MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-01 : MAINTENANCE & OPERATION CODE ITEM DESCRIPTION QTY UNIT COMMENT SPARES FOR COOLING TOWER AT BABA INDUSTRIAL AREA INCLUDING: Spares for airconditioning at process plants - SPARES FOR COOLING TOWER 370 TON 20 ITEM - SPARES FOR COOLING TOWER 155 TON 20 ITEM 08-9-01-01-0002 SPARE PARTS FOR DRESSER / M.H.I GAS COMPRESSORS AT NOC'S COMPRESSOR STATIONS. 100 ITEM Spares for compressor stations 08-9-01-01-0003 SERVICE CONTRACT FOR MAINTENANCE OF THERMODYNE GAS COMPRESSOR TYPE RB5B,C3A S/N 1316 AT KHABAZ OIL FIELD INCLUDING REQUIRED MATERIALS 2 CONTRACT Service contract for compressor stations PIPES FOR GENERAL PURPOSES: Piping for field use - 4 INCHES DIAMETER 10 KM. - 6 INCHES DIAMETER 20 KM. - 8 INCHES DIAMETER 20 KM. - 10 INCHES DIAMETER 20 KM. - 12 INCHES DIAMETER 20 KM. - 16 INCHES DIAMETER 8 KM. 08-9-01-01-0005 PIPE FITTING ASSORTED TYPES 40 ITEM General maintenance requirements 08-9-01-01-0006 STUD BOLTS ASSORTED TYPES 20 ITEM 08-9-01-01-0007 GASKETS ASSORTED TYPES 50 ITEM 08-9-01-01-0008 REINFORCED BRANCHED FITTING (WELDOLET) ASSORTED TYPES 20 ITEM 08-9-01-01-0009 WELDING ELECTRODES (GENERAL PURPOSE) 64 TON 08-9-01-01-0010 HEATER TUBES AT THE PROCESS PLANTS 50 ITEM 08-9-01-01-0001 08-9-01-01-0004 PAGE: 1 9RFN
149

MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

Mar 08, 2018

Download

Documents

buidan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENTSPARES FOR COOLING TOWER AT BABA INDUSTRIAL AREA INCLUDING: Spares for airconditioning at process plants

- SPARES FOR COOLING TOWER 370 TON 20 ITEM - SPARES FOR COOLING TOWER 155 TON 20 ITEM

08-9-01-01-0002 SPARE PARTS FOR DRESSER / M.H.I GAS COMPRESSORS AT NOC'S COMPRESSOR STATIONS. 100 ITEM Spares for compressor stations

08-9-01-01-0003SERVICE CONTRACT FOR MAINTENANCE OF THERMODYNE GAS COMPRESSOR TYPE RB5B,C3A S/N 1316 AT KHABAZ OIL FIELD INCLUDING REQUIRED MATERIALS

2 CONTRACT Service contract for compressor stations

PIPES FOR GENERAL PURPOSES: Piping for field use - 4 INCHES DIAMETER 10 KM. - 6 INCHES DIAMETER 20 KM. - 8 INCHES DIAMETER 20 KM. - 10 INCHES DIAMETER 20 KM. - 12 INCHES DIAMETER 20 KM. - 16 INCHES DIAMETER 8 KM.

08-9-01-01-0005 PIPE FITTING ASSORTED TYPES 40 ITEM General maintenance requirements

08-9-01-01-0006 STUD BOLTS ASSORTED TYPES 20 ITEM

08-9-01-01-0007 GASKETS ASSORTED TYPES 50 ITEM

08-9-01-01-0008 REINFORCED BRANCHED FITTING (WELDOLET) ASSORTED TYPES 20 ITEM

08-9-01-01-0009 WELDING ELECTRODES (GENERAL PURPOSE) 64 TON

08-9-01-01-0010 HEATER TUBES AT THE PROCESS PLANTS 50 ITEM

08-9-01-01-0001

08-9-01-01-0004

PAGE: 1 9RFN

Page 2: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-01-0011 AIR COMPRESSORS FOR NOC'S DEGASSING STATIONS 20 SET Replacement compressors

08-9-01-01-0012 PUMPS FOR PROCESS PLANTS 20 SET Replacement pumps

08-9-01-01-0013 SPARE PARTS FOR AIR COMPRESSORS AT OLD PROCESS PLANT, NEW PROCESS PLANT & DEGASSING STATIONS 30 ITEM Maintenance requirements

08-9-01-01-0014 SPARE PARTS FOR PUMPS AT PROCESS PLANTS. 30 ITEM Maintenance requirements

08-9-01-01-0015 RETROFIT CONTROL SYSTEM FOR SULZER GAS TURBINE AT K1 & T1 PUMPING STATIONS. 6 SET Replacement control systems

08-9-01-01-0016INSTRUMENTS & CONTROL EQUIPMENT FOR ITP STATIONS (TURBINE METER, CONTROL VALVE, FLOW TOTALIZER, PRESSURE & FLOW TRANSMITTERS & RECEIVERS, RECORDER …)

10 ITEM Control instrumentation for ITP

08-9-01-01-0017 CONTROL & MEASURING INSTRUMENTS FOR DRESSER/HITACHI GAS COMPRESSORS AT GAS COMPRESSOR STATIONS. 10 ITEM Replacement instrumentation

08-9-01-01-0018 MIST DETECTOR FOR GAS COMPRESSOR STATIONS 50 ITEM Replacement instrumentation

08-9-01-01-0019INSTRUMENTATION FOR NEW PROCESS PLANT TRANSMITTERS - (PRESSURE, TEMP., LEVEL, D.P. TRANSMITTERS) PRESSURE GAGES, PRESSURE SWITCHES, TRANSDUCER VALVE POSITIONAL, THERMO COUPLE & SIMILAR INSTRUMENT

1620 pieces Instrumentation requirements

08-9-01-01-0020 SPARE KITS FOR BETTIS SHUT-DOWN VALVE FOR COMPRESSOR STATIONS. 15 ITEM Spares

08-9-01-01-0021 INSTRUMENT SPARE PARTS FOR HITACHI GAS TURBINE AT GAS COMPRESSOR STATIONS. 25 ITEM Spares

PAGE: 2 9RFN

Page 3: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-01-0022DIGITAL RADIO LINKS AT SADDAM FIELD-K2, SARBASHAKH-ZAB , IT2-QAYARA (2 NOS) (2+2)MB IN 2.6GHZ WITH ALL ACCESSORIES & SPARE PARTS

4 ITEM To replace existing equipment

08-9-01-01-0023 PASSIVELY COOLED CONTAINERS & DC GENERATORS FOR THE ITP TELECOMMUNICATION REPEATER STATIONS. 7 SET ITP communication requirement

08-9-01-01-0024 ONE TELEPHONE EXCHANGE (250) EXTENSIONS WITH 24 TIE LINES+12 TRUNK LINES COMPLETE WITH ALL ACCESSORIES SPARE PARTS 10 ITEM To replace existing equipment

08-9-01-01-0025WIRELESS TELEPHONE IN VHF (160-11755 MHZ) & VHF (400-480MHZ) BANDS COMPLETE WITH ONE BASE STATION WITH ALL ACCESSORIES & SPARE PARTS FOR COMPANY LOCATIONS & DRILLING CAMPS

10 ITEM To replace existing equipment

REFRACTORY, INSULATING MATERIALS AT PROCESS PLANTS: Process plant repair requirements - ANTI ACID BRICKS 10 ITEM - STAINLESS STEEL ANCHORS 10 ITEM - JOINT FILLING CERAMIC ROBES CERAMIC BLANKETS 10 ITEM - FIRE PROOF SHIELD 10 ITEM - INSIDE PAINT FOR BOILERS 10 ITEM - SUPER PLASTIC CALCIUM SILICATE 10 ITEM

08-9-01-01-0026

PAGE: 3 9RFN

Page 4: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-01-0027DIESEL FIRE FIGHTING PUMP, SKID MOUNTED. CAPACITY: 180 M³ / HR DISCHARGE PRESSURE: 12 BAR AT DEGASSING STATIONS IN KIRKUK & AIN ZALAH, COMPLETE WITH SPARE PARTS.

10 SET Fire fighting equipment for degassing station

08-9-01-01-0028 TRI-EYTHYLEN GLYCOL AT GAS COMPRESSOR STATIONS. 300 TON Dewatering consumable

08-9-01-01-0029 DEMULSIFIER FOR WET CRUDE TREATMENT 3000 DRUM Dewatering consumablePUMPS FOR PRODUCTION FACILITIES WITH RECOMMENDED SPARE PARTS: Replacements for non-repairable units

- SUBMERSIBLE ELECTRICAL PUMP AT UNDERGROUND 10 SET STORAGE. - PORTABLE ELECTRIC PUMP FOR CHEMICAL & LUBE OIL 20 SET MAKEUP FOR GAS COMPRESSOR & CRUDE PUMPING STATIONS - CONDENSATE TRANSFER PUMP, HIGH PRESSURE FOR GAS 2 SET COMPRESSOR STATIONS. - CONDENSATE TRANSFER PUMP LOW PRESSURE FOR GAS 2 SET COMPRESSOR STATIONS. - GLYCOL RECYCLING RECIPROCATING PUMP FOR GAS 4 SET COMPRESSOR STATIONS. - PUMP FOR DEMULSIFIER INJECTION FOR DESALTER UNIT FOR 4 SET WET CRUDE PLANTS. - WATER RECYCLING PUMP FOR DESALTER UNIT FOR WET 3 SET CRUDE PLANTS. - PUMP FOR EFFLUENT WATER INJECTION IN WET CRUDE 2 SET PLANTS.

08-9-01-01-0030

PAGE: 4 9RFN

Page 5: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-01-0031

-SUBMERSIBLE ELECTRICAL PUMPS FOR SALT SATURATED BRINE AT UNDERGROUND STORAGE PLANT WITH SPARES

- CAUSTIC SODA

2

100

SET

TON

GATE VALVES FOR GENERAL USE IN ALL AREAS: General replacements - ½ ” CLASS 800. 300 NOS. - ¾ ” CLASS 800. 100 NOS. - ½ ” CLASS 1500. 50 NOS. - ¾ ” CLASS 1500. 50 NOS.

08-9-01-01-0033 SPARES FOR CAMERON CHOCK VALVES & CAMERON SAFETY VALVES FOR WELLS IN ALL AREAS. 50 ITEM General replacements

EQUIPMENT FOR WATER INJECTION PLANT AT ZAB COMPLETE WITH SPARE PARTS INCLUDING: Water injection improvement

- SLUDGE PUMPS. 2 SET - ELEC. MOTOR & GEARBOX FOR MUD SCRAPPER. 2 SET - ELEC. MOTOR FOR FLOCEULATOR. 5 SET - MIXERS. 8 SET - AUTO SLUDGE CONTROL SYSTEM. 8 SET

08-9-01-01-0032

08-9-01-01-0034

PAGE: 5 9RFN

Page 6: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : K1 - K3 & ZAB PROJECT 01-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-01-0035 FLEXFLO GROVE RELIEF VALVES FOR PUMPING STATIONS. WITH

RECOMMENDED SPARE PARTS 2 SET Valves for pumping stations at K1, IT-1, K3

VARIOUS PUMPS FOR K1/K3 PUMPING STATION & AIN ZALAH WITH SPARE PARTS: Pumps for K1/K3 & Ain Zalah

- SUBMERSIBLE SEWAGE PUMP. 2 SET - HIGH LIFT WATER PUMP WITH ELECTRIC MOTOR , 2 SET CAPACITY 520, GPM HEAD 800 FT. - LOW LIFT WATER PUMP WITH ELECTRIC MOTOR , 2 SET HORIZONTAL CAPACITY 385 GPM, HEAD 117 FTSPARE PARTS FOR PUMPS AT WATER PUMPING STATIONS INCLUDING THE FOLLOWINGS PUMPS: Pumps and spares for ZAB facility

- HIGH LIFT WATER PUMP(IMPELLER, NECK RING, WEAR RING) 40 NOS. - TRANSFER WATER PUMP (IMPELLER, SHAFT WITH KEYS, 10 NOS. LOCKNUT & RING , RING LOCKING). - LOW LIFT VERTICAL PUMP SIZE 4”x6”(STUFFING BOX GLAND, 20 NOS. SPINDLE, STUFFING BOX BUSH , SLEEVE DISTANCE, BOTTOM HALF CASING, TOP HALF CASING). - LOW LIFT WATER PUMP SIZE 5”x6”(BUSHES RUBBER , 50 NOS. SLEEVE D.E., SLEEVE F.B., IMPELLER , CASING NECK , RING , SHAFT SLEEVE).

08-9-01-01-0037

08-9-01-01-0036

PAGE: 6 9RFN

Page 7: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : K-3, ITP & OTHER AREAS PROJECT 01-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-01-0038 SPARE PARTS FOR VARIOUS PUMPS & AIR COMPRESSOR AT K3 50 ITEM Spares for K3

SPARE PARTS FOR PUMPS AT K3: Spares for K3 - SUMP PUMP RING PACKING (PISTON) 30 NOS. - FIRE FIGHTING JOCKEY PUMP COUPLING COMPLETE 10 NOS. - FIRE FIGHTING WATER PUMP (LOWER HALF CASING, UPPER 50 NOS. HALF CASING, IMPELLER, STUFFING BOX BUSH, SHAFT, IMPELLER RING SHAFT SLEEVE, RUBBER COUPLING BUSH).

08-9-01-01-0040 SPARE PARTS FOR STEAM BOILER: TUBES, SAFETY VALVES, FEED PUMPS & BLOW DOWN VALVES AT K-3. 50 ITEM Spares for K3

08-9-01-01-0041 SPARE PARTS FOR FIRE FIGHTING PUMPS & EMERGENCY GENERATORS AT IRAQ–TURKEY PIPELINE STATIONS. 50 ITEM Spares for ITP locations

08-9-01-01-0042 SUPPLY OF ELECTRICAL MATERIALS & EQUIPMENT FOR GENERAL MAINTENANCE 100 ITEM General maintenance requirements

08-9-01-01-0039

PAGE: 7 9RFN

Page 8: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 8 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : IT1 / SUFIAH / EAST BAGHDAD PROJECT 01-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-01-0043 U-CAP FOR MECHANICAL SEAL, FLANGE GASKET, SLEEVE GASKET,

STATIONARY FACE FOR SPARE PARTS, TO ITP MAIN PUMPS 100 NOS. Spares for ITP pumps

08-9-01-01-0044 GEAR BOXES FOR MAIN PUMPS VALVES IT/1 STATION TYPE PG ELECTROTECHNIC. 10 NOS. Spares for ITP pumps

08-9-01-01-0045 LOADING RUBBER HOSES 2 ½ INCH FOR FILLING STATIONS. 300 NOS. Filling station requirements

08-9-01-01-0046 TRANSFORMER 100 KVA FOR DESALTER UNIT WITH ALL ACCESSORIES, SFAYA OIL FIELD 1 ITEM Equipment for desalter unit

08-9-01-01-0047 SPARE PARTS FOR MAINTENANCE OF EAST BAGHDAD GAS COMPRESSOR 200 SET Compressor spares

LOCATION : ALL AREAS PROJECT 01-01 : MAINTENANCE & OPERATION

WORK OVER OF (50) WELLS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-01-0048 X-MAS TREES & TUBING SPOOLS WITH ALL ACCESSORIES & SPARES (

VARIOUS ) 50 ASS. Requirements to workover 50 wells

08-9-01-01-0049 TUBING ( VARIOUS SIZES, GRADES & WEIGHTS ) & SPARES. 150000 MTR.

08-9-01-01-0050 LINER HANGERS WITH SETTING TOOLS, ACCESSORIES 90 SET

08-9-01-01-0051 SINGLE PACKERS WITH SUB-SURFACE VALVE & ACCESSORIES. 80 SET

08-9-01-01-0052 SUB-SURFACE VALVE & ACCESSORIES. 50 SET

PAGE: 8 9RFN

Page 9: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 9 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-02-0070 ELECTRICAL SPARE PARTS FOR GAS COMPRESSOR STATIONS &

DEGASSING STATIONS 50 ITEM Electrical spares

08-9-01-02-0071 ELECTRICAL DRIVEN MOBILE AIR COMPRESSORS WITH SPARES AT NOC'S POWER STATION. 2 ITEM Replacement compressors

08-9-01-02-0072 DIESEL DRIVEN AC GENERATORS WITH SPARES FOR T1 & K3. 2 ITEM Generators & spares for IT-1, K3

CUSTODY TRANSFER METERS & PROVERS FOR CRUDE OIL INCLUDING : Metering systems for crude oil movement

P.D METER, TURBINE METERS, MOBILE BI-DIRECTIONAL PROVER, MOBILE MASTER METER PROVER

08-9-01-02-0073 20 ITEM

PAGE: 9 9RFN

Page 10: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 10 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS / DRILLING PROJECT 01-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATION

CODE ITEM DESCRIPTION QTY UNIT COMMENTSOLAR GAS COMPRESSORS AT NOC'S COMPRESSOR STATIONS: Service contract for gas turbines - SPARE PARTS 40 ITEM - SERVICE CONTRACTS FOR THE REPAIR OF GAS 2 CONTRACT

COMPRESSORS ROTORS -5 NOS- ( ABROAD)SULZER GAS TURBINE TYPE S-7 AT K-1 PUMPING STATION: Service contract for gas turbines - SERVICE CONTRACTS FOR THE REPAIR OF GGT ROTOR 1 CONTRACT

(ABROAD) - SPARE PARTS 40 ITEMHITACHI GAS TURBINE FRAME 3 TYPE M 3142 AT BAI-HASSAN GAS COMPRESSOR STATIONS: Service contract for gas turbines

- SPARE PARTS 40 ITEM - SERVICE CONTRACT FOR THE REPAIR OF L.P ROTOR 1 CONTRACT

(ABROAD) - SERVICE CONTRACT FOR THE REPAIR OF COMPLETE 1 CONTRACT

EXHAUST FRAME ASSEMBLY (ABROAD)

08-9-01-02-0074

08-9-01-02-0075

08-9-01-02-0076

PAGE: 10 9RFN

Page 11: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 11 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS / DRILLING PROJECT 01-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-02-0077SERVICE CONTRACTS FOR THE REPAIR OF COMPLETE CHARGING TURBINE SET FOR G.E.C GAS TURBINE TYPE EM 85 S/N GT 254 AT WATER INJECTION PLANT ( ABROAD)

1 CONTRACT Service contract for turbine repair

REHABILITATION , MAINTENANCE AS WELL AS THE 30 ITEM Service contract for turbine repairPROVISION OF SPARES PARTS FOR 10 MW STALL LAVAL GAS TURBINE AT BABA & ZAB AREAS.

2 CONTRACT

08-9-01-02-0079 REHABILITATION OF EMERGENCY COLD STRIPPING UNITES AT SHURAU , SARALU & HANJIRA 100 ITEM Repair and maintenance

08-9-01-02-0080 COMPLETION OF THE REHABILITATION OF THE OLD STEAM POWER GENERATION PLANT 50 ITEM Completion of work from Phase 8

08-9-01-02-0078

PAGE: 11 9RFN

Page 12: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 12 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-02 : REHABILITATION OF CATHODIC

PROTECTION SYSTEM & FACILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT - SURVEY, KNOW-HOW, TECHNICAL ASSISTANCE ENGINEERING CONSULTANCY Contracts to allow cathodic protection - SUPPLY OF MATERIALS / EQUIPMENT TO REHABILITATION of pipelines and vessels & UPGRADE throughout NOC area CATHODIC PROTECTION SYSTEMS & FACILITIES TO ENSURE PROPER OPERATION TO SAFE GUARD PIPE LINES (ITP & OTHERS) & VESSELS INCLUDING THE SUPPLY OF MATERIALS FOR LOCAL MANUFACTURE OF BOARDS & ANODES … - POWER SUPPLY SYSTEMS FOR THE OPERATION OF THE CATHODIC PROTECTION INCLUDING INDEPENDENT POWER SYSTEM FOR REMOTE LOCATIONS ( SOLAR , THERMO-ELECTRIC , DIESEL…) - ACCESSORIES AND SPARE PARTS FOR THE ABOVE - 2 No 5 TONS DIESEL DRIVEN TRUCKS WITH SPARES 5 PCS

CONTRACT08-9-01-02-0081 6

PAGE: 12 9RFN

Page 13: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 13 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS / DRILLING OF (75) WELLS PROJECT 01-03 : SUSTAINING AND ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-03-0088 CEMENT TRANSPORT SILOES WITH TRACTIVE UNITS EQUIPPED WITH AIR COMPRESSORS AND ALL NECESSARY ACCESSORIES & SPARE PARTS 2 SET Equipment to drill 75 new wells

08-9-01-03-0089 SPARE PARTS FOR CEMENTING UNITS, TYRES & DST TOOLS. 50 ITEM

08-9-01-03-0090 AIR COMPRESSORS FOR CEMENTING WITH SPARE PARTS. 10 SET

08-9-01-03-0091 CEMENTING UNITS TRUCK MOUNTED COMPLETE WITH ACCESSORIES & SPARE PARTS. 2 SET

08-9-01-03-0092 TRUCKS FOR CEMENTING AND WELL SERVICES EQUIPPED WITH AIR COMPRESSOR & CRANE WITH RECOMMENDED SPARE PARTS. 2 SET

08-9-01-03-0093 DRILLING SIMULATOR. 1 SET

08-9-01-03-0094 SPARE PARTS FOR OIL WELL TESTING EQUIPMENT. 50 ITEM

08-9-01-03-0095 WELL LOGGING SERVICES CONTRACT. 2 CONTRACT

08-9-01-03-0096 WELL HEADS & X-MAS TREES WITH ACCESSORIES & SPARE PARTS (VARIOUS). 75 SET

PAGE: 13 9RFN

Page 14: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 14 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-03 : SUSTAINING AND ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-03-0097 CASING AND TUBING (VARIOUS SIZES, GRADES AND WEIGHTS). 450000 MTR. Requirements for 75 wells

1730 NOS.230 SET

08-9-01-03-0099 CASING ACCESSORIES ( VARIOUS ). 15000 NOS.

08-9-01-03-0100 LINER HANGERS WITH SETTING TOOLS, ACCESSORIES & SPARES 30 SETMUD MATERIALS:BARYTES, CMC (LV, HV), SODA ASH, CAUSTIC SODA, PRIMARY AND SECONDARY EMULSIFIER LIME, STARCH...

08-9-01-03-0102 SINGLE PACKERS WITH SUB-SURFACE VALVE & ACCESSORIES. 70 SET

08-9-01-03-0103 DUAL PACKERS WITH SUB-SURFACE VALVE & ACCESSORIES 4 SET

08-9-01-03-0104TECHNICAL SERVICE / ASSISTANCE CONTRACT TO STUDY, APPRAISE, EVALUATE & IDENTIFY REMEDIES FOR THE PROBLEMS ENCOUNTERED IN PRODUCING WELLS IN ALL FIELDS

5 CONTRACT TSC for producution improvement

08-9-01-03-0105 CONTINUATION OF THE REHABILITATION OF LPG UNDER GROUND STORAGE 100 ITEM Repair of LPG storage facilities

08-9-01-03-0098

TON08-9-01-03-0101 25000

ROCK BITS & NOZZLES ( VARIOUS SIZES & TYPES ).

PAGE: 14 9RFN

Page 15: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 15 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-03 : SUSTAINING AND ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-03-0106STUDY & BASIC DESIGN FOR A SUPERVISORY CONTROL & DATA ACQUISITION "SCADA" AS PART OF A NATIONAL OIL & GAS SCADA SYSTEM

2 CONTRACT SCADA study and design

08-9-01-03-0107

COMPLETE DEHYDRATION UNIT CONTRACT, HEATER, GLYCOL REGENERATION UNIT CAPACITY 100 MMSCFD OPERATION PRESSURE 800 PSIG REQUIRED GAS DEW POINT 15 °F AT 800 PSIG WITH RECOMMENDED SPARE PARTS SHOULD PROVIDED WITH CORROSION INHIBITORS,… AT JAMBUR SOUTH STATION.

5 CONTRACT Replacement for existing plant

PAGE: 15 9RFN

Page 16: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 16 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-04 : SAFETY AND ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-04-0117 RAPID INTERVENTION F.F. TRUCK WITH SPARE PARTS 4 SET Fire fighting requirement

HOSES & MAINTENANCE EQUIPMENT INCLUDING : Fire fighting requirement - DELIVERY HOSE (30MT LENGTH SIZE 2 ¾ & 30 MT LENGTH 500 NOS. SIZE 1 ¾) - HOSE REPAIRING SET WITH SPARE PARTS. 5 SET - electric hose bending machines WITH SPAREStri ethylene glycol at gas compression stations

5300

NOSton

08-9-01-04-0119 WATER FIRE FIGHTING TRUCK WITH FIX MONITOR WITH RECOMMENDED SPARE PARTS. 3 SET Fire fighting requirement

FIRE FIGHTING EQUIPMENT INCLUDING : Fire fighting requirement

- PORTABLE WATER PUMP WITH SPARES. 4 NOS.

- POWER CHAIN SAW, PETROL ENGINE DRIVEN WITH SPARES. 6 NOS.

- FLOW NOZZLE 1.5 100 NOS. - MULTIPURPOSE SAW WITH SPARES 4 NOS.MISCELLANEOUS FIRE FIGHTING EQUIPMENT INCLUDING : Fire fighting requirement - HYDRANT VALVE 2 ½ " 100 NOS. - RUBBER MEMBRANE FOR FOAM TANK : CAPACITY 3000 10 NOS. LITERS FOR IT1A , CAPACITY 5000 LITERS FOR K3. - PROXIMITY HEAT PROTECTION SUITS. 10 NOS.IMPROVEMENT OF WASTE & OIL DRAINAGE 20 ITEM Waste & Spillage collectionIN BIA AREA NEAR PROCESS PLANT & OIL VALLEY 2 CONTRACT

08-9-01-04-0123 CONSUMABLES FOR PERSONAL SAFETY WEAR GOGGLES, BOOTS , HELMETS GLOVES... 1000 NOS. Fire equipment

08-9-01-04-0122

08-9-01-04-0118

08-9-01-04-0120

08-9-01-04-0121

PAGE: 16 9RFN

Page 17: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 17 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : BABA & PROCESS PLANT PROJECT 01-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENTSPARE PARTS FOR HEATING / COOLING EQUIPMENT AT THE NEW PROCESS PLANT AND BABA INDUSTRIAL AREAS INCLUDING :

Equipment and transport requirements for process plants and Baba area

- ELECTRIC HEATER 10 ITEM - MOTORIZED CONTROL VALVE 10 ITEM - HEATING / COOLING THERMOSTATS 4 ITEM

- SPARES FOR CHILLER 155 TON 80 ITEM - SPARES FOR CHILLER 370 TON 90 ITEM

08-9-01-05-0132 CHILLED WATER COOLING COILS FOR NEW PROCESS PLANT 30 NOS.

08-9-01-05-0133 WATER PUMP USED IN COOLING & HEATING SYSTEM COMPLETE WITH SPARE PARTS. 50 SET

- LATHE MACHINE FOR WORKSHOPS (ONE TON LOAD) 4 NOS. - HACK SAW MACHINE FOR WORKSHOPS 2 NOS.

- REVOLVING LATHE CENTER FOR WORKSHOPS 15 NOS.

- MACHINE VICES FOR WORKSHOPS 15 NOS.

