    Ministry of Urban Development

    Mission Directorate

    Implementation status of Projects

    approved under JnNURM(UIG & UIDSSMT)

    (As on 31.03.2012)

    http://www.jnnurm.nic.in/

    http://www.jnnurm.nic.in/http://www.jnnurm.nic.in/
  • 7/27/2019 MIS-Document1.pdf

    2/104

    Table of contentsA. State wise projects approved under Urban Infrastructure & Governance (UIG) Sub-Mission of JnNURM.

    Sl. No. Name of the State Page No.

    1. Andhra Pradesh 1-6

    2. Arunachal Pradesh 6

    3. Assam 6-7

    4. Bihar 75. Chandigarh 8

    6. Chattisgarh 8

    7. Delhi 8-12

    8. Goa 12

    9. Gujarat 12-19

    10. Haryana 20

    11. Himachal Pradesh 20-21

    12. Jammu & Kashmir 21-22

    13. Jharkhand 22

    14. Karnataka 23-2815. Kerala 28-29

    16. Madhya Pradesh 30-32

    17. Maharashtra 32-40

    18. Meghalaya 40

    19. Manipur 40-41

    20. Mizoram 41

    21. Nagaland 41-42

    22. Orissa 42

    23. Puduchery 43

    24. Punjab 43-44

    25. Rajasthan 44-45

    26. Sikkim 45-46

    27. Tamil Nadu 46-51

    28. Tripura 51

    29. Uttar Pradesh 51-54

    30. Uttrakhand 54-56

    31. West Bangal 56-64

  • 7/27/2019 MIS-Document1.pdf

    3/104

    Table of contentsB. State wise projects approved under UIDSSMT of JnNURM.

    Sl. No. Name of the State Page No.

    1. Andhra Pradesh 65-67

    2. Arunachal Pradesh 67

    3. Assam 67-68

    4. Bihar 685. Chattisgarh 68

    6. Dadar & Nagar Haveli 68

    7. Daman & Diu 68

    8. Goa 68

    9. Gujarat 68-70

    10. Haryana 70

    11. Himachal Pradesh 70

    12. Jammu & Kashmir 70-71

    13. Jharkhand 71

    14. Karnataka 71-7215. Kerala 72-73

    16. Madhya Pradesh 73-75

    17. Maharashtra 75-77

    18. Manipur 77

    19. Meghalaya 77

    20. Mizoram 77

    21. Nagaland 77-78

    22. Orissa 78

    23. Puducherry 78

    24. Punjab 78-79

    25. Rajasthan 79

    26. Sikkim 79-80

    27. Tamil Nadu 80-83

    28. Tripura 83

    29. Uttar Pradesh 83-84

    30. Uttrakhand 84

    31. West Bangal 84-85

  • 7/27/2019 MIS-Document1.pdf

    4/104

    Sl.No.

    Project Title Sector ApprovedCost

    AdditionalCentral

    Assistance(ACA)

    Commitment

    No. ofInstallments

    Released

    Total ACAReleased

    Status

    Andhra Pradesh

    Hyderabad1 Remodelling of Storm

    Water Drainage -

    MURKINALA SecondaryDrains

    Drainage / StormWater Drains 4,231.00

    1,480.85 3962.55 Under

    Progress

    2 Remodelling of StormWater Drainage -MURKINALA P-11, P-12

    Drainage / StormWater Drains

    3,299.00 1,154.65 3750.52

    UnderProgress

    3 Remodelling of StormWater Drainage-KUKATPALLY (Begumpet)Nalla P7

    Drainage / StormWater Drains

    3,136.00 1,097.60 4986.24 Under

    Progress

    4 Balkapur Channel Drainage / StormWater Drains

    3,579.00 1,252.65 3813.74

    UnderProgress

    5 Flyover at Rajiv GandhiCircle-Volume II Roads / Flyovers /RoB 3,300.00 1,155.00 4 1,023.75 PhysicallyCompleted

    6 Flyover at Green LandsJunction

    Roads / Flyovers /RoB

    1,727.00 604.45 4485.55

    PhysicallyCompleted

    7 Flyover atChandrayangagutta

    Roads / Flyovers /RoB

    1,101.00 385.35 4362.09

    PhysicallyCompleted

    8 DPR for laying pipelinefrom Sahebnagar TBR toPrashasan Nagar

    Water Supply 9,493.00 3,322.55 42,991.39

    PhysicallyCompleted

  • 7/27/2019 MIS-Document1.pdf

    5/104

    9 Diversion of Krishna Waterto Secunderabad

    Water Supply 8,120.00 2,842.00 42,558.30

    PhysicallyCompleted

    10 Road Widening on OuterRing Road and Inner RingRoad under CharminarPedestrianisation Project

    Urban Renewal 3,510.00 1,228.50 41,105.67 Under

    Progress

    11 Rehabilitation andStrengthening of

    Sewerage system in OldCity Area on South of Musi(in Zone 2 in catchments S7 to S11, S13 and S15)

    Sewerage 25,125.00 8,793.75 33,517.50

    UnderProgress

    12 Grid improvement worksbuilding additional storagefacilities on North of Musi

    Water Supply 2,981.00 1,043.35 4678.16 Physically

    Completed

    13 Grid improvement worksbuilding additional storagefacilities on South of Musi

    Water Supply 3,355.00 1,174.25 41,056.82 Under

    Progress

    14 Musi campaign MusiRevitalisation project

    Urban Renewal 4,426.51 1,549.28 31,161.96

    UnderProgress

    15 Providing Flow, Level andChlorine measurementsand supervisory Controland Data AcquisitionSystem (SCADA) for AllReservoirs and bulk supplypipe lines in the entiresystem of HMWSSB

    Water Supply 990.00 346.50 4311.83

    PhysicallyCompleted

    16 Rehabilitation andStrengthening ofSewerage system in OldCity area on South of Musi(In Zone I in catchmentsS1 to S6, S12 and S14)

    Sewerage 14,881.00 5,208.35 3 3,385.41Under

    Progress

    17 Krishna Drinking WaterSupply Project - Phase II

    Water Supply 60,650.00 21,227.50 421,227.50

    PhysicallyCompleted

  • 7/27/2019 MIS-Document1.pdf

    6/104

    18 Implementation ofSewerage Master Plan inSeringampally Municipalityof Hyderabad U.A

    sewerage 20,038.00 7,013.30 22,805.32 Under

    Progress

    19 Refurbishment of existingfeeder system includingdistribution network for 10zones in Old Municipal

    Corporation of Hyderabad

    Water Supply 23,222.00 8,127.70 33,251.07

    UnderProgress

    20 Commuter AmenityCentres (CAC)

    Other UrbanTransport

    16,213.00 5,674.55 22,269.81

    UnderProgress

    21 Improvement of StormWater Drainage in Zone-Iand II of MCH Area

    Drainage / StormWater Drains

    12,410.00 4,343.50 11,086.00

    UnderProgress

    22 Comprehensive WaterSupply DistributionNetwork andimplementation ofsewerage master plan for

    identified priority zones ofRajendranagar Municipalcircle of GHMC

    Water Supply 31,426.00 9,000.00 12,500.00

    UnderProgress

    22 2,57,213.51 88,025.63 55,291.18

    Vijayawada23 Providing Water Supply

    facilities in unserved areasWater Supply 3,548.00 1,774.00 4

    1,598.10Physically

    Completed

    24 Providing under-grounddrainage facilities to theunserved areas

    Drainage / StormWater Drains

    5,656.00 2,828.00 42,545.20

    Under

    Progress

    25 Providing seweragesystem in Krishnalankaarea of Vijayawada

    Sewerage 743.00 371.50 4334.33

    PhysicallyCompleted

    26 Providing seweragetreatment plan atSinghnagar (UASBR)(Sector-8)

    Sewerage 949.00 474.50 4427.07 Physically

    Completed

  • 7/27/2019 MIS-Document1.pdf

    7/104

    27 Storm Water DrainageSystem for uncoveredareas in Circle I II III andMG road of VMC

    Drainage / StormWater Drains

    4,912.00 2,456.00 42,210.40 Under

    Progress

    28 Augmentation of watersupply utility in VijayawadaMunicipal Corporation

    Water Supply 7,231.00 3,615.50 43,253.97

    UnderProgress

    29 Providing sewage facilities

    in unserved areas of VMCcovering Housing BaordColony, Gundala,Devinagar,Kedareswarapet etc.

    Sewerage 1,985.00 992.50 4

    889.27Physically

    Completed

    30 Bus Rapid TransportSystem for Vijayawada (i)MG Road (II) NujiveeduRoad (iii) Eluru Road (iv)Route No.5 (v) S.N.PuramRoad (vi) Loop Road -

    15.18Km

    Mass RapidTransport System

    15,100.00 7,550.00 46,795.00

    UnderProgress

    31 Restoration of roadsdamaged due to seweragein Vijaywada MunicipalCorporation

    Roads / Flyovers /RoB

    3,625.02 1,812.52 41,631.23 Physically

    Completed

    32 Formation of IRRconnecting NH-9 and NH-5inbetween the flyovers atMilk Project andRamvarappadu inVijayawada City

    Roads / Flyovers /RoB

    7,424.00 3,712.00 43,340.80

    UnderProgress

    33 Solid Waste ImprovementManagement Scheme

    Solid WasteManagement

    5,805.00 2,902.50 31,885.30

    UnderProgress

    34 Providing Storm WaterDrains at MangalagiriTown in Vijawada

    Drainage / StormWater Drains

    3,016.00 1,508.00 41,357.20

    UnderProgress

    35 Providing Sewerage fornorthern part of Vijawadacity

    Sewerage 17,815.00 8,907.50 33,563.13

    UnderProgress

    13 77,809.02 38,904.52 29,831.00

  • 7/27/2019 MIS-Document1.pdf

    8/104

    Vishakhapatnam36 DPR for replacement of

    existing Thatipudi pipelinefrom Thatipudi reservoir totown service reservoir andpumping units

    Water Supply 6,228.00 3,114.00 42,803.10

    PhysicallyCompleted

    37 Regularisation of S.L.Canal

    Drainage / StormWater Drains

    339.00 169.50 4152.33

    PhysicallyCompleted

    38 Improvement of YerriGedda Storm Water drainincluding bench drains

    Drainage / StormWater Drains

    921.00 460.50 4460.00

    PhysicallyCompleted

    39 Providing seweragesystem in Old city area ofVishakapatnam

    Sewerage 3,708.00 1,854.00 41,668.60

    PhysicallyCompleted

    40 Providing seweragesystem to Central part ofVisakhapatnam city

    Sewerage 24,444.00 12,222.00 410,999.30

    UnderProgress

    41 Augmentation of WaterSupply to Gajuvaka Area

    Water Supply 3,976.00 1,988.00 41,789.20

    UnderProgress

    42 Providing water supplydistribution system toGajuwaka area of GVMC(Phase II)

    Water Supply 4,600.00 2,300.00 42,070.00 Under

    Progress

    43 Augmentation of DrinkingWater Supply to the 32peripheral areas of GVMC

    Water Supply 24,074.00 12,037.00 410,833.30

    UnderProgress

    44 Providing water supply

    pipeline from TSR toYendada and to Kommadijunction for augmentingwater supply

    Water Supply 2,340.00 1,170.00 4

    1,053.00 PhysicallyCompleted

    45 Refurbishment ofdistribution ofComprehensive watersupply system in NorthEastern Zone in Central

    Area of GreaterVishakhapatnam Municipal

    Water Supply 19,018.00 9,509.00 36,180.85

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    9/104

    Corporation

    46 Comprehensive WaterSupply scheme in old city

    of Greater Visakhapatnam

    Water Supply 4,793.48 2,396.76 42,157.05

    UnderProgress

    47 Bus Rapid Transit Systemfor Vishakhapatnam (i)Simhachalam Transitcorridor including tunnel ( ii) Pendurthi TransitCorridor - 45.20 Km

    Mass RapidTransport System

    45,293.00 22,646.50 420,381.87

    UnderProgress

    48 Improvement of StormWater drains for Zone VIIIof Greater Vishakapatnamcity (Gangulhedda and

    Yerrigada branch canals)

    Drainage / StormWater Drains

    7,227.00 3,613.50 43,252.19

    UnderProgress

    49 Implementation of 24X7water supply in left outareas of south wesstsectors of central region ofGreater VisakhapatnamMunicipal Corporation(GVMC)

