Mobilizing SMEs to “ Green”: experiences and lessons with Resource Efficient and Cleaner Production René VAN BERKEL United Nations Industrial Development Organization Kyiv, 12 February 2015 15 February 2015 Mobilizing SMEs to "GREEN" 1
20

Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

May 15, 2018

Download

Documents

phamdat
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Mobilizing SMEs to “Green”: experiences and lessons with

Resource Efficient and Cleaner Production

René VAN BERKEL

United Nations Industrial Development Organization Kyiv, 12 February 2015

15 February 2015 Mobilizing SMEs to "GREEN" 1

Page 2: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Resource Efficient and Cleaner Production (RECP)

• Applies preventive environmental techniques and total productivity management practices to increase resource productivity and environmental performance of processes, products and services

Production Efficiency

Human

Development

Environmental Management

RECP

15 February 2015 Mobilizing SMEs to "GREEN" 2

Page 3: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Low Carbon Context

15 February 2015 Mobilizing SMEs to "GREEN" 3

Page 4: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Resource Efficient and Cleaner Production

• ReCiPE with – Ingredients ‘techniques’ or

’practices’ – Process ‘continuous

improvement’ – Outcomes ‘indicators’

15 February 2015 Mobilizing SMEs to "GREEN" 4

RECP is the RECiPe for putting green economy in practice at enterprise level

Page 5: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

RECP Techniques

15 February 2015 5 Mobilizing SMEs to "GREEN"

Resource Efficient & Cleaner Production

Good House-keeping

Input Material Change

Better Process Control

Equipment Modifi-cation

Technology Change

Onsite Reuse & Recycling

Production of Useful

Byproduct

Product Modifi-cation

Page 6: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

RECP Methodology

Environmental Aspects& Risks

Cleaner Production Options

Where are waste and emissions

generated?

Why are waste and emissions generated?

How can those causes be avoided

or minimised?

source inventory

cause diagnosis

option generation

Van Berkel (1995), Introduction to Cleaner Production Auditing, UNEP Industry and Environment Review

3. methods

Systematic root source and cause analysis guides the identification, evaluation and implementation of RECP opportunities

15 February 2015 Mobilizing SMEs to "GREEN" 6

Page 7: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

RECP Indicators • Resource Efficiency

– Productive output per unit of resource consumption

• Total energy use • Total water use • Total materials use

• Pollution Intensity – Waste and emission generation per unit of

productive output • Air emissions • Waste water volume • Waste quantity

15 February 2015 Mobilizing SMEs to "GREEN" 7

Page 8: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

FEC Concrete Producer (Moldova)

15 February 2015 Mobilizing SMEs to "GREEN" 8

Principal options implemented

Benefits

Economic Resource use Pollution generated

Invest-ment USD

Cost Saving USD/yr

Reductions in energy use, water

use and/or materials use (per

annum)

Reductions in waste water, air emissions and/or waste

generation (per annum)

Sub metering of electricity in 5 production Units 1000

25,000

Reduction of electricity

consumption* by 219,000

kWh/year

Reduction in air emissions: 217 t

CO2 eq.

Retiring old air compressor, P=75 kW and installing new efficient air compressor with variable speed P=30kW

23,000

Replacing 2 electric lifting cranes (P=28kW) with 2 forklifts N/A

Switching to efficient light bulbs from 500W to 125W (end of 2011) 532

Replacing air compressor for concrete transportation with 2 helical (screw) transporters, P=22kW (end of 2011).

