Ministry of Urban Development
Mission Directorate
Implementation status of Projects
approved under JnNURM(UIG & UIDSSMT)
(As on 31.03.2012)
http://www.jnnurm.nic.in/
http://www.jnnurm.nic.in/http://www.jnnurm.nic.in/7/27/2019 MIS-Document1.pdf
2/104
Table of contentsA. State wise projects approved under Urban Infrastructure & Governance (UIG) Sub-Mission of JnNURM.
Sl. No. Name of the State Page No.
1. Andhra Pradesh 1-6
2. Arunachal Pradesh 6
3. Assam 6-7
4. Bihar 75. Chandigarh 8
6. Chattisgarh 8
7. Delhi 8-12
8. Goa 12
9. Gujarat 12-19
10. Haryana 20
11. Himachal Pradesh 20-21
12. Jammu & Kashmir 21-22
13. Jharkhand 22
14. Karnataka 23-2815. Kerala 28-29
16. Madhya Pradesh 30-32
17. Maharashtra 32-40
18. Meghalaya 40
19. Manipur 40-41
20. Mizoram 41
21. Nagaland 41-42
22. Orissa 42
23. Puduchery 43
24. Punjab 43-44
25. Rajasthan 44-45
26. Sikkim 45-46
27. Tamil Nadu 46-51
28. Tripura 51
29. Uttar Pradesh 51-54
30. Uttrakhand 54-56
31. West Bangal 56-64
7/27/2019 MIS-Document1.pdf
3/104
Table of contentsB. State wise projects approved under UIDSSMT of JnNURM.
Sl. No. Name of the State Page No.
1. Andhra Pradesh 65-67
2. Arunachal Pradesh 67
3. Assam 67-68
4. Bihar 685. Chattisgarh 68
6. Dadar & Nagar Haveli 68
7. Daman & Diu 68
8. Goa 68
9. Gujarat 68-70
10. Haryana 70
11. Himachal Pradesh 70
12. Jammu & Kashmir 70-71
13. Jharkhand 71
14. Karnataka 71-7215. Kerala 72-73
16. Madhya Pradesh 73-75
17. Maharashtra 75-77
18. Manipur 77
19. Meghalaya 77
20. Mizoram 77
21. Nagaland 77-78
22. Orissa 78
23. Puducherry 78
24. Punjab 78-79
25. Rajasthan 79
26. Sikkim 79-80
27. Tamil Nadu 80-83
28. Tripura 83
29. Uttar Pradesh 83-84
30. Uttrakhand 84
31. West Bangal 84-85
7/27/2019 MIS-Document1.pdf
4/104
Sl.No.
Project Title Sector ApprovedCost
AdditionalCentral
Assistance(ACA)
Commitment
No. ofInstallments
Released
Total ACAReleased
Status
Andhra Pradesh
Hyderabad1 Remodelling of Storm
Water Drainage -
MURKINALA SecondaryDrains
Drainage / StormWater Drains 4,231.00
1,480.85 3962.55 Under
Progress
2 Remodelling of StormWater Drainage -MURKINALA P-11, P-12
Drainage / StormWater Drains
3,299.00 1,154.65 3750.52
UnderProgress
3 Remodelling of StormWater Drainage-KUKATPALLY (Begumpet)Nalla P7
Drainage / StormWater Drains
3,136.00 1,097.60 4986.24 Under
Progress
4 Balkapur Channel Drainage / StormWater Drains
3,579.00 1,252.65 3813.74
UnderProgress
5 Flyover at Rajiv GandhiCircle-Volume II Roads / Flyovers /RoB 3,300.00 1,155.00 4 1,023.75 PhysicallyCompleted
6 Flyover at Green LandsJunction
Roads / Flyovers /RoB
1,727.00 604.45 4485.55
PhysicallyCompleted
7 Flyover atChandrayangagutta
Roads / Flyovers /RoB
1,101.00 385.35 4362.09
PhysicallyCompleted
8 DPR for laying pipelinefrom Sahebnagar TBR toPrashasan Nagar
Water Supply 9,493.00 3,322.55 42,991.39
PhysicallyCompleted
7/27/2019 MIS-Document1.pdf
5/104
9 Diversion of Krishna Waterto Secunderabad
Water Supply 8,120.00 2,842.00 42,558.30
PhysicallyCompleted
10 Road Widening on OuterRing Road and Inner RingRoad under CharminarPedestrianisation Project
Urban Renewal 3,510.00 1,228.50 41,105.67 Under
Progress
11 Rehabilitation andStrengthening of
Sewerage system in OldCity Area on South of Musi(in Zone 2 in catchments S7 to S11, S13 and S15)
Sewerage 25,125.00 8,793.75 33,517.50
UnderProgress
12 Grid improvement worksbuilding additional storagefacilities on North of Musi
Water Supply 2,981.00 1,043.35 4678.16 Physically
Completed
13 Grid improvement worksbuilding additional storagefacilities on South of Musi
Water Supply 3,355.00 1,174.25 41,056.82 Under
Progress
14 Musi campaign MusiRevitalisation project
Urban Renewal 4,426.51 1,549.28 31,161.96
UnderProgress
15 Providing Flow, Level andChlorine measurementsand supervisory Controland Data AcquisitionSystem (SCADA) for AllReservoirs and bulk supplypipe lines in the entiresystem of HMWSSB
Water Supply 990.00 346.50 4311.83
PhysicallyCompleted
16 Rehabilitation andStrengthening ofSewerage system in OldCity area on South of Musi(In Zone I in catchmentsS1 to S6, S12 and S14)
Sewerage 14,881.00 5,208.35 3 3,385.41Under
Progress
17 Krishna Drinking WaterSupply Project - Phase II
Water Supply 60,650.00 21,227.50 421,227.50
PhysicallyCompleted
7/27/2019 MIS-Document1.pdf
6/104
18 Implementation ofSewerage Master Plan inSeringampally Municipalityof Hyderabad U.A
sewerage 20,038.00 7,013.30 22,805.32 Under
Progress
19 Refurbishment of existingfeeder system includingdistribution network for 10zones in Old Municipal
Corporation of Hyderabad
Water Supply 23,222.00 8,127.70 33,251.07
UnderProgress
20 Commuter AmenityCentres (CAC)
Other UrbanTransport
16,213.00 5,674.55 22,269.81
UnderProgress
21 Improvement of StormWater Drainage in Zone-Iand II of MCH Area
Drainage / StormWater Drains
12,410.00 4,343.50 11,086.00
UnderProgress
22 Comprehensive WaterSupply DistributionNetwork andimplementation ofsewerage master plan for
identified priority zones ofRajendranagar Municipalcircle of GHMC
Water Supply 31,426.00 9,000.00 12,500.00
UnderProgress
22 2,57,213.51 88,025.63 55,291.18
Vijayawada23 Providing Water Supply
facilities in unserved areasWater Supply 3,548.00 1,774.00 4
1,598.10Physically
Completed
24 Providing under-grounddrainage facilities to theunserved areas
Drainage / StormWater Drains
5,656.00 2,828.00 42,545.20
Under
Progress
25 Providing seweragesystem in Krishnalankaarea of Vijayawada
Sewerage 743.00 371.50 4334.33
PhysicallyCompleted
26 Providing seweragetreatment plan atSinghnagar (UASBR)(Sector-8)
Sewerage 949.00 474.50 4427.07 Physically
Completed
7/27/2019 MIS-Document1.pdf
7/104
27 Storm Water DrainageSystem for uncoveredareas in Circle I II III andMG road of VMC
Drainage / StormWater Drains
4,912.00 2,456.00 42,210.40 Under
Progress
28 Augmentation of watersupply utility in VijayawadaMunicipal Corporation
Water Supply 7,231.00 3,615.50 43,253.97
UnderProgress
29 Providing sewage facilities
in unserved areas of VMCcovering Housing BaordColony, Gundala,Devinagar,Kedareswarapet etc.
Sewerage 1,985.00 992.50 4
889.27Physically
Completed
30 Bus Rapid TransportSystem for Vijayawada (i)MG Road (II) NujiveeduRoad (iii) Eluru Road (iv)Route No.5 (v) S.N.PuramRoad (vi) Loop Road -
15.18Km
Mass RapidTransport System
15,100.00 7,550.00 46,795.00
UnderProgress
31 Restoration of roadsdamaged due to seweragein Vijaywada MunicipalCorporation
Roads / Flyovers /RoB
3,625.02 1,812.52 41,631.23 Physically
Completed
32 Formation of IRRconnecting NH-9 and NH-5inbetween the flyovers atMilk Project andRamvarappadu inVijayawada City
Roads / Flyovers /RoB
7,424.00 3,712.00 43,340.80
UnderProgress
33 Solid Waste ImprovementManagement Scheme
Solid WasteManagement
5,805.00 2,902.50 31,885.30
UnderProgress
34 Providing Storm WaterDrains at MangalagiriTown in Vijawada
Drainage / StormWater Drains
3,016.00 1,508.00 41,357.20
UnderProgress
35 Providing Sewerage fornorthern part of Vijawadacity
Sewerage 17,815.00 8,907.50 33,563.13
UnderProgress
13 77,809.02 38,904.52 29,831.00
7/27/2019 MIS-Document1.pdf
8/104
Vishakhapatnam36 DPR for replacement of
existing Thatipudi pipelinefrom Thatipudi reservoir totown service reservoir andpumping units
Water Supply 6,228.00 3,114.00 42,803.10
PhysicallyCompleted
37 Regularisation of S.L.Canal
Drainage / StormWater Drains
339.00 169.50 4152.33
PhysicallyCompleted
38 Improvement of YerriGedda Storm Water drainincluding bench drains
Drainage / StormWater Drains
921.00 460.50 4460.00
PhysicallyCompleted
39 Providing seweragesystem in Old city area ofVishakapatnam
Sewerage 3,708.00 1,854.00 41,668.60
PhysicallyCompleted
40 Providing seweragesystem to Central part ofVisakhapatnam city
Sewerage 24,444.00 12,222.00 410,999.30
UnderProgress
41 Augmentation of WaterSupply to Gajuvaka Area
Water Supply 3,976.00 1,988.00 41,789.20
UnderProgress
42 Providing water supplydistribution system toGajuwaka area of GVMC(Phase II)
Water Supply 4,600.00 2,300.00 42,070.00 Under
Progress
43 Augmentation of DrinkingWater Supply to the 32peripheral areas of GVMC
Water Supply 24,074.00 12,037.00 410,833.30
UnderProgress
44 Providing water supply
pipeline from TSR toYendada and to Kommadijunction for augmentingwater supply
Water Supply 2,340.00 1,170.00 4
1,053.00 PhysicallyCompleted
45 Refurbishment ofdistribution ofComprehensive watersupply system in NorthEastern Zone in Central
Area of GreaterVishakhapatnam Municipal
Water Supply 19,018.00 9,509.00 36,180.85
UnderProgress
7/27/2019 MIS-Document1.pdf
9/104
Corporation
46 Comprehensive WaterSupply scheme in old city
of Greater Visakhapatnam
Water Supply 4,793.48 2,396.76 42,157.05
UnderProgress
47 Bus Rapid Transit Systemfor Vishakhapatnam (i)Simhachalam Transitcorridor including tunnel ( ii) Pendurthi TransitCorridor - 45.20 Km
Mass RapidTransport System
45,293.00 22,646.50 420,381.87
UnderProgress
48 Improvement of StormWater drains for Zone VIIIof Greater Vishakapatnamcity (Gangulhedda and
Yerrigada branch canals)
Drainage / StormWater Drains
7,227.00 3,613.50 43,252.19
UnderProgress
49 Implementation of 24X7water supply in left outareas of south wesstsectors of central region ofGreater VisakhapatnamMunicipal Corporation(GVMC)
Water Supply 8,349.00 4,174.50 0-
Work notstarted
14 1,55,310.48 77,655.26 63,800.79
Tirupati49 Underground Drainage
scheme for TirupatiDrainage / StormWater Drains
1,613.00 1,290.40 41,162.20
UnderProgress
50 Storm Water DrainageSystem for TMC
Drainage / StormWater Drains
4,556.00 3,644.80 32,368.70
UnderProgress
51 Solid Waste Managementin Tirupati MunicipalCorporation
Solid WasteManagement
2,329.00 1,863.20 0-
Work notstarted
3 8,498.00 6,798.40 3,530.90
52 Andhra Pradesh 4,98,831.01 2,11,383.81 1,52,453.86
7/27/2019 MIS-Document1.pdf
10/104
Arunachal Pradesh
Itanagar1 Setting up of Municipal
Solid Waste Managementin a scientific way for
capital complex
Solid WasteManagement
1,194.38 1,074.94 4967.46 Under
Progress
2 Improvement and creationof infrastructure for urbantransport including roadsand parking lot/spaces atJNNURM mission cityItanagar
