Top Banner
Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of the Interior Minerals Management Service Presented by: Project Consulting Services, Inc. MMS MMS
98

MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

Apr 27, 2018

Download

Documents

hoangque
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico

Sponsored by:

United States Department of the Interior

Minerals Management ServicePresented by:

Project Consulting Services, Inc.

MMSMMS

Page 2: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

2

The Need for Deepwater Pipeline Repair in the Gulf of Mexico

5 Trillion Cubic Feet of Gas per Year500 Million Barrels of Oil per Year

MMSMMS

Page 3: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

3

1998 Gulf of Mexico Gas Production

Shallow Water Gas Production

89%

Deep Water Gas

Production11%

MMSMMS

Page 4: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

4

Anticipated 2000 Gulf of Mexico Gas Production

Shallow Water Gas Production

70%

Deep Water Gas

Production30%

MMSMMS

Page 5: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

5

Gulf of Mexico Gas Production Trends

0

2000

4000

6000

Sta

nd

ard

Cu

bic

Fee

t o

f Gas

(B

illio

ns)

1993 1994 1995 1996 1997 1998

Year

Deep Water Gas Production Total Gas Production

MMSMMS

Page 6: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

6

1998 Gulf of Mexico Oil Production

Shallow Water Oil

Production64%

Deep Water Oil

Production36%

MMSMMS

Page 7: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

7

Anticipated 2000 Gulf of Mexico Oil Production

Shallow Water Oil

Production36%

Deep Water Oil

Production64%

MMSMMS

Page 8: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

8

Gulf of Mexico Oil Production Trends

0

100

200

300

400

500

Bar

rels

of

Oil

(Mill

ion

s)

1993 1994 1995 1996 1997 1998

Year

Deep Water Oil Production Total Oil Production

MMSMMS

Page 9: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

9

Deepwater Defined

1000+ Feet Sea WaterGulf of Mexico Bottoms Out at 15,000+ Feet Sea Water

MMSMMS

Page 10: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

10

Deep Water Discoveries

112 Deepwater Discoveries as of 199927 Deepwater Discoveries Producing at end of 199983 of the Current Deepwater Discoveries have Future Production Plans

MMSMMS

Page 11: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

11

Deep Water Discovery Trend

0

10

20

Nu

mb

er o

f D

isco

veri

es P

er Y

ear

1990 1992 1994 1996 1998Year

MMSMMS

Page 12: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

12

1999 Deep Water Production Start Ups

0

500

1000

1500

2000

2500

3000

3500

4000

Wa

ter

De

pth

(fe

et)

All

eg

he

ny

An

gu

s

Ge

min

i

Ge

ne

sis

Ma

ca

ron

i

Ma

rlin

Urs

aDiscovery

MMSMMS

Page 13: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

13

Planned 2000 Deep Water Production Start Ups

0

1000

2000

3000

4000

5000

6000

7000

Wate

r D

epth

(fe

et)

Bla

ck

Wid

ow

Dia

na

Dia

na

So

uth

Eu

rop

a

Gli

de

r

Ho

ov

er

Kin

g

Kin

g K

on

g

Kin

g's

Pe

ak

#2

Lla

no

MC

243

Na

kik

a

Pe

tro

niu

s

Plu

to

Discovery

MMSMMS

Page 14: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

14

Gulf of Mexico Transportation Methods to Bring Deepwater Production to Market

PIPELINES

MMSMMS

Safe

ReliableEfficient

Page 15: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

15

Hazards to Subsea Pipelines

Natural DisastersOperational ErrorPhysical Impacts from Fishing or Oil and Gas ActivitiesConstruction of the Pipeline

MMSMMS

Page 16: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

16

Purpose and Need For Deepwater Pipeline Repair

Deepwater Pipeline Repair Capabilities are Essential to Provide Confidence in the Deepwater Oil and Gas Developments and to Ensure a Reliable Supply of Production from Deepwater Producing Fields

MMSMMS

Page 17: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

17

Gulf of Mexico Consortiums

R.U.P.E. Co-Ownership Project- Began in 1977 by Tennessee Gas with

11 Participants- Today 22 World Wide Participants

MMSMMS

Page 18: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

18

Gulf of Mexico Consortiums

DeepStar- Began in 1992 by Texaco- Conceptual Study of the Feasibility of

Extended Reach Tie-Backs 40-60 miles- Has Expanded to Encourage the

Production of Hydrocarbons from tracks in up to 10,000+ Feet Sea Water

MMSMMS

Page 19: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

19

Challenges of Deepwater

Saturation Diving Limited to 1,200 Feet Sea WaterHeavy Lift Vessels Required to Recover Pipelines to SurfaceRemote Operations Essential to Success of Deepwater Pipeline Intervention

