting bracket to the RRU as shown below:
Fixing Unit Mounting Bracket to RRU_U-Clamp Type
Using the bakelites and fasteners, fix RRU and the unit mounting bracket together.
Fixing RRU to Pole
Step 5: Fix the unit mounting bracket that is fixed to RRU to the pole mounting bracket as follows:a. Hang the hook of the unit mounting bracket over the hook
groove of the pole mounting bracket
Fixing RRU to Pole
b. Using the fasteners, fix firmly unit mounting bracket and the pole mounting bracket together.
Fixing RRU to Pole
Fasteners
RRU Mount Types
RRU
Pole Wall Pole Mount
U ClampUniversal
Clamp
Wall Mount
RRU Universal Bracket Mounting High Level
[R
[R[R
[R-
--
-02]
02] 02]
02]
Pole Mount Bracket
Assembly (Universal Bracket)
[R
[R[R
[R-
--
-01]
01] 01]
01]
Unit Mounting Bracket Assembly
*
* *
* M8 Hex. Bolt/Nut Torque
M8 Hex. Bolt/Nut Torque M8 Hex. Bolt/Nut Torque
M8 Hex. Bolt/Nut Torque : 122 kgf.cm
: 122 kgf.cm: 122 kgf.cm
: 122 kgf.cm (Tolerance
10%)* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm
* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm
* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm
RRU Universal Bracket Mounting
UUUUnit Mountnit Mountnit Mountnit Mounting ing ing ing Bracket(Universal Bracket)Bracket(Universal Bracket)Bracket(Universal Bracket)Bracket(Universal Bracket) FixationFixationFixationFixation M8 Insulation BushingM8 Plain WasherM8 Spring WasherM8 Hex. Nut
[R
[R[R
[R-
--
-02]
02] 02]
02] Universal Mount Bracket Assembly [R[R[R[R----01] 01] 01] 01] Unit Mounting Bracket Assembly
M12 Stud BoltM12 Plain WasherM12 Spring WasherM12 Hex. Nut
M12 Plain WasherM12 Spring WasherM12 Hex. Nut
RRU Universal Bracket Mounting
Installation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyM12 Hex. BoltM12 Plain Washer
Note: Use proper torque while mounting universal bracket on the
pole. Excessive force may cause bending of the bracket check
side view of bracket to make sure it is not bent
Pole Mounting Bracket hook
Unit Mounting Bracket Hook M12 Hex. Nut
M12 Spring WasherM12 Plain Washer
Advantage of Universal Bracket: Angular Pole
NOTE: Universal Bracket can be used at the angular as well as the tubular pole.
RRU Mount Types
RRU
Pole Wall Pole Mount
U ClampUniversal
Clamp
Wall Mount
RRU Installation Steps
[R
[R[R
[R-
--
-01]
01] 01]
01]
Unit Mounting Bracket Assembly
[R
[R[R
[R-
--
-02b]
02b] 02b]
02b]
Unit Mounting Bracket
(Wall Type)
* M8 Hex. Bolt/Nut Torque
* M8 Hex. Bolt/Nut Torque * M8 Hex. Bolt/Nut Torque
* M8 Hex. Bolt/Nut Torque : 122 kgf.cm
: 122 kgf.cm: 122 kgf.cm
: 122 kgf.cm (Tolerance
(Tolerance (Tolerance
(Tolerance
10%)
10%)10%)
10%)
* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm
* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm
* M12 Hex. Bolt/Nut Torque : 390~400 kgf.cm
RRU Installation Steps
Unit Mounting Bracket(Wall Type) Unit Mounting Bracket(Wall Type) Unit Mounting Bracket(Wall Type) Unit Mounting Bracket(Wall Type) FixationFixationFixationFixation
7
0
m
m
Drill bit : 17mm
Drill bit : 17mmDrill bit : 17mm
Drill bit : 17mm
Anchor Bolt
Hole(14)
198mm
M12 Washer(Plain, Spring)
M12 Strong Anchor
Drill bit : 17mm
Drill bit : 17mmDrill bit : 17mm
Drill bit : 17mm
Hole depth
Hole depthHole depth
Hole depth : 55mm
: 55mm: 55mm
: 55mm
Marking to anchor bolt position
Unit MountingBracket
M12 Hex. Bolt
[R
[R[R
[R-
--
-02b]
02b] 02b]
02b] U
UU
Unit Mounting Bracket (Wall Type)
RRU Installation Steps
Unit MountingBracket Upper furrow
M830L Hex. Bolt
Bakelite(5T)
Unit Mounting Bracket
Bakelite(5T)
Installation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket AssemblyInstallation for Unit Mounting Bracket Assembly
M8 x 30L Hex. Bolt
M8 Plain Washer
M8 Insulation BushingBakelite(5T)
M8 Spring Washer
Work Flow for Cabling
RRU earth connection
RJIL Plan1) GBM/GBT/RTT(Delta) sites: Provide TGB by RJIL2) RTP site: No TGB provide
Lightning rodLightning rod is
directly connected
to the pole
(Without Ground
bar)
RRU Ground
However, some case even GBM/GBT/RTT(Delta)
sites may not be found the TGB, then RRU ground
cable has to be connected to OGB directly.