Other UrbanTransport
9,128.50 8,215.65 35,340.17
UnderProgress
3 Augmentation of Watersupply for Itanagar
Water Supply 7,725.32 6,952.79 34,519.32
UnderProgress
3 18,048.20 16,243.38 10,826.95
3 Arunachal Pradesh 18,048.20 16,243.38 10,826.95
AssamGuwahati
1 Solid Waste Managementfor Guwahati
Solid WasteManagement
3,516.71 3,165.04 32,057.28
UnderProgress
2 Proposal for SouthGuwahati West Water
Supply Scheme inGuwahati MetropolitanDevelopment Area
Water Supply 28,094.00 25,284.60 422,755.99
UnderProgress
2 31,610.71 28,449.64 24,813.27
2 Assam31,610.71
28,449.64 24,813.27
Bihar
7/27/2019 MIS-Document1.pdf
11/104
Patna1 Municipal Solid Waste
Management for Patnatown
Solid WasteManagement
3,695.40 1,847.70 1461.93
Workawarded
2 Integrated Solid WasteManagement in Patna UAtowns - Phulwarishariff,Khagul and Danapur
Solid WasteManagement
1,155.81 577.91 1144.48 Work
awarded
3 Phulwarisharif WaterSupply Scheme
Water Supply 2,470.26 1,235.13 1308.78
UnderProgress
4 Khagul Water SupplyScheme
Water Supply1,315.43
657.72 1154.43
UnderProgress
5 Augmentation of WaterSupply Scheme forDanapur
Water Supply 6,896.45 3,448.23 1862.06
UnderProgress
6 Improvement andaugmentation of watersupply system at PatnaCity
Water Supply 42,698.00 21,349.00 15,337.25 Work
awarded
6 58,231.35 29,115.68 7,268.93
Bodhgaya1 Bodhgaya Water Supply
ProjectWater Supply
3,355.722,684.56 1
671.14Under
Progress2 Sewerage scheme for
Bodhgaya NagarPanchayat
Sewerage 9,594.34 7,675.48 11,918.87
UnderProgress
2 12,950.06 10,360.04 2,590.01
8 Bihar 71,181.41 39,475.72 9,858.94
Chandigarh1 Conservation of drinking
water by harvesting of thetertiary treated sewage forirrigation of green spacesin Chandigarh
Water Supply3,672.60
2,938.08 21,469.04
UnderProgress
7/27/2019 MIS-Document1.pdf
12/104
2 Upgradation of watersupply infrastructures forproper monitoring andautomation with remotecomputerized surveillancesystem to 24x7 watersupply
Water Supply 2,026.00 1,620.80 31,215.60
UnderProgress
3 Augmentation of water
Supply, Phase -V,Chandigarh
Water Supply 13,421.00 10,736.80 0
-Work notstarted
3 Chandigarh 19,119.60 15,295.68 2,684.64
Chattishgarh
Raipur1 Augmentation of Water
Supply Scheme includingextended area of RMC
Water Supply 30,364.00 24,291.20 421,862.08
UnderProgress
1 30,364.00 24,291.20 21,862.08
1 Chattishgarh 30,364.00 24,291.20 21,862.08
Delhi1 Redevelopment of
Connaught Place, NewDelhi-Urban Renewal andHeritage Conservation
Urban Renewal 25,378.00 8,882.30 12,220.58 Under
Progress
2 Setting up of 20 MGD STP
each at Nilothi andPappankalan
Sewerage 24,544.00 8,590.40 1
2,148.00
Under
Progress
3 Traffic Managemant planfor areas Around Civiccentre JLN Marg, MintoRoa, New Delhi
Other UrbanTransport
9,716.00 3,400.60 1850.15 Under
Progress
4 Construction of Cloverleaves at Karkari more(Intersection of Vikas margand Road No. 57) andwidening of existing bridge
Roads / Flyovers /RoB
8,617.00 3,015.95 1753.99
UnderProgress
7/27/2019 MIS-Document1.pdf
13/104
on Trunk drain No.-1)
5 Construction of GradeSeparator on Road No.56ISBT Anand Vihar, Delhi
Roads / Flyovers /RoB
9,600.00 3,360.00 21,344.00
UnderProgress
6 Construction of 3additional clover leaves atNoida More Flyover i/c sliproad, bridges, footpath,cycle track and underpass.
Roads / Flyovers /RoB
8,818.00 3,086.30 1771.58
UnderProgress
7 RUB & ROB at RailwayLevel Crossing at Roadno.68 Near Nand Nagari.
Roads / Flyovers /RoB
10,286.00 3,600.10 21,440.18
UnderProgress
8 Development of multilevelunderground unconventialparking at various
locations under thejurisdiction of MCD (AL-Block, Shalimar Bagh,Shiv Market Pitampura,QU Pitampura, CentralMarket Ashok Vihar,Mohammadpur Village,Malviya Nagar Market,PVR Basant Lok, PVRSaket, G-8 RajouriGarden, Block-10 Subhash
Nagar, C-4 Janakpuri,Ajmal Khan PARK KarolBagh, Krishna MarketKalkaji, Hauzrani, NewFriends Colony, JangpuraBhogal).
Parking lots andspaces on PPPbasis
46,980.00 16,443.00 14,110.75
UnderProgress
9 Improvement andstrengthening of roads ofOkhla Indl. Area Phase I &II, Central Zone.
Roads / Flyovers /RoB
14,861.00 5,201.35 11,300.34 Under
Progress
7/27/2019 MIS-Document1.pdf
14/104
10 Covering of Nallah inNauroji Nagar from Africa
Avenue to Ring Road forproviding parking/roadcum parking under the
jurisdiction of MCD.
Parking lots andspaces on PPPbasis
5,120.00 1,792.00 1448.00
Project notstarted
11 Covering of nallah fromPress Enclave road
passing through SheikhSarai, Chiragh Delhi,Panchsheel Enclave,Greater Kailash-I, AndrewsGanj upto Ring Roadbehind Police StationDefence Colony forproviding Parking/Roadcum parking under theJurisdiction of MCD.
Parking lots andspaces on PPP
basis
23,300.00 8,155.00 12,038.75
UnderProgress
12 Improvment of road of 60
ft. ROW and above byproviding RMC Pavement(Phase-I) in various zonesof MCD.
Roads / Flyovers /
RoB
16,510.00 5,778.50 1
1,444.63 UnderProgress
13 Construction of GradeSeparator at Intersectionof Shankar Road andUpper Ridge Road.
Roads / Flyovers /RoB
7,177.00 2,511.95 1627.99 Project not
started
14 Construction of GradeSeparator at intersection ofPusa Road, Dr. K.S.
Krishnan Marg and PatelRoad.
Roads / Flyovers /RoB
7,164.00 2,507.40 1626.85
Project not
started
15 Construction of 25 nos.Foot Over Bridges atdifferent locations in DelhiCity.
Roads / Flyovers /RoB
1,750.00 612.50 1153.13 Project not
started
16 Re-modeling of SSBL(Saharnpur Samli BranchLine) drains in Shah. (N)Zone.
Drainage / StormWater Drains
15,226.00 5,329.10 11,332.28 Under
Progress
7/27/2019 MIS-Document1.pdf
15/104
17 Construction of GradeSeparator/ Underpass atIntersection of Pusa Road,
Arya Samaj Road, FaizRoad, Upper Ridge Roadand Panchkuian Road.
Roads / Flyovers /RoB
5,544.00 1,940.40 1485.10
Project notstarted
18 Rehabilitation of TrunkSewer
Sewerage 25,337.00 8,867.95 22,216.99
UnderProgress
19 Flyover at Africa Avenueand Arun Asaf Ali Road.
Roads / Flyovers /RoB
12,661.00 4,431.35 21,772.54
PhysicallyCompleted
20 Flyover at VivekanandMarg, Nelson MandelaMarg, Poorvi, Marg.
Roads / Flyovers /RoB
12,661.00 4,431.35 21,772.54 Physically
Completed
21 Construction of GradeSeparator at Raja RamKohli Marg Intersection onMarginal Bund RoadGeeta Colony Delhi.
Roads / Flyovers /RoB
250.00 87.50 235.01
PhysicallyCompleted
22 Construction of GradeSeparator for free flowTraffic at T-Junction ofMarginal Bund Road andMaster Plan Road overDisusrd Canal near ShastriNagar in East Delhi.
Roads / Flyovers /RoB
250.00 87.50 235.01
PhysicallyCompleted
23 Construction of GradeSeparator at the Junctionof G.T. Road and RoadNo.56 near Apsara Border.
Roads / Flyovers /RoB
14,147.00 4,951.45 21,980.58 Under
Progress
24 Construction of Bridge andits Approaches over RiverYamuna Down stream ofexisting Bridge atWazirabad, Delhi.
Roads / Flyovers /RoB
1,08,740.00 38,059.00 29,514.75
UnderProgress
25 Alignment over BarapullaNallah
Roads / Flyovers /RoB
97,000.00 33,950.00 18,487.50
UnderProgress
7/27/2019 MIS-Document1.pdf
16/104
26 Ring Road Bye-pass fromSalimgarh Fort toVelodrom Road Package-IVelodrom Road to back ofRajghat Power StationPackage-II Back ofRajghat Power Station toSalimgarh Fort.
Roads / Flyovers /RoB
46,900.00 16,415.00 26,566.00
UnderProgress
27 Corridor Improvement ofU.P. Link Road from NH-24 Crossing (Noida More)to Chilla Regulator.
Roads / Flyovers /RoB
25,400.00 8,890.00 23,559.00 Under
Progress
28 Laying Interceptor Sewersalong the 3 major drainsviz. Najafgarh,supplementary andShahdhra for abatement ofpollution in Yamuna River
Sewerage 1,35,771.00 47,519.85 111,880.00
UnderProgress
28 7,19,708.00 2,51,897.80 69,916.17
28 Delhi 7,19,708.00 2,51,897.80 69,916.17
GoaPanaji
1 Heritage conservation forthe city of Panaji
Development ofHeritage Areas
362.25 289.80 172.45
Project notstarted
2 water suply for panaji cityand surrounding areas
under the jurisdiction ofcorporation of the city ofpanaji at Goa
Water supply 7,121.83 5,697.48 0-
Work notstarted
2 7,484.08 5,987.28 72.45
2 Goa 7,484.08 5,987.28 72.45
Gujarat
7/27/2019 MIS-Document1.pdf
17/104
Ahmedabad1 Pipeline from Narmada
Main canal to KotarpurWTP; 330 MLD IntakeWell in Sabarmati rivernear Kotarpur; WaterTreatment Plant at Rasaka
Water Supply 5,383.25 1,884.14 41,884.06
PhysicallyCompleted
2 Construction of Railwayover Bridge on
Ahmedabad Botad M.G.Railway line at ShreyasCrossing on 122 ft. RingRoad
Roads / Flyovers /RoB
1,212.00 424.20 4424.00
PhysicallyCompleted
3 Construction of four laneBridge across RiverSabarmati connectingVasna and Pirana 122road
Roads / Flyovers /RoB
2,955.00 1,034.25 41,034.00
PhysicallyCompleted
4 Renovation of ExistingSewage Treatment Plantat Pirana
Sewerage 6,922.00 2,422.70 42,422.72
PhysicallyCompleted
5 Renovation of SewerageTreatment Plant at Vasna
Sewerage 1,135.00 397.25 4397.24
PhysicallyCompleted
6 Bus Rapid TransportSystem- Construction of12 Km. long stretch(Stretch-1 of first phase)BRT Roadway and
Carrying out detailedstudies and engineering ofremaining stretches
Mass RapidTransport System
8,760.00 3,066.00 42,759.40
PhysicallyCompleted
7 Storm Water DrainageSystem for West Zone of
AMC area
Drainage / StormWater Drains
5,914.00 2,069.90 42,069.50
PhysicallyCompleted
8 Bus Rapid Transit System- 46 Km
Mass RapidTransport System
40,572.00 14,200.20 412,780.20
UnderProgress
9 Storm Water Drainage forSouth and Central zones
Drainage / StormWater Drains
12,088.00 4,230.80 44,230.80
PhysicallyCompleted
7/27/2019 MIS-Document1.pdf
18/104
of AMC area, Ahmedabad
10 Storm Water Drainage forNorth and East Zones of
AMC area Ahmedabad
Drainage / StormWater Drains
12,283.00 4,299.05 44,299.04 Physically
Completed
11 Construction of four laneROB in lieu of L.C.No.5aat Omkar Crossing on
Ahmedabad-HimatnagarM.G. Railway line betweenStation Kalupur andNaroda
Roads / Flyovers /RoB
1,851.00 647.85 4647.84
PhysicallyCompleted
12 Construction of Railwayover Bridge No.132 ft.Ring Road near DakshiniSocietyn over B.G.Railway lines betweenManinagar and Vatva Rly.