MMSMMS

Page 20: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

20

History of Deepwater Pipeline Repair

1973 Exxon JIP – 16 Participants- Repair 36” Concrete Coated Pipe in

3,000 Feet Sea Water- Based on Large ROVs that were Non-

Existent at the Time- Ended 1977 with Report Only

MMSMMS

Page 21: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

21

History of Deepwater Pipeline Repair

1974 – Shell JIP – 6 Participants- Repair of 36” Concrete Coated Pipe to

3,000 Feet Sea Water- Proposed Subsea Catamaran Vessel- Ended 1977 with Report Only

MMSMMS

Page 22: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

22

History of Deepwater Pipeline Repair

1977 – Statoil - Repair of 36” Concrete Coated Pipe in

1,500 Feet Sea Water- Based on HydroTech Manipulating

Frame to Install Connectors- Operated by Oceaneering WASP- Ended Same Year with Report Only

MMSMMS

Page 23: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

23

History of Deepwater Pipeline Repair

1981 – Gulf Oil JIP – 4 Participants- Repairs to 8,000 Feet Sea Water- System Based on Large (Non-Existent)

ROVs and Existing Equipment- Ended 1983 with Preliminary Design

Only

MMSMMS

Page 24: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

24

Deepwater Pipeline Repair Options

Re-Lay Pipeline Or Portion of Pipeline

MMSMMS

Page 25: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

25

Deepwater Pipeline Repair Options

Pipeline Repair Clamp

MMSMMS

Page 26: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

26

Deepwater Pipeline Repair Options

Surface-Lift-Layover

MMSMMS

Page 27: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

27

The Reality of Deepwater Pipeline Repair

A Comprehensive Pipeline Repair System Must Exist to Minimize Loss of ProductionMore Complete Systems Have Been Available in Europe over the Last Decade than in the Gulf of MexicoEstimated Worst Case Repair Scenario for Gulf of Mexico would take 8 months

MMSMMS

Page 28: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

28

Pipeline Repair PhilosophiesEuropean Shallow Water Tie-in and Repair Philosophy

- On-Bottom Hyperbaric Welding-Competitive in European Markets-All Welded System-High Strength / High Reliability-Limited by Water Depth

MMSMMS

Page 29: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

29

Pipeline Repair Philosophies

European Deepwater Pipeline Repair Philosophy

- On-Bottom Repair As Strong As Pipeline- Automated Hyperbaric/Other Welding

(Development)- Horizontal Mechanical Connections- Slip-On/Forged Mechanical Connectors- Remote On-bottom Flange Tie-Ins

MMSMMS

Page 30: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

30

Pipeline Repair PhilosophiesGulf of Mexico Shallow Water Tie-In and Repair Philosophy

- Surface Welding- Break-Over Tie-Ins- Flanges

MMSMMS

Page 31: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

31

Pipeline Repair Philosophies

Gulf of Mexico Deepwater Pipeline Repair Philosophy

- Surface Welding of Mechanical Connectors

- Vertical Connectors / U/M-Shaped Jumpers

- Slip-on Mechanical Connectors (Remote Installation Under Development)

MMSMMS

Page 32: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

32

The Major Deepwater Pipeline Repair Systems of the World

Where Have We Been?Where Are We Now?Where Are We Going?

MMSMMS

Page 33: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

33

The Major Deepwater Pipeline Repair Systems of the World

Statoil Pipeline Repair SystemSnam/Sonsub Pipeline Repair SystemStolt MATIS Pipeline Repair SystemShell Deepwater Pipeline Repair SystemOceaneering Pipeline Repair System

MMSMMS

Page 34: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

34

Statoil Pipeline Repair SystemOrigins in 1987Covered 1000 km of Pipelines

- Statoil’s Statpipe System- Norske Hydro’s Oseburg Transportation

SystemFirst System Based on Hyperbaric WeldingWater depth limitation to 1,200 Feet Sea Water

MMSMMS

Page 35: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

35

Statoil Pipeline Repair System1993 Began Development of Deepwater Pipeline Repair SystemDesign Criteria

- Remote Diverless On-Bottom Repair- Morgrip Mechanical Connector- Strong As Original Pipeline- Design Life of 50 Years- 20” Pipelines or Less

