119°5'0"E 119°5'0"E 119°0'0"E 119°0'0"E 118°55'0"E 118°55'0"E 118°50'0"E 118°50'0"E 118°45'0"E 22°55'0"S 22°55'0"S 23°0'0"S 23°0'0"S Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose. Document Path: Y:\Jobs\A501_A1000\A780\3Project\A780_076_E_MAC_Southern_Flank_PER_New_ModifiedIAIAA_RevA.mxd Date: Scale @ A4: MINING AREA C - SOUTHERN FLANK New Modified Footprint 0 5 2.5 Kilometres 1 31/08/2017 BHP BILLITON IRON ORE Figure: Project No: 1:150,000 Checked: Prepared: M. LYTTLE S. TRINDER A780/076 REV A Revision: Rev A Reviewed: S. WILLIAMSON Coordinate System: Central Project Grid (CPG94) Projection: Transverse Mercator Datum: GDA 1994 Proposed Mining Area C Development Envelope Approved Mining Area C (Northern Flank) Development Envelope Additional Development Envelope Mining Area C EMP Rev 6 Impact Assessment Area Indicative Additional Impact Assessment Area New Modified Indicative Additional Impact Assessment Area Great Northern Highway BHP Billiton Rail Rio Tinto Rail
13
Embed
MINING AREA C - SOUTHERN FLANK - EPA WA | EPA ... 3 6 ilom et rs # # # # # Inset A 0 300 Metres 119 15'0"E 119 15'0"E 119 10'0"E 119 10'0"E 119 5'0"E 119 5'0"E 119 0'0"E 119 0'0"E
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
119°5'0"E
119°5'0"E
119°0'0"E
119°0'0"E
118°55'0"E
118°55'0"E
118°50'0"E
118°50'0"E
118°45'0"E
22°5
5'0"S
22°5
5'0"S
23°0
'0"S
23°0
'0"S
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
MINING AREA C - SOUTHERN FLANKNew Modified Footprint
0 52.5
Kilometres
131/08/2017
BHP BILLITON IRON ORE
Figure:Project No:1:150,000
Checked:Prepared: M. LYTTLE
S. TRINDERA780/076 REV A
Revision: Rev A Reviewed: S. WILLIAMSONCoordinate System: Central Project Grid (CPG94)
Projection: Transverse MercatorDatum: GDA 1994
Proposed Mining Area C Development EnvelopeApproved Mining Area C (Northern Flank) Development EnvelopeAdditional Development EnvelopeMining Area C EMP Rev 6 Impact Assessment AreaIndicative Additional Impact Assessment AreaNew Modified Indicative Additional Impact Assessment AreaGreat Northern HighwayBHP Billiton RailRio Tinto Rail
119°5'0"E
119°5'0"E
119°0'0"E
119°0'0"E
118°55'0"E
118°55'0"E
118°50'0"E
118°50'0"E
118°45'0"E
118°45'0"E22
°55'0
"S
22°5
5'0"S
23°0
'0"S
23°0
'0"S
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
MINING AREA C - SOUTHERN FLANKVegetation Condition within the Proposed
Mining Area C Development Envelope 0 105
Kilometres
158/11/2017
BHP BILLITON IRON ORE
Figure:Project No:1:150,000
Checked:Prepared: M. LYTTLE
B. BARNETTA780/027 REV C
Revision: Rev B Reviewed: S. WILLIAMSONCoordinate System: Central Project Grid (CPG94)
Projection: Transverse MercatorDatum: GDA 1994
Proposed Mining Area C DevelopmentEnvelopeApproved Mining Area C (NorthernFlank) Development EnvelopeAdditional Development EnvelopeMining Area C EMP Rev 6 ImpactAssessment AreaNew Modified Indicative AdditionalImpact Assessment Area
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
MINING AREA C - SOUTHERN FLANKNew Modified Footprint
0 52.5
Kilometres
231/08/2017
BHP BILLITON IRON ORE
Figure:Project No:1:150,000
Checked:Prepared: M. LYTTLE
S. TRINDERA780/075 REV A
Revision: Rev A Reviewed: S. WILLIAMSONCoordinate System: Central Project Grid (CPG94)
Projection: Transverse MercatorDatum: GDA 1994
Proposed Mining Area C Development EnvelopeApproved Mining Area C (Northern Flank) Development EnvelopeAdditional Development EnvelopeMining Area C EMP Rev 6 Impact Assessment AreaModified Indicative Additional Impact Assessment AreaNew Modified Indicative Additional Impact Assessment AreaGreat Northern HighwayBHP Billiton RailRio Tinto Rail
119°5'0"E