Station
Roads / Flyovers /RoB
2,144.00 750.40 4749.20
PhysicallyCompleted
13 Cnstruction of four laneROB in lieu of No.306 on
Ahmedahad-Mumbai B.G.Rly line at Ambica Tubecrossing between StationVatva and Maninagar
Roads / Flyovers /RoB
1,500.00 525.00 4524.00
PhysicallyCompleted
14 Construction of six laneflyover bridge on SOLA(AEC) junction at
Ahmedabad
Roads / Flyovers /RoB
1,857.00 649.95 4648.98 Physically
Completed
15 Construction of four lanebridge on Sabarmati-Viramgam B.G. Railwayline, Ahmedabad
Roads / Flyovers /RoB 2,011.00 703.85 4 701.92 PhysicallyCompleted
16 Construction of four laneflyover bridge onShivranjani junction at
Ahmedabad
Roads / Flyovers /RoB
1,670.00 584.50 4584.26 Physically
Completed
17 Construction of six laneflyover on Memnagar
Roads / Flyovers /RoB
1,513.00 529.55 4529.56
PhysicallyCompleted
7/27/2019 MIS-Document1.pdf
19/104
junction at Ahmedabad
18 Construction of Major andMinor Radial RoadsPhase-I in AUDA Area
Roads / Flyovers /RoB
5,013.00 1,754.55 41,753.28
PhysicallyCompleted
19 Terminal SeweragePumping Station, PumpingMain and Sewage
Treatment Plant nearVinzol for East AUDA Area
Sewerage 3,681.26 1,288.44 41,159.60
Physically
Completed
20 West AUDA Area TerminalSewerage PumpingStation, Pumping Main andSewage Treatment Plantnear Vasana
Sewerage 10,692.01 3,742.20 43,367.98
PhysicallyCompleted
21 Catchment Developmentand Drainage for WaterBodies Development andflood Relief Project
Drainage / StormWater Drains
10,471.84 3,665.14 43,298.63 Under
Progress
22 BRTS Phase-II forAhmedabad MunicipalCorporation - 30.50 Km
Mass RapidTransport System
48,813.00 17,084.55 28,542.14
UnderProgress
23 Sewerage Network ofWest AUDA area of
Ahmedabad UA
Sewerage 23,541.00 8,239.35 35,353.94
UnderProgress
24 Sewerage Network of EastAUDA area of AhmedabadUA
Sewerage 7,730.81 2,705.78 42,435.20
UnderProgress
25 Solid Waste Managementin Ahmedabad
Solid WasteManagement
11,885.84 4,160.04 22,080.02
UnderProgress
26 Revitalisation of BhadraFort Precinct at
Ahmedabad
Development ofHeritage Areas
7,439.00 2,603.64 1650.91
Workawarded
26 2,39,038.01 83,663.29 65,328.42
Rajkot27 Water Supply Project for
RajkotWater Supply 8,562.00 4,281.00 4
4,280.00Physically
Completed
7/27/2019 MIS-Document1.pdf
20/104
28 Strengthening of SolidWaste Management(Phase-I)
Solid WasteManagement
867.00 433.50 4 433.52Under
Progress
29 Underground Drainage-Phase-II and Phase-III(Part-1) (Sewage DisposalNetwork and STP)
Drainage / StormWater Drains
7,542.00 3,771.00 43,770.80 Under
Progress
30 Construction of ROB in
lieu of level crossing onB.G railway line alongGondal Road and MavdiRoad
Roads / Flyovers /
RoB
2,480.74 1,240.37 4
1,116.32 UnderProgress
31 Bus Rapid Transit SystemPhase I (Development ofBlue Corridor Part I) -29.00 Km
Mass RapidTransport System
11,000.00 5,500.00 44,950.00 Under
Progress
32 Sewerage System Phase -II, Part -II for Rajkot City
Sewerage 19,195.12 9,000.00 12,250.00
UnderProgress
6 49,646.86 24,225.87 16,800.64
Surat33 Upgradation of Anjana
Sewage Treatment PlantSewerage
1,098.00549.00 4
549.00Physically
Completed
34 Augmentation of AdajanSewerage
Sewerage1,193.00
596.50 4596.50
PhysicallyCompleted
35 Augmentation of BhesanSewage Treatment Plant
Sewerage1,509.00
754.50 4754.50
PhysicallyCompleted
36 Water Supply Project for
Vesu Urban Settlement ofSurat Urban DevelopmentAuthority
Water Supply
1,919.00
959.50 4
959.50 PhysicallyCompleted
37 Water Supply Project forPal-Palanpur Area
Water Supply995.00
497.50 4497.50
PhysicallyCompleted
38 Bridge across river Tapijoining Daboli toJahangirpura
Roads / Flyovers /RoB 6,500.00
3,250.00 43,250.00
PhysicallyCompleted
39 Secondary SeweageTreatment Plant at Bamroli
Sewerage1,322.47
661.24 4661.23
PhysicallyCompleted
7/27/2019 MIS-Document1.pdf
21/104
40 Storm Water DrainageVesu Area
Drainage / StormWater Drains 4,995.00
2,497.50 42,497.52
PhysicallyCompleted
41 Sewerage DisposalNetwork and STP for Pal-palanpor area
Sewerage2,128.00
1,064.00 41,064.00 Physically
Completed
42 Sewerage DisposalNetwork and STP for Vesuarea
Sewerage3,437.00
1,718.50 41,718.50
PhysicallyCompleted
43 Flyover bridge onKapodhara Fire Station
Roads / Flyovers /RoB 932.00
466.00 4466.00
PhysicallyCompleted
44 Flyover Bridge nearNanavarachha
Roads / Flyovers /RoB 758.00
379.00 4379.00
PhysicallyCompleted
45 Upgradation of SolidWaste Management inSurat
Solid WasteManagement 5,249.72
2,624.86 42,362.39
UnderProgress
46 Augmentation of Sarthana,Katargam and RanderWater Works of SMC
Water Supply14,068.65
7,034.33 47,034.33 Under
Progress
47 Storm water drainagesystem of Surat city forSMC area
Drainage / StormWater Drains 11,662.87
5,831.44 45,248.30
UnderProgress
48 Bridge across KankaraKhadi between UdhanaMagdalla Road andBamroli
Roads / Flyovers /RoB 841.39
420.70 4420.70 Physically
Completed
49 Sewerage and SewageTreatment system for NewEast Zone Areas
Sewerage11,065.73
5,532.87 44,979.57 Under
Progress
50 Storm Water DisposalSystem for New Zone
Drainage / StormWater Drains 3,426.82
1,713.41 41,713.40
UnderProgress
51 Construction of RoB onproposed Outer Ring Roadof Surat city at Gothan
Roads / Flyovers /RoB 1,427.12
713.56 1178.39
Work notstarted
52 Construction of RailwayOver Bridges on proposedOuter Ring Road of Suratcity at Sachin
Roads / Flyovers /RoB 2,077.12
1,038.56 3675.07 Under
Progress
7/27/2019 MIS-Document1.pdf
22/104
53 Water Supply system forNew East Zone areas ofSurat MunicipalCorporation
Water Supply16,743.43
8,371.72 48,371.75 Under
Progress
54 Automation/SCDA ofexisting pumping stationand STP of SuratMunicipal Corporation
Sewerage3,063.43
1,531.72 41,377.95 Under
Progress
55 Development of BRTS forSurat - 29.90 Km
Mass RapidTransport System 46,902.00
23,451.00 211,725.50
UnderProgress
56 Sewerage system for NewNorthern Drainage Zone ofSMC
Sewerage18,404.35
9,202.18 48,281.94
UnderProgress
57 Water Supply distributionsystem for South - EastZone areas of SuratMunicipal Corporation(SMC)
Water Supply20,109.67
10,054.84 36,535.94
UnderProgress
25 1,81,828.77 90,914.39 72,298.48
Vadodara58 Construction of Road over
bridge across Vadodara -Jambusar NG railway Lineat Rly Km 2/3-4 in lieu ofrailway crossing no 2between stationVishwamitri and Jambusarat 40 M wide ring road at
Kalali
Roads / Flyovers /RoB 4,435.10
2,217.55 1-
UnderProgress
59 Water Supply Sourceaugmentation
Water Supply4,105.00
2,052.50 42,052.52
PhysicallyCompleted
60 Sewerage System forVadodara city
Sewerage10,514.93
5,257.47 45,257.47
UnderProgress
61 Storm Water Drainage ofVadodara city
Drainage / StormWater Drains 14,594.56
7,297.28 46,567.55
UnderProgress
62 Solid Waste Managementfor Vadodara
Solid WasteManagement 3,098.54
1,549.27 41,549.27
UnderProgress
7/27/2019 MIS-Document1.pdf
23/104
63 Restoration andStrengthening of Sayajisarovar Partappurasystem, Vadodara
Preservation ofwater bodies 2,869.72
1,434.88 3962.35 Under
Progress
64 Construction of Road overbridge in lieu of existinglevel crossing no 2between station
Pratapnagar Jambusar(NG) Section at RailwayKm 1/15 to 2/1 nearLalbaug at Vadodara
Roads / Flyovers /RoB 4,570.00
2,285.00 42,056.50
Under
Progress
65 Sewerage systems Phase- II for Vadodara City
Sewerage6,055.74
3,027.88 42,725.08
UnderProgress
66 Construction of 4 LaneRoB Across Ahmedabad-Mumbai B.G Line atRailway Km. 399/41between Station
Vishwamitri andMakarpura near D-CabinNavayard on 24.0 M. Roadat Vadodara city
Roads / Flyovers /RoB 1,396.00
698.00 4698.00
Physically
Completed
67 Source Augmentation forwater supply, VadodaraPhase - II
Water Supply3,688.00
1,844.00 41,659.60
UnderProgress
68 Construction of 2 LaneRoB Acrooss Ahmedabad-Mumbai B.G Line atRailway Km 395/10
between Station Vadodaraand Makarpura nearDinesh Mill at Vadodara
Roads / Flyovers /RoB 1,968.00
984.00 4885.60
Physically
Completed
69 Basic Services todeveloping rehabiltation ofKaans in Vadodra city (a)storm Water drainagesector (b) water suplysector
Water Supply16,789.88
8,394.94 24,197.46
UnderProgress
7/27/2019 MIS-Document1.pdf
24/104
70 Supplementary DPR forwater Supply in Ajwa Zoneof Vadodara City
Water Supply2,059.26
605.50 1151.37
UnderProgress
13 76,144.73 37,648.27 28,762.77
Porbandar71 Augmentation of water
supply at PorbandarWater Supply 2,631.04 2,104.84 1
526.21Project not
started72 Underground Drainage(Sewerage) project forporbandar mission city
Sewerage 11,180.65 8,944.52 0-
Work notstarted
2 13,811.69 11,049.36 526.21
72 Gujarat 5,60,470.06 2,47,501.17 1,83,716.52
Haryana
Faridabad1 Revamping of Sewerage
System and SewerageTreatment works inFaridabad
Sewerage10,383.00
5,191.50 44,672.37 Under
Progress
2 InfrastructureDevelopment Works(Drainage) in OldFaridabad Zone
Drainage / StormWater Drains 2,825.12
1,412.56 4996.04 Under
Progress
3 Augmentation of watersupply of for Faridabad
Town, Haryana
Water Supply49,349.00
24,674.50 316,038.40
UnderProgress
4 Solid Waste ManagementScheme for Faridabad
Solid WasteManagement 6,924.00
3,462.00 32,250.30
UnderProgress
4 69,481.12 34,740.56 23,957.11
4 Haryana 69,481.12 34,740.56 23,957.11
Himachal Pradesh
Shimla
7/27/2019 MIS-Document1.pdf
25/104
1 Solid Waste Mangementfor Shimla
Solid WasteManagement 1,604.00
1,283.20 1320.80
UnderProgress
2 Construction of wideningand lowering of existingtunnel near AucklandHouse school (Includingconstruction of approachbridge)