MMSMMS

Page 36: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

36

Statoil Pipeline Repair System

Morgrip Mechanical Connector

MMSMMS

Page 37: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

37

Statoil Pipeline Repair System

1996 Haltenpipe Mid-Line Tie-In During Pipeline Construction Using Statoil PRSFirst Remote On-Bottom Tie-In Performed Using Mechanical Connectors16” Pipeline in 460 Feet Sea Water

MMSMMS

Page 38: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

38

Statoil Pipeline Repair SystemMMSMMS

Page 39: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

39

Statoil Pipeline Repair System

Current Participants Include Statoil, Norske Hydro, and Phillips Petroleum Co.Total of 7000 km of pipeline covered42” Diverless Repair System Under Development

MMSMMS

Page 40: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

40

Statoil Pipeline Repair System

Current Pipeline Systems Coveredby PRS

MMSMMS

Page 41: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

41

Statoil Pipeline Repair System

42” Morgrip Connector

MMSMMS

Page 42: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

42

Statoil Pipeline Repair System

Current PRS Components- 2 Hyperbaric Welding Habitats- 6 Pairs of H-Frames- 2 Morgrip Installation Modules- One High Pressure Abrasive water jet system

used for pipe cutting, concrete removal, and corrosion coating removal

MMSMMS

Page 43: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

43

Statoil Pipeline Repair System

Limitations for Gulf of Mexico Applications

- Large and Heavy System Requires Large Heavy Lift Vessel to Deploy

- All equipment is located in the North Sea Area

MMSMMS

Page 44: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

44

Statoil Pipeline Repair System

Large 70 Ton H-Frame Can Handle Up to 48” Concrete Coated Pipe

MMSMMS

Page 45: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

45

Snam/Sonsub Deepwater Pipeline Repair System

Origins in late 1970’s by SonsubSnam Trans-Mediterranean Pipelines2000 Feet Sea Water Max. DepthPre-Dated “Work Class” ROVsUsed 14 Autonomous ModulesDiameter Specific to the 20” Pipelines

MMSMMS

Page 46: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

46

Snam/Sonsub Deepwater Pipeline Repair System

1993–Sonsub AROWSRevolutionary Repair Philosophy20” and 26” Trans-Med PipelinesBased on Work Class ROVsSimpler ROV Operated ToolsSystem Designed around the X-Loc Connector

MMSMMS

Page 47: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

47

Snam/Sonsub Deepwater Pipeline Repair System

X-Loc Telescoping Spool Piece

MMSMMS

Page 48: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

48

Snam/Sonsub Deepwater Pipeline Repair System

1995 Sonsub Diverless Sealine Repair System (D.S.R.S.)

MMSMMS

Page 49: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

49

Snam/Sonsub Deepwater Pipeline Repair System

Pipeline Handling H-Frame

MMSMMS

Page 50: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

50

Snam/Sonsub Deepwater Pipeline Repair System

1998 – D.S.R.S./A.R.CO.S.Combined New Snam Cold Forging / Collet Connection System with Sonsub D.S.R.S.The Latest Stand-By System for the 20”/26” Trans-Mediterranean Pipelines

MMSMMS

Page 51: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

51

Snam/Sonsub Deepwater Pipeline Repair System

Telescoping Spool Piece with Snam Connection System

MMSMMS

Page 52: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

52

Snam/Sonsub Deepwater Pipeline Repair System

1997-BP Foinaven Project-North Atlantic (West of Shetlands)Diverless Flange Tie-In System8” and 10” Pipelines1,500 Feet Sea Water

MMSMMS

Page 53: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

53

Snam/Sonsub Deepwater Pipeline Repair System

BRUTUS

MMSMMS

Page 54: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

54

Snam/Sonsub Deepwater Pipeline Repair System

BRUTUS –Axial Force Tool

MMSMMS

Page 55: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

55

Snam/Sonsub Deepwater Pipeline Repair System

BRUTUS –Reaction Tool

MMSMMS

Page 56: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

56

Snam/Sonsub Deepwater Pipeline Repair System

BRUTUS – Bolt Insertion and Tensioning Tool and Nut Magazine

MMSMMS

Page 57: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

57

Snam/Sonsub Deepwater Pipeline Repair System

BRUTUS Completed Flange Connection

MMSMMS

Page 58: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

58

Snam/Sonsub Deepwater Pipeline Repair System

BRUTUS – First Project- June 2000 – North Sea- Construction Subsea Tie-In- Statoil Norne/Heidrun Pipeline- 16” ANSI 1500 Taper-Lok Flange- 1000’ Sea Water

