ZAWTIKA DEVELOPMENT PROJECT PHASE 1A EPCIC OF ZAWTIKA ONSHORE PIPELINE CONTRACT NO. : IMO-EMP-CT-10-0018 CALCULATION REPORT FOR ZOC PROCESS AREA (5) A2 12-Jul-12 HJ Issued for Review RWM LY NW SB A1 6-Jul-12 HJ Issued for Review RWM LY NW SB REV DATE BY DESCRIPTION CHECK APPR. CHECK APPR. CPP APPROVAL COMPANY APPROVAL REVISION CODE: A = Issued for Review (IFR); B = Issued for Approval (IFA); C = Approved for Construction (AFC) TOTAL OR PARTIAL AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE COMPANY PTTEP INTERNATIONAL LIMITED CPP ZAWTIKA DEVELOPMENT PROJECT PHASE 1A EPCIC OF ZAWTIKA ONSHORE PIPELINE MM-ZTK-1A-ZOC-STR-CAL-5029 REV CLASS A2 1
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ZAWTIKA DEVELOPMENT PROJECT PHASE 1A
EPCIC OF ZAWTIKA ONSHORE PIPELINE
CONTRACT NO. : IMO-EMP-CT-10-0018
CALCULATION REPORT FOR ZOC PROCESS AREA (5)
A2 12-Jul-12 HJ Issued for Review RWM LY NW SB
A1 6-Jul-12 HJ Issued for Review RWM LY NW SB
REV DATE BY DESCRIPTION CHECK APPR. CHECK APPR.
CPP APPROVAL
COMPANY APPROVAL
REVISION CODE: A = Issued for Review (IFR); B = Issued for Approval (IFA); C = Approved for Construction (AFC)
TOTAL OR PARTIAL AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE COMPANY
PTTEP INTERNATIONAL LIMITED
CPP
ZAWTIKA DEVELOPMENT PROJECT PHASE 1A EPCIC OF ZAWTIKA ONSHORE PIPELINE
MM-ZTK-1A-ZOC-STR-CAL-5029 REV CLASS
A2 1
PTTEP International Limited Page 2/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
CONTENTS
1.0 CODES, STANDARDS AND ENGINEERING SPECIFICATIO ....................................................................... 3
2.0 CALCULATION FOR FOUNDATION .................................................................................................... 3
2.1 CALCULATION FOR TYPE A FOUNDATION ................................................................................................. 3 2.1.1 INFORMATION OF FOUNDATION ........................................................................................................................................ 3 2.1.2 INFORMATION OF CALCAULATION .................................................................................................................................. 3 2.1.3 CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION ..................................................................... 3 2.1.4 REINFORCE BAR OF FOUNDATION ...................................................................................................................................... 3 2.2 CALCULATION FOR TYPE B FOUNDATION ................................................................................................... 3 2.2.1 INFORMATION OF FOUNDATION........................................................................................................................................ 3 2.2.2 INFORMATION OF CALCAULATION .................................................................................................................................... 4 2.2.3 CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION ..................................................................... 4 2.2.4 REINFORCE BAR OF FOUNDATION ............................................................................................................... 4 2.3 CALCULATION FOR TYPE C FOUNDATION .................................................................................................. 4 2.3.1 INFORMATION OF FOUNDATION ................................................................................................................ 4 2.3.2 INFORMATION OF CALCAULATION .............................................................................................................. 4 2.3.3 CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION ..................................................................... 4 2.3.4 REINFORCE BAR OF FOUNDATION ............................................................................................................... 5
3.0 APPENDIX A SOIL REPORT ................................................................................................................. 7
4.0 APPENDIX B BASIC EQUIPMENT FOUNDATION INFORMATION PROVIDED BY PIPE DEPARMENT ... 41
5.0 APPENDIX C STRUCTURAL DRAWINGS ............................................................................................ 44
PTTEP International Limited Page 3/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
IFICATIOAND ENGINEERING SPEC STANDARDSCODES, 1.0
GB 50007-2002 Code For Design Of Building Foundation GB 50010-2002 Code For Design Of Concrete Structures MM-ZTK-1A-GEN-CIV-REP-0001 Effect Of Seismic Activity Report (Onshore) MM-ZTK-1A-ONEP-CIV-SPE-5001 Specification For Civil/Structural Works Calculation Report For Pier Foundation (Mechanical)
FOUNDATIONFOR CALCULATION 2.0
2.1 CALCULATION FOR TYPE A FOUNDATION 2.1.1 INFORMATION OF FOUNDATION
Foundation Parameter High of foundation H = 1.65 m Length of foundation L = 1.0m Width of foundation W = 1.0m Area of foundation A = L*B=1.0m2
Material Information Compressive strength of concrete: fc =240ksc Grade SD40 for deform bar yield strength: fy=4000ksc Grade SR24 for round bar design strength: fy=2400ksc
2.1.2 INFORMATION OF CALCAULATION
Structural important factor γo=1.0 Depth of foundation dh=1.5m Distance for resultant force to concrete edge as=40mm Effective high ho = H-as = 1.61 m Average weight which foundation and soil γ=2T/m3
2.1.3 CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION
Weight of column Wc = 3.6T Weight of soil Ws = 3.0T Allowable bearing capacity of soil Qa =10T/m2
Checking Soil Bearing Capacity Which Axial Load Action Compressive strength of foundation bottom Qb = (Wc+WS) / A= 6.6T/m2 < Qa=10T/m2
Safety status:OK
2.1.4 REINFORCE BAR OF FOUNDATION
A few force on the foundation, reinforcement Re-bar only avoid crack. So use RB 9@200