If, different site condition compare to RFI report
about TGB existence, SOLPAR should report to
TGBOGB
In case of no TGB on the pole or Tower
about TGB existence, SOLPAR should report to
Samsung . This case may not be able to install the
ground cable due to cable shortage
RRU & CPRI Ground Cable Connection
SEMS(M6x12L, 2EA)
CPRI forPressure Terminal
RRU Ground Cable
RRU forPressure Terminal
Cable Tie
/OGB[R
[R[R
[R-
--
-03] ~ [R
03] ~ [R03] ~ [R
03] ~ [R-
--
-11]
11] 11]
11] Connection of
Connection of Connection of
Connection of Ground Cable[TGB]
[R
[R[R
[R-
--
-03]
03] 03]
03] Ground Cable
CPRI Cable[CDU][CDU][CDU][CDU]
CPRI
Ground
Cable
CPRI Ground Cable
CPRI Ground Cable
RRU Ground Cable
* M6 SEMS Torque : 33.28~49.92 kgf.cm
* M6 SEMS Torque : 33.28~49.92 kgf.cm * M6 SEMS Torque : 33.28~49.92 kgf.cm
* M6 SEMS Torque : 33.28~49.92 kgf.cm
RRU Insulation Test
[Strong Anchor fixing
[Strong Anchor fixing[Strong Anchor fixing
[Strong Anchor fixing Hex. Bolt]
Hex. Bolt]Hex. Bolt]
Hex. Bolt]
[RRU fixing
[RRU fixing[RRU fixing
[RRU fixing Hex. Bolt]
Hex. Bolt]Hex. Bolt]
Hex. Bolt]
[Stud
[Stud[Stud
[Stud Bolt]
Bolt]Bolt]
Bolt]
[RRU fixing Hex. Bolt]
[RRU fixing Hex. Bolt][RRU fixing Hex. Bolt]
[RRU fixing Hex. Bolt]
Indication standard :
Indication standard : Indication standard :
Indication standard :
more than 500V/100M
more than 500V/100Mmore than 500V/100M
more than 500V/100M
[U
[U[U
[U-
--
-Bolt]
Bolt]Bolt]
Bolt]
[RRU fixing Hex. Bolt]
[RRU fixing Hex. Bolt][RRU fixing Hex. Bolt]
[RRU fixing Hex. Bolt]
Work Flow for Cabling
RRU Power Cabling: High-level view
[R
[R[R
[R-
--
-16]
16] 16]
16]
Heat
Shrink
Tube
[R
[R[R
[R-
--
-15]
15] 15]
15] Heat Shrink Tube
[DCDB][DCDB][DCDB][DCDB]
[R
[R[R
[R-
--
-12]
12] 12]
12] DC Power Cable Assembly 3 RRU (1Sector / 1RRU)Heat Shrink Tube
RRU Power Cabling: Preparing cable
Power Cabling & ConnectingPower Cabling & ConnectingPower Cabling & ConnectingPower Cabling & Connecting80 mm
Power Cable(AWG8, F-CV 6mm2 x 2C)RTN
-48V
M
a
x
.
