Emergency Response Solution- Keyspan Need Keyspan Energy needs to install four 69kV substations allowing local gas generation to be on line before the summer peak of 2002. In-house resources not available. Solution ABB’s MODULA concept allows delivery of permit-drawings in 5 weeks! Compact footprint allows flexibility in site selection First units scheduled for delivered to site in 4 months! Benefits Keyspan able to meet deadline and satisfy local customers ABB Modular design is more cost efficient than traditional internal solution Field Sales Lead Joe Fani - Burgoyne Dick Molnar-ABB Field Sales
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Emergency Response Solution- KeyspanNeed
Keyspan Energy needs to install four 69kV substations allowing local gas generation to be on line before the summer peak of 2002. In-house resources not available.
Solution
ABB’s MODULA concept allows delivery of permit-drawings in 5 weeks!
Compact footprint allows flexibility in site selection
First units scheduled for delivered to site in 4 months!
Benefits
Keyspan able to meet deadline and satisfy local customers
ABB Modular design is more cost efficient than traditional internal solution
Field Sales LeadJoe Fani - Burgoyne Dick Molnar-ABB Field Sales
Customer Resource and Time Constraint Solution at Grand Bahama Power
NeedShipcare facility required power in 8 monthsGBP desired ease of expansionwith minimum energization outages
SolutionModular approach met all of GBP’s desired objectivesTesco’s relationship achieved a sole sourced negotiation
BenefitsGrand Bahama met the Shipcare power delivery requirementTraining of new GBP personnel Standardization for future Subs
StatusPhase II being installed
10 MVA 69/12kV Modular Substation
Time and Resource Constraint Solution-Walgreens
Need
Central Warehouse Facility operating by March 2002
115/12.5kv Substation in service within 6 months
Solution
ABB’s pre-designed substation PS-1 concept met budget and saved 6 months off utilities completion time
Benefit
PS1 Modular design will allow Facility operation on schedule
Cost savings from better terms
Status
Commissioned 1/30/02
Energization: 2/10/02
Need
Georgia Pacific needed additional electrical capacity when expanding the paper mill in Virginia
Transmission Line, S/S, Distribution Line
Solution
ABB built short power line to connect to 69kV network instead of 13.8kV
ABB’s modular substation concept PS-1 met the budget and improved the completion time by 3 months
Benefits
GP’s received lower rates when buying energy @ 69kV
The 69kV connection allowed higher capacity and reliability