Top Banner
MOBILITY FUND OVERVIEW 18 th Annual Oregon Connections Telecommunications Conference Hood River, Oregon Mark P. Trinchero Davis Wright Tremaine LLP [email protected] October 25, 2013
21

MOBILITY FUND OVERVIEW

Feb 23, 2016

Download

Documents

jerica rendon

MOBILITY FUND OVERVIEW. 18 th Annual Oregon Connections Telecommunications Conference Hood River, Oregon Mark P. Trinchero Davis Wright Tremaine LLP [email protected] October 25, 2013. Universal Service Transformation and the Mobility Fund?. Background of Universal Service Funding - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MOBILITY FUND OVERVIEW

MOBILITY FUND OVERVIEW

18th Annual Oregon Connections Telecommunications ConferenceHood River, Oregon

Mark P. TrincheroDavis Wright Tremaine [email protected]

October 25, 2013

Page 2: MOBILITY FUND OVERVIEW

Universal Service Transformation and the Mobility Fund?

Background of Universal Service Funding– Historically, “implicit” support hidden in Inter-

Carrier Compensation rates– Telecom Act of 1996 Created an Explicit fund– Supported multiple carriers: Identical Support Rule

Concerns about size of USF– Supporting multiple carriers in the same area– FCC eliminated Identical Support Rule and Capped

Mobile Support at 2008 Levels– Competitive carrier support ≤ ILEC in the area

Page 3: MOBILITY FUND OVERVIEW

Universal Service Transformation and the Mobility Fund?

FCC’s “Transformation Order” Set Budget for USF Program For First Time– Wireline carriers: Connect America Fund ($4B)– Wireless carriers: Mobility Fund (two phases)– New funds for Remote Areas and Tribal Lands– Rural Health Care Fund becomes Healthcare

Connect Fund– Schools and Libraries Fund remains– Low-Income (Lifeline) Fund remains, with

substantial reforms

Page 4: MOBILITY FUND OVERVIEW

Mobility Fund Structure

• Phase I– $300M (plus separate $50M for Tribal lands)– Awarded by reverse auction (first ever)– One-time; no continuing support

• Phase II– $500M annually– Continuing support each year– Awarded for a period of years (period TBD)

Page 5: MOBILITY FUND OVERVIEW

Mobility Fund – Phase I

• What areas were eligible?– Unserved by either 3G or 4G wireless service

• 3G = at least 50 kbps uplink, 200 kbps downlink• 4G = at least 200 kbps uplink, 768 kbps downlink

– Determined at the census block level (is the “centroid” of the census block unserved?)

• Who could bid in an area?– Designated as an “Eligible Telecommunications

Carrier” (ETC) in the area– Access to spectrum in the area– Certify to financial and technical qualifications

Page 6: MOBILITY FUND OVERVIEW

Mobility Fund – Phase I (cont.)

• Winning Bidder Obligations – For at least 75% of the road miles in the bidding

area, deploy either• 3G service within 2 years, or• 4G service within 3 years

– Service must include voice, which must be available on a stand-alone basis

– Reasonably comparable rates– Offer co-location on new towers in the area, on

reasonable terms– Comply with FCC data roaming obligations– Drive testing, reporting, record retention, etc.

Page 7: MOBILITY FUND OVERVIEW

Mobility Fund – Phase I: Auction 901

• Auction 901 Procedures– Identified > 460,000 census blocks that lacked 3G

or better mobile service, and also contained road miles (out of ≈ 8,200,000 census blocks in US)

– Determined number of road miles in each census block (total of 650,000 road miles)

– For bidding purposes (except for Alaska and some tribal lands), aggregated these census blocks by census tracts

– 6,100 biddable census tracts– Bids were submitted based on dollars/road mile– Reverse auction: lowest bidder wins

Page 8: MOBILITY FUND OVERVIEW

Mobility Fund – Phase I: Auction 901

• Auction 901 Procedures (cont.)– $300 million cap for overall Phase I support

• Bids ordered from lowest to highest per road mile• “Work up the list” until the $300M is gone• Tribal bidders received 25% advantage when bidding

on their own tribal areas (but no reduction in support)– Process means there are “two ways to lose”

your bid:• Not the lowest bid in the census tract, or• Lowest bid, but bid too high in comparison to other

bids nationally (i.e., the $300M was already allocated to lower bids)

Page 9: MOBILITY FUND OVERVIEW

Mobility Fund – Phase I: Auction 901

• Auction 901 Procedures (cont.)– Designed to fund “the least costly of the most

costly” areas– Must cover at least 75% of road miles, but

support prorated for road coverage between 75% and 100%

– Competing with other bidders in the same area, and with all bidders in all other areas