1
3
.
5
m
m
Power Cable(AWG8, F-CV 6mm2 x 2C)
7 mm 73 mm
Power Cable(AWG8, F-CV 6mm2 x 2C)
15 mm11mm
90 mm
64mm
[RRU]
[R
[R[R
[R-
--
-13]
13] 13]
13]
PRESSURE TERMINAL
[R
[R[R
[R-
--
-12]
12] 12]
12] DC Power Cable Assembly
Fully insert the rain-proof
filler to the cable gland
body, and tighten the
cable gland nut using a
torque wrench with torque
value 30 kgf.cm.
* Note: For RRU
* Note: For RRU* Note: For RRU
* Note: For RRU-
--
-DCDB connection please refer DCDB connection page
DCDB connection please refer DCDB connection pageDCDB connection please refer DCDB connection page
DCDB connection please refer DCDB connection page
After CABLE Termination length
Power cable cover
should be projected
10mm from floor of
window inside
RTN
RTNRTN
RTN
-
--
-48V
48V48V
48V
RTN
RTNRTN
RTN
-
--
-48V
48V48V
48V
Power Gland
Power Gland Nut
Power Gland NutPower Gland Nut
Power Gland Nut
10mm
RRU Power Cabling: Connecting to RRU
RRU Power Cable > 70m: Use jumpers
3) Jumper Cable1) Main Cable
2) Junction under 15mm Jumper kit1. Main cable provides the
facility with materials
2. Junction & Jumper cable Tues
kit code for all known materials.
(EP96 kit code, 6 kind)
147
14.7 ~ 15.4mm
60mm
10mm
AWG 8
AWG 8AWG 8
AWG 8
100mm
200mm 3m or 5m
RRU Power Cable > 70m: Cabling Process
100mm
200mm
1) Main cable to the cutting 2) Main cable Main cable Main cable Main cable - cable ends and cut 15mm.
15mm
15mm
3) Jumper kit Jumper kit Jumper kit Jumper kit cable ends and cut 15mm.
15mm
15mm
4) Put a cross cable to be prepared.
RRU Power Cable > 70m: Cabling Process
< Heat Shrink Tube _ Panduit_ HST1.1 6 -3Y >
5) Heat Shrink Tube is inserted into the long cable.
6) After you cross the cables are crimped to Splice.
< Splicer/Reducer _ Panduit _ SR-2-xy>
RRU Power Cable > 70m: Cabling Process
7) Go to the Splice point of the Heat Shrink Tube, is the shrink.
< PVC Tape >< Butyl Tape >
8) Butyl Tape PVC Tape, then into the first wound is closed.
&&&&
Work Flow for Cabling
CPRI Cabling High-level view
[R[R[R[R----18] 18] 18] 18] CPRI Cable
3 RRU (1Sector / 1RRU)
- CDU RRU
-
Connector Color
BootColor
Connector Color
BootColor
TX Blue Red Blue Blue
RX Green Blue Green Red RX Green Blue Green Red
CPRI Connection at RRU
CPRI Optic Cabling(RRU)CPRI Optic Cabling(RRU)CPRI Optic Cabling(RRU)CPRI Optic Cabling(RRU)[Tx]
LC/UPC -Blue
[Rx] LC/APC -Red
6
0
m
m
[R
[R[R
[R-
--
-18]
18] 18]
18]
CPRI Cable
Install Window
Install Window Screw
Waterproof Filler
Cable Gland Nut
[R
[R[R
[R-
--
-18]
18] 18]
18] CPRI Cable(CDU Interface)
CPRI Cable
(CDU Interface)
CPRI Connection at CDU
Connector(LC/APC, Green)
L9CA L0~2 Port
Connector(LC/UPC, Blue)
Connecting to CPRI cable(CDU)Connecting to CPRI cable(CDU)Connecting to CPRI cable(CDU)Connecting to CPRI cable(CDU)
CDU Port
CDU PortCDU Port
CDU Port
Sector-A Sector-B Sector-C
Port-0 Port-1 Port-2
To each sector (RRU)
* Note: When you close the install window,
* Note: When you close the install window, * Note: When you close the install window,
* Note: When you close the install window,
screws should be tightened to the torque
screws should be tightened to the torque screws should be tightened to the torque
screws should be tightened to the torque
value
value value
value of 12.0kgf.cm specified in the order.
of 12.0kgf.cm specified in the order.of 12.0kgf.cm specified in the order.
of 12.0kgf.cm specified in the order.