MMSMMS

Page 59: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

59

Snam/Sonsub Deepwater Pipeline Repair System

D.S.R.S. / BRUTUS Integrated System

MMSMMS

Page 60: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

60

Snam/Sonsub Deepwater Pipeline Repair System

Gulf of Mexico Applications- D.S.R.S. - Large and Heavy System

Requires Large Heavy Lift Vessel to Deploy

- BRUTUS – More Portable But Requires D.S.R.S. Type Support

- BRUTUS and D.S.R.S. Equipment Are Located In Europe

MMSMMS

Page 61: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

61

Stolt MATIS

June 1999 – Diverless Flange ConnectionStatoil Loke Project North SeaConstruction Tie-In of 8” ANSI 1500 Taper-Lok Flange260’ Sea Water

MMSMMS

Page 62: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

62

Stolt MATISComponents and Procedures

- Flange Alignment Frame

MMSMMS

Page 63: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

63

Stolt MATISComponents and Procedures

- Flange Alignment Tool

MMSMMS

Page 64: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

64

Stolt MATIS

Deep MATIS System is Currently Under DevelopmentElf Angola Girassol Project

- June 2000 Sea Trials in North Sea- November 2000 Girassol Construction- 82 Diverless Flange Connections- 4,600’ Sea Water

MMSMMS

Page 65: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

65

Stolt MATISComponents and Procedures

- Deep MATIS Module Under Construction

MMSMMS

Page 66: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

66

Stolt MATISMATIS Support Tools Under Development

- H-Frames- Leak Detection- Mechanical Pipe Cutter- Concrete Removal- FBE Removal- Metrology- Hydrate Plug Detector- Pipe Deburial- Pollution Containment

MMSMMS

Page 67: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

67

Stolt MATISMATIS as Repair System

- Easily Adaptable for Existing Diameters- Deployable from DSV- Requires Surface Lift of Pipeline Ends- Multiple MATIS Modules Required for

Large Diameter Ranges

MMSMMS

Page 68: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

68

Stolt Future Development Goals

Remote On-Bottom Diverless Repair with Jumper / Mechanical Connectors

MMSMMS

BIMS Remote Articulated Connector

Page 69: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

69

Stolt Future Development Goals

Wet Friction Welding- Better weld metal characteristics than

arc welding- Not dependent on water depth- Automated (diverless) process- Not expected to be perfected for

several years

MMSMMS

Page 70: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

70

Stolt Future Development Goals

Friction Stitch Welding Process

MMSMMS

Page 71: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

71

Stolt Future Development Goals

Friction Stitch Welding Process

MMSMMS

Page 72: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

72

Shell Deepwater Pipeline Repair System

The First Comprehensive Pipeline Repair System in the Gulf of Mexico

MMSMMS

Page 73: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

73

Shell Deepwater Pipeline Repair System

Shell Stake in Deepwater

MMSMMS

Deepwater Pipeline Operation in Gulf of Mexico Based on Mileage

Other20%

ExxonMobil20%

Shell60%

Page 74: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

74

Shell Deepwater Pipeline Repair System

Shell, Equilon, and Coral Gas (Tejas) Developing Repair SystemGoal is to Minimize Down Time to 1 MonthIncludes

- Surface Lift OR On-Bottom Repair- Commissioning- Uninhibited Flow at Start-Up

MMSMMS

Page 75: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

75

Shell Deepwater Pipeline Repair System

Surface Lift Repair Procedure

MMSMMS

Page 76: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

76

Shell Deepwater Pipeline Repair System

Advantages to Surface Lift Repair Procedure

- Allows Welded Male Hubs- Allows Accessibility to Pipe Bore for Hydrate Plug

Remediation- Proven Procedure

MMSMMS

Page 77: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

77

Shell Deepwater Pipeline Repair System

Disadvantages to Surface Lift Repair Procedure

- Requires Heavy Lift Vessel- Not Applicable in All Damage Scenarios

MMSMMS

Page 78: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

78

Shell Deepwater Pipeline Repair System

On-Bottom Repair- Eliminates Surface Lift- Based on grip and seal connectors

MMSMMS

Page 79: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

79

Shell Deepwater Pipeline Repair System

Advantages of On-Bottom Repair- Heavy Lift Vessel Not Required- Serves as contingency if Surface Lift is Not Possible

