Modelling Pedestrian Circulation in Rail Transit Stations Using Micro-Simulation 1 Galiza*/Kim**/Ferreira*/Laufer** *University of Queensland **PTV-Asia Pacific ATRF 2009 Venue: Auckland, New Zealand Date: September 30, 2009
24

Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

May 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Modelling Pedestrian Circulation in Rail Transit Stations Using Micro-Simulation

1

Galiza*/Kim**/Ferreira*/Laufer**

*University of Queensland

**PTV-Asia Pacific

ATRF 2009Venue: Auckland, New Zealand

Date: September 30, 2009

Page 2: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Introduction

Increased public transport use (bus & rail)

2

Photo courtesy of ITSRR-NSW

Photo courtesy of ITSRR-NSW

Increased congestion esp. during peak periods…

Page 3: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Problem Statement

Traditional design &

evaluation of pedestrian

facilities � maintaining

a desirable pedestrian

level-of-service (PLOS)

3

level-of-service (PLOS)

Walkway Levels of Service (Fruin 1987)

Page 4: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Issues on Pedestrian Analysis

• Cultural differences

• Traveller composition/distribution

• Type of facilities & environment factors

�Designing pedestrian facilities complying

4

�Designing pedestrian facilities complying with local characteristics?

Page 5: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Micro-simulation Traffic models (MSTMs)

widely accepted tools…

5

…guidelines available (FHWA 2004; Austroads 2006; Faber Maunsell 2007).

Page 6: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Why not also use micro-simulation for pedestrian analysis?

6

Micro-simulation pedestrian software (e.g.

VISSIM®, SimWalk®, Legion®, NoMad®)

Page 7: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Conventional Pedestrian Circulation Analysis

7

Use of link-node network & spreadsheets…

Page 8: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Advantages of Pedestrian Micro-simulation

• Flexible geometric irregularities

• Non-uniform passenger arrivals

• Greater number of influencing factors

• Visual pedestrian interactions

8

• Visual pedestrian interactions

Page 9: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Disadvantages of Micro-simulation

9

• Time-consuming & expensive

• Considerable input data

• Extensive calibration, validation & verification

• Micro-simulation as black boxes

Page 10: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Data Collection

Sufficient time & resources input data collection

• Static data - scaled station plans, locations of temporary equipment, trash

10

locations of temporary equipment, trash bins, obstructions, & ticket vending machines.

• Dynamic data - train arrivals, pedestrian volumes & characteristics.

Page 11: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Modelling Criteria

• No modelling criteria - MSPM calibration

• MSTM criteria applied

�percent deviation (observed - modelled volumes)

11

volumes)

� or GEH statistics - pedestrian volumes

( )

OM

OMGEH

+

−=

22

Page 12: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Possible Scenarios (Station analysis)

• Rolling stock changes

• Additional services

• Service delay impacts

12

• Service delay impacts

• Passenger volumes changes

• Platform arrival changes

• Passenger evacuation

Page 13: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

VISSIM® Pedestrian Simulation

• Vehicles & pedestrians simulated individually

• Pedestrian behaviour defined individually

• Area based modelling

• Multiple level representation

• Pedestrian dynamic route choice

13

• Pedestrian dynamic route choice

Driving force in the desired direction of

motion

Forces from borders

Forces from fellow

pedestrians

Driving force in the desired direction of

motion

Forces from borders

Forces from fellow

pedestrians

Page 14: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

North Melbourne Station (NMS): Case Study

• located north of

Melbourne CBD

• contains six

platforms

14

platforms

• four ramps - northern

end

• 3 platforms for NB &

SB

Page 15: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Base Model Operational Characteristics

• Simulated during AM peak hour (7:30 –8:30AM)

• Services current timetable – May 2008

Platform

Number1 2 3 4 5 6 Total

No. of

Services

(Trains)

12 9 16 7 10 3 57

Rail Frequency for the AM Peak Period

(Laufer 2008)

15

timetable – May 2008

• Patronage October 2007

• receives ~3,000 persons alighting

• 40% exit &60% transfer

(Trains)

Page 16: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Base Model Network Coding

• platforms &

concourses -

pedestrian areas

• connections between

16

• connections between

levels - ramps

• shelters, poles &

other furniture -

obstacles

Page 17: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Base Model Calibration

17

Good network depiction

Page 18: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Base Model Calibration

Platform Simulation Volumes (Laufer 2008)

Pedestrian MovementObserved Modelled

Absolute

Difference

Percentage

Difference

Platform 1 – Entering 609 591 18 3%

Platform 1 – Leaving 422 448 -26 6%

Platform 2 & 3 –

18

Platform 2 & 3 –

Entering275 282 -7 3%

Platform 2 & 3 –

Leaving764 701 63 8%

Platform 4 & 5 –

Entering110 105 5 5%

Platform 4 & 5 –

Leaving1,079 1072 7 1%

Total 3,259 3199 60 2%

Page 19: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Model Performance Measures

19

Platform Occupancy in the SB Direction (Laufer 2008)

Page 20: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Model Performance Measures…

20

Platform 1 Pedestrian Level-of-service from Fruin (1971)

Page 21: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Lessons Learned

• Illustrated how the NMS can be modelled using pedestrian micro-simulation.

• Identified procedure & data

21

• Identified procedure & data requirements

• Produces broad number of quantitative outputs.

• Visualization for qualitative congestion measure.

Page 22: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Lessons Learned

• Requires considerable data and manpower.

• More expensive than traditional analysis.

22

traditional analysis.

• Capital investment on software.

• No agreed upon calibration guidelines.

Page 23: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Conclusions and Future Research

• Simulation - powerful tool for passenger flow analysis.

• Provides numerical results & graphical animations.

23

• Investigate pedestrian characteristics for Australian conditions.

• Establish guidelines for MSPM use.

Page 24: Modelling Pedestrian Circulation in Rail Transit Stations ...€¦ · Micro-simulation Traffic models (MSTMs) ... • Extensive calibration, validation & verification • Micro-simulation

Thank you for listening, that ends the presentation…