Top Banner
1 BATHROOM ADD-ON SYSTEM MODEL #S1101 Español p. 20 ATTACH YOUR RECEIPT HERE Purchase Date S TAR ® STOP For missing, damaged parts or technical help, Call 1-800-742-5044 before returning product For replacement pump, order 1102RP or see complete repair parts list on page 17 Patent No. 5,038,418 FW1591 0113 Supersedes NEW P/N 152521
38

MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

Feb 26, 2019

Download

Documents

phamnhan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

1

BATHROOM ADD-ON SYSTEMMODEL #S1101

Español p. 20

ATTACH YOUR RECEIPT HERE

Purchase Date

STAR®

STOPFor missing, damaged parts or technical help, Call

1-800-742-5044

before returning product

For replacement pump, order 1102RP or see complete repair parts list on page 17

Patent No. 5,038,418

FW15910113

Supersedes NEW

P/N 152521

Page 2: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

2

SAFETY INFORMATION

TABLE OF CONTENTS

Please read and understand this entire manual before attempting to assemble, operate or install the product. Inspect all materials before installation. If parts are damaged or missing, call 1-800-742-5044 before returning to your retailer.

Safety Information ............................................................................................................................2

Package Contents ............................................................................................................................4

Preparation .......................................................................................................................................5

General Pump Uses .........................................................................................................................5

Dimensions .......................................................................................................................................6

Pump System Location.....................................................................................................................6

Bolt Location .....................................................................................................................................7

Testing Operation .............................................................................................................................8

Connect to Plumbing ........................................................................................................................9

Installation of Toilet - Exposed Installation ...................................................................................... 11

Installation of Toilet - Hidden Installation ........................................................................................ 11

Additional Fixtures ..........................................................................................................................13

Replacement Parts .........................................................................................................................17

Troubleshooting ..............................................................................................................................18

Spotting Template ...........................................................................................................................19

DANGERELECTRICAL SHOCK HAZARD.Always disconnect power source before performing any work on or near the motor or its connected load. If the power disconnect point is out-of-sight, lock it in the open position and tag it to prevent unexpected application of power. Failure to do so could result in fatal electrical shock.ELECTRICAL SHOCK HAZARD.Do not handle the pump with wet hands or when standing in water as fatal electrical shock could occur. Disconnect main power before handling unit for ANY REASON!RISK OF ELECTRIC SHOCK. These pumps have not been investigated for use in swimming pool areas.

Page 3: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

3

ELECTRICAL SHOCK ALERT.To reduce the risk of electric shock, install only a circuit protected by a ground-fault circuit-interrupter (GFCI). Make certain that the ground fault receptacle is within the reach of the pump’s power supply cord. DO NOT USE AN EXTENSION CORD. ELECTRICAL SHOCK ALERT.Follow all local electrical and safety codes, as well as the National Electrical Code (NEC) and the Occupational Safety and Health Act (OSHA).ELECTRICAL SHOCK ALERT.Do not kink power cable and never allow the cable to come in contact with oil, grease, hot surfaces, chemicals or sharp objects. Replace damaged or worn wiring cord immediately.ELECTRICAL SHOCK ALERT.As a safety measure, each electrical outlet should be checked for ground using an Underwriters Laboratory Listed circuit analyzer which will indicate if the power, neutral and ground wires are correctly connected to your outlet. If they are not, contact a licensed electrician. ELECTRICAL SHOCK ALERT.These pumps are supplied with a 3-prong grounded plug to help protect you against the possibility of electrical shock. DO NOT UNDER ANY CIRCUMSTANCES REMOVE THE GROUND PIN.ELECTRICAL SHOCK ALERT.Make sure the pump electrical supply circuit is equipped with fuses or circuit breakers of proper capacity. A separate branch circuit is recommended, sized according to the National Electrical Code for the current shown on the pump nameplate.CHEMICAL ALERT.This product contains chemicals known to the state of California to cause cancer and birth defects or other reproductive harm.

WARNING SAFETY INFORMATION

CAUTIONPRODUCT DAMAGE MAY RESULTMake certain the power source conforms to the requirements of your equipment.PRODUCT DAMAGE MAY RESULTMaximum continuous operating water temperature for standard model pumps must not exceed 130°F (54°C).PRODUCT DAMAGE MAY RESULTDo not use an automatic plumbing vent device such as a “Pro-Vent.” Some states require this product to be installed by a licensed plumber.

• NOTE: Pumps with the “UL” mark and pumps with the “US” mark are tested to UL Standard UL778. CSA certified pumps are certified to CSA Standard C22.2 No. 108. (CUS.)

• Do not use wax seal that includes a flange that extends into the tank. If a floor is installed over the tank, use the floor flange extender seal kit included with the system.

• For installation below the original floor line, call 1-800-742-5044.

Page 4: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

4

Part Description QuantityA Pre-assembled Pump System 1B 2 in. Pipe Seal for 3 in. hole 2C 2” Check Valve 1D 3 in. Pipe Seal for 4 in. hole 1E Wax Ring 2F Locator Ring 1* Hardware Pack 1

*Not Shown

PACKAGE CONTENTS

PERFORMANCEModel

Number HP Phase Volts Ft. of Head Flow (GPM) Shut Off Head (Ft.)

