Top Banner
Ministério de Minas e Energia 1 Minister Eduardo Braga Brazil - Texas Chamber of Commerce - BRATECC May/2015
25

Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Mar 25, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

1

Minister Eduardo Braga

Brazil - Texas Chamber of Commerce - BRATECC May/2015

Page 2: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

2

Page 3: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

3

• World’s 7th largest economy;

• Investment grade

• Fiscal adjustment taking place;

• Inflation being controlled;

• Large and diversified productive sector;

• Abundant natural resources;

• High infrastructure investment

• Consolidated democracy;

• Solid macroeconomic foundations;

Page 4: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

4

Page 5: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

5

Top 5

Source – Brazilian Planning Ministry

Page 6: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

6

Page 7: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

Installed capacity 133,912 MW Transmission lines 125,833 km

Maximum recorded consumption 85,708 MW (02.05.2014)

Structural balance - No shortage, even with the most severe hydrology for two years

7

2001

80,315 MW

2014

133,912 MW

67%Installed

capacity

2001

70,034 km

2014

125,833 km

80%

Generation Transmission (only 1% isolated)

Additional capacity required – 4.4 GW/y

Page 8: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

Acelerating Contracted Projects

12

Power

PlantsPeriod Capacity (MW)

522 2015/2019 38.425

Lines PerIodLenth

km

240 2015 / 2018 30.609

Page 9: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

9

• 2.8 million km²- with potential

for oil & gas discoveries

• 307.7 thousand km² granted

• 430 producing fields

• 110 E&P companies

Proved reserves (2013): 18.5 bn boe

PRE-SALT ESTIMATED RECOVERABLE

VOLUMES

only discoveries under development and

appraisal

from 40.1 to 50.1 bn boe (2014)

Page 10: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

10

Strong regulatory Agency;

Stable rules;

12 bid rounds on Concession Model, and 1 bid on Production

Sharing Model - full transparency - no claims;

All big companies are working in Brazil;

26 companies operating producing fields in Brazil;

Friendly environment for business – government support;

Huge potential for new discoveries;

No restrictions on oil exports – More than 500 thousand barrels per day

exported in 2014, by 17 companies – Petrobras 45%; other companies 55%.

Page 11: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

900,000

1,100,000

1,300,000

1,500,000

1,700,000

1,900,000

2,100,000

2,300,000

2,500,000

2,700,000Ja

n-0

0

Jun

-00

No

v-0

0

Ap

r-0

1

Sep

-01

Feb

-02

Jul-

02

De

c-0

2

May

-03

Oct

-03

Mar

-04

Au

g-0

4

Jan

-05

Jun

-05

No

v-0

5

Ap

r-0

6

Sep

-06

Feb

-07

Jul-

07

De

c-0

7

May

-08

Oct

-08

Mar

-09

Au

g-0

9

Jan

-10

Jun

-10

No

v-1

0

Ap

r-1

1

Sep

-11

Feb

-12

Jul-

12

De

c-1

2

May

-13

Oct

-13

Mar

-14

Au

g-1

4

Jan

-15

BA

REL

S P

ER D

AY

Brazilian Oil Production. Production growth – 116% in 15 years – 5.2% per year

More to come:

- Huge discoveries starting production in a few years;

- Amazing prospects to be offered in future bid rounds

11

Page 12: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

36% of the oil discovered worldwide in the last 5 years were in Brazil (22.9 bnbbl)

63% of the deep water discoveries in the last 5 years were in Brazil (22.2 bnbbl)

Brazilian Discoveries

63%

Others Discoveries

37%

Deepwater oil discoveries in the world - 2010-2014

Brazilian Discoveries

36%

Others Discoveries

64%

Oil discoveries in the world -2010 -2014

The three biggest discoveries in the last 10 years took place in Brazil Lula, Libra and Búzios

Source: Wood Mackenzie

12

Page 13: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

Source: FPSO.com; IHS Petrodata April 15th, 2015Brazilian PAC

>20% Of all FPSOs are in operation in Brazil

46% FPSO/Platforms under construction will go to Brazil

40 New FPSOs will be operating in Brazil in a few years (24 only for Buzios and Libra)

13

Page 14: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

14

Phase 1 - (ongoing):