Roads / Flyovers /RoB 1,009.06
807.25 3524.71
UnderProgress
3 Rehabilitation of WaterrSupply distribution systemfor Shimla City
Water Supply7,236.00
5,788.80 11,447.20
Work notstarted
4 Rejuvenation of SewerageNetwork in missing linesand left out / worn-outsewerage in various zonesof Shimla, Phase-1
Sewerage5,474.00
3,880.00 1970.00
Project notstarted
5 Sanitary Landfill site forSolid Waste Managementplant at village Bhariyal,
Tehsil Dist. Shimla
Solid WasteManagement 1,050.62
840.50 0- Project not
started
5 16,373.68 12,599.74 3,262.71
5 Himachal Pradesh 16373.68 12,599.74 3,262.71
Jammu & KashmirJammu
1 Comprehensive seweragescheme for Division A of
Greater Jammu
Sewerage12,923.00
11,630.70 24,652.29 Under
Progress
2 Comprehensive SewerageScheme for left out area,Phase II of Division AofGreater Jammu City
Sewerage2,032.03
1,828.83 0- Project not
started
2 14,955.03 13,459.53 4,652.29
Srinagar
7/27/2019 MIS-Document1.pdf
26/104
2 Comprehensive sewerageScheme for Zone III(SectorI) of Greater Srinagar.
Sewerage13,292.00
11,962.80 37,775.82 Under
Progress
3 Augmentation of WaterSupply for Zone IV ofGreater Srinagar includingCentral Water TestingFacilities
Water Supply12,100.00
10,000.00 24,000.00
UnderProgress
4 Water Supply scheme forTangnar (Srinagar)
Water Supply14,837.00
13,353.30 25,341.32
UnderProgress
3 40,229.00 35,316.10 17,117.14
5 Jammu & Kashmir 55184.03 48,775.63 21,769.43
Jharkhand
Ranchi1 Water Supply Project for
Ranchi
Water Supply 28,839.15 23,071.32 2
9,228.53Under
Progress
2 Solid Waste Management Solid WasteManagement
5,139.43 4,111.54 11,027.89
UnderProgress
2 33,978.58 27,182.86 10,256.42
Dhanbad3 Improvement of Water
Supply to DhanbadWater Supply 36,585.00 18,292.50 2
7,317.04Under
Progress
4 Solid Waste Management Solid Waste
Management
5,585.90 2,792.95 1
698.24
Under
Progress2 42,170.90 21,085.45 8,015.28
Jamshedpur5 Integrated Solid Waste
Management Project forJamshedpur Urban
Agglomeration
Solid WasteManagement
3,336.24 1,668.12 1417.03 Project not
started
7/27/2019 MIS-Document1.pdf
27/104
1 3,336.24 1,668.12 417.03
5 Jharkhand 79,485.72 49,936.43 18,688.73
KarnatakaBangalore
1 Development of Traffic and
Transit Managementcentre at Kengery(Proposed Bus terminalMaintenance Depot andPassenger Amenity Centreat Kengery Bangalore)
Other Urban
Transport 2,112.66
739.43 4
665.50
PhysicallyCompleted
2 Development of Traffic andTransit Managementcentre at BannerghattaBangalore (Proposed BusTerminal Maintenance
Depot and PassengerAmenity Centre atBannerghatta)
Other UrbanTransport 392.60
137.41 4123.66
PhysicallyCompleted
3 Proposal for constructionof TTMC at ShantinagarVol I Vol II Vol IIIA 1 2 3 4Vol.III B 1 2
Other UrbanTransport 8,467.96
2,963.79 42,667.42 Physically
Completed
4 Proposal for constructionof TTMC at KoramangalaVol I, Vol II, Vol III 1 2 3
Other UrbanTransport 5,058.06
1,770.32 41,593.29 Physically
Completed
5 Proposal for constructionof TTMC at BanashankariVol I Vol II Vol III 1 2
Other UrbanTransport 2,223.51 778.23 4 700.39 PhysicallyCompleted
6 Proposal for constructionof TTMC at ITPLWhitefield Vol.I Vol. IIDetailed drawings
Other UrbanTransport 2,655.63
929.47 4835.99 Physically
Completed
7 Construction of TTMC atVijaynagar Vol.I Vol.II
Other UrbanTransport 3,812.42
1,334.35 41,200.89
PhysicallyCompleted
7/27/2019 MIS-Document1.pdf
28/104
8 Construction of Underpassat Malleshwaram Circle
Roads / Flyovers /RoB 1,245.21
435.82 4392.25
PhysicallyCompleted
9 Remodelling of Primaryand Secondary stormwater drawin in Bangalorecity at Vrushabhavathivalley includingKethamaranahalli and
arkavathi minor valley Iand Kathriguppa minorvalley III (3 DPRs)
Drainage / StormWater Drains 42,089.00
7,989.10 35,991.81
UnderProgress
10 Remodelling of Primaryand Secondary stormwater drains in BangaloreCity Challaghatta valley
Drainage / StormWater Drains 10,593.00
3,337.25 22,074.96 Under
Progress
11 Remodelling of Primaryand Secondary stormwater drawin in Bangalore
city, Koramangala valley
Drainage / StormWater Drains 12,858.00
3,902.15 32,926.59 Under
Progress
12 Remodelling of Primaryand secondary stormwater drains in Bangalorecity, Hebbal valley
Drainage / StormWater Drains 26,998.00
6,465.90 34,849.41 Under
Progress
13 Construction of underpassat Taogre circle
Roads / Flyovers /RoB 1,755.90
614.57 3399.46
UnderProgress
14 Development of Traffic andTransit ManagementCentre at Jayanagar,Bangalore (Proposedpassenger amenity centreat Jayanagar)
Roads / Flyovers /RoB 889.58
311.35 4280.20
PhysicallyCompleted
15 Augmentation of Additional100 MLD of water fromCWSS stage IV Phase I
Water Supply1,226.00
429.10 4343.28 Physically
Completed
16 Bulk flow metering systemfor Bangalor ewatertransmission network
Water Supply1,531.00
535.85 3348.30 Physically
Completed
7/27/2019 MIS-Document1.pdf
29/104
17 Upgradation side walksand asphalting work ofroads surrounding M.G.Road area
Roads / Flyovers /RoB 4,361.16
1,526.41 41,373.76 Physically
Completed
18 Upgradation side walksand asphalting work ofroads surroundingKoramangala area
Roads / Flyovers /RoB 5,044.90
1,765.72 41,589.15 Physically
Completed
19 Environmental Action PlanReplacementRehabilitation of existingsewerage system
Sewerage17,675.00
6,186.25 22,474.50 Under
Progress
20 Construction of bridge atGali Anjaneya junction
Roads / Flyovers /RoB 3,008.00
1,052.80 3726.45
UnderProgress
21 Construction of gradeseparator at Yeshwanthpur
junction
Roads / Flyovers /RoB 2,157.91
755.27 3566.46
PhysicallyCompleted
22 Construction of Flyover
along ORR at IBLURjunction
Roads / Flyovers /
RoB 1,874.28
656.00 4
590.40
Physically
Completed
23 Construction of Flyoveralong ORR at AgaraJunction
Roads / Flyovers /RoB 3,809.93
1,333.48 41,200.13
PhysicallyCompleted
24 Construction of Underpassat Ring Road HennurBanaswadi Road Junction
Roads / Flyovers /RoB 2,543.79
890.33 4801.29 Physically
Completed
25 Construction of underpassat Magadi Road and Chordroad junction
Roads / Flyovers /RoB 2,782.49
973.87 4876.46 Physically
Completed
26 Underground Drainageworks in Yelahanka
Sewerage1,500.63
525.22 2210.08
UnderProgress
27 Underground Drainageworks in Kengeri
Sewerage1,876.36
656.73 2262.69
UnderProgress
28 Traffic and TransitManagement Centre atDomlur Bus Stand
Other UrbanTransport 1,555.00
544.25 4489.82 Physically
Completed
7/27/2019 MIS-Document1.pdf
30/104
29 Traffic and TransitManagement Centre atYeswantpur Bus Stand
Other UrbanTransport 6,131.93
2,146.18 41,931.55 Physically
Completed
30 Underground Drainageworks or Byatarayanpura
Drainage / StormWater Drains 12,517.00
4,380.95 21,752.37
UnderProgress
31 Underground Drainagesystem and roadrestoration for erstwhileR.R. Nagar CMC
Drainage / StormWater Drains 4,153.80
1,453.83 2581.53 Under
Progress
32 Construction of Underpassat Ring Road-Kaderinahalli
junction
Roads / Flyovers /RoB 2,486.90
870.42 4783.36 Under
Progress
33 Construction of Underpassat Ring Road-CNR Rao
junction
Roads / Flyovers /RoB 2,260.62
791.22 3514.28
UnderProgress
34 Construction of Underpassat Ring Road-PuttenahalliJunction
Roads / Flyovers /RoB 2,284.84
799.69 4719.87 Physically
Completed
35 Underground SewerageSystem and RoadRestoration for erstwhileDasarahalli city municipalcouncil (Drainage Zone 7& 8)
Sewerage 13,657.00 4,779.95 21,911.99
UnderProgress
36 Underground SewerageSystem and RoadRestoration for K.R. PuramCity Municipal Council(Drainage Zone III)
Sewerage 8,789.00 3,076.15 21,230.39
UnderProgress
37 Underground SewerageSystem and RoadRestoration forMahadevapura CityMunicipal Council(Drainage Zone III)
Sewerage 11,018.00 3,856.30 21,542.37
UnderProgress
7/27/2019 MIS-Document1.pdf
31/104
38 Providing undergroundDrainage facilities andRoad restoration inerstwhile BommanahaliCity Municipal Council
Drainage / StormWater Drains
23,175.00 8,111.24 23,242.50
UnderProgress
38 2,58,572.07 79,806.31 50,764.78
Mysore39 Remodelling of watersupply Distribution network,Automation andIntegrated ManagementSystem for Mysore City
water supply19,454.00
15,563.20 310,115.36
UnderProgress
40 Development of TransportInfrastructure facilities atMysore
Other UrbanTransport 8,525.74
6,820.59 46,138.52 Under
Progress
41 Upgradation of Outer Ring
Road at Mysore
Roads / Flyovers /
RoB 23,951.00
17,521.98 3
11,389.29Under
Progress
42 Water Supply project forMysore
Water Supply10,881.99
8,705.59 35,658.79
UnderProgress
43 Integrated Municipal SolidWaste Strategy
Solid WasteManagement 2,985.00
2,388.00 2955.20
UnderProgress
44 Remodelling of StormWater Drainage system inMysore
Drainage / StormWater Drains 38,460.00
10,000.00 49,000.00
UnderProgress
45 Intelligent TransportSystem and Innovative
Environment Project forMysore
Other UrbanTransport 2,270.00
1,176.00 2470.40 Under
Progress
46 Heritage and UrbanRenewal at Heritage Core
Development ofHeritage Areas 3,945.00
3,156.00 1789.00
UnderProgress
7/27/2019 MIS-Document1.pdf
32/104
47 Water Managementthrough surface andRainwater harvesting at SriChamarajendra zoologicalGardens
Water Supply330.00
264.00 0-
Work notstarted
91,10,802.73
65,595.3644,516.56
47 Karnataka3,69,374.80
1,45,401.6895,281.34
KeralaKochi
1 Water Supply System toKochi Part I
Water Supply 20,117.00 10,058.50 36,538.06
UnderProgress
2 Solid Waste Managementfor Kochi
Solid WasteManagement
