MODEL WATERSHED MASTER PLAN AND PLANNING TOOL – WATER QUALITY AND NPDES REGULATIONS IMPLEMENTATION PACE performed a watershed-wide analysis of the San Gabriel/Coyote Creek watersheds (and is currently preparing plans for the remaining watersheds located in Orange County) to illustrate how to implement new various control measure re- quirements to mitigate hydromodification on new developments. These measures include low impact development (LID), hydromodification control, and treatment control to address hydrologic conditions of concern (HCOC), and support long-term watershed masterplanning goals. The planning process involved a multi-step process of characterizing and analyzing the wa- tershed and sub-surface conditions utilizing sophisticated GIS mapping tools. The project effort resulted in a dynamic planning tool that is accessible by County staff and property owners and provides watershed-specific support for integrating water quality, hydromodification, water supply and habitat protection issues as part of selecting and designing BMPs to meet the requirements of the County’s Model Water Quality Management Plan (WQMP). Specifically, this planning tool provides information related to infiltration feasibility and hydromodification susceptibility at the watershed and sub-watershed scale that will help inform BMP selection and design for a proposed project. Infiltration feasibil- ity and hydromodification susceptibility are fundamental factors in the selection and sizing of BMPs to meet the requirements of the MWQMP and TGD. Specific features of the watershed management planning tool include: • Regional watershed application of new MS4 criteria • Watershed information mapping database characteristics and constraints to assist site specific user • Identification of areas with Hydrologic Conditions of Concern (HCOC) for default basis • Technical foundation for site assessment screening using infiltration LID • Identification of areas with ability to participate in regional / subregional BMPs opportunities • Subwatershed plans and strategies planning /process •Technical guidance for demonstrating equivalent water quality benefits compared to onsite facilities
8

MODEL WatErshED MastEr pLan anD pLanning tOOL – WatEr ...pacewater.com/wp-content/uploads/2012/10/Watershed...characteristics. This will assist in the planning process to support

Aug 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MODEL WatErshED MastEr pLan anD pLanning tOOL – WatEr ...pacewater.com/wp-content/uploads/2012/10/Watershed...characteristics. This will assist in the planning process to support

MODEL WatErshED MastEr pLan anD pLanning tOOL –WatEr QuaLity anD npDEs rEguLatiOns iMpLEMEntatiOnPACE performed a watershed-wide analysis of the San Gabriel/Coyote Creek watersheds (and is currently preparing plans for the remaining watersheds located in Orange County) to illustrate how to implement new various control measure re-quirements to mitigate hydromodification on new developments. These measures include low impact development (LID), hydromodification control, and treatment control to address hydrologic conditions of concern (HCOC), and support long-term watershed masterplanning goals. The planning process involved a multi-step process of characterizing and analyzing the wa-tershed and sub-surface conditions utilizing sophisticated GIS mapping tools. The project effort resulted in a dynamic planning tool that is accessible by County staff and property owners and provides watershed-specific support for integrating water quality, hydromodification, water supply and habitat protection issues as part of selecting and designing BMPs to meet the requirements of the County’s Model Water Quality Management Plan (WQMP). Specifically, this planning tool provides information related to infiltration feasibility and hydromodification susceptibility at the watershed and sub-watershed scale that will help inform BMP selection and design for a proposed project. Infiltration feasibil-ity and hydromodification susceptibility are fundamental factors in the selection and sizing of BMPs to meet the requirements of the MWQMP and TGD.

Specific features of the watershed management planning tool include:• Regional watershed application of new MS4 criteria• Watershed information mapping database characteristics and constraints to assist site specific user• Identification of areas with Hydrologic Conditions of Concern (HCOC) for default basis• Technical foundation for site assessment screening using infiltration LID• Identification of areas with ability to participate in regional / subregional BMPs opportunities• Subwatershed plans and strategies planning /process•Technical guidance for demonstrating equivalent water quality benefits compared to onsite facilities

Page 2: MODEL WatErshED MastEr pLan anD pLanning tOOL – WatEr ...pacewater.com/wp-content/uploads/2012/10/Watershed...characteristics. This will assist in the planning process to support

WatErshED CharaCtEriZatiOn / Mapping tOOLs

A GIS database will help to characterize the physical resources that provide the foundation for an understanding of watershed characteristics. This will assist in the planning process to support identification of project opportunities and constraints, while guiding effective watershed planning implementation.