* Install Window Screw Torque
* Install Window Screw Torque * Install Window Screw Torque
* Install Window Screw Torque : 12 kgf.cm
: 12 kgf.cm: 12 kgf.cm
: 12 kgf.cm (Tolerance
(Tolerance (Tolerance
(Tolerance
10%)
10%)10%)
10%)
* Cable Gland(CPRI_M20) Torque : 30 kgf.cm
* Cable Gland(CPRI_M20) Torque : 30 kgf.cm* Cable Gland(CPRI_M20) Torque : 30 kgf.cm
* Cable Gland(CPRI_M20) Torque : 30 kgf.cm (Tolerance
(Tolerance (Tolerance
(Tolerance
10%)
10%)10%)
10%)
CPRI earth pressure terminal Lots of CPRI cable were supplied to the old model. In case of this,
earth pressure terminal should replaced with new models pressure terminal.
Cut old cable lug & replace with new pressure terminal
Old typeOld typeOld typeOld type----1111 Old typeOld typeOld typeOld type----2222
Work Flow for Cabling
RET Cable High-level view
[RF Antenna]
[RF Antenna][RF Antenna]
[RF Antenna]
RET Connector
RET Cable Assembly
RET Cable AssemblyRET Cable Assembly
RET Cable Assembly
RETu
RETuRETu
RETu
RET Connection at RRU End
Install for RET CableInstall for RET CableInstall for RET CableInstall for RET Cable
RET Connector
RET Cable Assembly
Part II: InstallationG) Installation of RF Antennas
Antenna Views
Upper Fixing Clamp
Upper Guide Clamp
Pole
Lower Guide Clamp
Main Radiation Direction
Lower Fixing Clamp
Lower Guide Clamp
Antenna Input Port
RETu
Antenna Mounting
40-90 mm
Attaching Base station Antenna on Poles Using Clamps
14 mm
* Torque : 239.7 ~ 270.3 kgf.cm
* Torque : 239.7 ~ 270.3 kgf.cm * Torque : 239.7 ~ 270.3 kgf.cm
* Torque : 239.7 ~ 270.3 kgf.cm
(23.5~26.5 Nm)
(23.5~26.5 Nm)(23.5~26.5 Nm)
(23.5~26.5 Nm)
Antenna Mechanical Tilt
Measure
using Tilt-
meter
Mechanical down tilt (In the case of tilting)
14 mm
Indicators for Mechanical tilt
* Torque : 239.7 ~ 270.3 kgf.cm
* Torque : 239.7 ~ 270.3 kgf.cm * Torque : 239.7 ~ 270.3 kgf.cm
* Torque : 239.7 ~ 270.3 kgf.cm
(23.5~26.5 Nm)
(23.5~26.5 Nm)(23.5~26.5 Nm)
(23.5~26.5 Nm)
RF Jumper Cabling: High-level View
[RRU][RRU][RRU][RRU][Antenna][Antenna][Antenna][Antenna]
Cable Tie
[R
[R[R
[R-
--
-20]
20] 20]
20] 1/2" Jumper Cable
Cable Tie
Cable Tie
RF Jumper Cabling : VSWR
Connect the RF jumpers at the bottom before pulling the antenna up the tower
Do a VSWR check on the RF jumpers using VSWR meter before pulling up the antenna
The acceptable value of VSWR is less than 1.3 The acceptable value of VSWR is less than 1.3
Attach these VSWR logs to ATP_11a document
RF Jumper Connecting & Cabling
RF Antenna
Din Type-Female7/16 in. Din Type-Male Connector
[R
[R[R
[R-
--
-20]
20] 20]
20] 1/2" Jumper Cable
RF Jumper Cabling & ConnectingRF Jumper Cabling & ConnectingRF Jumper Cabling & ConnectingRF Jumper Cabling & Connecting