08-9-01-05-0136 BUS 41 SEATERS, 4x2, WITH RECOMMENDED SPARE PARTS. 10 SET

08-9-01-05-0137 BUS 25 SEATERS, 4x2, WITH RECOMMENDED SPARE PARTS. 20 SET

08-9-01-05-0130

08-9-01-05-0131

08-9-01-05-0134

08-9-01-05-0135

PAGE: 17 9RFN

Page 18: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 18 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-05-0138 PICK-UP DOUBLE CABIN, 4x2 WITH RECOMMENDED SPARE PARTS 125 SET Spares & transport related equipment

08-9-01-05-0139 LORRY 10 TONS WITH CRANE,4x2, WITH RECOMMENDED SPARE PARTS 10 SET

08-9-01-05-0140 REFRIGERATED TRUCK, 4x2, WITH RECOMMENDED SPARE PARTS 2 SET

08-9-01-05-0141 TIP TRUCK, 6x4, WITH RECOMMENDED SPARE PARTS. 5 SET

08-9-01-05-0142 HYDRAULIC WHEEL LOADER WITH RECOMMENDED SPARE PARTS 5 SET

08-9-01-05-0143 FORKLIFT (3) TONS, WITH SPECIAL CLAMP FOR LIFTING BARRELS, WITH RECOMMENDED SPARE PARTS. 5 SET

08-9-01-05-0144 HYDRAULIC CRANE (20) TONS CAPACITY, WITH RECOMMENDED SPARE PARTS. 5 SET

08-9-01-05-0145 LIGHTING SET, DIESEL ENGINE WITH RECOMMENDED SPARE PARTS. 10 SET

08-9-01-05-0146 SPARE PARTS FOR HYDRAULIC WHEEL LOADER TYP ZL 60D. 65 ITEM

08-9-01-05-0147 SPARE PARTS FOR FORK LIFTS (HELI) TYPE. 60 ITEM

08-9-01-05-0148 SPARE PARTS FOR GRADER TYPE AZ-98B-1. 30 ITEM

08-9-01-05-0149 SPARE PARTS FOR BULLDOZERS 50 ITEM

08-9-01-05-0150 SPARE PARTS FOR SIDE BOOM KOMATSU. 5 ITEM

08-9-01-05-0151 SPARE PARTS FOR VAC-ALL, STERLING. 10 ITEM

08-9-01-05-0152 SPARE PARTS FOR CEMENT MIXER TYPE KAMAZ 53229. 45 ITEM

PAGE: 18 9RFN

Page 19: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 19 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-05-0153 SPARE PARTS FOR PICK-UP DOUBLE CABIN 70 ITEM Requirements for service equipment

08-9-01-05-0154 SPARE PARTS FOR BUS (11) SEATER 30 ITEM and vehicles

08-9-01-05-0155 LADDERS 60 NOS.

08-9-01-05-0156 PETROL FILLING PUMP WITH RECOMMENDED SPARE PARTS. 5 SET

08-9-01-05-0157 GAS OIL FILLING PUMP. 5 NOS.

08-9-01-05-0158 HAND PUMPS FOR SERVICING VEHICLES 6 NOS.

08-9-01-05-0159 SLING WIRES VARIOUS SIZES. 60 NOS.

08-9-01-05-0160 ELECTRONIC SCALES. 8 NOS.

08-9-01-05-0161 TYRES & TUBES, VARIOUS SIZES 4000 NOS.

08-9-01-05-0162 MOBILE WELDING MACHINE 6 NOS.

08-9-01-05-0163 LOADING TRUCK WITH 5 TON CRANE WITH RECOMMENDED SPARE PARTS. 1 SET

08-9-01-05-0164 CRANE (35 TONS) WITH SPARE PARTS. 2 SET

08-9-01-05-0165 LOW LOADER 50 TONS WITH SPARE PARTS. 3 SET

08-9-01-05-0166 GRADER WITH RECOMMENDED SPARE PARTS. 2 SET

08-9-01-05-0167 TIP TRUCK WITH RECOMMENDED SPARE PARTS. 3 SET

08-9-01-05-0168 LOADING TRUCK 10 TON (LORRY) WITH RECOMMENDED SPARE PARTS. 2 SET

PAGE: 19 9RFN

Page 20: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 20 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-05-0169 MOBILE STEAM BOILER FOR MOTOR CLEANING FOR CRUDE PUMPING

STATIONS WITH SPARE PARTS. 4 NOS. Steam boiler

08-9-01-05-0170 STEAM BOILER, TRAILER MOUNTED 3 TON/HOUR PRESSURE 150 PSI TEMP. 100 –120 °C WITH RECOMMENDED SPARE PARTS AT AIN ZALAH. 1 ITEM Mobile steam generator for Ain Zalah

08-9-01-05-0171 MATERIALS & EQUIPMENT FOR MOTORS REWINDING AT NOC'S ELECTRICAL WORKSHOP. 40 ITEM Workshop requirements

08-9-01-05-0172 SPARES FOR LINCOLN & ESAB WELDING MACHINE AT NOC'S MECHANICAL & ELECTRICAL WORKSHOPS. 15 ITEM

08-9-01-05-0173 MOBILE WORKSHOP FOR OVER HEAD STREET LAMPS MAINTENANCE TRUCKS WITH SPARES 4 SET

PAGE: 20 9RFN

Page 21: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 21 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : ALL AREAS PROJECT 01-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-01-06-0190 LAB EQUIPMENT SPARE PARTS FOR OIL & WATER ANALYSIS. 50 ITEM Quality control laboratory equipment

- LAB EQUIPMENT AND SPARE PARTS FOR ENVIRONMENTAL 50 ITEM Geological laboratory requirements POLLUTION TESTS. - GEOLOGICAL LAB. EQUIPMENT 50 ITEM

08-9-01-06-0192CONTACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURES COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIERS WORKS ABROAD

5 CONTRACT PSI contracts

LOCATION : KIRKUK FIELD PROJECT 01-07 : KHURMALAH DOME DEVELOPMENT PROJECT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-07-0200DEVELOPMENT OF KHURMALA DOME (PHASE 2) INCLUDING DESIGN / PROCUREMENT OF MATERIALS / COMMISSIONING / TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY.

6 CONTRACTSurface equipment to increase production

by 35,000 bpd at 33/34 API

08-9-01-06-0191

PAGE: 21 9RFN

Page 22: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 22 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : HAMRIN FIELD PROJECT 01-08 : HAMRIN FIELD DEVELOPMENT PROJECT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-08-0205DEVELOPMENT OF HAMRIN FIELD (PHASE 2) INCLUDING PURCHASING OF MATERIALS / TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY.

6 CONTRACTDevelopment of filed to give 15/20,000

bpd increase

LOCATION : ANFAL GAS FIELD PROJECT 01-09 : ANFAL GAS FIELD PROJECT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-09-0210DEVELOPMENT OF ANFAL GAS FIELD INCLUDING DESIGN / PROCUREMENT OF MATERIALS / COMMISSIONING / TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY.

6 CONTRACTEquipment for pressure reduction,

dehydration,and sweetening to give additional 200 MSCFD output

LOCATION : QUYARA FIELD PROJECT 01-10 : EXPANSION OF SURFACE INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-10-0215

KNOW-HOW, MATERIALS AND EQUIPMENT FOR THE REHABILITATION & UPGRADING OF FIELD SURFACE FACILITIES & INSTALLATIONS AT QAYARA FIELD TO INCREASE THE PROCESSING CAPACITY TO 35000 BARRELS / DAY TO FEED THE NEW NORTH POWER STATION INCLUDING TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY

6 CONTRACTField service installations to increase

output by c. 30,000 bpd

PAGE: 22 9RFN

Page 23: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 23 OF 23ESTABLISHMENT NAME : NORTH OIL COMPANY LOCATION : NAFT-KHANA PROJECT 01-11 : UTILIZATION OF NAFT-KHANA GAS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-11-0220

MATERIALS & EQUIPMENT FOR THE CONTINUATION OF THE UTILIZATION OF NAFT –KHANA GAS & ITS TRANSPORTATION TO HAMRIN ELECTRIC POWER STATION INCLUDING DESIGN / PURCHASING OF MATERIALS / COMMISSIONING / TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY.

6 CONTRACTContinuation of project at Naft-Khana gas

field

LOCATION : BABA DOME, AVANAH DOME AND BAI-HASSAN FIELD

PROJECT 01-12 : INSTALLATION OF THREE PHASE SEPARATORS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-01-12-0225

PROCUREMENT & INSTALLATION OF THREE PHASE SEPARATORS (PRODUCTION & TEST) & ASSOCIATED WATER TREATMENT PLANTS WITH WATER INJECTION EQUIPMENT IN BABA DOME, AVANAH DOME & BAI-HASSAN FIELD INCLUDING DESIGN / PURCHASING OF MATERIALS / COMMISSIONING / TECHNICAL ASSISTANCE / ENGINEERING / CONSULTANCY

6 CONTRACT3 phase separation system as crude

contains up to 90% water

PAGE: 23 9RFN

Page 24: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS PROJECT 02-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0230 SPARE PARTS MATERIALS FOR CATHODIC PROTECTION FOR ALL AREAS 150 ITEM Cathodic protection spares

08-9-02-01-0231 Demulsifiertransferred from 08-8-02-01-0298 20000 Lit Dehydration requirements

08-9-02-01-0232 TRI-ETHYLENE GLYCOL 750 TON Dehydration requirements

08-9-02-01-0233 WELL - HEAD SURFACE SAFETY VALVES 100 NOS. Safety valves

08-9-02-01-0234 VALVES 1700 ITEM Valves to connect surface lines

08-9-02-01-0235 PIPE FITTINGS 500 ITEM For surface line connection

08-9-02-01-0236 WATER FILTRATION MEDIA 250 M3 Anthracite for water treatment

08-9-02-01-0237 ALUMINUM SULPHATE 2000 TON Water treatment consumables

08-9-02-01-0238 ZINC SULPHATE 500 TON Water treatment consumablesSPARE PARTS FOR PUMPS (WATER TREATMENT) 45 NOS. Spares for water pumps

SPARE PARTS FOR GAS TURBINE transfer from 08-7-00-0290 798 Item NON OIP new item Comm 930620

08-9-02-01-0240 LINING MATERIALS FOR VESSELS AND TANKS, MOSTLY EPOXY RESINS 20 ITEM Resin linings for water vessels and lines

08-9-02-01-0239

PAGE: 24 9RFN

Page 25: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

COMPLETION AND WORK OVER OPERATION FOR (100) WELLS

PROJECT 02-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0241 SPARE PARTS FOR DOWN HOLE & ELECTRICAL SURFACE EQUIPMENT

FOR ELECTRICAL SUBMERSIBLE PUMP 100 ITEM Spares and equipment for workover of 100 wells

08-9-02-01-0242 SPARE PARTS FOR CEMENTING EQUIPMENT AND DRILLING FLUIDS STORAGE EQUIPMENT 100 ITEM

08-9-02-01-0243 WIRE LINE TRUCK WITH CRANE AND ACCESSORIES 100 ITEM

08-9-02-01-0244 COILED TUBING & NITROGEN UNIT WITH ACCESSORIES AND SPARE PARTS 1 SET

PAGE: 25 9RFN

Page 26: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : MESSAN FIELDS

DEGASSING STATION, OIL STORAGE DEPOTS, TANK FARMS & PUMPING STATION & WORK OVER OF WELLS

PROJECT 02-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0245 LINER HANGER AND ACCESSORIES 25 ITEM Spares and equipment

08-9-02-01-0246 VALVES FITTINGS & ACCESSORIES 500 ITEM for 25 well workovers

08-9-02-01-0247 CHEMICALS FOR OIL AND WATER TREATMENT 3000 BBL in Messan field region

08-9-02-01-0248 PUMPS FOR CHEMICAL INJECTION 50 ITEM

08-9-02-01-0249 SPARES FOR CRUDE OIL HEATERS 150 ITEMELECTRICAL CRUDE OIL PUMPS WITH SPARES AND ACCESSORIES 150 ITEMInstruments and other devices for degassing stationstransferred from 08-8-02-01-0311 29 Nos

08-9-02-01-0251 WELL HEAD FITTING AND ACCESSORIES 100 ITEM

08-9-02-01-0252 LATTICE TOWERS 33 kv WITH ALL ACCESSORIES - (INSULATORS CONDUCTORS, BOLTS) AND TRANSFORMERS 1500 ITEM

08-9-02-01-0253 SKID MOUNTED ELECTRIC STATION 132/33 kv CAPACITY : 15 MW 100 ITEM

08-9-02-01-0254 EMERGENCY GENERATORS WITH SPARES AND ACCESSORIES (10) GENERATORS 300 ITEM

08-9-02-01-0250

PAGE: 26 9RFN

Page 27: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : OIL STORAGE DEPOTS , TANKS FARM & PUMP

STATION PROJECT 02-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0255 TOOLS & EQUIPMENT FOR MAINTENANCE OF FIELD DEVICES 50 ITEM Requirements for Tuba tank farm

08-9-02-01-0256 CENTRAL CONTROL SYSTEM FOR TUBA DEPOT 50 ITEM

08-9-02-01-0257 SPARES FOR EXISTING (DSC) CONTROL SYSTEMS 80 ITEM

LOCATION : NORTH & SOUTH RUMAILA ,GARMA WATER INJECTION SYSTEM

PROJECT 02-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0258 UNITS & SPARES FOR GARMA LEVEL MEASURING SYSTEM 50 ITEM Requirements for Garma W.I. System

08-9-02-01-0259 FLOW METERS & ASSOCIATED INSTRUMENTS & MONITORS FOR GARMA 50 ITEM

08-9-02-01-0260 UNITS & SPARES FOR CONTROL ROOM & FIELD INSTRUMENTS 50 ITEM

PAGE: 27 9RFN

Page 28: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : NORTH & SOUTH RUMAILA

MAINTENANCE & REFURBISHMENT OF DEGASSING STATIONS

PROJECT 02-01 : MAINTENANCE AND OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0261 CENTRAL CONTROL SYSTEMS FOR RUMAILA CENTRAL STATION 50 ITEM Requirements for degassing stations

08-9-02-01-0262 FIELD INSTRUMENT FOR DEGASSING STATION WITH SPARES 150 ITEM

08-9-02-01-0263 CONTROL VALVES WITH SPARES FOR DEGASSING STATION 50 ITEM

LOCATION : NORTH & SOUTH RUMAILA MAINTENANCE & REFURBISHMENT OF GAS COMPRESSION STATIONS

PROJECT 02-01 : MAINTENANCE AND OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0264 UNITS & SPARES FOR GAS BOOSTER & BLOWERS 50 ITEM Requirements for gas compressor stations

08-9-02-01-0265UNITS & SPARES FOR GLYCOL REGENERATION SYSTEMS glycol cooler, transferred from 08-8-02-01-0282 & 0281gas cooler, transferred from 08-8-02-01-0282 & 0281

2054

ITEMsetset

08-9-02-01-0266 SPARES FOR PNEUMATIC ACTUATOR USED WITH EMERGENCY SHUT DOWN VALVES 50 ITEM

FIELD INSTRUMENTS FOR GE GAS COMPRESSOR TURBINE 50 ITEMSpare parts for medium and low voltage switch gear, MCC panel with all accessories transferred from 08-7-00-0383 32 Item OIP approval new item Comm

930619

08-9-02-01-0268 UNITS & SPARES FOR CONTROL ROOM EQUIPMENT 100 ITEM

08-9-02-01-0267

PAGE: 28 9RFN

Page 29: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ZUBAIR MAINTENANCE OF PRODUCTION / DEGASSING /

WATER INJECTION STATIONS PROJECT 02-01 : MAINTENANCE AND OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0269 UNITS & SPARES FOR CONTROL ROOM RECORDING AND ALARM SYSTEM 150 ITEM Control room equipment and spares

08-9-02-01-0270 CONTROL VALVES WITH SPARES FOR DEGASSING STATIONS 1605 NOS Control system spares

08-9-02-01-0271 UNITS & SPARES FOR PNEUMATIC FIELD INSTRUMENTS 80 ITEM Control system spares

08-9-02-01-0272 CONTROL & MONITORING INSTRUMENTS FOR CLUSTER MANIFOLDS 50 ITEM Injection manifold control systems

LOCATION : NORTH & SOUTH RUMAILA DEGASSING AND COMPRESSION STATIONS

PROJECT 02-01 : MAINTENANCE AND OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0273 SPARE PARTS FOR ELECTRICAL VALVE OPERATING SYSTEM 30 ITEM Maintenance requirements

08-9-02-01-0274 ELECTRIC MOTOR & SPARE PARTS 84 ITEM SPARE PARTS FOR BATTERY CHARGER & U.P.S. 200 ITEMBATTERY CHARGER ACCESSORIEStransferred from 08-7-00-0385 11 NOS OIP approval new item Comm

930647

08-9-02-01-0276 SPARE PARTS FOR DESALTER/DEHYDRATOR UNIT 50 ITEM

08-9-02-01-0275

PAGE: 29 9RFN

Page 30: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : AL-BAKER TERMINAL / BASRAH PROJECT 02-01 : MAINTENANCE AND OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0277 DIESEL GENERATOR ,SPARE PARTS AND ACCESSORIES 100 ITEM Mina al-Bakr maintenance requirements

08-9-02-01-0278 SPARE PARTS FOR MEDIUM VOLTAGE MOTORS 100 ITEM

08-9-02-01-0279 SPARE PARTS FOR LOW VOLTAGE PANEL AND CIRCUIT BREAKER 200 ITEM

PROTECTION AND CONTROL EQUIPMENT FOR DIESEL GENERATORS 50 ITEM

AIRCONDITIONING AND SPARES FOR AL BAKER TERMINAL. Transferred from 08-8-02-01-0343 9 ITEM

08-9-02-01-0281 SPARES FOR P.D. METERS 50 ITEM

08-9-02-01-0282 SPARE PARTS FOR CATERPILLAR DIESEL ENGINE TYPE 3516 25 ITEM

08-9-02-01-0283 SPARE PARTS FOR CATERPILLAR DIESEL ENGINE TYPE 3412 35 ITEM

08-9-02-01-0284 SPARE PARTS OF DIESEL ENGINE 645/16 G.M. & GENERATOR ( 350 ) 140 ITEM

08-9-02-01-0280

PAGE: 30 9RFN

Page 31: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 8 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : OIL STORAGE DEPOTS, TANK FARMS, PUMP

STATIONS, AL-BAKER TERMINAL PROJECT 02-01 : MAINTENANCE AND OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0285 EXPLOSION PROOF LIGHTING FIXTURES WITH ELECTRIC LAMPS &

ACCESSORIES 50 ITEM SOC oil transportation maintenance

08-9-02-01-0286 MEDIUM VOLTAGE SWITCH GEAR , SPARE PARTS AND ACCESSORIES 100 ITEM

08-9-02-01-0287 EXPLOSION PROOF MATERIALS GLANDS , SWITCHES, AMMETERS, JUNCTION BOXES, AND ACCESSORIES 100 ITEM

LOCATION : WEST QURNA / DG7 & DG8 PROJECT 02-01 : MAINTENANCE AND OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENTMEDIUM VOLTAGE & LOW VOLTAGE CABLES WITH CABLE JOINT 100 ITEM Maintenance requirementsACCESSORIES FOR POWER TRANSMISSION LINE 100 ITEM08-9-02-01-0288

PAGE: 31 9RFN

Page 32: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 9 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ZUBAIR , NORTH & SOUTH RUMAILA PROJECT 02-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0289 SPARE PARTS FOR MECH. SEALS 120 ITEM Maintenance requirements

08-9-02-01-0290 SKID MOUNTED ELECTRIC MOTOR DRIVEN HORIZONTAL DRAINAGE PUMP 2 NOS.

08-9-02-01-0291 COMPLETE ASSY. VERTICAL WASTE PUMP WITH ELECTRIC MOTOR AND SPARE PARTS 5 NOS.

08-9-02-01-0292 SPARE PARTS FOR B&W AIR COMP. TYPE V - 200 DA 120 ITEM

08-9-02-01-0293 SPARE PARTS FOR DEMULSIFIRE INJECTION PUMPS 100 ITEM

08-9-02-01-0294 SPARE PARTS FOR WASTE PUMP TYPE RE 32 / 125 25 ITEM

08-9-02-01-0295 SPARE PARTS FOR MAIN CRUDE OIL PUMP TYPE MATHER & PLATT . IVA. PLUROVANE 30 ITEM

08-9-02-01-0296 COMPLETE ASSY VERTICAL WASTE PUMP WITH ELECTRIC MOTOR & SUMP TANK 2 NOS.

08-9-02-01-0297 COMPLETE DEMULSIFIRE INJECTION PUMP WITH ELECTRIC MOTOR AND ACCESSORIES . 100 NOS.

08-9-02-01-0298 SPARE PARTS FOR CUMMINS DIESEL ENGINE 20 ITEM

08-9-02-01-0299 WORK SHOP EQUIPMENT AND TOOLS FOR MAINTENANCE AND INSPECTION 20 ITEM

08-9-02-01-0300 FRESH WAER PUMP WITH ELECTRIC MOTOR SKID MOUNTED, COMPLETE ASSY. 12 NOS.

PAGE: 32 9RFN

Page 33: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 10 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ZUBAIR , NORTH & SOUTH RUMAILA PROJECT 02-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0301 SALTY WATER PUMP WITH ELECTRIC MOTOR SKID MOUNTED,

COMPLETE ASSY. 12 NOS. Equipment requirements

08-9-02-01-0302 SPARE PARTS FOR RUSTON GAS TURBINES 50 ITEM

08-9-02-01-0303 DRAIN OIL PUMPS WITH ELECTRIC MOTORS 4 NOS.

08-9-02-01-0304 SKID MOUNTED FIRE FIGHTING PUMPS DIESEL AND ELECTRIC DRIVEN 6 ITEM

08-9-02-01-0305 COMPLETE ASSY. VERTICAL BOOSTER PUMP WITH ELECTRIC MOTOR 1 NO.

PAGE: 33 9RFN

Page 34: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 11 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : NORTH & SOUTH RUMAILA

GAS COMPRESSION STATION PROJECT 02-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0306 SPARE PARTS FOR AIR COMPRESSOR BVTN/1 25 ITEM Maintenance requirements

08-9-02-01-0307 SPARE PARTS FOR GLYCOL REGENERATORS 20 ITEM

08-9-02-01-0308 SPARE PARTS FOR SOLAR GAS TURBINES 30 ITEM

TRANSFERRED FROM 08-8-02-01-0319: OVERHAUL OF TURBINES 2 SET

08-9-02-01-0309 SPARE PARTS FOR ELECTRIC OVER HEAD CRANESspare parts for distribution switchgear, transferred from 08-7-00-0416

403 ITEM

08-9-02-01-0310 SPARES FOR DIESEL ENGINE ISOTTA FRASCHINI TYPE ID 36 SS 6V 50 ITEMSPARE PARTS FOR IDROMECHANKA PUMP TYPE RBS 32 / 20 MYII / M40 X 3 M - TOPF / RBS 65 / 20 MYII / NOW A 32 / 20 URPUMP AND SPARE PARTS FOR INGERSOLL - DRESSER PUMPS SIZE - 25 WB - 125

08-9-02-01-0313 ASSEMBLY & DISMANTLING SPECIAL TOOLS FOR BCL 353 GAS COMP. 20 ITEM

08-9-02-01-0311 ITEM

08-9-02-01-0312 20 ITEM

50

PAGE: 34 9RFN

Page 35: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 12 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : OIL STORAGE DEPOTS , TANK FARMS & PUMP

STATIONS PROJECT 02-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTSPARE PARTS FOR GAS TURBINE TYPE GT/53 ( INGERSOLL - RAND ) 100 ITEM Requirements for tank farms & pump

stationsKingsbury thrust bearings and spare parts transferred from 08-8-02-01-0268 20 ITEM

08-9-02-01-0315 SPARE PARTS FOR MAIN PUMP TYPE ZMI440/08X2 ( RUHRPUMPEN ) 60 ITEM

08-9-02-01-0316 SPARE PARTS FOR BOOSTER PUMP TYPE VLT800/9/815X2 (RUHRPUMPEN) 50 ITEM

08-9-02-01-0317 SPARE PARTS FOR DIESEL ENGINE TYPE ID36SS12V (ISOTTAFRASCHINI ) 70 ITEM

08-9-02-01-0318 SPARE PARTS FOR DIESEL ENGINE TYPE SA6D140 ( KOMATSU ) 70 ITEM

08-9-02-01-0319 SPARE PARTS FOR DIESEL ENGINE TYPE 3412 ( CATERPILLAR ) 70 ITEM

08-9-02-01-0320 SPARE PARTS FOR AIR COMPRESSOR TYPE FTV15D (WORTHINGTON) 40 ITEM

08-9-02-01-0321 - GAS HEATER FOR HEATING GAS FUEL FOR GAS TURBINES 2 NOS.

- TRANSFERRED FROM 08-8-02-01-0356: GAS TURBINE OIL 120 DRUMS

08-9-02-01-0322 COMPLETE VERTICAL BOOSTER PUMP WITH ELECTRIC MOTOR TYPE VMT-242RN (MHI) 3 NOS.

08-9-02-01-0323 DRAINAGE OILY WATER PUMP TYPE RV125/315 (SPP) COMPLETE WITH ELECTRIC MOTOR 2 NOS.