Topographic Relief

Hydrologic Soil Types Depth to Groundwater

P:\9

526E

\6-G

IS\M

xds\

Rep

orts

\WIH

MP_

2011

0330

\952

6E_W

IHM

P_So

ils_P

C1_

2011

0330

.mxd

Anaheim Bay-Huntington HarborWatershed

Newport BayWatershed

Santa Ana River Watershed

Los Angeles County

San BernardinoCounty

2.3.1

JOB

TITL

ESC

ALE

1" =

800

0'

DE

SIG

NE

D

DR

AW

ING

CH

EC

KE

DBM

P

03/3

0/11

DAT

E

JOB

NO

.95

26-E

PCTHO

RA

NG

E C

OU

NT

YW

AT

ER

SH

ED

MA

ST

ER

PL

AN

NIN

GO

RA

NG

E C

OU

NY

CA

SO

ILS

HY

DR

OLO

GIC

GR

OU

PN

RC

S S

OIL

SU

RV

EY

!I 0 8,000 16,000Feet

SoilsHydrologic Group

A

B

C

D

Watershed inventory / Characterization• Technical foundation for site assessments• Identification of opportunity / constraints

– Hydrologic Characteristics– Drainage Facilities Inventory– Water Supply– Geologic Constraints

Data sources• Multiple Agencies

Limitations• Funding Resources/Level of Accuracy/Availability

Regional Channel Types

Santa Ana RiverWatershed

Anaheim Bay-Huntington HarborWatershed

Newport BayWatershed

Santa Ana River Watershed

Los Angeles County

San BernardinoCounty

CHANNEL TYPES

8,500 0 8,5004,250

Feet

P:\9526E\6-GIS\Mxds\Reports\WIHMP_20110518\9526E_Fig_4_1_WIHMP_ChannelTypes_PC1_20110520.mxd

!I

FIGURE 4.1COYOTE CREEK/SAN GABRIEL CREEKWATERSHED INFILTRATION HYDROMODIFICATION MANAGEMENT PLAN

Nikki "Hoopz" Alexande

LegendEarth (Unstable)Earth (Stabilized)Stabilized

Page 3: MODEL WatErshED MastEr pLan anD pLanning tOOL – WatEr ...pacewater.com/wp-content/uploads/2012/10/Watershed...characteristics. This will assist in the planning process to support

WatErshED DELinEatiOn DrainagE FaCiLitiEs / Mapping tOOLs

Urban Drainage Facilities Regional Database

Urban Drainage Facilities Regional Database

Santa Ana RiverWatershed

Anaheim Bay-Huntington HarborWatershed

Newport BayWatershed

Santa Ana River Watershed

Los Angeles County

San BernardinoCounty

E03

A08

B01

A04

A06

A01

A02

B01

A03

A03

B02

A07

C01

A01

REGIONAL FLOOD FACILITIES

8,500 0 8,5004,250

Feet

P:\9526E\6-GIS\Mxds\Reports\WIHMP_20110518\9526E_Fig_02_7_WIHMP_RegionalFloodFacilities_LocalStormDrain_PC1_20110520.mxd

!I

FIGURE 2.7COYOTE CREEK/SAN GABRIEL CREEKWATERSHED INFILTRATION HYDROMODIFICATION MANAGEMENT PLAN

Legend

Regional Flood Facilities

Local Storm Drains

Urban Drainage Facilities Mapping Database

Urban Drainage Facilities Mapping Database

Page 4: MODEL WatErshED MastEr pLan anD pLanning tOOL – WatEr ...pacewater.com/wp-content/uploads/2012/10/Watershed...characteristics. This will assist in the planning process to support