8,812.00 4,406.00 32,863.40
UnderProgress
3 Upgrading Surface WaterDrainage System ofCentral area of Kochi
Drainage / StormWater Drains
978.00 489.00 1122.25 Under
Progress
4 Sewerage scheme forCentral zone covering sixDivisions and Wards(No.43, 49, 50, 51, 54 and56) of Kochi
Sewerage 7,841.00 3,920.50 1935.13
UnderProgress
5 Road Improvement andBridge Constrution at
Kochi
Roads / Flyovers /RoB
10,964.00 5,482.00 11,370.50
UnderProgress
6 Brodway and ErnakulamMarket Heritage andUrban renewal Project
Urban Renewal 2,210.00 1,105.00 1276.25 Project not
started
6 50,922.00 25,461.00 12,105.59
Thiruvananthapuram7 Improvement ot Water
SupplyWater Supply 8,716.00 6,972.80 3
4,532.32Under
Progress
7/27/2019 MIS-Document1.pdf
33/104
8 Improvement of StormWater Drainage in Zone-II
Area ofThiruvananthapuram
Drainage / StormWater Drains
4,039.00 3,231.20 1807.80 Under
Progress
9 Improvement of Sewerageschemes forThiruvananthapuramMunicipal Corporation
Sewerage 21,541.00 17,232.80 14,308.20 Under
Progress
10 Extension of seweragesystem F&G Block,Southern area ofThiruvannathapuram andrehabilitation of thesewerage systems,procurement of sewercleaning machines,sewerage system for
Attukal area, STP for Govt.Medical college,
Thiruvananthapuram
Sewerage 12,115.00 9,692.00 0-
Work notstarted
11 Solid Waste Managementin Thiruvananthapuram
Solid WasteManagement
2,456.00 1,964.80 31,277.12
UnderProgress
5 48,867.00 39,093.60 10,925.44
11 Kerala 99,789.00 64,554.60 23,031.03
Madhya PradeshBhopal
1 Water Supply to Gasaffected areas
Water Supply 1,418.31 709.16 4638.25
PhysicallyCompleted
2 Channelisation of Nallah(Storm Water Drain)
Drainage / StormWater Drains
3,057.00 1,528.50 4993.54
UnderProgress
3 Renewal of BasicInnfrastructure inCategorisedScrap Mart inBhopal
Urban Renewal 811.00 405.50 4364.95 Physically
Completed
7/27/2019 MIS-Document1.pdf
34/104
4 Renewal of Upgradation ofBasic Infrastructure in M.P.Nagar, Bhopal
Urban Renewal 1,894.00 947.00 4852.30 Physically
Completed
5 Pilot Corridor (New Marketto University) for BusRapid Transit System(42.19 km long)
Mass RapidTransport System
24,712.00 11,888.00 47,727.20 Under
Progress
6 Narmada Water SupplyProject for Bhopal Water Supply 30,604.16 15,302.08 4 13,774.87 UnderProgress
7 Water Supply distributionnetwork of BhopalMunicipal Area
Water Supply 41,545.64 20,772.84 28,309.12 Under
Progress
7 1,04,042.11 51,553.08 32,660.23
Indore8 Yeshwant Sagar Water
Supply System
Augmentation Scheme
Water Supply 2,375.00 1,187.50 41,187.75 Physically
Completed9 Bus Rapid Transport
System-PILOT PROJECT- 11.65 Km
Mass RapidTransport System
9,845.00 4,922.50 33,199.66
UnderProgress
10 Indore Sewerage Project Sewerage 30,717.00 15,358.50 49,983.01
UnderProgress
11 Construction of 8 importantroads at Indore
Roads / Flyovers /RoB
4,083.35 2,041.68 42,041.68
PhysicallyCompleted
12 Development of Link Roadfrom White Church to By
Pass Road
Roads / Flyovers /RoB
1,966.34 983.17 3639.06 Under
Progress13 Development of Master
Plan Link Road MR-9,Indore
Roads / Flyovers /RoB
3,974.64 1,987.32 31,291.76
UnderProgress
14 Solid Waste Managementof Indore City
Solid WasteManagement
4,324.66 2,162.33 31,621.74
UnderProgress
15 RoB at Juni IndoreRailway Crossing, Indorecity
Roads / Flyovers /RoB
631.00 315.50 4283.97
PhysicallyCompleted
7/27/2019 MIS-Document1.pdf
35/104
16 Construction of multi-levelparking at 20 differentlocations in Indore city
Parking lots andspaces on PPPbasis
5,600.00 2,800.00 1700.00
UnderProgress
17 Revierside corridor ofIndore BRTS Phase-I -14.30 Km
Mass RapidTransport System
18,000.00 9,000.00 0-
Work notstarted
10 81,516.99 40,758.50 20,948.63
Jabalpur18 Sewerage and Sewage
Treatment Project Phase-ISewerage 7,801.00 3,900.50 2
975.00Under
Progress
19 Sewerage and SewageTreatment Project Phase-II
Sewerage 7,081.00 3,540.50 2885.00
UnderProgress
20 Rehabilitation of existingpumping stations atRanjhi, Fagua andconstruction of newpumping stations at
Bhongadwar WTP
Water Supply 1,406.00 703.00 3456.95
UnderProgress
21 Storm Water drains atJabalpur city
Drainage / StormWater Drains
32,649.00 16,324.50 26,529.80
UnderProgress
4 48,937.00 24,468.50 8,846.75
Ujjain22 Reorganisation of Water
Supply schemeWater Supply 6,686.44 5,349.15 3
3,476.94Under
Progress
23 Restoration, Construction
and Development ofMahakal and GopalVirasat Kshetra
Development of
Heritage Areas
4,739.00 3,791.20 1
947.80 UnderProgress
2 11,425.44 9,140.35 4,424.74
23 Madhya Pradesh 2,45,921.54 1,25,920.42 66,880.35
MaharashtraGreater Mumbai
7/27/2019 MIS-Document1.pdf
36/104
1 Underground Tunnel fromMaroshi to RuparelCollege (12 kms.)
Water Supply 29,486.76 10,320.37 49,288.32 Under
Progress
2 Mumbai Sewage DisposalProject Stage-II priorityworks
Sewerage 36,201.00 12,670.35 411,403.32 Under
Progress
3 Eastern Freeway fromPrince of Wales Museum
to APLR - MUIP
Roads / Flyovers /RoB
33,638.80 11,773.58 38,830.20 Under
Progress
4 Elevated road on Saharroad - MUIP
Roads / Flyovers /RoB
15,513.34 5,429.67 44,072.26
UnderProgress
5 Thane Railway StationArea Traffic ImprovementScheme (SATIS)
Other UrbanTransport
2,325.00 813.75 4813.75 Physically
Completed
6 DPR for additional 110MLD Water supply schemeof THANE
Water Supply 7,118.00 2,491.30 42,491.30 Physically
Completed
7 Integrated NallaDevelopment Phase I forTHANE
Drainage / StormWater Drains
9,239.00 3,233.65 42,910.28
PhysicallyCompleted
8 Integrated NallaDevelopment ProjectPhase II for THANE
Drainage / StormWater Drains
11,659.00 4,080.65 43,672.58
PhysicallyCompleted
9 Underground SewerageScheme Phase I forTHANE
Sewerage 14,956.79 5,234.88 44,711.39
UnderProgress
10 Underground Tunnel fromMalabar Hill Reservoir to
Cross Maidan (3.6 kms)
Water Supply 9,398.79 3,289.58 42,138.21 Under
Progress11 Solid Waste Management
project,Greater MumbaiSolid WasteManagement
17,879.00 6,257.65 34,693.23
UnderProgress
12 Middle Vaitarna WaterSupply project for Mumbai- IV
Water Supply 1,32,950.00 46,532.50 446,532.13
UnderProgress
13 Sewerage System project-Phase II for Thane
Sewerage 14,009.00 4,903.15 21,961.26
UnderProgress
7/27/2019 MIS-Document1.pdf
37/104
14 Sewerage System project-Phase III for Thane
Sewerage 4,179.00 1,462.65 3951.00
UnderProgress
15 Underground sewerageproject based onDecentralised system
sewerage 33,142.27 11,599.79 37,539.81 Under
Progress
16 Storm water drainage -Kalyan -Dombivli
Drainage / StormWater Drains
5,540.26 1,939.09 41,745.17
UnderProgress
17 Underground sewerage forpart of KDMC Sewerage 16,963.35 5,937.17 3 3,859.15 UnderProgress
18 150 MLD Water SupplyScheme of KalyanDombivli MunicipalCorporation
water supply 10,681.49 3,738.52 43,364.67 Under
Progress
19 Augmentation of watersupply system for NaviMumbai MunicipalCorporation
water supply 23,052.03 8,068.21 35,244.33 Under
Progress
20 Integrated Nalla
Development Phase-III forKalwa and Mumbra areasof Thane MC
Drainage / Storm
Water Drains
5,789.27 2,026.24 4
1,823.62 PhysicallyCompleted
21 Ulhasnagar-Water SupplyDistribution system
Water Supply 12,765.23 4,467.83 32,904.09
UnderProgress
22 Kulgaon-Badlapur -Underground Seweragescheme
Sewerage 15,146.18 5,301.16 22,120.46 Under
Progress
23 Augmentation of existingwater supply scheme of
Kalyan Dombivli MunicipalCorporation
Water Supply 24,708.22 8,647.88 35,621.11 Under
Progress
24 Underground SewarageSystem for Navi MumbaiMunicipal Corporation
Sewerage 35,366.52 12,378.28 49,283.71 Under
Progress
25 Solid Waste Managementfor Navi Mumbai
Solid WasteManagement
4,986.86 1,745.40 2698.16 Under
Progress
7/27/2019 MIS-Document1.pdf
38/104
26 Sewerage System forAmbernath MunicipalCouncil
Sewerage 10,941.57 3,829.56 0-
Project notstarted
26 5,37,636.73 1,88,172.86 1,48,673.51
Nagpur27 Road Over Bridges
(ROBs)
Roads / Flyovers /
RoB
8,628.00 4,314.00 3
3,236.50
Under
Progress28 Expansion and
upgradation of watersupply distribution networkin Nagpur city
Water Supply 3,394.87 1,697.44 41,527.69 Physically
Completed
29 Energy Audit Projects forWater Supply
Water Supply 2,503.62 1,251.81 41,126.62
PhysicallyCompleted
30 Water Sector (LeakDetection)
Water Supply 278.73 139.37 4125.43
PhysicallyCompleted
31 Water Audit Projects Water Supply 2,500.00 1,250.00 4
1,125.00
Under
Progress32 Lifting water from Pench
Reservoir and conveyingupto Mahadulla by mortorlined MS pipeline in lieu ofcanal
Water Supply 14,463.70 7,231.85 46,508.66
UnderProgress
33 Recycle and Reuse ofWaste Water
Sewerage 13,011.00 6,505.50 11,626.38
UnderProgress
34 Kanhan AugmentationScheme
Water Supply 8,217.00 4,108.50 42,670.50
UnderProgress
35 Water Supply Pench IV(Part 2)
Water Supply 6,196.00 3,098.00 32,013.70
UnderProgress
36 Water Supply Pench IV(Part 3)
Water Supply 8,059.27 4,029.64 32,619.18
UnderProgress
37 Water Supply Pench IV(Part 4)
Water Supply 10,460.68 5,230.34 43,399.71
UnderProgress
38 Construction of Roadunder Bridge near AnandTalkies
Roads / Flyovers /RoB
1,828.65 914.33 3594.31
UnderProgress
7/27/2019 MIS-Document1.pdf
39/104
39 Construction of Road overBridge at Maskasath
Roads / Flyovers /RoB
253.00 126.50 131.63
UnderProgress
40 Construction of Road OverBridge at Itwari
Roads / Flyovers /RoB
900.80 450.40 3292.76
UnderProgress
41 Construction of RoB atMangalwari in replacementof level-crossing No.297/A(A-class) between
