1 Ministry of Home Affairs Action Plan-IV for the period 01.04.2010 to 31.03.2011 BM Division Sl. No. Issues/Programmes Time lines/Targets for Progress/ Remarks 1 st Quarter (1.4.2010 to 30.6.2010) 2 nd Quarter (1.7.2010 to 30.9.2010) 3 rd Quarter (1.10.2010 to 31.12.2010) 4 th Quarter (1.1.2010 to 31.3.2011) 1. (a) INDO-BANGLADESH BORDER Phase II Project (i) Fencing – Spill over works of Action Plan-III Targets for 2010- 11 Total targets 2010-11 110 Km 250 Km 360 Km 75 Km 50 Km 110 Km 125 Km (ii) Roads – Spill over works of Action Plan-III Targets for 2010- 11 Total targets 2010-11 109 Km 300 Km 409 Km 75 Km 50 Km 134 Km 150 Km (b) Phase III Project Replacement of Phase‐I fencing – Spill over works of Action Plan-III Targets for 2010- 11 Total targets 2010-11 96 Km 92 Km 188 Km 30 Km 28 Km 65 Km 65 Km
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
Ministry of Home Affairs
Action Plan-IV for the period 01.04.2010 to 31.03.2011
BM Division
Sl. No.
Issues/Programmes Time lines/Targets for Progress/ Remarks
1st Quarter (1.4.2010 to 30.6.2010)
2nd Quarter (1.7.2010 to 30.9.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2010 to 31.3.2011)
1.
(a)
INDO-BANGLADESH BORDER
Phase II Project
(i) Fencing –
Spill over works of Action Plan-III
Targets for 2010-
11
Total targets 2010-11
110 Km 250 Km 360 Km
75 Km
50 Km
110 Km
125 Km
(ii) Roads –
Spill over works of Action Plan-III
Targets for 2010-
11
Total targets 2010-11
109 Km 300 Km 409 Km
75 Km
50 Km
134 Km
150 Km
(b)
Phase III Project
Replacement of Phase‐I fencing –
Spill over works of Action Plan-III
Targets for 2010-
11
Total targets 2010-11
96 Km 92 Km 188 Km
30 Km
28 Km
65 Km
65 Km
2
(c)
Floodlighting Work
Spill over works of Action Plan-III
Targets for 2010-
11
Total targets 2010-11
75 Km 1200 Km 1275 Km
150 Km
150 Km
475 Km
500 Km
2.
INDO-PAKISTAN BORDER
Gujarat Sector
Work Spill over works of
Action Plan-III
Targets for 2010-
11
Total targets 2010-11
Fencing 11 Km 64 Km 75 Km Roads 15 Km 59 Km 74 Km Floodlighting 40 Km 40 Km 80 Km BOPs --- 16 16
10 Km 10 Km 10 Km
25% work
5 Km 5 Km
--- 25% work
30 Km 24 Km 25 Km
25% work
30 Km 35 Km 45 Km 25%
Punjab Sector (i) Completion of fencing and floodlighting in 17.38
Km in original and washed away gaps.
Tendering and award of works
3 Km
7 Km
7.38 Km
3.
CONSTRUCTION OF 509 BORDER OUTPOSTS (BOPs) • 383 BOPs on Indo-Bangladesh border and 126
BOPs on Indo-Pakistan border have been sanctioned. Completion by 2013-14.
Targets 2009-10 (86 allotted)
• 50% of construction work of 86 BOPs
3
• Construction of 50 BOPs out of 86 BOPs
started during 2009-10.
• In remaining 36 BOPs work has spilled over due to non completion of land acquisition (31 in West Bengal, 1 in Assam, 2 in Tripura and 2 in Mizoram)
Target 2010-11 (82 to be taken up)
• Completion of 50 BOPs where work started in
2009-10.
• 50% of construction work of 31 BOPs where land is available.
• Commencement of construction of 51 BOPs subject to acquisition of land.
• Commencement of construction of spilled over 36 BOPs
• Land acquisition of other BOPs i.e. 509 minus 168 (86 + 82).
(Land acquisition schedule cannot be specified since they vary from State to State.)
25%
25%
15%
15%
30%
30%
30%
30%
4. DEVELOPMENT OF INTEGRATED CHECK POSTS (ICPs) Targets for 2010-11 Phase-I ICPs
ICP Award of work Attari Work awarded. Raxaul Work awarded
1st Qtr 15%
5%
2nd Qtr 18% 15%
3rd Qtr 25% 30%
4th Qtr 37% 30%
4
Jogbani 31st May, 2010
Dawki June., 2010
Akhaura June., 2010
Moreh Sept., 2010
Petrapole* Sept., 2010
* Subject to possession of land
Tender finalisa-
tion. Issue of NIT and Award of
work
DER preparation, issue of
NIT
15%
5%
5%
DER preparation, issue of
NIT
25%
15%
15%
15%
15%
25%
20%
20%
20%
15%
Phase-II ICPs (Not a part of Phase-I which is under implementation under XI Five Year Plan) (i) Sunauli, Rupaidiha and Kwarpuchaiah ICPs (ii) Sutarkhandi, Chandrabangha and Hili ICPs
---
---
Completion of land acquisition process and preparation of DERs
---
Land acquisition, preparation of DERs.
5. COASTAL SECURITY SCHEME Supply of boats under Phase-I
Spill over works of Action Plan-III
Targets for 2010-11
Total targets 2010-11
17 boats 78 boats 95 boats
30 boats
28 boats
37 boats
---
5
Phase-II • Phase-II CCS Note of Coastal Security Scheme
Inter-Ministerial consultations and approval of CCS
Additional funds through Supplemen-tary Grants for Phase-I and Phase-II schemes and release of funds to the coastal States/UTs
BORDER AREA DEVELOPMENT PROGRAMME (BADP)
(a) Allocation of funds to the States as per guidelines of BADP
1st Week of April, 2010
(b) Examination of Annual Action Plan (AAP) of the States (due by April 2010) and release of first installment of funds to the States.
Within three weeks of receipt of AAP from the States
(c) Release of 2nd installment of funds to the States.
Beginning of third quarter
6.
(d) Review of the progress by the Empowered Committee.
End of first and third quarters
7.
SETTING UP OF LAND PORTS AUTHORITY OF INDIA (LPAI) • Approval of the Cabinet Note on LPAI Bill • Enactment of the LPAI Bill • Completion of formalities and finalization of
Rules
April, 2010 Budget session, 2010
July, 2010
6
MINISTRY OF HOME AFFAIRS
Action Plan –IV (April 2010 to March 2011)
CS Division
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
1. Amendment to the Repatriation of Prisoners Act, 2003
1. Draft Cabinet note as approved by the Home Minister on 26.3.2010
2. Sent to the Ministry of Law and Ministry of External Affairs seeking their concurrence.
05.4.2010 • Already Sent
3. Views of MEA & Ministry of Law
30.4.2010 • Already Received
4. Cabinet approval 30.05.2010 • Cabinet note would be sent to CS by 19.5.2010
5. Introduction in Parliament 30.7.2010
6. Passing of bill 30.8.2010
7. Issuance of notification 15.9.2010
7
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
2. Negotiating and Signing the Agreements on Transfer of Sentenced Persons in consultation with Ministry of External Affairs.
1. Issuance of notification regarding Agreement on Transfer of Sentenced Persons with Bangladesh, Korea and Saudi Arabia.
15.4.2010 • Notifications Issued
2. Vetting of the notification by Ministry of Law.
30.4.2010 • Done for Korea and Bangladesh
3. Issuance of notification for Bangladesh and Korea
30.5.2010 • Notifications Issued
4. Issuance of notification for Saudi Arabia
30.6.2010 • In process. Presently with MoL.
5. Once notified, process of ratification to be will be initiated through MEA.
6. Cabinet approval in respect of Iran and Sri Lanka obtained. Agreement to be signed in consultation with the Ministry of External Affairs.
30.9.2010
• VVIP visit in Sri Lanka is scheduled for June –July by MEA
7. Negotiations concluded and cabinet approval obtained but not yet signed with - Sri
30.7.2010
30.10.2010 01.02.2011
8
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
Lanka, Israel, Brazil, Hong Kong and Canada- Agreement with two countries to be signed
8. Negotiations underway, Maldives, Bosnia & Herzegovina, UAE, Italy, Turkey, Syria, Lebanon, Kuwait, Indonesia etc. – Close negotiations with two countries
30.8.2010
9. Ratification of Agreement with atleast two countries out of Bangladesh, Saudi Arabia and Korea
• Targeting Bangladesh
3. Signing of multilateral conventions on Transfer of sentenced persons subject to clearance by MEA
1. Matter already taken up with the Ministry of External Affairs. Response of MEA to be obtained.
30.5.2010 • MEA is yet to formulate their view and respond.
2. Response to be taken from Ministry of Law & Justice
30.5.2010 • MoL is yet to formulate their view as to whether such a multilateral conventions are possible under the present Repatriation of Prisoners Act 2003 and respond
9
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
3. Convention of Council of Europe or Inter- American Convention – signing one of the two depending upon the advice of MEA
31.3.2011
4. Holding of an All India Conference of Prison Officials in consultations with BPR&D
1. Finalization of dates 30.5.2010 30.8.2010 • Discussions with BPRD and DG Tihar already held
• They have proposed the conference in July- August, 2010
• File has been submitted for ascertaining suitable date from HM
2. Holding of Conference Follow-up 01.11.2010
Follow-up 01.02.2011
5. Rationalization of Expenditure in Raj Bhawans
1. Approval of HM 15.06.2010 • Information has been received from only a limited number of the States
• Based on this information a proposal is being worked out and would be put up.
10
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
2. Approval of Ministry of Finance
15.08.2010
3. Notification 30.08.2010
6. Changing the name of the State of Orissa and the name of its language
1. Bill has been introduced in Lok Sabha
15.05.2010 • Bill already introduced in Lok Sabha
2. Passing of the Constitutional Amendment Bill by Lok Sabha
3. Passing of the Constitutional Amendment Bill by Rajya Sabha
7. Demand for Gorkhaland
1. Discussion/ Negotiations on the draft interim proposal of GJM and GOI with Interlocutor and GoWB.
15.05.2010 • Second Official level discussions were organized on 11.5.2010. However GJM is adamant on their demand for inclusion of additional area of Siliguri and Doors in the jurisdiction of proposed Interim Authority.
2. Second round of political level tripartite talks – Mid May
30.05.2010 • Will be considered only after a framework of
11
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
solution is worked out at official level
3. Signing of Agreement with concerned stakeholders if a common agreement is reached
31.08.2010
4. Drafting of the bill for interim authority , if agreement happens
31.10.2010
8. Ratification of United Nations Convention against Transnational Organized Crime and its three Protocols
1. Ministry of External Affairs (MEA) has been requested to take follow up the ratification procedure after Cabinet approved the proposal for ratification of UNCTOC.
30.05.2010 • The cabinet approval for ratification of UNCTOC received
2. Follow up with MEA for getting the instrument of ratification signed by the President of India
31.05.2010 • It has been sent to MEA for further processing
3. Submission of instrument of ratification with Secretary General of UN.
As & when treaty event takes place
9. Strengthening of NCRB
12
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
1. Finalization and notification of RRs for all posts with the approval of MHA, DoPT, UPSC and MoL
30.06.2010 • Deputy Director and DPA-A, DPA-B- Finalized on 15.1.2010
With UPSC for approval
• Junior Staff Officer JSO • Joint Asst Director JAD • Assistant Director AD • Joint Deputy Director JDD • Up-gradation of the post of
of DD and filling of the same.
2. Recruitment of technical manpower on Contract by NCRB in the interim with the approval of IFD
30.05.2010 • IFD approval given • NISG submitted proposal
3. Approval of Cabinet Committee on Accommodation to keep NCRB base in Delhi for CCTNS
30.06.2010 • Cabinet note approved by HM and circulated
• Will be submitted to the cabinet on 19.5.2010
4. Preparation of basic Crime Statistics Software by NCRB in co-ordination with UNICEF
30.05.2010 • Software is ready, tested and demonstrated to HS
• To be operationalized by
5. Hosting of Crime Statistics data for facilitating answers to Parliament Question on NCRB’s website.
30.05.2010 • All Crime in India, Accidental Deaths and Suicides in India, Prison Statistics in India, data
13
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
since last more than 1953 till date uploaded on the web
6. Selection of Domain experts and Technical Consultants, not available on contract, on outsourcing basis
30.06.2010 • EC approved in principal • NISG submitted a proposal
to NCRB
7. Notifications of vacancies with UPSC for selection as per RRs
15.07.2010 • Will be done as soon as RRs are approved by UPSC
8. Hiring of additional space till NCRB’s building is designed, tendered, constructed and occupied with BPR&D
31.07.2010 • IFD’s approval is received • NCRB in the process of
hiring. • To be completed by June
end/ July beginning
9. Procurement and commissioning of Equipment for the development of CCTNS in NCRB
31.07.2010 • First set of procurement completed
• The remaining equipment to be procured by SDA
10. Purchase/ Hiring of Vehicles by NCRB under CCTNS after approval of IFD and MoF, DoE
30.09.2010 • IFD already given sanction for hiring since these are not covered under the operational requirements
10. Implementation of Crime and Criminal Tracking Network System (CCTNS) with NCRB and NISG
14
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
1. Release of funds for the project for the year 2010-2011 to the States/ UTs
Ongoing • Release of of Rs. 4.68 Crores has been initiated
2. Issue LOI to Software Development Agency by NCRB
15.04.2010 • Already done on 28.4.2010
3. Issue RFP for establishment of CPMU with the help of NISG/ NCRB
10.06.2010 • RFP to be issued by 24.05.2010
4. Signing of contract with Software Development Agency for development of Core Application Software for CCTNS
10.06.2010 • Draft contract has been prepared by NISG which is under examination in NCRB
• Tender EC is taking it up on 18.5.2010
• Likely to be approved by EC by 30.5.2010 and MoL by 10.6.2010
5. Initiate the Business Process Re-engineering by NCRB and NISG
30.05.2010 • Already started by NCRB and NISG
• Interim report on 25-26th May, 2010
• Final report by July 31, 2010
6. Finalization the Networking options from State/ UTs to NCRB for Police Stations and Higher Offices
15.04.2010 • Already finalized • Further processing of
proposal and signing of agreement will be
15
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
completed by 31.7.2010
7. Finalization of CPMU Tender and issue of LOI and Establishment of CPMU
31.07.2010 • Will be finalized by 31.07.2010
8. Review Capacity Building component of Scheme at State level
Monthly • Review process started • Training started in some
states (except NE and LEW States)
• 13 States actually Started training
• 12 States have decided to outsource
• 22 States decided to go for In-house
• 1 States Yet to decide (Nagaland)
• Additional training infrastructure procurement in process
9. Submission of Project Implementation (PIM) Report by the States
30.06.2010 • SPMC established by 27 States
• 8 States the process is on • PIM would start by
30.6.2010 but be available from all States by 31.7.2010
10. Issue Request for Proposal for selection of System
31.07.2010 • NISG is preparing a comprehensive draft
16
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
Integrator by the States/ UTs with the help of the S-PMC
Request for Proposal for selection of System Integrator by the States/ UTs
• 1 month after PIM
11. Complete the Business Process Re-engineering
31.07.2010 • In process, would be completed by 31.07.2010
• At least 4 to 6 consultation meeting/ workshops would be held
12. Complete Systems study & Start code writing for Core Application Software
31.07.2010 • Likely to be achieved
13. Test data Entry Module 31.08.2010 • Likely to be achieved
14. Release Data Entry Module 30.09.2010 • Likely to be achieved
15. Initial Testing of main CCTNS Module (Tentative)
11. Approval for construction of building to NCRB for construction of building in BPRD/ CRPF campus
1. Appointment of architect by BPRD and NCRB
15.04.2010. • NBCC has been appointed by both and the work is in progress
• Anil Kumar Gupta GM, NBCC has already appointed Mr. Subhranshu
17
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
Gupta Architect. 4 meetings have been held with the Architect.
