Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012
7

Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.

Jan 01, 2016

Download

Documents

Cody Roberts
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.

Military Redevelopment – Kelly AFB to Port of San AntonioTim Underwood Deloitte Consulting LLP

May 2012

Page 2: Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.

Copyright © 2011 Deloitte Development LLC. All rights reserved.2

Kelly AFB Overview

Realign toLackland

Light Industrial/ Warehouse

(Rail Access)

Administrative/

Services

Industrial (Aircraft Maintenance)

Multimodal Logistics Distribution Center

1,887 Acres 9 Million sq. ft. Airfield Industrial Office Space Warehouse Transportation

Established 1917 – Closed 2001

At its peak the Kelly AFB and Air Logistics Center employed over 15,000

military and civilian staff

Aircraft maintenance, engine repair and logistics

Page 3: Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.

Copyright © 2011 Deloitte Development LLC. All rights reserved.3

Environmental Overview 700 environmental sites 52 Post-closure Solid Waste Management Units 334 additional sites required investigation 360 above and below ground storage tanks Industrial waste treatment system and industrial sewer Groundwater contamination extending 6 miles off

base Remediation included excavation, containment

systems, pump and treat systems, soil vapor extraction, in-situ bioremediation and permeable reactive barriers

01 03 05 07 09 11 13 15 17 19 21 23 25 27 29

Onbase

Offbase

RFI CMS CMI WP CMI I RA-O LTM SC SR

OPS and FOSTLRIP Site Closure (SC)

Sites included: landfills, spill

sites, former fire training areas,

low-level radioactive waste sites, underground

storage tanks, aircraft

maintenance areas, sludge

lagoons, sludge-

spreading beds, a small arms

range, container storage areas, wash racks,

drains, oil/water separators,

silver recovery units and spill

sites

Page 4: Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.

Copyright © 2011 Deloitte Development LLC. All rights reserved.4

Three sample facilities: Aircraft Maintenance Hanger

Immediate occupancy desired

Reuse of some of the 37 SWMUs

Immediate renovation

Dual facility occupancy Combined closure and re-

permitting of SWMUs Combined corrective action

and renovation

Page 5: Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.

Copyright © 2011 Deloitte Development LLC. All rights reserved.5

Three sample facilities: Office Facility (452,000 sq. ft.)

BUILDING P171

B E R M A N R O A D

Q U E N T I N R O O S E V E L T

T I

N K

E R

D

R I

V E

B\ 171

SLURRY WALL - INSTALLED JUN 99

DNAPL PUMPING OCCURS

WITHIN A FENCED

COMPOUND

RECOVERY WELLS - UPGRADED MARCH 1998

Incomplete investigation Active interim and final

restoration Institutional controls

Remedy change Land use covenants Performance based

contract impact

Page 6: Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.

Copyright © 2011 Deloitte Development LLC. All rights reserved.6

Three sample facilities: Engine Maintenance Facilities

41 Unit Breakdown

23 Above ground storage tanks (some with underground piping);

03 Oil/Water separators;

11 Vaulted tanks registered as SWMUs

01 Grease trap

03 Washracks

Plating shop

Page 7: Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.

Copyright © 2011 Deloitte Development LLC. All rights reserved.7

Results: Port of San Antonio

Environmental:Final property transfer: 389 acres September 30, 2010

660 sites closed14 sites entering long term maintenance

Commercial:7.7 million sq. ft. of space occupied70 commercial organizations14,000 jobsAnnual economic impact of $4.2 billion