Top Banner
7

Mission Expectations As Planned: –Full end-to-end test of Akoya-Bandit imaging and dedicated comm subsystems –Take, store, and transmit images over 900MHz.

Dec 21, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Mission Expectations As Planned: –Full end-to-end test of Akoya-Bandit imaging and dedicated comm subsystems –Take, store, and transmit images over 900MHz.
Page 2: Mission Expectations As Planned: –Full end-to-end test of Akoya-Bandit imaging and dedicated comm subsystems –Take, store, and transmit images over 900MHz.

Mission Expectations

• As Planned:– Full end-to-end test of Akoya-Bandit

imaging and dedicated comm subsystems– Take, store, and transmit images over

900MHz and 2.4GHz links

• As Executed (Due to package changes)– Input images from cameras to FCB and

downlink via Microhard– Observe satisfactory thermal/vacuum

performance of components

Page 3: Mission Expectations As Planned: –Full end-to-end test of Akoya-Bandit imaging and dedicated comm subsystems –Take, store, and transmit images over 900MHz.

Summary of Package Changes

• Elimination of Atmel as processor– Bootloader corruption– Resulted in loss of temp sensors and heaters

• Atmel used as 5V power regulator– Powered 8 LEDs

• Bypass of 900MHz video TX/RX– 12V power connection used to power Atmel/LEDs

• Simplification of power board– Malfunction of 5V line

• Possibly resulted in loss of 3.3V line, thus accelerometer and digital memory

• Removal of onboard data storage– Incompatible power requirements

Page 4: Mission Expectations As Planned: –Full end-to-end test of Akoya-Bandit imaging and dedicated comm subsystems –Take, store, and transmit images over 900MHz.

Results• One confirmed and one suspected contact

– No telemetry data or pictures received• Link budget• Ground ops difficulties• Possible component failure

– Cold: unlikely, had been running hot– Batteries: popped out before whip?

• Excellent structural performance– No damage, excepting one dent in corner– Batteries loose, all other components

restrained

Image data recorded post-mission verifies system functionality.

Page 5: Mission Expectations As Planned: –Full end-to-end test of Akoya-Bandit imaging and dedicated comm subsystems –Take, store, and transmit images over 900MHz.

Lessons Learned

• Microhard radio and Atmel bootloader corruption

• Linear regulators MUST NOT be installed in parallel

• Establishing link more difficult than expected

• Must have documentation and circuit diagrams available to aid team communication

Page 6: Mission Expectations As Planned: –Full end-to-end test of Akoya-Bandit imaging and dedicated comm subsystems –Take, store, and transmit images over 900MHz.

Conclusions• Some programs, components, and procedures are

not mature– Power board redesign

– New Atmel programming procedure

– Improve component and procedure documentation

• Ground testing was incomplete for the complexity of the mission– Link budget verification

– Full-up system tests after modifications

– Software verification

• COTS equipment and basic design are functional– Proceed with satellite development

Page 7: Mission Expectations As Planned: –Full end-to-end test of Akoya-Bandit imaging and dedicated comm subsystems –Take, store, and transmit images over 900MHz.

Winners of the 2006 Butt-Saving Award forOutstanding Contributions to Wash U’s SHOT II Payload