[INSERT PLANNING SCHEME NAME] PLANNING SCHEME SCHEDULE [NUMBER] TO CLAUSE 42.03 SIGNIFICANT LANDSCAPE OVERLAY Shown on the planning scheme map as SLO[number]. NAME OF SCHEDULE 1.0 Statement of nature and key elements of landscape Clause 42.03 requires a schedule to contain a statement of the nature and key elements of the landscape. See 42.03-1 for relevant provisions. 2.0 Landscape character objectives to be achieved Clause 42.03 requires a schedule to contain the landscape character objectives to be achieved. Insert a maximum of 5 objectives See 42.03-1 for relevant provisions. 3.0 Permit requirement Where no requirements are specified insert “None specified.” or Where permit requirements are specified insert specific permit requirements such as “A permit is not required to [insert specific requirement/s: construct a building or construct or carry out works/ the conduct of agricultural activities including ploughing and fencing/ construct a fence/ remove, destroy or lop any vegetation]”. See 42.03-2 for relevant provisions. 4.0 Application requirements Where no requirements are specified insert “None specified.” or Where application requirements are specified insert “The following application requirements apply to an application for a permit under Clause 42.03, in addition to those specified elsewhere in the scheme and must accompany an application, as appropriate, to the satisfaction of the responsible authority: [insert application requirements].” 5.0 Decision guidelines Where no requirements are specified insert “None specified.” or OVERLAYS - CLAUSE 42.03 - SCHEDULE [NUMBER] PAGE 1 OF 2 25/05/2017 30/07/2018 30/07/201 8 30/07/201 8 30/07/2018 30/07/201 8 30/07/2018