08-9-02-01-0324 SPARE PARTS FOR SLOP TANK PUMP TYPE SKVN 65/3/200 15 ITEM

08-9-02-01-0325 SPARE PARTS FOR SLOP TANK PUMP TYPE 5WUJ-1 15 ITEM

08-9-02-01-0314

PAGE: 35 9RFN

Page 36: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 13 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : OIL STORAGE DEPOTS , TANK FARMS & PUMP

STATIONS PROJECT 02-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0326 SPARE PARTS FOR GEC GAS TURBINE TYPE EAS1 20 ITEM Spares & maintenance requirements

08-9-02-01-0327 SPARE PARTS FOR AIR COMPRESSOR TYPE 2030 COMPAIR 25 ITEM

08-9-02-01-0328 SPARE PARTS FOR SEA LINE JOCKEY PUMP TYPE 100 HP X 250 15 ITEM

08-9-02-01-0329 SPARE PARTS FOR DRAIN TANK PUMP TYPE ECP 40 - 125 15 ITEM

08-9-02-01-0330 SPARE PARTS FOR SLOP TANK PUMP TYPE ECPJ-80-160 15 ITEM

08-9-02-01-0331 SPARE PARTS FOR FIRE FIGHTING JOCKEY PUMP TYPE 50 HP X 315 15 ITEM

08-9-02-01-0332 SPARE PARTS FOR ROLLS - ROYCE DIESEL ENGINE TYPE 4LBK 60 ITEM

LOCATION : ZUBAIR , NORTH & SOUTH RUMAILA PROJECT 02-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTSERVICE CONTRACT FOR THE OVERHAUL OF SOLAR CENTAUR TWO SHAFT GAS TURBINE PRIME MOVER OF GAS COMPRESSOR. EACH SET CONSISTS OF :

Contracts for repair of turbines at gas compression plant & PS-2 on strategic line

1 - NO. H.P TURBINE ( GAS GENERATOR ) 1 - NO. L.P TURBINE ( POWER TURBINE )

08-9-02-01-0334 SERVICE CONTRACT FOR THE MAJOR OVERHAUL OF SOLAR CENTAUR GAS TURBINE, SINGLE SHAFT 1 CONTRACT

Contract for repair of turbine at N Rumailah

08-9-02-01-0335 SERVICE CONTRACT FOR THE OVERHAUL OF ROLLS - ROYCE AVON 1533 -75 GAS GENERATOR 1 CONTRACT Contract for repair of turbine at Zubair

CONTRACT08-9-02-01-0333 3

PAGE: 36 9RFN

Page 37: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 14 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : NORTH , SOUTH RUMAILA & GARMA

WATER TREATMENT & INJECTION SYSTEM PROJECT 02-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-01-0336 SPARE PARTS FOR WATER PUMP TYPE D 6300/27 10 ITEM Spares and equipment

08-9-02-01-0337 SPARE PARTS FOR WATER PUMP TYPE BBHI - 12T2 10 ITEM for repair and maintenance

08-9-02-01-0338 SPARE PARTS FOR WATER PUMP TYPE BBH12 MT 10 ITEM of water treatment and

08-9-02-01-0339 PUMP & SPARE PARTS FOR WATER PUMP TYPE FG 450/22.5 10 ITEM water injection systems

08-9-02-01-0340 PUMP & SPARE PARTS FOR WATER PUMP TYPE BKC 5/24 10 ITEM in SOC area

08-9-02-01-0341 SPARE PARTS FOR OVERHEAD CRANE TYPE TE1 40 ITEM

08-9-02-01-0342 SPARE PARTS FOR ROTARY WATER SCREEN TYPE 3000/8400 4 ITEM

08-9-02-01-0343 COMPLETE ELECTRIC DRIVEN WATER PUMP ASSY. WITH SPARES 2 SET

08-9-02-01-0344 SPARE PARTS FOR PUMP TYPE UH 3000/197 5 ITEM

08-9-02-01-0345 PUMP AND SPARE PARTS FOR PUMP TYPE H8/18E-2V-T 5 ITEM

08-9-02-01-0346 COMPLETE PUMP TYPE ND 2,5 - 2500/10 II 14MBT WITH SPARES 12 SET

08-9-02-01-0347 COMPLETE PUMP TYPE ( 2K - 20 / 30T2) WITH SPARES 4 SET

08-9-02-01-0348 COMPLETE PUMP TYPE ( D320-70 ) WITH SPARES 2 SET

08-9-02-01-0349TWIN BOOM TELESCOPIC CONTAINER LOADER ( CONVEYOR ) AND SPARE PARTSmaterials, pumps, tanks, vessels and associated electrical and control equipment, transferred from 08-7-00-0464

2

1000

SET

pcs

PAGE: 37 9RFN

Page 38: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 15 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : NORTH RUMAILA

TELECONTROL SYSTEM PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONSCODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-02-0370 WIRELESS MULTI-ACCESS TELECOM. SYSTEM FOR NORTH RUMAILA FIELD 20 ITEM Replacement of existing systems either

damaged or non-repairable

08-9-02-02-0371DIGITAL PRIVATE AUTOMATIC BRANCH EXCHANGE ( PABX ) CAPACITY 1000 SUBSCRIBER AT NORTH RUMAILA FIELD TO SERVE ALL DEGASSING, GAS COMPRESSION , WATER TREATMENT & PUMPING STATIONS

20 ITEM

08-9-02-02-0372 OPTICAL FIBER SYSTEM BETWEEN ( PS1 – ZUBAIR – FAO ) 20 ITEM

08-9-02-02-0373 OPTICAL FIBER EQUIPMENT TO REPLACE OBSOLETE EQUIPMENT BETWEEN ( PS1 – PS2 ) FOR OPERATION & CONTROL OF OIL PUMPING . 20 ITEM

08-9-02-02-0374 MICROWAVE RADIO SYSTEM ( 2GHZ ) TO LINK ( PS1 – PS2 ) FOR OPERATION & CONTROL OF OIL PUMPING . 20 ITEM

08-9-02-02-0375MICROWAVE RADIO SYSTEM 7 GHZ TO LINK NORTH RUMILA FIELD WITH WEST QURNA FIELD FOR OPERATION & CONTROL OF OIL PUMPING

20 ITEM

08-9-02-02-0376 MICROWAVE RADIO SYSTEM 2 GHZ TO LINK (PS4–FALLUJA) . 20 ITEM

PAGE: 38 9RFN

Page 39: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 16 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : SOUTH RUMAILA

TELECONTROL SYSTEM PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-02-0377 WIRELESS MULTI-ACCESS TELECOM. SYSTEM FOR SOUTH RUMAILA

FIELD 20 ITEM Replacement of existing systems either damaged or non-repairable

08-9-02-02-0378 UNDER GROUND CABLE TELEPHONE FOR SOUTH RUMAILA FIELD CAPACITY (100, 30 ) PAIR . 20 ITEM

LOCATION : ZUBAIR FIELD TELECONTROL SYSTEM

PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-02-0379 WIRELESS MULTI-ACCESS TELECOM. SYSTEM FOR ZUBAIR FIELD

DIGITAL PRIVATE AUTOMATIC BRANCH 20 ITEM Replacement of existing systems either damaged or non-repairable

08-9-02-02-0380 EXCHANGE (PABX) CAPACITY 300 SUBSCRIBER AT ZUBAIR/2 20 ITEM

08-9-02-02-0381 UNDER GROUND CABLE TELEPHONE FOR SCADA SYSTEM AT MISHRIF STATIONS CAPACITY 50 PAIR. 20 ITEM

08-9-02-02-0382 ACID BATTERY FOR SCADA SYSTEM AT ZB2 & MISHRIF STATIONS 20 ITEM

08-9-02-02-0383 BATTERY CHARGER FOR SCADA SYSTEM AT MISHRIF STATIONS 25 ITEM

PAGE: 39 9RFN

Page 40: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 17 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : TELECONTROL SYSTEM FOR AL–BAKER

OFF SHORE PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-02-0384 UHF RADIO SYSTEM PCM CAPACITY 30 CHANNELS TO LINK BAB AL-ZUBAIR–KHOR AL-ZUBAIR–FAO– AL-BAKER 10 ITEM Replacement of system which controls oil

export pumping and loading systems

08-9-02-02-0385 MICROWAVE RADIO PCM SYSTEM (1+1) OPERATED AT 2 GHZ CAPACITY (8) MB/S EQUIPPED 120 CH TO LINK(BAB ALZUBAIR- FAO – AL BAKER) 40 ITEM

08-9-02-02-0386 MODERN VHF / UHF WALKIE TALKIE WITH RECHARGEABLE BATTERIES & CHARGER SET FOR USE ON SITES & SHIPPING TERMINAL 50 PAIRS . 10 ITEM

PAGE: 40 9RFN

Page 41: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 18 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : MISSAN

TELECONTROL SYSTEM PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-02-0387MICROWAVE RADIO PCM SYSTEM (1+1) OPERATED AT 2 GHZ CAPACITY, (8) MB / S EQUIPPED 60 CH TO LINK(MESSAN – BUZURGAN FIELD – NAHR UMMAR – BASRAH ) THROUGH 5- HOP LINK FOR OPERATION & CONTROL OF OIL PUMPING .

20 ITEM Replacement of system which controls oil export pumping and loading systems

08-9-02-02-0388DIGITAL PRIVATE AUTOMATIC BRANCH EXCHANGE (PABX) AT MISSAN TO SERVE ALL DEGASSING , GAS COMPRESSION , WATER TREATMENT & PUMPING STATIONS

20 ITEM

LOCATION : BAB - ALZUBAIR TELECONTROL SYSTEM

PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-02-0389MICROWAVE RADIO PCM SYSTEM (1+1) OPERATED AT 7 GHZ CAPACITY (34) MB / S EQUIPPED FOR 360 CH TO LINK(BAB ALZUBAIR-ZUBAIR – GARMAT ALI)

20 ITEM Replacement of voice & control systems

08-9-02-02-0390 UNDER GROUND DIRECT BURIED VF. TELEPHONE CABLE 0.9 mm CONDUCTOR 500 PAIR . 10 ITEM

08-9-02-02-0391 VARIOUS TELEPHONES WITH ALL ACCESSORIES . 10 ITEM

PAGE: 41 9RFN

Page 42: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 19 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : MAJNOON FIELD

TELECONTROL SYSTEM PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-02-0392MICROWAVE RADIO PCM SYSTEM (1+1) OPERATED AT 7 GHZ, CAPACITY (8) MB / S EQUIPPED 60 CH TO LINK(NAHR UMR – MAJNOON FIELD) FOR OPERATION & CONTROL OF OIL PUMPING

20 ITEM Replacement of voice & control systems

08-9-02-02-0393 SINGLE CHANNEL VHF-UHF RADIO SYSTEM & ALL ACCESSORIES FOR OIL WELL DRILLING RIGS 50 ITEM

LOCATION : ALL AREAS COMPLEMENTARY EQUIPMENT FOR DEHYDRATION AND DESALTING UNITS.

PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-02-0394 CONTROL VALVES, PRESSURE INSTRUMENT & ACCESSORIES. 100 NOS. Replacement of control stystems

ELECTRICAL SWITCH GEAR, BATTERY CHARGERS TRANSFORMERS, SPARES, CABLING AND ACCESSORIES. 200 ITEM

Spare parts for 11 KV distribution switch geartransferred from 08-7-00-0416 10 NOS.

08-9-02-02-0395

PAGE: 42 9RFN

Page 43: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 20 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

FLOW LINES AND ACCESSORIES. PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTFlow lines and equipment for all sites

in SOC area

08-9-02-02-0397 VALVES (BALL, GATE, CHECK) SIZES (4", 6", 8", 10", 12", 14"), CLASS 600,900,1500. 1000 NOS.

- PIPE FITTINGS INCLUDING FLANGES, ELBOWS, TEES, GASKETS, BOLTS…, VARIOUS SIZES. 1000 ITEM

- TRANSFERRED FROM 08-8-02-09-0610: DEVELOPMENT OF LUHAIS FIELD 1 CONTRACT

- GASKETS AND STUDBOLTS. Transferred from 08-7-30-0552 1 CONTRACT

Pipe fittings various sizes class 150 and 300transferred from 08-8-02-02-0384 117

08-9-02-02-0399 MANIFOLD SKID AND CRUSH VALVE 10 ITEM

08-9-02-02-0400 FULL ENCIRCLEMENT SLEEVES FOR PIPE LINE REPAIRS 20 ITEM

LOCATION : MISSAN OIL FIELD. DEHYDRATION AND DESALTING UNITS.

PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-02-0401

DEHYDRATION , DESALTING TRAINS INCLUDING VESSELS, PUMPS, ELECTRICAL, CONTROL AND INSTRUMENT, PIPING, FITTING, VALVES, EFFLUENT WATER AND DISPOSAL FACILITIES AND ALL COMPLEMENTARY ACCESSORIES OF CAPACITY OF 60000 BPD AND 30000 BPD .

20610 NOS Dehydration equipment for Messan field

08-9-02-02-0398

08-9-02-02-0396 200 KM.PIPELINE API - 5LX GRADE 60 OF DIAMETER (4", 6", 8", 10", 12", 14") OF DIFFERENT THICKNESS AND GRADE B OF DIAMETERS (16,18,20,24,28) OF DIFFERENT THICKNESS.

PAGE: 43 9RFN

Page 44: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 21 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : AL-BAKER TERMINAL PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-02-0402 LOCAL CONTROL ROOM FOR PLATFORM (A) AT AL-BAKER TERMINAL 30 ITEM For control over loading operations

LOCATION : TUBA TANK FARM CONTINUATION OF THE REHABILITATION OF TUBA TANK FARM

PROJECT 02-02 : REHABILITATION / REVAMPING OF EXISTING INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT - STORAGE TANK, CAPACITY (66) THOUSAND M3 WITH ALL 4 SET Replacement of floating roof ANCILLARY SYSTEMS (FIRE FIGHTING, CATHODIC PROTECTION, tanks and 3 booster pumps LEVEL MEASUREMENT AND INSTRUMENTATION MIXERS, at Tuba tank farm PAINTS AND EXTERNAL LIGHTING SYSTEMS) - VERTICAL ELECTRICAL BOOSTER PUMPS WITH ACCESSORIES 3 SET - BULK MATERIALS FOR ABOVE (PIPING AND FITTINGS, WRAPPING 20 ITEM MATERIALS, ELECTRICAL CABLES AND ACCESSORIES AND INSTRUMENTATION) (SCOP)

08-9-02-02-0403

PAGE: 44 9RFN

Page 45: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 22 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION :ALL AREAS PROJECT 02-02 : REHABILITATION OF CATHODIC

PROTECTION SYSTEM & FACILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT - SURVEY , KNOW-HOW , TECHNICAL ASSISTANCE ENGINEERING Contracts for cathodic CONSULTANCY protection - SUPPLY OF MATERIALS / EQUIPMENT TO REHABILITATE & of vessels and lines UPGRADE CATHODIC PROTECTION SYSTEMS & FACILITIES in the SOC area TO ENSURE PROPER OPERATION TO SAFE GUARD PIPE LINES & VESSELS INCLUDING THE SUPPLY OF MATERIALS FOR LOCAL MANUFACTURE OF BOARDS & ANODES … - POWER SUPPLY SYSTEMS FOR THE OPERATION OF THE CATHODIC PROTECTION INCLUDING INDEPENDENT POWER SYSTEM FOR REMOTE LOCATIONS ( SOLAR, THERMO- ELECTRIC , DIESEL…) - ACCESSORIES AND SPARE PARTS FOR THE ABOVE

08-9-02-02-0405 valves for water treatment plant 96 nos

The new oil spares items need to be circulated to the committee until OIP has had response from the committee that OIP

can approve these.

08-9-01-02-0404 6 CONTRACT

PAGE: 45 9RFN

Page 46: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 23 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

DRILLING , COMPLETION OF ( 50 ) WELLS PROJECT 02-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-03-0420 CASING 600 KM. Service contract for the

08-9-02-03-0421 CASING ACCESSORIES 250 ITEM drilling and completion

08-9-02-03-0422 LINER HANGER AND ACCESSORIES 250 ITEM of 50 wells but

08-9-02-03-0423 WELL-HEAD AND X-MASS TREE 210 ITEM not including supply

08-9-02-03-0424 DRILLING BITS & NOZZLES 200 ITEM of materials

08-9-02-03-0425 Tubing (various sizes, grades & weights) 333 KM ITEM

08-9-02-03-0426 TUBING ACCESSORIES 100 ITEM

08-9-02-03-0427 CEMENT & CEMENT ADDITIVES 20 ITEM

08-9-02-03-0428 DRILLING FLUID CHEMICALS 20 ITEMDOUBLE PUMP CEMENT AND ACID TRUCK WITH ACCESSORIES AND SPARE PARTS 4 SET

AIR COMPRESSOR UNITtransferred from 08-7-20-0254 10 SET OIP approval new item Comm

930654

08-9-02-03-0430 WELL HEAD WITH ACCESSORIES FOR ELECTRIC SUBMERSIBLE PUMPS 100 ITEM

08-9-02-03-0429

PAGE: 46 9RFN

Page 47: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 24 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

DRILLING , COMPLETION OF ( 50 ) WELLS PROJECT 02-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENTELECTRICAL SUBMERSIBLE PUMP WITH ACCESSORIES & SPARE PARTS 100 ITEM Service contract for drilling and

completion of 50 wellsCentrifugal vertical column sump depth pump type Ritz with control panel with ADF motor Spare parts for two (2) years transferred from 08-8-02-03-0411

12

12

Units

Sets

08-9-02-03-0432 MANOMETER FOR DYNAMIC & STATIC HEAD 10 SET but not including

08-9-02-03-0433 TANKER FOR TRANSPORTATION DRILLING FLUIDS WITH ACCESSORIES AND SPARE PARTS 10 SET materials

08-9-02-03-0434 WIRELINE TOOLS AND ACCESSORIES 500 ITEM

08-9-02-03-0435 MOBILE MULTI-PHASE FLOW METER AND ACCESSORIES 50 ITEM

08-9-02-03-0436 PRODUCTION PACKER AND ACCESSORIES 250 ITEM

08-9-02-03-0437 COMPLETE SET OF LOGGING TRUCK, TOOLS & ACCESSORIES 2 SET

08-9-02-03-0438 TEST SEPARATOR AND ACCESSORIES 50 ITEM

08-9-02-03-0439 GATE VALVES AND ACCESSORIES 500 ITEM

08-9-02-03-0440 BALL-VALVES AND FITTINGS 100 ITEM

08-9-02-03-0431

PAGE: 47 9RFN

Page 48: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 25 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS PROJECT 02-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-03-0441 PERMANENT RESERVOIR MONITORING AND CONTROL 2 SET Contracts for reservoir monitoring

08-9-02-03-0442 OPEN HOLE AND CASED HOLE LOGGING (SERVICE CONTRACT) 2 CONTRACT Contracts for hole logging

08-9-02-03-0443 MUD-LOGGING SERVICES ( SERVICE CONTRACT) 2 CONTRACT Contracts for mud logging

08-9-02-03-0444 DRILLING AND COMPLETION OF (20) WELL IN MISSAN SIBA AND ZUBAIR(SERVICE CONTRACT) 2 CONTRACT

Contracts for drilling & completion of 20 wells in Missan Siba and Zubair

08-9-02-03-0445 TECHNICAL ASSISTANCE IN DEEP AND HORIZONTAL DRILLING (SERVICE CONTRACT) 2 CONTRACT Contracts for deep and hopizontal drilling

08-9-02-03-0446STUDY / BASIC DESIGN FOR SUPERVISORY CONTROL & DATA ACQUISITION SCADA SYSTEM AS PART OF A NATIONAL GAS & OIL SCADA

2 CONTRACT Design contract for SCADA system

08-9-02-03-0447TECHNICAL SERVICE / ASSISTANCE CONTRACT TO STUDY, APPRAISE, EVALUATE & IDENTIFY REMEDIES FOR PROBLEMS ENCOUNTERED IN PRODUCING WELLS IN THE SOUTHERN FIELDS

2 CONTRACTTSC for appraisal of producing wells in

SOC fields

PAGE: 48 9RFN

Page 49: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 26 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : FAO, PSI, TUBA & ZB2 TANK FARMS PROJECT 02-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-03-0448 CONTINUATION OF THE REBUILDING OF THE STORAGE TANKS IN FAO,

PS1,TUBA AND ZB2 50 ITEM Requirements to complete rebuilding of 4 tanks in Fao, 1 in PS-1, 8 in ZB-2

LOCATION : NORTH RUMAILA PROJECT 02-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES ADDITIONAL DEVELOPMENT / ACCELERATED PHASE

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-03-0449WATER INJECTION PUMPS PACKAGES COMPLETE WITH INTERCONNECTING PIPING & FITTINGS OF 500M3/H CAPACITY & 210 BAR HEAD INCLUDING TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY

5 SET Equipment and control systems to enhance water injection capabilities

08-9-02-03-0450 ELECTRICAL & CONTROL SYSTEM. 5 SET

PAGE: 49 9RFN

Page 50: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 27 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : NORTH RUMAILAH

CONTINUATION OF ADDITIONAL DEVELOPMENT OF NORTH RUMAILA

PROJECT 02-03 : SUSTAINING & ENHANCING PRODUCTION CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT - OIL-GAS SEPARATOR, 35000 B1/D 3 SET Continuation of works to

- ROTATING MACHINERY FOR DEGASSING STATIONS (PUMPS & 20 ITEM sustain and increased production

COMPRESSORS) from N Rumailah field from

- ROTATING MACHINERY FOR WATER INJECTION (PUMPS & 20 ITEM 140,000 to 300,000 bpd

COMPRESSORS)

- ELECTRICAL SYSTEM H.T. & L.T. SUBSTATIONS 20 ITEM

- VALVES, FITTINGS AND ACCESSORIES 200 LINE ITEM

- PIPES AND INTERCONNECTING MATERIAL & ACCESSORIES 10 ITEM

- CATHODIC PROTECTION SYSTEMS 10 ITEM

- INSTRUMENTATION, COMPLETE PACKAGES 20 ITEM

- POWER, INSTRUMENTS & CONTROL CABLES 20 ITEM

- TELECONTROL SYSTEM (SCOP) 10 ITEM

08-9-02-03-0451

PAGE: 50 9RFN

Page 51: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 28 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS PROJECT 02-04 : SAFETY AND ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-04-0470 SPARE PARTS FOR ELECTRIC & DIESEL ENGINE FIRE PUMP transferred

from 08-8-02-04-0466 75 ITEM Fire fighting and environmental

08-9-02-04-0471FIRE FIGHTING EQUIPMENT WITH SPARES : HOSES, EXTINGUISHER, FOAM EQUIPMENT, ACCESSORIES chemicals (to be coloured blue)

28002000

NOS.can control equipment

08-9-02-04-0472 FIRE - FIGHTING snorkel TRUCK WITH SPARES 2 NOS.

08-9-02-04-0473 HEAVY DUTY INDUSTRIAL FIRE FIGHTING TRUCK WITH SPARES 24 NOS.

08-9-02-04-0474 CONSUMABLE PERSONAL SAFETY WEAR (GOGGLES, BOOTS, GLOVES, HELMETS) 10 ITEM

08-9-02-04-0475 OIL SKIMMERS FOR REMOVAL OF OIL SPILLAGE 5 ITEM

08-9-02-04-0476 UNITS & SPARES FOR FIRE FIGHTING SYSTEM 50 ITEM

PAGE: 51 9RFN

Page 52: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 29 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS PROJECT 02-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-05-0481 EMERGENCY DIESEL POWER GENERATORS : ( 20 400 ) KVA WITH

SPARES 40 ITEM Emergency power generation equipment

SKID MOUNTED DIESEL GENERATORS WITH SPARE PARTS 10 ITEMDIESEL DRIVEN WELDING MACHINE & SPARES. Transferred form 08-8-02-05-0481 1 CONTRACT

LOCATION : WORK SHOPS BAB – AL ZUBAIR PROJECT 02-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-05-0483 ELECTRIC OVER HEAD TROLLEY CRANES 12 ITEM Workshop requirements

08-9-02-05-0484 PULLER WITH HYDRAULIC PRESS 40 ITEM

08-9-02-05-0485 SPARE PARTS FOR DIESEL ENGINE TYPE CUMMINS 100 ITEM

08-9-02-05-0486 SERVICE , TESTING AND HANDLING EQUIPMENT AND TOOLS 150 ITEM

08-9-02-05-0487 HYDRAULIC BENDING AND CUTTING MACHINES 20 NOS.nos

08-9-02-05-0488 WELDING AND CUTTING EQUIPMENT 25 NOS.

08-9-02-05-0489 TESTING EQUIPMENT 10 ITEM

08-9-02-05-0490 WORK SHOP EQUIPMENT ( CUTTING SAW, LATHE, BORING, COATING, …) 10 NOS.

08-9-02-05-0482

PAGE: 52 9RFN

Page 53: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 30 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS PROJECT 02-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-05-0491 ELECTRICAL CABLE & JOINT DIFFERENT SIZES 30 ITEM General equipment and spares

08-9-02-05-0492 SPARE PART FOR DIFFERENT TYPE OF AIR CONDITIONING UNITS 80 ITEM required for service and plant

08-9-02-05-0493 TOOLS & TEST EQUIPMENT 60 ITEM equipment in all areas

08-9-02-05-0494 GALVANIZED BOLTED TANKS FOR INDUSTRIAL & DRINKING WATER 10 ITEM

08-9-02-05-0495 SPARE PARTS FOR WATER PUMP DIFFERENT TYPES & CAPACITIES 61 ITEM

08-9-02-05-0496 GALVANIZED PIPES & FITTINGS FOR DRINKING WATER 100 ITEM

08-9-02-05-0497 WINDOW TYPE AIR CONDITIONER & SPILT 30 ITEM

08-9-02-05-0498 PACKAGE AIR CONDITIONERS & CHILLERS 20 ITEM

08-9-02-05-0499 ELECTRICAL & MECHANICAL SERVICE EQUIPMENT FOR WORK SHOPS 50 ITEM

08-9-02-05-0500 R.O UNIT PLANTS FOR DRINKING WATER. 10 ITEM

08-9-02-05-0501 MISCELLANEOUS MATERIAL FOR ELECTRICAL & MECH. 100 ITEM

08-9-02-05-0502 WATER PUMPS (DIESEL & ELECTRIC ) DIFFERENT CAPACITY 44 UNIT

08-9-02-05-0503 SPARE PARTS FOR ITALCOND INTERNATIONAL AIR CONDITIONER 20 ITEM

08-9-02-05-0504 ELECTRICAL SPARE PARTS 50 ITEM

08-9-02-05-0505 NITROGEN PLANT WITH ALL ACCESSORIES 10 ITEM

08-9-02-05-0506 WEIGH BRIDGE UNIT WITH SPARES 10 ITEM

08-9-02-05-0507 SKID MOUNTED RAW WATER DIESEL PUMPS FOR SUPPLYING WATER FOR DRILLING RIGS & ACCESSORIES 30 ITEM

08-9-02-05-0508 OFFICE APPLIANCES AND EQUIPMENT ( PHOTO COPY MACHINES, PRINTERS, WORD PROCESSORS, FACSIMILES …) 100 ITEM

PAGE: 53 9RFN

Page 54: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 31 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

SPECIALIZED TRUCKS , EQUIP. , TOOLS AND WORKSHOP EQUIPMENT.

PROJECT 02-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-05-0509 WHEEL LOADER AND BACKHOE WITH SPARES 20 SET Vehicle and transport requirements

08-9-02-05-0510 BULLDOZER TRACK TYPE D7G WITH SPARES 6 SET

08-9-02-05-0511 BULLDOZER TRACK TYPE D8K WITH SPARES 2 SET

08-9-02-05-0512 WHEEL LOADER 3 M3 WITH SPARES 12 SET

08-9-02-05-0513 CRAWLER TYPE LOADER 3 M3 WITH SPARES 3 SET

08-9-02-05-0514 MOTOR GRADER WITH SPARES 3 SET

08-9-02-05-0515 AMPHIBIOUS EXCAVATOR 1 M3 WITH SPARES 2 SET

08-9-02-05-0516 MACADAM SPREADER (FINISHER) WITH SPARES 1 SET

08-9-02-05-0517 SMALL HAND STEEL ROLLER WITH SPARES 4 SET

08-9-02-05-0518 ASPHALT SPRAYING TANKER 15 M3 CAP WITH SPARES 2 SET

08-9-02-05-0519 TRUCK TRACTOR WITH ASPHALT TANKER TRAILER CAP 33M3 WITH SPARES

2 SET

TRUCK TRACTORS, transferred from 08-8-02-05-0545 4 NOS

08-9-02-05-0520 TIPPER TRUCK (16) TON CAP WITH SPARES 15 SET

08-9-02-05-0521 FORKLIFT (3) TON WITH SPARES 12 SET

08-9-02-05-0522 FORKLIFT (10) TON WITH SPARES 10 SET

08-9-02-05-0523 FORKLIFT (5) TON WITH SPARES 15 SET

PAGE: 54 9RFN

Page 55: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 32 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

SPECIALIZED TRUCKS , EQUIP. , TOOLS AND WORKSHOP EQUIPMENT.

PROJECT 02-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-05-0524 FULLY HYDRAULIC TRUCK CRANE (20) TON CAP. WITH SPARES 11 SET Vehicle & workshop requirements

08-9-02-05-0525 FULLY HYDRAULIC TRUCK CRANE (8) TON CAP.WITH SPARES 10 SET

08-9-02-05-0526 FULLY HYDRAULIC TRUCK CRANE (50) TON CAP.WITH SPARES 4 SET

08-9-02-05-0527 FULLY HYDRAULIC TRUCK CRANE (30) TON CAP.WITH SPARES 10 SET

08-9-02-05-0528 RECOVERY TRUCK (30) TON CAP WITH SPARES 5 SET

08-9-02-05-0529 RECOVERY TRUCK (10) TON CAP WITH SPARES 2 SET

08-9-02-05-0530 CARGO LORRY (16) TON CAP.WITH SPARES 6 SET

08-9-02-05-0531 Cargo lorry (18) ton cap. with spares 60 SET

08-9-02-05-0532 TRUCK TRACTOR WITH OIL TANKER TRAILER 36 M3 CAP. WITH SPARES 4 SET

08-9-02-05-0533 STATION WAGON VEHICLES 4WD WITH SPARES 120 SET

08-9-02-05-0534 TANK TRAILER TANKER 6 M3 CAP. 1 SET

08-9-02-05-0535 LIGHTING UNIT WITH GENERATOR & SPARES 30 SET

08-9-02-05-0536 SPARE PARTS FOR COMPLETE HEAVY TRUCKS 10000 ITEM

08-9-02-05-0537 SPARE PARTS FOR LIGHT VEHICLES 6000 ITEM

08-9-02-05-0538 WORKSHOP EQUIPMENT AND TOOLS 600 ITEM

08-9-02-05-0539 REHABILITATION OF EARTHMOVING EQUIPMENT 50 NOS.

