MIRACOOL Pilot Project MIRACOOL Pilot Project In In Sorsogon Sorsogon City, City, In Philippines In Philippines MIRACOOL Co., Ltd. 5 November 2013
15

MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

Mar 03, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

MIRACOOL Pilot Project MIRACOOL Pilot Project InIn SorsogonSorsogon City,City,In PhilippinesIn Philippines

MIRACOOL Co., Ltd. 5 November 2013

Page 2: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

SUBSTRATE

Emission

ThermalConductivity

Reflectance

HighHigh

Low

SPECIAL PIGMENT

THERMAL CHARACTERISTICS OF HEAT SHIELDING PAINT ”MIRACOOL”

Section of Miracool Coating

HOLLOW CERAMIC MICRO SPHERES

Page 3: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

EFFECT OF MIRACOOL

Reduction of Heat Flow from the Roof into Rooms

Low Room Temp.

ComfortableSaving Energy

Less Cooling Load

Decrease of Surface Temperature of the Roof

Page 4: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

PILOT PROJECT IN SORSOGON CITY, PHILIPPINES

Presentation of “MIRACOOL” was carried out at the second Environmental Technology Expert Group Meeting in September, 2010.“MIRACOOL” was selected for one of the pilot projects. Location of the project was Sorsogoncity, Philippines.“MIRACOOL” was applied for the following buildings in March, 2011.(1)  Sorsogon Pilot Elementary School(2) Barangay Community Hall(3) Core Shelter Housing: 3 unitsTemperature data were recorded by officials ofSorsogon city in May‐Aug, 2011.

Page 5: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

(1) SORSOGON PILOT ELEMENTARY    SCHOOL

Completed

Primary Coating

Top coating by MIRACOOL SW200

Entrance

Page 6: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

Ceiling

Classroom

Roof Top

Page 7: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

9/July/2011~8/August/2011

Page 8: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

23/July/2011

Page 9: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

(2) BARANGAY COMMUNITY HALL

Painting

Ceiling

Page 10: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

(3) CORE SHELTER HOUSING

Ceiling

Page 11: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

14/May/2011~26/June/2011

Page 12: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

1/June/2011

Page 13: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

PERFORMANCE REQUIRED FOR HEAT‐SHIELDING PAINT

DurabilityContinuity of Performance

Initial Thermal Performance

MIRACOOL SW200Performance is rated by The “Cool Roof Rating 

Council” after three years outdoor exposure in Arizona, Florida and Ohio in USA.ENERGY STAR Mark was granted consequently.Verified by “Japan Environmental 

Technology Verification” by Ministry of The Environment of Japan.

No. 051-0966

Page 14: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

THE MOST SUITABLE LOCATION FOR “MIRACOOL” TO BE APPLIED.

Hot Climate Caused by Solar RadiationElectricity Cost is High

No or Less Insulation on RoofThere is a limitation to reduce product price due to high cost of the law materials in order to maintain high thermal performance, durability and continuity of performance. Therefore the most of the job records of “MIRACOOL” in abroad are for factories and warehouses of Japanese companies which afford to spend such the high cost.We would like to introduce “MIRACOOL” for those local people and organizations in developing countries who are the most sought of “MIRACOOL”, in collaboration with national governments, local authorities, non‐governmental organizations (NGOs), community organizations and the private sectors.

Page 15: MIRACOOL Pilot Project In Sorsogon City,In Philippines · PILOT PROJECT IN SORSOGON CITY, PHILIPPINES}Presentation of “MIRACOOL” was carried out at the second Environmental Technology

Thank you very much for your attention.

Miracool Co., Ltd.

http://www.miracool.jp