[R
[R[R
[R-
--
-20]
20] 20]
20] 1/2" Jumper Cable
N Type-Male Connector
[R
[R[R
[R-
--
-20]
20] 20]
20] 1/2" Jumper Cable
* N Type
* N Type* N Type
* N Type-
--
-Male Connector Torque : 20 kgf.cm
Male Connector Torque : 20 kgf.cmMale Connector Torque : 20 kgf.cm
Male Connector Torque : 20 kgf.cm (Tolerance
(Tolerance (Tolerance
(Tolerance
10%)
10%)10%)
10%)
* Din Type
* Din Type* Din Type
* Din Type-
--
-Male Connector Torque
Male Connector Torque Male Connector Torque
Male Connector Torque : 200 kgf.cm
: 200 kgf.cm: 200 kgf.cm
: 200 kgf.cm (Tolerance
(Tolerance (Tolerance
(Tolerance
10%)
10%)10%)
10%)
RF Jumper Cable: Min Bending Radius
RF Jumper Cable Connection at Antenna Connection AreaS
t
r
a
i
g
h
t
c
a
b
l
e
s
e
c
t
i
o
n
RF Antenna Connect a 1/2 in. Jumper line to the RF antenna.
- If excessive force is applied to the connector
assembled to the antenna port or cable, it may
cause poor contact or damage because the straight
S
t
r
a
i
g
h
t
c
a
b
l
e
M
i
n
.
r
a
d
i
u
s
o
f
c
u
r
v
a
t
u
r
e
R cable section is not long enough.
- Min. Radius Manufacturer
1/2 in. Feeder Line 125 mm LS
RF Jumper Cabling: Example of Smooth Bend
RET Installation
Remove the MET Protective cap from the antenna.R1
MET Protective cap
R2 Remove the RET Protective cap from the RETu.
RETProtective cap
Assemble RET unit on ground before pulling the antenna up the tower
R3 R4
Dont RemoveThe MET Knob.
*MET Knob(Black color)
Check the MET knob. Aligned with the bossed shape of the MET housing.
Detail
MET(Bossed shape)
RET
RET Installation: Post Check
After RET installation return the 41 size spanner to the
concerned Samsung contact person
Part II: InstallationH) Cable Tagging, Labeling & Weatherproofing
Weatherproofing Process
1) Insulation tape layer from top to bottom
2) Butyl tape layer from top to bottom
3) Insulation tape layer first top to 3) Insulation tape layer first top to bottom, then bottom to top
4) Cable ties at top and bottom
Step 1- Insulation Tape
10mm Gap
60mm (Insulation
Tape)
Step 2 - Butyl Tape
80mm 60mm
10mm
Connector
Connector Nut
80mm
(Butyl Tape)
60mm (Insulation Tape)
10mm
Butyl
Tape
Butyl Tape
10~20mm
Connector
Heat Shrink Tube
Step 3 - Insulation Tape
100mm (Insulation Tape) (Insulation Tape)
Step 4 Cable tie
80mm (Cable Tie start point & end start point & end point
1. RF feeder cable New process
Insulation tape Cable tie
Butyl tape
Insulation tape
Completed
2. RET cable
No weather-proofing required for
RET/AISG cable connectors
Antenna sideAntenna sideAntenna sideAntenna side
RRH sideRRH sideRRH sideRRH side
3. RF Cable Tagging
