    Howtospecify,workwithvendorandoverseetestingMikeMiller, PE

    1

  • 8/3/2019 Miller Tower Testing

    2/52

    ManufacturingPlantLocationsHeadquarters Houston,Texas

    Monterrey, Mexico

    BeloHorizonte, Brazil

  • 8/3/2019 Miller Tower Testing

    3/52

    Whyis

    testing

    needed?

    Isit

    worth

    the

    expense?

    Cantweverifydesigns

    withour

    computer

    tools?

  • 8/3/2019 Miller Tower Testing

    4/52

    ThePurposeofFullScaleTowerTesting

    Thearethreetypesoffullscaletesting.

    Goal:ToVerify:Design

    Detailing

    ProductionDesignTestsCost:

    $

    ProductionVerif NewConce ts

    Goals:ResearchTestsCost:

    $$$

    Design,Detailing

    NewDesign

    Concepts

    ToVerify:

    ExaminemodeofFailureFailureInvestigations

    Goal:Cost:$$ Fabrication

    ProductionQA/QC

    Extremelyrarebecause

    hassignificantschedule

  • 8/3/2019 Miller Tower Testing

    5/52

    Whyistestingneeded?

    LatticeTowersarecomplexsystems

    Indeterminate

    3D

    Structures

    TrussDeflectedShape

    Compression/TensionIn3D

  • 8/3/2019 Miller Tower Testing

    6/52

    Whyistestingneeded?

    LatticeTowersarecomplexsystems

    Modeled

    as

    2

    force

    (tension/compression)

    systems

  • 8/3/2019 Miller Tower Testing

    7/52

    Whyistestingneeded?

  • 8/3/2019 Miller Tower Testing

    8/52

    Whyistestingneeded?

    LatticeTowersarecomplexsystems

    Connection

    eccentricity

  • 8/3/2019 Miller Tower Testing

    9/52

    Whyistestingneeded?

    LatticeTowersarecomplexsystems

    Connection

    eccentricity

    TopView

  • 8/3/2019 Miller Tower Testing

    10/52

    Whyistestingneeded?

    Inaddition:

    Tover yt e es gnmet o sot at t sposs eto ave

    confidencein

    the

    design

    of

    the

    body

    and

    leg

    extensions

    thatarenottested.

  • 8/3/2019 Miller Tower Testing

    11/52

    Whyistestingneeded?

    Testingvideos

    ClickherefortheTowerTestingVideo

  • 8/3/2019 Miller Tower Testing

    12/52

    FullscaleTestingisalongstandingpractice

  • 8/3/2019 Miller Tower Testing

    13/52

    1948

  • 8/3/2019 Miller Tower Testing

    14/52

    1948

  • 8/3/2019 Miller Tower Testing

    15/52

    1965

  • 8/3/2019 Miller Tower Testing

    16/52

    Verticalloadapplication Deflectionmeasurements

    1965

  • 8/3/2019 Miller Tower Testing

    17/52

    196080

  • 8/3/2019 Miller Tower Testing

    18/52

    TowerTesting:

    HowtoSpecify

  • 8/3/2019 Miller Tower Testing

    19/52

    TowerTesting:HowtoSpecify

    Specification: ASCE10 Specification: IEC60652

  • 8/3/2019 Miller Tower Testing

    20/52

    TowerTesting:HowtoSpecify

    Familyof4to8towertypes:

    ower

    ype

    e ec onTypically: 50100%offamilyistested.

    Selectionoftowertypeisbasedon:

    MostUsed

    Tower

    (Tangent

    Suspension)

    MostCriticalTower(DeadEnd)

    ,

    treatdetailingindependently)

    Note:

    Ifany

    two

    towers

    are

    very

    close

    in

    strength,

    anditisexpectedthedetailingwillbeverysimilar,

    thenadecisiontotestonlyoneofthetwotowersis

    reasonable.

    TowerTypesnottested:

    RiverCrossingTowers OLF~1.2to1.5

    o es

  • 8/3/2019 Miller Tower Testing

    21/52

    WhyareTubularSteelPolesTypically

    NotTested?

    StructurallyDeterminant

    (LoadPathswellbehavedandpredictable)

    Analysismatchespoleperformance

    (Testinginthe70s)

    Fabricationdependentonweldquality,e.g.AWS

    D1.1(processesandprocedureswelldefined)

    Largerdeflections applicationloadvectorsmay

    change.