Discharge Size

S1101 .4 1 1155 73

17.5 2 in.10 3915 19

NOTE: Be sure installation has a minimum of 5 ft. vertical head. Recommended for maximum of 13 ft. vertical head.

SPECIFICATIONS

A

B

C

DE

F

Page 5: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

5

Before beginning installation of product, make sure all parts are present. Compare parts with package contents list. If any part is missing or damaged, do not attempt to assemble the product.

Estimated Installation Time: 5 hours for non-hidden installation or additional fixtures.

Tools Required for Assembly (not included): tape measure, pipe tape, hacksaw, flathead screwdriver, 2-step PVC glue system (primer and sealer), hydraulic cement or other material

PREPARATION

Parts Required For Assembly (not included): 2 in. Rubber coupling or union, 2 in. and 3 in. PVC pipe and fittings as required to complete installation, shut-off valve as required by codes.

1. Exposed Installation (no subflooring is used).

GENERAL PUMP USES

2. Hidden Installation (subflooring is installed over unit). 2

This pump system can be used in the following installations:

1

Page 6: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

6

Level towithin 1/8 in.

LOCATION SELECTION AND LEVELING OF TANK

NOTE: If a built in installation is to be used, locate pump chamber in an area that will allow access to the pump & switch.

1. Select a location which is readily accessible to the existing discharge and vent lines.

1

2. Level tank to within 1/8 in. for length and width. Use hydraulic cement or similar material for leveling.

CAUTION: Do not use wooden shims to level tank. CAUTION: Ensure that nails, screws or other sharp

objects do not puncture tank

2

DIMENSIONS

IL1653

13-1/2

5-1/2

42-3/1614-1/8

13-1/424-1/2

12-1/4

12-1/4

20-1/2

17

All dimensions are in inches.

Page 7: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

7

2 in. bolt locationfor toilet infoward mount position

OR

Side PositionForward Position

2 in. bolt location for toilet in side mount position

TOILET BOLT LOCATION

1

2

3

1. Determine how you will be placing the toilet on the pump system. This determines the location of the long bolts in step 2.

Note: Pump system ships preassembled in the forward installation position.

2. If a side installation is desired, take note of the position of the 2 in. bolts and remove the all four bolts located around toilet inlet hole in tank. Rotate the location of each bolt 90 degrees around the pre-drilled toilet installation hole and reinstall. Torque screws to 25-30 in-lbs. DO NOT over-torque screws.

3. If subflooring is installed, remove the 2 in. bolts located around the toilet inlet hole in tank and replace with 3 in. bolts from hardware pack.

Page 8: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

8

TESTING OPERATION

1. NOTE: Float switch on/off level has been preset but should be checked by viewing through the toilet inlet. Temporarily connect the pump discharge pipe to the house drain pipe and plug in pump

TemporaryConnectionTo houseDrain

GFCIOutlet

ToiletInlet

1

4 in.Water

2. Fill the tank with 4 in. of water. Be sure the pump does not turn on. 2

3. Add an additional 1/2 in. of water to the tank. The pump should turn “ON” when the water level reaches 4-1/2 in. If “ON” level is correct, unplug pump, disconnect temporary discharge piping and proceed to next section. If “ON” level is incorrect, refer to Troubleshooting on page 18.

4-1/2 in.Water

3

Page 9: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

9

DischargePipe

CheckValve

3. Install 2 in. shut off valve (not included) above the check valve in discharge pipe. Shut

OffValve

3

CONNECT TO PLUMBING

22. Install 2 in. check valve (included) in discharge pipe to prevent back-flow.

CAUTION: Make sure the flow arrows on the check valve are pointed up.

1. Install rigid 2 in. discharge pipe (not included) according to local, regional and state codes. Use a 2-step PVC glue system (not included) to join pipe and any fittings needed.

CAUTION: Do not use a discharge pipe smaller than the discharge pipe pre-installed in the system.

1

Page 10: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

10

Main waste line To Roof

Vent

Union

Main waste line

5 Ft.Min.

13 Ft.Max.

55. Connect rigid 3 in. vent pipe (not included) per local, regional and state codes. Include a union in the line for easy maintenance.

NOTE: Check with local code authority if a reduction in vent pipe size is desired.

CAUTION: Do Not use mechanical vent of any kind.

4. Connect discharge pipe into main waste line to sewer or septic tank. NOTE: Be sure discharge pipe has a minimum of 5 ft. vertical head and a maximum of 13 ft. vertical head.

4

CONNECT TO PLUMBING

Page 11: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

11

WaterSupply

6-1/2 in.diameter hole

Exposed Installation (no subflooring is used)1. Install 1 wax toilet bowl ring (included) and toilet as

described on the toilet ring carton.

1

2

1. Cut a 6-1/2 in. diameter hole in the subfloor, centered on the toilet tank opening in pump system.

NOTE: When using subflooring, the 2 in. bolts pre-installed in the tank must be replaced by the 3 in. bolts included in the hardware kit.