    Water Supply 8,349.00 4,174.50 0-

    Work notstarted

    14 1,55,310.48 77,655.26 63,800.79

    Tirupati49 Underground Drainage

    scheme for TirupatiDrainage / StormWater Drains

    1,613.00 1,290.40 41,162.20

    UnderProgress

    50 Storm Water DrainageSystem for TMC

    Drainage / StormWater Drains

    4,556.00 3,644.80 32,368.70

    UnderProgress

    51 Solid Waste Managementin Tirupati MunicipalCorporation

    Solid WasteManagement

    2,329.00 1,863.20 0-

    Work notstarted

    3 8,498.00 6,798.40 3,530.90

    52 Andhra Pradesh 4,98,831.01 2,11,383.81 1,52,453.86

  • 7/27/2019 MIS-Document1.pdf

    10/104

    Arunachal Pradesh

    Itanagar1 Setting up of Municipal

    Solid Waste Managementin a scientific way for

    capital complex

    Solid WasteManagement

    1,194.38 1,074.94 4967.46 Under

    Progress

    2 Improvement and creationof infrastructure for urbantransport including roadsand parking lot/spaces atJNNURM mission cityItanagar

    Other UrbanTransport

    9,128.50 8,215.65 35,340.17

    UnderProgress

    3 Augmentation of Watersupply for Itanagar

    Water Supply 7,725.32 6,952.79 34,519.32

    UnderProgress

    3 18,048.20 16,243.38 10,826.95

    3 Arunachal Pradesh 18,048.20 16,243.38 10,826.95

    AssamGuwahati

    1 Solid Waste Managementfor Guwahati

    Solid WasteManagement

    3,516.71 3,165.04 32,057.28

    UnderProgress

    2 Proposal for SouthGuwahati West Water

    Supply Scheme inGuwahati MetropolitanDevelopment Area

    Water Supply 28,094.00 25,284.60 422,755.99

    UnderProgress

    2 31,610.71 28,449.64 24,813.27

    2 Assam31,610.71

    28,449.64 24,813.27

    Bihar

  • 7/27/2019 MIS-Document1.pdf

    11/104

    Patna1 Municipal Solid Waste

    Management for Patnatown

    Solid WasteManagement

    3,695.40 1,847.70 1461.93

    Workawarded

    2 Integrated Solid WasteManagement in Patna UAtowns - Phulwarishariff,Khagul and Danapur

    Solid WasteManagement

    1,155.81 577.91 1144.48 Work

    awarded

    3 Phulwarisharif WaterSupply Scheme

    Water Supply 2,470.26 1,235.13 1308.78

    UnderProgress

    4 Khagul Water SupplyScheme

    Water Supply1,315.43

    657.72 1154.43

    UnderProgress

    5 Augmentation of WaterSupply Scheme forDanapur

    Water Supply 6,896.45 3,448.23 1862.06

    UnderProgress

    6 Improvement andaugmentation of watersupply system at PatnaCity

    Water Supply 42,698.00 21,349.00 15,337.25 Work

    awarded

    6 58,231.35 29,115.68 7,268.93

    Bodhgaya1 Bodhgaya Water Supply

    ProjectWater Supply

    3,355.722,684.56 1

    671.14Under

    Progress2 Sewerage scheme for

    Bodhgaya NagarPanchayat

    Sewerage 9,594.34 7,675.48 11,918.87

    UnderProgress

    2 12,950.06 10,360.04 2,590.01

    8 Bihar 71,181.41 39,475.72 9,858.94

    Chandigarh1 Conservation of drinking

    water by harvesting of thetertiary treated sewage forirrigation of green spacesin Chandigarh

    Water Supply3,672.60

    2,938.08 21,469.04

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    12/104

    2 Upgradation of watersupply infrastructures forproper monitoring andautomation with remotecomputerized surveillancesystem to 24x7 watersupply

    Water Supply 2,026.00 1,620.80 31,215.60

    UnderProgress

    3 Augmentation of water

    Supply, Phase -V,Chandigarh

    Water Supply 13,421.00 10,736.80 0

    -Work notstarted

    3 Chandigarh 19,119.60 15,295.68 2,684.64

    Chattishgarh

    Raipur1 Augmentation of Water

    Supply Scheme includingextended area of RMC

    Water Supply 30,364.00 24,291.20 421,862.08

    UnderProgress

    1 30,364.00 24,291.20 21,862.08

    1 Chattishgarh 30,364.00 24,291.20 21,862.08

    Delhi1 Redevelopment of

    Connaught Place, NewDelhi-Urban Renewal andHeritage Conservation

    Urban Renewal 25,378.00 8,882.30 12,220.58 Under

    Progress

    2 Setting up of 20 MGD STP

    each at Nilothi andPappankalan

    Sewerage 24,544.00 8,590.40 1

    2,148.00

    Under

    Progress

    3 Traffic Managemant planfor areas Around Civiccentre JLN Marg, MintoRoa, New Delhi

    Other UrbanTransport

    9,716.00 3,400.60 1850.15 Under

    Progress

    4 Construction of Cloverleaves at Karkari more(Intersection of Vikas margand Road No. 57) andwidening of existing bridge

    Roads / Flyovers /RoB

    8,617.00 3,015.95 1753.99

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    13/104

    on Trunk drain No.-1)

    5 Construction of GradeSeparator on Road No.56ISBT Anand Vihar, Delhi

    Roads / Flyovers /RoB

    9,600.00 3,360.00 21,344.00

    UnderProgress

    6 Construction of 3additional clover leaves atNoida More Flyover i/c sliproad, bridges, footpath,cycle track and underpass.

    Roads / Flyovers /RoB

    8,818.00 3,086.30 1771.58

    UnderProgress

    7 RUB & ROB at RailwayLevel Crossing at Roadno.68 Near Nand Nagari.

    Roads / Flyovers /RoB

    10,286.00 3,600.10 21,440.18

    UnderProgress

    8 Development of multilevelunderground unconventialparking at various

    locations under thejurisdiction of MCD (AL-Block, Shalimar Bagh,Shiv Market Pitampura,QU Pitampura, CentralMarket Ashok Vihar,Mohammadpur Village,Malviya Nagar Market,PVR Basant Lok, PVRSaket, G-8 RajouriGarden, Block-10 Subhash

    Nagar, C-4 Janakpuri,Ajmal Khan PARK KarolBagh, Krishna MarketKalkaji, Hauzrani, NewFriends Colony, JangpuraBhogal).

    Parking lots andspaces on PPPbasis

    46,980.00 16,443.00 14,110.75

    UnderProgress

    9 Improvement andstrengthening of roads ofOkhla Indl. Area Phase I &II, Central Zone.

    Roads / Flyovers /RoB

    14,861.00 5,201.35 11,300.34 Under

    Progress

  • 7/27/2019 MIS-Document1.pdf

    14/104

    10 Covering of Nallah inNauroji Nagar from Africa

    Avenue to Ring Road forproviding parking/roadcum parking under the

    jurisdiction of MCD.

    Parking lots andspaces on PPPbasis

    5,120.00 1,792.00 1448.00

    Project notstarted

    11 Covering of nallah fromPress Enclave road

    passing through SheikhSarai, Chiragh Delhi,Panchsheel Enclave,Greater Kailash-I, AndrewsGanj upto Ring Roadbehind Police StationDefence Colony forproviding Parking/Roadcum parking under theJurisdiction of MCD.

    Parking lots andspaces on PPP

    basis

    23,300.00 8,155.00 12,038.75

    UnderProgress

    12 Improvment of road of 60

    ft. ROW and above byproviding RMC Pavement(Phase-I) in various zonesof MCD.

    Roads / Flyovers /

    RoB

    16,510.00 5,778.50 1

    1,444.63 UnderProgress

    13 Construction of GradeSeparator at Intersectionof Shankar Road andUpper Ridge Road.

    Roads / Flyovers /RoB

    7,177.00 2,511.95 1627.99 Project not

    started

    14 Construction of GradeSeparator at intersection ofPusa Road, Dr. K.S.

    Krishnan Marg and PatelRoad.

    Roads / Flyovers /RoB

    7,164.00 2,507.40 1626.85

    Project not

    started

    15 Construction of 25 nos.Foot Over Bridges atdifferent locations in DelhiCity.

    Roads / Flyovers /RoB

    1,750.00 612.50 1153.13 Project not

    started

    16 Re-modeling of SSBL(Saharnpur Samli BranchLine) drains in Shah. (N)Zone.

    Drainage / StormWater Drains

    15,226.00 5,329.10 11,332.28 Under

    Progress

  • 7/27/2019 MIS-Document1.pdf

    15/104

    17 Construction of GradeSeparator/ Underpass atIntersection of Pusa Road,

    Arya Samaj Road, FaizRoad, Upper Ridge Roadand Panchkuian Road.

    Roads / Flyovers /RoB

    5,544.00 1,940.40 1485.10

    Project notstarted

    18 Rehabilitation of TrunkSewer

    Sewerage 25,337.00 8,867.95 22,216.99

    UnderProgress

    19 Flyover at Africa Avenueand Arun Asaf Ali Road.

    Roads / Flyovers /RoB

    12,661.00 4,431.35 21,772.54

    PhysicallyCompleted

    20 Flyover at VivekanandMarg, Nelson MandelaMarg, Poorvi, Marg.

    Roads / Flyovers /RoB

    12,661.00 4,431.35 21,772.54 Physically

    Completed

    21 Construction of GradeSeparator at Raja RamKohli Marg Intersection onMarginal Bund RoadGeeta Colony Delhi.

    Roads / Flyovers /RoB

    250.00 87.50 235.01

    PhysicallyCompleted

    22 Construction of GradeSeparator for free flowTraffic at T-Junction ofMarginal Bund Road andMaster Plan Road overDisusrd Canal near ShastriNagar in East Delhi.

    Roads / Flyovers /RoB

    250.00 87.50 235.01

    PhysicallyCompleted

    23 Construction of GradeSeparator at the Junctionof G.T. Road and RoadNo.56 near Apsara Border.

    Roads / Flyovers /RoB

    14,147.00 4,951.45 21,980.58 Under

    Progress

    24 Construction of Bridge andits Approaches over RiverYamuna Down stream ofexisting Bridge atWazirabad, Delhi.

    Roads / Flyovers /RoB

    1,08,740.00 38,059.00 29,514.75

    UnderProgress

    25 Alignment over BarapullaNallah

    Roads / Flyovers /RoB

    97,000.00 33,950.00 18,487.50

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    16/104

    26 Ring Road Bye-pass fromSalimgarh Fort toVelodrom Road Package-IVelodrom Road to back ofRajghat Power StationPackage-II Back ofRajghat Power Station toSalimgarh Fort.

    Roads / Flyovers /RoB

    46,900.00 16,415.00 26,566.00

    UnderProgress

    27 Corridor Improvement ofU.P. Link Road from NH-24 Crossing (Noida More)to Chilla Regulator.

    Roads / Flyovers /RoB

    25,400.00 8,890.00 23,559.00 Under

    Progress

    28 Laying Interceptor Sewersalong the 3 major drainsviz. Najafgarh,supplementary andShahdhra for abatement ofpollution in Yamuna River

    Sewerage 1,35,771.00 47,519.85 111,880.00

    UnderProgress

    28 7,19,708.00 2,51,897.80 69,916.17

    28 Delhi 7,19,708.00 2,51,897.80 69,916.17

    GoaPanaji

    1 Heritage conservation forthe city of Panaji

    Development ofHeritage Areas

    362.25 289.80 172.45

    Project notstarted

    2 water suply for panaji cityand surrounding areas

    under the jurisdiction ofcorporation of the city ofpanaji at Goa

    Water supply 7,121.83 5,697.48 0-

    Work notstarted

    2 7,484.08 5,987.28 72.45

    2 Goa 7,484.08 5,987.28 72.45

    Gujarat

  • 7/27/2019 MIS-Document1.pdf

    17/104

    Ahmedabad1 Pipeline from Narmada

    Main canal to KotarpurWTP; 330 MLD IntakeWell in Sabarmati rivernear Kotarpur; WaterTreatment Plant at Rasaka

    Water Supply 5,383.25 1,884.14 41,884.06

    PhysicallyCompleted

    2 Construction of Railwayover Bridge on

    Ahmedabad Botad M.G.Railway line at ShreyasCrossing on 122 ft. RingRoad

    Roads / Flyovers /RoB

    1,212.00 424.20 4424.00

    PhysicallyCompleted

    3 Construction of four laneBridge across RiverSabarmati connectingVasna and Pirana 122road

    Roads / Flyovers /RoB

    2,955.00 1,034.25 41,034.00

    PhysicallyCompleted

    4 Renovation of ExistingSewage Treatment Plantat Pirana

    Sewerage 6,922.00 2,422.70 42,422.72

    PhysicallyCompleted

    5 Renovation of SewerageTreatment Plant at Vasna

    Sewerage 1,135.00 397.25 4397.24

    PhysicallyCompleted

    6 Bus Rapid TransportSystem- Construction of12 Km. long stretch(Stretch-1 of first phase)BRT Roadway and

    Carrying out detailedstudies and engineering ofremaining stretches

    Mass RapidTransport System

    8,760.00 3,066.00 42,759.40

    PhysicallyCompleted

    7 Storm Water DrainageSystem for West Zone of

    AMC area

    Drainage / StormWater Drains

    5,914.00 2,069.90 42,069.50

    PhysicallyCompleted

    8 Bus Rapid Transit System- 46 Km

    Mass RapidTransport System

    40,572.00 14,200.20 412,780.20

    UnderProgress

    9 Storm Water Drainage forSouth and Central zones

    Drainage / StormWater Drains

    12,088.00 4,230.80 44,230.80

    PhysicallyCompleted

  • 7/27/2019 MIS-Document1.pdf

    18/104

    of AMC area, Ahmedabad

    10 Storm Water Drainage forNorth and East Zones of

    AMC area Ahmedabad

    Drainage / StormWater Drains

    12,283.00 4,299.05 44,299.04 Physically

    Completed

    11 Construction of four laneROB in lieu of L.C.No.5aat Omkar Crossing on

    Ahmedabad-HimatnagarM.G. Railway line betweenStation Kalupur andNaroda

    Roads / Flyovers /RoB

    1,851.00 647.85 4647.84

    PhysicallyCompleted

    12 Construction of Railwayover Bridge No.132 ft.Ring Road near DakshiniSocietyn over B.G.Railway lines betweenManinagar and Vatva Rly.

