Hi, my name is Mike. I like to have a good time and make things happen.

My life revolves around all aspects of design and construction. I have been an Illinois-

licensed architect since 2001. In my pastime I enjoy cooking, biking, live music

and spending time with my 9-year-old son.

CONTENTS

Georgian Manor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Urban Condo . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Ravenswood Residence . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12

Depaul Residence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Lincoln Park Spec Home . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Buddy Guys Legends . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Lakeview Residence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

Lincoln Park Residence . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

Halal Guys Restaurant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Lincoln Park Remodel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

Page 3: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

GEORGIAN MANOR | PAGE 5

GEORGIAN MANOR6,000 SF, coMPlEtEd 2015

AIA AWARD 2016 | Detailed intricate main stair and hall |

Designed and detailed exterior railings and roof deck

| Managed entire project from inception to completion

Page 4: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

GEORGIAN MANOR | PAGE 7

T/ GRADE0"

T/ FIRST FLOOR0"

T/ SECOND FLOOR0"

T/ THIRD FLOOR0"

T/ BLDG. HEIGHT0"

T/ BASEMENT FLOOR0"

T/ EAVE0"

T/ ROOF0"

8'-8"

2'-4"

9'-0"

2'-0"

10'-0"

2'-0"

9'-0"

A

B

C

D

A

B

C C C

D D D

MODULAR BRICKENGLISH BOND

PREFAB. BRICKJACK ARCH (TYP.)

COPPER CONDUCTORHEAD & DOWNSPOUT

LIMESTONECORNICE

COPPER GUTTER

ALUM. CLAD WOODWINDOW W/ BRICKMOLD

SYNTHETIC WOOD TRIMAT DORMERS, TYP.

SYNTHETIC SLATE SHINGLE ROOFING

COPPER CORNICE

LIMESTONE COPING AROUND CONC. CHIMNEY CAP, TYP.

COPPER FLASHING

LIMESTONE BANDAND SILLS

POWDER COATEDSTEEL RAILING

3'-6

"

2'-7

3/8

"

2

A5.2

1

A5.2

8

A5.2

7

A5.2

6

A5.2TYP.

105

DN [email protected]"

DN 1R@4"

DESK

2'-2

"

DININGROOM

LIVINGROOM

ENTRY HALL

BUTLER'SPANTRY

PWDR 1

1'-2" 14'-4" 10" 15'-8" 5" 6'-4"

1'-2

"12

'-8"

10"

7'-4

"2'

-2"

1'-2

"

4'-2" 7" 2'-0"

1'-8

1/2

"3"

6'-4

"

4'-2

"5'

-8"

8'-6

"7'

-0"

12'-8

"

5" 4'-0" 7" 2'-2"

5"5'

-0"

1'-8

1/2

"

8"11

'-6"

11'-4

"1'

-0"

DN [email protected]"

UP [email protected]"

5'-0

"

SDCO

STAIR 1

ELEV 1

5'-8" 5'-4" 13'-2" 11'-10" 3'-8"

1'-2"3" 3'-8" 10'-2" 3"

5'-8" 2'-8" 2'-8" 5'-8" 2'-8" 9'-8" 2'-8" 8'-0"

1'-8" 3'-2" 7'-8" 3'-2" 6"

2'-6

3/4

"

4'-2" 1'-2" 3'-8" 1'-2" 4'-2"

1'-8

"

1" 4" 4"

6'-8

"

101

104

106

102 103

1

2

3

4

56

7 8 910

1112

13

14

15

16

10

171/A6.1-1 1/A6.1-1

1/A6.1-1

2/A6

.1-1

2/A6

.1-1

3/A6.1-1 3/A6.1-1

3/A6.1-1

4/A6

.1-1

4/A6

.1-1 1/A6.1-2

4/A6.1-21/A6.1-2

1/A6.1-2

2/A6

.1-2

4/A6.1-2

4/A6.1-2

3/A6

.1-2

3/A6

.1-2

5

A6.1-2

PLAN AT FRONT YARD, SEE SHEET A2.2

NOTE: FRAMING UNDER ALL WINDOWS TO BE RECESSED 1" TO ALLOW FOR INTERIOR PANEL DETAIL

42" HIGH GUARDRAIL, TYP.

42" HIGH GUARDRAIL, TYP.

MASONRY FIREPLACE

Page 5: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

URBAN CONDO | PAGE 9

URBAN CONDO1,400 SF, coMPlEtEd 2012

Managed project from inception to completion |

Coordinated roof deck and stair restructuring | Coordinated

extensive home automation system | Designed and

detailed intricate millwork

Page 6: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

URBAN CONDO | PAGE 11

Project No.

Sheet Title:

Consultant:

Drawn By: JAWChecked By: GB/MRScale: AS NOTED

Issued For:Pricing

ConstructionPermit

Date

Sheet Number

© Copyright 2012, Burns + Beyerl Architects Inc.

