NON-STORE CLOSURE RENOVATION
23

MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Dec 15, 2015

Download

Documents

Vance Spilsbury
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

NON-STORE CLOSURE RENOVATION

Page 2: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Pre Construction Due Diligence Meet with town to discuss expectations and

pre-schedule inspections. Have Permits in hand

Meet with landlord to discuss dumpster & storage locations and to see if they have any site specific regulations This is especially important in mall locations

Complete the detailed construction schedule Cross reference the Material Schedules on

plan to the FFE Plan to the Items Ordered Sheet to look for discrepancies

Conduct pre-construction meeting with the SM, DM, CM and GC to alleviate apprehensions and go over expectations

Page 3: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Freehold, NJ Before & After

Page 4: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Typical Closing Schedule Day 1; Monday; 12:00 noon until 5:00 am (16 hours) Day 2; Tuesday; 12:00 noon until 5:00 am (16 hours) Day 3; Wednesday; 12:00 noon until 5:00 am (16 hours) Day 4; Thursday; 12:00 noon until 5:00 am (16 hours)

Not needed if floor is not being done Day 5; Friday; 6:00 pm close until 5:00 am (11 hours) Days 6 & 7; No work over the weekend (OPTIONAL) Day 8; Monday; 6:00 pm close until 5:00 am (11 hours) Day 9; Tuesday; 8:00 pm until 5:00 am (9 hours) Day 10; Wednesday; 8:00 pm until 5:00 am (9 hours) Thursday; Store is back to normal hours

Page 5: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Monday Day 1- Backline

Demo of back line/int. walls Rework electric & plumbing Build new walls/rock 1 side Blocking/install wall cubbies Set backline cabinets & counters

Re-set equipment Power and plumbing hook ups Clean and re-set store for a normal morning opening

Page 6: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Tuesday Day 2 - Frontline

Demo frontline, save pastry case Saw cutting for floor sink relo Re-work electric and plumbing Set new bar, POS, & pastry case Re-set all equipment Power and plumbing hook ups Seam Corian counters at the BL

Demo floor tiles to be replaced Scarify floor of thinset Prep for back splash wall tile Begin wall prep for paint Demo and set panels at 1st R. R. Clean and re-set this store for a normal morning opening

Page 7: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Wednesday Day 3 – Lighting/Ceiling

Rough framing inspection Re-locate/add wood soffit panels Install new ceiling lighting Finish first R.R. install Fixtures Install Banquette seating Continue wall prep

Demo existing chair rail Replace all damaged ceiling tiles Install R.R. accessories Clean and re-set store for a normal morning opening

Page 8: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Thursday Day 4 - Flooring

Install floor tile, base and grout Install backsplash tile and grout Continue wall prep Demo and set panels at 2nd R. R. Install under counter lights at cubbies Install FRP at the wet cabinets

Final ceiling prep for Friday paint Prep and install wall cladding at the accent wall Install custom wood trim at hallway door Clean and re-set this store for a normal morning opening

Page 9: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Friday Day 5 – Ceiling Paint Protection for ceiling paint Install BOH Eliason door Finish 2nd R.R. install fixtures Install R.R. accessories

Finish and sand all spackle Clean and re-set this store for a normal morning opening

Page 10: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Sat/Sun DAY 6 &7 No Work Over The Weekend

Page 11: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Monday Day 8 Install free-standing merchandise bays Build and set new condiment cart Begin wall paint, paint R.R. Install chair rail

Install new walk-off mat Install FRP & re-set BOH as per plan Install vinyl wainscoting Clean and re-set this store for a normal morning opening

Page 12: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Tuesday Day 9

Finish all wall painting Install custom shelving unit Install artwork/mural trim Install metal corner guards

Install mural Install artwork Silicone throughout Clean and re-set this store for a normal morning opening

Page 13: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Wednesday Day 10

Final electrical inspection Final plumbing inspection Build and set furniture General punch list Professional cleaning service

window cleaning mechanical floor

cleaning high dusting general cleaning

After today, the store is back to normal hours Final building and health inspections are done during the day on Thursday

Page 14: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Florham Park, NJ Store Expansion

BEFORE AFTER

OBJECTIVES: add Clover, claimed 500 square feet of unused square footage which increased customer seating from (18) to (32) seats, open-space feel with updated palette.

Page 15: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Before and After Floor Plans

Page 16: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Phasing Plan

Page 17: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Mercer Mall Ten Year Reno with a Restroom Relocation &

BOH Expansion,

BEFORE AFTER

OBJECTIVES; enlarge BOH and Managers area, get the full size refrigerator into the back of house, open up space, while increasing seating from (11) to (20) seats , we also replaced floor tile (tile over tile).

Page 18: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Before & After Floor Plans

Page 19: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Phasing Plan

Page 20: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Glen Rock, NJ Reno Using The Temporary Trailer

KEEPING THE CUSTOMER HAPPY WHILE INSIDE….

Page 21: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

Setting Trailer Utility Hookups

General Guide Lines Trailer must fit the location

Get prior approval from the town

Safe & separate egress for

customers and workers

Plan on minimum 4 days to set

trailer with inspections (NJ)

Prior arrangements for ice

delivery and bulk milk storage

Prior coordination of data runs

for POS and brewing equipment

Temporary dry storage will be

required

We were able to open store and

then remove trailer in one day

Page 22: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

This store was completed in 11 days working thru the weekend, turn over on Friday. We installed new floor tiles and did a full bar reversal. There were only a few hours of interrupted business.

Click icon to add picture

Page 23: MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.

QUESTIONS