2. Preparation of Building Design
30.12.2010 • Design process has started
3. Approval of Plans to be taken by NCRB
31.03.2011
12. Incorporating Training of Trainers (ToT)/ Anti Human Trafficking Units (AHTU) Scheme in MHA’s existing schemes
1. The components relating to the capital expenditure/ expenditure on assets like office furniture, camera, vehicle etc. to be covered under the scheme of Police Modernization. To get a proposal approved by HS/HM advising PM Division to include the same in their Police Modernization scheme.
30.04.2010 • The revised scheme has been prepared.
• Scheme has been submitted for approval in the first week of May, 2010 for approval.
2. The components of TOT to be got included in the general training/ capacity building schemes of MHA running in Police-I Division and BPR&D with the approval of HS/ HM.
30.04.2010 • The revised scheme has been prepared.
• Scheme has been submitted for approval in the first week of May, 2010 for approval.
18
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
3. Issue the revised scheme to the State Governments/ UT Administrations for implementation
15.05.2010 • Scheme has been submitted for approval in the first week of May, 2010 for approval.
• Presently with IFD for finding funds
4. Get the additional funds allocated in the 1st excess surrender in August/ September 2010
30.09.2010
13. Issue comprehensive advisories to the State Governments/ UT Administrations on crime against children, old age persons and persons with disabilities.
15.06.2010
14. Issues arising out of implementation of the UP Reorganization Act, 2000
1. Reimbursement of liabilities of pension and other pensionary benefits paid by the Govt. of Uttrakhand to employees who retired during the period 9.11.2000 to 31.3.2001 and every financial year thereafter.
o Get duly verified pension accounts from AG/ States
o Pass Order of GoI duly vetted
30.06.2010 • HS had fixed the meeting in March/ April 2010 with Chief Secretaries and Accountant General of both States
• Both Chief Secretaries have requested for more time for submitting the figures audited by the respective AGs of pension disbursed since the creation of the
19
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
by MoF/ MoLJ after above is received
States • Audited figures have been
made available by Uttrakhand
• The meeting will be fixed in June again if the audited figures are available from both.
15. Issues arising out of implementation of the Bihar Reorganization Act, 2000
1. Reimbursement of liabilities of pension and other pensionary benefits paid by the Govt. of Bihar to employees who retired during the period 9.11.2000 to 31.3.2001 and every financial year thereafter.
o Get duly verified pension accounts from AG/ States
o Pass Order of GoI duly vetted by MoF/ MoLJ after above is received
30.06.2010
• A meeting of the Finance Secretaries of Jharkhand and Bihar held with SS (CS) on 3.2.2010. The audited figures from AG Jharkhand are available whereas the audited figures from AG Bihar have not been received.
• HS had fixed the meeting in March/ April 2010 with Chief Secretaries and Accountant General of both States
• Both Chief Secretaries have requested for more time for submitting the figures audited by the respective AGs of pension disbursed
20
Sr. No.
Issues/ Programmes 1st Quarter (1.4.2010 to 30.06.2010)
2nd Quarter (1.7.2010 to 30.09.2010)
3rd Quarter (1.10.2010
to 31.12.2010)
4th Quarter (1.1.2011 to 31.03.2011)
Progress / Remarks
since the creation of the States.
• The meeting will be fixed in June again if the audited figures are available from both.
2. Division of assets and liabilities of Bihar State Food & Civil Supplies Corporation
31.08.2010
• A meeting with both States has been fixed in the last week of May, 2010
3. Division of the Bihar State Industrial Development Corporation.
31.08.2010 • Chief Secretaries of Bihar and Jharkhand were to decide whether the Bihar State Industrial Development Corporation shall be a joint venture corporation or whether it is to be divided into two independent Corporations and assets and liabilities of the undivided Corporation be apportioned.
• The Chief Secretaries are yet to meet and decide. SS(CS) has reminded them a number of times.
21
MINISTRY OF HOME AFFAIRS
Action Plan for the period 1.04.2010 to 31.03.2011 DM Division
Time Line/Targets for Sl. No.
Issue/Programme/ Activity
1st Quarter (1.04.2010 to 30.06.2010)
2nd Quarter (1.07.2010 to 30.09.2010)
3rd Quarter (1.10.2010 to 31.12.2010)
4th Quarter (1.01.2011 to 31.03.02011)
Progress/ Remarks
1. Spill over activity Procurement of specialised equipment for eight NDRF Bns. by CPMFs/NDRF
Progress of procurement will be reviewed by JS (DM)
Progress of procurement will be reviewed by Secretary (BM)
Procurement to be completed by 31-10-10
Started in 2006-07. Total cost of equipments is Rs.158.56 crore. Of this equipment worth Rs.72 crore has already been procured till 2009-10.
2. Constitution of National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF)
Activity will be completed during the quarter. Guidelines are to be issued by the Ministry of Finance
Draft guidelines have been sent to the Ministry of Finance.
3. Review of items and norms for assistance from CRF/NCCF
30.06.2010
The Expert Group has already held its last meeting on 7th May, 2010 and recommendations will sent to MoF by 31st May, 2010 for concurrence.
4. Upgradation of National Fire Service College, Nagpur (i) Approval of the Plan by the
EFC, HM & FM (ii) Preparation of the drawings
and estimates for
15.06.2010
Total cost of the Project is Rs.205 crore. The entire project is to be completed within a period of three years. EFC has appraised the Project and HM has already approved. In a meeting held
22
civil/electrical works by CPWD, approval of local bodies and award of work
(ii) Start of construction work
of Administrative and Academic buildings
15.05.2010 (start of the work)
30.11.2010 01.01.2011
on 14.05.2010 CPWD has assured that they will be able to prepare the drawings and award the work within a period of 6 months. A token provision of Rs.10 lakhs has been made and additional funds will be sought at the appropriate stage through supplementary budget.
5. Ongoing Activity The Scheme on Revamping of Civil Defence setup in the country:- (i) Strengthening of existing Training Institutes (17 States) (ii) Construction of New Training Institutes (10 States) (iii) Training of Civil Defence Volunteers by Master Trainers
Release of funds to the extent of Rs.3.05 crore
Training of 2000 CD volunteers by Master Trainers
Release of funds to the extent of Rs.6.16 crore Training of 1500 CD volunteers by Master Trainers
Release of funds to the extent of Rs.4.47 crore Release of funds to the extent of Rs.1.00 crore Training of 780 CD volunteers by Master Trainers
Release of funds to the extent of Rs.0.10 crore
The total cost of the Scheme is Rs.100 crore to be implemented in 100 identified Districts in the XIth Five Year Plan. It was approved in April, 09. In 2009-10, Rs.15 crores was released to States and DGCD for various activities. Allocation during the current year is Rs.15 crore. (i) Proposal for upgradation of 12 out of 17 existing Institutes have been received. These were approved and funds released partially in 2009-10. (ii) No proposal for new Training Institutes has been received from any of the 10 States. Govt. of Chattisgarh has, however, allotted land. (iii) Training of 214 Master Trainers completed in 2009-10.
23
Review of physical progress with States by DGCD
Review of physical progress with States by DGCD
Review of progress by Secy (BM)
Review of physical progress by DGCD
6. Ongoing Activity Strengthening of Fire & Emergency Services in the country
Release of funds to the extent of Rs.34.45 crore to the State Govts. for equipment and to DGCD for various activities including training of Trainers Review of physical progress with States by DGCD.
Release of funds to the extent of Rs.1.67 crore for the DGCD for various activities including training of Trainers Review of physical progress with States by DGCD
Release of funds to the extent of Rs.1.11 crore to DGCD for various activities including training of Trainers Review of progress by Secy (BM)
Release of funds to the extent of Rs.0.76 crore to DGCD for various activities. Review of physical progress by DGCD
The Scheme was approved by Cabinet on 22.10.2009, as a Centrally sponsored Scheme with an outlay of Rs.200 crore to be implemented during the current Plan period. In 2009-10, Rs.14 crore has been released to the States and DGCD. In BE 2010-11, Rs.38 crore has been provided (Rs.33 crore as grant-in-aid to the States and Rs.5.00 crore for other activities of DG, NDRF.
24
MINISTRY OF HOME AFFAIRS
Action Plan for the period 1.04.2010 to 31.03.2011
FFR Division
Time lines /Targets for Sl.No.
Issues / Programme / Activity
1st Quarter
(1.4.2010 to 30.6.2010)
2nd Quarter
(1.7.2010 to 30.9.2010)
3rd Quarter
(1.10.2010 t0 31.12.2010)
4th Quarter
(1.1.2011 to 31.3.2011)
Remarks
1. Ongoing activity.
(a) Implementation of the judgments given by various courts.
(b) Periodical meetings of the Committee of Eminent freedom fighters.
81 judgments which are pending as on 31.3.2010.
--
To be implemented within the timeframe given by the courts.
Meeting of the committee to be held.
To be implemented within the timeframe given by the courts.
--
To be implemented within the timeframe given by the courts.
Meeting of the committee to be held.
During the year, 2009-10, 433 judg-ments were implemented. As on 31.03.2010, 81 judgements are pending implementation.
One meeting to be held in every six months. The last meeting was held on 1st February, 2010 at Goa.
2. Ongoing activity.
Data Base of freedom fighters who are living and drawing Samman
25
Pension
(a) Preparation of the data base of freedom fighters.
(b) Periodic up-dation after every six months
20,000 entries
25,000 entries
25,000 or remaining entries
45,000 entries to be updated in the fourth quarter.
Data Base is being compiled on the basis of the information being received directly from the Banks. This will complement the earlier effort wherein data base of around 42,000 freedom fighters was prepared based on the records available with the Chief Controller of Pension, Ministry of Finance.
3. Ongoing activity – IInd phase
Digitization of the records of the Freedom Fighters pensioners and transfer of files where pension has been sanctioned, to the National Archives:
45,000 files
45,000 files
45,000 files
45,000 files
During the year 2009-10, data base of 1.43 lakh files has been completed. Of this, 9,000 are sanctioned cases and 1.34 lakhs are rejected cases. Action for transfer of the sanctioned files to National Archives has begun.
4. Ongoing Activity
Pension cases of Hyderabad Liberation
26
Movement –.
(i) Examination of the re-verification reports received from the State Government.
(ii) Meetings of the committee.
(iii) Processing of recommendation of the committee.
450 cases
One meeting to be held every month provided at least 50 cases which fulfill eligibility criteria and evidentiary requirement are available after examination of the re-verification reports.
Sanctions to be issued within one month of the meeting of the committee.
450 cases
450 cases
450 cases
As on 1st April, 2010, 750 re-verification reports received from the State Government are pending examination.
5. Ongoing activity.
Inventory/verification of movable / immovable assets declared as ‘Enemy Property’
27
(a) Submission of the draft report on movable properties by NIFM.
(b) Submission of the Final report by NIFM on movable properties.
(c) Follow up action on the report regarding movable properties.
(d) Submission of draft report on immovable properties.
(e) Submission of final report
(f) Follow up action on the report on immovable properties.
31.05.2010
30.06.2010
30.09.2010
31.08.2010
30.09.2010
31.12.2010
A number of deficiencies were observed in the draft report already submitted by the NIFM in mid-February,2010.
The physical verification of 100 identified properties would be completed by 31.07.2010 only.
6. New Activity
Amendments in the Enemy Property Act, 1968
The amendments have been necessitated by various judgments of the Supreme Court / High Courts on the rights of
28
a) Formulation of proposals by the Custodian of Enemy Properties
b) Examination of the proposals by the Inter-Ministerial Committee and to suggest changes in the Enemy Property Act, 1968
c) Consideration of the recommendations of the committee in MHA and approval of the competent authority.
d) Formulation of Bill and approval of the Cabinet.
e) Introduction of the Bill
30.04.2010
31.07.2010
31.08.2010
31.10.2010
Winter Session
the custodian over the enemy properties. An Ordinance to carry out the amendments has been issued on 2nd July, 2010. A Bill to replace the Ordinance is likely to be introduced in the Monsoon Session.
7. New Activity
Computerization of the records relating to claims and compensation of displaced persons
The Acts relating to assessment of claims and compensation have already been repealed. These records need to
29
(around 12 lakh files) and its transfer to the National Archives
a) Award of the work to an outside agency
b) Commencement of the computerization @ 50,000 files per month
30.04.2010
50,000 files
1,50,000 files
1,50,000 files
1,50,000 files
be transferred to National Archives.
30
Ministry of Home Affairs
Action Plan IV for the period 1-4-2010 to 31-3-2011
HR Division
Timelines / Targets for Sl. No.
Issues/Programmes/ Activity
1st Quarter
(1.4.2010 to 30.6.2010)
2nd Quarter
(1.7.2010 to 30.09.2010)
3rd Quarter
(1.10.2010 to 31.12.2010)
4th Quarter
(1.1.2011 to 31.3.2011)
Remarks
1
The Communal Violence (Prevention, Control and Rehabilitation of Victims) Bill, 2005 The above mentioned bill was introduced in the Rajya Sabha on 5.12.2005 and subsequently referred to the Parliamentary Standing Committee on Home Affairs. The Standing Committee submitted its report on 13.12.2006. After fresh approval of the Cabinet in Dec. 2009, notices were given in Dec. 2009 and Feb. 2010 in the Rajya Sabha for consideration and passing of the Bill. Ministry of Law & Justice has suggested some new amendments. On 19.04.2010, the Home Minister took a meeting with Secretary, Legislative Dept., Additional Secretary, Legislative Dept., SS (CS) and JS (HR) to discuss and formulate new amendments. Approval of the new amendment by HM
Vetting by Law Ministry
Approval of the Cabinet
By 30.04.2010
By 22.05.2010
By 4.06.2010
31
Timelines / Targets for Sl. No.
