Bridge Jib mobile bridge jib Key ea res F tu : l Comfortabel multi-place measurements l Easy Handling l Quick Mounting l Special version for up to 100 kg available Mobile Bridge Jib for single drum winch SEWII www.seba.de for measurements with cable suspended F1 current meter equipment 5 to 50 kg from bridges with different railings SE A- B meas rin s ati n u gt o Surface Water Surface Water Surface Water Surface Water B B u le 2 09_ rueckena s ger_e_S1-4 06.1 .2011 We are certified ISO 9001:2008 Quality is our standard Certificate No. 01150509 V QZ
4
Embed
Mobile Bridge Jib for single drum winch SEWII...mobile bridge jib LOWERING The assembled cable sus-pended current meter equip-ment is lifted from the bridge railing until the swivelling
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Bridge Jib
mobile bridge jib
Key ea resF tu :
l Comfortabel multi-place measurements
l Easy Handling
l Quick Mounting
l Special version for up to 100 kg available
Mobile Bridge Jib for single drum winch SEWII
www.seba.de
for measurements with cable suspended F1 current meter equipment 5 to 50 kg from bridges with different railings
SE
A-
B
meas
rin s
ati
nu
gt
o
Su
rface W
ate
r
Su
rface W
ate
r
Su
rface W
ate
r
Su
rface W
ate
r
B B u le 209_ rueckena s ger_e_S1-4 06.1 .2011
We are certified
ISO 9001:2008
Quality is our standard
Certificate No. 01150509
VQZ
After the mounting of the and the single drum winch SEW II, the torpedo sinker weight can be fixed on the measuring cable / suspension cable.Bigger torpedo sinker weights can be lifted di-rectly out of the transport case on top of the bridge railing. And there the stabilizer tail piece and cable sus-pended meter F1 is assembled to the torpedo sinker weight.
Now you can start with the for the measurement.
mobile bridge jib
LOWERING
The assembled cable sus-pended current meter equip-ment is lifted from the bridge railing until the swivelling arm unlocks.
The unlocked swivelling arm carries the cable suspended current meter equipment over the bridge railing.
From there the cable sus-pended current meter equipment is lowered into the water.
LOWERING FOR THE
MEASUREMENT
After the measurement the cable suspended current meter equipment is lifted from the waters.
After the stopper reached the re-turn pulley the cable suspended current meter is lifted back over the bridge railing.
The swivelling arm locks and the cable suspended current meter equipment is lowered on the bridge railing.
From there the cable suspended current meter equipment can be dismounted for transport.
LIFTING UP AFTER
MEASUREMENT
Function Description
Function Description
To measure from other points, the bridge jib is simply sledded step by step alongside the railing to the next point of measurement.
The bridge jib is very easy to mount.
1 22
44
33
22
3
1)
2)
3)
4)
Jib with SEW II mounted on a trolley
Trailer with telescope jib with SEW II
Rotatory telescope jib with motorized SEW II
e.g. mounted on a pick-up
Car with rotatory telescope jib and SEW II
Systems for mobile discharge measurement
Additional Samples
Technical Details
Components
return pulleymeasuringcable
stop
rope clamps
device
adjustingarm
bridge railing
winchSEW II
boom
fixed pairof rolls
lashingcables
griptensioning
strapstensioning
springsupporting
rodguidinggroove
winch SEW II
winch SEW II
l lSEW II
l
l
l
l
Dimensions for transport Winch:(length x width x height):130 x 54 x 30 cm Differences for the type “extended”
compared with the type “standard”:Material:Aluminium, galvanized steel,
Contrary to the type “standard” high-grade steel, PVCthe winch is fixed in a different
Permissible weights: way for the type “extended”. up to 50 kg An additionally installed brace
offers more stability. Moreover, Railing size:the jib is extended, as you can from 40 up to 220 mmalready learn from the name.
represented by:
The right is reserved to change or amend the foregoing technical specification without prior notice.