  • Pile Design 1

    ROBERT SIQECA, PE

    PAGE BY:

    PROJECT: 920 Westchester Ave, BX, NY JOB # CHK'K: RS

    ITEM: Pile design DATE:

    Foundation Wall Data:

    f 'c, grout strength = 5 ksi

    f'c_f, footing concrete strength = 4 ksi

    f 'y c steel strength casing = 60 ksi

    f 'y b steel strength bar = 75 ksi

    , strength reduction factor for shear = 0.75

    Area grout= = 52 in2

    Area bar= = 2.25 in2

    (no 14. threaded bar)

    Area casing= = 11.9 in2

    (HSS 8.625x0.500)

    Plunge length= = 5 ft

    Dia casing= 8.625 in

    Dia bond= = 10 in

    RS

    1531

    1 OF6

    8/2/2010

    920 Westchester Ave

  • Pile Design 2

    1. Pile Cased Length (Service Load Design)

    For strain compatibility between casing and bar, use the following for steel

    yield stress:

    F y-steel = the minimum of Fy bar & Fy casing= 60 ksi

    Tension - Allowable load

    Pt -allowable = 0.55 Fy steel x ( Area bar + Area casing)= 424.5 kips

    (Note: 0.55 is per AASHTO Table 10.32.1A)

    Tension Allowable load :

    Fa = Fy-steel/FS . . . . . FS = 2.12

    P c -allowable = 0.40fc-grout Area gout + 0.47Fy-steel [Area bar + Area casing]

    = 503.03 kips

    (Note: 0.40 is per AASHTO 8.15.2.1.1; 0.47 is per AASHTO, i.e. 1/2.12 = 0.47)

    2.Pile Uncased Length (Service Load Design)

    Cased bond length (plunge length) allowable load = P transfer allowable

    = 257,717 lbs

    bond nominal strength = geotechnical unit grout-to-ground bond strength= 2000 kpa

    = 290 psi

    920 Westchester Ave

  • Pile Design 3

    Tension - Allowable load

    P t-allowable = 0.55 Fy bar x Area bar + P transfer allowable= 350.5 kips

    (Note: 0.55 is per AASHTO Table 10.32.1A)

    Compression - Allowable load

    P c-allowable = 0.4fc-grout x Area grout + 0.47 Fy bar x Area bar + P transfer allowable=

    = 441.0295 kips >> 300 kips ok

    (Note: 0.40 is per AASHTO 8.15.2.1.1; 0.47 per AASHTO, i.e 1 /2.12 = 0.47)

    920 Westchester Ave

  • Pile Design 4

    3. Pile to Footing Connection

    a. bond between the pile casing and the footing concrete:

    bond btwn casing & footing= 1.75 Mpa= 253.8 psi

    casing embedment= 6 in

    P casing bond= (bond btwn casing & footing/FS)x3.14xD casing x Casing embedment

    = 20,617 lbs

    920 Westchester Ave

  • Pile Design 5

    b. Check if compression load can be transferred through bearing on pile top(figure 5-8) without optional

    bearing plate:

    Pn, max = 323,159 lbs

    Pn, max + Pcasing bond = 343,776 lbs < 300 kips

    Detail in Figure 5-8 cannot work.

    c.Design for bearing plate without stiffeners

    Pu=300kips- P casing bond= 279.38 kips

    920 Westchester Ave

  • Pile Design 6

    109.56 in2

    Use 11"x11" plate

    2.05 in

    fp=Pu/ 3.14*Dia casing = 10.316 ksi

    tp= 0.803 in

    Use 11x11x1" bearing plate