COnstraint CharaCtEristiCs FOr hyDrOMODiFiCatiOn anD LiD

Watershed hydromodification mapping characterizes all major channels or reaches within a given watershed as “susceptible” or “not susceptible” to hydromodification and includes delineations of the tributary area to each susceptible channel reach. Hydro-modification is defined as the physical response of stream channels to changes in catchment runoff and sediment yield caused by land use modifications. The maps are intended to be used as the default basis for determining whether a susceptible channel segment exists downstream of the project a part of determining whether HCOCs exist.

hydromodification susceptibility Mapping tool

Channel Erodibility Data• Watershed mapping / subareas• 100-year floodplains• Hydrography• Lakes / reservoirs / basins• Storm drains• Channel locations / types / materials

– Verification with aerial photographs– Extent of digital channel data

• In-stream structures

Watershed Erosion• Erosion potential

Data issues• Quality of data• Conflicts / inconsistencies

Limitations• Verification required in downstream

Hydromodification Susceptibility – Erosion Potential

Watershed Surface Soils – Erosion Potential

Hydromodification

P:\9

526E

\6-G

IS\M

xds\

Rep

orts

\WIH

MP_

2011

0330

\952

6E_F

ig_4

_3_2

_WIH

MP_

Ero

sionP

ote

ntia

l_PC

1_20

1103

30.m

xd

Anaheim Bay-Huntington HarborWatershed

Newport BayWatershed

Santa Ana River Watershed

Los Angeles County

San BernardinoCounty

4.3.2

JOB

TITL

ESC

ALE

1" =

800

0'

DE

SIG

NE

D

DR

AW

ING

CH

EC

KE

DBM

P

03/3

0/11

DAT

E

JOB

NO

.95

26-E

PCTHO

RA

NG

E C

OU

NT

YW

AT

ER

SH

ED

MA

ST

ER

PL

AN

NIN

GO

RA

NG

E C

OU

NY

CA

SU

SC

EP

TIB

ILIT

YA

NA

LYS

IS

!I 0 8,000 16,000Feet

Potential Areas of Erosion, Habitat, &Physical Structure Susceptibility

Channel TypeEarth (Unstable)

Earth (Stabilized)

Stabilized

Page 5: MODEL WatErshED MastEr pLan anD pLanning tOOL – WatEr ...pacewater.com/wp-content/uploads/2012/10/Watershed...characteristics. This will assist in the planning process to support

COnstraint CharaCtEristiCs FOr hyDrOMODiFiCatiOn anD LiD

Infiltration feasibility maps are intended to provide a preliminary planning level assessment of those infeasibility criteria that can be mapped meaningfully at a watershed or sub-watershed scale. The maps identify areas where infiltration is clearly infeasible to avoid the need for small projects to conduct site-specific testing that is unlikely to be necessary.

infiltration Feasibility assessment Mapping tool

infiltration Limitations / Constraints• Soil permeability• Depth to shallow groundwater• Groundwater protection / Contamination• Landslides• Sewer systems high I/I zones• Liquefaction hazard zones

Low Permeability Soils

Potential Landslide Areas

P:\9

526E

\6-G

IS\M

xds\

Rep

orts

\WIH

MP_

2011

0330

\952

6E_W

IHM

P_La

ndsli

des

_PC

1_20

1103

30.m

xd

Anaheim Bay-Huntington HarborWatershed

Newport BayWatershed

Santa Ana River Watershed

Los Angeles County

San BernardinoCounty

2.3.2

JOB

TITL

ESC

ALE

1" =

800

0'