Issues/Programmes/ Activity
1st Quarter
(1.4.2010 to 30.6.2010)
2nd Quarter
(1.7.2010 to 30.09.2010)
3rd Quarter
(1.10.2010 to 31.12.2010)
4th Quarter
(1.1.2011 to 31.3.2011)
Remarks
Notice for consideration/passing of the Bill in Rajya Sabha
Passing of the Bill in Rajya Sabha
Notice for consideration/passing of Bill in Lok Sabha
Passing of the Bill in Lok Sabha
By 15.8.2010 By 20.8.2010 By 21.8.2010
By 25.8.2010
2
Laying of Annual Report of the NHRC alongwith the action taken report. The Annual Report of the NHRC for 2007-08 alongwith the Action Taken Report are required to be laid on the Table of both Houses of Parliament as per provisions contained in Section 20(2) of Chapter IV of the PHR Act,1993.
Preparation of Action Taken Report and approval by HM
Laying of the Action Taken Report in Parliament
By 30.4.2010
By 7.8.2010
3 Follow-up of the decisions taken in the meeting of the Governing Council of National Foundation for Communal Harmony (NFCH) held on 6.1.2010 Preparation of a five-year “Vision Statement”
By 30.04.2010
Action Completed
32
Timelines / Targets for Sl. No.
Issues/Programmes/ Activity
1st Quarter
(1.4.2010 to 30.6.2010)
2nd Quarter
(1.7.2010 to 30.09.2010)
3rd Quarter
(1.10.2010 to 31.12.2010)
4th Quarter
(1.1.2011 to 31.3.2011)
Remarks
Appointment of new auditors for NFCH for the financial year 2010-11
By 7.05.2010
Action Completed
4 Declaration of Students Islamic Movement of India (SIMI) as Unlawful Association
SIMI has been declared as unlawful association vide Notification dated 5.2.2010. The Unlawful Activities (Prevention) Tribunal consisting of Mr. Justice Sanjeev Khanna, Judge of the High Court of Delhi has been constituted vide Notification dated 5.3.2010. Necessary action will be taken so that the Notification banning SIMI is upheld by the Tribunal.
By 5.08.2010
5 Holding the meeting of the Sub-Committee of National Integration Council (NIC) Office order reconstituting the NIC has been issued on 5/4/2010. HM has approved the constitution of the Sub-Committee on 16/4/2010. Thereafter a meeting of the Sub-Committee would be convened to finalize the agenda for the next meeting of the NIC. Subsequently, the agenda will be sent to the PMO for approval and time and date convenient to the Prime Minister will be sought for convening of the
33
Timelines / Targets for Sl. No.
Issues/Programmes/ Activity
1st Quarter
(1.4.2010 to 30.6.2010)
2nd Quarter
(1.7.2010 to 30.09.2010)
3rd Quarter
(1.10.2010 to 31.12.2010)
4th Quarter
(1.1.2011 to 31.3.2011)
Remarks
next NIC meeting.
Holding of meeting of Sub Committee and finalisation of Agenda
Holding of meeting of NIC
By 30.8.2010 By 30.9.2010
6 Kabir Puraskar
The nominations for the Kabir Puraskar for the year 2010 will be scrutinised and put up to the Selection Committee for the final decision.
By 01.10.2010
7
Package for the victims of Gujarat riots of 2002
The amount of Central Governments’ commitment towards payment of additional ex-gratia to the victims of communal riots in Gujarat in 2002 for damage to uninsured commercial/industrial properties has been finalised to the tune of Rs. 85.75 crores and this amount would be sought as supplementary demands in 2010-11.
By 10.10.2010
8
Close and continuous watch on the communal situation in the country
Close and continuous watch will be maintained on the communal situation in the country, and necessary steps will
Ongoing continuous
process
34
Timelines / Targets for Sl. No.
Issues/Programmes/ Activity
1st Quarter
(1.4.2010 to 30.6.2010)
2nd Quarter
(1.7.2010 to 30.09.2010)
3rd Quarter
(1.10.2010 to 31.12.2010)
4th Quarter
(1.1.2011 to 31.3.2011)
Remarks
be taken for communal harmony.
9
Continuous watch on the fundamentalist organisations and individuals.
A close and continuous watch would be kept on the fundamentalist organisations in the country and wherever deemed feasible and required, appropriate action under various laws will be taken.
Ongoing continuous
process
35
MINISTRY OF HOME AFFAIRS ANNUAL ACTION PLAN FOR THE YEAR 2010-11
INTERNAL SECURITY-I DIVISION
Time Lines/Targets for Sl.
No. Issues/programmes
1st Quarter (1-4-2010 to 30-6-2010)
2nd Quarter (1-7-2010 to 30-9-2010)
3rd Quarter (1-10-2010 to 31-12-2010)
4th Quarter (1-1-2011 to 31-6-2011)
Remarks
A National Investigation Agency (NIA)
1. Creation of 59 posts to form a specialized wing in NIA to handle the cases of terror funding and circulation of Fake Indian Currency Notes (FICN) having terror links
a) Formulation and initiation of the proposal and HM approval. – completed
b) Approval of IFD – 15.05.2010
c) Approval of Ministry of Finance – 15.06.2010
a) Notification of posts – 15.07.2010.
b) Formulation of Recruitment Rules
Actual filling up of posts.
Post creation order issued on 24.06.2010. Action completed.
2. Creation of 145 posts for opening of a branch office of NIA at Hyderabad (Cyberabad) in Andhra Pradesh
a) Formulation and initiation of the proposal and HM approval. – completed
b) Approval of IFD – 15.05.2010
c) Approval of Ministry of Finance – 15.06.2010
Post creation order of 110 posts issued on 24.06.2010. Action completed.
36
3. Allotment of office and residential accommodation to the NIA and its employees
30.06.2010 Approved by CCA by 05.05.2010 Key No. conveyed to NIA on - Action completed.
4. Framing of the Recruitment Rules (RRs) for Group ‘A’ & ‘B’ posts in NIA
Proposal to be submitted by NIA- 31.05.2010. Proposal to be sent to DOP&T by 15.07.2010.
Consultation and approval of DoPT and competent authority – 30.10.2010
B Unlawful Activities (Prevention) Act (UAPA)
1. Banning of LTTE under UAPA
Note for Cabinet approval – 13.05.2010
Notification of Tribunal and proceedings – 30.06.2010
Conclusion of Tribunal proceedings including visits- 13.11.2010
C Shiromani Gurudwara Prabhandhak Committee (SGPC)
1. Sending of Jatha Sending of Sikh/Sahajdhari pilgrims jathas to Gurudwaras in Pakistan
Sending of Sikh/Sahajdhari pilgrims jathas to Gurudwaras in Pakistan
Sending of Sikh/Sahajdhari pilgrims jathas to Gurudwaras in Pakistan
D Creation of NATGRID CCS approval accorded.
1. Initiating the process for operating the CEO post
22.4.2010
Action completed.
2. Initiating the procedure for creation of posts (below JS level) to be sent to Ministry of Finance (MoF) for approval
15.5.2010 – Submission by NATRGRID 30.05.2010 – Submission to IFD & MoF 30.06.2010 – Approval of MoF
36 posts created on 8.6.2010. Action of post creation completed. Action for filling up of the post commenced.
37
Ministry of Home Affairs
Action Plan for the period from 01.04.2010 to 31.03.2011
Name of Division: IS-II Division
Sl. No. Issue/Programme/Activity Time lines/Targets for Remarks
1st Quarter (1-4-2010 to 30-6-2010)
2nd Quarter (1-7-2010 to 30-9-2010)
3rd Quarter (1-10-2010 to 31-12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
Narcotics Control Bureau
1. Approval/Appointment to the posts of DDGs in NCB
a) Obtaining Cabinet approval for 3 posts of DDGs
b) Obtaining IFD vetting on draft order.
c) Issue of Sanction Order.
d) Issue of Circular/ Advertisement.
e) Finalising list of applicants.
f) Formation of Selection Committee.
g) Holding of Selection Committee meeting.
h) Obtaining ACC approval
i) Appointment of DDGs.
31-5-2010
7-6-2010
15-6-2010
24-7-2010
10-9-2010
31-7-2010
30-9-2010
30-11-2010
04-12-2010
2. Fixing revised norms for land & offices/residential buildings.
15-5-2010
Revised dates (R)
38
a) Obtaining norms from NCB
b) Obtaining IFD approval for norms.
c) Finalising norms.
25-5-2010
30-6-2010
13-7-2010
28-9-2010
30-9-2010
3. Fixing revised norms for vehicles
a) Obtaining names from NCB
b) Obtaining IFD approval for norms.
c) Finalising norms.
15-5-2010
30-6-2010
17-7-2010(R)
30-9-2010(R)
4. Sanction of vehicles for new NCB units.
a) Assessment of requirements by NCB.
b) Sanction of new vehicles.
15-5-2010
30-9-2010(R)
30-7-2010
31-3-2011(R)
5. Sanction for equipments including voice logger, GPS, Camera.
a) Obtaining proposals from NCB.
b) Reference to IFD.
c) Sanction of equipments.
15-5-2010
20-5-2010
15-7-2010(R)
15-10-2010(R)
30-7-2010
30-10-2010(R)
6. Sanction of funds for land/ buildings (Jodhpur, Kolkata, Chennai, Lucknow)
a) Obtaining proposals for land/ building.
b) Reference to IFD
c) Issue of sanction of funding for land/ building (1)
15-5-2010
20-5-2010
30-7-2010
39
d) Issue of sanction for land/ building (2) 30-9-2010
7. Amendment of RRs for (a) DD/ Superintendent (b) AD/IOs
a) DD/Superintendent
b) AD/IOs
31-5-2010
30-6-2010
30-9-2010(R)
31-10-2010(R)
8. Amendment of RRs for Sepoys 31-5-2010
9. Review of NCB’s activities at HS level 30-9-2010
10. Filling up of 249 posts (Phase I) by NCB 31-12-2010
11. Creation of 224 additional new posts (Phase-II)
a) Obtaining proposals from NCB
b) Reference to MoF
c) Issue of orders for creation
(The time frame is based on completion of appointment procedures for posts created in Phase I)
15-11-2010
30-11-2010
31-3-2011
12. Notification of Arms Rules 30-4-2010
14. Obtaining Cabinet approval for amendment to Arms Act
a) Obtaining comments of Law/ Legislative Deptts., after preparation of Bill and vetting
b) Finalising Note for Cabinet and obtaining HM’s approval
15-5-2010
20-5-2010
40
c) Sending to Cabinet Secretariat
d) Obtaining Cabinet approval
30-5-2010
30-6-2010
15. Introduction of Bill in Parliament for amendment to Arms Act.
31-7-2010
16. Finalisation of Scheme for building the data bases
a) Consultation with States
b) Finalisation of Scheme
c) Circulation to States/UTs
31-5-2010
15-6-2010
30-6-2010
17. Preparation of Scheme for computerisation of Arms Section
a) Consultation with NIC
b) Preparation of Hardware/ Software requirements
c) Assessment of staff requirements.
d) Sending request to Administration Division for staff
e) Obtaining Hardware
f) Obtaining staff for posting in Arms Section
g) Test implementation of scheme
h) Launch of Scheme.
15-7-2010
30-7-2010
30-7-2010
5-8-2010
30-9-2010
30-9-2010
30-10-2010
30-12-2010
18. Clearing backlog of pending applications:
a) for renewal of PB weapons.
30-5-2010
41
b) for extension of area with all India validity. 30-5-2010
Spill over items
19. Pay Parity with other CPMFs 30-6-2010 31-10-2010(R)
42
Ministry of Home Affairs
Action Plan IV for the period 1-4-2010 to 31-3-2011 JUDICIAL Division
S.No. Issues/Programmes First Quarter
30.6.2010
Second Quarter
30.9.2010
Third Quarter
31.12.2009
Fourth Quarter
31.3.2010
Progress/Remarks
1. The Code of Criminal Procedure (Amendment) Bill, 2010
(i) Presentation of the report by the Parliament Standing Committee
(ii) Examination of the Report of the Parliamentary Standing Committee
(iii) Preparation of the draft Cabinet Note for moving official amendment and consideration.
(iv)Consideration and passing of the Bill in the
31.07.2010
Monsoon Session of Parliament
43
Lok Sabha/Rajya Sabha in Winter Session of Parliament.
2. Follow up action on 172nd Report of the Law Commission of India on ‘Review of Rape Law’
(i) Finalization of the draft Criminal Law (Amendment) Bill, 2010
(ii) Preparation of the draft Cabinet Note for introduction of the Bill in the Parliament .
(iii) Introduction of the Bill in the Parliament in Monsoon Session of Parliament.
30.6.2010
31.07.2010
In monsoon Session of
44
Parliament 3. The Prevention of Torture
Bill, 2010
(i) Introduction of the Bill in Lok Sabha.
(ii) Consideration and passing of the Bill in the Lok Sabha.
(iii) Consideration and passing of the Bill in the Rajya Sabha
26.04.2010
06.05.2010
In monsoon Session of Parliament
4. Law relating to ‘Honour Killing- the Indian Penal Code and Certain other Laws (Amendment) Bill, 2010
(i) Preparation of the draft Cabinet Note
(ii) Obtaining comments of the Ministries/Deptts.
(iii) Finalization of Cabinet Note
(iv) Introduction of the Bill in the Parliament in the
20.4.2010 31.05.2010
30.06.2010
31.7.2010
45
Monsoon Session of Parliament.
5 There are 30 mercy petitions pending under Article 72 of the Constitution (of which 4 have been resubmitted to the President’s Secretariat, out of which the case of R. Govindasamy has been decided):-
4 (3+1) cases (1 case spill over from the last Annual Action Plan-III) to be submitted/resubmitted to the President’s Secretariat by
3 cases to be submitted/resubmitted to the President’s Secretariat by
3 cases to be submitted/resubmitted to the President’s Secretariat by
30.06.2010
30.09.2010
31.12.2010
46
…
3 cases to be submitted/resubmitted to the President’s Secretariat by
31.3.2011
47
Time limit Sl No.
Issues/Programmes
Ist Quarter IInd Quarter IIIrd Quarter
IVth Quarter
Progress/Remarks
6. There are 59 legislative proposals pending as on 11.5.2010. The quarter-wise schedule of action with respect to these State Legislative Proposals is as under :-
(i) 04 Ordinances under Article 213 (1) of the Constitution of India.
(ii) 10 State Legislative Proposals for assent of the President
15 State Legislative Proposals assent of the President
15 State Legislative Proposals assent of the President
15 State Legislative Proposals assent of the President
30.06.2010
30.09.2010
31.12.2010
31.03.2011
48
Ministry of Home Affairs ACTION PLAN for the period 1-4-2010 to 31-3-2011
Name of Division: Jammu and Kashmir Division
Sl.
No.
Issues/Programme/Activity Time lines/Targets for Remarks
1. 2. 3. 4.
1st Quarter
(1-4-2010 to 30-6-2010)
2nd Quarter
(1-7-2010 to30-9-2010)
3rd Quarter
(1-10-2010 to 31-12-2010)
4th Quarter
(1-1-2011 to 31-3-2011)
Spill over item 1. Talent Hunt Programme in some
districts by J&K Academy of Art, Culture and Languages
30-6-2010 -- -- -- Due to inclement weather, the programme could not be organized in March 2010.