1

INSTALLATION OF TOILET - EXPOSED INSTALLATION

2. Connect water line to toilet. Fill tank and test pump system.

INSTALLATION OF TOILET - HIDDEN INSTALLATION

Page 12: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

12

Plastic Locator Ring

1st Wax Ring

2nd Wax Ring

Toilet

3 in. Pan Head Bolt

Sub Floor

Cast Iron ToiletStabilizer Plate(pre-installed)

Tank

Locator Ring

1st Wax Ring

3 in. Bolts

1st Wax Ring

44. Place the second wax ring (included) over the toilet and install toilet. Lock in place using the 3 in. pan head bolts, washer and nuts from the hardware kit.

INSTALLATION OF TOILET - HIDDEN INSTALLATION

33. Place plastic locator ring (included) on tank system and firmly press into place until wax has completely filled the ring. This can be checked by looking through the four air holes on the locator ring.

2. Firmly press wax toilet bowl ring inside the 3 in. bolts against the top surface of the pump system. 2

Page 13: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

13

WaterSupply

5 in. Min.

1-1/2 in. Min.

7 in. Min.

7 in. Min.

2 in. Min.

6 in. Min.

Do not drill inCross-hatched areasof tank

Center line point for 3 in. hole saw.

Cut TemplateAlong This Line.

3 in. Dia.

55. Connect water line to toilet, fill tank and test pump system.

INSTALLATION OF TOILET - HIDDEN INSTALLATION

11. A 3 in. hole must be drilled into pump system in order to add additional fixtures. The hole can only be drilled in the areas shown.

CAUTION: Do not drill in cross-hatched areas noted.

NOTE: Use only with additional fixtures normally found in a typical bathroom. Not recommended for washing machines, dishwashers or other equipment.

22. Attach the spotting template from page 19 to the desired location on pump system and center the punch hole as shown on the template.

NOTE: Pump system is preassembled with pump inside tank. Use caution when drilling into tank. Be sure to remove any drilled plastic material from tank when drilling is complete.

INSTALLATION OF ADDITIONAL FIXTURES

Page 14: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

14

Do not drill inCross-hatched areasof tank

3 in. hole

2 in. Pipe Seal

5 in. Min.

1-1/2 in. Min.

7 in. Min.

7 in. Min.

2 in. Min.

6 in. Min.

Do not drill inCross-hatched areasof tank

INSTALLATION OF ADDITIONAL FIXTURES

3

4

3. Insert 2 in. pipe seal (included) into the 3 in. hole drilled in Step 2. Lubricate the inside diameter of the seal with soapy water to make it easier to insert pipe. NOTE: Pipe installed in this 2” seal must be supported vertically.

4. Insert approximately 3/4 in. of pipe through seal into the tank. NOTE: The bottom of the 3 in. hole drilled in Step 2 must be a minimum of 5 or 6 in. above the base of the tank, depending on where the hole is drilled. See Figures 5, 6, 7 and 8 for typical installations.

Page 15: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

15

SK1615

CAUTION: Do not drive any nails in area of tank.Discharge

Vent

Gate Valve

GFCI

Union by Others

Back Flow Device

Vent

4 in.Min.

Vent

NOTE: 1) All vents and discharge piping must be installed according to local codes. 2) Wall board removed for clarity to show piping.

SK1616NOTE: 1) All vents and discharge piping must be installed according to local codes. 2) Wall board removed for clarity to show piping. 3) To install a shower in place of a tub, raise the shower stall to provide a gravity drain to the system tank and connect as shown in the diagram above.

Subfloor3/4 in. ThickMinimum

8 Ft. Ceiling

7 Ft. Ceiling

CAUTION: Do not drive any nails in area of tank.

Vent

2x6FloorJoists

3 in. Min.

GFCI Vent

Union by Others

DischargeShut-off Valve by Others

Vent

Back Flow Device

5

6

INSTALLATION OF ADDITIONAL FIXTURES

Typical installation with raised tub, lavatory, vent & discharge

Alternate installation with special floor mounted raised bottom tub, lavatory, vent & discharge

Page 16: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

16

SK1617

8 Ft. Ceiling

7 Ft. Ceiling

Subfloor3/4 in. ThickMinimum

2x6FloorJoists

2 x 4 studs

Vent

Vent Vent

GFCIUnion by Others

CAUTION: Do not drive any nails in area of tank.

NOTE: 1) All vents and discharge piping must be installed according to local codes. 2) Wall board removed for clarity to show piping.

Back Flow Device

Shut-off Valve by Others

Discharge

4 in.Min.

GFCI

SK1618

NOTE: 1) All vents and discharge piping must be installed according to local codes. 2) Wall board removed for clarity to show piping.

Subfloor3/4 in. ThickMinimum

8 Ft. Ceiling

7 Ft. Ceiling

CAUTION: Do not drive any nails in area of tank.

Vent

2x6FloorJoists

3 in. Min.

GFCI

Vent

Union by Others

Discharge

Shut-off Valve by Others

Vent

Back Flow Device

7

8

INSTALLATION OF ADDITIONAL FIXTURES

Alternate installation with raised tub, lavatory, vent & discharge

Alternate installation with special floor mounted raised bottom tub, lavatory, vent & discharge

Page 17: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

17

REPLACEMENT PARTS

PART DESCRIPTION PART #

A Replacement pump and switch 1101RP

B 2 in. Tank Seal KH85

C 2 in. Check Valve 006817

For replacement parts, call our customer service department at 1-800-742-5044, 7:30 a.m. - 5 p.m., EST, Monday - Friday.

