Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans in Pennsylvania
89

Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

May 03, 2019

Download

Documents

dangkhuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Modeling Pollutant Load Reductions for TMDL and Pollution Reduction

Plans in Pennsylvania

Page 2: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Welcome to the Webcast

• To Ask a Question – Submit your question in the chat box located to the left of the

slides. We will answer as many as possible during Q&A.

• To Answer a Poll Question – Simply select the preferred option. For those viewing this session

alongside several colleagues, respond in a manner that represents your organization as a whole.

• We ARE Recording this Session – All comments and questions will be recorded and included in the

archives. We will notify you as soon as the recording and related resources are loaded on the web.

• We Appreciate Your Feedback– Fill out our evaluations – our funders need to hear it!

Page 3: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

To learn how you can have access to: FREE Webcasts

Free 1-day design, inspection & maintenance workshops

Intensive master stormwater seminarsDirect On-site technical assistance

Self guided web-based learning modules

Visit: www.chesapeakestormwater.net

Chesapeake Bay Stormwater Training Partnership

Page 4: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Upcoming Webcasts

http://chesapeakestormwater.net/events/categories/webcasts/2016-webcast-series/

• Feb. 25: Potential Benefits of Nutrient and Sediment Practices to Reduce Toxic Contaminants in the Chesapeake Bay Watershed

Page 5: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Poll Question #1

How many people are watching with you today?

• Just me

• 2-5 people

• 6-10 people

• > 10 people

Page 6: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Poll Question #2

In what sector do you work?

• Academia

• Federal Government

• Local Government

• State Government

• Non-profit

• Private

• Other…tell us in the chat box

Page 7: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Poll Question #3

Level of Modeling Experience?

• Expert-Show me a modeling program and I’ll blow your mind

• Novice- I have used some models but not a regular task.

• Beginner- I used to build model airplanes when I was a kid.

Page 8: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Speaker Info

Dr. Barry Evans, Penn State University

[email protected]

Bryan Seipp, Center for Watershed

Protection

[email protected]

Deb Caraco, P.E.Center for Watershed

Protection

[email protected]

Page 9: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Today’s Agenda

• MapShed Overview

• Watershed Treatment Model Overview

• Chesapeake Bay Assessment and Scenario Tool and BayFast Overview

Page 10: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Using MapShed to Evaluate Potential Load Reductions Associated with

MS4/TMDL/Reduction Plan Requirements

Barry M. Evans, Ph.D.

Penn State University

Page 11: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Estimating Pollutant Loads with MapShed

Page 12: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

General sequence of steps:

• Run MapShed to establish current load without BMPs/mitigation activities

• Determine “target” load• Use “BMP Editor” within GWLF-E to estimate

load reductions with various BMP “scenarios”• Iteratively run model and compare results with

“initial” load to see if “percent reduction” target has been achieved

• Use “Urban Area Tool” to assess load reductions by “urban area” as needed

Page 13: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

• Case study located on central PA• TP reduction of 26% required by local

TMDL

Page 14: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Run MapShed to EstablishInitial Load

Page 15: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Using the Project Manager

Page 16: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Loading Data

Page 17: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Selecting a Watershed

Page 18: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Specify Initial Input Parameters for Pre-Processing

Page 19: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Initiate Data Pre-processing

Page 20: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Open up the GWLF-E Model

Page 21: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Load and Review Input File (Optional)

Page 22: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Provide Output File Name and Run Model

Page 23: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Review Output from Initial Model Run

Page 24: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Review Output from Initial Model Run

Page 25: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Determine Target Reductions/Loads

At requirement for 26% reduction of TP:

• Required P reduction = 3188 kg * 0.26 = 829 kg• Target load = 3188 – 829 = 2359 kg

Page 26: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Run BMP Editor within GWLF-E to Estimate Load Reductions

Given Various BMP Types and Implementation Levels

Page 27: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Load Input File into GWLF-E

Page 28: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Add New and Proposed Rural Land BMPs

Page 29: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Add New and Proposed Urban Land BMPs

Page 30: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Re-Run the Model with Edited Input File

Page 31: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Compare New Loads with Initial Loads