119°5'0"E
119°0'0"E
119°0'0"E
118°55'0"E
118°55'0"E
118°50'0"E
118°50'0"E
118°45'0"E
118°45'0"E22°55'0"S
22°55'0"S
23°0'0"S
23°0'0"S
Liability BHP BIO d oes not warrant that this m ap is free from errors or om issions. BHP BIO shall not b e in any way liab le for loss, dam ag e or injury to the user of this m ap or any other person or org anisation consequent upon or inc id ental to the existence of errors or om issions on this m ap. This m ap has b een com piled with data from num erous sources with d ifferent levels of reliab ility and is considered b y the authors to b e fit for its in tended purpose at the tim e of pub lication. However, it should b e noted that the inform ation shown m ay b e sub ject to chang e and ultim ately, m ap users are required to determ ine the suitab ility of use for any particular purpose.
MINING AREA C - SOUTHERN FLANKInferred Extent of Hab itat for Antichiropus ‘DIP 007’
0 105
Kilom etres
279/11/2017
BHP BILLITON IRON ORE
Figure:Project No:1:150,000
Checked:Prepared: M. LYTTLE
B. BARNETTA780/043 REV C
Revision: Rev C Reviewed: S. WILLIAMSONCoordinate System: Central Project Grid (CPG94)
Projection: Transverse MercatorDatum: GDA 1994
P roposed Mining Area C Developm ent EnvelopeApproved Mining Area C (Northern Flank) Developm ent EnvelopeAd d itional Developm ent EnvelopeMining Area C EMP Rev 6 Im pac t Assessm ent AreaNew Mod ified Ind icative Ad d itional Im pac t Assessm ent AreaInferred Antichiropus 'DIP 007' Hab itatInferred Antichiropus 'DIP 007' Hab itat (Unverified )Antichiropus ̀DIP 007' ind eterm inedAntichiropus ̀DIP 007' c onfirm edBHP Billiton RailGreat Northern Hig hway
#
#
##
#
#
#
#
##
##
##
#
#
#
#
##
#
#
#
#
##
#
##
#
#
#
!
!
!!
!
!
!
!!
!
!
!
!
!
!
!
!
119°0'0"E
119°0'0"E
118°55'0"E
118°55'0"E
118°50'0"E
118°50'0"E22
°55'0
"S
22°5
5'0"S
23°0
'0"S
23°0
'0"S
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
MINING AREA C - SOUTHERN FLANKImpacts to Ghost Bat Caves and
Antichiropus 'DIP007' Habitat Following Mitigation
29
±26/10/2017
BHP BILLITON IRON ORE
Figure:Project No:1:110,000
Checked:Prepared: J. ROBERTS
B. BARNETTA780/088 REV D
Revision: Rev C Reviewed: S. WILLIAMSONCoordinate System: Central Project Grid (CPG94)
Projection: Transverse MercatorDatum: GDA 1994
Proposed Mining Area C Development EnvelopeApproved Mining Area C (Northern Flank)Development EnvelopeAdditional Development EnvelopeMining Area C EMP Rev 6 Impact AssessmentAreaInferred Antichiropus 'DIP007' HabitatPriority Ecological Community
Bat caves in proposed impact areas! High! LowBat caves outside proposed impact areas# High# Low
BHP Billiton RailGreat Northern HighwayNew Modified Indicative Additional ImpactAssessment Area
0 63Kilometers
##
#
##
Inset A
0 300Metres
119°15'0"E
119°15'0"E
119°10'0"E
119°10'0"E
119°5'0"E
119°5'0"E
119°0'0"E
119°0'0"E
118°55'0"E
118°55'0"E
118°50'0"E
118°50'0"E
118°45'0"E
118°45'0"E22
°50'0
"S
22°5
0'0"S
22°5
5'0"S
22°5
5'0"S
23°0
'0"S
23°0
'0"S
23°5
'0"S
23°5
'0"S
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
Proposed Mining Area CDevelopment EnvelopeGroundwater AssessmentAreaMining Area C EMP Rev 6Groundwater AssessmentAreaWA HydrographicSubcatchment
Alluvium - unconsolidatedsilt, sand and gravelColluvium -unconsolidated quartz androck fragments in soilCalcrete - sheet carbonateusually formed in majordrainage lines
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
Approved Mining Area C (NorthernFlank) Development EnvelopeAdditional Development EnvelopeIndicative Additional ImpactAssessment Area (Pit)Indicative pit outlineBHP Billiton RailRio Tinto RailHighways
!(!(
!($+
$+
$+")
" $+!