AC

B

Page 18: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

18

TROUBLESHOOTING

Problem Possible Cause Corrective ActionPump will not start or run.

Low voltage, blown fuse open circuit. Have a qualified electrician check fuse and circuit.

Impeller bound. Contact an Authorized Service Station.Motor or wiring shorted. Contact an Authorized Service Station.Faulty or stuck float switch Remove lid and check float

Pump starts too soon.

Float “ON” point is adjusted too low. Raise the top float stop. Make sure the float is between the two stops. Refer to Testing Pump/Tank Section.

Water level exceeds 4-1/2 in. before pump turns on.

Float “ON” point adjusted to high. Lower the top float stop. Make sure the float is between the two stops.

Pump will not shut off.

Debris under float. Remove debris from around float.Faulty float switch. Contact an Authorized Service Station.Float “Off” point adjusted too low. Raise the bottom float stop. Make sure

the float is between the two stops. Refer to Testing Section.

Pump operates but delivers little or no water.

Debris around intake. Clean area around intake.Blockage in discharge pipe. Remove pipe and flush out debris.Low or incorrect voltage. Have a qualified electrician check house

wiring.Damaged Impeller. Contact an Authorized Service Station.Incorrect float adjustment Make sure the float is between the two

stops. Refer to Testing Section.Pump is air locked. Make sure vent hole on discharge pipe

is clear.Vertical lift too high. Change discharge piping or contact

tech. service.Pump runs too long before water is pumped.

Pump is air locked. Make sure vent hole on discharge pipe is clear.

Water level too low. Clear debris from around baffle. Make sure the float is between the two stops. Refer to Testing Section.

Page 19: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

19

SK1279

Center line point for 3 in. hole saw.

Cut TemplateAlong This Line.

3 in. Dia.

Hole must be round. Use 3" hole saw.Hole sizes greater than 3.040" can create leaks.

SPOTTING TEMPLATE

Page 20: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S1

SISTEMA COMPLEMENTARIO PARA EL BAÑO

MODELO #S1101

ADJUNTE SU RECIBO AQUÍ

Fecha de compra

STAR®

¡ALTO!

En caso de piezas faltantes o dañadas, o asistencia técnica, llame al

1-800-742-5044 antes de devolver el producto

Para obtener la bomba de repuesto, pida la 1102RP o consulte la Lista completa de piezas de reparación en la página S17.

Patente No. 5,038,418

FW15910113

Supersedes NEW

Page 21: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

INFORMACIÓN DE SEGURIDAD

ÍNDICE

Lea y comprenda completamente este manual antes de intentar ensamblar, usar o instalar el producto. Revise todos los materiales antes de su instalación. Si faltan piezas o estas están dañadas, llame al 1-800-742-5044 antes de volver a la tienda.

Información de seguridad .............................................................................................................. S2Contenido del paquete .................................................................................................................. S4Preparación ................................................................................................................................... S5Usos generales de la bomba ......................................................................................................... S5Dimensiones .................................................................................................................................. S6Ubicación del sistema de bomba................................................................................................... S6Ubicación de los pernos ................................................................................................................ S7Operación de prueba ..................................................................................................................... S8Conectar a la plomería .................................................................................................................. S9Instalación del inodoro: instalación expuesta ...............................................................................S11Instalación del inodoro: instalación oculta ....................................................................................S11Ensambles adicionales ................................................................................................................ S13ezas de repuesto ......................................................................................................................... S17Solución de problemas ................................................................................................................ S18Plantilla de ubicación ................................................................................................................... S19

PELIGRO DE DESCARGA ELÉCTRICA.Siempre desconecte la fuente de alimentación antes de llevar a cabo cualquier trabajo en el motor o cerca de este, o en su carga conectada. Si el punto de desconexión de la alimentación está fuera de la vista, asegúrelo en la posición abierta y etiquételo para evitar una aplicación de alimentación inesperada. El incumplimiento de dicho paso podría provocar una descarga eléctrica fatal.

PELIGRO DE DESCARGA ELÉCTRICA.No manipule la bomba con las manos húmedas ni cuando esté parado en el agua, ya que podría ocurrir una descarga eléctrica fatal. SIN IMPORTAR EL MOTIVO, desconecte la alimentación principal antes de manipular la unidad.

RIESGO DE DESCARGA ELÉCTRICA. No se ha verificado el uso de estas bombas en piscinas.

Page 22: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S3

ALERTA DE DESCARGA ELÉCTRICA.Para reducir el riesgo de descargas eléctricas, instale solo a un tomacorriente protegido por un interruptor de circuito de falla de puesta a tierra (GFCI, por sus siglas en inglés). Asegúrese de que el receptáculo de falla de puesta a tierra esté al alcance del cable de suministro de electricidad de la bomba. NO UTILICE UNA EXTENSIÓN ELÉCTRICA.

ALERTA DE DESCARGA ELÉCTRICA.Siga todos los códigos locales eléctricos y de seguridad, además del Código nacional de electricidad (NEC, por sus siglas en inglés) y la ley de la Administración de Salud y Seguridad Ocupacional (OSHA, por sus siglas en inglés).

