To be among the best in the Energy Industry in providing properly engineered products and services to the sector for sustainable growth and profitability without compromising on issues of Safety, Health, Environment and Quality. OUR VISION To provide solutions to TOMORROW’S problems TODAY, through the application of appropriate technologies by our team of proficient engineers and craftsmen. MISSION STATEMENT M I S S I O N S T A T E M E N T A N D V I S I O N
MISSION STATE MENT AND VISION. MISSION STATEMENT. To be among the best in the Energy Industry in providing properly engineered products and services to the sector for sustainable growth and profitability without compromising on issues of Safety, Health, Environment and Quality. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
To be among the best in the Energy Industry in providing properly engineered
products and services to the sector for sustainable growth and profitability without compromising on issues of
Safety, Health, Environment and Quality.
OUR VISION
To provide solutions to TOMORROW’S problems TODAY,
through the application of appropriate technologies by our team of proficient
engineers and craftsmen.
MISSION STATEMENTMISSION STATE MENT
AND VISION
CAPABILITIESDesign and construction of conical fixed roof storage tanks.
Design and construction of floating roof storage tanks.
Design and construction of Piping systems.
Installation of Fire Detection & Suppressing Systems.
Installation of floating suction on Aviation Fuel tanks
Design and construction of Loading Gantry, installation of Loading Arms, Meters and
accessories
Sizing and installation of pumps
Civil works, which include design and construction of Tank Foundations, Buildings, Bund
walls, Concrete Driveway for BRV Access, Gutters, Drainage systems, etc
Construction of Oil/Water Interceptor
Earthing and cathodic protection of Tanks, Lightning Arrestors & Masts
Design and construction of Electrical systems and panels.
Roof and Wall Insulation including HVAC Ductwork
Design, Fabrication & Installation of Structural Steel Framework for Buildings including
warehouses
Concrete Sump Tank Construction
Steel Doors complete with Ironmongery (including but not limited to PANIC EXIT BARS,
DOOR CLOSERS…)
Room partitioning walls complete with acoustic sandwich panels
Provision of EPC Management of Complex contracts including the construction of mini oil
refineries
Design and fabrication of an increasing number of Engineering components
C
A
P
A
B
I
L
I
T
I
E
S
EQUIPMENT & FACILITIES AVAILABLE
Asaa Energy has, over time, acquired the basic equipment and facilities for
smooth execution of her clients’ brief. Where the required equipment are not
owed, such have usually been rented from equipment rental companies.
Also the company has acquired the latest editions of the relevant codes,
recommended practices, software and regulations to guide her design
engineers in meeting the stringent design requirements of the Power, Oil &
Gas Industry
Asaa Energy Management team is made up of experienced and tested
professionals is their various areas of specialization, from project
management, Structural, Mechanical and Chemical Engineering, to Safety
and Environmental Engineering. Our team has qualified and experienced
inspectors and supervisors in Quality Assurance and Control measures that
meet ISO 9001-2000 requirements, covering all our fabrication and
installation activities.
The company has developed well articulated SAFETY MANUAL and
WORK PROCEDURES MANUAL for the regulation of the activities of ALL
WORKERS.
American Petroleum Institute (API) Recommended Practices in areas of
interest
American Welding Society (AWS) Recommended Practices in areas of interest
American Society for Testing and Materials (ASTM) Standard Specifications
in areas of interest
British Codes of Practice and Standards in areas of interest
Department of Petroleum Resources Regulations
Electricity Regulation Council of Nigeria Publications
Various Software for Pipeline Design, Pumps Design, Structural Steel
Design, Electrical Design, etc, etc.
EQUIPMENT
&
FACILITIES AVAILABLE
Certificate of Incorporation
Ce
rtificate
of In
corp
ora
tion
Asaa Energy & Engineering Services Limited(RC: 164 091) was incorporated in 1991 as a limited liability company.
Core Business:
Engineering, Procurement, Installation and Commissioning in the Upstream and Downstream sectors of the Oil & Gas and Power Industries.
REGISTERED OFFICE
79, Mushin Road, Isolo, Lagos
Tel: 234018444182
Web Site : www.asaaenergy.com
OTHER OFFICES:
27 Balarabe Musa Crescent
Victoria Island, Lagos.