Km.1041/3-5 on Amla-Nagpur Section
Roads / Flyovers /RoB
849.14 424.57 4275.96
UnderProgress
42 Rehabilitation Plan toimplement 24X7 watersupply project for Nagpurcity under PPP framework
Water Supply 38,786.00 19,393.00 14,848.25 Under
Progress
43 Water Supply system forNIT area (Phase - II)Tertiary distributionnetwork in 46 clusters
Water Supply 29,639.55 14,819.78 13,704.95 Under
Progress
17 1,49,970.01 74,985.01 35,727.23
Nanded44 Improvement to water
supply in North NandedWater Supply 9,087.00 7,269.60 4
7,269.60 UnderProgress
45 Sewerage System in NorthNanded-Zone-I
Sewerage 4,025.00 3,220.00 32,415.00 Under
Progress
46 Sewerage System inNanded North - Zone-II
Sewerage 4,889.00 3,911.20 32,933.30 Under
Progress
47 Sewerage System inNanded North - Zone-III
Sewerage 3,931.00 3,144.80 32,358.65 Under
Progress
48 Water Supply for Nanded(South)
Water Supply 4,945.00 3,956.00 43,956.00 Under
Progress
7/27/2019 MIS-Document1.pdf
40/104
49 Undergrounda Sewerageand Sewage Treatment(Nanded-South)
Sewerage 4,093.00 3,274.40 42,946.96 Under
Progress
50 Improvement toMovements Network inNanded Package II III andIIIB Roads
Roads / Flyovers /RoB
21,497.33 17,197.86 415,478.09 Under
Progress
51 Improvement to City
Roads in Nanded(Package I)
Roads / Flyovers /
RoB
6,108.55 4,886.84 4
4,398.16 UnderProgress
52 River Front DevelopmentNorth Bank Zone 3
Development ofHeritage Areas
4,313.08 3,450.46 43,450.48 Physically
Completed
53 Improvement to MovementNetwork in NandedPackage IIIB Structures
Roads / Flyovers /RoB
5,815.49 4,652.39 44,652.40 Physically
Completed
54 Surface/Storm waterdisposal and management
project (North Zone,Nanded)
Drainage / StormWater Drains
4,573.08 3,658.46 32,378.01 Under
Progress
11 73,277.53 58,622.02 52,236.65
Nashik55 Ongoing works of Water
Supply ProjectsWater Supply 5,052.00 2,526.00 4
2,252.13Under
Progress
56 Underground SewerageProject for Nashik CityPhase I
Sewerage 14,846.00 7,423.00 46,680.70 Under
Progress
57 Solid Waste Managementfor Nashik
Solid WasteManagement
5,999.23 2,999.62 42,443.34
PhysicallyCompleted
58 Storm Water Drainage Drainage / StormWater Drains
31,031.00 15,515.50 311,636.25
UnderProgress
59 Godavari River FrontDevelopment, GhatImprovement andbeautification
Preservation ofwater bodies
5,805.00 2,902.50 31,886.64 Under
Progress
7/27/2019 MIS-Document1.pdf
41/104
60 Underground sewerageproject package -II
Sewerage 17,182.92 8,591.46 12,147.87
UnderProgress
6 79,916.15 39,958.08 27,046.93
Pune61 Augmentation and
Upgradation of SewageTreatment Plants and
Pumping Station
Drainage / StormWater Drains
8,613.00 4,306.50 44,306.49 Under
Progress
62 BRT Pilot project for Punecity (Katraj SwargateHadapsar Route 17.00Km)
Mass RapidTransport System
10,313.50 5,156.75 45,156.75 Physically
Completed
63 Construction andImprovement of Drains toprevent contamination ofnatural water bodies anddevelopment of Heritage
sites along in Pune(Environental Restoration/Preservation of MulaMutha River Ecos
Drainage / StormWater Drains
9,996.00 4,998.00 33,248.70
UnderProgress
64 Renewal and Managementof Sewerage and DrainageDisposal System in Pune(Augmentation of Weris,Restoration of Lakes Bio-remediation andLandscaping of Nalla and
Rivers)
Drainage / StormWater Drains
9,778.00 4,889.00 44,400.10
UnderProgress
65 Sewerage proposals forPimpri Chinchwad
Sewerage 11,938.88 5,969.44 45,969.44
UnderProgress
66 Bus Rapid Transit (PhaseI) for Pune city - 48.77 Km
Mass RapidTransport System
47,662.20 23,831.10 421,445.47
UnderProgress
67 Solid Waste Management- Pimpri-Chinchwad
Solid WasteManagement
7,044.81 3,522.41 43,522.41
UnderProgress
68 Water Supply proposals (4Nos.) for Pimpri
Water Supply 35,862.00 17,931.00 417,931.00
UnderProgress
7/27/2019 MIS-Document1.pdf
42/104
Chinchwad
69 Bus Rapid Transportsystem (Development ofInfrastructure forCommonwealth YouthGames, 2008) - 36.00 Km
Mass RapidTransport System
43,422.00 21,711.00 421,711.00
UnderProgress
70 BRTS Corridor for MumbaiPune Highway (8.5 Kms)and Audh Rawet Road(14.5 Kms) Total (23 Kms)
Mass RapidTransport System
31,214.00 15,607.00 415,607.00 Under
Progress
71 Construction of pedestriansubways (3 Nos.) andvehicular underpass (1No.) at Nagar Road
Roads / Flyovers /RoB
661.00 330.50 4330.52 Under
Progress
72 Subway on WesterlyBypass at Baner junction
Roads / Flyovers /RoB
726.00 363.00 4363.00
PhysicallyCompleted
73 Approach Road toSangamwadi bridge
Roads / Flyovers /RoB
782.00 391.00 4351.90
PhysicallyCompleted
74 Improvement andStrengthening of New
Alandi Road as BRTcorridor for Pune (13.9Km. from Vikrantwadi toDighi-Octroi Naka)
Mass RapidTransport System
3,703.00 1,851.50 31,388.64
UnderProgress
75 Sewerage System (Phase-II) for Pimpri Chinchwad
Municipal Corporation
Sewerage 12,070.45 6,035.23 46,035.20 Under
Progress76 BRTS Corridor-Kalewadi-
KSB Chowk to Dehu-Alandi Road (Trunk Route7)-PCMC - 11.20 Km
Mass RapidTransport System
21,920.00 8,768.00 22,192.00 Under
Progress
77 Water supply phase - II Water Supply 13,511.82 6,755.91 46,755.92
UnderProgress
78 Storm Water Drain forPimri - Chinchwad (Phase
Drainage / StormWater Drains
11,630.24 5,815.12 22,907.56
UnderProgress
7/27/2019 MIS-Document1.pdf
43/104
- II)
79 Storm Water DrainageProject for Pune CityPhase - I
Drainage / StormWater Drains
17,747.00 8,873.50 24,436.76
UnderProgress
80 BRTS Corridor-NashikPhata to Wakad (TrunkRoute No.9)-PCMC - 7.08
Km
Mass RapidTransport System
20,682.00 8,272.80 34,136.40 Under
Progress
20 3,19,277.90 1,55,378.75 1,32,196.26
80 Maharashtra 11,60,078.32 5,17,116.72 3,95,880.58
Meghalaya
Shillong1 Drainage Master Plan for
Shillong-Phase-IDrainage / StormWater Drains 2,446.00
2,201.40 3880.56
UnderProgress
2 Greater Shillong WaterSupply Project (Phase-III)for augmentation of WaterSupply to Shillong
Water Supply19,349.72
17,414.75 311,319.59 Under
Progress
221,795.72
19,616.1512,200.15
2 Meghalaya 21,795.72 19,616.15 12,200.15
Manipur
Imphal1 Solid Waste Management
for ImphalSolid WasteManagement
2,580.71 2,322.64 2929.06 Under
Progress
2 Improvement of NambulRiver Front and Naga Nala
Preservation ofWater Bodies
2,564.82 2,308.34 2923.34 Under
Progress
7/27/2019 MIS-Document1.pdf
44/104
3 Storm Water DrainageWork for Imphal City
Drainage / StormWater Drains
10,250.13 9,225.12 23,690.05 Under
Progress
3 15,395.66 13,856.09 5,542.45
3 Manipur 15,395.66 13,856.09 5,542.45
Mizoram
Aizawl1 Renewal pumping
machines and equipmentsand transmission systemof Greater Aizawl
Water Supply 1,681.80 1,513.62 2756.82 Under
Progress
2 Improvement andWidening of City RoadPhase - I
Roads / Flyovers /RoB
3,873.40 3,486.06 0-
Project notstarted
3 Improvement and
Widening of Vaivakawn toMizoram University
Roads / Flyovers /
RoB
1,907.64 1,716.88 0
- Project notstarted
4 Shimui to MizoramUniversity as spur of
Aizwal city Ring Road
Roads / Flyovers /RoB
5,309.32 4,778.39 0- Project not
started
4 12,772.16 11,494.94 756.82
4 Mizoram 12,772.16 11,494.94 756.82
NagalandKohima
1 Roads and Transportation Roads / Flyovers /RoB
2,525.60 2,273.04 31,477.48
UnderProgress
2 Integrated Road and Multilevel Parking Project atKohima
Parking lots andspaces on PPPbasis
5,042.43 4,538.19 11,134.55 Under
Progress
7/27/2019 MIS-Document1.pdf
45/104
3 Storm Water DrainageDevelopment Scheme forKohima city Phase I
Drainage / StormWater Drains
4,026.10 3,623.49 1905.87 Project not
started
3 11,594.13 10,434.72 3,517.90
3 Nagaland 11,594.13 10,434.72 3,517.90
Orissa
Bhubaneshwar1 Conservation of the
Heritage Tank ofBindusagar inBhubaneswar city
Urban Renewal 601.31 481.05 3312.68 Under
Progress
2 Integrated SewerageProject
Sewerage 49,891.35 39,913.08 215,965.23
UnderProgress
3 Storm water drainage forBhuvneswar
Drainage / StormWater Drains
6,833.00 5,466.40 22,186.56
UnderProgress
3 57,325.66 45,860.53 18,464.47
Puri4 24x7 Piped Water Supply
to Puri TownWater Supply 16,690.00 13,352.00 1
3,338.00Under
Progress
5 Storm water drainage forPuri
Drainage / StormWater Drains
7,182.00 4,500.00 11,125.00
UnderProgress
2 23,872.00 17,852.00 4,463.00
5 Orissa 81,197.66 63,712.53 22,927.47
Puduchery1 Comprehensive Sewerage
Scheme to the urbanareas of Puduchery
Sewerage 20,340.00 16,272.00 26,257.00 Under
Progress
2 Integrated Solid WasteManagement forPuduchery
Solid WasteManagement
4,966.00 3,972.80 1993.20
UnderProgress
7/27/2019 MIS-Document1.pdf
46/104
2 Puduchery 25,306.00 20,244.80 7,250.20
Punjab
Amritsar1 Water Supply, Sewerage
and Sewage treatment for
Amritsar
Water Supply 17,934.00 8,967.00 12,241.75 Under
Progress
2 Construction of two laneElevated Road from G.T.Road to Golden Temple
AND Construction of 4lane Elevated Road onG.T Road fromMaqbulpura Chowk toBhandari-Pul
Roads / Flyovers /RoB
14,949.00 7,474.50 47,474.14
UnderProgress
3 Rehabiliation of existingSewerage system for
Walled city Area Phase-II
Sewerage 3,690.00 1,845.00 1461.25 Under
Progress
4 Integrated Soild WasteManagement project for
Amritsar
Solid WasteManagement
7,249.00 3,624.50 1906.12 Project not
started
5 Rehabilitation of existingwater suplly system forwalled city area, Amritsar
Water Supply 4,578.00 2,289.00 1572.25 Project not
started
5 48,400.00 24,200.00 11,655.51
Ludhiana6 Providing sewerage andsewage treatment plant
Sewerage 24,139.00 12,069.50 13,017.37