  • 8/3/2019 Miller Tower Testing

    22/52

    PoleTesting 1979

  • 8/3/2019 Miller Tower Testing

    23/52

    TowerTesting:HowtoSpecify 8to12LoadCasesaretypical:

    oa

    ase

    e ec on e ec

    oa

    cases

    a

    con ro

    e

    es gno :

    MainLegs

    BodyCrossBracing

    TowerArms

    Shieldwirepeaks

    Typically: on ro ngwea ercases

    Construction/Stringing

    BrokenWire/Torsional

    LocateLoadcellsascloseto

    loadapplicationpointaspossibletoavoid

    u ey r c on osses

    es ng anpro uce y

    vendor/testingfacility

  • 8/3/2019 Miller Tower Testing

    24/52

    TowerTesting:HowtoSpecify

    WindLoad

    Application

    napprox mat onon oa ng

  • 8/3/2019 Miller Tower Testing

    25/52

    TowerTesting:HowtoSpecify

    TowerHeight

    Selectioncanbebasedon:

    BodyExt./Leg

    Ext.

    with

    highest

    reaction

    . .

    Tallesttowerconfiguration

    Mostcommon yuse tower e g t

  • 8/3/2019 Miller Tower Testing

    26/52

    TowerTesting:HowtoSpecify

    Genera

    Test ngCr ter a

    Themanufacturingprocessesusedinthefabricationofthe

    pro o ype or es ngs a e o esamespec ca onsas oseused

    during

    the

    fabrication

    of

    the

    production.

  • 8/3/2019 Miller Tower Testing

    27/52

    TowerTesting:HowtoSpecify

    Material

    Itisimportanttousethesamematerialforthetestthatwillbe

    producedduringthesupply.

    Toughness

    , . . .

    ductility,A709,etc.,thenitmaynotbepossibletoobtainthismaterialin

    smallquantitiesforthetest.

    A572Gr.

    50

    with

    Charpy notch

    toughness

    is

    asupplemental

    requirement

    andthisexactsteelwillmostlikelynotbeavailableforthetest.

    Yieldstrength

    maylimit

    test

    material

    availability.

  • 8/3/2019 Miller Tower Testing

    28/52

    TowerTesting:HowtoSpecify

    IdenticalMaterialforTestingmaynotbeavailable.

    ProcessforProduction towersupply:

    .

    2.Supplierpurchasesrawmaterial

    2a. Mills:Productionquantities rollingschedules (materialisnotstockedinsufficient

    productionquantities)

    2b.Distributionwarehouses(ifstandardmaterialandinstock)

    3. Fabrication

    ProcessforTest towersupply:

    1.TowerSupplier/TestingStationcontractaward

    .

    2b.Distribution

    warehouses

    (if

    standard

    material

    and

    in

    stock)

    3. Fabrication

    Note: Nonstandardmaterialistypicallynotavailablefortesting.

    Materialsubstitutionsmustbemadeutilizingthesameyieldstrength

    andshall

    be

    representative

    of

    the

    materials

    used

    in

    the

    production.

  • 8/3/2019 Miller Tower Testing

    29/52

    TowerTesting:HowtoSpecify

    F n s ng

    Blackvs.Galvanized

    Structurallyperformthesame.

    Blacksteeltendstobemoreaudiblethangalvanizedunderloading.

    es e ower s o e e vere o ec en , en es nga

    galvanizedtowermakespackagingandshippingsimpler.

  • 8/3/2019 Miller Tower Testing

    30/52

    TowerTesting: Scheduling

    Howmuchtime

    doesittake?

    TowerDesign,DetailingandTestingProcess

    TowerDesign

    TestMaterialProcurement

    48weeks

    2weeks

    TestingPlan

    Prototype

    Fabrication

    Detailing(prototype)6to12

    months

    68weeks

    2weeks

    Assembly,Erection&Rigging

    Testing

    23weeks

    12weeks

    Detailingcorrection

    (if

    required)2weeks Test

    Report

    Note: 6to12monthsforcompletionofdesign/detail/testingincludingalldetaildrawings.

  • 8/3/2019 Miller Tower Testing

    31/52

    EquipmentusedinFullScaleTesting

    oa

    e sTemperaturecompensating,calibratedbeforeeverytowertest

    MechanicalWinches(AutomaticorManual)

    WireRopes

    Sheaves

    TheodolitesFormeasuringdeflections

  • 8/3/2019 Miller Tower Testing

    32/52

    EquipmentusedinFullScaleTesting

    LoadCells:

    Calibratedbeforeeverytowertest

  • 8/3/2019 Miller Tower Testing

    33/52

    EquipmentusedinFullScaleTesting

    ControlRoomMonitoring

    slowprocess

  • 8/3/2019 Miller Tower Testing

    34/52

    EquipmentusedinFullScaleTesting

    Reaction

    Frame

    Reaction

    Frame

    TestBed

  • 8/3/2019 Miller Tower Testing

    35/52

    EquipmentusedinFullScaleTesting

    VerticalCables(holddowns)for

    Horizontalloadapplication

    ControlRoom

  • 8/3/2019 Miller Tower Testing

    36/52

    EquipmentusedinFullScaleTesting

    How to Specify : Strain Gauges?

  • 8/3/2019 Miller Tower Testing

    37/52

    HowtoSpecify: StrainGauges?

    StrainGauges Definition

    StrainGaugesareanelectronicresistance

    measuringdevicewhoseelectrical

    ofstraininthedevice.

