Ministry of Economic Development Tito Bianchi Department for Development and Cohesion Policies Ministry for Economic Development of Italy Seminar "Territorial cohesion: what scales of policy intervention? “, Bruxelles March 12 2010 Integrated Territorial Projects in Italian Cohesion Policy
17
Embed
Ministry of Economic Development Tito Bianchi Department for Development and Cohesion Policies Ministry for Economic Development of Italy Seminar "Territorial.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Ministry of Economic Development
Tito BianchiDepartment for Development and Cohesion Policies
Ministry for Economic Development of Italy
Seminar "Territorial cohesion: what scales of policy intervention? “, Bruxelles March 12 2010
Integrated Territorial Projects in Italian Cohesion Policy
Ministry of Economic Development
has taken a clear territorial orientation seeks the contribution of local actors, adjusts
to specific territorial needs and ambitions SF programming drives/catalyzes other forms
of public expenditure for economic development at each territorial scale
In 2000-2006 this was done done mainly through Integrated Territorial Projects in the Italian South
Since the mid 1990s, italian regional development Policy
Ministry of Economic Development
Integrated Territorial Projects definition
“Composite project for the development of an area, which includes a set of different operations that all contribute, in interaction with each other, to a common development strategy, devised by local actors in response to concrete needs and opportunities.”
2000-2006
Community Support Framework introduced in Italy….
Ministry of Economic DevelopmentFew Central–level guidelines provided by the Framework. Integrated Territorial
Projects (ITP)…
• Must include operations that add up to an “adequate critical mass”;
• Must identify a core-objective, a centre of responsibility, a territory;
• should not amount to an additional funding line or measure, but represent a special mode through which existing program measures operate
Ministry of Economic Development
Historic preservationEnvironment (restoring
buildings, cleaning polluted sites)
Infrastructure(Roads,
telecommunications Tourist Info points)
Productive sector (Support to local manufacturers of typical products)
Human Resources
(training in skills needed in the
tourism sector)
Measurable Expected Outcomes:Increased N. of visitors, Employment, reduced out-migration
Example of an ITP focused on tourism development
Unified Project Management (one municipal govt. chosen to lead