Model Status Update December 17, 2014. Agenda Purpose Model Conceptualization Recap Model Development Model Calibration Status Model Data for Review Next.

Jan 17, 2018

Download

Documents

Cynthia Pope

Purpose Inform stakeholders on status of model development Provide more detailed information on some of the model components Discuss the model data to be shared for review Discuss next steps and timeline
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

Model Status Update December 17, 2014 Agenda Purpose Model Conceptualization Recap Model Development Model Calibration Status Model Data for Review Next Steps Schedule Public Input Purpose Inform stakeholders on status of model development Provide more detailed information on some of the model components Discuss the model data to be shared for review Discuss next steps and timeline Model Conceptualization Recap 2500x2500 ft grid 7 layers HSPF models Steady-state calibration (2001 and 2009) Model Layers Lateral Boundary Conditions Recharge and Calibration Approach Rainfall and ET HSPF models Steady-state calibration 2001 and 2009 Transient Calibration ( ) Model Development MODFLOW-NWT Springs and Rivers Recharge Package Well Package Calibration Target Data Springs and Rivers GHB and River Package SRWMD HEC-RAS model St. Johns River SW Model Recharge Package HSPF Models 54 USGS HUC 8 watersheds More than 1800 subbasins Rainfall and PET NLDAS (North American Land Data Assimilation System) MODFLOW -HSPF Interaction Max ET rate for MODFLOW ET Package ( Remaining ET for Active groundwater) Recharge (AGWI + IGWI) 2001 Initial Draft Recharge Input Map Modification may be needed if required through calibration ET Extinction Depth (Modified from Shah et al., 2007) Extinction Depths (ft) under Forest Land Cover Soil TypeHydricPartly hydricNon-hydric sand loamy sand sandy loam sandy clay loam sandy clay loam silty clay clay loam silt loam silt silty clay loam clay Extinction Depths (ft) under Grass Land Cover Soil TypeHydricPartly hydricNon-hydric sand loamy sand sandy loam sandy clay loam sandy clay loam silty clay clay loam silt loam silt silty clay loam clay Water Use Data RegionPS/CII/RecDSSAG FL Water Use SJRWMD/SRWMD/SWFWMD Permit Database Estimated by SJRWMD using parcel data and well construction database and SWFWMD Database SJRWMD/SRWMD/SWFWMD Permit Database Estimated by Balmoral Group using AFSIRS and Metered/Reported water use GA Water Use Provided by USGS Estimated by GIS Associates using Census blocks and USGS estimates Estimated by Balmoral Group using AFSIRS and Metered/Reported water use SC Water Use Estimated by GIS Associates using Census blocks and USGS estimates Estimated by Balmoral Group using AFSIRS and Metered/Reported water use Water Use Summary (MGD) (Draft subject to change) YearRegionPS/CII/RecDSSAGTotal 2001 FL GA/SC Total FL GA/SC Total FL GA/SC Total Well Package AE wells (Permitted Wells) Well coordinates are known Source aquifer is only one aquifer MNW package (Permitted Wells) Well coordinates are known Source aquifer is more than one aquifer and/or not identified in the database BC wells (Estimated water use) Well coordinates are unknown Water use estimated Calibration Target Wells Data Filling Types (2001, 2009, 2010) (1) Original data > 6 months (2) Filled data > 6 months (3) Filled second data > 6 months (4) PCA data > 6 months (5) Any data < 6 months Calibration Target Baseflows Estimated Baseflows using Observed Flows Baseflows from HSPF Calibration Status (Below Gulf Trough) UFASAS Absolute Mean Standard Deviation Mean Simulated Potentiometric Map Insert a map showing simulated 2001 pot map Data to be reviewed Water Use Geodatabase by the end of this week Next Steps Update Water Use Complete Manual Calibration (2001 and 2009) Run Preliminary WSP Simulations (still in development) Complete PEST Calibration (2001 and 2009) Initiate transient calibration process Schedule End of Jan Initial Manual Calibration completed End of June 2015 PEST Calibration completed Public Input