Branch Office: 16, Choba St, D/Line,
Port-Harcourt
Tel/Fax 234-84-238823
Director
Mr. Ndudi Enenmoh
Director
Engr. Aileme Unuigbe
DIRECTORS OF THE COMPANY
Managing Director:
Engr. Cletus C. Duru
Engineering Director:
Engr. Oduche Azih
Construction Services Director:
Engr. Boniface Egelamba
Director
Mr. Ndudi Enenmoh
Director
Engr. Aileme Unuigbe
The Management comprises a team of competent professionals with several years of project experience in relevant EPC disciplines
Asaa E
nerg
y &
En
gin
eerin
g S
erv
ices
Lim
ited
TRACK RECORDS
YEAR PROJECT DESCRIPTION CLIENT LOCATION MAN-HRS
2012 Continuation of Detailed EngineeringDesigns for Refinery off-Sites
Antonio Oil Plc Iwopin, Ogun State 2,000
Contract for the construction of 4 x 12,700,000 Liters white products storage tanks
Ceecon Energy, Oil & Gas Limited
Ikot Abasi, Akwa Ibom State
6,000
Completion of Detailed Engineering Designs for a 45,000,000 liters Oil Terminal
Ascon Oil Company Limited
Oghara, Delta State 1,000
Contract for Front End & Detailed Engineering Designs for a 107,000,000 liters Oil Terminal
Liquid Bulk LimitedRumuolumeni, Port Harcourt, Rivers State
3,000
Contract for the construction of 4 x 8m Liters white products storage Tanks
Diamond Pearls Petroleum Limited
Iwopin, Ogun State 0
TRACK RECORDS
Contract for FEED and Detailed Engineering Designs for a 60,000,000 liters Oil Terminal
BakerfieldPetroleum Limited
Lekki, Lagos State 1,000
Contract for FEED and Detailed Engineering Designs for a 36,000,000 liters Oil Terminal
Transcon Energy MarketingLimited
Oghara, Delta State 1,000
Contract for FEED and Detailed Engineering Designs for a 28,000,000 liters Oil Terminal
Xixco OilLimited
Oron, Akwa Ibom State
1,000
Contract for complete brown field Depot upgrade comprising construction of an additional 5,000 MT capacity Storage tank, expansion of the Loading racks, Relocation of products pump house, demolition and rebuilding Of the BRV circulating area Techno Oil Limited Kirikiri, Lagos 20,000
2010
TRACK RECORDS
2011 Contract for the construction of 4 x 12,700,000 Liters white products storage tanks
Ceecon Energy, Oil & Gas Limited
Ikot Abasi, Akwa Ibom State
6,000
Contract for Front End & Detailed Engineering Designs for a 45,000,000 liters Oil Terminal
Ascon Oil Company Limited
Oghara, Delta State 2,000
Contract for Front End & Detailed Engineering Designs for a 107,000,000 liters Oil Terminal
Liquid Bulk Limited Rumuolumeni, Port Harcourt, Rivers State
2,000
Contract for the construction of 4 x 8,000,000 Liters white products storage tanks
Diamond Pearls Petroleum Limited
Iwopin, Ogun State 1,000
YEAR PROJECT DESCRIPTION CLIENT LOCATION MAN-HRS
TRACK RECORDS
YEAR PROJECT DESCRIPTION CLIENT LOCATION MAN-HRS
2009 THE FOLLOWING PROJECTS WERE UNDERTAKEN BUT SOME ARE STILL ON-GOING
Front End Engineering Designs & project Management Contract for the proposed Antonio Oil Plc Mini Refinery at Iwopin, Ogun State, Nigeria
Antonio Oil Plc
Iwopin, Ogun Waterside LGA
16,000
Provision of Project Management & Supervision of the Construction of additional tanks with internal floating roofs for Integrated Oil & Gas Depot. Two of the Tanks are the largest among private depots in Lagos
Integrated Oil & Gas Company Ltd
Apapa, Lagos 8,000
Construction of a 92m x 2m high Bund Wall around the 5,000 Tons Storage Tank and Construction of 2 Tank bases
Techno Oil Company Limited
Kirikiri, Lagos 2,000
Design and Construction of a 45m3 surface Storage Tank for Diesel
Great Brands Nigeria Limited
Ajah, Lagos 800
Fabrication and installation of Roof Structure and roof covering for the Control Building for Power Holding Company of Nigeria Plc.
Njonas Engineering Company Limited
Ope Ilu, Lagos
1,200
Construction of Pre-stressed reinforced 10.34m Electrical distribution concrete pole
Sample awaiting Certification
Design and Fabrication of In-line Foam Inductor as well as Top-mounted Foam Pourers
Samples awaiting Certification
TRACK RECORDS CONTINUES
TR
AC
K R
EC
OR
DS
YEAR PROJECT DESCRIPTION CLIENT LOCATION MAN-HRS
2008 A NUMBER OF PROJECTS WERE UNDERTAKEN DURING THE YEAR AS FOLLOWS
Front End Engineering Designs & project management Contract for the proposed Antonio Oil Plc Mini Refinery at Iwopin, Ogun State, Nigeria
Antonio Oil Plc Iwopin, Ogun Watrerside LGA
Completion of the Retaining Wall for Ascogas’s proposed LPG Terminal
ASCOGAS LIMITED Kirikiri, Lagos
Completion of Detailed Engineering Designs for the Proposed Diamond Pearls Petroleum Depot at Iwopin, Ogun State.