UnderProgress
1 24,139.00 12,069.50 3,017.37
6 Punjab 72,539.00 36,269.50 14,672.88
Rajasthan
7/27/2019 MIS-Document1.pdf
47/104
Ajmer-Pushkar1 Water Supply
Transmission for AjmerCity
Water Supply 18,873.00 15,098.40 415,098.40
PhysicallyCompleted
2 Water Supply to Ajmer -Pushkar
water supply 16,642.00 13,313.60 25,325.29
UnderProgress
3 Urban Renewal of Dargah
Area, Ajmer
Urban Renewal 3,841.80 3,073.44 2
1,229.38
Under
Progress
4 Sewerage Project Sewerage 11,208.00 8,966.40 12,521.50
UnderProgress
4 50,564.80 40,451.84 24,174.57
Jaipur5 Urban Renewal of
Chowkdi Sarhad, WalledCity, Jaipur
Urban Renewal 1,159.66 579.83 4521.85
UnderProgress
6 Solid Waste Managementfor Jaipur
Solid WasteManagement
1,319.74 659.87 4494.91
UnderProgress
7 Sewerage system forJaipur (Phase-I)
Sewerage 7,495.97 3,747.99 43,373.20
UnderProgress
8 Jaipur Sewerage ProjectPhase II
Sewerage 11,086.00 5,543.00 44,988.70
UnderProgress
9 BRTS project proposal(Package IB) from C zoneBypass corssing toPanipech via Sikar Road -
39.45 Km (for all 3prijects)
Mass RapidTransport System
7,519.00 3,759.50 43,383.57
PhysicallyCompleted
10 Construction of Bus RapidTransit System (Package2) - 39.45 Km (for all 3prijects)
Mass RapidTransport System
14,400.00 7,200.00 11,800.00 Under
Progress
11 Conservation andpropagation of PannaMeena Bori and itsenvirons Amber, Jaipur
Preservation ofwater bodies
431.00 215.50 3140.09 Under
Progress
12 BRTS (P k IIIA & M R id 26 035 94 13 017 96 1
7/27/2019 MIS-Document1.pdf
48/104
12 BRTS (Package - IIIA &IIIB), Jaipur - 39.45 Km(for all 3 prijects)
Mass RapidTransport System
26,035.94 13,017.96 13,254.49
UnderProgress
13 Revitalisation of WalledCity of Jaipur-Phase-I
Urban Renewal 2,761.00 1,380.50 1362.00
UnderProgress
9 72,208.31 36,104.15 18,318.81
13 Rajasthan 1,22,773.11 76,555.99 42,493.38
SikkimGangtok
1 Rehabilitation of TrunkSewer along NH startingfrom Hospital Dara to STPand sewer mains alongTibet Road New Marketalong MG Marg atGangtok
Sewerage 2,392.01 2,152.81 31,399.32
UnderProgress
2 Upgradation andmodernization of raw watertrunk mains and watertreatment plant for GreaterGangtok
Water Supply 7,261.66 6,535.49 22,614.19
UnderProgress
2 9,653.67 8,688.30 4,013.51
2 Sikkim 9,653.67 8,688.30 4,013.51
Tamil Nadu
Chennai1 Improvements to Water
Supply System in ChennaiWater Supply 32,200.00 11,270.00 3
7,325.50Under
Progress
2 Providing Water Supplyand Sewerage Systeminfrastructure along ITcorridor in Chennai (7packages)
Water Supply 4,177.00 1,461.95 41,096.47
UnderProgress
3 I t f t W t S l 3 261 60 1 141 56 4
7/27/2019 MIS-Document1.pdf
49/104
3 Improvement of watersupply in Tambarammunicipality
Water Supply 3,261.60 1,141.56 41,027.40
PhysicallyCompleted
4 Solid Waste Managementfor Chennai
Solid WasteManagement
3,647.58 1,276.65 1319.16
PhysicallyCompleted
5 Construction of additionalsewerage treatment plant54 MLD at Perungudi
Sewerage 3,147.98 1,101.79 4991.61 Under
Progress
6 Sea Water DesalinationPlant at Minjur
Water Supply 8,780.00 7,024.00 46,321.60
PhysicallyCompleted
7 Construction of RoBs andRUBs at Chennai (6 Nos.)
Roads / Flyovers /RoB
4,440.80 1,554.28 41,398.85
UnderProgress
8 Construction of flyover atPerambur at Chennai
Roads / Flyovers /RoB
3,287.50 1,150.63 41,035.57
PhysicallyCompleted
9 Constructiojn of High Levelbridge, Adyar River at
Alandur Road, Chennai
Roads / Flyovers /RoB
548.30 191.91 4172.70 Physically
Completed
10 Improvement of watersupply to Porur TwonPanchayat
Water Supply 1,235.79 432.53 4389.27 Physically
Completed
11 Improvement of watersupply to Maduravoil
Water Supply 2,330.00 815.50 3530.09
UnderProgress
12 Construction of sump cumpump house over 90 cuseccanal near Poondireservoir for raw watertreatment plant
Water Supply 911.00 318.85 4286.96
PhysicallyCompleted
13 Comprehensive Water
Supply scheme for AvadiMunicipality
Water Supply 10,384.00 3,634.40 4
3,270.96
Under
Progress
14 Providing seweragefacilities to UllagaramPuzhithivakkam
Sewerage 2,808.05 982.82 3638.82
UnderProgress
15 Providing comprehensivewater supply scheme toUllagaramPuzhuthivakkamMunicipality
Water Supply 2,424.00 848.40 3551.46
UnderProgress
16 Nerkundram Village Water Supply 1 917 00 670 95 2
7/27/2019 MIS-Document1.pdf
50/104
16 Nerkundram VillagePanchayat-Improvement ofWater Supply
Water Supply 1,917.00 670.95 2268.39 Under
Progress
17 Providing comprehensiveSewerage scheme to
Avadi Municipality
Sewerage 15,805.41 5,531.89 44,978.69 Under
Progress
18 Providing seweragefacilities for Ambattur
Municipality (Phase-III)
Sewerage 13,091.00 4,581.85 32,978.20 Under
Progress
19 Solid Waste Managementof Alandur, Pallavaramand TambaramMunicipality
Solid WasteManagement
4,421.25 1,547.44 2618.97 Under
Progress
20 Providing Sewage facilitiesfor Chennai MaduravoyalMunicipality
Sewerage 5,745.50 2,010.93 31,307.10 Under
Progress
21 Providing ComprehensiveWater Supply Scheme to
Thiruvottiyur Municipality
Water Supply 8,511.70 2,979.10 21,191.86 Under
Progress
22 Improvement to StormWater Drains in theNorthern Basin of Chennai
Drainage / StormWater Drains
35,986.39 12,595.24 25,038.09 Under
Progress
23 Improvement to Micro andMacro Drainage system inCentral basin of Chennai
Drainage / StormWater Drains
34,500.00 12,075.00 24,830.00 Under
Progress
24 Porur Panchayat-Providing Seweragefacilities for Porur townpanchayat
Sewerage 3,829.00 1,340.15 3871.09 Under
Progress
25 Nesapakkam-54 MLDSewerage Treatment Plant
Sewerage 5,457.00 1,909.95 41,718.95
UnderProgress
26 Alandur-ComprehensiveWater Supply scheme to
Alandur
Water Supply 6,439.00 2,253.65 31,464.87 Under
Progress
27 Improvement to Storm Drainage / Storm 44 407 00 15 542 45 3
7/27/2019 MIS-Document1.pdf
51/104
27 Improvement to StormWater Drains in theEastern Basin of ChennaiCity
Drainage / StormWater Drains
44,407.00 15,542.45 310,102.59 Under
Progress
28 Providing comprehensiveSewerage scheme toTambaram Municipality
Sewerage 16,096.59 5,633.81 43,661.97 Under
Progress
29 Providing comprehensive
water supply in entire areaof Ambattur Municipality
Water Supply 26,708.00 9,347.80 4
8,413.10Under
Progress
30 Providing ComprehensiveSewarage scheme toPerungudi town Panchayat
Sewerage 2,019.24 706.73 3459.41 Under
Progress
31 Providing ComprehensiveSewarage scheme toThirumazhisai townPanchayat
Sewerage 2,047.32 716.56 3465.76 Under
Progress
32 Improvement to Micro and
Macro Drainage system inthe Southern Basin ofChennai City
Drainage / Storm
Water Drains
29,897.57 10,464.15 2
6,801.70 UnderProgress
33 Providing ComprehensiveSewerage Scheme toPallikarani town Panchayat
Sewerage 5,861.00 2,051.35 31,334.22 Under
Progress
34 Construction of HeritagePrecincts along EVRPeriyar Salai, Chennai
Development ofHeritage Areas
610.00 213.50 3138.78 Under
Progress
35 Construction andCommissioning ofadditional 120 MLDsewage treatment plant atKoyambedu (Phase - II) in,Chennai
Sewerage 11,610.00 4,063.50 0 -Project not
started
35 3,58,543.57 1,29,441.25 82,000.16
Coimbatore
36 Improvement to Water Water Supply 11 374 30 5 687 15 4 Under
7/27/2019 MIS-Document1.pdf
52/104
36 Improvement to WaterSupply Scheme
Water Supply 11,374.30 5,687.15 45,118.28
UnderProgress
37 Solid Waste Managementfor Coimbatore
Solid WasteManagement
9,651.00 4,825.50 44,342.96
UnderProgress
38 ComprehensiveUnderground SewerageScheme
Sewerage 37,712.88 18,856.44 312,256.69
UnderProgress
39 Water Supply
improvement scheme to16 Town Panchayats inCoimbatore Urban
Agglomeration
Water Supply 5,882.36 2,941.18 2
1,176.48 UnderProgress
40 Storm Water DrainageSystem in the CoimbatoreCity Municipal Corporation(Phase -1)
Drainage / StormWater Drains
22,675.00 9,000.00 23,600.00 Under
Progress
5 87,295.54 41,310.27 26,494.41
Madurai41 Water Supply to MaduraiCorporation Improvementworks & SystemImprovement (Phase-I andPhase-II)
Water Supply 5,931.60 2,965.80 42,669.22
PhysicallyCompleted
42 Thirupparankundrammunicipality DPR forcombined water supplyscheme toThiruppakundram
municipality andHarveypatty TownPanchayat
Water Supply 969.57 484.79 4412.06
PhysicallyCompleted
43 Solid Waste Managementfor Madurai
Solid WasteManagement
7,429.00 3,714.50 43,344.18
PhysicallyCompleted
44 Construction of CheckDam at Vaigai river forMadurai
Water Supply 915.00 238.50 4214.67
PhysicallyCompleted
45 Anaiyur municipality DPR Water Supply 788 00 394 00 4
7/27/2019 MIS-Document1.pdf
53/104
45 Anaiyur municipality DPRon Water Supply schemeto Anaiyur municipality
Water Supply 788.00 394.00 4354.60 Physically
Completed
46 Storm Water Drain andDesilting of natural Drains(Improvement andconstruction of StormWater Drain)
Drainage / StormWater Drains
25,181.00 12,590.50 411,331.47
UnderProgress
47 Under Ground SewerageScheme for Phase III areaand Renovation of existingSewerage System
Sewerage 22,934.00 11,467.00 410,320.30 Under
Progress
48 Providing combined WaterSupply Scheme to MaduraiUrban Agglomeration Area
Water Supply 20,141.00 10,070.50 24,028.20 Under
Progress
8 84,289.17 41,925.59 32,674.70
48 Tamil Nadu 5,30,128.28 2,12,677.10 1,41,169.27
TripuraAgartala
1 Agartala Water SupplyProject (North Zone)
Water Supply 7,826.00 7,043.40 22,817.36
UnderProgress
2 Sewerage and SewerageTreatment Scheme forNorth Zone (Priority I Area)
Sewerage 10,221.00 9,000.00 23,600.00 Under