2.2 CALCULATION FOR TYPE B FOUNDATION 2.2.1 INFORMATION OF FOUNDATION
Foundation Parameter High of foundation H = 1.85m Length of foundation L = 0.5m
PTTEP International Limited Page 4/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
Width of foundation W = 0.5m Area of foundation A = L*B=0.25m2
Material Information Compressive strength of concrete: fc =240ksc Grade SD40 for deform bar yield strength: fy=4000ksc Grade SR24 for round bar design strength: fy=2400ksc
2.2.2 INFORMATION OF CALCAULATION
Structural important factor γo=1.0 Depth of foundation dh=1.5m Distance for resultant force to concrete edge as=40mm Effective high ho = H-as = 1.81m Average weight which foundation and soil γ=2T/m3
2.2.3 CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION
Weight of column Wc = 0.2T Weight of soil Ws = 0.75T Allowable bearing capacity of soil Qa =10T/m2
Checking Soil Bearing Capacity Which Axial Load Action Compressive strength of foundation bottom Qb = (Wc+WS) / A= 3.8T/m2 < Qa=10T/m2
Safety status:OK
2.2.4 REINFORCE BAR OF FOUNDATION
A few force on the foundation, reinforcement Re-bar only avoid crack. So use RB 9@200
2.3 CALCULATION FOR TYPE C FOUNDATION 2.3.1 INFORMATION OF FOUNDATION
Foundation Parameter High of foundation H = 2.08 m Length of foundation L = 1.0m Width of foundation W = 1.3m Area of foundation A = L*B=1.3m2
Material Information Compressive strength of concrete: fc =240ksc Grade SD40 for deform bar yield strength: fy=4000ksc Grade SR24 for round bar design strength: fy=2400ksc
2.3.2 INFORMATION OF CALCAULATION
Structural important factor γo=1.0 Depth of foundation dh=1.5m Distance for resultant force to concrete edge as=40mm Effective high ho = H-as = 2.04 m Average weight which foundation and soil γ=2T/m3
2.3.3 CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION
Weight of column Wc = 3.6T
PTTEP International Limited Page 5/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
Weight of soil Ws = 3.9T Allowable bearing capacity of soil Qa =10T/m2
Checking Soil Bearing Capacity Which Axial Load Action Compressive strength of foundation bottom Qb = (Wc+WS) / A=5.77T/m2 < Qa=10T/m2
Safety status:OK
2.3.4 REINFORCE BAR OF FOUNDATION
A few force on the foundation, reinforcement Re-bar only avoid crack. So use RB 9@200
PTTEP International Limited Page 6/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 7/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
SOIL REPORT A APPENDIX 3.0
PTTEP International Limited Page 8/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 9/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 10/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 11/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 12/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 13/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 14/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 15/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 16/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 17/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 18/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 19/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 20/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 21/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 22/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 23/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 24/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 25/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 26/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 27/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 28/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 29/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 30/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 31/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 32/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 33/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 34/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 35/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 36/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 37/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 38/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 39/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 40/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 41/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
ROVIDED BY PIPE DATION INFORMATION PBASIC EQUIPMENT FOUN B APPENDIX4.0 DEPARMENT
DWG5013 AxB(mm) ELEVATION(m) LOAD(N)
PS251 350×350 0.50 17000
PS252 350×350 0.50 17000
PS253 350×350 0.50 17000
PS254 350×350 0.50 17000
PS255 220×220 0.50 2000
PS256 220×220 0.50 2000
PS257 220×220 0.50 2000
PS258 600×900 0.58 36000
PS259 600×900 0.58 36000
PS260 350×350 0.50 17000
PS261 220×220 0.50 2000
PS262 350×350 0.50 17000
PS263 350×350 0.50 17000
PS264 220×220 0.50 2000
PS265 300×300 Hold 2000
PS266 350×350 0.50 17000
PS267 350×350 0.50 17000
PS268 220×220 0.50 2000
PS269 350×350 0.50 17000
PS270 300×300 HOLD 2000
PS271 350×350 0.50 17000
PS272 350×350 0.50 17000
PS273 220×220 0.50 2000
PS274 300×300 HOLD 2000
PS275 600×900 0.58 36000
PS276 350×350 0.50 17000
PS277 350×350 0.50 17000
PS278 350×350 0.50 17000
PS279 300×300 HOLD 2000
PS280 220×220 0.50 2000
PS281 350×350 0.50 17000
PTTEP International Limited Page 42/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PS282 220×220 0.50 2000
PS283 350×350 0.50 17000
PS284 600×900 0.58 36000
PS285 350×350 0.50 5100
PS286 600×900 0.58 36000
PS287 350×350 0.50 36000
PTTEP International Limited Page 43/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029
EPCIC of Zawtika Onshore Pipeline Revision : A2
Date : 12-Jul-2012
PTTEP International Limited Page 44/44
Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029