Top Banner
LOGO MODELING AND HEURISTICS FOR SCHEDULING OF DISTRIBUTED JOB SHOPS Expert Systems with Applications 41 (2014) 7754–7763 BACHTIAR HERDIANTO PETTY CHYNTYA N.
20

Modeling and Heuristics for Scheduling of Distributed Job

Dec 04, 2015

Download

Documents

Modeling and Heuristics for Scheduling of Distributed JobModeling and Heuristics for Scheduling of Distributed JobModeling and Heuristics for Scheduling of Distributed JobModeling and Heuristics for Scheduling of Distributed Job
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Modeling and Heuristics for Scheduling of Distributed Job

LOGO

MODELING AND HEURISTICS FOR SCHEDULING OF

DISTRIBUTED JOB SHOPS

Expert Systems with Applications 41 (2014) 7754–7763

BACHTIAR HERDIANTOPETTY CHYNTYA N.

Page 2: Modeling and Heuristics for Scheduling of Distributed Job

INTRODUCTION

Comprehensive experiments are conducted to evaluate the performance of the two models and the six heuristics. The results show sequence based model and greedy heuristics equipped with redundancy exclusion are effective for the problem.

LPT

SPT

LRPT

Greedy heuristic

𝑮𝑯𝟏

DJS

Small sized problems

Large sized problems 𝑮𝑯𝟐

𝑮𝑯𝟑

MILPOperation-position based

MILPOperation-position based

Rule-based heuristics

(Distributed Job Shop)

(Mathematical Models)

(The Heuristic)

Page 3: Modeling and Heuristics for Scheduling of Distributed Job

Hot Tip

How do I incorporate my logo to a slide that will apply to all the other slides?

On the [View] menu, point to [Master], and then click [Slide Master] or [Notes Master]. Change images to the one you like, then it will apply to all the other slides.

Page 4: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

ThemeGallery is a Design Digital Content & Contents mall developed by Guild Design Inc.

TitleAdd your text

ThemeGallery is a Design Digital Content & Contents mall developed by Guild Design Inc.

Page 5: Modeling and Heuristics for Scheduling of Distributed Job

Cycle Diagram

Text

TextText

Text

Text

Cycle name

Add Your Text

Page 6: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

Text

Text

Text

Add YourTitle Text

• Text 1• Text 2• Text 3• Text 4• Text 5

Add YourTitle Text

• Text 1• Text 2• Text 3• Text 4• Text 5

Text

Text

Page 7: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

Concept

Add Your Text

Text

Text

Text

Text

Text

Text

Page 8: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

Add Your Text

Add Your Text

Add Your Text

Add Your Text

Add Your Text

Add Your Text

Add Your Text

Add Your Text

Page 9: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

Add Your Text

Add Your Text

Add Your Text

Add Your Title

Page 10: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

Add Your Text Add Your Text Add Your Text

Text Text Text

Page 11: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

Add Your Title

Text

Text

Text

Text

Page 12: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

Text

Text

Text

Title

Text

Text

Text

Add Your Text

Page 13: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

1

ThemeGallery is a Design Digital Content & Contents mall developed by Guild Design Inc.

2

ThemeGallery is a Design Digital Content & Contents mall developed by Guild Design Inc.

3

ThemeGallery is a Design Digital Content & Contents mall developed by Guild Design Inc.

Page 14: Modeling and Heuristics for Scheduling of Distributed Job

Diagram

Your TextYour Text

Your TextYour Text

Your TextYour Text

Your TextYour Text

2001 2002 2003 2004

Page 15: Modeling and Heuristics for Scheduling of Distributed Job

Progress Diagram

Phase 1Phase 1 Phase 2Phase 2 Phase 3Phase 3

Page 16: Modeling and Heuristics for Scheduling of Distributed Job

Block Diagram

TEXT TEXT TEXT TEXT

TEXT TEXT TEXT TEXT

Page 17: Modeling and Heuristics for Scheduling of Distributed Job

Table

Title Title Title Title Title

Title O O O O O

Title O O O O O

Title O O O O O

Title O O O O O

Title O O O O O

Title O X O X O

Page 18: Modeling and Heuristics for Scheduling of Distributed Job

Text1

Text2Text3

Text4

Text5

3-D Pie Chart

Page 19: Modeling and Heuristics for Scheduling of Distributed Job

Block Diagram

Add Your TextAdd Your Text

Add Your Text

concept ConceptConcept Concept

Page 20: Modeling and Heuristics for Scheduling of Distributed Job

LOGO

www.themegallery.com