49
2. Implementation of following components of PM’s package relating to return and rehabilitation of Kashmiri Migrants to the Valley:
i) Construction of transit accommodation at three sites
ii) Employment- Government jobs
--
30-06-2010
31-07-2010
--
--
--
--
--
3. Construction of remaining 4218 two-roomed tenements for Kashmiri Migrants at Jagti
-- -- 31-10-2010 --
4. Completion of construction of 200 flats at Sheikhpura, Budgam district as transit accommodation for Kashmiri migrants
-- -- 31-07-2010 --
50
New items 5. Conduct of Folk/Cultural Festivals by
J&K Academy of Art, Culture and Languages in 8 cites viz. Pune, Mumbai, Delhi, Ahmedabad, Hyderabad, Bangalore, Lucknow and Chennai.
Finalization of proposals by 30.6.2010.
Festival at Lucknow and Delhi
Festival at Pune, Mumbai and Ahmedabad
Festival at Chennai, Hyderabad and Bangalore
6. Tour of youth of J&K to various States of India to be organized by NYKS 30-6-2010 --
51
MINISTRY OF HOME AFFAIRS
Action Plan for the period 1.4.2010 to 31.3.2011.
Name of Division: NE Division
SPILL OVER ITEMS OF ACTION PLAN - III
S.No
Issues/Programmes/Activities Time lines/Targets for
1st Quarter
(1.4.2010 to 30.6.2010)
2nd Quarter (1.7.10 to 30.9.10)
3rd Quarter (1.10.10 to 31.12.10)
4th Quarter
(1.1.11 to 31.03.11)
Remarks
1. 2. 3. 4. 5. 6. 7.
1. Pursue with Statement Government of Manipur to hold elections to the Hill District Councils
Elections have been held although some Naga groups in some areas have been still protesting against the amendment to Manipur Hills Council Act and holding of elections.
2. Repatriation of Bru migrants from Relief Camps in Tripura to Mizoram
About 462 Bru families, who had fled to Tripura after 13th November, 2009 have since been repatriated to Mizoram. According to Govt. of
Repatriation of Bru migrants who had fled to Tripura after 13.11.2009 to be
52
Tripura, such Bru families are much more than 462 reported by Govt. of Mizoram. Both State Governments are jointly identifying Mizoram Bru migrants who had fled to Tripura in November, 2009. After completion of this exercise, some more Bru migrants would be repatriated to Mizoram.
completed.
3 Rehabilitation of Bru families in Mizoram on their repatriation from Tripura.
Rehabilitation of fresh migrants could not be completed as some more fresh Bru migrants are to return to Mizoram. for which assistance has already been released.
Persuade State Government of Mizoram to rehabilitate fresh Bru migrants
Rehabilitation process of fresh Bru migrants to be completed.
53
NEW ISSUES
1. Implementation of the package for Development of Tribal Welfare in Tripura under the Memorandum settlement signed with the NLFT(NB)
Out of total package of Rs. 55.00 crore. Rs. 35.05 crore released.
To release the balance amount of Rs.19.95 crore.
The balance amount of Rs. 19.55 crore could not be released in the absence of receipt of UCs from Government of Tripura for grant released earlier..
UCs have since been received and the balance amount would be release in this quarter.
2. Release of funds under SRE
Entire funds allocated for the 6 NE States
1/3rd of the budget provision under SRE Scheme has been released.
Further release of 1/3rd of the budget provision
Further release of 1/3rd of the budget provision
3. Release of funds under MPF scheme
Entire amount to all the 8 NE States.
1/6th of the budget provision under MPF Scheme has been released.
54
4. Increase of remuneration to SPO/VOF from Rs. 500 to Rs.3000/- per month each SPO
Concurrence of Ministry of Finance, the proposal to be obtained.
Persue matter with Ministry of Finance.
Orders to issue as per concurrence of Ministry of Finance.
55
MINISTRY OF HOME AFFAIRS
Action Plan for the period 1-4-2010 to 31-3-2011
NAXAL MANAGEMENT (NM) DIVISION
SI. No. Issue/programme Time lines/Targets for Remarks
1. Action Plan on anti-naxal Operations:
1st Quarter
(1-4-2010 to 30-6-2010)
2nd Quarter (1-7-2010 to 30-9-2010)
3rd Quarter
(1-10-2010 to 31-12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
A Quarterly review of Intra-State/Inter-State Operations
30.6.2010
30.9.2010
31.12.2010
31.3.2011
B Quarterly review of status of CPMF camps
30.6.2010
30.9.2010
31.12.2010
31.3.2011
C Availability of UAV 30.6.2010
2. Security Related Expenditure Scheme
A Release of SRE reimbursement to the remaining States viz. Andhra Pradesh, Bihar, Madhya
31.5.2010
56
Pradesh, Orissa, Uttar Pradesh & West Bengal for 2008-09
B Audit of Accounts of expenditure for the year 2009-10
31.8.2010
C Release of SRE reimbursement to the States for the year 2009-10
31.10.2010
D Finalization the proposal of raising honorarium of SPOs
31.5.2010
E Approval of work plan 2010-11 of the States.
15.5.2010
Completed. Work Plans approved by SRE committee on 4.5.2010.
F Release of advance for 2010-11 to the States.
31.5.2010
3. Special Infrastructure Scheme (SIS)
A. Evaluation study on implementation of the scheme in Andhra Pradesh, Bihar, Chhattisgarh, Jharkhand,
B. Release of funds to the States for the projects approved in 2009-10
15.6.2010
C. Approval of project proposals of the States for 2010-11
31.7.2010
D. Release of fund to the States for projects approved in 2010-11
30.9.2010
4.
Media / Perception Management Plan
A Release of advertisements
06 Nos. Advertisements
04 Nos. Advertisements
25.4.2010
15.5.2010
Completed. 06 Ads released.
Completed. 04 Ads released.
B. 3rd Tribal Youth Cultural Exchange Programme will be implemented in four phases
30.6.2010
30.9.2010
30.12.2010
21.3.2011
58
one programme in each quarter of 2010-04-06
C. Review of focus districts 30.6.2010
59
MINISTRY OF HOME AFFAIRS
Action Plan- IV (1.04.2010 to 31.03.2011)
POLICE – I DIVISION
Sl. No
Issues / Programmes 1st Quarter (1-4-10 to
30-6-2010)
2nd Quarter (1-7-10 to 30-
09-2010)
3rd Quarter (1-10-2010 to 31-
12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
Progress / Remarks
Mid-Term Cadre Review of 11 Cadres (12 States)
i) Proposal to be received from State Governments.
30.04.2010
ii) Consultation/Meetings with State Governments
15.05.2010
iii) Approval of HS/HM 31.05.2010
iv) Forwarding the proposals to the Cabinet Secretariat
05.06.2010
1.
iv) Notification to be issued
30.06.2010
60
Sl. No
Issues / Programmes 1st Quarter (1-4-10 to
30-6-2010)
2nd Quarter (1-7-10 to 30-
09-2010)
3rd Quarter (1-10-2010 to 31-
12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
Progress / Remarks
Strengthening of National Police Academy (NPA), Hyderabad
i) Proposal to be received from NPA 20.05.2010
2.
ii) Examination of Proposal 20.07.2010
iii) Consultation with IFD/MoF
iv) Approval by the Competent Authority
20.08.2010
20.09.2010
Sl. No
Issues / Programmes 1st Quarter (1-4-10 to
30-6-2010)
2nd Quarter (1-7-10 to 30-
09-2010)
3rd Quarter (1-10-2010 to 31-
12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
Progress / Remarks
3.
Conducting Limited Competitive
Examination
i) Approval of the Competent Authority 31.05.2010
ii) Obtaining comments of all the State Governments & Ministry of Defence
iii) Obtaining comments of DOP&T/ UPSC/ Mol
31.08.2010
20.09.2010
61
Sl. No
Issues / Programmes 1st Quarter (1-4-10 to
30-6-2010)
2nd Quarter (1-7-10 to 30-
09-2010)
3rd Quarter (1-10-2010 to 31-
12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
Progress / Remarks
iv) Approval of PMO
v) Required Amendments in Rules
30.09.2010
10.10.2010
vi) Working out details of written examination in consultation with UPSC
20.10.2010
vii) Working out details of training in consultation with NPA/BPR&D
30.10.2010
viii) Time Schedule of Recruitment to be prepared in consultation with UPSC.
15.12.2010
62
Sl. No
Issues / Programmes 1st Quarter (1-4-10 to
30-6-2010)
2nd Quarter (1-7-10 to 30-
09-2010)
3rd Quarter (1-10-2010 to 31-
12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
Progress / Remarks
4. Empanelment of DG – 1977 Batch
(i) Updation of ACRs
15.06.2010
(ii) Assessment of ACRs by Expert Panel
30.06.2010
(iii) Vigilance Clearance Status to be obtained from CVC
31.07.2010
(iv) Preparation of List of officers with all details and documents
31.08.2010
(v) Approval of HS
15.09.2010
(vi) Forwarding proposal to Cabinet Secretariat
15.10.2010
vii) Approval of the Competent Authority
31.10.2010
63
Sl. No
Issues / Programmes 1st Quarter (1-4-10 to
30-6-2010)
2nd Quarter (1-7-10 to 30-
09-2010)
3rd Quarter (1-10-2010 to 31-
12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
Progress / Remarks
5. Empanelment of ADG – 1979 Batch
(i) Updation of ACRs/Moderation factor
31.10.2010
(ii) Assessment of ACRs by Expert Panel
30.11.2010
(iii) Vigilance Clearance Status to be obtained from CVC
31.12.2010
(iv) Preparation of List of officers with all details and documents
31.01.2011
64
(v) Approval of HS
15.2.2011
(vi) Forwarding proposal to Cabinet Secretariat
28.2.2011
(vii) Approval of the Competent Authority
15.3.2011
6. Empanelment of IG –1990 Batch + 1991 Batch
(i) Updation of ACRs 30.06.2010
(ii) Circulation of ACRs to the members of the Central Police Establishment Board (CPEB)
15.07.2010
(iii) Report of the Assessment to be received from the members of CPEB.
15.08.2010
(iv) Meeting of the CPEB 31.08.2010
65
(v) Approval of the Competent Authority
30.09.2010
Sl. No
Issues / Programmes 1st Quarter (1-4-10 to
30-6-2010)
2nd Quarter (1-7-10 to 30-
09-2010)
3rd Quarter (1-10-2010 to 31-
12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
Progress / Remarks
7. Empanelment of DIG – 1997 Batch
(i) Upgradation of ACRs 30.09.2010
(ii) Circulation of ACRs to the members of the Central Police Establishment Board (CPEB)
15.10.2010
(iii) Report of the Assessment to be received from the members of CPEB
15.11.2010
(iv) Meeting of the CPEB 31.01.2011
(v) Approval of the Competent Authority 10.02.2011
66
Sl. No
Issues / Programmes 1st Quarter (1-4-10 to
30-6-2010)
2nd Quarter (1-7-10 to 30-
09-2010)
3rd Quarter (1-10-2010 to 31-
12-2010)
4th Quarter (1-1-2011 to 31-3-2011)
Progress / Remarks
8. Uploading the vacancies in various CPOs / CPMFs on the website of MHA
In order to ensure that vacancies in CPOs / CPMFs are filled up in a smooth manner, the existing system is to be reviewed. Accordingly, a new system was evolved and notified on 27.11.2009. Follow up measures for implementing the new system are required to be taken.
Uploading the details of vacancies in various CPOs / CPMFs on the website of MHA and sending letters to all the State Govts. informing them about the vacancies with a request to forward the nominations of officers accordingly.
30.06.2010
67
MINISTRY OF HOME AFFAIRS ACTION PLAN IV (01.04.2010 – 31.03.2011) POLICE DIVISION-II
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
(BSF) 1st Quarter
1-4-2010 to
30-6-2010
2nd Quarter
1-7-2010 to
30-9-2010
3rd Quarter
1-10-2010 to
31-12-2010
4th Quarter
1-1-2011 to 31-3-2011
1. PROCUREMENT & DEPLOYMENT OF HELICOPTERS
A. Induction of 4th ALH/Dhruv helicopter of 1st Batch
(i) 5th , 6th & 7th Helicopters
11/05/10
31/08/10
Spill over from Action Plan-III.
4th helicopter positioned at Raipur on 04th July 2010.
Action Completed.
5th, 6th and 7th heptrs are expected to be inducted by end of Nov 2010. Hence, timelines are required to be amended after meeting of SS(IS) with CMD, HAL scheduled for 16/07/2010.
68
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
(ii) 8th Helicopter
31/03/11
A. OPERATIONALISATION OF FLEET i. Commencement of Operation& Maintenance
services of ALH/Dhruv helicopters at Agartala
30/09/10
Agartala Airbase is ready in all respect and can be operationalised as detachment for ALH and MI-17 1V helicopters with immediate effect.
ii. Commencement of Operation & Maintenance services of ALH/Dhruv helicopters at Srinagar
30/09/10
Air HQr issued NOC for Ops & Maint of ALH from AF Stn Srinagar upto 30th Sept 2010. Parking facilities for 2 ALH/Dhruv also been provided. AOC Srinagar has also recommended to WAC, IAF (CATCO) for issuing of NOC for establishment of Airbase at STC Kashmir. MoD has been requested by this Ministry on 06th July 2010 to advise Air HQ
69
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
to issue NOC at the earliest. However timelines have to be extended upto 30th Nov 2010 due to delay in induction of heptrs by HAL.
B. CREATION OF AIR BASES Srinagar Airbase
(i) Sanction of estimates by DG BSF
15/08/10
Proposal not required to be sent to MHA as powers have been delegated to DG BSF upto Rs.5.00 crore.
Action to be taken by BSF:- DG to Sanction estimate.
(ii) Award of work 30/09/10
C. ACQUISITION OF LAND/HANGAR Ranchi
(i) Obtaining sanction for acquisition of land at Ranchi.
15/04/10
Action completed.
(ii) Physical Possession of land at Ranchi. 31/08/10 Revalidation sanction issued by MHA on 3.5.10. Possession not yet taken over.
BSF intimated that
70
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
there would be no necessity of taking physical possession of AAI leased land as BSF proposed to take over the hangar& space of M/s Coal India Ltd for 10 years. CMD, CIL already requested by DG BSF to extend the lease agreement for 10 years on existing terms& conditions as this option is more economically viable.
Raipur
(i) Obtaining sanction for acquisition of land at Raipur.
31/05/10
Action Completed on 18/05/2010.
(ii) Physical possession of Land at Raipur
31/07/10 Physical possession will be taken on depositing of lease rent amount and execution of agreement for which a Board of Officers has been detailed. Concerned Official of AAI Raipur was not available during June
71
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
2010. Ftr HQ South Bengal has been directed to expedite the matter.
Delhi
Acquisition of Hangar No.1 at Safdarjung Airport from AAI for creation of mother base.
31/08/10
SS (IS) has taken a meeting on 25/06/2010 with MoCA and it was decided during the meeting that MoCA will hold a meeting with all concerned agencies during July 2010 for finalising the allotment of additional hangar to BSF.