Sector RF Cable Color Code
Alpha Path#0 Blue / Yellow(One String)
Alpha Sector
Alpha SectorAlpha Sector
Alpha Sector Beta Sector
Beta SectorBeta Sector
Beta Sector Gamma Sector
Gamma SectorGamma Sector
Gamma Sector
Alpha Path#0 Blue / Yellow(One String)
Path#1 Blue / Yellow(Two String)
Path#2 Blue / Yellow(Three String)
Path#3 Blue / Yellow(Four String)
Beta Path#0 Red / Yellow(One String)
Path#1 Red / Yellow(Two String)
Path#2 Red / Yellow(Three String)
Path#3 Red / Yellow(Four String)
Gamma Path#0 Green / Yellow(One String)
Path#1 Green / Yellow(Two String)
Path#2 Green / Yellow(Three String)
Path#3 Green / Yellow(Four String)
RRU Cable TagsSector Cable Color Code
Alpha Ground, AISG(RET) Blue
Beta Ground, AISG(RET) Red
Gamma Ground, AISG(RET) Green
Alpha Sector(RRU)(GND, AISG)
Beta Sector(RRU)(GND, AISG)
Gamma Sector(RRU)(GND, AISG)
AISG (RET) Cable Tagging
Alpha Sector(Antenna)
Alpha Sector(Antenna)Alpha Sector(Antenna)
Alpha Sector(Antenna)
(AISG cable)
(AISG cable)(AISG cable)
(AISG cable)
Beta Sector(Antenna)
Beta Sector(Antenna)Beta Sector(Antenna)
Beta Sector(Antenna)
(AISG cable)
(AISG cable)(AISG cable)
(AISG cable)
Gamma Sector(Antenna)
Gamma Sector(Antenna)Gamma Sector(Antenna)
Gamma Sector(Antenna)
(AISG cable)
(AISG cable)(AISG cable)
(AISG cable)
Ground Cable Tagging
Ground Cable TaggingGround Cable Tagging
Ground Cable Tagging
Cable Name Plates
Cable name Tagging point Qty (ea)
RRU POWER Alpha / Beta / Gamma , End to End 6 (3Sector)RRU CPRI Alpha / Beta / Gamma , End to End 6 (3Sector)
GPS FEEDER CNT-400 Cable, End to End 2
Length & Site name should be written by using a permanent
marking pen.
Name plate should be lapped on the label sticker.
Length & Site name should be written by using a permanent marking
pen.
Name plate should be lapped on the label sticker.
Length & Site name should be written by using a permanent marking
pen.
Name plate should be lapped on the label sticker.
Cable Name Plate Positions
Name plates for BoQ #1,2 and
3 are in old format. BoQ #4
onwards will be in new format.
Samsung will provide the
labels.
For the older formats, SolPar
[GPS Antenna]
[GPS Antenna][GPS Antenna]
[GPS Antenna]
[L8HU]
[L8HU][L8HU]
[L8HU]
Optic Cable (CPRI)
Optic Cable (CPRI)Optic Cable (CPRI)
Optic Cable (CPRI)
Power Cable (L8HU)
Power Cable (L8HU)Power Cable (L8HU)
Power Cable (L8HU)
GPS
GPSGPS
GPS
CNT
CNTCNT
CNT-
--
-400 Cable
400 Cable400 Cable
400 Cable
Name Plate [R[R[R
[R-
--
-16]
16] 16]
16] Name Plate [D[D[D
[D-
--
-30]
30] 30]
30]
For the older formats, SolPar
has to paste new label formats
on existing name plates at the
site.
SolPar must put transparent
tape on the labels.
