5 Mission DCU plans, coordinates, and integrates DSCA with local, State, and Federal agencies. On order, deploys as the DoD early entry command and control element in support of civil or military authorities conducting consequence management operations in order to save lives, prevent human suffering, and prevent property damage.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
5Mission
DCU plans, coordinates, and integrates DSCA with local, State, and
Federal agencies. On order, deploys as the DoD early entry command
and control element in support of civil or military authorities
conducting consequence management operations in order to save
lives, prevent human suffering, and prevent property damage.
5
LNOsLNOs
Cmd StaffDCO
SVC EPLOs
MA Tm
DDASS
MA Trk
JRMPO
PAO
JAG
AT/FP
USAR
SEPLOs
LNO JTFNC
NCOIC
Plans
Operations
MA
Fusion Log/Fin/Admin
Per
OpsOff/NCO
Fin
Log
DDCO
CoS
167LNO
Signal
Aug
Aug
Aug
Aug
Aug
Aug
Aug
DCE Ops NCO
DCO
DDCO
REPLO
REPLO
REPLOOPS
DCE Comms NCOAUG
SEPLONCO
DCE GS13
REPLOS4
SEPLONCO
SEPLONCO / AUG
DCEGS12C2
DCE OpsOff
Safety Aug
TaskersFRAGOsUnit SITREPS
MA Process
LNOs
OpsNCO
OpsOff
2 Augs
DCE OPORDsLNO TO LFA
SEPLONCO
OpsNCO
2 Augs
REPLOOPS
SA/COP (DSEL, HSIN, TRITON, Cha, WEB EOC) ReportsIntel/WeatherRFIsBRDSEL
CAE
OpsOff/NCO
6 Augs 2 Augs 2 Augs 2 Augs
4 Augs2 Augs
5 Augs
Total DCU Personnel at JFO = 20
Total ARNORTH Augmentees = 21
DCU JFO Task Organization
5DCE Regions II, VI, & X –
Hurricane DeanDCE Regions II, VI, & X –
Hurricane Dean
Baton Rouge
PR
/ V
I
Corpus Christi
514
AUG
18AUG
Rg VI Aug. deploy
19AUG
Rg II prepares to deploy to
PR/VI
Rg’s IV, VI, & X rec. BPT mission
Hurr. Dean still 500+ mi. from PR/VI
FEMA starts VTC’s
20AUG
21AUG
NC/AR CUBs begin
NC & AR WARNOs published
Hurricane Dean – TimelineHurricane Dean – Timeline
15AUG
16AUG
17AUG
NC starts daily
telecons
BSI/FSOAs ID’d for PR/VI
Rg II DCO – 2 MA’s, arrives in
VI w/ ERT-A
TS C-1 C-2
NC/AR EXORDs• USTRANSCOM BPT move DoD forces to PR/VI• Rg VI deploys to Corpus Christi • Rg II & VI EPLOs activated
C-3
Hurr. Dean 260 mi. SSE of PR/VI
167 TSC JRSOI BPT rpt. to AR
3 MAs- TX• Dep Rg VI – C.C• Dep Rg X – B.R.• Dep Air/Gnd Cell
ARNG sends A/C to TX
C-4
Rg II redeploy to HS
7 MA’s (TX) – BPT spt missions
Rg’s VI & X working
redeploymentBPT MA’s
cancelled/closed
NC/AR CUBs end
NC/AR resume normal operations
C-5 Dean landfall Mex.
DCE stand-up, integration & Ops
5AAR Food for ThoughtAAR Food for Thought
Funding Deployment of DoD forces and equipment prior to a disaster declaration.
Contingency movement of general population residents.
Lack of a clearly-defined patient evacuation plan – defined, documented and synchronized patient evacuation plan.
Activation of NDMS
State Integrated SAR plan
Improving TRANSCOM’s coordinated response to conduct federally-supported, state-level contingency planning for real-world DSCA (disaster) missions.
Movement of pets on DoD aircraft.
Competition for same EMAC assets (NG and contracts)
PSMAs must be reviewed and updated to fit changing missions
BSI and FOSA requests not routed/approved properly