2. TRAINING OF PILOTS ON HELICOPTERS/AIRCRAFT
A. Endorsement of one trainee pilot as Co-Pilot on BSF AVRO
31/07/10
Spill over from Action Plan-III
Training of two trainee pilots completed and endorsement is under process.
IAF has been approached to allow Gp Capt S Krishnan to do the release check on a convenient date.
Action partially
72
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
completed.
B. Conversion of two CPFs trainee helicopter pilots on ALH/Dhruv helicopter at HAL Academy Bangalore as Co-Pilot
30/06/10 Spill over from Action Plan-III.
The issue of Flying training of 2 CPFs officers not yet finalised by BSF with HAL because of terms of payment. Timelines are required to be amended after meeting of SS (IS) with CMD, HAL scheduled for 16/07/2010.
C. Completion of advance flying training of CPFs officers at IAF Hyderabad
30/06/10 Basic & advanced training of both CPF officers has been completed.
Action completed.
D. Flying Training of 10 CPFs Pilots for obtaining CHPL at HAL Academy Bangalore.
31/03/11 Training is in progress.
3. Connectivity of Prahari Project with MHA 31/07/10 Sanction for installation and hiring of 2 lines issued on 15/06/2010. Action Partially Completed.
73
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
NIC has been requested to allow access to Prahari Intranet through MHA by 15th July 2010.
4. RRs for promotion from Commandant to DIG and Women Asstt Comdt in BSF
Spill over from Action Plan-III
a) Receipt of DoPT’s approval 30/04/10 Action completed
b) Vetting by MoL 31/05/10 Action completed on 19.5.2010.
c) Hindi translation by MoL 30/06/10 File has been sent to MoL (OL Wing) on 02.06.10 for preparation of Hindi version of draft notification.
d) Approval of HM 31/07/10
e) Issue of notification 15/08/10
5. Recruitment of Constables in BSF
(i) Non OMR Recruitment of Constables in BSF 2009-10 31/05/10 Medical examination of short listed candidates who qualified in written test have been completed and total 9349
(4547+3337+1465) candidates found fit.
74
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
The trg will start from 18th July 2010 and 05th Aug 2010 respectively.
Action completed.
(ii) 7 GD Bns to be raised in 2010-11 OMR based
a) Issue of advertisement 31/07/10 Process for outsourcing some portion of the recruitment process to the Pvt firms is under progress.
b) Scrutiny of applications 21/08/10
c) Issue of call letter for PET 25/08/10
d) Conducting of PET 05/10/10
e) Conduct of Written Examination 24/10/10
f) Conduct of Medical examination 10/01/11
g) Declaration of Final Result 15/01/11
h) Completion of Recruitment process 25/01/11
i) Commencement of Training 10/03/11
(iii) Recruitment of Constables from J&K in BSF-378 31/12/10
(iv) 7 GD Bns to be raised in 2011-12 (OMR based)
a) Commencement of Recruitment 15/01/11
75
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
6. Launching of separate & interactive website bilingual with FAQs & complaint, Helpline and recruitment authority level (including local language), SMS based assistance, OMR based application and Biometric identification in BSF
31/07/10 Process for outsourcing some portion of the recruitment process to the Pvt firms is under progress.
7. Development of infrastructure for Hussainiwala (ICP) – BSF
a) Submission of proposal to MHA 20/05/10 Proposal has been received and referred to BM Division on 28/5/2010 to inquire whether the funds required for the project can be made available by them. BM Division is of the view that expenditure be met by BSF from its own budget.
Action completed.
b) Sanction/Approval in MHA 31/07/10 File has been sent to IFD on 15/06/2010.
CRPF
8. Raising of 4 CoBRA Bns during 2010-11(Bn Nos 207 to 210)
76
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
Identification and Selection of Personnel for Bns
30/06/10
Identification and selection completed and posting orders of 112 pers of various ranks has been issued on 19/5/10 and 21/06/2010 for raising of 4 SAF Units (207 to 210 Bn). Action completed.
Training
i) Start of training of 1st batch (207(9 teams), 208 (18 teams) and 210 (9 teams))
02/08/10 Being commenced as per the time line.
ii) Completion of training of 1st batch 30/10/10
iii) Operationalization of 1st batch 31/12/10
iv) Start of training of 2nd batch (207 (9 teams), 209(18 teams) and 210(9 teams))
21/11/10 Being commenced as per time line
v) Completion of training of 2nd batch 19/02/11
vi) Operationalization of 2nd batch 31/03/11
9. Infrastructure for CoBRA Bns in CRPF
201, Jagdalpur
i) Completion of semi-permanent works
15/04/10
Action completed.
ii) Construction of permanent works
77
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
a) Award of works 27/04/10 Action completed on 04/03/2010.
(i) Actual start of execution on ground 15/06/10 Action completed on 29.4.10.
(ii) Completion upto super structure level 30/04/11
(iii) Completion of plastering and finishing works 31/10/11
(iv) Handing over of building 31/12/11
202, Koraput
i) Completion of Semi permanent works
15/08/10
96% work completed. However, work has been stopped due to local disturbance w.e.f 29.5.10, which was resumed on 11.6.2010. NBCC has confirmed that work will be completed by 15th Aug 2010.
Action partially completed.
ii) Construction of permanent works
a) Award of works 31/08/10 CRPF has submitted estimates for constructing 3 Nos. barracks and 269 quarters at a cost of 51.82 crore. The
78
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
sanction of 269 quarters and 3 barracks have been issued on 3/06/2010 and 09/06/2010 separately. Tenders are likely to be floated by 20/07/2010.
(i) Actual start of execution on ground 15/09/10
(ii) Completion up to plinth level 15/12/10
(iii) Completion up to super structure level 30/10/11
(iv) Completion of plastering and finishing works 31/03/12
(v) Handing over of building 31/05/12
b) Completion of works 31/05/12
203, Hazaribagh Construction of semi-permanent works
a) Award of works 07/05/10 Action completed on 17/05/2010
(i) Actual start of execution on ground 07/06/10 Action completed on 01/06/2010.
(ii) Completion up to plinth level 31/07/10 The works is under progress and target date is likely to be achieved.
79
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
(iii) Completion up to super structure level 30/09/10
(iv) Completion of plastering and finishing works 15/12/10
(v) Handing over of building 31/12/10
b) Completion of works 31/12/10
206, Bhandara Construction of semi-permanent structures
a) Award of works 17/05/10 Action Completed on 03/06/2010
(i) Actual start of execution on ground 25/06/10 Action Completed on 20/06/2010.
(ii) Completion up to plinth level 31/08/10 The work is under progress
(iii) Completion up to super structure level 30/10/10
(iv) Handing over of building 31/12/10
b) Completion of works 31/12/10
205, Gaya Construction of Semi-permanent works
a) Award of works 07/05/10 Action completed on 24/05/2010.
(i) Actual start of execution on ground 07/06/10 Action completed on 04/06/2010.
(ii) Completion up to plinth level 31/07/10 The work is under progress and target will
80
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
be achieved.
(iii) Completion up to super structure level 30/09/10
(iv) Completion of plastering and finishing works 15/12/10
(v) Handing over of building 31/12/10
b) Completion of works 31/12/10
209, Jharkhand (Khunti) Construction of semi- permanent works
a) Approval of estimates 20/04/10 Action completed
b) Award of work 10/05/10 Action completed
(i) Actual start of execution on ground 30/05/10 Action completed on 29.4.10.
(ii) Completion up to plinth level 31/07/10 The works is under progress. Target will be met.
(iii) Completion up to super structure level 30/09/10
(iv) Completion of plastering and finishing works 15/12/10
(v) Handing over of building 31/12/10
c) Completion of work 31/12/10
207, West Bengal (Salboni) Construction of semi- permanent works
81
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
a) Approval of estimates 03/05/10 Action completed
b) Award of work 21/07/10 Tender were invited, but no response was received. Accordingly fresh tender has been floated on 16/06/2010. The tenders have been opened on 6th July 2010. The work will be awarded within 15 days.
(i) Actual start of execution on ground 31/07/10 Actual start of work by 31/07/2010
(ii) Completion up to plinth level 31/08/10
(iii) Completion up to super structure level 30/11/10
(iv) Completion of plastering and finishing works 31/01/11
(v) Handing over of building 28/02/11
c) Completion of work 28/02/11
208, Uttar Pradesh (Mirzapur)
a) Identification of land 30/06/10 Spill over from AP-III
Suitable land site measuring 95.07 Acres at Sonbhadra, UP has been identified and found suitable. State
82
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
Govt offered the land on 5.5.10 and agreed to hand over the advance possession of land. Action Completed.
However, the State Govt has advised that CRPF may first submit their views on the earlier land offered by them at Mirzapur and on the basis of the same approval of Competent authority will be issued. CRPF has requested MHA on 25/06/2010 that MHA may take up the issue with State Govt for allotment of land at Sonbadhra to CRPF free of cost. Letter to Govt of UP issued on 06/07/2010 for allotment of land to CRPF at Sonbhadra.
210, Assam (Darrang) Construction of semi- permanent works
a) Approval of estimates 31/07/10 CPWD has given estimates on
83
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
03/07/2010 which is under submission to IFA, CRPF.
b) Award of work 31/08/10
(i) Actual start of execution on ground 30/09/10
(ii) Completion up to plinth level 31/10/10
(iii) Completion upto super structure level 31/01/11
(iv) Completion of plastering and finishing works 30/05/11
(v) Handing over of building 30/06/11
c) Completion of work 30/06/11
10. RRs for promotion from Commandant to DIG in CRPF
Spill over from Action Plan-III
a) Vetting by MoL 31/5/10 Action completed on 1.4.10.
b) Hindi translation by MoL 25/07/10 After vetting by MoL, RRs have been referred to MoL (OL Wing) for Hindi Translation on 17/6/2010
c) Approval of HM 31/07/10
d) Issue of notification 31/07/10
84
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
11. Raising of CRPF
(i) 2 GD Bns raised in 2009-10 (Non OMR based)
a) Commencement of Training 29/03/10.
b) Completion of Training 28/02/11
(ii) 1 Mahila Bn raised in 2009-10 (Non OMR based)
a) Completion of recruitment process 09.04.10 Action completed
b) Commencement of Training 15/05/10 Action completed.
c) Completion of Training 15/04/11
(iii) Recruitment of Constables on OMR based applications in CRPF in 2010-11
a) Commencement of Recruitment 30/06/10 Action completed on 25/06/2010
b) Issue of advertisement 26/7/10
c) Scrutiny of applications 05/09/10
d) Issue of call letters 09/09/10
e) PET
03/11/10
f) Written examination 28/11/10
85
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
g) Medical exam 10/01/11
h) Result declaration 14/02/11
i) Completion of Recruitment 31/03/11
(iv)
Recruitment of Constables in CRPF from J&K-855 31/12/10 Out of 855, 276 vacancies (165+4+3+26+78=276) have been filled up.
12. Construction of Hostel Block in Vasant Kunj
a) Submission of proposal to MHA 31/05/10 Action completed on 12.5.10.
b) Examination in MHA in consultation with IFD 31/07/10 IFD sought clarification regarding total cost, authorisation of items etc, which had been forwarded to CRPF on 23/06/2010 for reply.
c) Award of Work 15/09/10
13. Enactment of CRPF Act
i) Vetting by MoL 31/07/10 Sent to MoL for vetting on 24.12.2009. Still pending in MoL. Reminder D.O sent by HS on 26/5/2010.
86
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
ii) Preparation of Cabinet note 15/08/10
iii) Approval of draft Cabinet note by HM 31/08/10
iv) Inter-departmental consultation 15/10/10
v) Approval of Cabinet note by HM 31/10/10
vi) Submission of Cabinet note to the Cabinet Secretariat 07/11/10
14. Connectivity of SELO etc. computer system to MHA
Decision regarding level up to which connectivity of CPMF computer network be provided in MHA.
01/05/10
Connectivity will be provided up to integrated Ops control Room MHA. Action completed.
Award of work by CPMF for providing connectivity to MHA
31/07/10 CRPF has collected quotations from MTNL. It was processed for sanction by IFD. IFD raised certain queries and also suggested that it may be routed through PM Division. The file has been returned to CRPF on 03/06/2010 for submission to PM Division with the clarification/information sought by IFD.
87
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
Providing the connectivity 30/09/10
15.
Launching of separate & interactive website bilingual with FAQs & complaint, Helpline and recruitment authority level (including local language), SMS based assistance, OMR based application and Biometric identification in CRPF
30/06/10 Action completed on 09th July 2010.
Assam Rifles
16. Direct recruitment of officers in Assam Rifles
i) IMA’s consent to train directly recruited officers 15/08/10 Proposal received. HS has accorded in principle approval for introducing direct recruitment at the level of Assistant Commandant in Assam Rifles and also for revision of the method of filling up other Group ’A’ posts upto the level of Inspector General accordingly. As per the decision, case has been taken up with MoD for obtaining their consent on 18/06/2010 and DoP&T has also been requested to concur in the proposal on
88
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
21/06/2010. DoPT has suggested that recruitment may be made through CPF (AC) Exam.
ii) Decision on percentage of direct recruitment in
Assam Rifles(AC level)
31/08/10 -do-
17. Restructuring of AR 31/07/10 The file has been referred to IFD on 11/06/2010 with the approval of HM for obtaining concurrence of MoF.
18. Launching of separate & interactive website bilingual with FAQs & complaint, Helpline and recruitment authority level (including local language), SMS based assistance, OMR based application and Biometric identification in AR
30/06/10 The website has been made interactive alongwith the facility of links for the FAQs and helpline and was demonstrated to HS on 03 June 2010.
Action completed.
19. OMR based Recruitment of Constables in AR
(i) Recruitment of constables of AR in 2010-11
a) Orissa, Chhatisgarh, Jharkhand & Bihar 23/04/10 to 28/04/10
Action completed
89
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
b) Madhya Pradesh, Maharastra, Gujarat 12/04/10 to 17/04/10
Action completed
c) Uttar Pradesh, 12/04/10 to
17/04/10
Action completed
d) Arunachal, Assam & West Bengal 5/05/10 to
10/05/10
Action completed
e) Nagaland, Manipur, Tripura & Mizoram 16/05/10 to
21/05/10
Action completed.
f) All Sates(only for Clerks Trade) 07/06/10 to
12/06/10
Action completed
g) Tamil Nadu, Kerala, Karnataka 05/09/10 to
10/09/10
h) Goa, Pondicherry & Andhra Pradesh 20/09/10 to
25/09/10
i) Bodo 06/12/10 to
11/12/10
j) Arunachal Pradesh(8th class pass) 08/11/10 to
13/11/10
90
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
SSB
20. Raising of additional Bns/ in SSB – submission of CCS Note/
i. Finalization of Cabinet Note on receipt of comments of Department and concerned Ministries/
10/05/10 Spill over from Action Plan-III.