08-9-02-05-0540 GENERAL AND CONSUMER MATERIALS (TYRES, LAMPS, …) 10000 ITEM

08-9-02-05-0541 TRUCK WITH REFRIGERATION VAN (5) TON CAP.WITH SPARES 4 SET

TRUCK TRACTOR WITH DRINKING WATER TANKER TRAILER 28 M3 CAP. WITH SPARES Tractor unit 6*4 and 100 tons semi trailes and spares, transferred from 08-8-02-05-0542

10

21000

SET

unititem spares

Tractor unit 6*4 complete with semi trailer 50 tons transferred from 08-8-02-05-0539 5 NOS.08-9-02-05-0542

PAGE: 55 9RFN

Page 56: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

Truck tractor with cement semi trailer cap. 35 tons with accessoriestransferred from 08-7-00-0472 3 Unit

MINISTRY OF OIL SHEET NO.: 33 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

SPECIALIZED TRUCKS , EQUIP. , TOOLS AND WORKSHOP EQUIPMENT.

PROJECT 02-05 : SERVICE AND PLANT EQUIPMENTCODE ITEM DESCRIPTION QTY UNIT COMMENT

FIELD CARS ( JEEP) 4. WD WITH SPARES 40 SET Vehicles equipment and tools

SPARE PARTS FOR LIGHT EQUIPMENT AND VEHICLEStransferred from 08-7-00-0480 5594 PCS NON OIP new item Comm

930658

08-9-02-05-0544 CESSPIT EMPTIER TRUCK WITH WATER JETTING UNIT WITH SPARES 4 SET

08-9-02-05-0545 CLEANING & REFUSE COLLECTOR TRUCK WITH SPARES 3 SET

08-9-02-05-0546 DUMPER WITH SPARES 12 SET

08-9-02-05-0547 WHEEL EXCAVATOR 1 M3 CAP. WITH SPARES 2 SET

08-9-02-05-0548 TRUCK TRACTOR (6x4) 35 TON WITH SPARES 5 SET

08-9-02-05-0549 CARGO LORRY (5) TON CAP. WITH SPARES 60 SET

08-9-02-05-0550 LORRY WITH LIFT CRANE (8) TON CAP. WITH SPARES 8 SET

08-9-02-05-0551 MOBILE WORKSHOP WITH SPARES 17 SET

08-9-02-05-0552 PICK-UP D. CAB. WITH SPARES 150 SET

08-9-02-05-0553 COLD STORES FOR FOOD 10 NOS. Requirements for improving

08-9-02-05-0554 DRINKING WATER COOLER (50-80) LTR CAP. 50 NOS. conditions on Mina al-Bakr

08-9-02-05-0555 ELECTRICAL COOKER WITH OVEN 20 NOS.

08-9-02-05-0556 BAKERY OVEN 5 NOS.

08-9-02-05-0557 FORTIFIED STEEL DOORS 8 NOS.

08-9-02-05-0558 MOBILE SKID MOUNTED MEDICAL UNIT FOR AL - BAKER TERMINAL 2 SET

08-9-02-05-0559 REHABILITATION OF KENWORTH TRUCKS 5 SET Vehicles equipment and tools

08-9-02-05-0560 CRAVAN FOR DRILLING CAMPS: LAB AND OFFICE 30 NOS.

08-9-02-05-0561 STRETCHERS FOR OFF SHORE INSTALLATIONS 20 NOS.

08-9-02-05-0543

PAGE: 56 9RFN

Page 57: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 34 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

SERVICE EQUIPMENT, WORKSHOP EQUIPMENT, CONSTRUCTION EQUIPMENT, TOOLS & SPARES.

PROJECT 02-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-05-0562 DIESEL ENGINE DRIVEN WELDING MACHINES. 20 NOS. Service equipment and tools

08-9-02-05-0563 ELECTRICAL WELDING MACHINES. 20 NOS.

08-9-02-05-0564 HYDRO BLASTING SETS. 5 NOS.

08-9-02-05-0565 AIR COMPRESSORS. 10 NOS.

08-9-02-05-0566 CENTRAL CONCRETE MIXING PLANT WITH ALL COMPLEMENTARY SYSTEMS AND ACCESSORIES. 20 SET

08-9-02-05-0567 ASPHALT PLANT WITH ALL COMPLEMENTARY SYSTEMS AND ACCESSORIES. 20 SET

08-9-02-05-0568 DUMPERS. 10 NOS.

08-9-02-05-0569 CONCRETE VIBRATOR WITH ACCESSORIES. 10 NOS.

08-9-02-05-0570 MANUAL COMPACTOR. 5 NOS.

08-9-02-05-0571 JACK HAMMER WITH ACCESSORIES. 10 ITEM

08-9-02-05-0572 AIRLESS PAINTING SPRAY . 10 SET

08-9-02-05-0573 UNDER WATER CAMERA FOR INVESTIGATION OF MARINE PIPE LINES & TERMINAL 2 SET

08-9-02-05-0574 WELDING ELECTRODES 500 TON

08-9-02-05-0575 GRINDING DISCS. 10 ITEM

PAGE: 57 9RFN

Page 58: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 35 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

SERVICE EQUIPMENT, WORKSHOP EQUIPMENT, CONSTRUCTION EQUIPMENT'S, TOOLS & SPARES.

PROJECT 02-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENTSURVEYING SYSTEM CONSISTING OF: Geological survey equipment & spares - PRECISION DIGITAL LEVEL 360 DISPLAY TEXT ENGLISH 10 SET MAGNETICALLY DAMPED WITH ACCESSORIES - MOTORIZED ELECTRONIC TOTAL STATION WITH AUTOMATIC 5 SET TRACE RECOGNITION WITH ALL ACCESSORIES. - GPS SYSTEM 500 WITH ALL ACCESSORIES. 5 SET

08-9-02-05-0577 PIPE AND CABLE LOCATOR 2 SET

08-9-02-05-0578 DISTILLATION APPARATUS (10) LETTER / H 2 SET Testing equipment

REHABILITATION OF FINISHING FILTER, transferred from 08-8-02-11-0625 2 SET

REHABILITATION OF DEOXYGENATION UNIT, transferred from 08-8-02-11-0625 2 ITEM

08-9-02-05-0579 SPARE PARTS FOR SURVEYING INSTRUMENTS 100 ITEM Spares for existing equipment

08-9-02-05-0580 SPARE PARTS FOR DOCUMENTATION INSTRUMENTS 100 ITEM Spares for archiving equipment

08-9-02-05-0581 COMPUTERIZED ARCHIVING SYSTEM 2 SET Storage system for survey results

08-9-02-05-0576

PAGE: 58 9RFN

Page 59: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 36 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : ALL AREAS

MATERIALS FOR W/S & WAREHOUSE PROJECT 02-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-05-0582 ROLLED SECTIONS OF DIFFERENT SIZES 1/2" TO 40" AND ALL

COMPLEMENTARY SYSTEM & ACCESSORIES. 11980 NOS Workshop requirements

TRANSFERRED FROM 08-7-20-0250: BOILER TUBESprefabricated sheds

47

CONTRACTSET

08-9-02-05-0583CLADDING MATERIAL INCLUDING GALVANIZED STEEL SHEETS AND ALUMINUM SHEETS OF DIFFERENT GAUGES AND ALL COMPLEMENTARY SYSTEM & ACCESSORIES.

5000 TON

LOCATION : ALL AREAS PROJECT 02-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-05-0584 PORTABLE DIESEL PUMPS WITH SPARES 2 SET Sevice requirement

08-9-02-05-0585 LORRY WITH LIFT CRANE WITH SPARES 4 SET Sevice requirement

08-9-02-05-0586 FURNITURE AND GENERAL USE ITEMS FOR AL-BAKR TERMINAL 1000 ITEM Accommodation requirements MAB

08-9-02-05-0587 PASSENGER BOAT FOR AL- BAKR TERMINAL 1 NO. Fast tender for staff rotation at MAB

08-9-02-05-0588 MOBIL ELECTRIC TEST VAN 5 ITEM Workshop requirementsWORK SHOP EQUIPMENT FOR ALL AREAS 100 ITEM Workshop requirements

SPARES FOR AIRCONDITIONING UNITS. Transferred from 08-8-02-05-0533 1 CONTRACT08-9-02-05-0589

PAGE: 59 9RFN

Page 60: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 37 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY

LOCATION : ALL AREAS PROJECT 02-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-06-0610 EQUIPMENT FOR CENTRAL LAB. AND ACCESSORIES. 250 ITEM Quality testing requirements

08-9-02-06-0611 MOBILE LABORATORY FOR ON SITE MEASUREMENTS. 2 ITEM

08-9-02-06-0612 BIOLOGICAL MATERIALS FOR BIO-TEST OF DRINKING WATER AND RESERVOIR FORMATION WATER. 30 ITEM

08-9-02-06-0613 CHEMICALS FOR CENTRAL LAB 100 ITEM

08-9-02-06-0614 EQUIPMENT AND TOOLS FOR INSPECTION OF CRUDE OIL TANKS 100 ITEM NDT requirements

08-9-02-06-0615 EQUIPMENT AND MATERIALS OF CONVENTIONAL NON – DESTRUCTIVE TESTING TECHNIQUES. 400 ITEM NDT requirements

08-9-02-06-0616 WELDING MACHINES, TOOLS, AND MATERIALS FOR WELDING TRAINING CENTER. 500 ITEM Training requirements

08-9-02-06-0617 ENGINEERING INSPECTION SERVICES FOR MISSAN - BASRAH PIPELINE . 1 CONTRACT NDT contract

TRANSFERRED FROM 08-8-02-06-0564: CATHODIC PROTECTION SERVICE CONTRACT 1 CONTRACT

08-9-02-06-0618 EQUIPMENT FOR GEOLOGICAL LABS AND ACCESSORIES 100 ITEM Geophysical analyses requirements

08-9-02-06-0619 LAB. APPARATUS FOR OIL PRODUCTION 20 NOS. Quality testing requirements1000 LIT.

40 KG.

08-9-02-06-0621CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIER'S WORKS ABROAD

2 CONTRACT PSI contracts

08-9-02-06-0620 LAB. CHEMICALS FOR OIL PRODUCTION

PAGE: 60 9RFN

Page 61: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 38 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : MAJNOON OIL FIELD PROJECT 02-07 : MAJNOON FIELD DEVELOPMENT PROJECT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-07-0626

CRUDE OIL PROCESSING & TREATMENT PLANT FOR EARLY PRODUCTION OF 80000 BPD WHICH INCLUDE DEGASSING BANKS EACH OF FOUR STAGES DEHYDRATION, DESALTING, H2S STRIPPING, TEST SEPARATOR, INLET MANIFOLDS, CHEMICAL INJECTION , EFFLUENT WATER TREATMENT & DISPOSAL,(FIRST STAGE) INCLUDING TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY .

500 ITEM Equipment and consultancy requirements for initial development of Majnoon field

08-9-02-07-0627CRUDE OIL FLOW TANKS OF 5000 M3 EACH, BAD OIL TANKS & FIRE WATER TANKS. COMPLETE WITH ALL COMPLEMENTARY SYSTEM & ACCESSORIES.

109 NOS Crude oil flow tanks

08-9-02-07-0628 CRUDE OIL BOOSTER & MAIN PUMPS, SMALL PUMPS VARIOUS SIZES COMPLETE WITH ACCESSORIES. 50 ITEM Crude oil booster pumps

08-9-02-07-0629 FIRE FIGHTING SYSTEM INCLUDING TANKS, PUMPS, FOAM GENERATOR, HYDRANTS … 100 ITEM Fire fighting

08-9-02-07-0630ELECTRICAL SYSTEM TO INCLUDE 132/33/11/0.4 KV , TRANSFORMERS & SWITCH GEAR, O/H TRANSMISSION LINES, MEDIUM & LOW VOLTAGE MCC DISTRIBUTION NETWORK AND ACCESSORIES WITH EMERGENCY GENERATING SETS.

100 ITEM Electrical power distribution requirements

08-9-02-07-0631TRANSFER PIPES, FLOW LINES, INTERCONNECTING PIPING, STATION MANIFOLDS AND FLARE SYSTEMS FOR THE MOVEMENT OF OIL, GAS & WATER TO AND FROM THE PROCESS STATION WITH VALVES, FITTINGS, INSTRUMENTS & ACCESSORIES.

1 400 CONTRACT NOS

NON OIP approval additional items transferred from 08-8-02-

07-0582 930352

08-9-02-07-0632 POTABLE WATER SYSTEM SEWAGE SYSTEM, AIR CONDITIONING UNITS, SERVICE & HANDLING EQUIPMENT'S. 100 ITEM Water system

PAGE: 61 9RFN

Page 62: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 39 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : AL BAKER TERMINAL PROJECT 02-08 : TERMINAL DEVELOPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-09-0637WORKSHOP FACILITIES FOR MAINTENANCE WORK ON AL-BAKER TERMINAL EQUIPMENT INCLUDING CRANE, PILE DRIVER, ELECTRIC GENERATING SET, PUMPS, COMPRESSORS & ALL COMPLEMENTARY FACILITIES TO BE INSTALLED ON A PONTOON

20 ITEM Floating workshop for MAB maintenance

PAGE: 62 9RFN

Page 63: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 40 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : MISSAN OIL FIELD PROJECT 02-09 : EXPERIMENTAL WATER INJECTION FOR MISSAN

OIL FIELD

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-10-0641RAW WATER FIRST LIFTING PUMPING SET OF 500 M3/H AND 7 KG/CM2 COMPLETE WITH ELECTRIC MOTOR, VALVES & ACCESSORIES INCLUDING TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY

10 SETNew project for Missan field to supply

water injection following on previous pilot project

08-9-02-10-0642 RAW WATER BOOSTER PUMPS OF 500 M3/H AND 40 KG/CM2 COMPLETE WITH MOTORS AND ACCESSORIES. 10 SET

08-9-02-10-0643ELECTRICAL FEEDING AND DISTRIBUTION SYSTEM 132/33/11/0.4 KV COMPLETE WITH ALL TRANSFORMERS SWITCH GEARS, CABLING, CONDUCTORS, TRANSMISSION LINES, TOWERS AND ALL ACCESSORIES.

100 ITEM

08-9-02-10-0644 DUCTILE TRANSFER WATER PIPELINE COMPLETE WITH VALVES,FITTINGS AND ACCESSORIES. 100 ITEM

PAGE: 63 9RFN

Page 64: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 41 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : STRATEGIC P/L PROJECT 02-11 : COMPLETION OF 2ND STRATEGIC P/L

CODE ITEM DESCRIPTION QTY UNIT COMMENT - P/L 42" TO COMPLETE THE SECTION BETWEEN PS3 &PS4 Contracts to complete OF THE 2ND STRATEGIC P/L AS PHASE ( I ) OF THE 2nd strategic line between COMPLETE PROJECT PS3 and PS4, and to - STUDY & BASIC DESIGN FOR THE UPGRADING OF THE include the second strategic STRATEGIC LINE PUMPING STATIONS TO CATER THE 2ND line PIPELINE INCLUDING ANY MODIFICATION & ADDITIONS AS WELL AS THE UPGRADING OF THE TELECONTROL / TELECOM. SYSTEM

5 CONTRACT08-9-02-11-0650

PAGE: 64 9RFN

Page 65: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 42 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : WEST QURNA PROJECT 02-12 : CONTINUATION OF THE DEVELOPMENT OF

DS6/WEST QURNA OIL FIELD

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-02-12-0655 FLOW LINES AND TRANSFER PIPES (VARIOUS SIZES) 200 KM. Equipment to increase output

08-9-02-12-0656 VALVES, FITTINGS AND PIPE ACCESSORIES 100 ITEM from DS6/W Quarna field

08-9-02-12-0657 FIELD OIL WELL PRODUCTION MANIFOLDS (EACH MANIFOLD SUITABLE FOR 25 WELLS) 100 ITEM from 50,000 to 100,000 bpd

08-9-02-12-0658 UTILITIES (FIRE FIGHTING, COMPRESSED AIR, INDUSTRIAL WATER, TELECOM, INSTRUMENTATION, CIVIL WORKS, …) 20 ITEM

08-9-02-12-0659 FLOW TANKS 1 NO.

08-9-02-12-0660 WATER INJECTION FILTERS 4 SET

08-9-02-12-0661 WATER INJECTION PUMPS 4 SET

08-9-02-12-0662 TREATMENT FOR WASTE WATER 1 SET

08-9-02-12-0663 GAS COMPRESSION UNITS 3 SET

08-9-02-12-0664 GAS DEHYDRATION UNIT 1 SET

08-9-02-12-0665 WELDING MACHINES 10 NOS.

08-9-02-12-0666 WELDING RODS GENERAL USE 20 TON

08-9-02-12-0667 ELECTRICAL (TRANSFORMER, CABLES, L.V.SWITCHGEARS, …) 50 ITEM

08-9-02-12-0668INSTRUMENTATION (CONTROL VALVE, SAFETY VALVE, PRESSURE INST. LEVEL INST. FLOW INST. TEMP. INST. DCS. PRIMARY & SECONDARY MATERIAL, …)

100ITEM

set

PAGE: 65 9RFN

Page 66: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 43 OF 43ESTABLISHMENT NAME : SOUTH OIL COMPANY LOCATION : WEST QURNA PROJECT 02-13 : CONTINUATION OF OIL FIELD UPGRADING, WATER

INJECTION (SURFACE INSTALLATION)

CODE ITEM DESCRIPTION QTY UNIT COMMENT - COMPLETION & REHABILITATION OF PERMANENT 132/11 KV 8 SET Continuation of electrical project SUBSTATION WITH SUPPLY OF SPARES for W Qurna water injection - SUPPLY OF EQUIPMENT FOR 132 KV H.T. LINES INCLUDING 200 ITEM surface units (TOWERS, CONDUCTORS, FITTINGS & ACCESSORIES, …) - PIPES, VALVES & FITTINGS 100 ITEM - CHEMICAL FEED SYSTEM FOR WATER TREATMENT FACILITIES 6 SET - AIR_BLOWERS FOR FILTERS 6 SET - COMPLETION & REHABILITATION OF GAS COMPRESSION LINES 4 SET WITH SUPPLY OF SPARES - VARIOUS PUMPS WITH DRIVERS AND SPARES 1 LOT - VESSELS AND ACCESSORIES 1 LOT - TECHNICAL ASSISTANCE/ ENGINEERING CONSULTANCY 1 CONTRACT

(SCOP) electrical distribution equipment & lighting accessories, overhead line accessories 100 item

- Completion and rehabilitation of deoxygenation unit with supply of spares 182 ITEM

- REHABILITATION OF FILTERS AND SPARE PARTS. Transferred from 08-8-02-11-0625 1 CONTRACT

NON OIP approval additional items transferred from 08-8-02-

11-0625 930382

LOCATION : ZUBEIR & WEST QURNA PROJECT 02-14 : DEVELOPMENT PROJECT (COMPLETION OF GAS

UTILIZATION)

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-02-14-0678KNOW-HOW, MATERIALS FOR THE CONTINUATION OF THE UTILIZATION OF GAS ZUBEIR & WEST QURNA FIELDS INCLUDING TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY

10 CONTRACTCompletion of project for dry gas

production commenced in Phase 8

08-9-02-13-0673

PAGE: 66 9RFN

Page 67: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 3ESTABLISHMENT NAME : IRAQI DRILLING CO. LOCATION : ALL AREAS PROJECT 03-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-03-01-0690 SPARE PARTS FOR DRILLING & WORKOVER RIGS 160000 NOS. Requirements for drilling operations

08-9-03-01-0691 ACCESSORY EQUIPMENT FOR DRILLING & WORKOVER RIGS 15000 NOS. in all areas

08-9-03-01-0692 DRILL PIPE & DRILL COLLARS 5000 NOS.

08-9-03-01-0693 MUD PUMPS FOR RIGS WITH SPARES 4 SET

08-9-03-01-0694 MUD SYSTEMS ( PUMPS, TANKS, AGITATORS, SHAKERS, VALVES & ALLOTHER ACCESSORIES) 2 SET

08-9-03-01-0695 DRILLING CAMPS 2 SET

08-9-03-01-0696 TOOL PUSHER CARAVAN FOR EXISTING CAMPS 10 NOS.

PAGE: 67 9RFN

Page 68: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.:2 OF 3ESTABLISHMENT NAME : IRAQI DRILLING CO. LOCATION : ALL AREAS PROJECT 03-02 :REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-03-02-0701SERVICE CONTRACT FOR MAINTAINING AND REFURBISHMENT OFTWENTY SPECIAL OIL FIELD TRUCK ( KENWORTH ) TO BE CARRIED OUTIN IRAQ,COMPLETE WITH THE SUPPLY OF REQUIRED SPARE PARTS ANDTOOLS .

2 CONTRACTContracts for specialized repair to oil field

trucks

LOCATION : ALL AREAS PROJECT 03-03 :SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-03-03-0705 DRILLING RIG COMPLETE WITH ALL ACCESSORIES 1 SET Drilling rig requirement

LOCATION : ALL AREAS PROJECT 03-04 : SAFETY & ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-03-04-0710 SAFETY AND INSPECTION EQUIPMENT 15000 NOS. Safety equipment

HELMETS, GOGGLES, EAR PROTECTION, SAFETY BOOTS, HOSES, 5000 NOS.FOAM (LIQUID & DRY) … 4000 MTR.

5000 LIT.6000 KG.

08-9-03-04-0711

PAGE: 68 9RFN

Page 69: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 3ESTABLISHMENT NAME : IRAQI DRILLING CO. LOCATION : ALL AREAS PROJECT 03-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-03-05-0715 SPARE PARTS FOR H. VEHICLE & EQUIPMENT (CRANES, SHOVELS,

BULLDOZERS, FORK LIFTS) WITH TYRES, TUBES & BATTERIES 50000 NOS. Transportation requirements for rig and staff movements

08-9-03-05-0716 WORK SHOP EQUIPMENT & HAND TOOLS 3000 NOS.

08-9-03-05-0717 OIL FIELD TRUCK ( KENWORTH ) 3 NOS.

08-9-03-05-0718 LOW BED LOADER SUITABLE FOR RIGS MOVEMENT 6 NOS.

08-9-03-05-0719 BUSES 25 SEATERS WITH SPARE PARTS 10 NOS.

LOCATION : ALL AREAS PROJECT 03-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-03-06-0723CONTACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TOENSURES COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIERS WORKSABROAD

2 CONTRACT PSI contracts

PAGE: 69 9RFN

Page 70: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 7ESTABLISHMENT NAME : STATE COMPANY FOR OIL PROJECT LOCATION : ALL AREAS / MATERIALS WAREHOUSES PROJECT 04-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-04-01-0730 VALVES & FITTINGs 2000 item Maintenance requirements

08-9-04-01-0731 LINE PIPES (DIFFERENT SIZES & THICKNESS) 225 Km

08-9-04-01-0732 STEEL PLATES & SECTIONS 2000 TON Plate for water tanks, small product tanks etc

PAGE: 70 9RFN

Page 71: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 7ESTABLISHMENT NAME : STATE COMPANY FOR OIL PROJECT LOCATION : ALL AREAS

CONSTRUCTION EQUIPMENT PROJECT 04-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-04-05-0736 PIPE LAYER (SIDE BOOM) 50 TONS WITH RECOMMENDED SPARES 10 SET Pipelaying and construction

08-9-04-05-0737 WELDING TRACTOR (TWIN ARC) WITH RECOMMENDED SPARES 8 SET

08-9-04-05-0738 DRINKING WATER TANKER (6X4) (13M3) WITH RECOMMENDED SPARE PARTS 3 SET

08-9-04-05-0739 HEAVY WATER TANKER(6X4) (10 M3) WITH RECOMMENDED SPARE PARTS 1 SET

08-9-04-05-0740 TRUCK WITH CRANE (10 TONS) WITH RECOMMENDED SPARE PARTS 4 SET

08-9-04-05-0741 RADIAL DRILLING MACHINE WITH RECOMMENDED SPARE PARTS 1 SET

08-9-04-05-0742 HORIZONTAL BORING & MILLING MACHINE WITH RECOMMENDED SPARE PARTS (FOR WORK SHOP) 1 SET Workshop equipment

08-9-04-05-0743 LOW BED SEMI-TRAILER / THREE AXELS (70 TONS) WITH SPARES 3 SET Transportation equipment

08-9-04-05-0744 FLAT FORM SEMI-TRAILER / THREE AXELS (50 TONS) WITH SPARES 6 SET

08-9-04-05-0745 WATER TANK SEMI-TRAILER (30 M3) WITH SPARES 3 SET Potable water transportation

PAGE: 71 9RFN

Page 72: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 7ESTABLISHMENT NAME : STATE COMPANY FOR OIL PROJECT LOCATION : ALL AREAS

CONSTRUCTION EQUIPMENT PROJECT 04-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENTSPARE PARTS FOR : Spare parts for vehicles & equipment - CRANES (25 / 50 / 80 / 120 TONS) 500 NOS. - BULLDOZERS 1316 NOS. - EXCAVATORS 400 ITEM - PIPE LAYERS (SIDE BOOM) 278 NOS. - HEAVY TRUCKS 400 NOS. - LIGHT FIELD VEHICLE 500 NOS. - WHEEL LOADER 200 NOS. - WELDING MACHINES 200 NOS. - DIESEL GENERATORSspare parts for light field vehicles

200500

NOS.nos

08-9-04-05-0746

PAGE: 72 9RFN

Page 73: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 7ESTABLISHMENT NAME : STATE COMPANY FOR OIL PROJECT LOCATION : ALL AREAS / ENGINEERING INSPECTION PROJECT 04-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-04-06-0750 X- RAY EQUIPMENT 4 SET NDT & inspection equipment

X- RAY FILMS: - AGFA D4 OR EQUIV. 50 ROLL - AGFA D7 OR EQUIV. 50 ROLLPROCESSING CHEMICALS : - DEVELOPER 10000 LITER - FIXER 10000 LITER

08-9-04-06-0753 ISOTOPE SOURCE IR 192 140 4 NOS.

08-9-04-06-0754 ULTRASONIC THICKNESS GAUGE 4 NOS.

08-9-04-06-0755 PORTABLE HARDNESS TESTER 2 NOS.

08-9-04-06-0756 DYE PENETRANT AEROSOL KIT 50 SET

08-9-04-06-0757 WELD SEAM VACUUM TESTING DEVICE (1800, 900) 10 NOS.

08-9-04-06-0758 PORTABLE COATING THICKNESS GAUGE 4 NOS.

08-9-04-06-0759 POCKET DOSIMETER 30 NOS.

08-9-04-06-0760 POCKET RADIATION MONITOR 10 NOS.

08-9-04-06-0761 DOSE RATE MEASURING DEVICE 4 NOS.

08-9-04-06-0762 DIAL - DEPTIT GAUGE 20 NOS.

08-9-04-06-0763 SURFACE PROFILE COMPARATOR 20 NOS.

08-9-04-06-0751

08-9-04-06-0752

PAGE: 73 9RFN

Page 74: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 7ESTABLISHMENT NAME : STATE COMPANY FOR OIL PROJECT LOCATION : ALL AREAS / ENGINEERING INSPECTION PROJECT 04-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENTTECHNICAL RADIOGRAPHIC ACCESSORIES: Radiography equipment - SET OF EXPOSURE MARKERS/NUMBERS 20 SET - BLACK ADHESIVE TAPE 100 ROLL - PENETRAMETER (EF 10/16, EF 6/12) 40 SET

08-9-04-06-0765 MULTI-CHECK WELD GAUGE 20 NOS. NDT

08-9-04-06-0766 DYNAMOMETER TENSION GAUGE 20 NOS.

08-9-04-06-0767 MAGNIFYING GLASS INSPECTION MIRROR 20 NOS.

