Mining and Exploration highlights Omineca and Northeast Region, British Columbia, 2013-2014 C. Paul Jago Regional Geologist Omineca/Northeast Prince George, BC Image from Thompson Creek Metals Co Inc
Mining and Exploration highlights
Omineca and Northeast Region, British Columbia, 2013-2014
C. Paul Jago Regional Geologist
Omineca/Northeast Prince George, BC
Image from Thompson Creek Metals Co Inc
Select projects in BC by deposit type
Coal
Polymetallic Zn, Pb, Cu, Ag, Au
Cu-Au
Au ± Ag
Specialty metals REE, Nb, Ta
Mo ± W
Ni
Northeast Region
• Peace River Coalfield
• 17% of BC coal production
• $81.6 M in exploration (2013)
• 83% - advanced stage projects
• $180 M in mine development
Exploration Expenditure
$81.6 M (down 25% YOY)
Drilling Meters
54,500 m (down 55% YOY)
• Quintette-Babcock
• Roman Mtn
• 5 projects in Environ Assessment
4
3
2
1
2
1
4
3
NEBC Coal Mines
Willow Creek
Brule
Perry Creek
Trend
40 km
m
c
t
h
2
1
4
3
Brule - Walter Energy Inc (Western Coal Corp)
• 1.4 Mt/y PCI coal product - target 2.0 Mt/y
• mining 3 seams in the South pit – expanding to North and Blind pits
• updated 5-year mine plan in 2014
• 17.5 Mt ROM reserves + 12.5 Mt resource (Meas.) >> 8 year mine life
Willow Creek - Walter Energy Inc (Western Coal Corp)
• 0.45 Mt hard coking coal (HCC) and PCI coal in 2013
• Apr 2013 - high cash-cost-of-sales ($150/tonne) = production curtailed 2/3
• processing plant running at half-capacity
• 18.6 Mt ROM reserves + 31.1 Mt resource (M&I) >> 16-20 year mine life
Wolverine (Perry Creek) – Walter Energy Inc (Western Coal Corp)
• 1.8 Mt/y HCC product - target 1.9 Mt/y
• completed mining in Phase 3 - mining Phase 4A, 4B
• 9.4 Mt ROM reserves + 15.1 Mt resource (Meas.) >> 3 year mine life
EB expansion - start-up in 2016-17 at 2.0 Mt/y HCC
• 15.6 Mt ROM reserves >> 8 year mine life
Trend Mine - Anglo American plc (Peace River Coal Inc)
• 1.7 Mt/y HCC product - 2013 mining in Phases 1, 3, and 4
• 12.8 Mt ROM reserves + 27.7 Mt resource (M&I)
Roman Mtn expansion - start-up in 2015 at 1.0 Mt/y HCC
• $50M Phase-1 (2013) of $200M multi-year construction project
• combined Trend-Roman mine to produce 2.5 Mt/y HCC
• RM - 35.5 Mt ROM reserves + 4.2 Mt resource (M&I) >> 16 year mine life
Coal Exploration projects 1. Dunlevy - Jameson Resources Ltd (NWP Coal Canada)
2. Gething - CDN Kailuan Dehua Mines Co Ltd
3. Carbon Creek - Cardero Resources Corp
4. Suska - Glencore
- JX Nippon Oil & Energy
5. Sukunka - Glencore
- JX Nippon Oil & Energy
6. Bullmoose Creek - CDN Dehua Int’l Mines Group
- CDN Bullmoose Mines Co Ltd
7. Murray River - HD Mining Int’l Ltd
8. Quintette-Babcock - Teck Coal Ltd
9. Roman Mtn, Roman NW, Waterfall -Anglo American PLC (Peace River Coal Inc)
10. Wapiti River - CDN Dehua Int’l Mines Group Ltd
11. Huguenot - Colonial Coal Int’l Corp
12. Wapiti East (phosphate) – Fertoz Ltd
2.
5. 6.
7.
4.
3.
8. 9.
10.
11. 12.
1.
40 km
If all proposed mines became operational:
$3950 M capex
3500 jobs
AT LEAST
m
c
t
h
Omineca Region (North-central)
• $102.5 M exploration expenditure 2013
• 22% of provincial total
• 83% from advanced stage projects
• 62% from Blackwater project (New Gold Inc)
• 7% increase in Grassroots/Early stage (16%)
• $419 M in mine construction at Mt. Milligan
$102.5 M (down 37% YOY)
Exploration Expenditure
$80,300 m (down 73% YOY)
Drilling
(Thompson Creek Metals Co Ltd)
• 3 projects in Environ Assessment
Terranes (east to west):
Blue - Ancestral North America
Green - Quesnel Terrane (island arc)
Orange - Cache Creek Terrane (oceanic)
Pale green - Stikine Terrane (island arc)
Starting from Peace River coalfield...