Page 32: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Before and After Load Comparisons

With requirement for 26% reduction of TP:

• Required P reduction = 3188 kg * 0.26 = 829 kg• Target load = 3188 – 829 = 2359 kg

• New TP load with BMPs = 2087• This is below the target load of 2359• Actual reduction was about 35%

Re-running the model using the “BMP Editor” can be repeated as necessary to evaluate a range of BMP options and potential load reductions

Page 33: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Township

Page 34: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Urbanized Areas

Page 35: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans
Page 36: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

MapShed available at:

www.mapshed.psu.edu

• Data currently available for PA, NY, and New England• User manual describes process for creating data in

other areas• Video tutorials also available for download• MapShed soon to be available through a web

application (summer 2016)

Page 37: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Questions?

Page 38: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Watershed Treatment Model

1. Overview of the WTM

– Background

– Terminology

– Model Structure (Versions)

2. Example Application

Page 39: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

What is the WTM?

• Simple Spreadsheet-Based Model

• Predicts Annual Rates of TN, TP, TSS, Fecal Coliform and Runoff Volume

• Four Major Components

– Sources

– Practices (Existing)

– Practices (Future)

– New Development

WTM Overview

Page 40: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

WTM Terminology

• Primary Sources

• Secondary Sources

• Management Practices

• Discount Factors

WTM Overview - Terminology

Page 41: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Primary Sources

• Determined entirely from land use/cover

– Residential

– Commercial

– Industrial

– Forest

– Rural

WTM Overview - Terminology

Page 42: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Secondary Sources

• Cannot be calculated solely by land use

• Secondary Sources in the WTM:– Sanitary: CSOs, SSOs, OSDSs,

Illicit Connections– Channel Erosion– Livestock– Marinas– Road Sanding– Point Sources

WTM Overview - Terminology

Page 43: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Existing Management Practices

• Structural: ponds, swale, LID, etc.

• Turf Management• Erosion and Sediment

Control• Catch Basin Cleanouts• Pet Waste Education• Street Sweeping• Riparian Buffers• Marina Pumpout Station

WTM Overview - Terminology

Page 44: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Future Management Practices

• Most Existing Practices, plus• Lawn Care Education• Urban Downsizing,

Redevelopment• Stream Restoration• OSDS Education, Repair, or

Retirement• Stormwater Retrofit

(Structural Practices)• Illicit Discharge, CSO, and

SSO Repairs• Point Source Reduction

Page 45: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Discount Factors

• Ideal load reductions can rarely be achieved

– Lack of space

– Imperfect practice application

– Inability of programs to be completely effective

• Discount factors "discount" load reductions to account for less than perfect application of practices.

WTM Overview - Terminology

Page 46: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Example: Erosion and Sediment Control

(ESC)

• Base Conditions– Load from “uncontrolled”

construction is 1000 lb TSS/year

– Practices can achieve 70% effectiveness (base efficiency), or 700 lb/year

WTM Overview - Terminology

Page 47: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

ESC Discount Factors

BUT…

• Only 80% of Sites are Regulated…

Down to 0.8*700, or 560 lbs/year

• A combination of poor installation and maintenance reduces practice implementation/effectiveness by 25%

Down to 0.75*560, or 420 lbs/year

WTM Overview - Terminology

Page 48: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

WTM 2013 Version – Two Versions

• WTM “Custom”– Spreadsheet model

– Easily adapted, but

– Lots of information presented at one time, so

– Not easy to pick up and use

• WTM “Off the Shelf”– Spreadsheet model

– Incorporates more features to make it more user friendly, but

– While we tried to make it adaptable, you CANNOT ADD MORE ROWS

– This might make it difficult to adapt for some applications

WTM Overview – Model Structure

Page 49: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

WTM “Off the Shelf” Worksheets

• Input Sheets– Sources– Existing Management Practices– Future Management Practices– New Development

• Output Sheets– Results– Results – Unlocked

• Other Sheets– Defaults– Calculations

WTM Overview – Model Structure

Page 50: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Example: Mill Creek in Springettsbury

• Overview

– Used Land Use Data from the Mill Creek Watersehd in Springettsbury

– Made assumptions to estimate other sources.