DIAMOND PEARLS PETROLEUM LIMITED
Ogba, Lagos
Completion of Detailed Engineering Designs for the Proposed Slok Group Depot at Ikot Abasi, Akwa Ibom State.
SLOK GROUP Victoria island, lagos
Completion of the construction of One 5,000 Mt Vertical Cylindrical tank
TECHNO OIL COMPANY LIMITED
Kirikiri, Lagos
Design & Fabrication of 12 Foam Pourers
EF-QUA OIL SERVICES LIMITED
Ikeja, Lagos
Design, Fabrication and Installation of Complete Foam System comprising Foam tank, Inductors, Valve manifold and Foam Pourers as well as Gantry Sprinkler System
ASCON OIL COMPANY LIMITED
Ibru Port Complex. Ibafon, Apapa, Lagos
Provision of Project Management & Supervision of the Construction of additional tanks for Integrated Oil & Gas Depot
INTEGRATED OIL & GAS LIMITED
Apapa, Lagos
TR
AC
K R
EC
OR
DS
YEAR PROJECT DESCRIPTION CLIENT LOCATION MAN-HRS
2006 - 2007 SUB – CONTRACT No. 02423-SC18 FOR BUILDING SERVICES COMPRISING THE FOLLOWING:-
WILLBROS WEST AFRICA Inc. MAIN CONTRACTOR TO THE WEST AFRICAN GAS PIPELINE COMPANY
Lagos State 300,000
MAIN FEATURES COMPLETE ENGINEERING & ARCHITECTURAL DESIGNS OF THE FOLLOWING BUILDINGS and THE INSTALLATION OF SAME AFTER DESIGN APPROVALS:- OFFICE CONTROL BUILDINGCOMPRESSOR CONTROL BUILDINGELECTRICAL OFFICE BUILDINGWORKSOP / WAREHOUSE BUILDINGGENERATOR & COMPRESSOR SHELTERSSUMP TANK SUB – ELEMENTS OF THE WORKS INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING DESIGNS & INSTALLATION:
ROOF INSULATION TO ACHIEVE R-value OF 3.5m2.K/WWALL INSULATION TO ACHIEVE R-value OF 2.3m2.K/WHVAC DUCTWORKSTRCTURAL STEEL FRAMEWORK INCLUDING BRIDGE CRANE GIRDER DESIGN, FABRICATION & INSTALLATION.ELECTRICAL POWER SUPPLY & DISTRIBUTION WITHIN BUILDINGSPLUMBING DESIGN & INSTALLATIONRAISED ACCESS FLOOR PANELS PROCUREMENT & INSTALLATIONMASONRY WORKS, RENDERING & FINISHESSTEEL DOORS & ALLUMINIUM WINDOWS COMPLETE WITH IRONMONGERY, INCLUDING PANIC EXIT AND DOOR CLOSING HARDWARE. SELECTION & INSTALLATION OF ACOUSTIC CEILING PANELSSELECTION & INSTALLATION OF WALL & FLOOR TILES AS WELL AS SANITARYWARESDRYWALL PARTITIONING COMPLETE WITH SANDWICHED ACOUSTIC PANELS
TR
AC
K R
EC
OR
DS
YEAR PROJECT DESCRIPTION CLIENT LOCATION MAN-HRS
2004-2005
Engineering Design, Procurement, Construction of a turnkey 20,000 Metric Tons Petroleum Products Bulk Storage Terminal including pipelines & loading Gantry
2002 Provision of Corrosion Protection for Petroleum Storage Tanks
MARCA INTERNATIONAL LTD
Lagos State 1600
2002 Engineering Design for a 20,000 Metric Tons Petroleum Storage Depot
GULF AGENCY COMPANY LTD
EPZ Calabar 800
2002 Engineering Design, Procurement and Construction of Petroleum Product Pipelines, Pump house, Oil/ Water Separator, Loading Gantry and Hydrant System
A-Z PETROLEUM LTD Lagos State 60,000
2001 Engineering Design for Compressed Air Plant, and Petroleum Storage Depot
PRECISION DESIGN CONCEPTS LTD
Lagos State 250
2001-2002
Construction of 17,000 Metric Tons Petroleum Products Tanks, Product Piping and Loading Gantry
SAHARA ENERGY RESOURCE NIGERIA LTD
Lagos State 100,000
2000 Engineering Design and Works Supervision for a 6,000 Metric Tons Petroleum Storage Depot
TECHNO-AI PETROLEUM LTD
Lagos State 400
2000 Construction of a 1,500 Metric Tons Petroleum Storage Tank and Piping
ZENON PETROLEUM & GAS LIMITED
Lagos State 4,800
1999-2001
Engineering, Procurement, Construction and Commissioning of a 35,000 Metric Tons Petroleum Products Depot Complete with Civil and Electrical Works, Fire Fighting System, Internal Pipelines within Tank Farm and Product Piping from Depot to Jetty