Swanson Condo34 E. Elm, Chicago, IL

Project Number: 2011-0014

08.02.11

09.15.11REV. CD SET 11.02.11CSK 10 03.23.12

A6.7

Plan Detail

7/8"

CENTER OF OPENING

2(SIM)

2(SIM)

2" 1 3/4" 1'-4 1/8"

1 3/

4"7/

8" 1/8"

1'-4

1/4

"

2 1/

2"

1'-4

1/4

"

2"1 3/4" 1/8" 1'-4 1/8"

1'-6

"1'

-6"

1 1/

2"

1/4"

1/8"2"1 1/2"

3/8"1'-8

5/8

" FU

LL R

.O.

3'-0

"

1 1/2"

3/8"

2'-0

"

3/8"

3/8"

1'-1

1 1/

4"

1/4"

3/4"

1/4"

2 5/

8"

5 1/2"5/8"1'-0"

1/2"+/-

1 1/

2"1'

-4 1

/4"

1'-4

1/4

"1

1/2"

1/4"

1/4"

1'-3 3/8"

1'-3 3/8"

1 1/

2"

1 3/4" 2" 1 1/2" 1'-2 3/8"1/8" 1/8" 1/8" 1/8" 3/8" 1/4"

1'-2 3/8"1 1/2" 3/8"1 3/4"1/8"1/8"1/4"

1/4"

1'-9

3/4

"

2'-4 1/2"

7/8"

1/4"

1/2"

1'-4 1/2"

1"3/

4"

1 3/

4"

5/8"

3 1/

2"5/

8"1

1/2"

2 1/

2"

1"5/

8"

2 5/8"

TILED NICHE

(VERIFY WITH TILE SIZE;SEE ELEVATIONS FOR

LAYOUT)

(3) EQUAL PANELS(SEE INT. ELEV'S FOR LAYOUT)

CENTERLINEOF PANEL &

LIGHT SWITCH

ELECTRICAL J-BOX-VIF SPACE REQUIRED

(EQUAL "B")

RABETTED DOOR SLAB AT STRIKE SIDE OF JAMB AND AT HEAD

DOOR 105

DOOR 108

DOOR 108

DOOR 115

MAGNETIC CATCHAT HEAD

1'-3 3/8"

1'-3 3/8"1/4"

1/4"

1 1/4"4"

1/8"

1 7/

8"2

1/8"

1/8"

1 3/

4"

(EQUAL "A")

(EQUAL "A")

ALIGN

1 3/4" SOLID CORE INSWING DOOR

KERF CUT

DET

AIL

CO

NTI

NU

ES O

N 5/

A6.6

DET

AIL

CO

NTI

NU

ES O

N 5/

A6.6

DET

AIL

CO

NTI

NU

ES O

N 5/

A6.6

PLAN DETAIL AT MASTER HALLWAY/BBA DOORSScale: 3" = 1'-0"1

TILE TO WRAP CORNER WITH MITERED JOINT; TYP. AT HEAD & JAMB

DOOR 107

4"

1"

1/4"

2 1/8"3/8"

2 1/

2"

1 1/

2"

5/8"

3 1/

2"5/

8"

CENTER OF OPENING

1 3/4"1/8"1'-4 1/8"

1/8"

2"

1'-8

5/8

" FU

LL R

.O.

1'-2 3/8" 1 1/2" 2"3/8"1/4" 1/8"

1 3/4"1/8"

1'-6"

1'-6 3/8"

1'-7

"

2 1/2"

1 3/

4"1/2"

2 3/

4"

1 1/2"

1 7/

8"2

1/8"

1/8"

1 3/

4"

1/4"1'-2 3/8"

1'-9

1/2

"

1'-8

5/8

" FU

LL R

.O.

22

1/8"

1 1/4"

1'-4

1/4

"1'

-6"

EXIS

TIN

GW

ALL

1 3/8"

2 1/

2"1'

-9 3

/4"

1/4"

BALL CATCH

5/8" DRYWALL

KERF CUT

RIXON FIREMARK PIVOT HINGES 128 3/4 / 320

KERF CUT

CENTER PIVOT

RECESSED CUP PULLS

TYPICAL STICKING DETAIL

ALIG

N

FIN

ISH

ES

3/4" PLYWOOD

STILE & RAIL MOULDING TO MATCH DOOR

SHIM SPACE

T-1 DOOR CASING (SEE A6.0)

MODIFIED STILE & RAIL DOOR PANEL TO MATCH TYPICAL DOOR PANEL

VENEER PLYWOOD (FINISH VARIES)

SCRIBE/REVEAL

SHIM SPACE

FLUSH MILLWORK PANEL WITH MITERED CONNECTION AT CORNERS

STRIKE PLATE ON TOP OF DOOR. MATCH FINISH OF DOOR HARDWARE. CROWN CITY HARDWARE, PASADENA, CA (626) 794-0234

BALL CATCH AT HEAD

KERF CUT

TILED WALLS; SEE INTERIOR ELEVATIONS FOR LAYOUT

SEALANT JOINT; TYPICAL AT ALL WOOD TRIM-TILE LOCATIONS

NARROW WIDTH STUD WALL FRAMING

(EQUAL "B")