– Example options to reduce pollutant loads.

Page 51: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Sources and Watershed Data

• On the “Sources” tab

– Select the potential pollutant sources.

– Basic Watershed Data

Page 52: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Primary Sources: Input Data

• Use GIS Data to identify land use and soils in the watershed.

• Land Use should be zoning classes (e.g., High Density Residential, etc.)

Page 53: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Primary Sources: WTM

• Data in Land Use Categories

• Impervious cover/other data

• Results in a loading rate.

Page 54: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Secondary Sources

• Include:

– Illicit Connections

– CSOs

– Channel Erosion

• Channel Erosion

– 3 Methodologies

Page 55: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Existing Practices

• Documents existing practices in the watershed

• In this case, only accounted for turf management.

Page 56: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Future Practices

• Identify Options

– Lawn Care Education

– Pet Waste Education

– Stream Restoration

– Stormwater Retrofits

– Illicit Connection Removal

– CSO/SSO Repair

Page 57: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Future Practices: Enter Extent

• Some Notes

– Different types of data depending on the practice.

– Some practices have different options available.

Page 58: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Example: Stream Restoration

• Two Options:

– Base on miles stabilized

– Identify individual projects

Page 59: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Results: Output Options

• Can Display:

– Source Loads

– Loads with Existing Practices

– Benefits of Existing Practices

– Benefits of Future Practices

– Loads with Future Practices

– Loads with new Development

Page 60: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Results: Summary

Page 61: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Results: Benefits of Future Practices

Page 62: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Other Tabs (not used)

• New Development

• Output (Unlocked)

• Defaults

• Calculations

Page 63: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

WTM Is on OWL

• Download files at:

http://www.cwp.org/online-watershed-library/cat_view/65-tools/91-watershed-treatment-model

Page 64: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Questions?

Page 65: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Chesapeake Assessment and Scenario Tool

(CAST)

&

Chesapeake Bay Facility Assessment

Scenario Tool

(BayFAST)

65

Page 66: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Overview

• Designed as simple planning tools– Complex calculations and information hidden behind the

interface

– Users only need to know general information

• Commonly used for – Milestones

– NFWF proposals and reports

– 319 Plans

– WLAs for MS4s

– Nutrient and sediment local TMDL development and watershed management plans

Page 67: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Features

• Designed provide local jurisdictions with a tool to provide evaluate strategies for the Chesapeake Bay TMDL .

• The load calculations performed by CAST are identical to the current Bay Model.

• The tools use the same assumptions and calculation methods as the Bay Model.

Page 68: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Typical Uses

• Target the highest loading land uses by looking at the baseline lb/acre using a no BMP scenario.

• Choose BMPs that have the highest load reductions/efficiencies.

• Comparing costs for various BMP scenarios.

• Test cost-effectiveness of adopting alternative implementation strategies.

Page 69: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans
Page 70: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans
Page 71: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans
Page 72: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Land Use Download

Includes:

• Land river segment

• Land use

• Land Use abbreviation

• Total acres in each category

FacilityName Landuse ShortName Acres

Webcast MS4 animal feeding operations afo 4.227

Webcast MS4 concentrated animal feeding operations cfo 1.199

Webcast MS4 alfalfa alf 221.885

Webcast MS4 regulated construction rcn 18.845

Webcast MS4 regulated extractive rex 77.356

Webcast MS4 forest for 101.012

Webcast MS4 hightill without manure hom 11.769

Webcast MS4 harvested forest hvf 1.02

Webcast MS4 hightill with manure hwm 1106.479

Webcast MS4 hay without nutrients hyo 53.534

Webcast MS4 hay with nutrients hyw 191.216

Webcast MS4 regulated impervious developed rid 341.063

Webcast MS4 nonregulated impervious developed nid 0

Webcast MS4 pasture pas 163.139

Webcast MS4 regulated pervious developed rpd 1002.636

Webcast MS4 nonregulated pervious developed npd 0

Webcast MS4 degraded riparian pasture trp 6.35

Webcast MS4 nursery urs 3.536

Webcast MS4 water wat 18.46

Webcast MS4 CSS pervious developed cpd 0

Webcast MS4 CSS impervious developed cid 0

Webcast MS4 CSS extractive cex 0

Webcast MS4 CSS construction ccn 0

Webcast MS4 nonregulated extractive nex 0

Page 73: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans
Page 74: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans
Page 75: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Urban BMP Scenario