08-9-04-06-0768CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIER'S WORKS ABROAD

2 CONTRACT PSI contracts

08-9-04-06-0769ECHO SOUNDER FOR WATER DEPTH MEASUREMENT COMPLETE SYSTEM WITH HARDWARE, SOFTWARE & RECOMMENDED SPARE PARTS AND CONSUMABLES (SH)

4 SET Marine survey equipment

08-9-04-06-0770RANGE FINDER FOR (GIS) APPLICATIONS (GEOGRAPHICAL INFORMATION SYSTEM) COMPLETE WITH RECOMMENDED SPARE PARTS (SH)

2 SET GIS systems for field work

08-9-04-06-0771MODERN (GIS) STATION FOR (20) USERS, COMPLETE WITH ALL HARDWARE, SOFTWARE & RECOMMENDED SPARE PARTS AND CONSUMABLES (SH)

1 SET

08-9-04-06-0764

PAGE: 74 9RFN

Page 75: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 7ESTABLISHMENT NAME : STATE COMPANY FOR OIL PROJECT LOCATION : BAGHDAD PROJECT 04-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-04-06-0772

TRAINING OF TECHNICAL PERSONNEL ON TECHNOLOGIES, PROCESSES, SYSTEMS AND EQUIPMENT RELATED TO THE VARIOUS SECTORS OF THE INDUSTRY (UPSTREAM, DOWNSTREAM, DISTRIBUTION) COVERING VARIOUS ASPECTS SUCH US STUDIES, EVALUATION, DESIGN, TESTING OPERATION, TROUBLESHOOTING AND PROBLEM SOLVING .. THE TRAINING TO BE CARRIED (INSIDE AND OUTSIDE IRAQ ) ACCORDING TO PRE-AGREED PROGRAMS OUTLINED IN CONTRACTS TO BE SIGNED WITH SPECIALIZED INSTITUTES AND TRAINING ESTABLISHMENTS [MOO]

6 CONTRACT Training contracts

08-9-04-06-0773

TECHNICAL ASSISTANCE CONTRACTS TO CARRY OUT EVALUATION & APPRAISAL STUDIES / TECHNICAL ASSISTANCE / CONSULTANCIES FOR THE PURPOSE OF IDENTIFYING SOLUTIONS / REMEDIES TO SOME MAJOR PROBLEMS FACING THE OIL INDUSTRY AND / OR SELECTING NEW PROCESSES AND TECHNOLOGIES TO IMPROVE PERFORMANCE , ENHANCE PRODUCTION AND TO IMPROVE QUALITY - IN ALL ASPECTS OF THE OIL INDUSTRY [MOO]

6 CONTRACT Technical services contracts

08-9-04-06-0774VARIOUS MATERIAL, EQUIPMENT & ACCESSORIES FOR PRODUCTION OF TENDER DOCUMENT, DESIGN DRAWINGS, TECHNICAL CATALOGUES… & PERIPHERALS INCLUDING AN ARCHIVING SYSTEM (HARDWARE & SOFTWARE) COMPLETE WITH CONSUMABLES & ACCESSORIES [MOO]

20 ITEM Requirement for office systems and archiving

PAGE: 75 9RFN

Page 76: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 7ESTABLISHMENT NAME : STATE COMPANY FOR OIL PROJECT LOCATION : BAGHDAD PROJECT 04-07 : INTEGRATED TELECOMMUNICATION SYSTEM

FOR THE OIL INDUSTRY

CODE ITEM DESCRIPTION QTY UNIT COMMENTSTUDY & BASIC DESIGN FOR AN INTEGRATED TELECOMMUNICATION SYSTEM TO LINK THE MINISTRY OF OIL COMPLEX WITH THE HEADQUARTERS OF ALL OPERATING STATE COMPANIES IN BAGHDAD, KIRKUK, BASRAH & BEIJI EMPLOYING STATE OF THE ART TECHNOLOGIES IN TRANSMISSION OVER VARIOUS MEDIA:

Telecom equipment for Ministry of Oil project utilising existing equipment

MICROWAVE RADIO RELAY, WIRELESS LOCAL LOOP (WLL), V. SAT AND OPTIC FIBER CABLES, TOGETHER WITH A SUITABLE MODERN VOICE/DATA PABX WITH 300-500 EXTENSIONS. THE SYSTEM IS TO BE CAPABLE OF HANDLING LOCAL, NATIONAL & INTERNATIONAL TRAFFIC OF VOICE, DATA, E-MAIL & OTHER COMPUTER TRAFFIC. AS WELL AS SCADA INFORMATION. THE WORKS IS TO INCLUDE TECHNICAL ASSISTANCE AND ENGINEERING CONSULTANCY [MOO]

CONTRACT08-9-04-07-0780 5

PAGE: 76 9RFN

Page 77: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 4ESTABLISHMENT NAME : OIL EXPLORATION COMPANY LOCATION : ALL AREAS PROJECT 05-01: MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-05-01-0790 SEISMIC TELEMETRY RECORDING SYSTEM 1200 CHS. 1 SET Replacements for old units

08-9-05-01-0791 SEISMIC DRILLING RIG (300-400) MTR. DEPTH WITH DRILLING PIPES AND SPARE PARTS 8 SET Seismic drilling requirements

08-9-05-01-0792 SPARE PARTS FOR DRILLING RIGS 100 ITEM Spares

08-9-05-01-0793 VHF-FM TRANSCEIVER WITH ACCESSORIES 120 SET Communications

08-9-05-01-0794 COMPLETE AUTOMATED SURVEYING STATION WITH ACCESSORIES. Theodolite Fet 200 6 SET Central and outlying stations

08-9-05-01-0795 AUTOMATED SURVEYING SYSTEM 5 SET

08-9-05-01-0796 SEISMIC CABLE CARRIER TRUCK WITH SPARE PARTS 20 SET Seismic transport

PAGE: 77 9RFN

Page 78: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 4ESTABLISHMENT NAME : OIL EXPLORATION COMPANY LOCATION : ALL AREAS PROJECT 05-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTVAX DISCO SYSTEM PARTS AND SPARES:- Replacement operating system & spares

- 24” VERSATEC ELECTROSTATIC PLOTTER - FUJITSU 404 MB. WINCHESTER HARD M2351A - FPS100 ARRAY PROCESSOR UNIT - PDP11 UNIBUSS BI-DIRECTIONAL BD. - TELEX TAPE DRIVE MODEL 6253 - UNIBUSS SCSI CONTROLLER - 12GB. SCSI-II HARD DISK - DLT III TAPE

interactive seismic processing system/hardware & software: 36 set Replacement seismic processing system

- HARDWARE PC WITH ITS PERIPHERALS. 1 SET - SOFTWARE FOR 2D AND 3D BASIC AND ADVANCED 1 SET PROCESSING BASED ON PCS PLATFORM FOR AT LEAST 25 USERS.

08-9-05-02-0802 GEOLOGICAL SITE LABORATORY EQUIPMENT 6 SET UV light, balances etc

08-9-05-02-0800 10 ITEM

08-9-05-02-0801

PAGE: 78 9RFN

Page 79: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 4ESTABLISHMENT NAME : OIL EXPLORATION COMPANY LOCATION : ALL AREAS PROJECT 05-04: SAFETY & ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-05-04-0806 DRY POWDER FOR EXTINGUISHERS 3 TON Fire fighting consumables

08-9-05-04-0807 CO2 FILLING MACHINE FOR REFILLING EXTINGUISHER CYLINDERS 1 SET Filling machine for CO2 cylinders

LOCATION : ALL AREAS PROJECT 05-05: SERVICES AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-05-05-0810 FIELD BUSES WITH SPARE PARTS 12 SET Field transportation equipment

08-9-05-05-0811 POTABLE WATER TANKERS 14000Ltrs. WITH SPARE PARTS 2 SET

08-9-05-05-0812 DIESEL GENERATORS 400 KVA WITH SPARE PARTS 20 SET

08-9-05-05-0813 CRANE ( 35 TONS ) WITH SPARE PARTS. 1 SET

08-9-05-05-0814 SPARE PARTS FOR( RICOH ) COPIER TYPE FT-7950 AND FW-750 73 ITEM Office equipment and consumables - TONER FOR COPIER 80 BOTL. - DEVELOPER FOR COPIER 44 BAG

08-9-05-05-0816 FACILITIES OPTIONS FOR ( RICOH ) COPIERS TYPE FT-7950 & FW-750 16 SET

08-9-05-05-0817 BLACK & WHITE COPIER MACHINE FOR PLANE PAPER UP TO A3 SIZE WITH ALL OPTIONS AND SPARE PARTS. 1 SET

08-9-05-05-0815

PAGE: 79 9RFN

Page 80: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 4ESTABLISHMENT NAME : OIL EXPLORATION COMPANY LOCATION : ALL AREAS PROJECT 05-06 : TESTING , INSPECTION, STUDIES, SURVEYS

AND LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-05-06-0821 AUTOFLOOD-RESERVOIR CONDITION,COREFLOODING SYSTEM (RPDS) 1 SET Oil recovery

08-9-05-06-0822 CAPRIWET SYSTEM WITH SPARE PARTS . 1 SET Core analysis

08-9-05-06-0823 DEAN STARK UNIT WITH SPARE PARTS . 1 SET

08-9-05-06-0824 SOXHLET EXTRACTOR, GLASS , PLUG SIZE ( 6-UNIT) WITH SPARE PARTS. 1 SET

08-9-05-06-0825 RAPID INCINERATOR APPARATUS FOR TOTAL DISSOLVED SALT(TDS) 1 SET

08-9-05-06-0826 PYROLYSIS-GC WITH SPARE PARTS . 1 SET

08-9-05-06-0827 2D BASIN-MODELING MULTI-WELL (SOFTWARE) 1 SET Core Analysis Software - WATER BATH FOR DENSITY . 2 SET Core analysis equipment - GHORCHELL FOR TEMP. CONTROLLING 1 SET

08-9-05-06-0829 SCANNING ELECTRON MICROSCOPE WITH ENERGY DISPERSIVE X-RAY & COATING INSTRUMENT. 1 SET

08-9-05-06-0830CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIER'S WORKS ABROAD.

2 CONTRACT PSI Contracts

08-9-05-06-0828

PAGE: 80 9RFN

Page 81: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 8ESTABLISHMENT NAME : NORTH REFINERIES COMPANY LOCATION : BAIJI PROJECT 06-01 : MAINTENANCE AND OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTINSTRUMENTATION AND CONTROL SYSTEMS WITH SPARES :

- U.P.S SYSTEMS 500 SET Items for maintenance

- FIELD INSTRUMENTS 3000 SET " - ANALYZERS 50 NOS. " - CONTROL ROOM INSTRUMENTS 800 SET " - EXTENSION CABLES FOR CONTROL & SIGNAL CABLES 50000 MTR. " - PLC SYSTEMS TO REPLACE EXISTING OBSOLETE CONTROLS 150 SET " - MAINTENANCE TOOLS 150 SET " - INDUSTRIAL COMPUTER & MONITOR FOR PROCESS CONTROL 100 SET " - ANALYTICAL INSTRUMENTS : (PH METER, CONDUCTIVITY 50 NOS. " METER, MOISTER ANALYZER,...) " - SPARE PARTS FOR EXISTING INSTRUMENTATION 500 SET "MECHANICAL EQUIPMENT: - MAINTENANCE TOOLS (HAND & POWER ) 700 SET Items for maintenance - PIPES VARIOUS SIZES 100000 MTR. " - FITTINGS 20000 SET " - VALVES, STRAINERS, WITH DIFFERENT SIZES & TYPES 15000 NOS. " - GASKETS 5000 SET " - PLATE FOR DRUM MAKING 3000 TON " - BEARINGS, COUPLINGS, SPACERS, SEALS, ... 500 SET " - REFRIGERATOR COMPRESSORS 200 SET "

08-9-06-01-0840

08-9-06-01-0841

PAGE: 81 9RFN

Page 82: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 8ESTABLISHMENT NAME : NORTH REFINERIES COMPANY LOCATION : BAIJI PROJECT 06-01 : MAINTENANCE AND OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-06-01-0842 CATALYSTS FOR HYDRO TREATMENT & REFORMER 500 TON Platinum catalyst for hydrotreaters &

reformers

08-9-06-01-0843 CHEMICALS FOR PROCESS UNITS (SOLVENTS, INHIBITORS, ...) 1500 TON Solvents & inhibitors for lube plants

08-9-06-01-0844 CHEMICAL FOR COOLING WATER CIRCULATION 1500 TON MEK, carbonates, NaOH

08-9-06-01-0845 CHEMICALS FOR BOILER FEED WATER 1000 TON Resins for ion exchangeADDITIVES : - TETRA ETHYL LEAD ( T.E.L ) 2000 TON RON enhancer - ADDITIVES FOR MOTOR ENGINE OILS 1500 TON Quality improvers - ADDITIVES FOR DIESEL ENGINE OILS 1500 TON Quality improvers - ADDITIVES FOR VISCOSITY INDEX IMPROVEMENT 150 TON Quality improvers - AUTOMATIC TRANSMISSION FLUID ( A.T.F ) 100 TON Quality improversELECTRICAL EQUIPMENT WITH RECOMMENDED SPARES :

- MOTORS WITH RECOMMENDED SPARES 150 SET Equipment to maintain control systems

- LIGHTING & LIGHTING FIXTURES 1000 SET " - FIELD CONTROL EQUIPMENT 3000 SET " - CABLES 100000 MTR. " - MAINTENANCE HAND TOOLS, (AVOMETERS, SOLDERING UNIT, ...) 200 SET " - SPARE PARTS FOR EXISTING ELECTRICAL EQUIPMENT 200 ITEM "

- ELECTRIC MOTOR DRIVEN COMPRESSOR. Transferred from 08-8-06-02-0820 5 SET

reverse osmosis unit and spares, transferred from 08-8-06-08-0875 20000 item

08-9-06-01-0846

08-9-06-01-0847

PAGE: 82 9RFN

Page 83: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 8ESTABLISHMENT NAME : NORTH REFINERIES COMPANY LOCATION : BAIJI PROJECT 06-02 : REHABILITATION/REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTCOMPLETE ROTATING MECHANICAL & ELECTRICAL EQUIPMENT WITH RECOMMENDED SPARES FOR REVAMPING OF EXISTING FACILITIES:

- PUMPS, VARIOUS SIZES 150 SET Replacements for inoperative equipment

- TURBINES, VARIOUS SIZES 100 SET "

- GEAR BOXES, FANS 70 SET "

- AIR COMPRESSORS 50 SET "

- HEAT EXCHANGER BUNDLES & AIR COOLER FIN FAN 100 SET " BUNDLES " - BOILER COMPLETE WITH ACCESSORIES 2 SET " - SUPER HEATERS FOR BOILERS 10 SET " - CHILLERS & EXCHANGER 100 SET " - BURNERS 100 SET " - BLOWERS & SOOT BLOWERS 100 SET " - FURNACE WITH ACCESSORIES 2 SET " - AIR CONDITIONING EQUIPMENT FOR CONTROL ROOMS 100 SET " - VESSELS, COLUMNS, DRUMS AND FLARE TIP VESSELS . 600 SET " - COOLING TOWER PACKING 100 SET " - TRANSFORMERS (REPLACEMENT FOR DAMAGED ONES) 20 ITEM " - EQUIPMENT FOR SUBSTATIONS 20 ITEM " - EMERGENCY GENERATORS (TURBOGAS AND DIESEL) (3) NOS. 50 ITEM " WITH ACCESSORIES

08-9-06-02-0851

PAGE: 83 9RFN

Page 84: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 8ESTABLISHMENT NAME : NORTH REFINERIES COMPANY LOCATION : BAIJI PROJECT 06-02 : REHABILITATION/REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-06-02-0852 REHABILITATION OF THE THREE EXISTING “LGO” HYDRO TREATING

UNITS INCLUDING ALL NECESSARY EQUIPMENT AND MATERIALS. 6 CONTRACT Contract to construct a light gas oil hydrotreater

PAGE: 84 9RFN

Page 85: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 8ESTABLISHMENT NAME : NORTH REFINERIES COMPANY LOCATION : BAIJI PROJECT 06-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-06-03-0855 INSTALLATION OF THE PRESSURE SWING ABSORPTION SYSTEM (PSA)

FOR EXISTING HYDROGEN PRODUCTION UNIT 5 CONTRACT Contract to increase hydrogen production

- ERECTION EQUIPMENT, TOOLS AND CONSUMABLE 100 ITEM Equipment to construct isomerisation unit

MATERIALS, … FOR ISOMERIZATION UNIT AND OTHERS. - SERVICE CONTRACTS FOR SUPERVISION OF INSTALLATION 6 CONTRACT "

& COMMISSIONING OF THE ISOMERRATION UNIT

- MACHINES FOR EXISTING BOTTLING PLANT FOR BOTTLES , 5 CONTRACTEquipment to manufacture storage

requirements CANS AND BARRELS WITH RECOMMENDED SPARE PARTS . 600 SET " - SPARE PARTS FOR THE CONTINUOS OPERATION OF THE 8000 NOS. "

BOTTLING PLANT "

08-9-06-03-0858TECHNICAL ASSISTANCE/ ENGINEERING CONSULTANCY FOR EQUIPMENT & PLANT SURVEY TO IMPROVE EFFICIENCY AND PRODUCT QUALITY AND TO REMOVE BOTTLENECKS LEADING TO INCREASED PLANT EFFICIENCY

5 CONTRACT Contract to advise on increasing plant efficiency

- TELEPHONE EXCHANGE 1000 LINE (PABX) COMPLETE WITH 1 SET Replacement telephone exchange ALL ACCESSORIES on hold since Phase 5 - INTERCOM UNITS WITH CENTRAL CONTROL 50 SET "

- TANKS (5000-20000 M3), VARIOUS SIZES WITH NECESSARY Replacement of 30 product tanks

COMPLIMENTARY EQUIPMENT & MATERIALS from 5-20,000 M3

08-9-06-04-0861 fire fighting system and safety equipment, transferred from 08-8-06-04-0841 6 item

30 SET08-9-06-03-0860

08-9-06-03-0856

08-9-06-03-0859

08-9-06-03-0857

PAGE: 85 9RFN

Page 86: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 8ESTABLISHMENT NAME : NORTH REFINERIES COMPANY LOCATION : BAIJI PROJECT 06-06 : TESTING, INSPECTION, STUDIES, SURVEYS AND

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENTENVIRONMENTAL POLLUTION MEASURING EQUIPMENT WITH RECOMMENDED SPARE PARTS FOR POLLUTION CONTROL OF AIR & OIL SPILLS ON LAND & IN WATER SOURCES

100 SET Equipment for pollution control

FIRE FIGHTING AND SAFETY EQUIPMENT427 ITEM

OIP approval additional items transferred from 08-8-06-04-0841

08-9-06-06-0865 MEASURING EQUIPMENT AND ANALYZERS FOR QUALITY CONTROL OF PRODUCTS 300 SET Equipment to enhance product quality

08-9-06-06-0866CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIERS WORKS ABROAD

5 CONTRACT Contracts to provide PSI

08-9-06-06-0867TECHNICAL SERVICE CONTRACT: SURVEY, STUDIES & ASSISTANCE FOR EQUIPMENT SURVEY, EFFICIENCY STUDIES & TECHNICAL ASSISTANCE, FOR IMPROVEMENT OF MAINTENANCE & OPERATION.

4 CONTRACT Technical Service Contracts for plant improvement

08-9-06-06-0864

PAGE: 86 9RFN

Page 87: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 8ESTABLISHMENT NAME : NORTH REFINERIES COMPANY LOCATION : BAIJI PROJECT 06-07 : FCC UNIT

CODE ITEM DESCRIPTION UNIT COMMENTKNOW-HOW, MATERIALS & EQUIPMENT REQUIRED FOR THECONTINUATION OF THE PROJECT TO INSTALL A FLUIDIZED CATALYTICCRACKING “FCC” UNIT WITH THE OTHER REQUIRED DOWN STREAMUNITS CONSISTING OF THE FOLLOWING ITEMS:

FCC processing unit, carried forward from phase 7

HEAT EXCHANGERS, AIR COOLERS, RISER, REGENERATORS, INSTRUMENTS, COLUMNS, ELECTRICAL EQUIPMENT, ROTATING EQUIPMENT, WELDING EQUIPMENT AND TOOLS, WELDING RODS, PIPES, FITTINGS, INCLUDING TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY

Complementary equipment for FCC unit

LOCATION : BAIJI PROJECT 06-08 : DELAYED COKE UNIT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-06-08-0874STUDY, LICENSE AND BASIC DESIGN FOR DELAYED COKE UNIT, HYDRO DESULFURIZATION UNIT & CALCINING UNIT FOR THE EXTRACT AND/OR DECANTED OIL AS FEED TO THE DELAYED COKE UNIT.

4 CONTRACT Requirements for Coke Unit

10 CONTRACT08-9-06-07-0871

PAGE: 87 9RFN

Page 88: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.:8 OF 8ESTABLISHMENT NAME : NORTH REFINERIES COMPANY LOCATION : BAIJI PROJECT 06-09 : ZEO REFORMER

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-06-09-0878STUDY, LICENSE, BASIC DESIGN AND COMMENCEMENT OF THE WORKS FOR THE INSTALLATION OF A ZEO REFORMER FOR THE TRANSFORMATION OF NATURAL GASOLINE TO HIGH OCTAIN FUEL

4 CONTRACT Requirements for ZEO reformer unit to increase quality

PAGE: 88 9RFN

Page 89: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 7ESTABLISHMENT NAME : MIDLAND REFINERIES COMPANY LOCATION : DAURA REFINERY PROJECT 07-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTSPARE PARTS FOR EXISTING PUMPS, COMPRESSORS, FANS, GEARS STEAM TURBINES, ROTARY FILTERS… 2000 NOS. Repair & maintenance

PUMS COMPLETE WITH RECOMMENDED SPARE PARTS/PACIFIC COMPLETE HORIZONTAL CENTRIFUGAL PUMPS WITH SPARE PARTS, transferred from 08-8-07-02-0910

7O Items

SPARE PARTS FOR EXISTING ELECTRICAL EQUIPMENT:LAMPS, LIGHTING FITTINGS, COMPLETE MOTOR CONTROL CENTERS, MEDIUM VOLTAGE SWITCHGEAR, PROTECTION SYSTEMS, COMPLETE MOTORS AND AUTO TRANSFORMERS WITH STARTER AND ACCESSORIES

Repair & maintenance

SPARE PARTS FOR EXISTING INSTRUMENTS, COMPLETE INSTRUMENTS AND ACCESSORIES, CONTROL VALVES 4000 NOS. Repair & maintenance

- TRANSFERRED FROM 08-8-07-06-0956: LABORATORY INSTRUMENTS 21 ItemsLab equipmenttransferred from 08-8-07-06-0956 1 Set

08-9-07-01-0891 IMPLEMENTATION OF RELIABILITY BASED MAINTENANCE PROGRAM FOR MAINTENANCE MANAGEMENT 5 CONTRACT Study & recommendations following on plan from

phase 8

08-9-07-01-0892 TETRA ETHYL LEAD (TEL) 300 TON Product quality improvement

08-9-07-01-0893 CAUSTIC SODA 500 TON Product quality improvement

08-9-07-01-0894 LUBE OIL ADDITIVES FOR GASOLINE ENGINES 400 TON Product quality improvement

08-9-07-01-0895 LUBE OIL ADDITIVES FOR DIESEL ENGINES 1200 TON Product quality improvement

08-9-07-01-0896 MEK (METHYL ETHYL KETON) 500 TON Dewaxing solvent

08-9-07-01-0897 FURFURAL 518 TON Requirement for lube oil treatment15000 NOS. Requirements for boiler repair60000 MTR.

08-9-07-01-0899 COOLING TOWERS PACKING 20 SET Internal structural requirement

08-9-07-01-0900 HEAT RESISTANT CEMENT AND REFRACTORY 100 TON Requirements for boiler/chimney repair

25000 NOS.

PIPES & FITTINGS, BOILER TUBES, FURNACE TUBES BURNERS

08-9-07-01-0890

08-9-07-01-0889

08-9-07-01-0898

08-9-07-01-0888

PAGE: 89 9RFN

Page 90: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 7ESTABLISHMENT NAME : MIDLAND REFINERIES COMPANY LOCATION : DAURA REFINERY PROJECT 07-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-07-01-0901 HEAT RESISTANT PAINTS 20000 LIT. Maintenance requirements

08-9-07-01-0902 ALUMINUM SHEETS FOR INSULATION PROTECTION WITH BINDING TAPES 100 TON Pipe insulation requirements

08-9-07-01-0903 TOWER INTERNALS, TRAYS, DOWNCOMERS, BOLTS & NUTS 20000 NOS. Internals for tower units

08-9-07-01-0904 ALKALINE & ACID BATTERIES FOR VARIOUS USES, AND CAPACITIES 500 NOS. Various accumulator requirements

ELECTRICAL EQUIPMENT (MCC, MOTORS, STARTER,…) 100 ITEM Electrical spares requirementsWITH SPARES 50 SET

Motors with recommended spare parts�transferred from 08-8-07-01-0891 26 ITEM OIP approval new item Comm. 930595

60000 MTR. Cabling for control systems1000 SET400 NOS. Control instrumentation 80 SET

ELECTRIC & INSTRUMENT CABLES & ACCESSORIES

INSTRUMENTATION EQUIPMENT08-9-07-01-0907

08-9-07-01-0906

08-9-07-01-0905

PAGE: 90 9RFN

Page 91: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 7ESTABLISHMENT NAME : MIDLAND REFINERIES COMPANY LOCATION : DAURA REFINERY PROJECT 07-02 : REHABILITATION / REVAMPING OF

EXISTING INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTCOMPLETE PUMPS AND COMPRESSORS WITH MOTOR OR STEAM TURBINE DRIVE, FANS COMPLETE, VARIATORS, MIXERS, GEARBOXES, SOOT BLOWERS

50 ITEM Scheduled replacement of equipment

Spare parts for existing steam/Worthington turbinetransferred from 08-8-07-02-0880 1380 Nos

08-9-07-02-0916CONTROL SYSTEMS FOR PROCESS UNITS AND EQUIPMENT, MONITORING SYSTEMS FOR TANKS, COMPRESSORS, INSTRUMENTS AND ACCESSORIES FOR CONTROL ROOMS

50 ITEM Replacing pneumatic systems with electric

08-9-07-02-0917 MOTOR WINDING COPPER WIRES, DIFFERENT SIZES 15 TON Maintenance requirements

08-9-07-02-0918 PLATES FOR TWO TANKS 15000 M3 CAPACITY 500 TON 1*product,1*crude storage tank

LOCATION : DAURA REFINERY PROJECT 07-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENTSYSTEM FOR RAISING COMBUSTION EFFICIENCY FOR BOILER & FURNACES INCLUDING ENGINEERING ASSISTANCE & CONSULTANCY 5 CONTRACT Tender based on previous study

AUTOMATIC LUBE OIL PLANT WITH SPARE PARTS 1 CONTRACT NON OIP Comm 930394 08-9-07-03-0921

08-9-07-02-0915

PAGE: 91 9RFN

Page 92: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 7ESTABLISHMENT NAME : MIDLAND REFINERIES COMPANY LOCATION : DAURA REFINERY PROJECT 07-04 : SAFETY & ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-07-04-0925 REVAMPING WASTE WATER TREATING UNIT 5 CONTRACT Continued upgrading of water treatment plant

HELMETS, GOGGLES, EAR PROTECTION, SAFETY BOOTS, HOSES, 5000 NOS. Safety and fire fighting requirementsFOAM (LIQUID & DRY) … 4000 MTR.

5000 LIT.6000 KG.

08-9-07-04-0927 OIL SKIMMERS AND OIL SPILLAGE CONTROL EQUIPMENT 10 SET Pollution controlSEALS FOR FLOATING ROOF TANKS DRAINAGE, FLEXIBLE 5 ITEM Maintenance of storage facilitiesHOSES AND OTHER ACCESSORIES 1000 MTR.