[GPS Arrestor]
[GPS Arrestor][GPS Arrestor]
[GPS Arrestor]
[DCDB Panel]
[DCDB Panel][DCDB Panel]
[DCDB Panel]
RG
RGRG
RG-
--
-316D Cable
316D Cable316D Cable
316D Cable
(GPS)
(GPS)(GPS)
(GPS)
Optic Cable (CPRI)
Optic Cable (CPRI)Optic Cable (CPRI)
Optic Cable (CPRI)
Name Plate [R[R[R
[R-
--
-18]
18] 18]
18]
Part II: InstallationPart II: Installation
I) Key Points to Remember
Torque Values Master Table
Sl. No Unit Connector Type Torque Value (Kgf.cm) Purpose
1 CDU M6 SEMS 33.28-44.92 To fix at 19'' rack
2 CDU M6 SEMS 20-30 CDU Grounding at CDU end
3 CDU M6 Brass Bolt/Nut 29.98 (+-10%) CDU Grounding at MGB end
4 GPS Antenna SMA-male 2.5 Connectivity at CDU end
5 GPS Antenna N-Male 20 Connectivity at GPS arrester end
6 GPS Antenna TNC-male 9 Connectivity GPS Ant. End
7 RRU
U-Type
Clamp(M12) 390-400 RRU Installation7 RRU Clamp(M12) 390-400 RRU Installation
8 RRU M8 Bolt 122 (+-10%) RRU Insulation with Bakelite
9 RRU M6 SEMS 33.28-49.92 CPRI Grounding
10 RRU M4 SEMS 9.52-14.28 Power Cable
11 RRU Window Screw 12 Install Window Screw
12 RRU M25 30 Cable Gland(Power)
13 RRU M20 30 Cable Gland(CPRI)
14 Antenna 14mm bolt 239.7-270.3 Ant. Mounting
15 RF Jumper N-Male 20 At RRU end
16 RF Jumper Din-Male 200 Connectivity at Antenna end
17 RET AISG Cable 183.6-204 Connectivity at RET end
Cables running through cable tray
Alpha Gamma
CPRI cable
Beta
Grounding
cable
Power cable
Label
ODC
OGB
Cables points to remember
Cables for each sector should be tied together with no crossing over no crossing over no crossing over no crossing over into the other sector
Run cables without crossing and periodic ties all the way from RRU to ODC as shown in the previous slideprevious slide
Use colored insulation tapes inside the cable tray to differentiate cables in each sector. (Blue for Alpha, Red for Beta and Green for Gamma)
CPRI earth pressure terminal
Lots of CPRI cable[3,143 sites] were supplied to the old model. In case of this,earth pressure terminal should replaced with new models pressure terminal.
Cut old cable lug & replace with new pressure terminal
Old typeOld typeOld typeOld type----1111 Old typeOld typeOld typeOld type----2222
2-hole ground pressure terminal
Single hole pressure terminal is official for the earth cable connection.
In case of 2-hole pressure terminal material in the IM kit box, connect as below picture.
RRU grounding connection
If there is no TGB on the antenna pole, RRU ground cable should be connectedon OGB directly.
Lightning rodLightning rod is
Directly connect to pole
(Without Ground bar)
RRU
Ground bar
TGBOGB
TGB is fixed by U-Bolt
&
TGB is connect to MGB
Directly connect to
Ground
(Without Ground bar)
In case of no TGB on the pole.
Cables
Bends in cables should be smooth, NOT sharp. Follow minimum bending radius restrictions
No crossing over of cables
Do not leave any power-cables exposed
Cover cable tray with packing after installation
Connectors
Ensure all steps have been followed in GPS connectorization If connector with clamping ring was used, make sure that the
clamp ring was installed with hexagonal crimping tool
Tighten all connectors with the appropriate torque values
Do not leave gaps (especially check RET unit-to-antenna connection & RRU connections)
All screws should be fastened tight Keep the waterKeep the waterKeep the waterKeep the water----proof caps and rubber packingproof caps and rubber packingproof caps and rubber packingproof caps and rubber packing to secure
the unused ports
Antenna
While pulling antenna up to the tower, tie the rope at the antenna clamps
Tie the top and bottom ends so antenna does not swing
Keep rope at enough distance from tower
Two people - one at bottom and one at the top - to ensure that antenna does not touch anything on its way up
Antenna Pulling Technique
RRU
While pulling RRU up to the tower, tie the rope at the center so that the RRU does not swing
Keep rope at enough distance from tower
Two people - one at bottom and one at the top - to ensure that RRU does not touch anything on its way upensure that RRU does not touch anything on its way up
Post-Installation Check
Remove any debris produced during the work and clean up the installation site. Make sure to clean the rack clean the rack clean the rack clean the rack before leaving the site. Remove boxes, pieces of cable from the site and discard them suitably Do NOT leave any waste at the site
Any remaining material after installation (e.g. cable, tools) should be returned to the concerned Samsung contact personAny remaining material after installation (e.g. cable, tools) should be returned to the concerned Samsung contact person
Double-check each and every aspect of the installation. Fill out the Site Installation ChecklistSite Installation ChecklistSite Installation ChecklistSite Installation Checklist
Gamsahapnida