MMSMMS

Page 80: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

80

Shell Deepwater Pipeline Repair System

Disadvantages of On-Bottom Repair- Procedure Not Proven- No Accessibility to the Pipe Bore- Mechanical Seal Reliability

MMSMMS

Page 81: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

81

Shell Deepwater Pipeline Repair System

Philosophy:- System Based on Proven Technology- All Components Adapted from Existing

Products and Equipment- Covers Sizes: 12”, 14”, 16”, 18”, 20”

MMSMMS

Page 82: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

82

Shell Deepwater Pipeline Repair System

Summary of Major Components:- Mechanical Connectors (Collet, Grip & Seal) - HydroTech- H-Frames - HydroTech- Diamond Wire Pipe Cutter – Sonsub- Concrete and FBE Removal Tool – Sonsub- Hydrate Detection Tool – Oceaneering- Discharge Containment Tent – Oceaneering- Taut Wire Metrology – Oceaneering- Acoustic Metrology – Leased from Fugro/Chance

MMSMMS

Page 83: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

83

Shell Deepwater Pipeline Repair System

Additional Requirements- Agreements with Contractors and Service

Companies for Repair Emergencies- Repair Manual

MMSMMS

Page 84: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

84

Shell Deepwater Pipeline Repair System

System Limitations- Steel Catenary Risers- Pipe-In-Pipe Systems- MAOP > 6,000 PSIG

MMSMMS

Page 85: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

85

Shell Deepwater Pipeline Repair System

Status:- System Ready by August 2000- Soliciting Participation from Other Deepwater

Operators- Draft Participation Agreement Prepared in a DeepStar

Committee Base on R.U.P.E. Model

MMSMMS

Page 86: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

86

Oceaneering Deepwater Pipeline Repair System

Based on WASP Atmospheric Diving SystemOn-Bottom Repair Capabilities to 2,300’ Sea WaterUp to 14” Pipelines

MMSMMS

Page 87: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

87

Oceaneering Deepwater Pipeline Repair System

Oceaneering Pipeline Repair Tools- WASP ADS – Rated to 2,300’ Sea Water- ROVs- Smart Flange Plus Connector- Hydraulic Smart Connector- WACHS Guillotine Saw- PMT – Taut Wire Metrology

MMSMMS

Page 88: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

88

Oceaneering Deepwater Pipeline Repair System

WASP Atmospheric Diving System

MMSMMS

Page 89: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

89

Oceaneering Deepwater Pipeline Repair System

Smart Flange Plus Connector

MMSMMS

Page 90: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

90

Oceaneering Deepwater Pipeline Repair System

Hydraulic Smart Connector

MMSMMS

Page 91: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

91

Oceaneering Deepwater Pipeline Repair System

WACHS Guillotine Saw

MMSMMS

Page 92: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

92

Oceaneering Deepwater Pipeline Repair System

First Deepwater On-Bottom Pipeline Repair in Gulf of Mexico

- Mariner 4” Dulcimer Flowline Repair

MMSMMS

Page 93: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

93

Oceaneering Deepwater Pipeline Repair System

Mariner 4” Dulcimer Flowline Repair- Summer 1999- 1,100 Feet Sea Water- WASP Installed Smart Flanges- Performed off of 243’ MSV

MMSMMS

Page 94: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

94

Oceaneering Deepwater Pipeline Repair System

Mariner 8” Pluto Repair- October 1999- Leaking Weld Found During Hydrotest- Surface Lift by the Pipeline Lay Vessel- 2,150 Feet Sea Water- ANSI Flange Make Up On-Bottom Using

WASP

MMSMMS

Page 95: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

95

Oceaneering Deepwater Pipeline Repair System

Reflange A-Con Variable Alignment Connector

MMSMMS

Page 96: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

96

Oceaneering Deepwater Pipeline Repair System

Diverless Hot Tap- Williams Field Services JIP- Oceaneering, HydroTech, T.D. Williamson

MMSMMS

Page 97: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

97

Conclusions

Deepwater Pipeline Repair Systems Are Available to the Gulf of MexicoThe First Comprehensive System Will Be Available to the GOM by August 2000Pipeline Repair Scenarios have been Reduced from 8 months to 1 month

MMSMMS

Page 98: MMS Assessment and Analysis of Deepwater Pipeline Repair ... · Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico Sponsored by: United States Department of

Assessment and Analysis of Deepwater Pipeline Repair in the Gulf of Mexico

Sponsored by:

United States Department of the Interior

Minerals Management Service

Presented by:

Project Consulting Services, Inc.

MMSMMS