    Station

    Roads / Flyovers /RoB

    2,144.00 750.40 4749.20

    PhysicallyCompleted

    13 Cnstruction of four laneROB in lieu of No.306 on

    Ahmedahad-Mumbai B.G.Rly line at Ambica Tubecrossing between StationVatva and Maninagar

    Roads / Flyovers /RoB

    1,500.00 525.00 4524.00

    PhysicallyCompleted

    14 Construction of six laneflyover bridge on SOLA(AEC) junction at

    Ahmedabad

    Roads / Flyovers /RoB

    1,857.00 649.95 4648.98 Physically

    Completed

    15 Construction of four lanebridge on Sabarmati-Viramgam B.G. Railwayline, Ahmedabad

    Roads / Flyovers /RoB 2,011.00 703.85 4 701.92 PhysicallyCompleted

    16 Construction of four laneflyover bridge onShivranjani junction at

    Ahmedabad

    Roads / Flyovers /RoB

    1,670.00 584.50 4584.26 Physically

    Completed

    17 Construction of six laneflyover on Memnagar

    Roads / Flyovers /RoB

    1,513.00 529.55 4529.56

    PhysicallyCompleted

  • 7/27/2019 MIS-Document1.pdf

    19/104

    junction at Ahmedabad

    18 Construction of Major andMinor Radial RoadsPhase-I in AUDA Area

    Roads / Flyovers /RoB

    5,013.00 1,754.55 41,753.28

    PhysicallyCompleted

    19 Terminal SeweragePumping Station, PumpingMain and Sewage

    Treatment Plant nearVinzol for East AUDA Area

    Sewerage 3,681.26 1,288.44 41,159.60

    Physically

    Completed

    20 West AUDA Area TerminalSewerage PumpingStation, Pumping Main andSewage Treatment Plantnear Vasana

    Sewerage 10,692.01 3,742.20 43,367.98

    PhysicallyCompleted

    21 Catchment Developmentand Drainage for WaterBodies Development andflood Relief Project

    Drainage / StormWater Drains

    10,471.84 3,665.14 43,298.63 Under

    Progress

    22 BRTS Phase-II forAhmedabad MunicipalCorporation - 30.50 Km

    Mass RapidTransport System

    48,813.00 17,084.55 28,542.14

    UnderProgress

    23 Sewerage Network ofWest AUDA area of

    Ahmedabad UA

    Sewerage 23,541.00 8,239.35 35,353.94

    UnderProgress

    24 Sewerage Network of EastAUDA area of AhmedabadUA

    Sewerage 7,730.81 2,705.78 42,435.20

    UnderProgress

    25 Solid Waste Managementin Ahmedabad

    Solid WasteManagement

    11,885.84 4,160.04 22,080.02

    UnderProgress

    26 Revitalisation of BhadraFort Precinct at

    Ahmedabad

    Development ofHeritage Areas

    7,439.00 2,603.64 1650.91

    Workawarded

    26 2,39,038.01 83,663.29 65,328.42

    Rajkot27 Water Supply Project for

    RajkotWater Supply 8,562.00 4,281.00 4

    4,280.00Physically

    Completed

  • 7/27/2019 MIS-Document1.pdf

    20/104

    28 Strengthening of SolidWaste Management(Phase-I)

    Solid WasteManagement

    867.00 433.50 4 433.52Under

    Progress

    29 Underground Drainage-Phase-II and Phase-III(Part-1) (Sewage DisposalNetwork and STP)

    Drainage / StormWater Drains

    7,542.00 3,771.00 43,770.80 Under

    Progress

    30 Construction of ROB in

    lieu of level crossing onB.G railway line alongGondal Road and MavdiRoad

    Roads / Flyovers /

    RoB

    2,480.74 1,240.37 4

    1,116.32 UnderProgress

    31 Bus Rapid Transit SystemPhase I (Development ofBlue Corridor Part I) -29.00 Km

    Mass RapidTransport System

    11,000.00 5,500.00 44,950.00 Under

    Progress

    32 Sewerage System Phase -II, Part -II for Rajkot City

    Sewerage 19,195.12 9,000.00 12,250.00

    UnderProgress

    6 49,646.86 24,225.87 16,800.64

    Surat33 Upgradation of Anjana

    Sewage Treatment PlantSewerage

    1,098.00549.00 4

    549.00Physically

    Completed

    34 Augmentation of AdajanSewerage

    Sewerage1,193.00

    596.50 4596.50

    PhysicallyCompleted

    35 Augmentation of BhesanSewage Treatment Plant

    Sewerage1,509.00

    754.50 4754.50

    PhysicallyCompleted

    36 Water Supply Project for

    Vesu Urban Settlement ofSurat Urban DevelopmentAuthority

    Water Supply

    1,919.00

    959.50 4

    959.50 PhysicallyCompleted

    37 Water Supply Project forPal-Palanpur Area

    Water Supply995.00

    497.50 4497.50

    PhysicallyCompleted

    38 Bridge across river Tapijoining Daboli toJahangirpura

    Roads / Flyovers /RoB 6,500.00

    3,250.00 43,250.00

    PhysicallyCompleted

    39 Secondary SeweageTreatment Plant at Bamroli

    Sewerage1,322.47

    661.24 4661.23

    PhysicallyCompleted

  • 7/27/2019 MIS-Document1.pdf

    21/104

    40 Storm Water DrainageVesu Area

    Drainage / StormWater Drains 4,995.00

    2,497.50 42,497.52

    PhysicallyCompleted

    41 Sewerage DisposalNetwork and STP for Pal-palanpor area

    Sewerage2,128.00

    1,064.00 41,064.00 Physically

    Completed

    42 Sewerage DisposalNetwork and STP for Vesuarea

    Sewerage3,437.00

    1,718.50 41,718.50

    PhysicallyCompleted

    43 Flyover bridge onKapodhara Fire Station

    Roads / Flyovers /RoB 932.00

    466.00 4466.00

    PhysicallyCompleted

    44 Flyover Bridge nearNanavarachha

    Roads / Flyovers /RoB 758.00

    379.00 4379.00

    PhysicallyCompleted

    45 Upgradation of SolidWaste Management inSurat

    Solid WasteManagement 5,249.72

    2,624.86 42,362.39

    UnderProgress

    46 Augmentation of Sarthana,Katargam and RanderWater Works of SMC

    Water Supply14,068.65

    7,034.33 47,034.33 Under

    Progress

    47 Storm water drainagesystem of Surat city forSMC area

    Drainage / StormWater Drains 11,662.87

    5,831.44 45,248.30

    UnderProgress

    48 Bridge across KankaraKhadi between UdhanaMagdalla Road andBamroli

    Roads / Flyovers /RoB 841.39

    420.70 4420.70 Physically

    Completed

    49 Sewerage and SewageTreatment system for NewEast Zone Areas

    Sewerage11,065.73

    5,532.87 44,979.57 Under

    Progress

    50 Storm Water DisposalSystem for New Zone

    Drainage / StormWater Drains 3,426.82

    1,713.41 41,713.40

    UnderProgress

    51 Construction of RoB onproposed Outer Ring Roadof Surat city at Gothan

    Roads / Flyovers /RoB 1,427.12

    713.56 1178.39

    Work notstarted

    52 Construction of RailwayOver Bridges on proposedOuter Ring Road of Suratcity at Sachin

    Roads / Flyovers /RoB 2,077.12

    1,038.56 3675.07 Under

    Progress

  • 7/27/2019 MIS-Document1.pdf

    22/104

    53 Water Supply system forNew East Zone areas ofSurat MunicipalCorporation

    Water Supply16,743.43

    8,371.72 48,371.75 Under

    Progress

    54 Automation/SCDA ofexisting pumping stationand STP of SuratMunicipal Corporation

    Sewerage3,063.43

    1,531.72 41,377.95 Under

    Progress

    55 Development of BRTS forSurat - 29.90 Km

    Mass RapidTransport System 46,902.00

    23,451.00 211,725.50

    UnderProgress

    56 Sewerage system for NewNorthern Drainage Zone ofSMC

    Sewerage18,404.35

    9,202.18 48,281.94

    UnderProgress

    57 Water Supply distributionsystem for South - EastZone areas of SuratMunicipal Corporation(SMC)

    Water Supply20,109.67

    10,054.84 36,535.94

    UnderProgress

    25 1,81,828.77 90,914.39 72,298.48

    Vadodara58 Construction of Road over

    bridge across Vadodara -Jambusar NG railway Lineat Rly Km 2/3-4 in lieu ofrailway crossing no 2between stationVishwamitri and Jambusarat 40 M wide ring road at

    Kalali

    Roads / Flyovers /RoB 4,435.10

    2,217.55 1-

    UnderProgress

    59 Water Supply Sourceaugmentation

    Water Supply4,105.00

    2,052.50 42,052.52

    PhysicallyCompleted

    60 Sewerage System forVadodara city

    Sewerage10,514.93

    5,257.47 45,257.47

    UnderProgress

    61 Storm Water Drainage ofVadodara city

    Drainage / StormWater Drains 14,594.56

    7,297.28 46,567.55

    UnderProgress

    62 Solid Waste Managementfor Vadodara

    Solid WasteManagement 3,098.54

    1,549.27 41,549.27

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    23/104

    63 Restoration andStrengthening of Sayajisarovar Partappurasystem, Vadodara

    Preservation ofwater bodies 2,869.72

    1,434.88 3962.35 Under

    Progress

    64 Construction of Road overbridge in lieu of existinglevel crossing no 2between station

    Pratapnagar Jambusar(NG) Section at RailwayKm 1/15 to 2/1 nearLalbaug at Vadodara

    Roads / Flyovers /RoB 4,570.00

    2,285.00 42,056.50

    Under

    Progress

    65 Sewerage systems Phase- II for Vadodara City

    Sewerage6,055.74

    3,027.88 42,725.08

    UnderProgress

    66 Construction of 4 LaneRoB Across Ahmedabad-Mumbai B.G Line atRailway Km. 399/41between Station

    Vishwamitri andMakarpura near D-CabinNavayard on 24.0 M. Roadat Vadodara city

    Roads / Flyovers /RoB 1,396.00

    698.00 4698.00

    Physically

    Completed

    67 Source Augmentation forwater supply, VadodaraPhase - II

    Water Supply3,688.00

    1,844.00 41,659.60

    UnderProgress

    68 Construction of 2 LaneRoB Acrooss Ahmedabad-Mumbai B.G Line atRailway Km 395/10

    between Station Vadodaraand Makarpura nearDinesh Mill at Vadodara

    Roads / Flyovers /RoB 1,968.00

    984.00 4885.60

    Physically

    Completed

    69 Basic Services todeveloping rehabiltation ofKaans in Vadodra city (a)storm Water drainagesector (b) water suplysector

    Water Supply16,789.88

    8,394.94 24,197.46

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    24/104

    70 Supplementary DPR forwater Supply in Ajwa Zoneof Vadodara City

    Water Supply2,059.26

    605.50 1151.37

    UnderProgress

    13 76,144.73 37,648.27 28,762.77

    Porbandar71 Augmentation of water

    supply at PorbandarWater Supply 2,631.04 2,104.84 1

    526.21Project not

    started72 Underground Drainage(Sewerage) project forporbandar mission city

    Sewerage 11,180.65 8,944.52 0-

    Work notstarted

    2 13,811.69 11,049.36 526.21

    72 Gujarat 5,60,470.06 2,47,501.17 1,83,716.52

    Haryana

    Faridabad1 Revamping of Sewerage

    System and SewerageTreatment works inFaridabad

    Sewerage10,383.00

    5,191.50 44,672.37 Under

    Progress

    2 InfrastructureDevelopment Works(Drainage) in OldFaridabad Zone

    Drainage / StormWater Drains 2,825.12

    1,412.56 4996.04 Under

    Progress

    3 Augmentation of watersupply of for Faridabad

    Town, Haryana

    Water Supply49,349.00

    24,674.50 316,038.40

    UnderProgress

    4 Solid Waste ManagementScheme for Faridabad

    Solid WasteManagement 6,924.00

    3,462.00 32,250.30

    UnderProgress

    4 69,481.12 34,740.56 23,957.11

    4 Haryana 69,481.12 34,740.56 23,957.11

    Himachal Pradesh

    Shimla

  • 7/27/2019 MIS-Document1.pdf

    25/104

    1 Solid Waste Mangementfor Shimla

    Solid WasteManagement 1,604.00

    1,283.20 1320.80

    UnderProgress

    2 Construction of wideningand lowering of existingtunnel near AucklandHouse school (Includingconstruction of approachbridge)