ALERTA DE DESCARGA ELÉCTRICA.No pliegue el cable de alimentación ni permita que entre en contacto con aceite, grasa, superficies calientes, sustancias químicas u objetos afilados. Reemplace inmediatamente los cables dañados o desgastados.

ALERTA DE DESCARGA ELÉCTRICA.Como medida de seguridad, se debe examinar cada tomacorriente para comprobar que cuenta con puesta a tierra con un analizador de circuitos con calificación de Underwriters Laboratory que indicará si los conductores de alimentación, neutro y de puesta a tierra están correctamente conectados en el tomacorriente. Si no lo están, póngase en contacto con un electricista calificado.

ALERTA DE DESCARGA ELÉCTRICA.Estas bombas se suministran con un enchufe de 3 clavijas con puesta a tierra para ayudar a protegerlo contra la posibilidad de descargas eléctricas. NO RETIRE LA CLAVIJA DE PUESTA A TIERRA BAJO NINGUNA CIRCUNSTANCIA.

ALERTA DE DESCARGA ELÉCTRICA.Asegúrese de que el circuito de suministro eléctrico de la bomba esté equipado con fusibles o interruptores de circuito de la capacidad adecuada. Se recomienda un circuito de derivación aparte, de tamaño acorde al Código eléctrico nacional para la corriente que se muestra en la placa de datos de la bomba.

ALERTA DE PRODUCTO QUÍMICO.Este producto contiene sustancias químicas reconocidas por el estado de California como causantes de cáncer y defectos congénitos u otros daños en el aparato reproductivo.

INFORMACIÓN DE SEGURIDAD

PUEDE PROVOCAR DAÑO AL PRODUCTOAsegúrese de que la fuente de alimentación cumpla los requisitos de su equipo.

PUEDE PROVOCAR DAÑO AL PRODUCTOLa temperatura máxima del agua de funcionamiento continuo para bombas de modelo estándar no debe exceder los 54 °C (130 °F).

PUEDE PROVOCAR DAÑO AL PRODUCTONo utilice dispositivos automáticos de ventilación de plomería como “Pro-Vent”. Algunos estados exigen que estos productos sean instalados por un plomero certificado.

• NOTA: Las bombas con la marca “UL” y con la marca “US” se prueban para cumplir los estándares de UL UL778. Las bombas con certifi cación CSA cumplen con el estándar CSA C22.2 No. 108. (CUS.)

• No use un sello de cera que incluya una brida que se extiende por el tanque. Si se instala un piso sobre el tanque, use el kit para sello extensor de brida del piso incluido con el sistema.

• Para la instalación por debajo de la línea del piso original, llame al 1-800-742-5044.

Page 23: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

Pieza Descripción CantidadA Preensamblada 1

BSello de tubería de 2 pulg para un agujero de 3 pulg 2

C Válvula de control de 2 pulg 1

DSello de tubería de 3 pulg para un agujero de 4 pulg 1

E Anillo de cera 2F Anillo de ubicación 1* Kit de aditamentos 1

*No se muestra

CONTENIDO DEL PAQUETE

RENDIMIENTONúmero de

Modelo HP Fase Voltios Pies de cabezal Flujo (GPM) Cabezal de

cierre (pies)Tamaño de descarga

S1101 .4 1 1155 73

17.5 2 pulg10 3915 19

NOTA: Asegúrese de que la instalación tenga un cabezal vertical de un mínimo de 5 pies. El máximo recomendado para un cabezal vertical es de 13 pies.

ESPECIFICACIONES

A

B

C

DE

F

Page 24: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S5

Antes de comenzar a instalar el producto, asegúrese de tener todas las piezas. Compárelas con la lista del contenido del paquete. No intente ensamblar el producto si falta alguna pieza o si estas están dañadas. Tiempo estimado de instalación: 5 horas para una instalación no oculta o ensambles adicionales.

Herramientas necesarias para el ensamblaje (no se incluyen): Cinta métrica, cinta para tuberías, sierra de mano, destornillador de cabeza plana, sistema de pegamento PVC de 2 pasos (cebado y sellado), cemento hidráulico u otro material

PREPARACIÓN

Piezas necesarias para el ensamblaje (no se incluyen): Unión o acoplamiento de goma de 2 pulg, se requieren conectores y tubos de PVC de 2 pulg y 3 pulg para completar la instalación, válvula de cierre según lo requieran los códigos.

1. Instalación expuesta (no se utiliza subsuelo).

USOS GENERALES DE LA BOMBA

2. Instalación oculta (se instala un subsuelo sobre la unidad). 2

Este sistema de bomba puede utilizarse en las siguientes instalaciones:

1

Page 25: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

UBICACIÓN DEL SISTEMA DE BOMBA

NOTA: Si se utilizará una instalación empotrada, ubique la cámara de la bomba en un área que permita el acceso a la bomba y el interruptor.

1. Seleccione una ubicación de acceso fácil para las tuberías de descarga y ventilación existentes.

1

Nivele hasta 1/8 de pulg.

2. Nivele el tanque hasta 1/8 de pulg de largo y ancho. Para nivelar, use cemento hidráulico o un material similar.

PRECAUCIÓN: No use calzas de madera para nivelar el tanque.