Action completed
ii. Submission of CCS Note to Cabinet Secretariat/ 10/05/10 Action completed
21. Amendment of RRs of Asstt/Comdts/ in SSB to allow recruitment of women
Spill over from Action Plan-III
a) Approval of HM 30/4/10 Action completed
b) Hindi translation by MoL 25/07/10 Again sent to MoL (Leg.I) on 3.5.10 for vetting as desired by MoL. MoL made some modifications and advised to obtain concurrence of DoPT again. Concurrence of DoPT obtained on 07/07/2010 and sent to MoL on 08/07/2010.
c) Issue of notification 31/07/10
22. Restructuring of SSB 31/07/10 The file has been referred to MoF on
91
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
09/06/2010 for concurrence. MoF has been reminded on 07/07/2010 to expedite.
23. Launching of separate & interactive website bilingual with FAQs & complaint, Helpline and recruitment authority level (including local language), SMS based assistance, OMR based application and Biometric identification in SSB
30/06/10 Action completed on 13.4.2010.
24. Recruitment of Constables in SSB
(i) Non OMR based Recruitment of Constables in SSB in 2009-10
30/06/10 Results for 15 States, 1 UT has been finalised after completion of review medical. Basic training is scheduled to start w.e.f. 16/08/2010. Action Completed.
(ii) OMR based Recruitment of constables of SSB in 2010-11
a) Issue of advertisement 31/07/10
b) Scrutiny of applications 30/09/10
c) Issue of call letters 15/10/10
d) Conduct of PET 01/01/11
92
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
e) Conduct of written test 03/01/11
f) Conduct of Medical exam 20/01/11
g) Declaration of result 31/03/11
h) Completion of Recruitment process 31/03/11
(iii) Recruitment of Constables from J&K in SSB-286 31/12/10 Publication of Advertisement sent to DAVP in 1st week of June 2010 and was to be published in the Employment News. Postal authorities are yet to finalize the arrangements for distribution of forms. JS has written a D.O to GM, Business Development & Mktg Dte, Deptt of Posts, Dak Bhawan on 30th June 2010. Matter is being pursued in this regard.
ITBP
25. Launching of separate & interactive website bilingual with FAQs & complaint, Helpline and recruitment authority level (including local language), SMS based assistance, OMR based application and Biometric
30/06/10 Action completed.
93
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
identification in ITBP
26. Recruitment of Constables in ITBP
(i)
Non OMR based Recruitment of Constables in ITBP in 2009-10
a) Conduct of PET 30/05/10 Action Completed on 30/05/10.
b) Conduct of written Exam 13/06/10 Action completed on 13/06/10.
c) Conduct of Medical Exam 30/06/10 Medical examination commenced as per schedule.
Action completed
d) Declaration of result 30/07/10
e) Completion of recruitment process 16/08/10
f) Commencement of training 20/09/10
(ii) OMR based Recruitment of constables of ITBP in 2010-11
a) Advertisement for recruitment 30/06/10 Action completed.
b) Scrutiny of applications 15/09/10
c) Conduct of PET 30/11/10
d) Conduct of written test 19/12/10
94
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
e) Conduct of Medical exam 30/01/11
f) Declaration of result 10/02/11
g) Completion of Recruitment process 20/02/11
h) Commencement of training 31/03/11
(iii) Recruitment of Constable from J&K in ITBP-71 31/12/10
27. Proposal for Restructuring & Augmentation of ITBP
(i) Obtaining approval of IFD 12/04/10 Action Completed.
(ii) Administrative approval of Home Minister on draft CCS Note
23/04/10 Action completed.
(iii) Finalization of Cabinet Note on receipt of comments of concerned Ministry/Deptt
31/07/10 Draft Cabinet Note circulated to concerned Ministries on 07/05/2010. MoF has raised queries. ITBP on 24/5/10 has been requested to furnish the clarification. Clarification received & sent to MoF on 14/06/2010. MoF reminded on 30/6/2010 and on 07/07/2010 for expediting the concurrence.
(iv) Submission of Note to Cabinet Sectt 15/08/10
95
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
28. Finalization & Notification of RRs in respect of DIG-ITBP
31/07/10 The draft RRs have been referred to MoL (LD) for vetting on 01/07/2010.
CISF
29. Finalization of RRs of ASI/Exe 14/04/10 Action completed
30. Scheme for recruitments of direct ASIs
(i) Obtaining consent of SSC on conduct of recruitment by SSC
20/05/10 DoPT has given approval for conducting the examination by SSC on 21.5.2010. Action completed.
(ii) Notification of vacancy 15/06/10
Action completed on 14.5.2010
(iii) Finalization of rules and notification by SSC Notification of vacancy published in Employment News on 29/5/10. Last date of receipt of application is 28/06/10.
Action completed.
96
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
(iv) Written examination by SSC 31/08/10
(v) Conduct of PET 30/11/10
(vi) Conduct of Medical 28/02/11
31. Notification of RRs of DIG-CISF 16/04/10 Action completed
32.
Acquiring of 4 acres of land for Gp. HQrs at Ahmedabad
(i) Submission of proposal to MHA 22/04/10 Action completed
(ii) Issue of Sanction order by MHA 31/05/10 Sanction order issued on 31/05/2010.
Action completed.
33. Acquisition of land for Group HQrs Allahabad
(i) Submission of proposal to MHA 19/04/10 Action completed
(ii) Issue of sanction order by MHA 31/07/10 Clarification sought from CISF on 20.4.2010. Clarification received on 01/07/2010. CISF has been asked to link up commitment letter of Govt of UP.
34. Identification of land for the new battalion to be sanctioned by MHA in the State of Assam & Karnataka
97
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
(i) Identification of land 31/07/10 As informed by CISF, site identified in Assam but not in Karnataka. However, no proposal has been received from CISF so far. It has been intimated by CISF that proposal is being sent by 31/07/10.
35. Sanction of two New Reserve Battalions
(i) Submission of proposal by CISF 29/04/10 Action completed
(ii) Approval by MHA 15/08/10 Submitted to IFD on 13.5.2010. IFD has sought some clarifications. CISF was asked on 21/05/2010 to provide the clarifications sought by IFD. CISF submitted the clarifications on 15/06/2010 A meeting was taken by JS(P-II) on 25/6/2010.CISF was requested to submit a status report on the action taken for filling up the vacancies. On receipt of the report, the proposal has been sent
98
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
to IFD on 01/07/2010.
36. Revision of norms for deployment of CISF
(i) Submission of proposal by CISF 20/04/10 Action completed on 20/04/10.
(ii) Examination by PF division and submission to IFD 31/07/10 Clarification sought from CISF on 22.4.10. Information received from CISF.
Meeting held on 08/07/10 with CISF and CISF was asked to review their recommendations. Timelines to be reviewed.
(iii) Processing in IFD 15/08/10
(iv) Submission of the proposal for approval of HS/HM 31/08/10
37. Launching of separate & interactive website bilingual with FAQs & complaint, Helpline and recruitment authority level (including local language), SMS based assistance, OMR based application and Biometric identification in CISF
15/07/10 Testing is in progress. To be done by 15th July 2010.
38. Recruitment of Constables in CISF
Non OMR based Recruitment of Constables in CISF in 30/06/10 Action completed
99
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
(i) 2009-10
(ii) OMR based Recruitment of constables of CISF in 2010-11
a) Commencement of Recruitment/Issue of advertisement
08/10/10
b) Scrutiny of applications 12/11/10
c) Issue of Call letters 10/12/10
d) PET 04/01/11
e) Written examination 20/02/11
f) Medical Exam 01/03/11
g) Result declaration 15/03/11
h) Completion of Recruitment 31/03/11
(iii) Recruitment of Constables from J&K in CISF-452 31/12/10
NSG
39. 2 Regional Centres of NSG
(i) Kolkata
a) Identification of suitable land 31/05/10 As the cost of land near Kolkata is on higher side, NSG has been asked to locate at suitable land within 50-60 Kms of the Kolkata
100
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
Airport with good road connectivity. NSG has identified 3 locations and submitted the details to MHA on 05/07/2010, which is under submission in MHA. IG, NSG also intimated during the meeting on 07th July that they have also identified a site on Kalyani Expressway which is 23 Km away from Airport. NSG would be sending the proposal within a week. Timelines will revised after meeting with DG NSG.
(ii) Hyderabad
a) Advance possession of land 05/04/10 Action completed
b) Completion of land acquisition 31/05/10 NSG has taken possession of the land. Land acquisition process now to be completed by State Govt.
c) Digital survey of the land 30/06/10 Action completed.
101
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
d) Preparation of LOP and cost estimate 31/08/10
e) Finalization of estimates and submission to MHA 30/09/10
40. Completion of construction of permanent structures in NSG hubs at Hyderabad, Mumbai, Kolkata and Chennai
31/12/10 Work in progress at all sites. Fortnightly reports being submitted by NSG.
All CPMFs
43. Introduction of ASI in CPMFs
Processing the proposal 15/05/10 Submitted to IFD on
18.5.10. Action completed
Obtaining the approval of IFD 15/06/10 Action completed.
Obtaining the approval of Ministry of Finance 31/07/10 Sent to MoF on 07/07/2010
Obtaining the approval of competent authority 31/08/10
44. CPMF Housing Project
Deliverables/Timeline from the date of
commencement(for pilot project)
(i) Receipt of RFQ 16/04/10 Action completed
(ii) Evaluation of RFQ documents 11/05/10 Action completed
102
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
(iii) Issue of RFP documents 20/07/10
(iv) Replies to pre-bid queries 12/08/10
PPPAC meeting
of RFP documents have been held on 21/06/2010 and the minutes from MoF received on 05th July 2010 conveying the approval of PPPAC. The timelines to be redrawn.
(v) Receipt of RFP 31/08/10
(vi) Evaluation Reports 15/09/10
(vii) Issue of LOIs 31/10/10
(viii) Signing of Concession Agreements 15/11/10
46. Recruitment Rules of Specialist doctors & Dentists
(i) Approval of DoP&T 30/04/10 Action completed
(ii)
Vetting by MoL 25/07/10 After vetting of MoL, file again referred to DoPT on 09/06/2010 as per advise of MoL. File received from DoPT on 01/07/2010 & has been referred to MoL (OL Wing) for Hindi
103
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
translation.
(iiii) MHA approval and notification 31/07/10
47. Establishment of Referral Hospital for CPMFs under ITBP at Greater Noida
(i) Approval of competent authority 15/08/10 Draft CNE note was submitted to MoF. MoF has returned the file on 24/06/2010 with some observations. D.O reminder issued on 29/06/2010 to Min of Health& Family Welfare for vetting the cost estimates as asked by MoF.
48.
Implementation of Courts Orders (CAT, High Court, Supreme Court ) received till 31/3/2010 by CPMFs
15/08/10 Out of 376 Court order received till 31st Mar 2010, 278 Court orders have been implemented upto 30/06/2010.
Action Partially completed.
49. Completion of MOSB 2009 (other than Dental)
i) Completion of interview 10/04/10 Action Completed.
ii) Conduct of Review Medical Exam 10/05/10 Action completed.
104
Sl.No.
Issue Programme/Activity Time Lines/Target for Remarks
iii) Submission of merit list to MHA 31/05/10 Action completed
iv) Approval of merit list & Force allocation 15/06/10 Action completed
v) ITBP conveying Force allocation 01/07/10 Action completed
50. MOSB-2010
DOPT’s permission for recruitment based on BSF RR 01/06/10 Action completed.
Approval of HM for conducting MOSB-2010 30/06/10 Action completed.
ii) Advertisement of MOSB-2010 to be issued by DAVP 15/7/10
iii) Last date of receipt of application 15/8/10
iv) Last date of receipt of application for remote area 30/8/10
v) Processing application form and issue of call letter 15/09/10
vi) Interview and medical examination to be conducted 15/10/10
vii) Conduct of Review Medical Examination by Review Medical Board
15/11/10
viii) Preparation of category wise merit list by nodal Force and its submission to MHA.
15/03/11 HM has directed to complete recruitment by 31/12/2010. So all the timelines need to be pre-poned. BSF has been requested to draw a timeline plan and to submit by 15th July 2010.
105
ACTION PLAN IV FOR THE YEAR 2010-11 `
POLICE MODERNISATION DIVISION
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
1 Procurement of 59,000 BR Jackets
a Issue of Acceptance of tender by the CRPF
HM has approved the file on the 23rd. CRPF will have to issue the A/T only which will be done before the 30th April.
b Inspection & Delivery of Lot 1 c Inspection & Delivery of Lot 2 d Inspection & Delivery of Lot 3 e Inspection & Delivery of Lot 4
The total delivery period is 8 months and the delivery will be split into 4 lots which would be staggered based on the inspection and testing schedule. There could be a possibility that the 1st lot could be amalgamated with the second lot.
2 Air Courier Service for personnel of CPMFs
a Clearence by the Competent Authority
The SOP and the contract has been cleared by the AS & FA. Now the approval of the competent authority to start the scheme is necessary
b Signing of the Contract c Starting the NE Sector Flights d Starting the J&K Sector Flights
Due to the non-availability of aircraft and the need to familiarise our own CPMF to the new systems, it is being done stepwise.
3 Extension of Current Scheme of MPF for States
a Circulation of the HM approved DCN to the PMO & the Finance Min.
b Clearance from the PMO to the DCN
106
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
c Submission of the DCN to the Cabinet Sectt.
d Approval of the Union Cabinet e 1st Release of Funds f 2nd Release of Funds g 3rd Release of Pooled Funds 4 Development of the New Scheme of MPF for the
States
a Receipt & Study of the findings of the impact assessment report from the Ernest & Young
Study report from E&Y received from the BPR&D on 20th April
b Dissemination of findings of the report and elicit feedback about the contours of the new MPF Scheme
The States that had participated in the Study as well as those that have not would need to view the findings and make suggestions about the new scheme
c Prepare Concept Paper on new MPF Scheme
Concept Paper would be prepared by the PM Division & BPR&D
d Circulate & obtain comments from States.
Deadline for receipt of comments would be fixed
e Prepare the CNE/EFC Note f Circulate the CNE/EFC Note and obtain
comments from all the Ministries & Depts.
g IFD to Convene meeting of EFC/CNE h Prepare Cabinet Note i Circulate Draft Cabinet Note & invite comments
j Circulation of the HM approved DCN to the PMO & the Finance Min.
k Clearence from the PMO to the DCN
l Submission of the DCN to the Cabinet Sectt.
107
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
m Approval of the Union Cabinet 5 Development of the New Scheme of MPF for the
Central Paramilitary Forces (CPMF)
a Receipt & Study of the findings of the impact assessment report from the BPR&D
BPR&D is yet to submit the report and it is expected that it would be done in May
b Dissemination of findings of the report and elicit feedback about the contours of the new MPF Scheme
c Prepare Concept Paper on new MPF Scheme d Circulate & obtain comments from CPMFs and
other stakeholders.
e Prepare the CNE/EFC Note f Circulate the CNE/EFC Note and obtain
comments from all the Ministries & Depts.
g Convene meeting of EFC/CNE h Prepare Cabinet Note i Circulate Draft Cabinet Note & invite comments
j Circulation of the HM approved DCN to the PMO & the Finance Min.
k Clearance from the PMO to the DCN l Submission of the DCN to the Cabinet Sectt.
m Approval of the Union Cabinet 6 Implementation of the Computerised Financial
Management Information System (CFMS) for the MPF Scheme
A Identify the Agency for development of Application Software/NIC
PM Division had already identified the CMC as the agency. IFD feels that the NIC application for monitoring Plan Schemes could be shaped to accept non-Plan schemes also. However NIC will take time till atleast July to get their
108
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
application off the ground. Panchayat Raj had also developed similar scheme and Agriculture Ministry had developed a software application which could be explored quickly as alernatives.