- Amazing development of local industry;

- Operators Resistance:- Additional cost- Additional time

- Contracts being respected

Phase 2 – (to be implemented):- New scenario:

- Huge demand;- Prices variation

- Adjustments are required–we need:1. Competitive suppliers;2. Development of new suppliers;3. Investments in innovation- Contracts must be respected 14

Page 15: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

15

1. Regulated Open Access to all existent pipelines before 2020;

2. New pipelines under concession regime – open season - all companies can contract capacity;

3. Demand growing fast – 50% provided by imported gas;

4. Spot LNG is responsible for 38% of the imported natural gas – local production is a great opportunity;

5. Local gas production for new electrical power plants are very welcome;

Page 16: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

16

1. The biggest Brazilian company is facing serious challenges – but the solution will come soon;

2. The company has full and unconditional government support;

3. The company continues to work hard and to overcome challenges:

• Pre-salt production – 674 thousand barrels/day – March

2015 – less than 9 years after the first discovery;

• Developing technologies;

• Winning awards;

4. Brazilian people remain proud of our most successful company.

Page 17: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

17

Page 18: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

13th Bid Round

October 2015;

269 onshore and

offshore blocks;

Mature, new

frontiers and high

potential basins

18

High Potential

NewFrontier

NaturalGas

Mature Basins

Page 19: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

19

13th Bid Round - Blocks

Basin onshore/offshore Potential Fluid Number of Blocks Coments

Amazonas onshore New Frontier gas 7 to be confirmed

Parnaiba onshore New Frontier gas 22 important gas discoveries

Potiguar onshore Mature oil and gas 71

Reconcavo onshore Mature oil and gas 85

Sergipe/Alagoas offshore High Potential Gas and light oil 10 Most important area

Jacuipe offshore New Frontier oil and gas 4 close to SE/AL

Camamu-Almada offshore New Frontier oil and gas 9

Espírito Santo offshore High Potential oil and gas 7 Amazing prospects

Campos offshore High Potential oil and gas 3 only shalow water

Pelotas offshore New Frontier oil and gas 51 Good Potential

Total 269

Page 20: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

Concession Model - periodic rounds - considering:

The oil companies necessity;

The service companies demand;

The local industry capacity;

ANP studies on the areas;

Recent discoveries;

TARGET – Not more than two years without a bid

Production Sharing Model – rounds depend on:

Brazilian target for oil export;

The local industry capacity;

20

Page 21: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

Generation –New Investments

17

Auctions

2nd Auctions for Reserve Energy Date: August 14th 2015

Source of energy: Solar Photovoltaic

3rd Auction for Reserve EnergyDate: 13 de novembro de 2015

Source of energy: Solar Photovoltaic e Wind

2015

1st Auction for Reserve Energy Date: may 29th 2015

Source of energy: Gas power plants

Auction A-3 Date: July 24th 2015

Source of energy: Hydro, Gas, solar and wind

Page 22: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

22

Transmission –New Investments

Date: June, July, September and December

4 Auctions in 2015

Total Extension

18,200 km

Transformation Capacity

33,600 MVA

Forecast Investiment

US$ 9 billions

Page 23: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

23

Page 24: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

24

A good opportunity to invest:

if you are an oil company (13th bid round could be the path);

if you provide goods and services for oil companies;

If you want to generate energy;

If you want to invest in transmission

Huge potential for oil and gas – not only within the Pre-Salt polygon;

Many opportunities to generate energy from renewable sources

Stable regulatory framework and two strong Agencies;

Political stability:

Institutions working;

Free press;

Free manifestations

Page 25: Minister Eduardo Braga Brazil - Texas Chamber of …...Apr 01, 2019  · Ministério de Minas e Energia Installed capacity 133,912 MW Transmission lines 125,833 km Maximum recorded

Ministério de Minas e Energia

25