Progress
2 18,047.00 16,043.40 6,417.36
2 Tripura 18,047.00 16,043.40 6,417.36
Uttar Pradesh
Agra1 Municipal Solid Waste
Management in AgraSolid WasteManagement
3,083.99 1,542.00 41,387.80
UnderProgress
2 Yamuna Action Plan Sewerage 2 162 00 1 081 00 4
7/27/2019 MIS-Document1.pdf
54/104
2 Yamuna Action PlanPhase II for Branch andLateral Sewer Lines inNorthern Zone andWestern Zone in Agra
Sewerage 2,162.00 1,081.00 41,081.00
PhysicallyCompleted
3 Agra Water Supply Water Supply 8,270.50 4,135.25 43,721.72
UnderProgress
4 Agra Sewerage Scheme
Phase -1 (Part-1)
Sewerage 19,592.00 9,000.00 4
8,100.00
Under
Progress4 33,108.49 15,758.25 14,290.52
Allahabad5 Water Supply Component
of Allahabad cityWater Supply 8,969.00 4,484.50 4
4,484.52Under
Progress
6 Solid Wate Managementfor Allahabad
Solid WasteManagement
3,041.49 1,520.75 3988.47
UnderProgress
7 Water Supply componentof Allahabad city (Part-II)
Water Supply 15,915.22 7,957.61 47,161.85
UnderProgress
8 Sewerage system ofAllahbad City (Zone D)Phase - I
Sewerage 33,826.00 16,913.00 310,993.45
UnderProgress
4 61,751.71 30,875.86 23,628.29
Kanpur9 Municipal Solid Waste
Management in KanpurSolid WasteManagement
5,623.79 2,811.90 42,530.70
UnderProgress
10 Water Supply scheme forinner old area of Kanpur
city Vol I and II
Water Supply 27,094.89 13,547.45 412,192.58 Under
Progress
11 Sewerage work of InnerOld City Area of Kanpur
Sewerage 19,088.22 9,544.11 48,587.57
UnderProgress
12 Sewage Treatment forKanpur city
Sewerage 10,100.45 5,050.23 33,282.63
UnderProgress
13 Water Supply Part-II forremaining area of Kanpur
Water Supply 37,778.92 18,889.48 417,000.53
UnderProgress
14 Kanpur - Sewerage works Sewerage 20 736 00 10 000 00 2 Under
7/27/2019 MIS-Document1.pdf
55/104
14 Kanpur Sewerage worksin District IV in Kanpur city
Sewerage 20,736.00 10,000.00 24,000.00
UnderProgress
6 1,20,422.27 59,843.16 47,594.01
Lucknow15 Sewerage works for
Lucknow SewerageDistrict I (Vol.I and II)
Sewerage 23,623.00 11,811.50 411,811.48 Under
Progress
16 Municipal Solid WasteManagement in Lucknow
Solid WasteManagement
4,292.37 2,146.19 31,395.03
UnderProgress
17 Water Supply Works ofLucknow (Phase I Part IVol.I to V)
Water Supply 38,861.00 19,430.50 417,487.46 Under
Progress
18 Sewerage works forLucknow City-SewerageDistrict-III (Part-I0
Sewerage 26,216.00 13,108.00 38,520.20 Under
Progress
19 Storm Water Drainage for
Lucknow
Drainage / Storm
Water Drains
32,521.00 16,260.50 4
14,634.55
Under
Progress20 Sewage works for
Lucknow City-SewerageDistrict-III (Part-II)
Sewerage 21,443.00 10,721.50 36,968.98 Under
Progress
21 Water Supply for Lucknow(Phase - I, Part - II)
Water Supply 14,656.60 7,328.30 46,595.43
UnderProgress
7 1,61,612.97 80,806.49 67,413.13
Mathura22 Municipal Solid Waste
Management in MathuraSolid WasteManagement
991.60 793.28 4713.95 UnderProgress
23 Storm Water Drainage Drainage / StormWater Drains
8,720.00 6,976.00 34,534.40
UnderProgress
24 DPR for Sewerage Worksin Sewerage Zone -II ofMathura city
Sewerage 6,035.77 4,500.00 21,800.00 Under
Progress
3 15,747.37 12,269.28 7,048.35
M t
7/27/2019 MIS-Document1.pdf
56/104
Meerut25 Municipal Solid Waste
ManagementSolid WasteManagement
2,259.40 1,129.70 3734.32
UnderProgress
26 Water Supply for Meert Water Supply 27,301.00 13,650.50 412,285.34
UnderProgress
27 Sewerage Work inSewerage Zone-5&7 of
Meerut City
Sewerage 18,589.00 9,000.00 23,600.00
Under
Progress3 48,149.40 23,780.20 16,619.66
Varanasi28 Water Supply Component
Priority of VaranasiWater Supply 11,102.00 5,551.00 4
4,995.90Under
Progress
29 Solid Waste Managementof Varanasi
Solid WasteManagement
4,867.73 2,433.87 31,582.02
UnderProgress
30 Water Supply Part-II of
Cis-Varuna area
Water Supply 8,610.00 4,305.00 2
1,722.00
Under
Progress31 Storm Water Drainage
works for VaranasiDrainage / StormWater Drains
19,162.00 9,581.00 36,227.65
UnderProgress
32 Sewerage work forVaranasi Trans Varunaarea
Sewerage 30,912.00 15,456.00 310,046.40
UnderProgress
33 Water Supply Component(priority-II) for Trans-Varuna Area of VaranasiCity
Water Supply 20,916.00 9,000.00 23,600.00 Under
Progress
6 95,569.73 46,326.87 28,173.97
33 Uttar Pradesh 5,36,361.94 2,69,660.09 2,04,767.93
Uttarakhand
Dehradun1 Water Suply
reorganisation scheme(Phase I)
Water Supply 7,002.70 5,602.16 45,041.94
UnderProgress
2 Integrated Solid Waste Solid Waste 2,460.00 1,968.00 2 Under
7/27/2019 MIS-Document1.pdf
57/104
2 Integrated Solid WasteManagement
Solid WasteManagement
2,460.00 1,968.00 2787.20
UnderProgress
3 Improvement of 30intersections of Dehradooncity
Roads / Flyovers /RoB
2,757.91 2,206.32 31,434.11 Under
Progress
4 Dehradoon SewerageScheme
Sewerage 5,465.00 4,372.00 32,841.55
UnderProgress
5 Dehradoon Sewerage
Scheme (Phase -I) for LZone
Sewerage 6,283.00 4,628.00 3
1,851.20 UnderProgress
5 23,968.61 18,776.48 11,956.00
Haridwar6 Water Supply
Reorganisation schemeWater Supply 4,784.43 3,827.54 4
3,444.66Under
Progress
7 Improvement of junctionsfor Haridwar city
Roads / Flyovers /RoB
1,765.05 1,412.04 3917.83
UnderProgress
8 Integrated Solid WasteManagement in Haridwar Solid WasteManagement 1,671.53 1,337.24 1 334.30 Project notstarted
9 Sewerage System in ZoneD (Kankhal) and Zone D1(Arya Nagar, NewHaridwar)
Sewerage 2,698.00 2,158.40 1539.60 Project not
started
10 Sewerage System in ZoneC2 of Haridwar
Sewerage 748.33 598.68 1149.67
Project notstarted
5 11,667.34 9,333.90 5,386.06
Nainital11 Augmentation andRenovation ofWaterSupply Scheme PartI
Water Supply 547.00 437.60 3284.44 Under
Progress
12 Reorganisation andexpansion of Nainitalsewerage
Sewerage 1,960.00 1,568.00 2627.70
UnderProgress
13 Integrated Solid WasteManagement in Nanital
Solid WasteManagement
931.00 744.80 1186.20
UnderProgress
14 Restoration and Development of 1,182.27 945.82 1Project not
7/27/2019 MIS-Document1.pdf
58/104
conservation of RajBhawan
pHeritage Areas
,236.45
Project notstarted
4 4,620.27 3,696.22 1,334.79
14 Uttarakhand 40,256.22 31,806.60 18,676.85
West Bengal
Asansol1 7 MGD WTP together with
reservoir, distributionsystem and other alliedworks
Water Supply 2,878.00 1,439.00 41,439.00 Physically
Completed
2 42 MLD Water SupplyProject in Raniganj under
Asansol Urban Area, WestBengal
Water Supply 3,627.00 1,813.50 31,360.14 Under
Progress
3 22.7 MLD Water Supply
Project in Jamuria underAsansol Urban Area, WestBengal
Water Supply 1,453.00 726.50 4
726.50 PhysicallyCompleted
4 Municipal Solid WasteManagement in AsansolUrban Area
Solid WasteManagement
4,357.27 2,178.64 31,633.98 Under
Progress
5 10 MGD Water SupplyScheme for AsansolMunicipal Corporation
Water Supply 8,982.96 4,491.48 44,042.33
UnderProgress
6 Consatruction, widening
and improvement of roadfrom Raghunathpur toDhupchuria and Akandarato Fuljihore at Durgapur
Roads / Flyovers /
RoB
9,492.26 4,746.13 1
1,186.53 UnderProgress
7 Sewerage Project forRanigunj Municipality
Sewerage 4,008.82 2,004.41 1501.10
UnderProgress
8 24 x 7 water supplyscheme (Phase -III) forDurgapur
Water Supply 12,681.40 6,340.70 22,536.29
UnderProgress
9 24 x 7 water supply Water Supply 13,370.60 6,685.30 1Work not
7/27/2019 MIS-Document1.pdf
59/104
pp yscheme for KultiMunicipality, Asansol UA
pp y , ,1,671.33
Work notstarted
10 Improvement upgradation& strengthening of road forGammon bridge to Gandhimore (NH-2) via Mayabazar in Durgapur
Roads / Flyovers /RoB
7,781.79 3,890.90 0-
Project notstarted
11 Improvement, widening to
4 lane and strengtheningof road from JubleeDhabato SCOB gate at Asansol.
Roads / Flyovers /
RoB
4,316.61 2,158.31 0
- Project notstarted
11 72,949.71 36,474.86 15,097.20
Kolkata12 Water Treatment Plan at
Dhapa 30 MGD Phase-IWater Supply 9,693.45 3,392.71 4
3,053.44 UnderProgress
13 Integration of Maheshtalaunderground reservoir withexisting water distributionnetwork
Water Supply 1,717.00 600.95 4600.95 Physically
Completed
14 Underground WaterReservoir-cum-Boosterpumping station at GandhiMaidan, Akra
Water Supply 1,066.00 373.10 4373.12 Physically
Completed
15 15 MGD Water TreatmentPlan at Bansberia
Water Supply 4,492.00 1,572.20 41,414.98
UnderProgress
16 10 MGD Water Treatment
Plan at Uluberia
Water Supply 4,558.00 1,595.30 4
1,435.79Physically
Completed
17 Construction of FlyoverBetween EM Bypass &Kazi Nazrul Islam Sarani
Roads / Flyovers /RoB
3,802.00 1,330.70 41,330.68 Physically
Completed
18 Upgr+G4adation of SewerSystem in Kolkata (Phase-I)
Sewerage 9,712.00 3,399.20 32,209.48 Under
Progress
19 Transmunicipal Scheme Drainage / Storm 4,530.14 1,585.55 4
7/27/2019 MIS-Document1.pdf
60/104
pon removal of Drainagecongestion within Khardah,Panihati, North Dum Dum,Dum Dum and South DumDum
gWater Drains 1,585.55
PhysicallyCompleted
20 Upgradatio of Man EntryBrick Sewer System (Part)
for Kolkata
Sewerage 40,291.00 14,101.85 412,691.65 Under
Progress
21 Improvement of drainagein Howrah
Drainage / StormWater Drains
9,338.03 3,268.31 21,634.16 Under
Progress
22 Municipal Solid WasteManagement of MunicipalTowns
Solid WasteManagement
5,658.53 1,980.49 31,485.36 Physically
Completed
23 Water supply scheme forbaruipur Municipality
Water Supply 951.86 333.15 4299.84
UnderProgress
24 Water Supply Scheme foradded areas of HowrahMunicipal Corporation
Water Supply 9,068.91 3,174.12 4 2,856.71 UnderProgress
25 EM