08-9-07-04-0926

08-9-07-04-0928

PAGE: 92 9RFN

Page 93: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 7ESTABLISHMENT NAME : MIDLAND REFINERIES COMPANY LOCATION : DAURA REFINERY PROJECT 07-05 : SERVICES & PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-07-05-0933 MINI BUS (12 PASSENGERS) 5 NOS. Staff movement

08-9-07-05-0934 REFUSE COLLECTOR 1 NO. Site clearance

08-9-07-05-0935 CESSPIT TANKERS 4 NOS. Sewage removal

08-9-07-05-0936 TANKERS WEIGHING STATION (100 TON) 1 SET Lube oil tanker weighscale

08-9-07-05-0937 GENERAL TOOLS (HAND, POWER) FOR MAINTENANCE 2000 NOS. Maintenance

08-9-07-05-0938 HYDRAULIC CRANE (15 120 TONS) 5 NOS. Heavy lift requirement

08-9-07-05-0939 DUMP TRUCK 16 TONS 4 NOS. Removal of scrap metal

CATER PILLAR PIPELAYER, TRANSFERRED FROM 08-8-07-05-0940 1 unit, 3100 pcs

08-9-07-05-0940 BOX TRAILER 35 TONS 2 NOS. Transport of chemicals

08-9-07-05-0941 WINCH TRUCK 2 NOS. Equipment movement

08-9-07-05-0942 SPARE PARTS FOR EXISTING HEAVY EQUIPMENT (CRANES, SHOVELS, …) 1000 NOS. Maintenance

08-9-07-05-0943 TYRES & TUBES, VARIOUS SIZES FOR BUSES, TRUCKS & OTHER VEHICLES, FORKLIFTS, CRANES… 2400 NOS. Assorted tryes and inner tubes

PAGE: 93 9RFN

Page 94: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 7ESTABLISHMENT NAME : MIDLAND REFINERIES COMPANY LOCATION : DAURA REFINERY PROJECT 07-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-07-06-0949 INSPECTION & LABORATORY EQUIPMENT 50 SET NDT & quality control

08-9-07-06-0950 PORTABLE VIBRATION MONITORS ,ANALYZERS FOR ROTATING EQUIPMENT & ACCESSORIES FOR PREVENTIVE MAINTENANCE 200 NOS. Vibration monitoring on installed

equipment

08-9-07-06-0951MEASURING INSTRUMENTS, FOR AMP, VOLTAGE RESISTANCE, MEGGER POTENTIAL TO SOIL VOLTMETER, INSULATION TESTER, CABLE LOCATOR

200 NOS. AVO's, Megga's etc

08-9-07-06-0952 - CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIERS WORKS ABROAD

2 CONTRACT Contracts to allow PSI

- TRANSFERRED FROM 08-8-07-06-0958: STUDY RELIABILITY BASED MAINTENANCE 1 CONTRACT

08-9-07-06-0953TECHNICAL SERVICE CONTRACT, SURVEY, STUDIES & ASSISTANCE FOR EQUIPMENT SURVEY, EFFICIENCY STUDIES & TECHNICAL ASSISTANCE FOR IMPROVEMENT OF MAINTENANCE & OPERATION EFFICIENCY. (To include 08-8-07-06-0958 as this contract is to be financed from ph IX)

4 CONTRACT Contracts for studies for increased efficiency

LOCATION : DAURA REFINERY PROJECT 07-07 : WATER TREATMENT UNIT(RO)

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-07-07-0956WATER TREATMENT UNIT COMPLETE WITH ACCESSORIES AND RECOMMENDED SPARE PARTS (200 M3/HOUR CAPACITY) INCLUDING TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY

6 CONTRACTContinued improvement to water treatment

plant

PAGE: 94 9RFN

Page 95: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 7ESTABLISHMENT NAME : MIDLAND REFINERIES COMPANY LOCATION : DAURA REFINERY PROJECT 07-08 : MEROX UNITS TO IMPROVE KEROSENE AND GASOLINE QUALITY

CODE ITEM DESCRIPTION QTY UNIT COMMENTKEROSENE & NAPHTHA MEROXS UNITS AND ACCESSORIES :

- UNIT CAPACITY FOR KEROSENE 1850 B/DAY Contract & equipmentto improve quality of

- UNIT CAPACITY FOR NAPHTHA 1958 B/DAY kerosene and naphtha - TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY by reducing sulphur compounds

LOCATION : DAURA REFINERY PROJECT 07-09 : GASOIL DESULPHURIZATION UNIT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-07-09-0964

KNOW-HOW, EQUIPMENT AND MATERIALS FOR THE CONTINUATION OF THE PROJECT TO INSTALL GASOIL DESULPHURIZATION UNIT COMPLETE WITH ACCESSORIES AND RECOMMENDED SPARE PARTS, CAPACITY (22000) B/DAY INCLUDING TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY

10 CONTRACTContract and equipment to reduce sulphur

levels from 12,000 ppm to 500 ppm

6 CONTRACT08-9-07-08-0960

PAGE: 95 9RFN

Page 96: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 7ESTABLISHMENT NAME : SOUTH REFINERIES COMPANY LOCATION : BASRAH PROJECT 08-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENTSPARES FOR EXISTING ROTATING EQUIPMENT (PUMPS, 25000 NOS. Maintenance of existing pumps etcCOMPRESSORS, TURBINES, GEARBOXES, FANS AND OTHER 150 SET UNITS - PIPES OF DIFFERENT SIZES & SCHEDULES 80000 MTR. Equipment and spares

- FITTINGS, VALVES, SAFETY VALVES 60000 SET "

- WELDING ELECTRODES 30 TON " - GASKETS & BEARINGS 500 SET " - HEAT EXCHANGER TUBES AND BUNDLES 60000 MTR. "

80 SET " - ELECTRICAL EQUIPMENT (MCC, MOTORS COMPLETE, 5000 NOS. Electrcial equipment for maintenance STARTERS, METERS, CIRCUIT BREAKERS, FUSES, CONTACTORS, 50 SET SWITCHGEARS) WITH RECOMMENDED SPARE PARTS - ELECTRIC AND INSTRUMENT CABLES & ACCESSORIES 80000 MTR. Cables & accessories (SUCH AS JOINTS & SLEEVES) 5000 SET - CONTROL VALVES, TRANSMITTERS, CONTROLLERS, COMPLETE 400 NOS. Equipment and spares WITH SPARES 200 SET - SPARES FOR EXISTING INSTRUMENTS 100 SET

2000 NOS.

08-9-08-01-0975

08-9-08-01-0976

08-9-08-01-0977

08-9-08-01-0979

08-9-08-01-0978

PAGE: 96 9RFN

Page 97: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 7ESTABLISHMENT NAME : SOUTH REFINERIES COMPANY LOCATION : BASRAH PROJECT 08-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENTCHEMICALS AND ADDITIVES : - TETRA ETHYL LEAD (TEL) 800 TON Quality improvers - ADDITIVES FOR MOTOR ENGINE OILS 1100 TON - ADDITIVES FOR DIESEL ENGINE OIL 2300 TON - ADDITIVES FOR VISCOSITY IMPROVER 80 TON - WATER TREATMENT CHEMICALS 100 TON Water treatment requirements - CORROSION INHIBITORS 50 TON - CAUSTIC SODA 1000 TON - SODIUM CARBONATE FOR PH NEUTRALIZATION 200 TON - NEUTRALIZER FOR PROCESS UNITS & STEAM SYSTEM 80 TON

08-9-08-01-0981 ACCESSORIES AND SPARE PARTS FOR PABX & TELEPHONES 10 ITEM Replacement of defunct PABX system

08-9-08-01-0980

PAGE: 97 9RFN

Page 98: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 7ESTABLISHMENT NAME : SOUTH REFINERIES COMPANY LOCATION : BASRAH PROJECT 08-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-08-02-0987 REPLACEMENT OF DAMAGED PUMPS, COMPRESSORS, TURBINES, GEARBOXES, FANS... WITH SPARES 75 SET Spares for process cooling systems

08-9-08-02-0988 CONTINUATION OF THE REVAMPING AND UPGRADING OF PRESENT CONTROL SYSTEMS TO A FULLY AUTOMATED ONES 2 SYSTEM Replacing pneumatic controls with electrical

08-9-08-02-0989 CONTINUATION OF THE INSIDE LINING OF THE EXISTING COOLING WATER NETWORK TO GET MORE RELIABILITY IN THE LUBE OIL PLANT 50 ITEM Replacement lining for cooling water systems

08-9-08-02-0990 REHABILITATION OF THE ASPHALT UNIT INCLUDING KNOW-HOW, MATERIALS & EQUIPMENT 6 CONTRACT

Requirements to increase efficiency of asphalt unit

LOCATION : BASRAH PROJECT 08-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-08-03-0994CONTINUATION OF INCREASING STORAGE CAPACITIES BY ADDING NEW TANKS OF VARIOUS CAPACITIES (CRUDE & PRODUCTS) WITH ALL ACCESSORIES

10 ITEM The construction of 5 replacement crude and product tanks

08-9-08-03-0995 CONTINUATION OF UPGRADING OF THE CAPACITY OF EXISTING ATMOSPHERIC UNIT (140 200) B/DAY 50 ITEM

The upgrading of atmospheric units to increase throughput from 140 to 200,000

bpd

PAGE: 98 9RFN

Page 99: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 7ESTABLISHMENT NAME : SOUTH REFINERIES COMPANY LOCATION : BASRAH PROJECT 08-04 : SAFETY & ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-08-04-0999 FIRE FIGHTING VEHICLES WITH SPARE PARTS 4 NOS. Fire fighting requirements

SAFETY EQUIPMENT AND PERSONAL CONSUMABLE ITEMS : 20 ITEM SAFETY BOOTS, FIRE FIGHTING OVERALL SUITS,GLOVES, GOGGLES, HELMETS, HOSES…fire protection equipment 20 item Safety requirements

08-9-08-04-1001 TESTING AND MEASURING ENVIRONMENTAL PROTECTION EQUIPMENT WITH RECOMMENDED SPARE PARTS (FOR H2S, CO2)

20 ITEM Testing equipment for H2S, CO2 etc

08-9-08-04-1002 INDUSTRIAL WASTE WATER TRANSPORTATION & DISPOSAL FACILITIES 10 ITEM Waste water facilities

08-9-08-04-1003 FIRE FIGHTING CHEMICALS AND FOAM (CONSUMABLES) 100 TON Fire fighting consumables

08-9-08-04-1000

PAGE: 99 9RFN

Page 100: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 7ESTABLISHMENT NAME : SOUTH REFINERIES COMPANY LOCATION : BASRAH PROJECT 08-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-08-05-1008 TANKERS FOR DRINKING WATER WITH SPARE PARTS 2 NOS. Drinking water distribution

08-9-08-05-1009 AMBULANCES WITH SPARE PARTS 2 NOS. Health & safety requirements

08-9-08-05-1010 GARBAGE VEHICLES WITH SPARE PARTS 3 NOS. Sanitation requirements

08-9-08-05-1011 VAC-ALL FOR WASTE WATER WITH SPARES 3 NOS. Waster water disposal

08-9-08-05-1012 FUEL TANKER WITH SPARES 1 NO. Fuel distribution requirements

08-9-08-05-1013 SPARE PARTS FOR THE EXISTING VEHICLES AND FIELD EQUIPMENT 200 SET Maintenance requirements

08-9-08-05-1014 MAINTENANCE TOOLS (HAND TOOLS / POWER TOOLS) 1000 set Maintenance requirementsAIR-CONDITIONING EQUIPMENT FOR CONTROL ROOMS WITH 100 SET Maintenance requirementsSPARE PARTS 25 ITEM "08-9-08-05-1015

PAGE: 100 9RFN

Page 101: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 7ESTABLISHMENT NAME : SOUTH REFINERIES COMPANY LOCATION : BASRAH PROJECT 08-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENTMEASURING EQUIPMENT, ANALYZERS AND SYSTEMS FOR 200 NOS. NDT requirements

INSPECTION WITH RECOMMENDED SPARE PARTS 100 SET "

TESTING EQUIPMENT WITH RECOMMENDED SPARE PARTS FOR 100 NOS. Product quality controlQUALITY ANALYSIS 50 SET

08-9-08-06-1022CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIER’S WORKS ABROAD

3 CONTRACT Contracts for PSI

08-9-08-06-1023TECHNICAL SERVICE CONTRACT, SURVEY, STUDIES & ASSISTANCE FOR EQUIPMENT SURVEY, EFFICIENCY STUDIES & TECHNICAL ASSISTANCE FOR IMPROVEMENT OF MAINTENANCE & OPERATION EFFICIENCY.

4 CONTRACT TSC for plant efficieny

08-9-08-06-1021

08-9-08-06-1020

PAGE: 101 9RFN

Page 102: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 7ESTABLISHMENT NAME : SOUTH REFINERIES COMPANY LOCATION : BASRAH PROJECT 08-07 : REFORMING TO IMPROVE OCTAIN NO. & LGO

HYDRO TREATMENT TO REDUCE SULPHUR

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-08-07-1026CONTINUATION OF STUDY, LICENSING AND DESIGN OF NEW REFORMING UNIT AND LIGHT GASOIL HYDROTREATING UNIT WITH OTHER REQUIRED UNITS INCLUDING TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY LEADING TO FULL CONTRACTS

6 CONTRACTContract for process units to increase

octane level of motor spirit, and reduce sulphur content in gas oil

LOCATION : BASRAH PROJECT 08-08 : WATER SUPPLY PLANT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-08-08-1029WATER SUPPLY PLANT COMPLETE (PIPES, DESALINATION UNITS, CLARIFIORS, FILTERS, ELECTRICAL, CONTROL, & INSTRUMENTATION, TELEPHONIC SERVICES, TANKS & OTHERS NECESSARY ITEMS) INCLUDING TECHNICAL / ENGINEERING CONSULTANCY

10 CONTRACT

Complete raw water intake and treatment plantt at Garmat Ali (including

housing,operations facilities, boilers, R/O units etc) to supply the whole of the South

Oil Company region

PAGE: 102 9RFN

Page 103: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 7ESTABLISHMENT NAME : NORTH GAS COMPANY LOCATION : KIRKUK PROJECT 09-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENTCHEMICALS FOR PROCESS UNITS: - DIETHANOL AMINE 1000 TON Chemicals for process units - METHANOL 100 TON " - ANTI FOAM 10 TON " - CAUSTIC SODA 400 TON " - CATALYST FOR CLAUS PROCESS SULPHUR RECOVERY UNITS 140 TON Catalyst for reducing sulphur levelsACTIVATED CARBON FOR :

- MERCURY REMOVAL FROM NATURAL GAS Activated carbon for various processes

- DIETHANOL AMINE TREATMENT " - LP STEAM CONDENSATE . "DESCICCANT : - MOLECULAR SIEVES FOR HYDROCARBON GAS DRYERS & 215 TON Dessicant for water removal AIR DRYING FOR NITROGEN UNIT - ACTIVATED ALUMINA FOR INSTRUMENT AIR DRYERS 10 TON Dessicant for water removal

08-9-09-01-1043 ANTHRACITE FOR WATER TREATMENT (RAW WATER, COOLING WATER AND WASTE WATER FILTERS) 150 TON Raw water treatment filters

08-9-09-01-1044 CHEMICALS FOR COOLING TOWER & BOILERS & SERVICE WATER TREATMENT 500 TON Chemicals for water treatment

08-9-09-01-1045 RESINS (FOR WATER DEMI UNITS) 100 M3 Ion exchange resins

100 TON

08-9-09-01-1042

08-9-09-01-1041

08-9-09-01-1040

PAGE: 103 9RFN

Page 104: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 7ESTABLISHMENT NAME : NORTH GAS COMPANY LOCATION : KIRKUK PROJECT 09-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENTMEASURING & CONTROL INST. WITH SPARE PARTS :

- SPARE PARTS FOR EXISTING MEASURING & CONTROL SYSTEMS... 350 SET Measurement and control system items

6000 NOS. - INST. CABLES, THERMOCOUPLE CABLES, FITTING, TUBES… 13000 MTR. 700 NOS.ELECTRICAL EQUIPMENT SPARE PARTS AND CABLES : - POWER & CONTROL CABLES 37 NOS Electrical system requirements - RELAYS, CONTRACTORS, CHARGERS, BATTERIES, CAPACITOR 120 SET BANKS… 4000 NOS. - SPARE PARTS FOR THE EXISTING ELECT. EQUIPMENT 200 SET 2500 NOS. - EMERGENCY POWER GENERATORS WITH SPARES 6 SETSPARE PARTS FOR EXISTING ROTATING EQUIPMENT: - PUMPS 4000 SET Maintenance of rotating equipment

5000 NOS. - COMPRESSORS 4000 SET

4000 NOS. - STEAM TURBINES 8000 SET

8000 NOS. - COOLING TOWERS FANS & GEAR BOXES 4000 SET

5000 NOS. - BLOWERS 3000 SET

4000 NOS.

08-9-09-01-1046

08-9-09-01-1047

08-9-09-01-1048

PAGE: 104 9RFN

Page 105: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 7ESTABLISHMENT NAME : NORTH GAS COMPANY LOCATION : KIRKUK PROJECT 09-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-09-01-1049SMALL DIAMETER PIPES, TUBES, FITTINGS, PLATES, TRAYS, TUBE SHEETS FOR (HEAT EXCHANGERS FURNACES, BOILER, FLARE, TOWER MESH WIRES, GASKET & CARTRIDGE FILTERS)

100 ITEM Requirements for repair and maintenance of heat exchangers

Stud bolts 67 ITEM

LOCATION : KIRKUK PROJECT 09-02 : REHABILITATION REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT9 NOS. Requirements as recommended by external

study20000 SET

PUMPS, BLOWERS, GEARBOXES TO REPLACE OBSOLETE 200 ITEM Replacement of damaged itemsONES , WITH RECOMMENDED SPARES. 10000 NOS.

100 SET Improve efficiency of cooling towers2000 NOS.

MEASURING INSTRUMENTS (CONTROLLER, RECORDERS, 300 SET Control system requirementsINDICATORS, AUXILIARY PANEL INST. VIBRATION MONITORS, 3500 NOS.PRESSURE & TEMP. GAUGES, LEVEL SWITCHES, THERMOCOUPLESSOLENOID VALVES…WASTE WATER TREATMENT UNIT REHABILITATION WITH 50 SET Waste water plant requirementsSPARE PARTS. 10000 NOS.08-9-09-02-1059

08-9-09-02-1055 STEAM TURBINES FOR GAS COMPRESSORS WITH SPARE PARTS

UPGRADING OF COOLING TOWERS WITH SPARE PARTS.

08-9-09-02-1058

08-9-09-02-1056

08-9-09-02-1057

PAGE: 105 9RFN

Page 106: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 7ESTABLISHMENT NAME : NORTH GAS COMPANY LOCATION : KIRKUK PROJECT 09-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT300 SET40 NOS. Requirements for plant operations

08-9-09-02-1061 ON LINE ANALYZERS, CHROMATOGRAPHS WITH SPARE PARTS 10 SET Quality control items20 SET Rotating equipment replacements

2000 NOS.MOTOR CONTROL CENTERS (MCC), SWITCH BOARDS AND 5 SET Control system requirementsCONTROLS AND RECOMMENDED SPARE PARTS 20 NOS.

10 SET Improvements to sulphur handling system

10000 NOS.

08-9-09-02-1065 FINNED PLATE HEAT EXCHANGER COOLING SYSTEM. 1 SET Cooling system requirements

LOCATION : KIRKUK PROJECT 09-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT5 SET Water treatment plant

1500 NOS.

08-9-09-03-1072 CONTINUATION OF THE UPGRADING OF THE STEAM GENERATION UNITS WITH SPARE PARTS. 100 ITEM Continuing steam generation

improvements

08-9-09-02-1063

08-9-09-02-1064 UPGRADING OF SULFUR SLATING UNIT WITH SPARE PARTS .

08-9-09-03-1071 WATER CHLORINATOR UNIT WITH RECOMMENDED SPARES

08-9-09-02-1060 VALVES & REGULATORS WITH ACCESSORIES & SPARE PARTS

08-9-09-02-1062 MOTORS WITH ACCESSORIES AND SPARES

PAGE: 106 9RFN

Page 107: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 7ESTABLISHMENT NAME : NORTH GAS COMPANY LOCATION : KIRKUK PROJECT 09-04 : SAFETY & ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-09-04-1076 PERSONAL SAFETY DEVICES ( BELTS, SUITS, HELMETS, BOOTS, GLOVES,

GOGGLES...) 30000 NOS. Safety equipment

08-9-09-04-1077 TOXIC GAS MEASURING EQUIPMENT WITH SPARE PARTS 2000 SET H2S, CO2 detection equipment

08-9-09-04-1078 TESTING AND MEASURING ENVIRONMENTAL PROTECTION EQUIPMENT WITH RECOMMENDED SPARE PARTS (FOR H2S, CO2)

500 NOS. Pollution control instrumentation and equipment

08-9-09-04-1079 GAS/ SMOKE/ FIRE DETECTORS & MONITORS WITH SPARE PARTS. 200 SET Safety equipment

FIRE EXTINGUISHING MATERIALS & EQUIPMENT (LIGHT WATER 50000 LIT Fire fighting consumablesFOAM , FLOUR PROTEIN , EXTINGUISHING POWDER). 15 TON08-9-09-04-1080

PAGE: 107 9RFN

Page 108: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 7ESTABLISHMENT NAME : NORTH GAS COMPANY LOCATION : KIRKUK PROJECT 09-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENTSPARE PARTS FOR TRANSPORTATION & SERVICE EQUIPMENT : - SPARE FOR BUSES, MINI BUSES & PICK UPS 25000 NOS. Spares for servicing vehicles 500 SET - SPARES FOR LIFTING, HANDLING & EARTHMOVING EQUIPMENT 30000 NOS. - SPARES FOR TRUCKS 15000 NOS.

2000 SETTRANSPORTATION & SERVICE EQUIPMENT: - AMBULANCES 2 NOS. Transportation equipment and spares - VAC-ALL 1 NO. - FIRE FIGHTING VEHICLES 2 NOS. - TANK CAR 3 NOS. - EXCAVATOR 1 NO. - ELECTRIC MAINTENANCE LIFTING CAR 1 NO. - SPARE PARTS FOR ABOVE 5000 NOS.

08-9-09-05-1088RAW & SIMI FINISHED MATERIALS FOR WORKSHOP (SOLID & HOLLOW BARS OF BRASS, BRONZE, ALLOY STEEL, CAST IRON...) FOR WORKSHOP REQUIREMENT.

7000 MTR. Workshop consumables

08-9-09-05-1086

08-9-09-05-1087

PAGE: 108 9RFN

Page 109: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 7ESTABLISHMENT NAME : NORTH GAS COMPANY LOCATION : KIRKUK PROJECT 09-06 : TESTING , INSPECTION , STUDIES ,

SURVEYS & LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-09-06-1091GENERAL MEASURING EQUIPMENT & ANALYZERS WITH SPARE PARTS & CHEMICALS FOR QUALITY CONTROL OF PRODUCTS, POLLUTANTS, WATER.

2000 NOS. Equipment for quality control purposes

50 SET NDT requirements2000 NOS.

08-9-09-06-1093CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATION AT THE SUPPLIERS WORKS ABOARD.

5 CONTRACT Contracts for PSI

08-9-09-06-1094TECHNICAL SERVICE CONTRACT, SURVEY, STUDIES & ASSISTANCE FOR EQUIPMENT SURVEY, EFFICIENCY STUDIES & TECHNICAL ASSISTANCE, FOR IMPROVEMENT OF MAINTENANCE & OPERATION.

4 CONTRACTExternal contracts for efficiency studies

and recommendations

LOCATION : KIRKUK PROJECT 09-07 : SULPHER GRANULATION UNIT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-09-07-1099KNOW-HOW, EQUIPMENT & MATERIALS FOR PHASE 'I' OF THE PROJECT FOR THE INSTALLATION OF SULPHUR GRANULATING UNIT WITH RECOMMENDED SPARE PARTS INCLUDING TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY .

5 CONTRACTContracts to investigate sulphur

granulation unit

TESTING EQUIPMENT & TOOLS (NDT) WITH SPARES.08-9-09-06-1092

PAGE: 109 9RFN

Page 110: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 6ESTABLISHMENT NAME : SOUTH GAS CO. LOCATION : KHOR-ZUBAIR NGL, LPG PLANT, STORAGE &

COOLING PLANT& FACILITIES, NORTH RUMAILA NGL PLANT AND SOUR GASES

PROJECT 10-01 : MAINTENANCE AND OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT15000 NOS. Spares for GE turbines at S Gas/N

Rumailah2000 SET

08-9-10-01-1111 SPARES FOR COMPRESSORS 10000 NOS. Spares for pumping gas compressorsSPARES FOR PUMPS 2000 SET

200 NOS. Spares for cooling fans in propane storage

2000 SET

INSTRUMENTS INCLUDING CONTROL VALVES AND SPARE PARTS Control instrumentation maintenance

FOR VALVES, SWITCHES, RECORDERS & CHARTS, GAUGES, 30000 NOS.THERMOCOUPLES, THERMOMETERS, ELECTRONIC CARDS, 2000 SETTRANSMITTERS, TRANSDUCERS, FUSES, CAPACITORS, RECEIVERS, METERS.ELECTRICAL, INCLUDING CONTACTORS WITH SPARES, 45042 NOS. Electrical instrumentation maintenanceCIRCUIT BREAKER, MOTORS (FOR FANS/PUMPS)WITH SPARES, 2000 SETFUSES, CAPACITORS, LIGHTING FITTINGS WITH SPARES, 15000 MTR.INSULATION, CABLES, WIRES, BATTERIES & BATTERY SOLUTION 5000 KG.

50000 MTR. Piping for membranes and operations50000 NOS.

08-9-10-01-1116 WELDING RODS / GENERAL PURPOSES 30 TON General purpose welding rods

08-9-10-01-1113

08-9-10-01-1114

08-9-10-01-1115 PIPES, VARIOUS SIZES, TUBES & FITTING, BEARINGS, SEALS

08-9-10-01-1110 SPARES FOR GAS TURBINES INCLUDING FILTERS

08-9-10-01-1112 SPARES FOR AIR COOLER FANS

PAGE: 110 9RFN

Page 111: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 6ESTABLISHMENT NAME : SOUTH GAS CO. LOCATION : KHOR-ZUBAIR NGL, LPG PLANT, STORAGE &

COOLING PLANT FACILITIES, NORTH RUMAILA NGL PLANT AND SOUR GASES TREATMENT UNIT

PROJECT 10-01 : MAINTENANCE AND OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-10-01-1117 SPARES FOR BURNERS 1000

50NOS.SET For furnaces in condensate trains

08-9-10-01-1118 SPARES FOR FLARES 10050

NOS.SET Spares for flares

CONSUMABLE CHEMICALS & SIEVES USED FOR THE OPERATION AND FIRE FIGHTING : - MOLECULAR SIEVES FOR THE DEHYDRATION UNITS 240 TON Consumables for hydration units - CERAMIC BALLS FOR THE DEHYDRATION UNITS 30 TON " - TETRA ETHYL GLYCOL (USED IN SOUR GASES UNIT) 320 TON Consumables for hydration units - SULFOLANE OR EQUIVALENT (USED IN SOUR GASES UNIT) 80 TON " - DIPA (USED IN SOUR GASES UNIT) 330 TON "

08-9-10-01-1119

PAGE: 111 9RFN

Page 112: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 6ESTABLISHMENT NAME : SOUTH GAS CO. LOCATION : ALL AREA PROJECT 10-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTEQUIPMENT & MATERIALS FOR THE CONTINUATION OF THE REVAMPING OF EXISTING FACILITIES INCLUDING: - GAS TURBINE WITH RECOMMENDED SPARES (REPLACEMENT OF 2 SET Replacement of damaged turbines OBSOLETE GAS TURBINES) - AIR COMPRESSORS WITH RECOMMENDED SPARES 10 SET Replacement of damaged compressors - PUMPS WITH RECOMMENDED SPARES 20 SET - CONTROL SYSTEM FOR EXISTING GAS TURBINES WITH 10 SET Turbine control systems RECOMMENDED SPARES (RETROFIT) - VIBRATION INSTRUMENTS WITH RECOMMENDED SPARES 8 SET Vibration monitors - COMPRESSORS SEALS WITH SPARES 10 SET Spares - ELECTRICAL POWER FACTOR CORRECTION EQUIPMENT WITH 20 SET Power stabilisation requirements SPARES - TANK GAUGE SYSTEMS WITH SPARES 8 SET - AIR COOLING SYSTEM WITH SPARES 8 SET Propane cooling system

08-9-10-02-1125

PAGE: 112 9RFN

Page 113: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 6ESTABLISHMENT NAME : SOUTH GAS CO. LOCATION : ALL AREA PROJECT 10-04 : SAFETY AND ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-10-04-1129 FIRE FIGHTING AND SAFETY EQUIPMENT WITH ACCESSORIES & SPARES 10000 NOS. Fire fighting equipment

08-9-10-04-1130 SAFETY DEVICES FOR GAS DETECTION 500 SET Safety equipment

HELMETS, GOGGLES, EAR PROTECTION, SAFETY BOOTS, HOSES, 5000 NOS. Personnel safety equipment & consumables

FOAM (LIQUID & DRY) … 4000 MTR. 5000 LIT.6000 KG.