Page 76: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Select BMP

Page 77: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Apply BMP to Land Use

Page 78: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

BMP Data

Page 79: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Sector Bmp Full NameLifespanYears Capital

Cap.Unit O&M

O&Munit

Opportunity Opp. Unit

Urban Abandoned Mine Reclamation 20 7134$/acre 43$/acre/year 0$/acre

UrbanAdvanced Grey Infrastructure Nutrient Discovery Program 10 0 0 0

Urban Forest Conservation 1 0$/acre 0$/acre/year 0$/acre

Urban Impervious Surface Reduction 20 100994$/acre 3610$/acres/year 50000$/acre

Urban Urban Growth Reduction 75 0$/acre 0$/acre/year 0$/acreUrban Forest Buffers 75 2986.67$/acre 0$/acre/year 0$/acre

Urban Grass Buffers 10 524.44$/acre 0$/acre/year 0$/acreUrban Stream Restoration 20 645$/ft 8.6$/feet/year 0$/feet/year

Urban

Dirt & Gravel Road Erosion & Sediment Control - Driving Surface Aggregate + Raising the Roadbed 20 10.39$/ft 0$/feet/year 0$/feet/year

Urban Shoreline Management 20 63.56$/ft 0$/feet/year 0$/feet/yearUrban Street Sweeping Pounds 20 1.53$/lbs 0.11$/lbs/year 0$/lbs

Urban Wet Ponds and Wetlands 50 4418.64$/acres treated 63.02

$/acre treated/year 507.71$/acre treated

UrbanDry Detention Ponds and Hydrodynamic Structures 50 10281

$/acres treated 165

$/acre treated/year 635$/acre treated

Urban Dry Extended Detention Ponds 50 4096.4$/acres treated 54.77

$/acre treated/year 1269.27$/acre treated

UrbanInfiltration Practices w/o Sand, Veg. - A/B soils, no underdrain 50 13454.55

$/acres treated 292.89

$/acre treated/year 1269.27$/acre treated

UrbanInfiltration Practices w/ Sand, Veg. - A/B soils, no underdrain 50 13454.55

$/acres treated 292.89

$/acre treated/year 1269.27$/acre treated

Urban Filtering Practices 25 20517.31$/acres treated 837.44

$/acre treated/year 634.64$/acre treated

Cost Data Download

Page 80: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Results

Page 81: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Loads from Each Sector

Page 82: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Comparing Scenarios

Page 83: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Percent Change

Page 84: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

File Download

Page 85: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Summary

• BayFAST & CAST scenarios closely replicate the results of the Chesapeake Bay Model. – Uses CBP-approved BMPs and efficiencies

– Consistent with the CBP Phase 5.3.2 Watershed Model and updates

– Users may quantify the impacts of various management actions

– designed to be useful to people with a general knowledge of BMPs.

– Available on-line to users with a login and password (Free)

Page 86: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Questions?

Page 87: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Webcast Resources

Mapshed Website– www.mapshed.psu.edu

• Download tool and base GIS files

• Instructional Videos

• Documentation

Watershed Treatment Model

-http://www.cwp.org/online-watershed-library/cat_view/65-tools/91-watershed-treatment-model

CAST Website– www.casttool.org

BayFast Website– www.bayfast.org

www.chesapeakestormwater.net

Page 88: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Questions for Pennsylvania DEP

[email protected]

Page 89: Modeling Pollutant Load Reductions for TMDL …chesapeakestormwater.net/wp-content/uploads/dlm_uploads/...Modeling Pollutant Load Reductions for TMDL and Pollution Reduction Plans

Please take a few moments to answer our 6 question survey to help us better serve your needs in future

webcasts.

https://www.surveymonkey.com/r/Modeling-Webcast

We use this information to report it to assess our work, your needs and to report it to our funders for future

webcasts !

Evaluation