PRECAUCIÓN: Asegúrese de que clavos, tornillos u otros objetos fi losos no perforen el tanque.

2

DIMENSIONES

IL1653

13-1/2

5-1/2

42-3/1614-1/8

13-1/424-1/2

12-1/4

12-1/4

20-1/2

17

Todas las dimensiones están expresadas en pulg.

Page 26: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S7

Ubicación del perno de 2 pulg para el inodoro en posición de montaje hacia delante

O

Posición lateralPosición hacia delante

UBICACIÓN DE LOS PERNOS

1

2

3

1. Determine como colocará el inodoro en el sistema de bomba. Esto determina la ubicación de los pernos largos en el paso 2.

Nota: El sistema de bomba se envía preensamblado con la posición de instalación hacia delante.

2. Si se desea una instalación lateral, tome nota de la posición de los pernos de 2 pulg y retire los cuatro pernos alrededor del agujero de entrada del inodoro en el tanque.

Gire la ubicación de cada perno en 90 grados alrededor del agujero de instalación del inodoro pretaladrado y vuelva a instalarlo. Torque los tornillos hasta 2,88 a 3,46 kgf-m. NO torque demasiado los tornillos.

3. Si se instala un subsuelo, retire los pernos de 2 pulg que se encuentran alrededor del agujero de entrada del inodoro en el tanque y reemplácelos con los pernos de 3 pulg del kit de aditamentos.

Ubicación del perno de 2 pulg para el inodoro en posición de montaje lateral

Page 27: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

OPERACIÓN DE PRUEBA

1. NOTA: El nivel de encendido y apagado del interruptor del fl otador ha sido preajustado, sin embargo, debe verifi carse revisando la entrada del inodoro.

Conecte temporalmente la tubería de descarga de la bomba a la tubería de desagüe doméstica y enchufe la bomba

Conexión temporal al desagüe doméstico

Tomacorrientes con interruptor de circuito de falla de puesta a tierra

Entrada del inodoro

1

10,16 cm de agua

2. Llene el tanque con 4 pulg de agua. Asegúrese de que la bomba no se encienda. 2

3. Agregue 1,27 cm adicional de agua al tanque. La bomba debe encenderse (“ON”) cuando el nivel de agua alcance 4-1/2 pulg. Si el nivel de encendido es el correcto, desenchufe la bomba, desconecte temporalmente la tubería de desagüe y continúe con la siguiente sección.

Si el nivel de encendido no es el correcto, consulte Solución de problemas en la página S18.

11.43 cm de agua

3

Page 28: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S9

Válvula de cierre

Válvula de control

Tubería de descarga

3. Instale una válvula de cierre de 2 pulg (no se incluye) sobre la válvula de control en la tubería de desagüe. 3

CONECTAR A LA PLOMERÍA

22. Instale una válvula de control de 2 pulg (se incluye) en la tubería de desagüe para evitar el refl ujo.

PRECAUCIÓN: Asegúrese de que las fl echas de fl ujo en la válvula de control apunten hacia arriba.

1. Instale la tubería de descarga rígida de 2 pulg (no se incluye) de acuerdo con los códigos locales, regionales y estatales. Use un sistema de adhesivo PVC de 2 pasos (no se incluye) para unir la tubería y cualquier conector necesario.

PRECAUCIÓN: No utilice una tubería de desagüe más pequeña que la tubería de desagüe preinstalada en el sistema.

1

Page 29: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

Tubería de desagüe principal

A la ventilación de techo

Unión

Tubería de desagüe principal

5 pies mín.

13 pies máx.

55. Conecte la tubería de ventilación rígida de 3 pulg (no se incluye) de acuerdo con los códigos locales, regionales y estatales. Incluya una unión en la línea para facilitar el mantenimiento.NOTA: Verifi que con la autoridad de código local si desea reducir el tamaño de la tubería de ventilación.PRECAUCIÓN: No utilice ventilación mecánica de ningún tipo.

4. Conecte la tubería de desagüe en la tubería de desagüe principal que va hacia el desagüe o el tanque séptico.

NOTA: Asegúrese de que la tubería de desagüe tenga un cabezal vertical de mínimo 5 pies y máximo 13 pies.

4

CONECTAR A LA PLOMERÍA

Page 30: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S11

Instalación expuesta (no se utiliza subsuelo)1. Instale 1 anillo de cera para taza de inodoro (se incluye)

y el inodoro como se describe en la caja del anillo para inodoro.

1

Suministro de agua

2

Agujero de 6-1/2 pulg de diámetro

1. Corte un agujero de 6-1/2 pulg en el subsuelo, centrado en la abertura del tanque del inodoro en el sistema de bomba.

NOTA: Cuando utilice un subsuelo, los pernos de 2 pulg preinstalados en el tanque deben reemplazarse con los pernos de 3 pulg incluidos en el kit de aditamentos.