TANK CONSTRUCTION IS PRECEDED BY THE FOLLOWING CIVIL WORKS:
SITE CLEARING, SITE LAYOUT & SOIL INVESTIGATIONSOIL IMPROVEMENT WORKS TO UP-GRADE SOIL LOAD BEARING CAPACITYPLACEMENT OF REINFORCED CONCRETE RING BEAM PLACEMENT AND COMPACTION OF FILLING SAND TO LEVELLAYING OF DAMP PROOF COURSE (ASPHALTIC PAD) OVER COMPACTED SAND
CONSTRUCTION OF THE TANK CONSISTS IN THE FOLLOWING WORKS:
BLASTING AND COATING OF THE UNDERSIDE OF BOTTOM PLATES & LAYING ERECTION OF SHELL PLATES ACCORDING TO BEST PRACTICES WELDING OF BOTTOM & SHELL PLATES ACCORDING TO BEST PRACTICES ERECTION & WELDING OF ROOF STRUCTURES & ROOF PLATES INSTALATION OF SHELL AND ROOF NOZZLES INSTALATION OF STAIRS AND HAND RAILS NON DESTR. TESTS (X-RAY, MAGNETIC PARTICLE, VAC. BOX, HYDROSATAIC) GRIT-BLASTING AND PAINTING AS REQUIRED
TANK CONSTRUCTION ACTIVITIES
Casting of Tank Base in progress
After casting the wall of the Tank base, compaction of filling sand underway
TANK CONSTRUCTION ACTIVITIES
With 50mm thick hot-rolled asphalt, tank pad is Completed followed by the laying of Annular plates
TANK CONSTRUCTION ACTIVITIES
Erection of first shell course in progress
Erection of other shell courses in progress
TANK CONSTRUCTION ACTIVITIES
TANK CONSTRUCTION ACTIVITIES (CONTINUED)
Erection of other shell courses in progress
A fully welded shell horizontal joint
TANK CONSTRUCTION ACTIVITIES
Staff, well kitted in their respective PPES await the next call to duty
Steel plates for the tank construction are selected from known stamped sources
TANK CONSTRUCTION ACTIVITIES
A TECHNICIAN SQUARING STEEL PLATES AT IKOT ABASI
A WELDING INSPECTOR ON DUTY AT IKOT ABASI
TANK CONSTRUCTION ACTIVITIES
Welding of the shell courses in progress: Note precautionary safety accessories outside and inside the tank being erected
Some Asaa Energy Senior Engineers During the Commissioning of the Ascon Oil Petroleum Products Depot At Ibru Port Complex in 2000
Technicians executing pipeline installations including floating suction device in an aviation fuel tank
PIPELINE
INSTALLATION ACTIVITIES
Capabilities in the installing and commissioning a variety of equipment such as pumps, meters, foam systems, etc
SUMP TANK INSTALLATION
PICTURE GALLERY(SUMP TANK INSTALATION)
INSERTS: (Water bar to the left and Anchor Bolts at the center), then Concrete placing
SUMP TANK INSTALATION
PICTURE GALLERY(SUMP TANK INSTALATION)
Sump Tank after completion
PILE CAP CONSTRUCTION
PICTURE GALLERY(QUALITY CONTROL MEASURES)
Concrete Slump test in progress
Before and during concrete placing, the Surveyor keeps watch on levels
QUALITY CONTROL MEASURES
A 150mm concrete cube being weighed before crushing test
Quality Control measures are taken for practically all of ASAA ENERGY’S Construction services covering, in the case of CIVIL WORKS, the following activities:
Physical analysis of reinforcement bars, anchor bolts,
Full characterization of sand, cement, granite and water for concrete works
Concrete cube tests after 7 and 28 days of curing
Random sampling and testing using Third Party Laboratories
to confirm Manufacturers’ Mill Certificate claims
Preparation of Concrete Cubes
PILE CAP CONSTRUCTION
PICTURE GALLERY(PILE CAP CONSTRUCTION)
Using a TOTAL STATION surveying Instrument, all anchor bolts are well aligned Thereafter, anchor bolts sleeves are carefully