16,000 Improved

materials use productivity by 7% (6,900tons)

Reduction in waste generation

Installation and operation of new production line for concrete rings

N/A 68 000

31

6

18

37

7

-4-10

0

10

20

30

40Energy Productivity

Materials Productivity Water Productivity

RESOURCE PRODUCTIVITY (change in %) 2010 2011

Page 9: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

EaP GREEN: RECP Demonstration Component

RECP in 6 countries

Human and Institutional Capacity

Implementation Dissemination and Replication

Technology Support

Experts Training (2 batches)

Awareness & Advocacy

National Coordination Mechanism

Demonstrations (2 batches)

Results Monitoring (success stories)

Regional Replication (RECP Clubs (2-3 rounds)

Technology Gap Assessment (3 batches)

Pilot Project Support

Food processing, chemical and construction materials sectors

15 February 2015 Mobilizing SMEs to "GREEN" 9

Page 10: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Messages for Enterprises

• RECP generally makes good business sense • Operational costs savings, productivity and quality

improvements and reduction of environmental impacts – Yet

• Site specific assessment needed to determine most appropriate solutions

• Realization of benefits contingent on : – Enterpreneurial capacities – Policy and regulatory certainty – Market expectations and acceptance – Real costs for energy, water, waste, waste water and compliance

15 February 2015 Mobilizing SMEs to "GREEN" 10

Page 11: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Challenges for Information

Attention Interest

Desire Action

15 February 2015 Mobilizing SMEs to "GREEN" 11

Toolkits Checklists

Business Cases

Awareness of potential benefits and availability of technical tools is insufficient to spur interest and desire to implement

Page 12: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Analyzing the Challenges

mainstream

scale-up

15 February 2015 Mobilizing SMEs to "GREEN" 12

Limited uptake of RECP by

enterprises

Productivity losses

Environmental degradation

Weak incentives

High transaction costs

1. Limited operational cost savings 2. Low environmental compliance costs 3. Limited market recognition

1. Accessibility of advice 2. Applicability of techniques 3. Affordability of solutions

Page 13: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Towards a Framework

13

Public Policy

Public Institutions Markets Society

Mainstreaming

Replicate

Expand

Streamline

Innovate

Scaling-Up

More companies More impact per company Less public effort per company

Corporate Policy

Management Systems

Incentives Rewards

Public Disclosure

15 February 2015 Mobilizing SMEs to "GREEN"

Page 14: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Policy Message

15 February 2015 Mobilizing SMEs to "GREEN" 14

Stronger incentives

Better enterprises

Smarter solutions

GREEN SMEs

Page 15: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Policy Message: Incentivize

• Make it urgent for SMEs to address their resource, environment and climate issues – Set up schemes that recognize and reward good

performance – Ensure full compliance and set long term goals – Use fiscal and pricing instruments that value

natural assets

15 February 2015 Mobilizing SMEs to "GREEN" 15

Page 16: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Good Practice Examples: Recognition

15 February 2015 Mobilizing SMEs to "GREEN" 16

EcoMark Thailand engaged ~17000 industries within 3 years of its launch

Between 1998 and 2012 OkoPlan Vienna engaged >1000 enterprises that imple- mented >11,000 actions, achieving cummulative savings exceeding 120 MEUR 330 kt CO2 and 125kt waste

Page 17: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Policy Message: Ease

• Make it easier for SMEs to adapt and adopt green techniques and practices – Improve the Accessibility – Improve the Applicability – Improve the Affordability

• For information, advisory

services, techniques and finance

15 February 2015 Mobilizing SMEs to "GREEN" 17

Accessibility

Appropriateness

Affordability

Page 18: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Good Practice Example RECP Service Providers

Awareness

Training

Assessment

Policy support

Technology support

RECP Uptake

15 February 2015 Mobilizing SMEs to "GREEN" 18

Page 19: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

Closing Remarks • Good opportunities exist for

SMEs to green their existing business through RECP

• Greening policies to focus on incentivizing into RECP and easing its adoption

• Good practice examples exist

15 February 2015 Mobilizing SMEs to "GREEN" 19

Page 20: Mobilizing SMEs to “Green” - OECD.org · line for concrete rings N/A 68 000 31 6 18 37 7 ... 15 February 2015 Mobilizing SMEs to "GREEN" 10 . ... PowerPoint Presentation

r.vanberkel(at)unido.org www.unido.org/cp www.recpnet.org

15 February 2015 20 Mobilizing SMEs to "GREEN"

Thank You