    ClickhereforStrainGau eDemo

    How to Specify : Strain Gauges?

  • 8/3/2019 Miller Tower Testing

    38/52

    HowtoSpecify: StrainGauges?

    StrainGauges ExpectationsandLimitationsonuse

    Notmandatory.

    Notrecommendedforprooftestingnormallatticeconfigurations.

    Doesincreasethecostoftestin . ~ 3 000 ermember au ed

    Unlesscalibratedlikealoadcell,gaugesyieldapproximateresults.

    Canbe

    used

    to

    spot

    check

    load

    flow

    in

    members.

    Judiciousselectionoflocationsareimportant.

    equa ewea erproo ng srequ re .

    h d l d ?

  • 8/3/2019 Miller Tower Testing

    39/52

    WhatdoesTestingInclude?

    es gno

    a

    x ure

    Verificationofassemblyanderection

    VerificationofRiggingthatsimulatesthedesignloading

    DesignFitnessofPurposeunderloading.

    mes,

    es ng

    a so

    includes:

    Failurerootcause

    analysis

    DetailingFitnessofPurposeunderloading.

    RecordingDeflections

    in

    Longitudinal

    and

    Transverse

    directions.

    Structuralcorrection

    Re

    testing

    Witnessingbyclient(orclientsrepresentative)

    TestReport

    AsInstalledinfield

  • 8/3/2019 Miller Tower Testing

    40/52

    Testingprocess Whattoexpectduringtesting

    Loadingtowerto50%of1st loadcasetocheckrigging,etc.

    LoadCaseloadingwith1min.holdsat50%,75%,90%,95%and5min.holdat100%.

    , .

    Videodocumentation.

    LoadBalancingcanbe

    pro ema c

  • 8/3/2019 Miller Tower Testing

    41/52

    Testingprocess Whattoexpectduringtesting

    ForRigid

    lattice

    towers:

    Deflectionscanbe1.5to2timesthatpredictedbyanalysisduetoboltslippage.

    Thereisadistinctionbetweendesignloaddeflectionsandserviceloaddeflections.

  • 8/3/2019 Miller Tower Testing

    42/52

    Testingprocess Whattoexpectduringtesting

    Ovalizationof

    holes:

    Generally,someovalization ofholesandpermanentdeformationofboltsare

    .

    Ifthe

    test

    tower

    is

    to

    be

    used

    for

    production,

    these

    deformations

    must

    be

    replacedtoconformtheproductionspecification. Boltsusedintowertestsshould

    notbereused.

    Mechanical ClearanceIssues:

  • 8/3/2019 Miller Tower Testing

    43/52

    TestingCosts

    ~1.5 2.0xcostofproductionruntowers.

    Test Basic: ~$150,000to$250,000

    Failurecost: dependingonextentoffailureandavailabilityofmaterial,

    downtimeofstation.

    Strain

    Gauges

    (if

    used)

    ~

    3,000

    per

    gauge. Additionalloadcasesbeyondthestandard812.

    Destruction Test: ~ 20 000 to 50 000

    CostforFailureafterenergization $$$$$

  • 8/3/2019 Miller Tower Testing

    44/52

    DestructionTests

    increasingthetransverseandverticalloadsinorder

    togaininformationonactualvs.predictedbehavior. Thefailureloadcouldthenberelatedto

    aincreaseinspanutilization.

    ~114%

  • 8/3/2019 Miller Tower Testing

    45/52

    FailureCaseStudy1

    500kVSingleCircuit

    TangentSuspension

    Failure

    at

    95%

    b /f

  • 8/3/2019 Miller Tower Testing

    46/52

    Freebodydiagram/force

    summationcheck

    Anglesdonothaveequal

    flangestressdistributions

  • 8/3/2019 Miller Tower Testing

    47/52

    FailureCaseStudy2

    500kVSingleCircuit

    DeadEnd

    Loading evaluation

  • 8/3/2019 Miller Tower Testing

    48/52

    Loadingevaluation

    Solution

  • 8/3/2019 Miller Tower Testing

    49/52

    WhatsnewintheIndustryregardingTowerTesting?

    TowerTesting: Newinformation (Cigre Report399)

  • 8/3/2019 Miller Tower Testing

    50/52

    oa

    ase

    e ec on

    Deterministicvs.Probabilisticdesignloads

    e%exc usion imits,w eree=5%,10%

    Howtocorrelateittothestrengthfactor?

    Return eriod

    DestructionTestsRecommended

    forcalibrationoftowerstrength

    curves.

    TowerTesting: Newinformation (Cigre Report399)

  • 8/3/2019 Miller Tower Testing

    51/52

    p t

    test ng

    snot

    necessary

    BayesianApproach

    probabilitybasedanalysis.

    FrictionLossesdueto ulle s stemsMethodofdeterminationbytest

    Acceptable

    tolerances

    on

    applied

    loads

  • 8/3/2019 Miller Tower Testing

    52/52

    Whiletestingyoucan