08-9-10-04-1132 MATERIALS AND EQUIPMENT FOR THE CONTROL THE POLLUTION OF AIR ,LAND & WATER SOURCES. 1000 ITEM Pollution measurement and control

LOCATION : ALL AREA PROJECT 10-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-10-05-1136 RENOVATION OF THE CENTRAL AIR CONDITIONING SYSTEMS

COMPLETE WITH SPARES 50 ITEM Air conditioning requirements

08-9-10-05-1137 SPARES PARTS FOR LIFTING & HANDLING EQUIPMENT, TRUCKS, FIRE FIGHTING, OTHER VEHICLES AND BUSES

500005000

NOS.SET Transportation maintenance

08-9-10-05-1138 HAND AND ELECTRICAL TOOLS WITH SPARES AND CONSUMABLE MATERIALS (GRINDERS, EMERY PAPER, DRILL BITS)

10000010000

NOS.SET Hand tools, grinders etc

08-9-10-05-1139 TELESCOPIC HANDLER 5 TONS CAPACITY WITH ACCESSORIES AND RECOMMENDED SPARE PARTS 3 SETS Equipment for handling lifts

08-9-10-01-1140 Fuses 50000 nos

08-9-10-01-1140 transformers 5000 nos

08-9-10-01-1141 lighting fittings & fixtures with spares (other items remain unchanged) 40000 nos

08-9-10-04-1131

PAGE: 113 9RFN

Page 114: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 6ESTABLISHMENT NAME : SOUTH GAS CO. LOCATION : ALL AREA PROJECT 10-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENTQUALITY CONTROL MEASURING EQUIPMENT AND ANALYZERS WITH RECOMMENDED SPARE PARTS:

TESTING , INSPECTION, MEASURING EQUIPMENT, DEVICES AND NDT and inspection equipment

ANALYZERS WITH ACCESSORIES AND RECOMMENDED SPARES

08-9-10-06-1144TECHNICAL SERVICE CONTRACT, SURVEY, STUDIES & ASSISTANCE FOR EQUIPMENT SURVEY, EFFICIENCY STUDIES & TECHNICAL ASSISTANCE FOR IMPROVEMENT OF MAINTENANCE & OPERATION EFFICIENCY.

4 CONTRACT TSC contracts for improved efficiency

08-9-10-06-1145CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIERS WORKS ABROAD

2 CONTRACT Contracts for PSI

LOCATION : ALL AREA PROJECT 10-07 : LPG REVERSE PUMPING

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-10-07-1149KNOW-HOW , EQUIPMENT & MATERIALS FOR THE CONTINUATION OF LPG. REVERSE PUMPING FACILITIES INCLUDING TECHNICAL ASSISTANCE /ENGINEERING CONSULTANCY

5 CONTRACTContracts for LPG distribution to the North

60 ITEM08-9-10-06-1143

PAGE: 114 9RFN

Page 115: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 6ESTABLISHMENT NAME : SOUTH GAS CO. LOCATION : ALL AREA PROJECT 10-08 : WATER SUPPLY PLANT

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-10-08-1152

WATER SUPPLY PLANT COMPLETE (PIPES OF FITTINGS, PUMPS, DESALINATION UNITS, CLARIFIERS, FILTERS, ELECTRICAL, CONTROL & INSTRUMENTATION, TELEPHONIC SERVICES, TANKS & OTHER NECESSARY ITEMS) INCLUDING TECHNICAL ASSISTANCE/ENGINEERING CONSULTANCY.

10 CONTRACT Raw water supply contract

PAGE: 115 9RFN

Page 116: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 8ESTABLISHMENT NAME : GAS FILLING CO. LOCATION : ALL AREAS PROJECT 11-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTLPG CYLINDER VALVES AND SPARES : - VALVE , COMPLETELY ASSEMBLED 12000000 NOS. Replacements for existing cylinders - UPPER PARTS OF VALVES 800000 NOS. - LOWER PARTS OF VALVES 400000 NOS. - SPINDLE 6000000 NOS. - O - RING 800000 NOS.FILLING HEAD AND SPARES : - PNEUMATIC FILLING HEAD , COMPLETE 250 NOS. Replacements for existing cylinders - SPARE PARTS 10000 NOS.

100 SETKUT CYLINDERS FACTORY :

- SPARE PARTS FOR EQUIPMENT & MACHINES & REPLACEMENT 250 ITEM Spare parts for presses, milling machines etc

EQUIPMENT SUCH AS MILLING MACHINES, PRESSES, OXYGEN PLANT, WELDING MACHINES…ACCESSORIES FOR LPG TANK (20) TON : - ROTO GAUGE 200 NOS. Spares for LPG storage tank - DIALS 100 NOS. - DIP TUBES 100 NOS. - SEAT NW 80 500 NOS. - SEAT WASHER NW 50 500 NOS.

08-9-11-01-1165

08-9-11-01-1166

08-9-11-01-1163

08-9-11-01-1164

PAGE: 116 9RFN

Page 117: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 8ESTABLISHMENT NAME : GAS FILLING CO. LOCATION : ALL AREAS PROJECT 11-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTELECTRICAL & INSTRUMENTATION SPARE PARTS FOR LPG FILLING PLANTS: - SPARE PARTS FOR INSTRUMENT EQUIPMENT (METERS, ROTARY 50 ITEM Electrical spare parts GAUGES,) - SPARE PARTS FOR ELECTRICAL EQUIPMENT, ( H.T & L.T) 20 ITEM - SPARE PARTS FOR ELECTRIC MOTORS AND GENERATORS 30 ITEMPIPES, FITTINGS, VALVES & SPARES : - PIPES, PIPE FITTINGS (CARBON STEEL & GALVANIZED), VARIOUS 10000 MTR. Mechanical spare parts SIZES & SCHEDULES 20000 NOS. - VALVES 10000 NOS.

1000 SET - SPARE PARTS FOR BALL VALVES 20000 NOS.

5000 SET

08-9-11-01-1169 MECHANICAL SPARE PARTS FOR LPG FILLING PLANTS : - SPARES FOR GAS COMPRESSOR 20 ITEM Mechanical spare parts - SPARE PARTS FOR FIRE FIGHTING PUMPS (ELECTRIC & DIESEL) 87 ITEM - SPARE PARTS FOR SEWAGE WATER VERTICAL PUMP 20 ITEM - SPARE PARTS FOR AIR COMPRESSOR (ELECTRIC & DIESEL) 20 ITEM - SPARE PARTS FOR HIGH PRESSURE PUMPS & FIRE FIGHTING 500 ITEM TRUCKS - SPARE PARTS FOR HYDRAULIC PUMP FOR LPG TANKS 20 ITEM - SPARE PARTS FOR FILLING PLANTS 20 ITEM

08-9-11-01-1167

08-9-11-01-1168

PAGE: 117 9RFN

Page 118: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 8ESTABLISHMENT NAME : GAS FILLING CO. LOCATION : ALL AREAS PROJECT 11-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENTLPG CYLINDERS : - LPG CYLINDERS COMPLETE WITH VALVES 4,850,000 NOS. New gas cylindersGAS REGULATORS AND HOSES :

- LOW PRESSURE REGULATORS 600,000 NOS. Equipment for domestic use of cylinders

- HIGH PRESSURE REGULATORS 200,000 NOS. - HOSES FOR HIGH PRESSURE REGULATORS 100,000 NOS. - SPARE PARTS FOR REGULATORS 50 ITEM - REHABILITATION OF TRANSFORMERS, (INCLUDING COPPER 200,000 MTR. WIRES) & CABLES 2,000 TON - WEIGHING BRIDGE CAPACITY 80000 KG WITH SPARE PARTS 3 SET

08-9-11-02-1174

08-9-11-02-1175

PAGE: 118 9RFN

Page 119: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 8ESTABLISHMENT NAME : GAS FILLING CO. LOCATION : ALL AREAS PROJECT 11-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT - STEEL PLATE FOR LPG CYLINDER GUARD RINGS 1000 TON Maintenance requirements - STEEL PLATE FOR LPG CYLINDER BASE RINGS 1000 TON - STEEL PLATE & ACCESSORIES FOR 3000 M3 LPG SPHERICAL Requirements to construct new tank STORAGE TANKSTOOLS AND APPLIANCES WITH SPARE PARTS TO FORM BASES & GUARDS FOR DEFORMED CYLINDERS :

- ROLLERS FOR LPG CYLINDER CONVEYORS 15000 NOS. Equipment for repair of defective cylinders

- ECCENTRIC PRESS 50 TON CAPACITY 7 SET - HYDRAULIC PRESS 100 TON CAPACITY 3 SET - STEEL BAR WINDING MACHINE 7 SET - STEEL BAR CUTTING MACHINE 7 SET - ROD STEEL RING FORMING MACHINE 7 SET - STEEL STRIP WINDING MACHINE 3 SET - BEADING & CUTTING MACHINE 3 SET - SPARE PARTS FOR ABOVE 50 ITEM

9 SET

08-9-11-03-1181

08-9-11-03-1179

08-9-11-03-1180

PAGE: 119 9RFN

Page 120: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 8ESTABLISHMENT NAME : GAS FILLING CO. LOCATION : ALL AREAS PROJECT 11-04 : SAFETY & ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT - FIRE FIGHTING WATER TANK TRUCK ( 18 CU. M. CAPACITY ) 3 SET Safety and fire fighting requirements WITH SPARES - FIRE FIGHTING EQUIPMENT ( HOSES, SPRAY NOZZLES …) 350 NOS. - SPARE PARTS FOR EXTINGUISHERS AND CO2 UNIT AS WELL AS 100 SET OTHER SAFETY EQUIPMENT

08-9-11-04-1185

PAGE: 120 9RFN

Page 121: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 8ESTABLISHMENT NAME : GAS FILLING CO. LOCATION : ALL AREAS PROJECT 11-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENTSERVICE TRUCKS AND SPARES : - WATER TANK TRUCK ( 13 M3 CAPACITY ) 3 SET Transportation requirements - SIDE CRANE ( 5 TON CAPACITY ) 2 SET - PICK-UPS DOUBLE CAB 40 SET

- STATION WAGONS 10 SET

- FORK LIFT (5) TON , FLAME PROOF 10 SET

- SPARE PARTS FOR TRUCKS & SKID EQUIPMENT 200 ITEM

WORKSHOP MACHINES, TOOLS AND SPARES :

- MAINTENANCE TOOLS, MATERIALS, LUBE OILS & WORKSHOP 50 ITEM Workshop requirements

TOOLS

- WORKSHOP MACHINES (PRESSES FOR BENDING & CUTTING 100 SET

PLATES)

- JACK HAMMER & PNEUMATIC TOOLS 20 ITEM

- WELDING MACHINE (ELECTRIC & DIESEL) WITH ACCESSORIES 20 ITEM

- SPARE PARTS FOR ABOVE 100 ITEM

COOLING / HEATING SYSTEMS :

- EQUIPMENT FOR COOLING / HEATING (AIR CONDITIONING, 310 ITEM Cooling and chilling units WATER COOLERS, CHILLERS, HEATERS …) WITH SPARES

08-9-11-05-1192 LIGHTING FITTINGS AND SPARE PARTS 100 ITEM Lighting requirements

08-9-11-05-1189

08-9-11-05-1190

08-9-11-05-1191

PAGE: 121 9RFN

Page 122: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 8ESTABLISHMENT NAME : GAS FILLING CO. LOCATION : ALL AREAS PROJECT 11-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIESCODE ITEM DESCRIPTION QTY UNIT COMMENT

LABORATORY APPARATUS : - MULTI-GAS ANALYZER (NOX, COX, SOX, ...) 1 NO. Quality control equipment - PHOTOMETER (WATER POLLUTION DETERMINATION) 1 NO. - MULTI-PARAMETER INSTRUMENT (PH, O2 CONTENT, SALINITY, 2 NOS. TEMP.,…) - LABORATORY DISTILLATION UNIT (FOR OIL PRODUCTS) 1 NOS. - GENERAL PURPOSE LAB. MICROSCOPE 2 NOS. - LABORATORY WATCHES 10 NOS. - WATER TESTING GLASSWARE 2000 NOS. - CODES, STANDARDS & SCIENTIFIC REFERENCES (CD & HARD 2 SETS COPY) - GAS ANALYZER 1 - TOTAL DISSOLVE METER KIT 8

08-9-11-06-1197 ELECTRIC TESTING APPARATUS (TOOLS, AVOMETERS, CLAMPMETERS, WATTMETERS,…) 50 ITEM Testing equipment (AVO's etc)

08-9-11-06-1198CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIER'S WORKS ABROAD

2 CONTRACT Contracts for PSI

08-9-11-06-1196

PAGE: 122 9RFN

Page 123: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 8 OF 8ESTABLISHMENT NAME : GAS FILLING CO. LOCATION : ALL AREAS PROJECT 11-07 : OXYGEN PLANT / LPG FILLING PLANTS

CODE ITEM DESCRIPTION QTY UNIT COMMENTOXYGEN PLANT: - OXYGEN PLANT , COMPLETE New PlantLPG FILLING PLANTS : - TWO AUTOMATIC LPG FILLING PLANTS, COMPLETE LPG filling carousels

08-9-11-07-1204 - TECHNICAL ASSISTANCE / ENGINEERING CONSULTANCY 3 CONTRACTConsultancy agreement for carousel construction

LOCATION : ALL AREAS PROJECT 11-08 : FACTORY FOR THE PRODUCTION OF LPG

CYLINDERS

CODE ITEM DESCRIPTION QTY UNIT

08-9-11-08-1208

KNOW-HOW, ENGINEERING, TECHNICAL ASSISTANCE / CONSULTATION, SUPPLY OF MATERIALS & EQUIPMENT INCLUDING ALL ACCESSORIES & NECESSARY SERVICES FOR THE ERECTION OF: -FACTORY FOR THE PRODUCTION OF LPG CYLINDERS WITH A CAPACITY OF ONE MILLION CYLINDERS PER ANNUM INCLUDING ALL ACCESSORIES AND NECESSARY SERVICES. - PLANT FOR MANUFACTURING VALVES FOR LPG CYLINDERS - LPG cylinders repair plant

6 1 1

CONTRACTContracts resulting in the construction of plant to fabricate 1 million LPG cylinders per annum

- ENGINEERING STANDARDS, REFERENCE BOOKS AND SOFTWARE, TRANSFERRED FROM 08-8-11-06-1257 160 Items

08-9-11-07-1202 2 CONTRACT

08-9-11-07-1203 2 CONTRACT

PAGE: 123 9RFN

Page 124: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : ALL AREAS PROJECT 12-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-12-01-1218 SPARE PARTS FOR METERING STATIONS FOR ALL AREAS 150 NOS. Spares for all forms of metering

requirements

08-9-12-01-1219 SPARE PARTS FOR SOLATRON DENSITY EQUIPMENT SIGNAL CONVERTER TYPE 7950 230 NOS. Spares for "in-line" densitometer

08-9-12-01-1220 SPARE PARTS FOR TANK LEVEL GAUGES 1000 NOS. Spares for tank level indicators

08-9-12-01-1221 SPARE PARTS FOR LOADING ARMS: SWIVEL JOINTS, BALANCING ... 218 NOS. Spares

08-9-12-01-1222 SPARE PARTS FOR PANEL INDICATORS : RELAYS, LAMPS… 20 NOS.

08-9-12-01-1223 DENSITY GRAPHIC RECORDER, COMPLETE UNIT WITH SPARE PARTS 20 SET Chart recorder

08-9-12-01-1224 TEMPERATURE MONITORING UNITS, COMPLETE SYSTEM FOR PUMPING STATIONS FOR ALL AREAS WITH SPARE PARTS 20 SET Remote temperature recording units

08-9-12-01-1225 ACCULOAD (METERS) FOR CONTROLLING LOADING ARMS FOR TRUCK LOADING 600 NOS. Fail safe meters for loading products

08-9-12-01-1226 P.D.METER FOR UNLOADING TANK TRUCK 25 NOS. Meters for truck discharges

08-9-12-01-1227 PIPE WRENCH, HYDRAULIC OR PNEUMATIC WITH SOCKETS 6 NOS. Tools for repair work

08-9-12-01-1228 SPARE PARTS FOR P .D. METERS, DIFFERENT SIZES ( 3-12 ) INCHES ALL AREAS 10000 NOS. Spares for metering

08-9-12-01-1229 SPARE PARTS FOR LOADING AND UNLOADING PUMPS 5000 NOS. Spares for pumps

08-9-12-01-1230 SPARE PARTS FOR DIESEL GENERATORS, DIFFERENT RATINGS 100 ITEM Spares for diesel generators

(75 750) KVA

PAGE: 124 9RFN

Page 125: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : ALL AREAS PROJECT 12-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-12-01-1231 STOPPLE OPERATION MACHINE FOR 14 INCHES LPG KIRKUK-BASRAH

PIPELINE, COMPLETE WITH ALL ACCESSORIES 2 SET By pass for LPG pipeline repair

MAINTENANCE TOOLS: - HAND ABLE HYDRAULIC TEST PUMP Tools for pipe maintenance - MANUAL PIPE CUTTER WITH SPARE WHEELS, ELECTRIC RIGHT ANGLE - GRINDER, GRINDER DISCS, STEEL BRUSHES WHEEL TYPE, WELDING HELMETS …

08-9-12-01-1233 FLOOD LIGHTING EQUIPMENT WITH DIESEL ENGINE GENERATORS AND SPARE PARTS 10 SET Lighting requirements

CABLE FAULT LOCATOR AND CABLE BURNER, VEHICLE- Fault locator equipmentMOUNTED SYSTEM

08-9-12-01-1235 VALVES AND FITTINGS, DIFFERENT SIZES AND CLASSES 2750 NOS. Various valvesMEASURING EQUIPMENT FOR CATHODIC PROTECTION & NDT INCLUDING :

- MULTIFUNCTION INSTRUMENT (MODATA) FOR CLOSE 2 SET NDT and cathodic protection equipment

POTENTIAL SURVEY

- PIPE AND CABLE LOCATOR EQUIPMENT 3 SET

- SOIL RESISTIVITY EQUIPMENT 3 SET

- ULTRASONIC THICKNESS METER 3 SET

08-9-12-01-1237 TRANSFORMER FOR OIL PURIFYING AND DRYING SETS 2 SET Electrical equipment for drying oil

08-9-12-01-1236

NOS.

08-9-12-01-1234 1 SET

08-9-12-01-1232 7400

PAGE: 125 9RFN

Page 126: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : ALL AREAS PROJECT 12-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-12-01-1238 HYDRAULIC AND MANUAL EQUIPMENT FOR CABLE AND MOTOR

DISMANTLING & ASSEMBLY , DIFFERENT SIZES 50 SET Equipment for general repair & maintenance

POWER CABLE 6 Km

08-9-12-01-1239 POWER CABLES ACCESSORIES 20 SETLUGS AND CONNECTORS 30000 NOS.POLYPROPYLENE SEALING TAGS, SELF CLOSING COLOURED, 2000000 NOS.WITH TWISTED STEEL GALVANIZED WIRE .FLAMEPROOF STARTERS AND PUSH BUTTON CONTROLS FOR 90 NOS.11, 15 , 22 , AND 37KW MOTORS

08-9-12-01-1242 SPARE PARTS FOR 3.3KV AND 6KV ELECTRIC MOTORS 100 NOS.

08-9-12-01-1243 NEUTRAL GROUNDING RESISTORS FOR POWER TRANSFORMERS 5 SET

08-9-12-01-1244 SPARE PARTS FOR EXISTING PUMPING STATION AND DEPOTS 500 NOS.TOOLS FOR ( TEST , MEASURING , MAINTENANCE ) OF 600 NOS.ELECTRICAL EQUIPMENT .SPARE PARTS FOR EXISTING VALVES IN VARIOUS LOCATIONS, 1000 NOS.DIFFERENT SIZES, INCLUDING V- PACKING & LUBRICANT WIRE ROPE, SIZE 6 × 35 AND 7 × 26 OF LENGTH 1000M USED ON 4 NOS.

TRAIN RAIL LOADING

VALVE OPERATING SYSTEM, VARIOUS RATINGS & TYPES, FITTED ON 25 NOS.

VARIOUS VALVE SIZES FOR DRY GAS PIPE LINES 08-9-12-01-1248

08-9-12-01-1245

08-9-12-01-1246

08-9-12-01-1247

08-9-12-01-1240

08-9-12-01-1241

PAGE: 126 9RFN

Page 127: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : ALL AREAS PROJECT 12-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-12-01-1249 SPARE PARTS FOR BAIJI DEPOT P.D METER SIZE (10 -12 ) INCHES 500 NOS. Parts for Baiji metering system

08-9-12-01-1250 CARBON STEEL LINE PIPE, VARIOUS SIZES AND SCHEDULES WITH HEAT SHRINKABLE SLEEVE FOR MAINTENANCE

90 13000

KM. ITEMS Carbon steel pipe for general maintenance

08-9-12-01-1251ELECTRICAL AND DIESEL DRIVEN PUMPS FOR LIGHT OIL PRODUCTS, CAPACITY 50-110 M3/ HR PRESSURE .MAX.50BAR OF VARIOUS HEADS & SIZES WITH ACCESSORIES & SPARE PARTS .

50 SET Pumps for product transfer

08-9-12-01-1252 LOADING METERS FOR TRUCK LOADING 110/220 VAC WITH ACCESSORIES 600 NOS. Control systems for truck loading

PAGE: 127 9RFN

Page 128: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : ALL AREAS PROJECT 12-02 : REHABILITATION / REVAMPING OF EXITING

INSTALLATION

CODE ITEM DESCRIPTION QTY UNIT COMMENTSTANDARD VOLUME CALIBRATION PROVERS 5000 LITER FACTORY 5 SET Standard volume meter proversMOUNTED ON MOBILE TRAILER FOR LOADING ARM IN DEPOTS LIGHTING EQUIPMENT, FITTINGS, BULBS, BALLAST, IGNITERS, 1500 NOS. Lighting equipmentTUBULAR TUBES…

08-9-12-02-1258 - WIRELESS MULTI ACCESS COMMUNICATION SYSTEM WITH ALL ACCESSORIES AND INSTALLATION, TESTING AND COMMISSIONING. 2 SET Communication system

- RADIO LINK UHF C/W ALL ACCESSORIES & SPARES 10+1 SET

- DIGITAL PABX TELEPHONE EXCHANGE 2 SET

- SPARE PARTS FOR 2 YEARS OPERATION 1 SET

- TELEPHONES 300 SET

- FUNCTION TELEPHONES 50 SET

08-9-12-02-1259LPG PRESSURE REDUCTION AND METERING STATIONS ,INCLUDING METERS, STRAINERS, FILTERS,VALVES, FITTINGS, CABLES, LIGHTING, CONTROL VALVES, RELIEF SYSTEM AND ALL ACCESSORIES TOGETHER WITH TECHNICAL ASSISTANCE AND ENGINEERING CONSULTANCY.

4 CONTRACTLine pressure reduction unit from 600 Bar to atmospheric

08-9-12-02-1257

08-9-12-02-1256

PAGE: 128 9RFN

Page 129: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : ALL AREAS PROJECT 12-02 : REHABILITATION OF CATHODIC

PROTECTION SYSTEM & FACILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT - SURVEY , KNOW-HOW , TECHNICAL ASSISTANCE Contracts for cathodic protection

requirements ENGINEERING CONSULTANCY

- SUPPLY OF MATERIALS / EQUIPMENT TO REHABILITATE

& UP GRADE

CATHODIC PROTECTION SYSTEMS & FACILITIES TO

ENSURE PROPER OPERATION TO SAFE GUARD PIPE LINES

& VESSELS INCLUDING THE SUPPLY OF MATERIALS FOR LOCAL MANUFACTURE OF BOARDS & ANODES … - POWER SUPPLY SYSTEMS FOR THE OPERATION OF THE CATHODIC PROTECTION INCLUDING INDEPENDENT POWER SYSTEM FOR REMOTE LOCATIONS ( SOLAR , THERMO-ELECTRIC , DIESEL…)

- ACCESSORIES AND SPARE PARTS FOR THE ABOVE

08-9-12-02-1260 6 CONTRACT

PAGE: 129 9RFN

Page 130: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : MOSUL AREA PROJECT 12-03 : SUSTAINING & ENHANCING PRODUCTION

CAPABILITIES HAMMAM AL-ALIL OIL PRODUCTS PUMPING STATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-12-03-1265KNOW-HOW, MATERIALS & EQUIPMENT FOR THE CONTINUATION & COMPLETION OF THE HAMMAM AL-ALIL PRODUCTS PUMPING STATION INCLUDING TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY .

6 CONTRACTContinuation of contract commenced in

Phase 8

LOCATION : ALL AREAS PROJECT 12-05 : SERVICE AND PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-12-05-1270 SPARE PART FOR AIR-CONDITIONING EQUIPMENT 100 NOS. Climate control

PAGE: 130 9RFN

Page 131: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 8 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : ALL AREAS PROJECT 12-06 : TESTING, INSPECTION, STUDIES, SURVEYS &

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-12-06-1273CONTRACTS FOR THIRD PARTY INSPECTION OF CONTRACTED GOODS TO ENSURE COMPLIANCE TO SPECIFICATIONS AT THE SUPPLIERS WORKS ABROAD

2 CONTRACT Contracts for PSI

PAGE: 131 9RFN

Page 132: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 9 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : SALAH AL-DIN PROJECT 12-07 : PIPELINE FOR FEEDING SALAH AL-DIN POWER

STATION WITH FUEL SUPPLY

CODE ITEM DESCRIPTION QTY UNIT COMMENTPIPELINE , CARBON STEEL: 20 INCHES DIAMETER, 135 KILOMETER Contracts to build new fuel line to Sala al-

DinLENGTH , FACTORY COATED WITH EXTRUDED POLYETHYLENE , COMPLETE WITH : - LAUNCHING AND RECEIVING TRAP STATIONS

- METERING AND PRESSURE REDUCTION STATIONS

- LINE BREAK VALVES

- CATHODIC PROTECTION SYSTEM

- ACCESSORIES INCLUDING+B50 VALVES, FLANGES, TEES,

ELBOWS, REDUCERS , GASKETS , CAPS , STUD BOLTS AND NUTS - WELDING ELECTRODES , FLOW METERS , FILTERS - CONTROL EQUIPMENT - HEAT SHRINKABLE SLEEVES - PUMPING STATIONS - TANKS - MIXING EQUIPMENT - TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY . - RECOMMENDED ACCESSORIES & SPARE PARTS (SCOP)

08-9-12-07-1277 10 CONTRACT

PAGE: 132 9RFN

Page 133: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 10 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : AL-ANBAR PROJECT 12-08 : PIPELINE FOR FEEDING ANBAR

POWER STATION WITH FUEL SUPPLY

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-12-08-1281

PIPELINE CARBON STEEL TO TRANSPORT CRUDE OIL FROM STRATEGIC PIPELINE TO ANBAR ELECTRIC POWER STATION 12 INCH DIAMETER AND 30 KM LONG, FACTORY COATED WITH EXTRUDED POLYETHYLENE PLUS HEAT SHRINKABLE SLEEVE FOR GIRTH WELDS WITH ALL NECESSARY METERING, ELECTRICAL, INSTRUMENTS, CONTROL, CATHODIC PROTECTION, VALVES, FITTING, PRESSURE REDUCTION STATION, INCLUDING TECHNICAL ASSISTANCE AND ENGINEERING CONSULTANSY

12 CONTRACTNew pipeline to supply crude oil from Strategic Line to power station in the

Western Desert

(SCOP)

PAGE: 133 9RFN

Page 134: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 11 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : NINEVA GOVERNATE PROJECT 12-09 : PIPELINE TO FEED NORTH POWER

STATION WITH FUEL SUPPLY

CODE ITEM DESCRIPTION QTY UNIT COMMENTPIPELINE CARBON STEEL , 16 INCH DIAMETER 70 KM LONG , FACTORY COATED WITH EXTRUDED POLY ETHYLENE , WITH HEAT SHRINKABLE SLEEVES FOR GIRTH WELDS , TO TRANSPORT CRUDE OIL FROM IRAQ - TURKEY PIPELINE TO NORTH ELECTRIC POWER STATION , COMPLETE WITH :-

New pipeline to carry crude from Quara field (API = 18.0) near Mosul to North

Power Station

- PUMPING STATION AND METERING - PRESSURE REDUCTION STATION - LAUNCHING AND RECEIVING STATIONS - TANKS AND LINE MIXING EQUIPMENT - FITTINGS DIFFERENT SIZES AND TYPES, LINE BREAK VALVES - CATHODIC PROTECTION SYSTEM - WELDING ELECTRODES (GENERAL PURPOSE) - ELECTRICAL INSTRUMENTS AND CONTROL EQUIPMENT

- TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY

(SCOP)

08-9-12-09-1285 CONTRACT 10

PAGE: 134 9RFN

Page 135: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 12 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : BAAQUBA PROJECT 12-10 : (LPG PIPELINE TO FEED CYLINDER FILLING

PLANT AT BAAQUBA)

CODE ITEM DESCRIPTION QTY UNIT COMMENTEQUIPMENT & MATERIALS FOR THE CONTINUATION & COMPLETION OF CARBON STEEL PIPE LINE TO TRANSPORT LPG FROM BAGHDAD TO BAQUBA GAS FILLING PLANT OF 8 INCH DIAMETER 35 KM LONG, FACTORY COATED WITH EXTRUDED POLYETHYLENE PLUS HEAT SHRINKABLE SLEEVE FOR GIRTH WELDS COMPLETE WITH THE FOLLOWING :

LPG branch pipeline to supply cylinder filling plant at Baaquba

- LAUNCHING AND RECEIVING TRAP STATIONS .