1

INSTALACIÓN DEL INODORO: INSTALACIÓN EXPUESTA

2. Conecte la tubería de agua al inodoro. Llene el tanque y pruebe el sistema de bomba.

INSTALACIÓN DEL INODORO: INSTALACIÓN OCULTA

Page 31: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

Anillo de ubicación de plástico

Primer anillo de cera

Segundo anillo de cera

Inodoro

Perno de cabeza plana de 3 pulg

Subsuelo

Placa estabilizadora de inodoro de hierro forjado (preinstalada)

Tanque

Anillo de ubicación

Primer anillo de cera

Pernos de 3 pulg

Primer anillo de cera

44. Coloque el segundo anillo de cera (se incluye) sobre el inodoro e instale el inodoro. Asegúrelo en su lugar con los pernos de cabeza plana de 3 pulg, arandelas y tuercas del kit de aditamentos.

INSTALACIÓN DEL INODORO: INSTALACIÓN OCULTA

33. Coloque el anillo de ubicación de plástico (se incluye) en el sistema de tanque y presione fi rmemente en el lugar hasta que la cera llene por completo el anillo. Esto puede verifi carse a través de los cuatro agujeros de aire en el anillo de ubicación.

2. Presione fi rmemente el anillo para taza de inodoro dentro de los pernos de 3 pulg contra la superfi cie superior del sistema de bomba.

2

Page 32: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S13

Suministro de agua

Mínimo de 12,7 cm

Mínimo de 3,81 cm

Mínimo de 17,78 cm

Mínimo de 17,78 cm

Mínimo de 2 pulg

Mínimo de 15,24 cm

No taladre en las áreas del tanque marcadas con líneas diagonales

Punto central para la sierra de perforación de 3 pulg

Corte la plantilla por esta línea.

3 pulg de diámetro

55. Conecte la tubería de agua al inodoro, llene el tanque y pruebe el sistema de bomba.

INSTALACIÓN DEL INODORO: INSTALACIÓN OCULTA

11. Debe taladrarse un agujero de 3 pulg en el sistema de bomba para agregar ensambles adicionales. El agujero solo puede taladrarse en las áreas que se muestran.

PRECAUCIÓN: No taladre en las áreas marcadas con líneas diagonales.

NOTA: Use solo ensambles adicionales que se encuentran normalmente en un baño típico. No se recomienda para lavadoras, lavaplatos u otros equipos.

22. Adjunte la plantilla de ubicación de la página 19 a la ubicación deseada en el sistema de bomba y centre el agujero perforado como se muestra en la plantilla.

NOTA: El sistema de bomba está preensamblado con el tanque de la bomba dentro. Tenga cuidado cuando taladre la parte interna del tanque. Una vez fi nalizada la perforación, retire cualquier material de plástico taladrado del tanque.

ENSAMBLES ADICIONALES

Page 33: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

No taladre en las áreas del tanque marcadas con líneas diagonales

Agujero de 3 pulg

Sello de la tubería de 2 pulg

Mínimo de 12,7 cm

Mínimo de 3,81 cm

Mínimo de 17,78 cm

Mínimo de 17,78 cm

Mínimo de 2 pulg

Mínimo de 15,24 cm

No taladre en las áreas del tanque marcadas con líneas diagonales

ENSAMBLES ADICIONALES

3

4

3. Inserte un sello de la tubería de 2 pulg (se incluye) en el agujero de 3 pulg taladrado en el Paso 2. Lubrique el diámetro interno del sello con agua y jabón para facilitar la inserción de la tubería.

NOTA: La tubería instalada en este sello de 2 pulg debe tener un soporte vertical.

4. Inserte aproximadamente 3/4 de pulg de la tubería a través del sello al tanque.

NOTA: La parte inferior del agujero de 3 pulg taladrado en el Paso 2 debe tener un mínimo de 12,7 cm o 15,24 cm por sobre la base del tanque, dependiendo del lugar donde se taladre el agujero.

Consulte las instalaciones típicas en las Figuras 5, 6, 7 y 8.

Page 34: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S15

SK1615

PRECAUCIÓN: No atornille clavos en el área del tanque.DescargaVentilación

Válvula de compuerta

GFCI

Unión de otros

Dispositivo de reflujo

Ventilación

Mínimo de 10,16 cm

Ventilación

NOTA: 1) Todas las tuberías de ventilación y desagüe deben instalarse acuerdo con los códigos locales, regionales y estatales. 2) Se retiró la tabla para pared para claridad al mostrar la tubería.

SK1616NOTA: 1) Todas las tuberías de ventilación y desagüe deben instalarse acuerdo con los códigos locales, regionales y estatales. 2) Se retiró la tabla para pared para claridad al mostrar la tubería. 3) Para instalar una ducha en lugar de una bañera, levante el compartimiento para ducha para proporcionar un desagüe de gravedad al tanque del sistema

Grosor mínimo del subsuelo de 19,05 mm

Techo de 2,44 m

Techo de 2,13 m

PRECAUCIÓN: No atornille clavos en el área del tanque.

Ventilación

2 x 6 viguetas de piso

Mínimo de 7,62 cm

GFCIVentilación

Unión de otros

DescargaVálvula de cierre de otros

Ventilación

Disposit vo de reflujo

5

6

ENSAMBLES ADICIONALES

Instalación típica con bañera, lavamanos, ventilación y desagüe elevados

Instalación alternativa con piso especial montado para elevar bañera, lavamanos, ventilación y desagüe inferiores

Page 35: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

SK1617

Techo de 2,44 m

Techo de 2,13 m

Grosor mínimo del subsuelo de 19,05 mm

2 x 6 viguetas de piso

Montantes de 2 x 4

Ventilación Ventilación Ventilación

GFCIUnión de otros

PRECAUCIÓN: No atornille clavos en el área del tanque.