    Roads / Flyovers /RoB 1,009.06

    807.25 3524.71

    UnderProgress

    3 Rehabilitation of WaterrSupply distribution systemfor Shimla City

    Water Supply7,236.00

    5,788.80 11,447.20

    Work notstarted

    4 Rejuvenation of SewerageNetwork in missing linesand left out / worn-outsewerage in various zonesof Shimla, Phase-1

    Sewerage5,474.00

    3,880.00 1970.00

    Project notstarted

    5 Sanitary Landfill site forSolid Waste Managementplant at village Bhariyal,

    Tehsil Dist. Shimla

    Solid WasteManagement 1,050.62

    840.50 0- Project not

    started

    5 16,373.68 12,599.74 3,262.71

    5 Himachal Pradesh 16373.68 12,599.74 3,262.71

    Jammu & KashmirJammu

    1 Comprehensive seweragescheme for Division A of

    Greater Jammu

    Sewerage12,923.00

    11,630.70 24,652.29 Under

    Progress

    2 Comprehensive SewerageScheme for left out area,Phase II of Division AofGreater Jammu City

    Sewerage2,032.03

    1,828.83 0- Project not

    started

    2 14,955.03 13,459.53 4,652.29

    Srinagar

  • 7/27/2019 MIS-Document1.pdf

    26/104

    2 Comprehensive sewerageScheme for Zone III(SectorI) of Greater Srinagar.

    Sewerage13,292.00

    11,962.80 37,775.82 Under

    Progress

    3 Augmentation of WaterSupply for Zone IV ofGreater Srinagar includingCentral Water TestingFacilities

    Water Supply12,100.00

    10,000.00 24,000.00

    UnderProgress

    4 Water Supply scheme forTangnar (Srinagar)

    Water Supply14,837.00

    13,353.30 25,341.32

    UnderProgress

    3 40,229.00 35,316.10 17,117.14

    5 Jammu & Kashmir 55184.03 48,775.63 21,769.43

    Jharkhand

    Ranchi1 Water Supply Project for

    Ranchi

    Water Supply 28,839.15 23,071.32 2

    9,228.53Under

    Progress

    2 Solid Waste Management Solid WasteManagement

    5,139.43 4,111.54 11,027.89

    UnderProgress

    2 33,978.58 27,182.86 10,256.42

    Dhanbad3 Improvement of Water

    Supply to DhanbadWater Supply 36,585.00 18,292.50 2

    7,317.04Under

    Progress

    4 Solid Waste Management Solid Waste

    Management

    5,585.90 2,792.95 1

    698.24

    Under

    Progress2 42,170.90 21,085.45 8,015.28

    Jamshedpur5 Integrated Solid Waste

    Management Project forJamshedpur Urban

    Agglomeration

    Solid WasteManagement

    3,336.24 1,668.12 1417.03 Project not

    started

  • 7/27/2019 MIS-Document1.pdf

    27/104

    1 3,336.24 1,668.12 417.03

    5 Jharkhand 79,485.72 49,936.43 18,688.73

    KarnatakaBangalore

    1 Development of Traffic and

    Transit Managementcentre at Kengery(Proposed Bus terminalMaintenance Depot andPassenger Amenity Centreat Kengery Bangalore)

    Other Urban

    Transport 2,112.66

    739.43 4

    665.50

    PhysicallyCompleted

    2 Development of Traffic andTransit Managementcentre at BannerghattaBangalore (Proposed BusTerminal Maintenance

    Depot and PassengerAmenity Centre atBannerghatta)

    Other UrbanTransport 392.60

    137.41 4123.66

    PhysicallyCompleted

    3 Proposal for constructionof TTMC at ShantinagarVol I Vol II Vol IIIA 1 2 3 4Vol.III B 1 2

    Other UrbanTransport 8,467.96

    2,963.79 42,667.42 Physically

    Completed

    4 Proposal for constructionof TTMC at KoramangalaVol I, Vol II, Vol III 1 2 3

    Other UrbanTransport 5,058.06

    1,770.32 41,593.29 Physically

    Completed

    5 Proposal for constructionof TTMC at BanashankariVol I Vol II Vol III 1 2

    Other UrbanTransport 2,223.51 778.23 4 700.39 PhysicallyCompleted

    6 Proposal for constructionof TTMC at ITPLWhitefield Vol.I Vol. IIDetailed drawings

    Other UrbanTransport 2,655.63

    929.47 4835.99 Physically

    Completed

    7 Construction of TTMC atVijaynagar Vol.I Vol.II

    Other UrbanTransport 3,812.42

    1,334.35 41,200.89

    PhysicallyCompleted

  • 7/27/2019 MIS-Document1.pdf

    28/104

    8 Construction of Underpassat Malleshwaram Circle

    Roads / Flyovers /RoB 1,245.21

    435.82 4392.25

    PhysicallyCompleted

    9 Remodelling of Primaryand Secondary stormwater drawin in Bangalorecity at Vrushabhavathivalley includingKethamaranahalli and

    arkavathi minor valley Iand Kathriguppa minorvalley III (3 DPRs)

    Drainage / StormWater Drains 42,089.00

    7,989.10 35,991.81

    UnderProgress

    10 Remodelling of Primaryand Secondary stormwater drains in BangaloreCity Challaghatta valley

    Drainage / StormWater Drains 10,593.00

    3,337.25 22,074.96 Under

    Progress

    11 Remodelling of Primaryand Secondary stormwater drawin in Bangalore

    city, Koramangala valley

    Drainage / StormWater Drains 12,858.00

    3,902.15 32,926.59 Under

    Progress

    12 Remodelling of Primaryand secondary stormwater drains in Bangalorecity, Hebbal valley

    Drainage / StormWater Drains 26,998.00

    6,465.90 34,849.41 Under

    Progress

    13 Construction of underpassat Taogre circle

    Roads / Flyovers /RoB 1,755.90

    614.57 3399.46

    UnderProgress

    14 Development of Traffic andTransit ManagementCentre at Jayanagar,Bangalore (Proposedpassenger amenity centreat Jayanagar)

    Roads / Flyovers /RoB 889.58

    311.35 4280.20

    PhysicallyCompleted

    15 Augmentation of Additional100 MLD of water fromCWSS stage IV Phase I

    Water Supply1,226.00

    429.10 4343.28 Physically

    Completed

    16 Bulk flow metering systemfor Bangalor ewatertransmission network

    Water Supply1,531.00

    535.85 3348.30 Physically

    Completed

  • 7/27/2019 MIS-Document1.pdf

    29/104

    17 Upgradation side walksand asphalting work ofroads surrounding M.G.Road area

    Roads / Flyovers /RoB 4,361.16

    1,526.41 41,373.76 Physically

    Completed

    18 Upgradation side walksand asphalting work ofroads surroundingKoramangala area

    Roads / Flyovers /RoB 5,044.90

    1,765.72 41,589.15 Physically

    Completed

    19 Environmental Action PlanReplacementRehabilitation of existingsewerage system

    Sewerage17,675.00

    6,186.25 22,474.50 Under

    Progress

    20 Construction of bridge atGali Anjaneya junction

    Roads / Flyovers /RoB 3,008.00

    1,052.80 3726.45

    UnderProgress

    21 Construction of gradeseparator at Yeshwanthpur

    junction

    Roads / Flyovers /RoB 2,157.91

    755.27 3566.46

    PhysicallyCompleted

    22 Construction of Flyover

    along ORR at IBLURjunction

    Roads / Flyovers /

    RoB 1,874.28

    656.00 4

    590.40

    Physically

    Completed

    23 Construction of Flyoveralong ORR at AgaraJunction

    Roads / Flyovers /RoB 3,809.93

    1,333.48 41,200.13

    PhysicallyCompleted

    24 Construction of Underpassat Ring Road HennurBanaswadi Road Junction

    Roads / Flyovers /RoB 2,543.79

    890.33 4801.29 Physically

    Completed

    25 Construction of underpassat Magadi Road and Chordroad junction

    Roads / Flyovers /RoB 2,782.49

    973.87 4876.46 Physically

    Completed

    26 Underground Drainageworks in Yelahanka

    Sewerage1,500.63

    525.22 2210.08

    UnderProgress

    27 Underground Drainageworks in Kengeri

    Sewerage1,876.36

    656.73 2262.69

    UnderProgress

    28 Traffic and TransitManagement Centre atDomlur Bus Stand

    Other UrbanTransport 1,555.00

    544.25 4489.82 Physically

    Completed

  • 7/27/2019 MIS-Document1.pdf

    30/104

    29 Traffic and TransitManagement Centre atYeswantpur Bus Stand

    Other UrbanTransport 6,131.93

    2,146.18 41,931.55 Physically

    Completed

    30 Underground Drainageworks or Byatarayanpura

    Drainage / StormWater Drains 12,517.00

    4,380.95 21,752.37

    UnderProgress

    31 Underground Drainagesystem and roadrestoration for erstwhileR.R. Nagar CMC

    Drainage / StormWater Drains 4,153.80

    1,453.83 2581.53 Under

    Progress

    32 Construction of Underpassat Ring Road-Kaderinahalli

    junction

    Roads / Flyovers /RoB 2,486.90

    870.42 4783.36 Under

    Progress

    33 Construction of Underpassat Ring Road-CNR Rao

    junction

    Roads / Flyovers /RoB 2,260.62

    791.22 3514.28

    UnderProgress

    34 Construction of Underpassat Ring Road-PuttenahalliJunction

    Roads / Flyovers /RoB 2,284.84

    799.69 4719.87 Physically

    Completed

    35 Underground SewerageSystem and RoadRestoration for erstwhileDasarahalli city municipalcouncil (Drainage Zone 7& 8)

    Sewerage 13,657.00 4,779.95 21,911.99

    UnderProgress

    36 Underground SewerageSystem and RoadRestoration for K.R. PuramCity Municipal Council(Drainage Zone III)

    Sewerage 8,789.00 3,076.15 21,230.39

    UnderProgress

    37 Underground SewerageSystem and RoadRestoration forMahadevapura CityMunicipal Council(Drainage Zone III)

    Sewerage 11,018.00 3,856.30 21,542.37

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    31/104

    38 Providing undergroundDrainage facilities andRoad restoration inerstwhile BommanahaliCity Municipal Council

    Drainage / StormWater Drains

    23,175.00 8,111.24 23,242.50

    UnderProgress

    38 2,58,572.07 79,806.31 50,764.78

    Mysore39 Remodelling of watersupply Distribution network,Automation andIntegrated ManagementSystem for Mysore City