DE

SIG

NE

D

DR

AW

ING

CH

EC

KE

DBM

P

03/3

0/11

DAT

E

JOB

NO

.95

26-E

PCTHO

RA

NG

E C

OU

NT

YW

AT

ER

SH

ED

MA

ST

ER

PL

AN

NIN

GO

RA

NG

E C

OU

NY

CA

PO

TE

NT

IAL

LA

ND

SL

IDE

AR

EA

S

!I 0 8,000 16,000Feet

Potential Landslide Areas

Page 6: MODEL WatErshED MastEr pLan anD pLanning tOOL – WatEr ...pacewater.com/wp-content/uploads/2012/10/Watershed...characteristics. This will assist in the planning process to support

rEgiOnaL WatErshED OppOrtunitiEs anD pLanning stratEgiEs

A key role to watershed planning is to identify potential opportunities for regional and subregional stormwater management facilities that can play a critical role in meeting water quality, hydromodification, water supply, and/or habitat goals within the watershed rather than relying on individual site-specific treatment. Future subwatershed analysis can tier off this regional facility planning effort to develop subwatershed control strategies in compliance with the MS4 Permit. Subwatershed BMP facilities identified as part of this initial screening process are intended to serve as the planning and implementation tool for developing a subwatershed control approach, demonstrating that stormwater requirements and watershed objectives are still met based on scientifically based and technically sound analysis.

process for implementing subregional /regional Facility strategies

Generalized Steps1. Select opportunity locations2. Develop subwatershed plans and supporting analysis3. Implement regional/subregional facilities and administer participation

Facility implementation and prioritization also depends on variety of factors including (1) maximizing water quality benefits, and (2) timing opportunities of projects (i.e. development forecasts).

Site Factors• Physical characteristics• Ownership considerations• Receiving water conditions• Watershed characteristics• Development forecasts• Stakeholder input

subwatershed plan Minimum Elements1. Develop Subwatershed control strategy2. Conceptual facility plans and design criteria3. Estimate facility capacity and expected performance4. Establish criteria for project participation5. Describe implementation plan

– Funding mechanism– Schedule– Monitoring / Operations /Maintenance

Open Space Areas with ExistingRetarding Basins

Resulting Potential Regional Sites

Contributing Watershed - Regional Sites

Infiltration Constraints Physiographic Constraints

P:\9526E\6-GIS\Mxds\Reports\WIHMP_20110518\9526E_Fig_7_1_WIHMP_RegionalLIDFacilityOpportunitiesPC1_20110511.mxd

Santa Ana RiverWatershed

Anaheim Bay-Huntington HarborWatershed

Newport BayWatershed

Santa Ana River Watershed

Los Angeles County

San BernardinoCounty

0 8,500 17,000Feet

LegendSubbasin OutlinesPotential BMP Opportunities

REGIONAL/SUBREGIONAL BMP OPPORTUNITIESWATERSHED INFLUENCE ZONES

FIGURE 7.1COYOTE CREEK/SAN GABRIEL CREEKWATERSHED INFILTRATION HYDROMODIFICATION MANAGEMENT PLAN

P:\9526E\6-GIS\Mxds\Reports\WIHMP_20110510\9526E_Fig_7_2_WIHMP_RegionalLIDFacilityOpportunitiesWithWatershedInfluencePC1_20110511.mxd