NOTA: 1) Todas las tuberías de ventilación y desagüe deben instalarse acuerdo con los códigos locales, regionales y estatales. 2) Se retiró la tabla para pared para claridad al mostrar la tubería

Dispositivo de reflujo

Válvula de cierre de otros

Descarga

Mínimo 10,16 cm

GFCI

SK1618

NOTA: 1) Todas las tuberías de ventilación y desagüe deben instalarse acuerdo con los códigos locales, regionales y estatales. 2) Se retiró la tabla para pared para claridad al mostrar la tubería.

Grosor mínimo del subsuelo de 19,05 mm

Techo de 2,44 m

Techo de 2,13 m

PRECAUCIÓN: No atornille clavos en el área del tanque.

Ventilación

2 x 6 viguetas de piso

Mínimo de 7,62 cm

GFCI

Ventilación

Unión de otros

Descarga

Válvula de cierre de otros

Ventilación

Dispositivo de reflujo

7

8

ENSAMBLES ADICIONALES

Instalación alternativa con bañera, lavamanos, ventilación y desagüe elevados

Instalación alternativa con piso especial montado para elevar bañera, lavamanos, ventilación y desagüe inferiores

Page 36: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S17

PIEZAS DE REPUESTO

PIEZA DESCRIPCIÓN PIEZA #

A Bomba e interruptor de reemplazo 1101RP

B Sello de tanque de 2 pulg KH85

C Válvula de control de 2 pulg 006817

Para obtener piezas de repuesto, llame a nuestro Departamento de Servicio al Cliente al 1-800-742-5044, de lunes a viernes de 7:30 a.m. a 5:00 p.m., hora estándar del Este.

AC

B

Page 37: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

SOLUCIÓN DE PROBLEMAS

Problema Causa posible Acción correctivaLa bomba no enciende ni funciona.

Voltaje bajo, fusible fundido, circuito abierto.

Pídale a un electricista califi cado que revise el fusible y el circuito.

El impulsor se salta. Póngase en contacto con una estación de servicio autorizada.

Se produjo cortocircuito en el motor o cableado.

Póngase en contacto con una estación de servicio autorizada.

El interruptor de fl otador está defectuoso o atascado

Retire la tapa y revise el fl otador

La bomba se enciende demasiado pronto.

El punto de encendido (“ON”) del fl otador está ajustado en una posición demasiado baja.

Levante el tope superior del fl otador. Asegúrese de que el fl otador quede entre los dos topes. Consulte la sección Prueba de la bomba/el tanque.

El nivel del agua excede 11,43 cm antes de encender la bomba.

El punto de encendido (“ON”) del fl otador está ajustado en una posición demasiado alta.

Baje el tope superior del fl otador. Asegúrese de que el fl otador quede entre los dos topes.

La bomba no se cierra.

Hay desechos bajo el fl otador. Retire todos los desechos alrededor del fl otador.

El interruptor del fl otador está defectuoso. Póngase en contacto con una estación de servicio autorizada.

El punto de apagado (“Off”) del fl otador está ajustado en una posición demasiado baja.

Levante el tope inferior del fl otador. Asegúrese de que el fl otador quede entre los dos topes. Consulte la sección Prueba.

La bomba funciona pero sale muy poca o nada de agua.

Hay desechos alrededor de la entrada. Limpie el área alrededor de la entrada.Hay un bloqueo en la tubería de descarga. Retire la tubería y enjuague los desechos.El voltaje es incorrecto o bajo. Pídale a un electricista califi cado que revise

el cableado doméstico.El impulsor está dañado. Póngase en contacto con una estación de

servicio autorizada.El ajuste del fl otador es incorrecto Asegúrese de que el fl otador quede entre

los dos topes. Consulte la sección Prueba.La bomba está bloqueada con aire. Asegúrese de que el agujero de ventilación

en la tubería de desagüe esté despejado.La elevación vertical es demasiado alta. Cambie la tubería de desagüe o póngase

en contacto con el servicio técnico.La bomba trabaja mucho antes de bombear el agua.

La bomba está bloqueada con aire. Asegúrese de que el agujero de ventilación en la tubería de desagüe esté despejado.

El nivel de agua es demasiado bajo. Limpie los desechos alrededor del defl ector. Asegúrese de que el fl otador quede entre los dos topes. Consulte la sección Prueba.

Page 38: MODEL #S1101 Español p. 20 Patent No. 5,038,418beyondconstruction.com/beyond-knowledge/assets/Star Water Systems... · Cut Template Along This Line. 3 in. Dia. 5. Connect water line

S19

SK1279

Punto central para la sierra de perforación de 3 pulg

Corte la plantilla por esta línea.

3 pulg de diámetro

El agujero debe ser redondo. Use una perforación del agujero de 3 pulg.Los agujeros de más de 3,040 pulg pueden provocar fi ltraciones.

PLANTILLA DE UBICACIÓN