Page 10: MOBILITY FUND OVERVIEW

Mobility Fund – Phase I: Auction 901

• Auction 901 Results (announced 10/3/2012)– 52 qualified bidders; 33 submitted at least one

winning bid– 894 bids submitted; 795 winning bids (about

13% of biddable cnsus tracts)– 31 states and 1 territory had winning bids – Winning bids covered c. 83,000 road miles (out

of a 650,000 eligible)– Winning bids ranged from $130/road mile to

$45,000/road mile– Average winning bid: $3,593/road mile

Page 11: MOBILITY FUND OVERVIEW

Mobility Fund – Phase I: Auction 901

• Auction 901 Results: Top State WinnersTotal Support Road Miles $/Road Mile

ID $32,840,434 2,697 $ 12,177 CO $32,649,205 3,985 $ 8,193 NC $26,108,602 972 $ 26,861 TX $24,916,904 14,364 $ 1,735 WY $22,831,980 13,577 $ 1,682 NV $21,060,478 2,776 $ 7,587 NM $17,895,266 17,920 $ 999 VA $12,414,554 753 $ 16,487 WV $10,611,162 344 $ 30,846 OK $10,376,072 1,339 $ 7,749

Page 12: MOBILITY FUND OVERVIEW

Mobility Fund Phase I: Eligible Areas Example

Page 13: MOBILITY FUND OVERVIEW

Mobility Fund Phase I: Winning Bids Example

Page 14: MOBILITY FUND OVERVIEW

Winning Bids in Oregon and Washington

Oregon had one winning bidder on two census tracts in Baker County– Total Awarded Amount = $123,081.40– Covering 946.78 road miles– @$130.00/road mile

Washington had two winning bidders on seven census tracts spread across Cowlitz, Grant, Lewis, Lincoln and Skamania Counties– Total Awarded Amount = $10,139,520.56– Covering 2963.70– @$1,244.00/road mile to $24,753.00/road mile

Page 15: MOBILITY FUND OVERVIEW

Tribal Mobility Fund Phase I: Auction 902

Scheduled for December 19, 2013– Short Form Applications Originally Due By COB

October 9th

– Federal Government Shutdown Resulted in Suspension

– Awaiting New Deadlines– Will the December 19th date slip?

Page 16: MOBILITY FUND OVERVIEW

Tribal Mobility Fund Phase I: Auction 902 (cont.)

$50M Set Aside for Tribal Lands– Most procedures similar to MF I Auction 901 with

some important exceptions– Tribally-owned entities are favored with:

• 25% Bidding Credit• Do Not Need to Have ETC Designation Prior (just

pending application)– Remains Difficult for Many Tribal Entities

• Trouble Obtaining Letters of Credit

Page 17: MOBILITY FUND OVERVIEW

Mobility Fund – Phase II

• Further Notice of Proposed Rulemaking (FNPRM) in MF Phase II issued as part of Transformation Order

• Additional Public Notice (PN) refining issues: DA 12-1853 in WT Docket No. 10-208 (12/21/2012)

• The resolution of many important issues remains uncertain

Page 18: MOBILITY FUND OVERVIEW

Mobility Fund – Phase II

• Overall Structure (as set forth in FNPRM)– $500M annually (up to $100M of this will be

reserved for Tribal Areas, including AK)– Distribution by reverse auction– Purpose: “ensure 4G wireless services in areas

where such service would not otherwise be available”

– Eligibility criteria to be same as MF I– Service must include voice service, and voice

service must be offered on a stand-alone basis– Public interest obligations similar to MF I

Page 19: MOBILITY FUND OVERVIEW

Mobility Fund – Phase II

• Refining the Issues: The 12/21/2012 PN– Eligible Areas – Prioritization of Eligible Areas– Term of Support - 10 years?– Support from multiple mechanisms (MF II,

CAF)?– Tribal Priorities - Interaction with 25% tribal

bidding credit?

Page 20: MOBILITY FUND OVERVIEW

Mobility Fund: Final Observations

• $300M in Phase I covered just under 13% of unserved road miles

• It will take a lot of money to cover all unserved road miles (CTIA has estimated $7.8B to $21B)

• Amounts in Phase II ($500M annually) plus Phase I ($300M one-time) are dwarfed by annual wireless industry capital expenditures ($20B+)

Page 21: MOBILITY FUND OVERVIEW

Mobility Fund: Were You Moved?

Thank You! Questions?

Email: [email protected]