Santa Ana RiverWatershed

Anaheim Bay-Huntington HarborWatershed

Newport BayWatershed

Santa Ana River Watershed

Los Angeles County

San BernardinoCounty

B01-08

B01-04 B01-11B01-19

B01-17

B01-22 B01-31 B01-46

B01-54

B01-58

B01-62

B02-02B01-15

B01-13 B01-20

B01-25B01-47

B01-45

B01-50B01-52

B01-57

A03-19

A03-21

A03-23

A03-25

A04-01

A03-16

A03-15

B01-34

A03-11

A03-09A03-08

A03-07

A03-14

A03-13

A03-05A03-04

A03-03

B02-05

B01-26B01-05

B01-39

A01-01

C01-03

B01-12

B01B03

B01B06

B01B07

A06B01

B01-48

B01B05

B01-07

A03-10

B02-04B02-03

B02-01

B01-09

B01-01

B01-16

C01-01

B01B02

B01B04

LegendSubbasin Outlines

B01-57

Potential BMPBMP Contributing Area

REGIONAL/SUBREGIONAL BMP OPPORTUNITIESWATERSHED INFLUENCE ZONES

FIGURE 7.2COYOTE CREEK/SAN GABRIEL CREEKWATERSHED INFILTRATION HYDROMODIFICATION MANAGEMENT PLAN

0 8,500 17,000Feet!I

P:\9

526E

\6-G

IS\M

xds\

Wor

ksp

ace

\Coy

ote

Cre

ekSa

nGa

brie

l_20

1102

01\9

526E

_Pot

entia

lBM

P_C

hang

eFro

mLU

2005

toLU

2011

_PC

1_20

1103

21.m

xd

Anaheim Bay-Huntington HarborWatershed

Newport Bay-Newport Coastal

Streams Watershed

Santa Ana River Watershed

Los Angeles County

San BernardinoCounty

CypressRe ta rd ing

Basin

LosAlami tos

Re ta rd ingBasin

RaymondRe ta rd ing

Basin

CrescentRe ta rd ing

Basin

Placent iaRe ta rd ing

Basin

Gi lbe rtRe ta rd ing

Basin

RossmoorRe ta rd ing

Basin

2

JOB

TIT

LESC

ALE

1" =

800

0'

DES

IGN

ED

DR

AWIN

G

CH

ECKE

DB

MP

03/2

4/11

DAT

E

JOB

NO

.95

26-E

PC

THO

RA

NG

E C

OU

NT

YW

AT

ER

SH

ED

MA

ST

ER

PL

AN

NIN

GO

RA

NG

E C

O.

CA

EX

IST

ING

RE

TAR

DIN

G B

AS

INS

& O

PE

N S

PAC

E A

RE

AS

PO

TE

NT

IAL

BM

P L

OC

AT

ION

S

0 8,000 16,000Feet

PRELIMINARY MAPSUBJECT TO FURTHER REVISION

LEGENDPotential BMP Locations

Existing Retarding Basin

Open Area

Anaheim Bay-Huntington HarborWatershed

Santa Ana RiverWatershed

Los Angeles County

San BernardinoCounty

CypressRetarding

Basin

LosAlamitos

RetardingBasin

RaymondRetarding

Basin

CrescentRetarding

Basin

Placent iaRetarding

Basin

Gi lber tRetarding

Basin

RossmoorRetarding

Basin

0 8,000 16,000Feet

LEGENDPhysiographic BMP Constraints

Potential BMP LocationsExisting Retarding Basin

Open Area

Potential BMP Location Removed

Anaheim Bay-Huntington HarborWatershed

Santa Ana RiverWatershed

Los Angeles County

San BernardinoCounty

CypressRetarding

Basin

LosAlamitos

RetardingBasin

RaymondRetarding

Basin

CrescentRetarding

Basin

Placent iaRetarding

Basin

Gi lber tRetarding

Basin

RossmoorRetarding

Basin

0 8,000 16,000Feet

LEGENDPotential BMP Locations

Existing Retarding Basin

Open Area

Potential BMP Location Removed

Page 7: MODEL WatErshED MastEr pLan anD pLanning tOOL – WatEr ...pacewater.com/wp-content/uploads/2012/10/Watershed...characteristics. This will assist in the planning process to support

ORANGE COUNTYORANGE COUNTY

LOS ANGELES COUNTYLOS ANGELES COUNTY

LOS

ANGELES

COUNTY

LOS

ANGELES

COUNTY

FULLERTON

ANAHEIM

SEALBEACH

BREA

BUENA PARK

PLACENTIA

CYPRESS

LOSALAMITOS

LA PALMA

BREA

LA HABRA

P:\9

526E

\6-G

IS\M

xds\

Wo

rksp

ace\

Pollu

tant

Load

ing

_201

1062

1\95

26E_

Pollu

tant

Loa

din

gRes

ults

_201

1021

5.m

xd

FIGURE

1

JOB

TITL

ESC

ALE

1" =

800

0'

