LIFT LIFT UP PARKING R O A D SHRI KRIPA & PANCHWATI BUILD ASS. LTD C-49,B-6 ,VIDYA APPARTMENT,PARAS MARG NEAR JANTA STORE,BAPU NAGAR ARCHITECTS, ENGINEERS AND INTERIOR DESIGNERS SPACE GRID MOB. 9314918766, 9314510603 JAIPUR - 302015. ARCHITECTS:- E W N S UP DN SHAFT LVL.-16'-0" LVL.-17'-4½" LVL.-18'-3" LVL.-15'-9" LVL.-16'-0" LVL.-15'-9" WATER CHANEL B B D=6'0" Sump Well WATER CHANEL SB HT Rigid PVC Conduit 25mm2 core 1.0 sq mm armoured cable for Fire Alarm Rigid PVC Conduit 25mm/3+1 coaxial wire for Security Camera (C.C.T.V.). LEGENDS: Description Mounting Height MCB DISTRIBUTION BOARD MCB DB TL/C 1X40W CEILING TUBELIGHT IN RCC SLAB Rigid PVC Conduit 25mm/1.0 sqmm wire for Light points Rigid PVC Conduit 25mm/2.5 sqmm wire for Light Circuits Submain wire to DB from Main Panel on Ground Floor in 1 nos. 32 mm dia conduits CONDUIT CONDUIT CONDUIT 01 IN RCC SLAB IN RCC SLAB +60" 56 CEILING MANUAL CALL POINT MCP 01 +42" HOOTER POINT HT 01 +90" WALL MOUNTED CCTV CAMERA CCTV 04 CONDUIT IN RCC SLAB CONDUIT IN RCC SLAB FIRE CCTV IN FLOOR Rigid PVC Conduit 25mm/1.0 sqmm wire for Light points CONDUIT Symbol ID Qty. CONDUIT IN RCC SLAB Rigid PVC Conduit 25mm/4.00 sqmm wire for POWER Circuits FOOT LIGHT FL 04 +21" 15A POWER POINT FOR SUMP PP 01 +18" CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCT V CCT V FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE FIRE CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CUT IN ROOF SIZE:-1'-6" X 0'-9" 5'-2" 4'-9" 9" 6'-8" 6'-7" 1' 4'-2" 4'-2" 1' 5'-8" 5'-8" 1' 4'-8" 4'-8" 1' 5'-3" 5'-6" 9" 3' 3' 4'-9" 4'-9" 9" 6'-8" 6'-8" 6'-2" 6'-2" 1' 4'-10" 4'-10" 5'-7" 6'-2" 1' 5'-5" 5'-5" 4'-10" 4'-10" 4'-5" 4'-5" 4'-7" 4'-7" 9" 6'-5" 6'-5" 3'-8" 3'-8" 9" 3'-7" 3'-7" 9" 5' 5' 1' 5' 5' 9" 3'-7" 3'-7" 9" 4'-3" 4'-2" 3'-8" 3'-8" 9" 3'-7" 3'-7" 5' 5' 1' 5' 5' 9" 3'-7" 3'-7" 9" 3'-11" 3'-11" 3'-8" 3'-8" 9" 8'-11" 8'-11" 1' 8'-5" 8'-5" 3'-8" 3'-8" 9" 4'-1" 4'-1" 9" 4'-6" 4'-6" 1' 4'-8" 4'-8" 3'-10" 3'-10" 4'-2" 4'-2" 9" 3'-6" 3'-6" 9" 4'-8" 4'-7" 9" 4'-8" 4'-8" 4'-2" 4'-2" 9" 4'-4" 4'-4" 9" 3'-10" 3'-10" 9" 4'-8" 4'-8" 4'-2" 3'-2" 4'-2" 4'-2" 5'-7" 5'-8" 1' 4'-8" 4'-8" 5'-3" 5'-6" 5'-8" 5'-8" 1' 4'-7" 4'-8" 5'-3" 5'-3" 1' 6'-9" 6'-9" 1' 8'-6" 8'-6" 5'-3" 5'-3" 1' 6'-9" 6'-9" 1' 8'-6" 8'-6" 1' 4'-8" 4'-8" 1' 4'-11" 4'-11" 4'-3" 4'-3" 3'-10" 3'-10" 9" 4'-8" 4'-8" 3'-9" 3'-9" 3'-10" 3'-10" 9" 4'-8" 5'-11" 1' 4'-11" 4'-11" 4'-1" 4'-1" 3'-9" 3'-9" 9'-8" 9'-8" 9" 4'-10" 4'-10" 6'-3" 6'-3" 4'-10" 4'-10" 4'-2" 4'-2" 6'-2" 6'-1" 4'-3" 4'-3" 4'-2" 5' 4'-11" 4'-11" 1' 4'-9" 4'-7" 5'-10" 5'-10" 1' 6'-2" 6'-2" 6' -3" 6' -3" 7 ' - 4 " 7 ' - 4 " 8'-6" 8'-6" 9" 1'-6" 2' 2' 4'-3" 4'-3" 6'-5" 6'-5" 1' 5'-5" 5'-5" 1' 5'-2" 5'-2" 6'-5" 6'-5" 1' 5'-5" 5'-5" 1' 5'-2" 5'-2" 1' 3'-4" 3'-4" 5'-7" 5'-7" 7'-8" 7'-8" 9" 5'-10" 5'-10" 7'-8" 7'-8" 9" 6'-2" 6'-2" 7'-8" 7'-8" 9" 6'-6" 6'-6" 3'-11" 3'-11" 9" 3'-11" 3'-11" 5'-7" 5'-7" 8'-4" 8'-5" 8'-5" 8'-5" 5'-11" 5'-11" 10'-2" 10'-2" 12'-2" 12'-2" 1' 10'-2" 10'-2" 9" 11'-10" 11'-10" 2'-8" 2'-8" 9" 6'-3" 6'-3" 6'-3" 6'-3" LOWER BASEMENT FLOOR ELECTRIC & CCTV CONDUIT PLAN DRAWING: PROJECT:- SERVICES CONSULTANT: VIPUL CONSULTING, F 9 / 440 , Keshav Marg Chitrakut Scheme,Jaipur PH:91-0-93146-10438 ,0141-2440946 Mail:[email protected]REV. NO. 00,DATE:-18-05-2015 VC–SC–B.F.-ELE.–01 VIPUL AGARWAL APPD BY:- SANJAY DEALT BY:- VIJESH DRAWN BY:- 18-05-2015 DATE:- N.T.S. SCALE:- R-00 REV.:- NORTH:- DRG. NO.:- 6'-3" 6'-3" 1NOs. 32mm Dia & 4NOs. 25mm Dia Conduit Vertical up to Ground floor panel DEEP JUNCTION 4WAY 01 CEILING SWITCH BOARD SB 01 +42" FHC
5
Embed
MOB. 9314918766, 9314510603rera.rajasthan.gov.in/Content/Project/308/Building/... · lift lift up parking r o a d shri kripa & panchwati build ass. ltd c-49,b-6 ,vidya appartment,paras
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.