B Development of the application software on CFMS for the States
C Implementation of the CFMS in the States
Implementation in over 20 States would take some time in terms of coordinating the logistics coupled with the uneven responses
7 Procurement of 54,000 no.s of AK – Series of rifles thro’ a limited tender enquiry
a Last Date for receipt of Bids
Last date has been fixed as 19th May for the receipt of bids and sample AK Rifles
b Completion of Technical Trials This would take three weeks c Opening of Financial Bids and issue of
Acceptance of Tender
This would take two weeks for the opening of financial bids and preparing the case for approval of HM
d Pre-dispatch Inspection & Delivery
Six months had been given for the delivery and is expected to be completed in three lots foir every two months
8 Preparation and Implementation of Procurement Plans of the CPMFs
a Finalisation of Procurement Plans
Procurement plans have already been submitted by the CPMFs. One review has been fixed for the re-orientation of the Plans.
b Obtain Provisional Sanction for the Items
Provisional Sanction has been obtained for most of the items to be procured this year. A review to be held shortly will bring out the details further
c Issue of Tender Notices by CPMFs for Modernisation & Provisioning procurements
CPMFs have started issuing tender notices but the deadline fixed by HS has been the 1st week on May for them
109
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
d Finalisation of tenders and issue of Acceptance of Tenders
This should be done within the month to leave atleast six months ahead for the delivery and payment of the vendors all well before the end of the calendar year.
9 Central Procurement of weapons on behalf of States to quicken the procurement of weapons.
a Obtain data from the States indicating the requirement for the year 2010-11
Last date has already been fixed as the 30th of April.
b Consolidate the requirements with the ongoing procurements of the CPMFs
Consolidation of data already received has been taken up.
10 Megacity/ Safe City Policing and measures to improve policing in these areas
A meeting was convened by the Home Secretary on 28.1.10 and it was decided that DPRs would need to be prepared for the cities of Delhi NCR, Kolkatta, Mumbai, Chennai, Bengluru, Pune, Ahmedabad and Hyderabad. A Cabinet Note in this respect is under preparation.
a Preparation of CNE note as well as a Cabinet Note for information for the deployment of Consultants
b Obtain the concurrence of IFD & the CNE for the expenditure. Inform the Cabinet about the policy step
c Float Expression of Interest d Select the Consultants for each city
e Preparation of the DPR for each city by the consultant
Atleast 6 months is required for the completion of the DPR as there would be a lot of field work associated.
11 Procurement Reforms
110
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
a Provision of some staff for filling up the vacancies in the Procurement Wing of MHA
The Procurement Cell has withered away and personnel transferred out or retired are not being replaced at all. There are not only 3 officers and 2 Assistants left which is simply not sufficient for the crucial work at hand. HM directed that retired personnel with knowledge of procurement whose integrity can be vouched by responsible officers should be employed against vacancies immediately.
b Preparation of Procurement Manual for the MHA along with Standard Bidding Document & Executive Orders
A Committee has been constituted regarding this issue. The FA has sent the names of the persons from the Finance side also. The work will start soon and will be completed shortly.
c Capacity Building of officers & staff in Procurement Cell of CPMFs
Training will be done in NIFM for which a week session has already been slotted.
d Review of Authorisations
A suggestion of the SS (IS) who is right in saying that the current manner of using thumb-rules for providing for each battalion should be reviewed. A committee would be constituted and it would decide expeditiously.
e Review of QRs
No review of QRs has been undertaken recently and it is necessary to do so to reduce obsolescence and also eliminate any in-built biases against generic specifications.
f Develop MIS on Procurement
Progress of procurement as well as a database for the Last Purchase Price (LPP) should be prepared. It is expected to take atleast 3 months.
g Pilot & Implement e-Procurement
This is already a Micro Mission objective and after a System Requirement Study is done a Pilot Project could be launched. Actual rollout would take a much longer time and is not included
111
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
h Review the performance after the Delegation of Financial Powers to the CPMF for further improvement
A much smaller task and would be related to assessment of the work done for only 1 year.
i Setup a Procurement Audit Mechanism for Capacity Building
An agency has to be selected for assisting in the review of cases and providing technical assistance to the CPMF procurement cell
j Streamlining the OFB deliveries to the CPMF & State Police Organisations
A number of decisions arrived at before the HS would need to be implemented by the OFB which would need to be reviewed frequently.
12 Reforms of the Forensic Science Sector
a Appointment of the Chief Forensic Scientist of DFS
b Appointment of the Chief Forensic Scientist of CFSL (CBI)
In both cases the ACR dossiers are incomplete and there some technical issues in respect of the DFS which involve different ministries also. Both the posts also need to be confirmed by the ACC.
c Implementation of the Flexible Complement Scheme
The matter is pending with the DOPT since February and once cleared by them it would need to be cleared by the Dept of Expenditure after which revised RRs would need to be cleared by the DOPT and the FCS would then be implemented. RRs would need to be developed and approval of DOPT would need to be obtained.
d Cadre Review of the DFS
A committee would do it and it would take atleast 6 months to complete.
e Identification and slotting of Forensic Scientists for training in USA
This would be an ongoing programme wherein different batches of forensic scientists would be sent to Quantico Labs of USA
f Identification of Forensic Technology/ Equipment for procurement based on Dr CN Bhattacharya report
112
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
g Creation of new cells in new and emerging areas of forensic science based on Dr CN Bhattacharya report
This only considers the administrative actions necessary for creation and redeployment of existing manpower and not for creation of new manpower positions.
h Implementation of Action points based on Interim Report of Consultants
i Implementation of Action points based on Final Report of Consultants
13 Reforms in the DCPW A Cadre re-structure of the DCPW
This is a 60 year old organization which has never had a cadre review. RRs would be looked at carefully and copy would be sent to the HM for perusal.
B Examination of the POLNET Feasibility & further viability of the network in the PM Division based on the Director ISRO report
The examination is to take a decision for up gradation and expansion of POLNET.
c Integration of the POLNET with the CCTNS
The RFP for the CCTNS is under way and integration is necessary. Director DCPW will need to be involved in the coordination as a member of a committee and would work towards the goal.
d Review of delegated financial powers to Director DCPW
e Delegation of DCPW officers to developed countries to understand their police communication technologies and techniques
14 Policy Paper on Private Security Agencies
A Data collection and compilation into the paper
15 Report on Arms Licences to Private Security Agencies
A Report submission and preparation of draft rules
113
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M 16 Policy Regarding Personal Protective Equipment
A Circulation, compilation of comments received
B Preparation of amendment to Arms Rules
17 Restructuring of National Police Mission
Currently the NPM is unable to function in a mission mode manner and needs to be empowered.
A Preparation of a Concept Paper based on inputs of BPR&D
B Preparation of CNE Note based on comments on the concept paper
C Approval of the CNE note and start of mission mode work
18 Development of alternate Ballistic Testing Facility at CFSL Chandigarh
There a number of limitations if the MHA and the State Police Organisations were to rely only on TBRL and it is essential that we wean ourselves away from the TBRL as it is not cooperating satisfactorily for various requests.
A Receipt and Approval of the proposal by the Competent Authority
Proposal has already been received from the Director CFSL Chandigarh.
B Implementation of the Project by the Director CFSL
19 Implementation of Central Sector Scheme for the expansion of Forensic Science services
A Transfer of land by State Govt. for the FSLs at Bhopal, Gauhati & Pune
In Bhopal land is available, in Gauhati it has been identified but would need to be acquired and is yet to be identified in Pune.
B Building Plan to be prepared by CPWD/PSU and necessary approvals for the estimate
114
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
C Approvals from Local and Statutory Authorites D Tendering Process of CPWD/PSU E Start of construction
A Identification of interim accommodation for the FSLs in the 3 cities
B Complete Fair Rent Assessment & Occupation of the premises
C Prepare a Staffing Proposal for outsourced staff to startup the Lab for the approval of the IFD
D Interim Hire of Staff on contract basis
E Training of the newly hired contract staff
A Preparation of Staffing Proposal for concurrence of IFD and approval of the Dept. of Expenditure
B Approval of the Dept of Expenditure c UPSC & SSC to recruit based on the requisition
provided
d Identification of Procurement required for the Lab
e Procurement Process for the equipment
F Installation, Training & Induction of equipment
115
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
A Transfer of land by State/UT Govt. for the previous FSLs at Kolkata & Chandigarh
B Building Plan to be prepared by the CPWD and approval of estimates to be done
c Approvals of Local Authorities d Identification of Agency by CPWD E Start of Construction of Building 20 Creation of Regional Forensic Science
Laboratories (RFSLs) and District Mobile Forensic Units (DMFUs) for States and UTs –outlay Rs.100 crores.
A Preparation of the Scheme Book for the RFSL & DMFU
B States/UTs to sign off on the MOU
C Release of funds D Inter-departmental transfer of land by State Govt.
to State Home Dept. for the FSLs or Premises for housing FSL
E Building Plan to be prepared by the State PWD and approval of estimates to be done
F Approvals of Local Authorities G Identification of Agency by PWD H Start of construction
A Identification of interim accommodation for the FSLs
116
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
B Complete Fair Rent & Occupation of the premises
C Preparation of Staffing Proposal by State Home Dept for concurrence of Finance Dept & State Cabinet
D Approval of the State Cabinet E State Public Service Commission to recruit
based on the requisition provided
F Interim Hire of Staff on contract basis G Training of the newly hired contract staff
H Identification of Procurement required for the Lab
i Procurement Process for the equipment
P Installation, Training & Induction of equipment
21 National Police Mission (NPM) Transparent Recruitment Process (TRP)
Monitoring Proforma for a qualitative assessment of the status sent on Jan 29th 2010. CPMFs also asked to submit information Responses awaited Status Report on response of Chief Ministers to the DO letter of HM dt.12/16 Nov 2009 is enclosed as Annexure-I. It is an ongoing activity and may take the whole year to get all the States to agree to all aspects of the TRP.
22 NPM - Soft Skills Training to Police Personnel
FICCI will develop training module and organize sponsor for delivery of modules in the States. A MOU is to be signed between FICCI, MHA and concerned States: Punjab and Delhi. A Training needs Analysis (TNA) is underway and training module will be designed based on TNA. Training will start after the MoU is signed with
117
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
the states which they have agreed. This is a carried over activity from last year and is contingent on FICCI signing the MOU.
23 NPM - Setting up of Community Counselling Centres
Project is in PPP Mode. FICCI will set up 5 pilot projects, initially in 5 States within 3 months and then upgrade to 200 centers within one year. A MOU is to be signed between FICCI, MHA and concerned States. All the 5 State Govt.s have agreed for signing the MoU. The final MoUs sent to FICCI in respect of Orissa, Rajasthan, Haryana and TN for signing. This is a carried over activity from last year and is contingent on FICCI signing the MOU.
24 NPM - Effective Incidence Response: Dial 100
A DPR was required to be prepared and the proposal by the NISG was rejected by HM. However a US based company OST has offered to do a DPR for one of the cities free of cost to integrate the 100, 108 and Fire Helpline. Some more documentation was requested after which the file would be put up for approval. They would need 4 months to complete the study for one city which would be the template for standardisation by all other cities.
25 NPM - MMM1: Project on ‘National Police Information & Convergence Network’.
Mission for Geo Spatial Applications, (GoI) has been asked to prepare a DPR for the pilot project in Assam. They have started the work and will complete the DPR within 3 months (20th May, 2010)
26 NPM - MM2: Project on ‘Standardization of Procurement Processes’.
Further clarifications being obtained from the MM as desired by SS(CS). The concept paper would be finalised within May. The scoping work and the system requirement study would take another 2 months to complete. The application software based on the SRS would be developed for a pilot which would take 3
118
SL No ISSUE/PROGRAMME/ACTIVITY TIMELINES/ TARGETS REMARKS
1st QTR 2nd QTR 3rd QTR 4th QTR A M J J A S O N D J F M
months.
27 NPM - MM3: Project on ‘Forensic Science as an Aid to Investigation at Police Station’.
. Further clarifications were asked from the MM and it is being submitted on file as per the direction of HS. This could be subsumed within the Forensic Reform being taken up. This micro mission may be dropped.
28 NPM - MM5: Project on ‘Police Community Partnership and Overarching Model of Community Policing’
The file received back from MHA on 17/3/2010 asking to draft a pilot scheme for 7 states. Gr. Leader MM-2 has been informed to do the needful. The pilot scheme would be prepared within May and obtaining financial sanction would take 1 month. Implementation would take another 3 months.
119
MINISTRY OF HOME AFFAIRS Action Plan for the period1-4-2010 to 31-3-2011
Name of Division: O/o Registrar General, India (ORGI)
S.No Issue/ Programme/Activity Time lines/Targests for Remarks
1st Quarter
(1-4-2010 to 30-6-2010)
2nd Quarter
(1-7-2010 to 30-9-2010)
3rd Quarter
(1-10-2010 to 31-12-2010)
4th Quarter
(1-1-2011 to 31-3-2011)
SPILL OVER ITEMS
Creation of National Population Register (NPR) and issue of Identity (Smart) Cards in the coastal areas
Trial production of NPR cards 30.09.2010 Detailed proposal for production of cards has been received from the consortium. LOI has been issued.
120
S.No Issue/ Programme/Activity Time lines/Targests for Remarks
1st Quarter
(1-4-2010 to 30-6-2010)
IInd Quarter
(1-7-2010 to 30-9-2010)
IIIrd Quarter
(1-10-2010 to 31-12-2010)
IVth Quarter
(1-1-2011 to 31-3-2011)
NEW ITEMS
1. Creation of National Population Register (NPR) and issue of Identity (Smart) Cards to the ‘usual residents’ in coastal villages
Delivery of identity (smart) cards in coastal villages
31.12.2010 Publication of Draft Roll in progress.
2. National Population Register for the entire country
(a) Completion of Data collection work (in paper format) by filling up of NPR Schedules for the entire population
30.09.2010 Work commenced in New Delhi (part), Assam, West Bengal, Meghalaya and Andaman & Nicobar Islands on 01.04.2010.