DE

SIG

NE

D

DR

AW

ING

CH

EC

KE

DBM

P

06/2

3/11

DAT

E

JOB

NO

.95

26-E

THTH

OR

AN

GE

CO

UN

TY

INF

ILT

RA

TIO

N S

TU

DY

OR

AN

GE

CO

.C

A

SU

BB

AS

IN P

CP

I FIN

AL

RE

SU

LTS

PO

LLU

TAN

T L

OA

DIN

G A

NA

YS

IS

0 8,000 16,0004,000Feet

LEGENDCity Boundaries

PCPI Results0 - 1011 - 2021 - 3031 - 4041 - 50

ORANGE COUNTYORANGE COUNTY

LOS ANGELES COUNTYLOS ANGELES COUNTY

LOS

ANGELES

COUNTY

LOS

ANGELES

COUNTY

FULLERTON

ANAHEIM

SEALBEACH

BREA

BUENA PARK

PLACENTIA

CYPRESS

LOSALAMITOS

LA PALMA

BREA

LA HABRA

P:\9

526E

\6-G

IS\M

xds\

Wo

rksp

ace\

Pollu

tant

Load

ing

_201

1062

1\95

26E_

Pollu

tant

Loa

din

gRes

ults

_201

1021

5.m

xd

FIGURE

1

JOB

TITL

ESC

ALE

1" =

800

0'

DE

SIG

NE

D

DR

AW

ING

CH

EC

KE

DBM

P

06/2

3/11

DAT

E

JOB

NO

.95

26-E

THTH

OR

AN

GE

CO

UN

TY

INF

ILT

RA

TIO

N S

TU

DY

OR

AN

GE

CO

.C

A

PC

PI F

INA

L R

ES

ULT

SP

OL

LUTA

NT

LO

AD

ING

AN

AY

SIS

0 8,000 16,0004,000Feet

LEGENDCity Boundaries

Subbasins

PCPI Results0 - 1010 - 20 20 - 3030 - 4040 - 50

Implementation planning should also emphasize the strategic location of BMPs that have been chosen to maximize the pollutant reduction within a watershed. An approach using a GIS-based tool can provide guidance for the systematic prioritizing of BMP projects to optimize pollutant reduction in a cost effective manner. The tool employs different weighting factors to assess high pollutant loading based on pollutant generation and watershed impairments. The methodology will generate a numerical scoring system to determine the subwatershed priority index based on the annual commutative pollutant loading tributary to a specific facility and weighted based on watershed specific impairments for the different pollutants to provide a relative importance within the watershed.

rEgiOnaL BMp iMpLEMEntatiOn priOritiZatiOn

Methodology for analysis of Determination of regional BMp prioritization

• Analysis similar to Geosyntec SBPAT• Smaller subwatershed parcels of 40 acres• Computation of annualized area weighted pollutant load for different constituents landuse based

– Runoff Coefficients– Pollutant EMCs– 85th percentile 24-hour depth

• Normalize between high to low valueCopper

Zinc

Overall Pollutant Loading Results

Subbasin Pollutant Loading Results

Page 8: MODEL WatErshED MastEr pLan anD pLanning tOOL – WatEr ...pacewater.com/wp-content/uploads/2012/10/Watershed...characteristics. This will assist in the planning process to support

17520 nEWhOpE strEEt, suitE 200 | FOuntain VaLLEy, CaLiFOrnia 92708 • 714.481.7300 | WWW.paCEWatEr.COMAdditional Offices: Scottsdale • Beijing • Moscow

gis WatErshED sitE pLanning tOOL

Identify Site

1

2

3

4

6

Regional Facility & Drainage Facilities

Site BMP InformationSite Subwatershed Location

Regional Infiltration Constraints

Receiving Waters Flowpath

An interactive GIS mapping tool was developed to assist general public located within the watershed to be able to utilize the information database about their specific site and readily provide information in a format that would (1) answer specific questions about their site related to MS4 permit requirements and applying the WQMP, (2) assist in providing the required design information for BMP facilities, and (3) identifying the regional BMP which could be uti-lized to mitigate their particular site.

5