- PRESSURE REDUCTION STATION .

- FILTERS , MICROFILTERS , FLOW METERS . - LINE BREAK VALVES . - CATHODIC PROTECTION SYSTEM . - ELECTRICAL MATERIALS , CABLES , LIGHTING . - WELDING ELECTRODES (GENERAL PURPOSE). - ACCESSORIES , VALVES , FLANGES ,TEES , ELBOW … - TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY .

08-9-12-10-1290 CONTROL AND TELECOMMUNICATION SYSTEM INCLUDING AN OPTICAL FIBER CABLE TO BE LAID ALONGSIDE ABOVE THE P/L. 2 CONTRACT Control system for above pipeline

08-9-12-10-1289 10 CONTRACT

PAGE: 135 9RFN

Page 136: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 13 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : ALL AREAS PROJECT 12-11 : EXPANSION OF LOADING FACILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENTPRODUCTS LOADING ARMS SYSTEMS INCLUDING LOADING ARMS, METERS, STRAINERS, FILTERS, VALVES , FITTINGS, ELECTRICAL, AND INSTRUMENTATION EQUIPMENT . LIGHTING , CABLES , SHADES AND ALL NECESSARY ACCESSORIES & SPARES, AS WELL AS TECHNICAL ASSISTANCE, ENGINEERING CONSULTANCY.

10 CONTRACTOverhead loading facilities for all product

loading and distribution stations

SCRAPER, LAUNCHING AND RECEIVING FACILITIES AND ASSOCIATED EQUIPMENT. Transferred from 08-8-12-11-1365 1 CONTRACT

METERING SKIDS FOR DRY GASLINES. Transferred from 08-8-12-11-1365 1 CONTRACT

08-9-12-11-1295

PAGE: 136 9RFN

Page 137: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 14 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : NASSIRIYA-DIWANIAH PROJECT 12-12 : PART '2' OF 2ND PRODUCTS LINE

BASRAH BAGHDAD (NASSIRIYA - DYWANIAH)

CODE ITEM DESCRIPTION QTY UNIT COMMENTPIPELINE CARBON STEEL: 14 INCHES DIA, 200 KM, FACTORY Continuation of pipeline in Phase 8COATED WITH EXTRUDED, POLYETHYLENE COMPLETE WITH: - LAUNCHING AND RECEIVING TRAP STATIONS - METERING AND PRESSURE REDUCTION STATIONS - LINE BREAK VALVES - CATHODIC PROTECTION SYSTEM - ACCESSORIES INCLUDING VALVES, FLANGES , FITTINGS, GASKETS, CAPS , STUD BOLTS , NUTS AND ACCESSORIES - WELDING ELECTRODES - HEAT SHRINKABLE SLEEVES - ASSOCIATED ELECTRICAL EQUIPMENT INCLUDING CABLES LIGHTING AND ACCESSORIES INCLUDING - TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY consumables 10 contract

08-9-12-12-1300CONTROL AND TELECOMMUNICATION EQUIPMENT INCLUDING AN OPTICAL FIBER CABLE TO BE LAID ALONGSIDE ABOVE P/L, COMPLETE WITH ALL ACCESSORIES.

2 CONTRACT

08-9-12-12-1299 9 CONTRACT

PAGE: 137 9RFN

Page 138: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 15 OF 15ESTABLISHMENT NAME : OIL PIPELINES COMPANY LOCATION : ALL AREAS PROJECT 12-13 : CONNECTION OF STRATEGIC DRY GAS LINE

WITH THE NATIONAL DRY GAS GRID

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-12-13-1304

PIPELINE, CARBON STEEL TO TRANSPORT DRY GAS TO POWER STATIONS: 18 INCH DIAMETER 40 KM LENGTH WITH LINE BREAK VALVES , PIG TRAPS , VALVES , ELECTRICAL , INSTRUMENTATION, WELDING ELECTRODES ,CATHODIC PROTECTION EQUIPMENT AND OTHER ACCESSORIES INCLUDING TECHNICAL ASSISTANCE & ENGINEERING CONSULTANCY

8 CONTRACTNew gas line from Najif to Daura to

connect to the National Grid

LOCATION : ALL AREAS PROJECT 12-14 : SCADA FOR PRODUCT & GAS PIPELINES

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-12-14--1307STUDY & BASIC DESIGN FOR SUPERVISORY CONTROL & DATA ACQUISITION (SCADA) SYSTEM FOR THE PRODUCTS & GAS PL`s & DEPOTS AS PART OF A NATIONAL OIL & GAS SCADA SYSTEM.

5 CONTRACTSCADA system to connect products and gas pipelines to national SCADA sytem

PAGE: 138 9RFN

Page 139: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 7ESTABLISHMENT NAME : OIL PRODUCTS DISTRIBUTION COMPANY LOCATION : ALL AREAS PROJECT 13-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-13-01-1318 FORKLIFT, CAP. (2) TONS WITH SPARE PARTS FOR GENERAL USE. 15 SET Forklift for general stores

08-9-13-01-1319FLAT TRAILER FOR DOMESTIC LPG CYLINDERS, STANDARD DOUBLEAXLES WITH SPARE PARTS FOR TRANSPORTATION FROM FILLINGPLANTS TO CONSUMERS

50 SET Trailer for domestic LPG distribution

08-9-13-01-1319 AXLES WITH SPARE PARTS TRANSPORT ( FILLING PLANTS TO

08-9-13-01-1320 BOX TRAILER DOUBLE AXLES (20-25) TONS WITH SPARE PARTS (OILDRUMS FROM REFINERY TO DEPOTS) 40 SET Trailer for oil drum distribution

08-9-13-01-1321CARGO TRUCK CAP (10-12) TONS WITH SPARE PARTS FORTRANSPORT GENERAL MATERIALS FROM STORES TO DEPOTS ANDSERVICE STATIONS

50 SET General transportation requirements

08-9-13-01-1322 SEMI-TRAILERS FOR OIL PRODUCT TANK, CAP 36 M3 WITH SPARE PART.

75 SET Tankers for domestic oil delivery

08-9-13-01-1323 COMPLETE TRUCKS FOR OIL PRODUCTS CAP. 40-50 M3 WITH ACCESSORIES & SPARE PARTS

6 SET Trailer for kerosine distribution

08-9-13-01-1324CARGO DOUBLE CABS (3 TONS CARGO LOADING CAP) FITTED WITHHYDRAULIC CRANE MAX LOADING CAP. (1 TON ) WITH DOUBLE CABIN &DIESEL ENGINE .

20 SET Maintenance requirements

08-9-13-01-1325 STEAM BOILER, CAP ( 5-7 ) TONS / HR. FOR OIL PRODUCTS TANKSCLEANING WITH SPARE PARTS. 6 SET Tank cleaning requirements

08-9-13-01-1326 ELECTRIC WELDING MACHINE 15 NOS. Maintenance requirements

DIESEL WELDING MACHINE 10 NOS. Maintenance requirements

PAGE: 139 9RFN

Page 140: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 7ESTABLISHMENT NAME : OIL PRODUCTS DISTRIBUTION COMPANY LOCATION : ALL AREAS PROJECT 13-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENTPIPES SIZE 2"- 6" 100000 MTR. General replacement & maintenanceFITTING SIZE 2"- 6" 10000 NOS. General replacement & maintenance

08-9-13-01-1328 HOSES SIZE (3/4"- 2.5") TO BE USED FOR LOADING FROM TRUCKS TO SERVICE STATIONS TANKS & FUEL DISPENSERS. 3000 NOS. For fuel deliveries

PUMPS FOR SERVICE STATIONS & DEPOTS WITH SPARES: - ELECTRIC DRIVEN CENTRIFUGAL PUMP CAP . 70M3/H 50 SET Pumps for fuel depots

- DIESEL DRIVEN CENTRIFUGAL PUMP CAP .70M3/H 15 SET "

- ELECTRIC DRIVEN CENTRIFUGAL PUMP 100M3/H 10 SET "

- SCREW PUMP ELECTRIC DRIVEN CAP 70M3/H 20 SET " - PORTABLE AIR DRIVEN PUMP 30 SET - AIR DRIVEN VENTURI PIPE 30 SET

08-9-13-01-1330 SPARE PART FOR POSITIVE DISPLACEMENT METERS 1000 ITEM Spares for metering

08-9-13-01-1331 NOZZLES(1/2" 3/4") TO REPLACE DAMAGED NOZZLES IN FUELDISPENSERS. 1000 NOS. Fuel dispensers spares

08-9-13-01-1332 ELECTRIC CABLES, VARIOUS SIZES . 10000 MTR. Requirements for depots and filling stations

08-9-13-01-1333 LIGHTING FITTINGS, VARIOUS TYPES. 10000 NOS. "

08-9-13-01-1334 ELECTRIC CONTROL PARTS ( SWITCHES, STARTERS…) 18720 NOS. "

08-9-13-01-1335 SPARE PARTS FOR FUEL DISPENSERS 500 ITEM "

08-9-13-01-1336 SPARE PART FOR LOADING ARMS 100 ITEM "

08-9-13-01-1337 FINGER GREASE FOR LUBRICATING VALVES 2000 CAN "

08-9-13-01-1338CENTRIFUGAL PUMP ELECTRIC DRIVEN 1 "×3/4", DISCHARGEPRESSURE 2.5 KG / CM2 FOR THE COOLING SYSTEM OF LPG CYLINDERYARDS.

100 NOS. Pumps for gas bottling plant

08-9-13-01-1339 TOOL KITS FOR MAINTENANCE TEAMS. 500 SET Maintenance tools

08-9-13-01-1327

08-9-13-01-1329

PAGE: 140 9RFN

Page 141: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 7ESTABLISHMENT NAME : OIL PRODUCTS DISTRIBUTION COMPANY LOCATION : ALL AREAS PROJECT 13-01 : MAINTENANCE & OPERATION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-13-01-1340 STANDARD VOLUME FOR FIELD TEST AND CALIBRATION OF METERS 10

& 20 LITER 250 NOS. Primary standards for calibration

08-9-13-01-1341 SPARE PARTS FOR FUEL DISPENSERS AND PUMPS 200 ITEM Spares for fuel dispensers

08-9-13-01-1342 TANK LEVEL MECHANICAL MEASURING AND INDICATING DEVICE FORSERVICES STATIONS TANKS. 500 NOS. Operational control system

08-9-13-01-1343 Tank level gauge for oil products storage tanks 29 NOS. Operational control system

08-9-13-01-1344 WELDING ELECTRODES (GENERAL PURPOSE) 30 TON General purpose usage only

08-9-13-01-1345CONSUMABLE MATERIALS SUCH AS (MICA, GASKET, SHEETS, BOLTS &NUTS…) FOR GENERAL MAINTENANCE OF TRUCKS AND SERVICESTATIONS.

200 ITEM Maintenance consumables

PAGE: 141 9RFN

Page 142: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 7ESTABLISHMENT NAME : OIL PRODUCTS DISTRIBUTION COMPANY LOCATION : ALL AREAS PROJECT 13-02 : REHABILITATION / REVAMPING OF EXISTING

INSTALLATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT

08-9-13-02-1356 FUEL DISPENSERS WITH PUMPS, SINGLE & DOUBLE WITH SPARE PARTS FOR SERVICE STATIONS 500 SET Fuel dispensers

08-9-13-02-1357 SERVICE AND SUPPLY CONTRACTS FOR THE MAINTENANCE OF FUELSTATIONS INCLUDING SUPPLY OF PIPES, ACCESSORIES AND PARTS. 5 CONTRACT Maintenance contract

LOCATION : ALL AREAS PROJECT 13-03 : SUSTAINING AND ENHANCING PRODUCTION

CAPABILITIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-13-03-1361 FIXED ROOF TANKS CAP. 10000 M3 WITH ACCESSORIES. 5 NOS. Storage Tanks for Mosul, Ramadi &

Basrah

08-9-13-03-1362 STEEL PLATES & ACCESSORIES FOR 3000 CU.M FOR LPG SPHERICALSTORAGE TANKS. 7 SET Construction requirements for LPG storage

tanks

PAGE: 142 9RFN

Page 143: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 5 OF 7ESTABLISHMENT NAME : OIL PRODUCTS DISTRIBUTION COMPANY LOCATION : ALL AREAS PROJECT 13-04 : SAFETY AND ENVIRONMENTAL PROTECTION

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-13-04-1365 FIRE FIGHTING TRUCKS FOR DEPOT. 6 SET Fire fighting equipment & consumables

FIRE FIGHTING DIESEL PUMPS FOR DEPOTS. 10 SETFIRE FIGHTING ELECTRIC PUMPS FOR DEPOTS. 10 SET

08-9-13-04-1367 PERSONAL SAFETY ITEM (SAFETY BOOTS, SUITS, GLOVES, FIRE, BLANKET, SAFETY HELMETS, FILTER MASK, HOSES, …) 50 ITEM

FIRE FIGHTING EQUIPMENT, FIRE HOSES, NOZZLES, FIRE ,EXTINGUISHERS, AIRCOMPRESSORS, …)

08-9-13-04-1369 FOAM LIQUID 75000 LIT.

08-9-13-04-1370 DRY POWDER 30 TON

08-9-13-04-1366

08-9-13-04-1368 50 ITEM

PAGE: 143 9RFN

Page 144: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 6 OF 7ESTABLISHMENT NAME : OIL PRODUCTS DISTRIBUTION COMPANY LOCATION : ALL AREAS PROJECT 13-05 : SERVICE & PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-13-05-1375 SPARE PARTS FOR VARIOUS TYPES OF TRUCK TRACTOR, FORKLIFT &

SEMI TRAILER 500 SET Spares for all areas

08-9-13-05-1376 SERVICING EQUIPMENT FOR TRUCK MAINTENANCE. 20 SET Spares for all areas

08-9-13-05-1377 SPARE PARTS FOR LIGHT TRUCKS (L.C.V.) 100 ITEM Spares for all areas

08-9-13-05-1378ELECTRIC FLAME PROOF HEATERS, WALL MOUNTED (2KW) TO BE USEDIN WORKING SPACES AT SERVICE STATIONS, DEPOTS, WORKSHOPS ANDOFFICES

2000 NOS. Intrinsically safe heaters

08-9-13-05-1379 VARIOUS OFFICE EQUIPMENT ( COPY MACHINE, FAX, …) WITH SPAREPARTS 10 ITEM Office equipment

08-9-13-05-1380PERSONAL COMPUTERS WITH ACCESSORIES WITH PRINTERS,SCANNERS, PLOTTERS, COMPLETE WITH CONSUMABLE MATERIALS &SPARES.

20 SET General office equipment

08-9-13-05-1381 TYRES & TUBES OF VARIOUS SIZES FOR LIGHT TRUCKS 3000 NOS. Replacements for vehicles

08-9-13-05-1382 DIESEL GENERATORS (75KVA, 100KVA, 250KVA) FOR DEPOTS & PETROLSTATIONS TO OPERATE DURING POWER CUT OFF WITH SPARE PARTS. 75 SET Emergency power requirements

08-9-13-05-1383 LOW LOADER (25-30 TONS) WITH SPARE PARTS TO CARRY EQUIPMENTFOR PETROL STATIONS SUCH AS SHOVELS, PIPES & THE LIKE… 5 SET Delivery equipment for loads up to 30

tonnes

08-9-13-05-1384 DUMP TRUCKS WITH SPARE PARTS. 6 SET Maintenance (site clearance)

PAGE: 144 9RFN

Page 145: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 7 OF 7ESTABLISHMENT NAME : OIL PRODUCTS DISTRIBUTION COMPANY LOCATION : ALL AREAS PROJECT 13-05 : SERVICE & PLANT EQUIPMENT

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-13-05-1385 ELECTRIC DRIVEN CEMENT MIXER ON WHEELS 0.5M3 CEMENT CAP. 10 NOS. Replacement equipment

08-9-13-05-1386 DIESEL DRIVEN COMPACTOR (MANUAL WORK ) 10 NOS.

08-9-13-05-1387 AMBULANCE CARS, STANDARD WITH SPARE PARTS 4 SET

08-9-13-05-1388 TRUCK TRACTOR 6X4 WITH SPARE PART 100 SET

08-9-13-05-1389 PICK UP DOUBLE CABIN WITH SPARE PARTS 100 SET

LOCATION : ALL AREAS PROJECT 13-06 : TESTING, INSPECTION, STUDIES, SURVEYS AND

LABORATORIES

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-13-06-1395 OIL PRODUCTS TESTING APPARATUS WITH ACCESSORIES AND SPARE

PARTS. 45 ITEM Product quality testing equipment

08-9-13-06-1396INSPECTION AND TESTING EQUIPMENT FOR GENERAL MAINTENANCEOF SERVICE STATIONS AND DEPOTS, PIPING SYSTEM AND TANKS (NDT,MECHANICAL / ELECTRICAL)

20 ITEM NDT/mechanical/electrical testing

PAGE: 145 9RFN

Page 146: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 1 OF 4ESTABLISHMENT NAME : OIL TRAINING INSTITUTES LOCATION : BAGHDAD / BASRAH / BAIJI PROJECT 14-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-14-01-1410 PROGRAMMABLE OIL WELL DRILLING RIG SIMULATOR (FULL SIZE) FOR

TRAINING 3 SET Training simulator

08-9-14-01-1411 FAN V.G. METER TO MEASURE RHEOLOGICAL PROPERTIES OF DRILLING FLUIDS (C.P) AND SPARE PARTS FOR DEMONSTRATION 30 NOS Demonstration laboratory equipment

08-9-14-01-1412 MUD BALANCE (4) SCALE (C.P.I) FOR LABS. 30 NOS Demonstration laboratory equipment

08-9-14-01-1413 DEAD-WEIGHT HYDRAULIC FILTER PRESS. (A.P.I) FOR LABS. 30 NOS Demonstration laboratory equipment

08-9-14-01-1414 MARSH FUNNEL WITH STOP WATCH & GRADUATED CUP (A.P.I) FOR LABS. 10 SET Demonstration laboratory equipment

08-9-14-01-1415 OIL & WATER RETORT KIT (API) WITH SPARE PARTS FOR LABS 30 NOS

08-9-14-01-1416 ATMOSPHERIC PRESSURE CONSISTOMETER AND SPARE PARTS FOR TESTING OILWELL CEMENT FOR LABS 3 NOS

08-9-14-01-1417 PRESSURIZED CONSISTOMETER (HP-HT THICKENING TIME TESTER API) AND SPARE PARTS FOR LABS 2 NOS

08-9-14-01-1418 CURING CHAMBER FOR OIL-WELL CEMENT (A.P.I) FOR LABS. 1 SET Training simulator

08-9-14-01-1419 CEMENT BLENDER AND SPARE PARTS FOR PREPARING CEMENT SLURRY (API) FOR LABS 3 NOS

08-9-14-01-1420 GAS TURBINE SIMULATOR 3 unit Training simulator

08-9-14-01-1421 STEAM POWER PLANT SIMULATOR 3 unit Training simulator

08-9-14-01-1422 CENTRIFUGAL COMPRESSOR SIMULATOR 2 SET Training simulator

08-9-14-01-1423 HOT TAPPING MACHINE FOR STUDENTS WORKSHOP 2 SET Demonstration laboratory equipment

08-9-14-01-1424 MICROSCOPE (ELECTRICAL TYPE) FOR LABS. And spare parts 15 SET Demonstration laboratory equipment

08-9-14-01-1425 MINERAL ANALYZER APPARATUS FOR LABS. with accessories and spare parts 3 SET Demonstration laboratory equipment

08-9-14-01-1426 WELDING MACHINES FOR TRAINING 63 SET Demonstration laboratory equipment

PAGE: 146 9RFN

Page 147: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 2 OF 4ESTABLISHMENT NAME : OIL TRAINING INSTITUTES LOCATION : BAGHDAD / BASRAH / BAIJI PROJECT 14-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-14-01-1427 INTELLIGENT TRANSMITTER WITH CONTROL CAPABILITY / SIMULATOR 2 ITEM Training simulator

08-9-14-01-1428MODEL PROGRAMMABLE LOGIC CONTROL (P.L.C) MACHINE FOR LEVEL CONTROL, TEMPERATURE CONTROL, PRESSURE CONTROL AND FLOW RATE CONTROL

5 SET Training simulator

08-9-14-01-1429 POWER SUPPLY UNIT AND FUNCTION GENERATOR 20 ITEM Demonstration laboratory equipment

08-9-14-01-1430 MONITOR FOR TRAINING 2 ITEM Visual training requirement

08-9-14-01-1431 ARMATURE WINDING MACHINE FOR STUDENTS WORKSHOP 4 ITEM Demonstration laboratory equipment

08-9-14-01-1432 MODEL MULTI SPEED MOTOR FOR TRAINING 1 ITEM Demonstration laboratory equipment

08-9-14-01-1433 CLOSED CCT TV FOR TEACHING 2 ITEM Visual training requirement

08-9-14-01-1434 TEST & TRAINING STAND OF BURNER'S FOR OIL AND GAS, ADJUSTABLE WITH TARGET FOR REVERSAL OF FLAME 1 ITEM Demonstration laboratory equipment

CONTINUOUS LIQUID / LIQUID EXTRACTION : 3 SET AUTOMATED MODEL PILOT PLANT 1 ITEM Training simulator

08-9-14-01-1436 AUTOMATED MODEL PILOT PLANT FOR REFINERY OPERATION 3 SET Training simulator

08-9-14-01-1437SIMULATOR FOR MULTI FUNCTION PROGRAMMABLE CONTROLLERS SIGNAL LOOP TO MINI DSC WITH COMPUTER CONTROL SOFT WARE CONTROL

2 ITEM Training simulator

08-9-14-01-1438 ELECTRONIC TELEPHONE EXCHANGE (10 LINES) SIMULATOR 1 ITEM Training simulator

08-9-14-01-1439 MODEL MICROWAVE LINK FOR TRAINING 1 ITEM Training simulator

08-9-14-01-1435

PAGE: 147 9RFN

Page 148: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 3 OF 4ESTABLISHMENT NAME : OIL TRAINING INSTITUTES LOCATION : BAGHDAD / BASRAH / BAIJI PROJECT 14-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-14-01-1440 ARMATURE GROWLER (MODEL) 1 ITEM Training simulator

08-9-14-01-1441 LIQUID LEVEL CONTROL (MODEL) with accessories and spares 4 SET Training simulator

LIQUID TEMPERATURE CONTROL (MODEL) with accessories and spares 4 SET

08-9-14-01-1442 PRESSURE AND TEMPERATURE GAUGES FOR TRAINING 4 ITEM Demonstration laboratory equipment

08-9-14-01-1443 DIGITAL MEAGER FOR WORKSHOP 1 ITEM Demonstration laboratory equipment

08-9-14-01-1444 PNEUMATIC CALIBRATOR FOR WORKSHOP 6 ITEM Demonstration laboratory equipment

08-9-14-01-1445 POSITIONER FOR CONTROL VALVE FOR WORKSHOP 4 ITEM Demonstration laboratory equipment

08-9-14-01-1446 MICROMETER 2 ITEM Demonstration laboratory equipment

08-9-14-01-1447 CONTINUOUS DISTILLATION MODEL PILOT PLANT FOR TRAINING PURPOSES 2 ITEM Training simulator

08-9-14-01-1448FLUID MECHANICS DEMONSTRATION PILOT PLANT MODEL PLANT FOR "FLOW CONDITIONS" WITH SPARES, INSTALLATION, COMMISSIONING AND TRAINING ON SITE

3 3

SETSET

08-9-14-01-1449 AUTOMATED PILOT PLANT FOR HEAT TRANSFER WITH SPARES, INSTALLATION, COMMISSIONING AND TRAINING ON SITE

3 SETTraining simulator

08-9-14-01-1450 SECTION SIMULATOR FOR CENTRIFUGAL PUMP 2 SET Training simulator

08-9-14-01-1451 STEAM BOILER SIMULATOR 1 SET Training simulator

08-9-14-01-1452 DEAD WEIGHT TESTER FOR CALIBRATION OF OIL WELL FIELD MEASUREMENT TOOLS FOR LABS. 2 SET Demonstration laboratory equipment

08-9-14-01-1453 BOTTOM HOLE PRESSURE MEASURING TOOL (SUCH AS AMERADA RPG-3 FOR DEMONSTRATION 4 SET Training simulator

PAGE: 148 9RFN

Page 149: MINISTRY OF OIL SHEET NO.: 1 OF 23 ESTABLISHMENT · PDF fileinstruments & control equipment for itp stations ... parts for steam boiler: tubes ... bi-directional prover, mobile master

MINISTRY OF OIL SHEET NO.: 4 OF 4ESTABLISHMENT NAME : OIL TRAINING INSTITUTES LOCATION : BAGHDAD / BASRAH / BAIJI PROJECT 14-01 : MAINTENANCE & OPERATIONS

CODE ITEM DESCRIPTION QTY UNIT COMMENT08-9-14-01-1454 VARIABLE SPEED VISCOMETER 5 SET Demonstration laboratory equipment

FANN VG METER 5 SET

08-9-14-01-1455 WIRE LINE UNIT FOR RUNNING IN TOOLS USED IN OIL WELL FIELD MEASUREMENTS 1 SET Training simulator

08-9-14-01-1456 TOP DRIVE (POWER SWIVEL) SMALL SIZE FOR TRAINING PURPOSES (1/4 OF ACTUAL SIZE) 1 SET Training simulator

08-9-14-01-1457 FIXED OIL BATH TO SIMULATE OIL WELL CONDITIONS FOR THE CALIBRATION OF FIELD MEASUREMENTS TOOLS 2 SET Demonstration laboratory equipment

08-9-14-01-1458 CHART SCANNER TO READ PRESSURE CHARTS OF OIL WELL FIELD MEASUREMENTS TOOLS (SIMULATOR) 3 SET Training simulator

08-9-14-01-1459 CEMENT COMPRESSIVE AND TENSILE MEASURING DEVICE AND SPARE PARTS FOR OILWELL CEMENT SIMULATOR 1 NOS

08-9-14-01-1460 ELECTRONICS LABORATORY FOR TRAINING PURPUSES 8 SET

PAGE: 149 9RFN