""
" $+$+""$+
$+
##̂_̂_#
$+
$+$+
$+ _̂̂_̂_ ")
119°15'0"E
119°15'0"E
119°10'0"E
119°10'0"E
119°5'0"E
119°5'0"E
119°0'0"E
119°0'0"E
118°55'0"E
118°55'0"E
118°50'0"E
118°50'0"E
118°45'0"E
118°45'0"E22
°55'0
"S
22°5
5'0"S
23°0
'0"S
23°0
'0"S
23°5
'0"S
23°5
'0"S
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
South Flank Highway Pits Adjacent to Regional Dyke
1: 25,000
Recommended Pit Design
Pit Crest
Pit Toe
Ramp
Outline
Hillshade
BHPBIO 1:20000 Structure
Fault
Fold
Dyke
Joint
Vein
")
")
")")
")
")
")
")
")
")
")
")
")")
")")
")
")
")")
")
")
")
")
!
")
")
")
")
")
!
")
")
")
")")")
")")
")
")
")
!
")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
")
")")
")
")")")
")
")
")
")
")
")
")")
")")
")
")
")
")
")")")
")
")")
")
")
")") ")
")
") ")
!
")
")
")
")
!!
")
")")")
")")
")
")
")
")
")
")
!
!
!!
! ")
")
!
!
!!
!
!
!
")
")
")
")")
")")
")")")
")
")
")
")
")
")
")
")
")
")
")")")")")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
") ")")
118°50'0"E
118°50'0"E
118°45'0"E
118°45'0"E22
°55'0
"S
22°5
5'0"S
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
Liability BHPBIO does not warrant that this map is free from errors or omissions. BHPBIO shall not be in any way liable for loss, damage or injury to the user of this map or any other person or organisation consequent upon or incidental to the existence of errors or omissions on this map. This map has been compiled with data from numerous sources with different levels of reliability and is considered by the authors to be fit for its in tended purpose at the time of publication. However, it should be noted that the information shown may be subject to change and ultimately, map users are required to determine the suitability of use for any particular purpose.
" Sida sp. Barlee Range (S. van Leeuwen 1642)(Priority 3)
" Themeda sp. Hamersley Station (M.E. Trudgen 11431)(Priority 3)
" Triodia sp. Mt Ella (M.E. Trudgen 12739)(Priority 3)
" Vittadinia sp. Coondewanna Flats (S. van Leeuwen 4684)(Priority 1)
Broad Floristic FormationDisturbedAcacia Low Open ForestAcacia Low Open WoodlandAcacia Low WoodlandEriachne Tussock GrasslandEucalyptus Low Open ForestThemeda Open Tussock GrasslandTriodia Hummock GrasslandTriodia Open Hummock Grassland
Great Northern Highway
Juna Downs Project Area
RailRio Tinto Rail
Table 1: Summary of troglofauna species only recorded within Indicative Additional Impact Assessment Areas