-Exploration and Mining in British Columbia 2011
Omineca Region
start
Carbonatite Belt (niobium) Kechika Trough (Zn-Pb-Ag SEDEX) Toodoggone District (epithermal Au-Ag and porphyry Cu-Au ) Quesnel Terrane (porphyry Cu-Au ) Cache Creek Terrane (Fe-Ni alloy) Endako Batholith (porphyry Mo ±Cu ) Nechako Plateau (epithermal Au-Ag)
Carbonatite-hosted Nb
• Aley: Taseko Mines Ltd
- 2nd largest niobium deposit in world
- 10,000 t/d open pit operation >> 20+ years
- annually producing 12 Mlbs niobium ($350-400M)
- engineering mine components, TSF, power line
- metallurgical test work = 35%>>50% Nb concentrate
- 2012 resource est: 285 Mt at 0.37% Nb2O5 (M&I)
- containing 739 Mkg Nb (~$40/kg)
- Nb in pyrochlore, columbite, fersmite
- used in high-strength, low alloy steels
Rocky Mountain carbonatite belt
Niobium ore – magnetite-apatite-baddelyite
Central Zone
apatite-baddelyite fluorescence
SEDEX (baritic Zn-Pb-Ag) Kechika Trough
• Akie: Canada Zinc Metals Corp
- combining VTEM response with GIS data compilation
- 2013: 9-hole drilling program - 4 target areas
- new discovery – Sitka showing - eastern SEDEX horizon
• Kechika Regional: (includes Pie, Mount Alcock)
- 2013: 2795 km VTEM on remaining 8 core properties
- Pie, Cirque East and Yuen properties optioned to Teck
Cross Section 2900 South Showing Mineral Facies
Canada Zinc Metals Corp
-Cardiac Creek - open at depth (>800 m), along strike (>1300 m)
- 12.7 Mt at 8.4% Zn, 1.7% Pb, 13.7 g/t Ag (Ind.)
- containing 2.4 Blbs Zn, 472 Mlbs Pb, 5.6 Moz Ag
• Cirque: Teck Resources Ltd, Korea Zinc
- last work in 1995 - Prefeasibility study
- 18.5 Mt at 8.1% Zn, 2.2% Pb (reserves)
- multi-year exploration program
- deep drill targets on North and South Cirque
- testing westward extension of minz at depth
- soil program extended to Fluke and Elf
- optioned adjoining CZM properties in Sept 2013
Zn-Pb-Ag ore from Cardiac Creek deposit - Akie
Deep drilling at South Cirque
Looking out over North Cirque
SEDEX (baritic Zn-Pb-Ag) Kechika Trough
Toodoggone District
• Kemess Underground: AuRico Gold Inc
- March 2013 - Feasibility study results:
- Reserves: 100.4 Mt at 0.28% Cu, 0.56 g/t Au, 2.0 g/t Ag (Prob.)
- 619.2 Mlbs Cu, 1.8 Moz Au, 6.6 Moz Ag contained
- 24,650 t/d block cave operation for 12 years
- higher grade portion of Kemess North deposit
- use KS pit, half of mill circuit, infrastructure (buildings, power)
- 5-year construction project - $502 M capex – 100-400 jobs
N S AuRico Gold Inc
Mine Evaluation and exploration
- 9-hole program
- follow up 2007 drilling
- testing fault displacement of mineralization
- Au/Cu ratio increases towards core zone?
• Kemess East KN-13-02
• Mt. Milligan Mine: Thompson Creek Metals Co Inc
Quesnel Trough
- private equity Royal Gold Inc – 52% stake
- $1.57 B mine construction project
- $419 M capex in 2013 - $50 M in 2014
- 60,000 t/d over 22 year mine life - 0.84 strip ratio
- Aug 2013 - phased start-up began
- Oct 2013 - first rail shipment to Vancouver (5 Kt)
- Q1 2014 - 3 shipments of approx 10 Kt (DMT) each
- state-of-the-art zero-discharge operation
- 3 x 4 km footprint
- largest SAG mill in North America and tallest oprimary crusher in Canada
- first new BC greenfields mine in 15 years!