(b) Commencement of Scanning and Data Entry of NPR Schedules
30.06.2010 The work will come to an end on 31.12.2011
121
(c) Commencement of Collection of Biometrics (photographs and ten finger-biometrics)
31.12.2010 The work will come to an end on 30.06.2012
3. Census of India, 2011
(a) Conduct of field operations during April to September, 2010 for Houselisting Operations alongwith NPR
30.09.2010 Work commenced in New Delhi (part), Assam, West Bengal, Meghalaya and Andaman & Nicobar Islands on 01.04.2010
(b) Technical Advisory Committee meeting for approval of Household Questionnaire
31.05.2010
(c) Approval of Household Schedule by the Government
30.06.2010
(d) Finalization and release of Geographical Code Directory
30.06.2010
(e) Notification of questionnaire of Household Schedule
31.07.2010
(f) Preparation of Instruction Manual for canvassing of Household Schedule and translation in 18 languages
31.07.2010
(g) Commencement of data processing of Houselisting Operations, checking of the
31.03.2011
122
consistency of data and preparation of tables for census publications
(h) Conducting of Second Phase of Census i.e. Population Enumeration throughout the country from 9th February to 28th February, 2011 followed by a Revisional Round from 1st March to 5th March, 2011
05.03.2011
(i) Collection of village and town level amenities data for preparation of Village and Town Directories.
30.09.2010
4. Annual Health Survey in EAG States and Assam
After the field work in 9 AHS States is over, First Fact Sheet will be released.
31.01.2011
5. Updating of NRC 1951 in Assam
(a) Preparation of draft Manual of Instructions
30.04.2010
(b) Communication to State Government of Assam
31.05.2010
123
Ministry of Home Affairs
Action Plan 2010-11
UT Division
Sl.
No.
Issues/programmes
Time lines Remarks
1st Quarter 2nd Quarter 3rd quarter 4th quarter
Spill over items
1 Installation of CCTV Project of the Delhi Police in identified markets and border check-posts.
Earlier number of sites were 6. Now the revised number of sites stands at 29.
Approval from civic authorities for digging, cable laying, installation of poles, cameras etc
Establishment of leased line connectivity, installation of servers, monitors, software, testing etc and system handing over and evaluation of the system by the Technical Committee of the Delhi Police at 14 sites
Establishment of leased line connectivity, installation of servers, monitors, software, testing etc and system handing over and evaluation of the system by the Technical Committee of the Delhi Police at 15 sites
While approving ECIL on nomination basis, Cabinet decided that draft contract has to be approved by MoF. The draft contract from DP was sent to MoF on 16.12.2009. Queries received on 4.1.10 were responded to. Finally on persistent follow-up with MoF, it was conveyed by MOF on 2.3.10 that MHA may take a view on finalising the contract. Meeting was taken by HS and after clause by clause review by AS&FA(H) and JS(UT) with DP and ECIL, the contract was approved by HS on 16.3.10 and conveyed to DP on 18.3.10 . On signing of agreement, an amount of Rs.47,62,60,221/- was released as advance.
124
2 Monitoring of Delhi Police’s Plan scheme relating to Modernisation of Traffic and Communication Network
This is a Plan scheme and approval of CCEA has been obtained. MHA is monitoring/expediting financial and physical progress through a Project Monitoring Committee under AS(UT). Quarterly reviews by HS and monthly reviews by AS(UT) through PMC would be scheduled
(a) RITES
Target Date
Issue of Bid Documents
6.3.10
Submission of Bids
(Global tender published on 6.3.10)
21.6.10
(a) RITES
Target Date
Evaluation of Technical Bids
21.7.10
Approval of Technical Bid
5.8.10
Opening of financial bid
11.8. 10
Selection of Vendor
6.9.10
Award of contract
21.9. 10
(b) MTNL : HS has directed to complete the original Cyber Highway Component by 31.8.10. The work of providing last mile connectivity for ITS will be taken up by MTNL only after the work of installation of ITS is awarded to a vendor and after obtaining approval of MHA.
RITES/MTNL :
Implementation of project
RITES/MTNL:
Implementation of project
The timelines are as per the decision taken by HS in a meeting with CP, Delhi and RITES on 22.5.2010.
3 Monitoring of progress of Delhi Police Building Programme
Target Date Completion of 104 staff
30.6.10
125
MHA is monitoring/expediting financial and physical progress through a Project Monitoring Committee under AS(UT) . Monthly review by AS(UT) through PMC are scheduled.
3 projects for construction of 104 staff quarters and 4 are substantially completed in 2009-10.
quarters and 4 PS buildings at Mandawali Fazalpur, Mansarovar Park, Jafrabad and Mandir Marg.
4 The Delhi Police (Amendment) Bill
After receipt of the legislative proposal from the Govt. of NCT of Delhi, HS desired that the entire proposal may be placed in the public domain and wider consultation may be held. The finalization of the matter may, therefore, take some more time, as indicated in the proposed time line.
Target Date Wider consultation with various stakeholders and submission of report
31.5.10
Target Date Examination of the Proposal in the Ministry and approval by HM
30.6.10
Preparation and circulation of draft Cabinet Note
31.8.10
Receipt of comments of concerned Ministries
30.9.10
Target Date Approval of Cabinet Note by HS/HM
15.10.10
Submission of Note to Cabinet
31.10.10
Propose to revisit Action Plan after Cabinet decision to draw up further route map/set timelines
126
New Items
1 Monitoring of progress of Projects for construction of staff quarters and office buildings for Delhi Police
MHA is monitoring/expediting financial and physical progress on a monthly basis through a Project Monitoring Committee under AS(UT)
Completion of 23 staff quarters
Completion of 3 PS/PP/Office Blgds
Finalization of tenders for 20 projects
Mandatory clearances of 20 projects to be obtained
Completion of 3 PS/PP/Office Blgds
Finalization of tenders for 33 projects
Mandatory clearances of 27 projects to be obtained
127
2 Creation of posts for immigration duties at Airport and Seaport at Port Blair.
Target Date
Clarification to IFD, MHA.
30-04-10
Clearance from IFD, MHA & sending it to M/o Finance.
31-05-10
Clarifications, if any, to M/o Finance and decision thereon.
30-06-10
3 Delegation of powers and funds to PRIs by UTs of A&NI /Lakshadweep/DNH/DD
Follow up on the recommendations of 3rd FC & decisions in this connection
Target Date
Decision taken on recommendations and taking up the matter with UTs.
30.04.10
Target Date
Follow up/implementation of decisions in MHA
30.9.10.
Target Date
Follow-up action on inter-ministerial issues
31.12.10
128
4 Issue of sanction orders under Police Modernisation Scheme for release of balance funds to UTs for 2010-11
Target Date
Issue of sanction orders for release of 1/3rd funds to UTs as due with IFD’s concurrence
31.8.10
Target Date
Issue of sanction orders for release of balance funds to UTs as due with IFD’s concurrence
31.12.10
5 Approval of AAP of 2011-12 for the UTS under Police Modernisation Scheme by High Powered Committee
Target Date
Meeting of the HPC
31.1.11
Conveying the Administrative approval
31.3.11
6 Amendment in the NDMC Act, 1994, subsequent to the delimitation of Assembly constituencies in Delhi:
Target Date Approval of draft Cabinet Note
30.4.10
Circulation of draft Cabinet Note for comments
31.5.10
Target Date Submission of Note to Cabinet
15.7.10
129
Approval of Cabinet Note by HS/HM
30.6.10
7 Promulgation of the Dadra and Nagar Haveli Motor Vehicle Tax Amendment Regulation
Target Date
Clarification/information from UT
31.5.10
Recirculation of Cabinet Note
30.6.10
Target Date
Clearance by subject- matter Ministries
31.8.10
Target Date
Clearance/vetting by Law Ministry
31.10.10
Approval of Cabinet Note by HS/HM
31.12.10
Target Date
Submission of Note to Cabinet
28.2.11
8 Promulgation of the Daman and Diu Motor Vehicle Tax Amendment Regulation
Target Date
Clarification/information from UT
31.5.10
Recirculation of Cabinet Note
30.6.10
Target Date
Clearance by subject- matter Ministries
31.8.10
Target Date
Clearance/vetting by Law Ministry
31.10.10
Approval of Cabinet Note by HS/HM
31.12.10
Target Date
Submission of Note to Cabinet
28.2.11
130
9 Sanction of manpower to the CISF for Phase-II of Delhi Metro
Target Date Processing the proposal for obtaining approval of IFD/Ministry of Finance
30.05.10
Target Date Follow up on decision of COS
30.7.10
10 Promulgation of Andaman and Nicobar Island Excise Regulation, 10
Target Date
Revised draft Regulation/comments of UT Administration received
31.5.10
Preparation & Circulation of draft Cabinet Note and Regulation to concerned Ministries/Dept
30.6.10
Target Date
Consultation with subject matter Ministries
31.7.10
Clearance & vetting by Law Ministry
31.8.10
Approval of HS/HM on DCN
15.9.10
Submission of Note to Cabinet
30.9.10
11 Proposal to issue (fresh) notification authorizing the Commissioners, Secretaries & other officers of the A&N Administration to execute contracts on behalf of the A&N
Target Date
Clearance of Law Ministry
30.6.10
Target Date
Issue of notification
31.7.10
131
Administration
12 The Delhi Registration of Marriage Bill, 2007—Prior Approval of the Central Govt
Target Date
Received revised Bill from Govt. of NCT of Delhi
30.6.10
Target Date
Seek Law Ministry’s clearance
31.7.10
Receipt of clearance of Law Ministry
31.8.10
Prior Approval of the Central Govt.
15.9.10
Approval of HM for revision of timelines had been separately obtained by UTL Desk. Revised timelines, as approved by HM, has been indicated.
13 Delegation of the powers of “Appropriate Government” under section 38 of the Industrial Disputes Act, 1947
Target Date
Clearance from Law Ministry
31.5.10
Issue of Notification
30.6.10
14 Conferment of powers of Executive Magistrate under section 130 and 131 of Cr. PC to Commissioner of Police, Delhi—Proposal of Delhi Police
Target Date
Proposal received with approval of L.G, Delhi through Delhi Govt
31.5.10
Target Date
Decision on the proposal
31.7.10
132
Vetting by Law Ministry
30.6.10
15 Delhi Prevention of Malpractices and Touting Bill, 2009—Prior approval of the Central Government
Target Date
Revised Bill/comments of Govt. of NCT of Delhi received
31.5.10
Target Date
Consultation/clearance of subject matter Ministries/Deptt.
31.7.10
Clearance of Law Ministry
31.8.10
Prior approval of the Central Govt.
30.9.10
16 Promulgation of the Dadra and Nagar Haveli Panchayat Regulation,10
Target Date
Comments of Ministry of Panchayati Raj
31.5.10
Consultation with UT Administration on comments of M/o Panchayati Raj and revising Draft Regulation
30.6.10
Target Date
Preparation of Draft Cabinet Note
31.7.10
Circulation and obtaining comments of M/o Panchayati Raj/M/o Law on draft Cabinet Note
30.9.10
Target Date
Clearance/ vetting of draft Cabinet Note by Law Ministry
30.11.10
Approval of Cabinet Note by HS/HM
31.12.10
Target Date
Submission of Note to Cabinet
31.1. 11
133
17 Promulgation of the Dadra and Nagar Haveli Excise Duty Regulation, 10
Target Date
Revised draft Regulation/comments of UT Administration received
31.5.10
Preparation & Circulation of draft Cabinet Note and Regulation to concerned Ministries/Dept
30.6.10
Target Date
Consultation with subject matter Ministries
31.7.10
Clearance & vetting by Law Ministry
31.8.10
Approval of HS/HM on DCN
15.9.10
Submission of Note to Cabinet
30.9.10
18 The Puducherry State University Bill, 2009—ex-post facto approval of the Central Govt.
Target Date
Clearance of M/o HRD
30.4.10
Concurrence of Deptt. of Expenditure
31.5.10
Target Date
Clearance of Law Ministry
31.7.10
Approval of the Central Govt.
31.8.10
134
19 The Puducherry Prevention of Anti-Social Activities Bill, 2008 –Assent of the President
Target Date
Comments of UT Govt on observations/views of subject matter ministries/depts
31.5.10
Target Date
Consultation with subject matter Ministries/Deptt
31.8.10
Target Date
Re-consultation with UT Govt before taking a view
31.10.10
Clearance of Law Ministry
31.12.10
Target Date
Assent of the President
28.2.11
20 Karaikal Port, Puducherry – Settlement of
Target Date
Obtain approval of HM on the issues for re-negotiation with the Concessionaire.
30.4.10
Meeting of Group of Officers with the Concessionaire and GoP on the issues for re-negotiation
31.5.10
Examine and process the proposal in consultation with MoF/Ministry of Shipping.
30.6.10
Target Date
Convey the decision to GoP after obtaining approval of HM
31.7.10
135
21 Preparation of Select List for promotion to IAS (UT Segment) for the years 2008 and 2009
Target Date
Sending complete proposal to UPSC and pursuing with UPSC for holding of Selection Committee Meeting
31.5.10
22 Preparation of Select List for promotion to IAS (UT Segment) for the year 2010
Target Date
Determination of vacancies by DOP&T
30.4.10
Target Date
Collection of Records – ACRs, VC/IC, undertakings etc.
31.7.10
Sending of proposal to UPSC and pursuing with UPSC for holding of Selection Committee Meeting
31.8.10
136
23 Framing of Transfer/posting Guidelines in respect of IAS/IPS of AGMU Cadre.
Target Date
In-principle approval of draft policy note
30.4.10
JCA Meeting 15.5.10
Target Date
Finalisation of transfer/posting policy
31.7.10
24 Status of ACR/PAR of IAS and IPS officers of AGMU Cadre placed on the website of MHA
Placing on the website
25 Submission of proposal to UPSC for holding DPC for filling up the vacancies in JAG-II of DANICS pertaining to the year 2003-2007
Send a complete proposal to UPSC and pursue with UPSC for fixing DPC meeting
26 Submission of proposal to UPSC for holding DPC for filling up the vacancies in Selection Grade of DANICS pertaining to the year 2003-2007
Send a complete proposal to UPSC and pursue with UPSC for fixing DPC meeting
27 Preparation of Civil List of DANIPS.
Target Date
Calling for records/data entry/compilation
31.8.10
Target Date
Finalisation of Civil List
31.10.10
137
Printing & Publication of Civil List
31.12.10
28 Development of PHQ
and Housing Complex at Dheerpur for Delhi Police in PPP mode
Target Date
Evaluation/issue of RFQ documents
30.6. 10
Target Date
2nd approval of PPAC
15.7.10
Replies to pre bid queries
6.8.10
Evaluation Reports
30.9.10
Target Date
Issue of LOIs 15.10.10
Signing of Concession Agreements
15.11.10
After signing of Concession Agreements, further timelines would be developed for both projects, separately
29 Setting up of an Integrated Command, Control, Coordination and Communication Centre(C4i) at Police Headquarters
Target Date
Grant of approval by MHA/LG
30.4.10
Issue of LOI by DP 10.5.10
Signing of Contract by DP.
20.5.10
Target Date
Supply of equipments and installation and Commissioning
20.9.10
Integration with other systems & Acceptance Test Procedure(ATP)
30.9.10
30 Raising the limit for market borrowing by GOvt. of Puducherry from 20% to 28% of GSDP.