    water supply19,454.00

    15,563.20 310,115.36

    UnderProgress

    40 Development of TransportInfrastructure facilities atMysore

    Other UrbanTransport 8,525.74

    6,820.59 46,138.52 Under

    Progress

    41 Upgradation of Outer Ring

    Road at Mysore

    Roads / Flyovers /

    RoB 23,951.00

    17,521.98 3

    11,389.29Under

    Progress

    42 Water Supply project forMysore

    Water Supply10,881.99

    8,705.59 35,658.79

    UnderProgress

    43 Integrated Municipal SolidWaste Strategy

    Solid WasteManagement 2,985.00

    2,388.00 2955.20

    UnderProgress

    44 Remodelling of StormWater Drainage system inMysore

    Drainage / StormWater Drains 38,460.00

    10,000.00 49,000.00

    UnderProgress

    45 Intelligent TransportSystem and Innovative

    Environment Project forMysore

    Other UrbanTransport 2,270.00

    1,176.00 2470.40 Under

    Progress

    46 Heritage and UrbanRenewal at Heritage Core

    Development ofHeritage Areas 3,945.00

    3,156.00 1789.00

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    32/104

    47 Water Managementthrough surface andRainwater harvesting at SriChamarajendra zoologicalGardens

    Water Supply330.00

    264.00 0-

    Work notstarted

    91,10,802.73

    65,595.3644,516.56

    47 Karnataka3,69,374.80

    1,45,401.6895,281.34

    KeralaKochi

    1 Water Supply System toKochi Part I

    Water Supply 20,117.00 10,058.50 36,538.06

    UnderProgress

    2 Solid Waste Managementfor Kochi

    Solid WasteManagement

    8,812.00 4,406.00 32,863.40

    UnderProgress

    3 Upgrading Surface WaterDrainage System ofCentral area of Kochi

    Drainage / StormWater Drains

    978.00 489.00 1122.25 Under

    Progress

    4 Sewerage scheme forCentral zone covering sixDivisions and Wards(No.43, 49, 50, 51, 54 and56) of Kochi

    Sewerage 7,841.00 3,920.50 1935.13

    UnderProgress

    5 Road Improvement andBridge Constrution at

    Kochi

    Roads / Flyovers /RoB

    10,964.00 5,482.00 11,370.50

    UnderProgress

    6 Brodway and ErnakulamMarket Heritage andUrban renewal Project

    Urban Renewal 2,210.00 1,105.00 1276.25 Project not

    started

    6 50,922.00 25,461.00 12,105.59

    Thiruvananthapuram7 Improvement ot Water

    SupplyWater Supply 8,716.00 6,972.80 3

    4,532.32Under

    Progress

  • 7/27/2019 MIS-Document1.pdf

    33/104

    8 Improvement of StormWater Drainage in Zone-II

    Area ofThiruvananthapuram

    Drainage / StormWater Drains

    4,039.00 3,231.20 1807.80 Under

    Progress

    9 Improvement of Sewerageschemes forThiruvananthapuramMunicipal Corporation

    Sewerage 21,541.00 17,232.80 14,308.20 Under

    Progress

    10 Extension of seweragesystem F&G Block,Southern area ofThiruvannathapuram andrehabilitation of thesewerage systems,procurement of sewercleaning machines,sewerage system for

    Attukal area, STP for Govt.Medical college,

    Thiruvananthapuram

    Sewerage 12,115.00 9,692.00 0-

    Work notstarted

    11 Solid Waste Managementin Thiruvananthapuram

    Solid WasteManagement

    2,456.00 1,964.80 31,277.12

    UnderProgress

    5 48,867.00 39,093.60 10,925.44

    11 Kerala 99,789.00 64,554.60 23,031.03

    Madhya PradeshBhopal

    1 Water Supply to Gasaffected areas

    Water Supply 1,418.31 709.16 4638.25

    PhysicallyCompleted

    2 Channelisation of Nallah(Storm Water Drain)

    Drainage / StormWater Drains

    3,057.00 1,528.50 4993.54

    UnderProgress

    3 Renewal of BasicInnfrastructure inCategorisedScrap Mart inBhopal

    Urban Renewal 811.00 405.50 4364.95 Physically

    Completed

  • 7/27/2019 MIS-Document1.pdf

    34/104

    4 Renewal of Upgradation ofBasic Infrastructure in M.P.Nagar, Bhopal

    Urban Renewal 1,894.00 947.00 4852.30 Physically

    Completed

    5 Pilot Corridor (New Marketto University) for BusRapid Transit System(42.19 km long)

    Mass RapidTransport System

    24,712.00 11,888.00 47,727.20 Under

    Progress

    6 Narmada Water SupplyProject for Bhopal Water Supply 30,604.16 15,302.08 4 13,774.87 UnderProgress

    7 Water Supply distributionnetwork of BhopalMunicipal Area

    Water Supply 41,545.64 20,772.84 28,309.12 Under

    Progress

    7 1,04,042.11 51,553.08 32,660.23

    Indore8 Yeshwant Sagar Water

    Supply System

    Augmentation Scheme

    Water Supply 2,375.00 1,187.50 41,187.75 Physically

    Completed9 Bus Rapid Transport

    System-PILOT PROJECT- 11.65 Km

    Mass RapidTransport System

    9,845.00 4,922.50 33,199.66

    UnderProgress

    10 Indore Sewerage Project Sewerage 30,717.00 15,358.50 49,983.01

    UnderProgress

    11 Construction of 8 importantroads at Indore

    Roads / Flyovers /RoB

    4,083.35 2,041.68 42,041.68

    PhysicallyCompleted

    12 Development of Link Roadfrom White Church to By

    Pass Road

    Roads / Flyovers /RoB

    1,966.34 983.17 3639.06 Under

    Progress13 Development of Master

    Plan Link Road MR-9,Indore

    Roads / Flyovers /RoB

    3,974.64 1,987.32 31,291.76

    UnderProgress

    14 Solid Waste Managementof Indore City

    Solid WasteManagement

    4,324.66 2,162.33 31,621.74

    UnderProgress

    15 RoB at Juni IndoreRailway Crossing, Indorecity

    Roads / Flyovers /RoB

    631.00 315.50 4283.97

    PhysicallyCompleted

  • 7/27/2019 MIS-Document1.pdf

    35/104

    16 Construction of multi-levelparking at 20 differentlocations in Indore city

    Parking lots andspaces on PPPbasis

    5,600.00 2,800.00 1700.00

    UnderProgress

    17 Revierside corridor ofIndore BRTS Phase-I -14.30 Km

    Mass RapidTransport System

    18,000.00 9,000.00 0-

    Work notstarted

    10 81,516.99 40,758.50 20,948.63

    Jabalpur18 Sewerage and Sewage

    Treatment Project Phase-ISewerage 7,801.00 3,900.50 2

    975.00Under

    Progress

    19 Sewerage and SewageTreatment Project Phase-II

    Sewerage 7,081.00 3,540.50 2885.00

    UnderProgress

    20 Rehabilitation of existingpumping stations atRanjhi, Fagua andconstruction of newpumping stations at

    Bhongadwar WTP

    Water Supply 1,406.00 703.00 3456.95

    UnderProgress

    21 Storm Water drains atJabalpur city

    Drainage / StormWater Drains

    32,649.00 16,324.50 26,529.80

    UnderProgress

    4 48,937.00 24,468.50 8,846.75

    Ujjain22 Reorganisation of Water

    Supply schemeWater Supply 6,686.44 5,349.15 3

    3,476.94Under

    Progress

    23 Restoration, Construction

    and Development ofMahakal and GopalVirasat Kshetra

    Development of

    Heritage Areas

    4,739.00 3,791.20 1

    947.80 UnderProgress

    2 11,425.44 9,140.35 4,424.74

    23 Madhya Pradesh 2,45,921.54 1,25,920.42 66,880.35

    MaharashtraGreater Mumbai

  • 7/27/2019 MIS-Document1.pdf

    36/104

    1 Underground Tunnel fromMaroshi to RuparelCollege (12 kms.)

    Water Supply 29,486.76 10,320.37 49,288.32 Under

    Progress

    2 Mumbai Sewage DisposalProject Stage-II priorityworks

    Sewerage 36,201.00 12,670.35 411,403.32 Under

    Progress

    3 Eastern Freeway fromPrince of Wales Museum

    to APLR - MUIP

    Roads / Flyovers /RoB

    33,638.80 11,773.58 38,830.20 Under

    Progress

    4 Elevated road on Saharroad - MUIP

    Roads / Flyovers /RoB

    15,513.34 5,429.67 44,072.26

    UnderProgress

    5 Thane Railway StationArea Traffic ImprovementScheme (SATIS)

    Other UrbanTransport

    2,325.00 813.75 4813.75 Physically

    Completed

    6 DPR for additional 110MLD Water supply schemeof THANE

    Water Supply 7,118.00 2,491.30 42,491.30 Physically

    Completed

    7 Integrated NallaDevelopment Phase I forTHANE

    Drainage / StormWater Drains

    9,239.00 3,233.65 42,910.28

    PhysicallyCompleted

    8 Integrated NallaDevelopment ProjectPhase II for THANE

    Drainage / StormWater Drains

    11,659.00 4,080.65 43,672.58

    PhysicallyCompleted

    9 Underground SewerageScheme Phase I forTHANE

    Sewerage 14,956.79 5,234.88 44,711.39

    UnderProgress

    10 Underground Tunnel fromMalabar Hill Reservoir to

    Cross Maidan (3.6 kms)

    Water Supply 9,398.79 3,289.58 42,138.21 Under

    Progress11 Solid Waste Management

    project,Greater MumbaiSolid WasteManagement

    17,879.00 6,257.65 34,693.23

    UnderProgress

    12 Middle Vaitarna WaterSupply project for Mumbai- IV

    Water Supply 1,32,950.00 46,532.50 446,532.13

    UnderProgress

    13 Sewerage System project-Phase II for Thane

    Sewerage 14,009.00 4,903.15 21,961.26

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    37/104

    14 Sewerage System project-Phase III for Thane

    Sewerage 4,179.00 1,462.65 3951.00

    UnderProgress

    15 Underground sewerageproject based onDecentralised system

    sewerage 33,142.27 11,599.79 37,539.81 Under

    Progress

    16 Storm water drainage -Kalyan -Dombivli

    Drainage / StormWater Drains

    5,540.26 1,939.09 41,745.17

    UnderProgress

    17 Underground sewerage forpart of KDMC Sewerage 16,963.35 5,937.17 3 3,859.15 UnderProgress

    18 150 MLD Water SupplyScheme of KalyanDombivli MunicipalCorporation

    water supply 10,681.49 3,738.52 43,364.67 Under

    Progress

    19 Augmentation of watersupply system for NaviMumbai MunicipalCorporation

    water supply 23,052.03 8,068.21 35,244.33 Under

    Progress

    20 Integrated Nalla

    Development Phase-III forKalwa and Mumbra areasof Thane MC

    Drainage / Storm

    Water Drains

    5,789.27 2,026.24 4

    1,823.62 PhysicallyCompleted

    21 Ulhasnagar-Water SupplyDistribution system

    Water Supply 12,765.23 4,467.83 32,904.09

    UnderProgress

    22 Kulgaon-Badlapur -Underground Seweragescheme

    Sewerage 15,146.18 5,301.16 22,120.46 Under

    Progress

    23 Augmentation of existingwater supply scheme of

    Kalyan Dombivli MunicipalCorporation

    Water Supply 24,708.22 8,647.88 35,621.11 Under

    Progress

    24 Underground SewarageSystem for Navi MumbaiMunicipal Corporation

    Sewerage 35,366.52 12,378.28 49,283.71 Under

    Progress

    25 Solid Waste Managementfor Navi Mumbai

    Solid WasteManagement

    4,986.86 1,745.40 2698.16 Under

    Progress

  • 7/27/2019 MIS-Document1.pdf

    38/104

    26 Sewerage System forAmbernath MunicipalCouncil

    Sewerage 10,941.57 3,829.56 0-

    Project notstarted

    26 5,37,636.73 1,88,172.86 1,48,673.51

    Nagpur27 Road Over Bridges

    (ROBs)