- reserves of: 477.5 Mt at 0.20% Cu, 0.39 g/t Au
- containing: 5.95 Moz Au , 2.10 Blbs Cu (Dec 31, 2013)
- first 6 years annually: 89 Mlbs Cu, 262 Koz Au
Mine Construction
• Decar: First Point Minerals Corp (40%)
- Cliffs Natural Resources Inc (60%)
- Baptiste deposit extended 580 m to NW
- volume: 3000 m x 150-1080 m x 540 m deep
- Mar 2013 - positive PEA for 4-stage open-pit
- 114,000 t/d over +24 year mine life - low strip ratio 0.17
- Nickel production: 82.4 Mlbs/y in ferronickel concentrate
- awaruite (Ni2-3Fe) - conventional mag and gravity separation
Ni-Fe alloy Cache Creek terrane
First Point Minerals Corp
- 1159 Mt at 0.124% Ni (DTR) containing 3.17 Blbs (Ind.)
4 km
1 km
Mo porphyry
• Endako Mine: Thompson Creek Metals Co (75%)
Sojitz Corp (25%)
- mining stockpiles, historic dumps, and fresh ore
- Super Pit expansion project continuing
- roaster shut down for retrofitting - shipping con to PA
- 29.1% reduced cash cost of production ($10.93/lb) YOY
- produced 9.07 Mlbs moly oxide (46.5% increase YOY)
- 52,000 t/d mill (operating at 45-60 Kt/d in 2013)
- 2014: reserves revised to 65.8 Mt at 0.052% Mo (P&P)
- mine life reduced to 3-4 years at $10/lb moly price
Francois Lake Suite – Endako Batholith
- photo courtesy of Thompson Creek Metals Co Inc
N
• Blackwater: New Gold Inc
Epithermal Au-Ag
- 2013 - Feasibility Study (>20,000 m geotech)
- 2014 - advance project through permitting
- 344.4 Mt at 0.74 g/t Au, 5.5 g/t Ag (P&P)
- containing 8.17 Moz Au and 60.8 Moz Ag (P&P)
- LOM production: 7.0 Moz Au, 30 Moz Ag
- 60,000 t/d processing plant - 17 yr mine life
- $1865 M capex (Rainy River = $885 M)
W
Nechako Plateau
700 drill holes in 2012 (>247,000 m)
3.37 gt Au, 12.3 gt Ag - BW-917
E
New Gold Inc
2013 Regional Program - 14 target areas
- 7 targets tested (22,500 m) - 3 with Au-Ag intercepts
- 2014: <15,000 m drilling planned
New Gold Inc
- >4200 m drilling in 2013
- 20.3 Mt at 0.50 g/t Au and 22.4 g/t Ag (Ind)
- 320 Koz Au and 14.6 Moz Ag (Ind) - up 63% and 54%
Epithermal Au-Ag
• Capoose New Gold Inc
Nechako Plateau
• 3T’s: Independence Gold Corp
- 12-hole drilling program (3863 m)
- Ted-Mint: 3.19 g/t Au, 33.5 g/t Ag over 11.3 m
- Larry: 2.09 g/t Au, 5.0 g/t Ag over 1.0 m
- Tommy: 2.74 g/t Au, 45.7 g/t Ag over 6.7 m
- >12 qtz-cbt veins <900 m length, <20 m true width
- 5.45 Mt at 2.52 g/t Au, 71.5 g/t Ag (Inf.)
- seeking bedrock source of high-grade float
- Big Bear - Parlane Resources Corp - 0.26 g/t Au over 330.7 m
- Trout- Venerable Ventures Ltd - 0.33 g/t Au over 47.8 m
- Key- now New Gold Inc – 0.38 g/t Au over 13.7 m
- TREK – Geoscience BC – >20,000 km2 - $4.1 M project
• other projects:
3T’s - Ringer Zone boulder
View north across Nechako Plateau
3T’s - Tsacha Property
500 m
N
2014 Outlook
- Mine construction (Roman Mtn)
- Surface facility & bulk sample (Gething, Murray River)
-EA reviews (Carbon Creek, Gething, Echo Hill, Sukunka, Murray River)
Northeast region
Omineca region
- Commercial production - residence construction (Mt. Milligan)
- Super-pit expansion (Endako)
- Complete permitting (Blackwater)
- Feasibility studies (Aley, Decar)
- EA reviews (Blackwater, Giscome, Kemess UG)
- Drilling programs (3Ts, Fawnie regional, Kliyul, Kemess East, Akie, Cirque)
N
Google Earth database
screenshot
Mineral Production in BC
$8.0 B
0
1
2
3
4
5
6
7
8
9Total Mineral Production value in BC
(metals, coal, industrial minerals)
Billions of Dollars
0
100
200
300
400
500
600
700
Mil
lio
ns
of
Do
llar
s
Exploration Expenditures (metal and coal)
$476 M 81% from Northern BC
(42% NW, 39% NC-NE)
Linear regression increasing $476 M/y since 2003
Coal (60%) Copper (25%)
Forecast 2013 production value by commodity