Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER 2014 SECTOR: INFRASTRUCTURE DEVELOPMENT
17

Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

Dec 26, 2015

Download

Documents

Brianna Dorsey
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

Millennium Challenge Account Zambia

LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT

TITLE: INNOVATORS FORUMVENUE: MCA-ZAMBIA OFFICEDATE: 08th OCTOBER 2014 SECTOR: INFRASTRUCTURE DEVELOPMENT

Page 2: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

1200 Twikatane Rd, off Addis Ababa DriveReducing Poverty Through Economic Growth

The Presentation• Introduction• Project Objective• Infrastructure Activity • Institutional Strengthening• Contract Packages• Benefits• Project Timelines

Page 3: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

31200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

Safety Tip

I. ElectricalII. FallsIII. Struck byIV. Excavations

and Trenching

Page 4: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

41200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

Urban Water Management

The Lusaka Water Supply, Sanitation and Drainage Project ( LWSSDP)

Water Supply

Sanitation Drainage

Page 5: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

51200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

LWSSDP PROJECT OBJECTIVES:

• To expand access to, and improve reliability of, water supply and sanitation

• Improve drainage services in select urban and peri urban areas of the city of Lusaka

• To decrease the incidence of waterborne and water-related diseases• Generate time savings for households and businesses and

• Reduce non revenue water in the water supply network

The project consists of two components:

1. Infrastructure Activity

2. Institutional strengthening Activity

Page 6: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

61200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

INFRASTRUCTURE ACTIVITY

The Lusaka LWSSD project focuses on the City of Lusaka with the following components:

Lusaka City•Water Supply•Sanitation•Storm-Water Drainage

Page 7: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

71200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

• Core Water Network Rehabilitation• Chelston distribution line rehabilitation and expansion• Chelston and Kaunda Square Sewersheds rehabilitation

and expansion• Central distribution line rehabilitation and expansion• Bombay drain improvements

INFRASTRUCTURE Cont’d

Page 8: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

81200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

• Asset Management -LWSC

• Maintenance Management -LCC

• Environmental Management

• Gender Mainstreaming

• Information ,Education & Communication Programme • Innovations & Grants

INSTITUTIONAL STRENGTHENING

Page 9: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

91200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

ENVIRONMENT & SOCIAL PERFORMANCE

• Manage environmental & social risks (including Resettlement) and

impacts of the Compact according to IFC Performance Standards

• Maximize benefits & minimize adverse impacts

• MCC Environmental Guidelines: “..to ensure that the projects

funded under Millennium Challenge Compacts are environmentally

sound, are designed to operate in compliance with applicable

regulatory (Zambian) requirements, and, are not likely to cause a

significant environmental, health, or safety hazard”

Page 10: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

101200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

SOCIAL AND GENDER ASSESSMENT

• Social and Gender integration across the compact • Identify approaches for regular, meaningful and inclusive

consultations with women and other vulnerable/ under represented groups

• Social inclusion ,Gender mainstreaming including IEC Institutional support

• Ensure that Contactors and Consultants adhere & comply with requirements in the SGIP

• Gender and social integration (including HIV/AIDS) through development of site specific ESMPs (working with ESP)

• Adhere to MCC Gender Integration guidelines and operational procedures

Page 11: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

111200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

INNOVATIONS & GRANTS

• Novel feature of LWSSD Project• Supports Competitive grant & Partnership

Program• Supports Innovation & Entrepreneurship• Goal –Increase & sustain access to quality water

& sanitation.• Target group-women, youths & vulnerable

groups• First call of proposals expected in October 2014

Page 12: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

121200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

MONITORING AND EVALUATION

• Project Evaluation to show results• Implementation Monitoring to show progress

towards objectives• Economic analysis • Support evidence-based decision-making

Page 13: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

131200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

CONTRACT PACKAGES

Notation Description

CP1 Iolanda Chilanga Pipeline Rehabilitation and Rehabilitation of Distribution Centres (7C, Woodlands, Waterworks, Lumumba, Stuart Park East, Stuart Park West, Chawama, Chelston and Mass Media )

CP2 Construction of Lumumba, Roadside and Kamloops Pipelines

CP3 Water and Sewer Reticulation in the Kamanga, Mtendere, Kaunda Square and Chelston Areas

CP4 Kaunda Square Waste Stabilization Ponds

Page 14: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

141200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

CONTRACT PACKAGESCont’d

Notation Description

CP5 Water Reticulation in Ndeke, Kwamwena, SOS Village, Chipata and Ng’ombe

CP6 Non-revenue water reduction projects

CP7 Bombay Drainage Project North

CP8 Bombay Drainage Project South

Page 15: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

151200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth

Benefits• New Services• Improved service level• Longer hours of service• Reduced risk of loss• Reduced flood damage• Reduce business down

time

1.2 Million People

Page 16: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

Project Identification

Needs Analysis

Concept Development

Masterplans

Priority Projects

Pre-Feasibility Studies

Feasibility Studies

-

Detailed Designs

Entry into force

Procurement

2009

2010

2011

2012

15/11/13

15/11/18 Project Closure

TIMELINES OF LWSSDP

2014

Five (5) year fixed implementation

periodCommencement

2015

Page 17: Millennium Challenge Account Zambia LUSAKA WATER SUPPLY SANITATION AND DRAINAGE PROJECT TITLE: INNOVATORS FORUM VENUE: MCA-ZAMBIA OFFICE DATE: 08 th OCTOBER.

171200 Twikatane Rd, off Addis

Ababa DriveReducing Poverty Through Economic Growth