    Roads / Flyovers /

    RoB

    8,628.00 4,314.00 3

    3,236.50

    Under

    Progress28 Expansion and

    upgradation of watersupply distribution networkin Nagpur city

    Water Supply 3,394.87 1,697.44 41,527.69 Physically

    Completed

    29 Energy Audit Projects forWater Supply

    Water Supply 2,503.62 1,251.81 41,126.62

    PhysicallyCompleted

    30 Water Sector (LeakDetection)

    Water Supply 278.73 139.37 4125.43

    PhysicallyCompleted

    31 Water Audit Projects Water Supply 2,500.00 1,250.00 4

    1,125.00

    Under

    Progress32 Lifting water from Pench

    Reservoir and conveyingupto Mahadulla by mortorlined MS pipeline in lieu ofcanal

    Water Supply 14,463.70 7,231.85 46,508.66

    UnderProgress

    33 Recycle and Reuse ofWaste Water

    Sewerage 13,011.00 6,505.50 11,626.38

    UnderProgress

    34 Kanhan AugmentationScheme

    Water Supply 8,217.00 4,108.50 42,670.50

    UnderProgress

    35 Water Supply Pench IV(Part 2)

    Water Supply 6,196.00 3,098.00 32,013.70

    UnderProgress

    36 Water Supply Pench IV(Part 3)

    Water Supply 8,059.27 4,029.64 32,619.18

    UnderProgress

    37 Water Supply Pench IV(Part 4)

    Water Supply 10,460.68 5,230.34 43,399.71

    UnderProgress

    38 Construction of Roadunder Bridge near AnandTalkies

    Roads / Flyovers /RoB

    1,828.65 914.33 3594.31

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    39/104

    39 Construction of Road overBridge at Maskasath

    Roads / Flyovers /RoB

    253.00 126.50 131.63

    UnderProgress

    40 Construction of Road OverBridge at Itwari

    Roads / Flyovers /RoB

    900.80 450.40 3292.76

    UnderProgress

    41 Construction of RoB atMangalwari in replacementof level-crossing No.297/A(A-class) between

    Km.1041/3-5 on Amla-Nagpur Section

    Roads / Flyovers /RoB

    849.14 424.57 4275.96

    UnderProgress

    42 Rehabilitation Plan toimplement 24X7 watersupply project for Nagpurcity under PPP framework

    Water Supply 38,786.00 19,393.00 14,848.25 Under

    Progress

    43 Water Supply system forNIT area (Phase - II)Tertiary distributionnetwork in 46 clusters

    Water Supply 29,639.55 14,819.78 13,704.95 Under

    Progress

    17 1,49,970.01 74,985.01 35,727.23

    Nanded44 Improvement to water

    supply in North NandedWater Supply 9,087.00 7,269.60 4

    7,269.60 UnderProgress

    45 Sewerage System in NorthNanded-Zone-I

    Sewerage 4,025.00 3,220.00 32,415.00 Under

    Progress

    46 Sewerage System inNanded North - Zone-II

    Sewerage 4,889.00 3,911.20 32,933.30 Under

    Progress

    47 Sewerage System inNanded North - Zone-III

    Sewerage 3,931.00 3,144.80 32,358.65 Under

    Progress

    48 Water Supply for Nanded(South)

    Water Supply 4,945.00 3,956.00 43,956.00 Under

    Progress

  • 7/27/2019 MIS-Document1.pdf

    40/104

    49 Undergrounda Sewerageand Sewage Treatment(Nanded-South)

    Sewerage 4,093.00 3,274.40 42,946.96 Under

    Progress

    50 Improvement toMovements Network inNanded Package II III andIIIB Roads

    Roads / Flyovers /RoB

    21,497.33 17,197.86 415,478.09 Under

    Progress

    51 Improvement to City

    Roads in Nanded(Package I)

    Roads / Flyovers /

    RoB

    6,108.55 4,886.84 4

    4,398.16 UnderProgress

    52 River Front DevelopmentNorth Bank Zone 3

    Development ofHeritage Areas

    4,313.08 3,450.46 43,450.48 Physically

    Completed

    53 Improvement to MovementNetwork in NandedPackage IIIB Structures

    Roads / Flyovers /RoB

    5,815.49 4,652.39 44,652.40 Physically

    Completed

    54 Surface/Storm waterdisposal and management

    project (North Zone,Nanded)

    Drainage / StormWater Drains

    4,573.08 3,658.46 32,378.01 Under

    Progress

    11 73,277.53 58,622.02 52,236.65

    Nashik55 Ongoing works of Water

    Supply ProjectsWater Supply 5,052.00 2,526.00 4

    2,252.13Under

    Progress

    56 Underground SewerageProject for Nashik CityPhase I

    Sewerage 14,846.00 7,423.00 46,680.70 Under

    Progress

    57 Solid Waste Managementfor Nashik

    Solid WasteManagement

    5,999.23 2,999.62 42,443.34

    PhysicallyCompleted

    58 Storm Water Drainage Drainage / StormWater Drains

    31,031.00 15,515.50 311,636.25

    UnderProgress

    59 Godavari River FrontDevelopment, GhatImprovement andbeautification

    Preservation ofwater bodies

    5,805.00 2,902.50 31,886.64 Under

    Progress

  • 7/27/2019 MIS-Document1.pdf

    41/104

    60 Underground sewerageproject package -II

    Sewerage 17,182.92 8,591.46 12,147.87

    UnderProgress

    6 79,916.15 39,958.08 27,046.93

    Pune61 Augmentation and

    Upgradation of SewageTreatment Plants and

    Pumping Station

    Drainage / StormWater Drains

    8,613.00 4,306.50 44,306.49 Under

    Progress

    62 BRT Pilot project for Punecity (Katraj SwargateHadapsar Route 17.00Km)

    Mass RapidTransport System

    10,313.50 5,156.75 45,156.75 Physically

    Completed

    63 Construction andImprovement of Drains toprevent contamination ofnatural water bodies anddevelopment of Heritage

    sites along in Pune(Environental Restoration/Preservation of MulaMutha River Ecos

    Drainage / StormWater Drains

    9,996.00 4,998.00 33,248.70

    UnderProgress

    64 Renewal and Managementof Sewerage and DrainageDisposal System in Pune(Augmentation of Weris,Restoration of Lakes Bio-remediation andLandscaping of Nalla and

    Rivers)

    Drainage / StormWater Drains

    9,778.00 4,889.00 44,400.10

    UnderProgress

    65 Sewerage proposals forPimpri Chinchwad

    Sewerage 11,938.88 5,969.44 45,969.44

    UnderProgress

    66 Bus Rapid Transit (PhaseI) for Pune city - 48.77 Km

    Mass RapidTransport System

    47,662.20 23,831.10 421,445.47

    UnderProgress

    67 Solid Waste Management- Pimpri-Chinchwad

    Solid WasteManagement

    7,044.81 3,522.41 43,522.41

    UnderProgress

    68 Water Supply proposals (4Nos.) for Pimpri

    Water Supply 35,862.00 17,931.00 417,931.00

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    42/104

    Chinchwad

    69 Bus Rapid Transportsystem (Development ofInfrastructure forCommonwealth YouthGames, 2008) - 36.00 Km

    Mass RapidTransport System

    43,422.00 21,711.00 421,711.00

    UnderProgress

    70 BRTS Corridor for MumbaiPune Highway (8.5 Kms)and Audh Rawet Road(14.5 Kms) Total (23 Kms)

    Mass RapidTransport System

    31,214.00 15,607.00 415,607.00 Under

    Progress

    71 Construction of pedestriansubways (3 Nos.) andvehicular underpass (1No.) at Nagar Road

    Roads / Flyovers /RoB

    661.00 330.50 4330.52 Under

    Progress

    72 Subway on WesterlyBypass at Baner junction

    Roads / Flyovers /RoB

    726.00 363.00 4363.00

    PhysicallyCompleted

    73 Approach Road toSangamwadi bridge

    Roads / Flyovers /RoB

    782.00 391.00 4351.90

    PhysicallyCompleted

    74 Improvement andStrengthening of New

    Alandi Road as BRTcorridor for Pune (13.9Km. from Vikrantwadi toDighi-Octroi Naka)

    Mass RapidTransport System

    3,703.00 1,851.50 31,388.64

    UnderProgress

    75 Sewerage System (Phase-II) for Pimpri Chinchwad

    Municipal Corporation

    Sewerage 12,070.45 6,035.23 46,035.20 Under

    Progress76 BRTS Corridor-Kalewadi-

    KSB Chowk to Dehu-Alandi Road (Trunk Route7)-PCMC - 11.20 Km

    Mass RapidTransport System

    21,920.00 8,768.00 22,192.00 Under

    Progress

    77 Water supply phase - II Water Supply 13,511.82 6,755.91 46,755.92

    UnderProgress

    78 Storm Water Drain forPimri - Chinchwad (Phase

    Drainage / StormWater Drains

    11,630.24 5,815.12 22,907.56

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    43/104

    - II)

    79 Storm Water DrainageProject for Pune CityPhase - I

    Drainage / StormWater Drains

    17,747.00 8,873.50 24,436.76

    UnderProgress

    80 BRTS Corridor-NashikPhata to Wakad (TrunkRoute No.9)-PCMC - 7.08

    Km

    Mass RapidTransport System

    20,682.00 8,272.80 34,136.40 Under

    Progress

    20 3,19,277.90 1,55,378.75 1,32,196.26

    80 Maharashtra 11,60,078.32 5,17,116.72 3,95,880.58

    Meghalaya

    Shillong1 Drainage Master Plan for

    Shillong-Phase-IDrainage / StormWater Drains 2,446.00

    2,201.40 3880.56

    UnderProgress

    2 Greater Shillong WaterSupply Project (Phase-III)for augmentation of WaterSupply to Shillong

    Water Supply19,349.72

    17,414.75 311,319.59 Under

    Progress

    221,795.72

    19,616.1512,200.15

    2 Meghalaya 21,795.72 19,616.15 12,200.15

    Manipur

    Imphal1 Solid Waste Management

    for ImphalSolid WasteManagement

    2,580.71 2,322.64 2929.06 Under

    Progress

    2 Improvement of NambulRiver Front and Naga Nala

    Preservation ofWater Bodies

    2,564.82 2,308.34 2923.34 Under

    Progress

  • 7/27/2019 MIS-Document1.pdf

    44/104

    3 Storm Water DrainageWork for Imphal City

    Drainage / StormWater Drains

    10,250.13 9,225.12 23,690.05 Under

    Progress

    3 15,395.66 13,856.09 5,542.45

    3 Manipur 15,395.66 13,856.09 5,542.45

    Mizoram

    Aizawl1 Renewal pumping

    machines and equipmentsand transmission systemof Greater Aizawl

    Water Supply 1,681.80 1,513.62 2756.82 Under

    Progress

    2 Improvement andWidening of City RoadPhase - I

    Roads / Flyovers /RoB

    3,873.40 3,486.06 0-

    Project notstarted

    3 Improvement and

    Widening of Vaivakawn toMizoram University

    Roads / Flyovers /

    RoB

    1,907.64 1,716.88 0

    - Project notstarted

    4 Shimui to MizoramUniversity as spur of

    Aizwal city Ring Road

    Roads / Flyovers /RoB

    5,309.32 4,778.39 0- Project not

    started

    4 12,772.16 11,494.94 756.82

    4 Mizoram 12,772.16 11,494.94 756.82

    NagalandKohima

    1 Roads and Transportation Roads / Flyovers /RoB

    2,525.60 2,273.04 31,477.48

    UnderProgress

    2 Integrated Road and Multilevel Parking Project atKohima

    Parking lots andspaces on PPPbasis

    5,042.43 4,538.19 11,134.55 Under

    Progress

  • 7/27/2019 MIS-Document1.pdf

    45/104

    3 Storm Water DrainageDevelopment Scheme forKohima city Phase I

    Drainage / StormWater Drains

    4,026.10 3,623.49 1905.87 Project not

    started

    3 11,594.13 10,434.72 3,517.90

    3 Nagaland 11,594.13 10,434.72 3,517.90

    Orissa

    Bhubaneshwar1 Conservation of the

    Heritage Tank ofBindusagar inBhubaneswar city

    Urban Renewal 601.31 481.05 3312.68 Under

    Progress

    2 Integrated SewerageProject

    Sewerage 49,891.35 39,913.08 215,965.23

    UnderProgress

    3 Storm water drainage forBhuvneswar

    Drainage / StormWater Drains

    6,833.00 5,466.40 22,186.56

    UnderProgress

    3 57,325.66 45,860.53 18,464.47

    Puri4 24x7 Piped Water Supply

    to Puri TownWater Supply 16,690.00 13,352.00 1

    3,338.00Under

    Progress

    5 Storm water drainage forPuri

    Drainage / StormWater Drains

    7,182.00 4,500.00 11,125.00

    UnderProgress

    2 23,872.00 17,852.00 4,463.00

    5 Orissa 81,197.66 63,712.53 22,927.47

    Puduchery1 Comprehensive Sewerage

    Scheme to the urbanareas of Puduchery

    Sewerage 20,340.00 16,272.00 26,257.00 Under

    Progress

    2 Integrated Solid WasteManagement forPuduchery

    Solid WasteManagement

    4,966.00 3,972.80 1993.20

    UnderProgress

  • 7/27/2019 MIS-Document1.pdf

    46/104

    2 Puduchery 25,306.00 20,244.80 7,250.20

    Punjab

    Amritsar1 Water Supply, Sewerage

    and Sewage treatment for

    Amritsar

    Water Supply 17,934.00 8,967.00 12,241.75 Under

    Progress

    2 Construction of two laneElevated Road from G.T.Road to Golden Temple

    AND Construction of 4lane Elevated Road onG.T Road fromMaqbulpura Chowk toBhandari-Pul

    Roads / Flyovers /RoB

    14,949.00 7,474.50 47,474.14

    UnderProgress

    3 Rehabiliation of existingSewerage system for

    Walled city Area Phase-II

    Sewerage 3,690.00 1,845.00 1461.25 Under

    Progress

    4 Integrated Soild WasteManagement project for

    Amritsar

    Solid WasteManagement

    7,249.00 3,624.50 1906.12 Project not

    started

    5 Rehabilitation of existingwater suplly system forwalled city area, Amritsar

    Water Supply 4,578.00 2,289.00 1572.25 Project not

    started

    5 48,400.00 24,200.00 11,655.51

    Ludhiana6 Providing sewerage andsewage treatment plant

    Sewerage 24,139.00 12,069.50 13,017.37

    UnderProgress

    1 24,139.00 12,069.50 3,017.37

    6 Punjab 72,539.00 36,269.50 14,672.88

    Rajasthan

  • 7/27/2019 MIS-Document1.pdf

    47/104

    Ajmer-Pushkar1 Water Supply

    Transmission for AjmerCity

    Water Supply 18,873.00 15,098.40 415,098.40

    PhysicallyCompleted

    2 Water Supply to Ajmer -Pushkar

    water supply 16,642.00 13,313.60 25,325.29

    UnderProgress

    3 Urban Renewal of Dargah

    Area, Ajmer

    Urban Renewal 3,841.80 3,073.44 2

    1,229.38

    Under

    Progress

    4 Sewerage Project Sewerage 11,208.00 8,966.40 12,521.50

    UnderProgress

    4 50,564.80 40,451.84 24,174.57

    Jaipur5 Urban Renewal of

    Chowkdi Sarhad, WalledCity, Jaipur

    Urban Renewal 1,159.66 579.83 4521.85

    UnderProgress

    6 Solid Waste Managementfor Jaipur

    Solid WasteManagement

    1,319.74 659.87 4494.91

    UnderProgress

    7 Sewerage system forJaipur (Phase-I)

    Sewerage 7,495.97 3,747.99 43,373.20

    UnderProgress

    8 Jaipur Sewerage ProjectPhase II

    Sewerage 11,086.00 5,543.00 44,988.70

    UnderProgress

    9 BRTS project proposal(Package IB) from C zoneBypass corssing toPanipech via Sikar Road -

    39.45 Km (for all 3prijects)

    Mass RapidTransport System

    7,519.00 3,759.50 43,383.57

    PhysicallyCompleted

    10 Construction of Bus RapidTransit System (Package2) - 39.45 Km (for all 3prijects)

    Mass RapidTransport System

    14,400.00 7,200.00 11,800.00 Under

    Progress

    11 Conservation andpropagation of PannaMeena Bori and itsenvirons Amber, Jaipur

    Preservation ofwater bodies

    431.00 215.50 3140.09 Under

    Progress

    12 BRTS (P k IIIA & M R id 26 035 94 13 017 96 1

  • 7/27/2019 MIS-Document1.pdf

    48/104

    12 BRTS (Package - IIIA &IIIB), Jaipur - 39.45 Km(for all 3 prijects)

    Mass RapidTransport System

    26,035.94 13,017.96 13,254.49

    UnderProgress

    13 Revitalisation of WalledCity of Jaipur-Phase-I

    Urban Renewal 2,761.00 1,380.50 1362.00

    UnderProgress

    9 72,208.31 36,104.15 18,318.81

    13 Rajasthan 1,22,773.11 76,555.99 42,493.38

    SikkimGangtok

    1 Rehabilitation of TrunkSewer along NH startingfrom Hospital Dara to STPand sewer mains alongTibet Road New Marketalong MG Marg atGangtok

    Sewerage 2,392.01 2,152.81 31,399.32

    UnderProgress

    2 Upgradation andmodernization of raw watertrunk mains and watertreatment plant for GreaterGangtok

    Water Supply 7,261.66 6,535.49 22,614.19

    UnderProgress

    2 9,653.67 8,688.30 4,013.51

    2 Sikkim 9,653.67 8,688.30 4,013.51

    Tamil Nadu

    Chennai1 Improvements to Water

    Supply System in ChennaiWater Supply 32,200.00 11,270.00 3

    7,325.50Under

    Progress

    2 Providing Water Supplyand Sewerage Systeminfrastructure along ITcorridor in Chennai (7packages)

    Water Supply 4,177.00 1,461.95 41,096.47

    UnderProgress

    3 I t f t W t S l 3 261 60 1 141 56 4

  • 7/27/2019 MIS-Document1.pdf

    49/104

    3 Improvement of watersupply in Tambarammunicipality

    Water Supply 3,261.60 1,141.56 41,027.40

    PhysicallyCompleted

    4 Solid Waste Managementfor Chennai

    Solid WasteManagement

    3,647.58 1,276.65 1319.16

    PhysicallyCompleted

    5 Construction of additionalsewerage treatment plant54 MLD at Perungudi

    Sewerage 3,147.98 1,101.79 4991.61 Under

    Progress

    6 Sea Water DesalinationPlant at Minjur

    Water Supply 8,780.00 7,024.00 46,321.60

    PhysicallyCompleted

    7 Construction of RoBs andRUBs at Chennai (6 Nos.)

    Roads / Flyovers /RoB

    4,440.80 1,554.28 41,398.85

    UnderProgress

    8 Construction of flyover atPerambur at Chennai

    Roads / Flyovers /RoB

    3,287.50 1,150.63 41,035.57

    PhysicallyCompleted

    9 Constructiojn of High Levelbridge, Adyar River at

    Alandur Road, Chennai

    Roads / Flyovers /RoB

    548.30 191.91 4172.70 Physically

    Completed

    10 Improvement of watersupply to Porur TwonPanchayat

    Water Supply 1,235.79 432.53 4389.27 Physically

    Completed

    11 Improvement of watersupply to Maduravoil

    Water Supply 2,330.00 815.50 3530.09

    UnderProgress

    12 Construction of sump cumpump house over 90 cuseccanal near Poondireservoir for raw watertreatment plant

    Water Supply 911.00 318.85 4286.96

    PhysicallyCompleted

    13 Comprehensive Water

    Supply scheme for AvadiMunicipality

    Water Supply 10,384.00 3,634.40 4

    3,270.96

    Under

    Progress

    14 Providing seweragefacilities to UllagaramPuzhithivakkam

    Sewerage 2,808.05 982.82 3638.82

    UnderProgress

    15 Providing comprehensivewater supply scheme toUllagaramPuzhuthivakkamMunicipality

    Water Supply 2,424.00 848.40 3551.46

    UnderProgress

    16 Nerkundram Village Water Supply 1 917 00 670 95 2

  • 7/27/2019 MIS-Document1.pdf

    50/104

    16 Nerkundram VillagePanchayat-Improvement ofWater Supply

    Water Supply 1,917.00 670.95 2268.39 Under

    Progress

    17 Providing comprehensiveSewerage scheme to

    Avadi Municipality

    Sewerage 15,805.41 5,531.89 44,978.69 Under

    Progress

    18 Providing seweragefacilities for Ambattur

    Municipality (Phase-III)

    Sewerage 13,091.00 4,581.85 32,978.20 Under

    Progress

    19 Solid Waste Managementof Alandur, Pallavaramand TambaramMunicipality

    Solid WasteManagement

    4,421.25 1,547.44 2618.97 Under

    Progress

    20 Providing Sewage facilitiesfor Chennai MaduravoyalMunicipality

    Sewerage 5,745.50 2,010.93 31,307.10 Under

    Progress

    21 Providing ComprehensiveWater Supply Scheme to

    Thiruvottiyur Municipality

    Water Supply 8,511.70 2,979.10 21,191.86 Under

    Progress

    22 Improvement to StormWater Drains in theNorthern Basin of Chennai

    Drainage / StormWater Drains

    35,986.39 12,595.24 25,038.09 Under

    Progress

    23 Improvement to Micro andMacro Drainage system inCentral basin of Chennai

    Drainage / StormWater Drains

    34,500.00 12,075.00 24,830.00 Under

    Progress

    24 Porur Panchayat-Providing Seweragefacilities for Porur townpanchayat

    Sewerage 3,829.00 1,340.15 3871.09 Under

    Progress

    25 Nesapakkam-54 MLDSewerage Treatment Plant

    Sewerage 5,457.00 1,909.95 41,718.95

    UnderProgress

    26 Alandur-ComprehensiveWater Supply scheme to

    Alandur

    Water Supply 6,439.00 2,253.65 31,464.87 Under

    Progress

    27 Improvement to Storm Drainage / Storm 44 407 00 15 542 45 3

  • 7/27/2019 MIS-Document1.pdf

    51/104

    27 Improvement to StormWater Drains in theEastern Basin of ChennaiCity

    Drainage / StormWater Drains

    44,407.00 15,542.45 310,102.59 Under

    Progress

    28 Providing comprehensiveSewerage scheme toTambaram Municipality

    Sewerage 16,096.59 5,633.81 43,661.97 Under

    Progress

    29 Providing comprehensive

    water supply in entire areaof Ambattur Municipality

    Water Supply 26,708.00 9,347.80 4

    8,413.10Under

    Progress

    30 Providing ComprehensiveSewarage scheme toPerungudi town Panchayat

    Sewerage 2,019.24 706.73 3459.41 Under

    Progress

    31 Providing ComprehensiveSewarage scheme toThirumazhisai townPanchayat

    Sewerage 2,047.32 716.56 3465.76 Under

    Progress

    32 Improvement to Micro and

    Macro Drainage system inthe Southern Basin ofChennai City

    Drainage / Storm

    Water Drains

    29,897.57 10,464.15 2

    6,801.70 UnderProgress

    33 Providing ComprehensiveSewerage Scheme toPallikarani town Panchayat

    Sewerage 5,861.00 2,051.35 31,334.22 Under

    Progress

    34 Construction of HeritagePrecincts along EVRPeriyar Salai, Chennai

    Development ofHeritage Areas

    610.00 213.50 3138.78 Under

    Progress

    35 Construction andCommissioning ofadditional 120 MLDsewage treatment plant atKoyambedu (Phase - II) in,Chennai

    Sewerage 11,610.00 4,063.50 0 -Project not

    started

    35 3,58,543.57 1,29,441.25 82,000.16

    Coimbatore

    36 Improvement to Water Water Supply 11 374 30 5 687 15 4 Under

  • 7/27/2019 MIS-Document1.pdf

    52/104

    36 Improvement to WaterSupply Scheme

    Water Supply 11,374.30 5,687.15 45,118.28

    UnderProgress

    37 Solid Waste Managementfor Coimbatore

    Solid WasteManagement

    9,651.00 4,825.50 44,342.96

    UnderProgress

    38 ComprehensiveUnderground SewerageScheme

    Sewerage 37,712.88 18,856.44 312,256.69

    UnderProgress

    39 Water Supply

    improvement scheme to16 Town Panchayats inCoimbatore Urban

    Agglomeration

    Water Supply 5,882.36 2,941.18 2

    1,176.48 UnderProgress

    40 Storm Water DrainageSystem in the CoimbatoreCity Municipal Corporation(Phase -1)

    Drainage / StormWater Drains

    22,675.00 9,000.00 23,600.00 Under

    Progress

    5 87,295.54 41,310.27 26,494.41

    Madurai41 Water Supply to MaduraiCorporation Improvementworks & SystemImprovement (Phase-I andPhase-II)

    Water Supply 5,931.60 2,965.80 42,669.22

    PhysicallyCompleted

    42 Thirupparankundrammunicipality DPR forcombined water supplyscheme toThiruppakundram

    municipality andHarveypatty TownPanchayat

    Water Supply 969.57 484.79 4412.06

    PhysicallyCompleted

    43 Solid Waste Managementfor Madurai

    Solid WasteManagement

    7,429.00 3,714.50 43,344.18

    PhysicallyCompleted

    44 Construction of CheckDam at Vaigai river forMadurai

    Water Supply 915.00 238.50 4214.67

    PhysicallyCompleted

    45 Anaiyur municipality DPR Water Supply 788 00 394 00 4

  • 7/27/2019 MIS-Document1.pdf

    53/104

    45 Anaiyur municipality DPRon Water Supply schemeto Anaiyur municipality

    Water Supply 788.00 394.00 4354.60 Physically

    Completed

    46 Storm Water Drain andDesilting of natural Drains(Improvement andconstruction of StormWater Drain)

    Drainage / StormWater Drains

    25,181.00 12,590.50 411,331.47

    UnderProgress

    47 Under Ground SewerageScheme for Phase III areaand Renovation of existingSewerage System

    Sewerage 22,934.00 11,467.00 410,320.30 Under

    Progress

    48 Providing combined WaterSupply Scheme to MaduraiUrban Agglomeration Area

    Water Supply 20,141.00 10,070.50 24,028.20 Under

    Progress

    8 84,289.17 41,925.59 32,674.70

    48 Tamil Nadu 5,30,128.28 2,12,677.10 1,41,169.27

    TripuraAgartala

    1 Agartala Water SupplyProject (North Zone)

    Water Supply 7,826.00 7,043.40 22,817.36

    UnderProgress

    2 Sewerage and SewerageTreatment Scheme forNorth Zone (Priority I Area)

    Sewerage 10,221.00 9,000.00 23,600.00 Under

    Progress

    2 18,047.00 16,043.40 6,417.36

    2 Tripura 18,047.00 16,043.40 6,417.36

    Uttar Pradesh

    Agra1 Municipal Solid Waste

    Management in AgraSolid WasteManagement

    3,083.99 1,542.00 41,387.80

    UnderProgress

    2 Yamuna Action Plan Sewerage 2 162 00 1 081 00 4

  • 7/27/2019 MIS-Document1.pdf

    54/104

    2 Yamuna Action PlanPhase II for Branch andLateral Sewer Lines inNorthern Zone andWestern Zone in Agra

    Sewerage 2,162.00 1,081.00 41,081.00

    PhysicallyCompleted

    3 Agra Water Supply Water Supply 8,270.50 4,135.25 43,721.72

    UnderProgress

    4 Agra Sewerage Scheme

    Phase -1 (Part-1)

    Sewerage 19,592.00 9,000.00 4

    8,100.00

    Under

    Progress4 33,108.49 15,758.25 14,290.52

    Allahabad5 Water Supply Component

    of Allahabad cityWater Supply 8,969.00 4,484.50 4

    4,484.52Under

    Progress

    6 Solid Wate Managementfor Allahabad

    Solid WasteManagement

    3,041.49 1,520.75 3988.47

    UnderProgress

    7 Water Supply componentof Allahabad city (Part-II)

    Water Supply 15,915.22 7,957.61 47,161.85

    UnderProgress

    8 Sewerage system ofAllahbad City (Zone D)Phase - I

    Sewerage 33,826.00 16,913.00 310,993.45

    UnderProgress

    4 61,751.71 30,875.86 23,628.29

    Kanpur9 Municipal Solid Waste

    Management in KanpurSolid WasteManagement

    5,623.79 2,811.90 42,530.70

    UnderProgress

    10 Water Supply scheme forinner old area of Kanpur

    city Vol I and II

    Water Supply 27,094.89 13,547.45 412,192.58 Under

    Progress

    11 Sewerage work of InnerOld City Area of Kanpur

    Sewerage 19,088.22 9,544.11 48,587.57

    UnderProgress

    12 Sewage Treatment forKanpur city

    Sewerage 10,100.45 5,050.23 33,282.63

    UnderProgress

    13 Water Supply Part-II forremaining area of Kanpur

    Water Supply 37,778.92 18,889.48 417,000.53

    UnderProgress

    14 Kanpur - Sewerage works Sewerage 20 736 00 10 000 00 2 Under

  • 7/27/2019 MIS-Document1.pdf

    55/104

    14 Kanpur Sewerage worksin District IV in Kanpur city

    Sewerage 20,736.00 10,000.00 24,000.00

    UnderProgress

    6 1,20,422.27 59,843.16 47,594.01

    Lucknow15 Sewerage works for

    Lucknow SewerageDistrict I (Vol.I and II)

    Sewerage 23,623.00 11,811.50 411,811.48 Under

    Progress

    16 Municipal Solid WasteManagement in Lucknow

    Solid WasteManagement

    4,292.37 2,146.19 31,395.03

    UnderProgress

    17 Water Supply Works ofLucknow (Phase I Part IVol.I to V)

    Water Supply 38,861.00 19,430.50 417,487.46 Under

    Progress

    18 Sewerage works forLucknow City-SewerageDistrict-III (Part-I0

    Sewerage 26,216.00 13,108.00 38,520.20 Under

    Progress

    19 Storm Water Drainage for

    Lucknow

    Drainage / Storm

    Water Drains

    32,521.00 16,260.50 4

    14,634.55

    Under

    Progress20 Sewage works for

    Lucknow City-SewerageDistrict-III (Part-II)

    Sewerage 21,443.00 10,721.50 36,968.98 Under

    Progress

    21 Water Supply for Lucknow(Phase - I, Part - II)

    Water Supply 14,656.60 7,328.30 46,595.43

    UnderProgress

    7 1,61,612.97 80,806.49 67,413.13

    Mathura22 Municipal Solid Waste

    Management in MathuraSolid WasteManagement

    991.60 793.28 4713.95 UnderProgress

    23 Storm Water Drainage Drainage / StormWater Drains

    8,720.00 6,976.00 34,534.40

    UnderProgress

    24 DPR for Sewerage Worksin Sewerage Zone -II ofMathura city

    Sewerage 6,035.77 4,500.00 21,800.00 Under

    Progress

    3 15,747.37 12,269.28 7,048.35

    M t

  • 7/27/2019 MIS-Document1.pdf

    56/104

    Meerut25 Municipal Solid Waste

    ManagementSolid WasteManagement

    2,259.40 1,129.70 3734.32

    UnderProgress

    26 Water Supply for Meert Water Supply 27,301.00 13,650.50 412,285.34

    UnderProgress

    27 Sewerage Work inSewerage Zone-5&7 of

    Meerut City

    Sewerage 18,589.00 9,000.00 23,600.00

    Under

    Progress3 48,149.40 23,780.20 16,619.66

    Varanasi28 Water Supply Component

    Priority of VaranasiWater Supply 11,102.00 5,551.00 4

    4,995.90Under

    Progress

    29 Solid Waste Managementof Varanasi

    Solid WasteManagement

    4,867.73 2,433.87 31,582.02

    UnderProgress

    30 Water Supply Part-II of

    Cis-Varuna area

    Water Supply 8,610.00 4,305.00 2

    1,722.00

    Under

    Progress31 Storm Water Drainage

    works for VaranasiDrainage / StormWater Drains

    19,162.00 9,581.00 36,227.65

    UnderProgress

    32 Sewerage work forVaranasi Trans Varunaarea

    Sewerage 30,912.00 15,456.00 310,046.40

    UnderProgress

    33 Water Supply Component(priority-II) for Trans-Varuna Area of VaranasiCity

    Water Supply 20,916.00 9,000.00 23,600.00 Under

    Progress

    6 95,569.73 46,326.87 28,173.97

    33 Uttar Pradesh 5,36,361.94 2,69,660.09 2,04,767.93

    Uttarakhand

    Dehradun1 Water Suply

    reorganisation scheme(Phase I)

    Water Supply 7,002.70 5,602.16 45,041.94

    UnderProgress

    2 Integrated Solid Waste Solid Waste 2,460.00 1,968.00 2 Under

  • 7/27/2019 MIS-Document1.pdf

    57/104

    2 Integrated Solid WasteManagement

    Solid WasteManagement

    2,460.00 1,968.00 2787.20

    UnderProgress

    3 Improvement of 30intersections of Dehradooncity

    Roads / Flyovers /RoB

    2,757.91 2,206.32 31,434.11 Under

    Progress

    4 Dehradoon SewerageScheme

    Sewerage 5,465.00 4,372.00 32,841.55

    UnderProgress

    5 Dehradoon Sewerage

    Scheme (Phase -I) for LZone

    Sewerage 6,283.00 4,628.00 3

    1,851.20 UnderProgress

    5 23,968.61 18,776.48 11,956.00

    Haridwar6 Water Supply

    Reorganisation schemeWater Supply 4,784.43 3,827.54 4

    3,444.66Under

    Progress

    7 Improvement of junctionsfor Haridwar city

    Roads / Flyovers /RoB

    1,765.05 1,412.04 3917.83

    UnderProgress

    8 Integrated Solid WasteManagement in Haridwar Solid WasteManagement 1,671.53 1,337.24 1 334.30 Project notstarted

    9 Sewerage System in ZoneD (Kankhal) and Zone D1(Arya Nagar, NewHaridwar)

    Sewerage 2,698.00 2,158.40 1539.60 Project not

    started

    10 Sewerage System in ZoneC2 of Haridwar

    Sewerage 748.33 598.68 1149.67

    Project notstarted

    5 11,667.34 9,333.90 5,386.06

    Nainital11 Augmentation andRenovation ofWaterSupply Scheme PartI

    Water Supply 547.00 437.60 3284.44 Under

    Progress

    12 Reorganisation andexpansion of Nainitalsewerage

    Sewerage 1,960.00 1,568.00 2627.70

    UnderProgress

    13 Integrated Solid WasteManagement in Nanital

    Solid WasteManagement

    931.00 744.80 1186.20

    UnderProgress

    14 Restoration and Development of 1,182.27 945.82 1Project not

  • 7/27/2019 MIS-Document1.pdf

    58/104

    conservation of RajBhawan

    pHeritage Areas

    ,236.45

    Project notstarted

    4 4,620.27 3,696.22 1,334.79

    14 Uttarakhand 40,256.22 31,806.60 18,676.85

    West Bengal

    Asansol1 7 MGD WTP together with

    reservoir, distributionsystem and other alliedworks

    Water Supply 2,878.00 1,439.00 41,439.00 Physically

    Completed

    2 42 MLD Water SupplyProject in Raniganj under

    Asansol Urban Area, WestBengal

    Water Supply 3,627.00 1,813.50 31,360.14 Under

    Progress

    3 22.7 MLD Water Supply

    Project in Jamuria underAsansol Urban Area, WestBengal

    Water Supply 1,453.00 726.50 4

    726.50 PhysicallyCompleted

    4 Municipal Solid WasteManagement in AsansolUrban Area

    Solid WasteManagement

    4,357.27 2,178.64 31,633.98 Under

    Progress

    5 10 MGD Water SupplyScheme for AsansolMunicipal Corporation

    Water Supply 8,982.96 4,491.48 44,042.33

    UnderProgress

    6 Consatruction, widening

    and improvement of roadfrom Raghunathpur toDhupchuria and Akandarato Fuljihore at Durgapur

    Roads / Flyovers /

    RoB

    9,492.26 4,746.13 1

    1,186.53 UnderProgress

    7 Sewerage Project forRanigunj Municipality

    Sewerage 4,008.82 2,004.41 1501.10

    UnderProgress

    8 24 x 7 water supplyscheme (Phase -III) forDurgapur

    Water Supply 12,681.40 6,340.70 22,536.29

    UnderProgress

    9 24 x 7 water supply Water Supply 13,370.60 6,685.30 1Work not

  • 7/27/2019 MIS-Document1.pdf

    59/104

    pp yscheme for KultiMunicipality, Asansol UA

    pp y , ,1,671.33

    Work notstarted

    10 Improvement upgradation& strengthening of road forGammon bridge to Gandhimore (NH-2) via Mayabazar in Durgapur

    Roads / Flyovers /RoB

    7,781.79 3,890.90 0-

    Project notstarted

    11 Improvement, widening to

    4 lane and strengtheningof road from JubleeDhabato SCOB gate at Asansol.

    Roads / Flyovers /

    RoB

    4,316.61 2,158.31 0

    - Project notstarted

    11 72,949.71 36,474.86 15,097.20

    Kolkata12 Water Treatment Plan at

    Dhapa 30 MGD Phase-IWater Supply 9,693.45 3,392.71 4

    3,053.44 UnderProgress

    13 Integration of Maheshtalaunderground reservoir withexisting water distributionnetwork

    Water Supply 1,717.00 600.95 4600.95 Physically

    Completed

    14 Underground WaterReservoir-cum-Boosterpumping station at GandhiMaidan, Akra

    Water Supply 1,066.00 373.10 4373.12 Physically

    Completed

    15 15 MGD Water TreatmentPlan at Bansberia

    Water Supply 4,492.00 1,572.20 41,414.98

    UnderProgress

    16 10 MGD Water Treatment

    Plan at Uluberia

    Water Supply 4,558.00 1,595.30 4

    1,435.79Physically

    Completed

    17 Construction of FlyoverBetween EM Bypass &Kazi Nazrul Islam Sarani

    Roads / Flyovers /RoB

    3,802.00 1,330.70 41,330.68 Physically

    Completed

    18 Upgr+G4adation of SewerSystem in Kolkata (Phase-I)

    Sewerage 9,712.00 3,399.20 32,209.48 Under

    Progress

    19 Transmunicipal Scheme Drainage / Storm 4,530.14 1,585.55 4

  • 7/27/2019 MIS-Document1.pdf

    60/104

    pon removal of Drainagecongestion within Khardah,Panihati, North Dum Dum,Dum Dum and South DumDum

    gWater Drains 1,585.55

    PhysicallyCompleted

    20 Upgradatio of Man EntryBrick Sewer System (Part)

    for Kolkata

    Sewerage 40,291.00 14,101.85 412,691.65 Under

    Progress

    21 Improvement of drainagein Howrah

    Drainage / StormWater Drains

    9,338.03 3,268.31 21,634.16 Under

    Progress

    22 Municipal Solid WasteManagement of MunicipalTowns

    Solid WasteManagement

    5,658.53 1,980.49 31,485.36 Physically

    Completed

    23 Water supply scheme forbaruipur Municipality

    Water Supply 951.86 333.15 4299.84

    UnderProgress

    24 Water Supply Scheme foradded areas of HowrahMunicipal Corporation

    Water Supply 9,068.91 3,174.12 4 2,856.71 UnderProgress

    25 EM