(EQUAL "B")

TILE TO BE MITERED AT OUTSIDE CORNER

RABBETTED JAMB MITERED TO FACE FRAME/CASING

DOOR 115

DOOR 109

DOOR 110

DOOR 1101'-2 3/8" 1/4" 1'-2 3/8"

4"

1'-2 3/8"1/4"

1/4"

1/8"

1 1/4"

3/4"

RABBETTED JAMB

(EQUAL "B")

(EQUAL "B")

FACE OF FINISH WALL ABOVE

SOLID CORE OUTSWING DOOR WITH MORTISED OFFSET PIVOT HINGES

CLOSET DOOR; CABINET CONTRACTOR TO MAKE RECOMMENDATION FOR THICKNESS TO MAINTAIN DOOR STIFFNESS

WALL TILE TO WRAP CORNER WITH MITERED JOINT; TYP. AT HEAD & JAMB

LINE OF TUB DECK BELOW

3'-4"-MAXIMUMVERIFY WITH TUB SELECTION

Page 7: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

RAvENSWOOD RESIDENCE7,000 SF, coMPlEtEd 2011

RAVENSWOOD RESIDENCE | PAGE 13

Managed entire LEED Gold Certification process | Managed all exterior, shell and core coordination and detailing,

including shop drawing review and approval | Managed all MEP coordination with engineers | Managed extensive

low-voltage home automation install | Attended all client meetings with interior designers | Coordinated

landscape design and installation

Page 8: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

DEPAUL RESIDENCE | PAGE 15

DEPAUL RESIDENCE 5,000 SF, coMPlEtEd 2005

Managed 3-Unit project from inception to completion | Coordinated

international interior design including CAD conversions | Main stair

design, detailing and shop drawing approval | Construction administration

Page 9: Mike Ryan Portolio 10

FIRST PROJECT NAME GOES HERE | PAGE 17

MIKE RYAN | PORTFOLIO

LINCOLN PARK SPEC HOME | PAGE 17

Designed and detailed all interiors and millwork | Organized the complete restructuring throughout gut rehab |

Managed MEP coordination | Construction administration through project completion

LINCOLN PARK SPEC HOME7,000 SF, coMPlEtEd 2016

Page 10: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

LINCOLN PARK SPEC HOME | PAGE 19

CONTROLPANEL

HYD.PUMP

ELECT.

BE

NC

H

24"REF.

24"DW27"

WINE 27"WINE

LOWER LEVEL1626 SF

OPEN TOBELOW

COVE LT.CEILING

COFFERED CEILING

OPEN TO BELOW

PANTRY

30" REF

BARREL VAULTCEILING

24"MICRO

24"DW

24"UCR

48" RANGE

42" FP

+4'-0" ABOVE GRADE

18" 24" 18"

30" REF

FIRST FLOOR1632 SF

1WINDOWREMOVED

OPEN TOBELOW

COVE LT.CEILING

BE

NC

H

24"UCRLAYOUT

TABLE

BARREL VAULTCEILING

BE

NC

H

SECOND FLOOR1680 SF

OPEN TO BELOW

RO

OF

BE

LOW

LCLC BE

NC

H

THIRD FLOOR1632 SF

1WINDOWREMOVED

'JOMY'LADDER

OPEN TO BELOW

6'-8" ceil. ht.PENTHOUSE356 SF

1WINDOWREMOVED

AREA CALCULATION - 1922 N. DAYTONPENTHOUSE 356 SFTHIRD FLOOR 1632 SFSECOND FLOOR 1680 SFFIRST FLOOR 1632 SFLOWER LEVEL 1626 SF

TOTAL 6926 SF

Page 11: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

BUDDY GUYS LEGENDS | PAGE 21

BUDDY GUYS LEGENDS16,000 SF, coMPlEtEd 2010

Coordinated extensive structural renovation | Coordinated MEP engineering | Coordinated restaurant

equipment | Detailed interior millwork | Organized and integrated stage lighting and sound system

Page 12: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

LAKEVIEW RESIDENCE | PAGE 23

LAKEvIEW RESIDENCE4,000 SF, coMPlEtEd 2004

Lead design role | Managed all exterior, shell and core coordination and detailing, including shop drawing review

and approval | Managed all MEP coordination with engineers | Designed and detailed all interiors and finishes

Page 13: Mike Ryan Portolio 10

FIRST PROJECT NAME GOES HERE | PAGE 25

MIKE RYAN | PORTFOLIO

Page 14: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

LINCOLN PARK RESIDENCE | PAGE 27

LINCOLN PARK RESIDENCE13,000 SF, coMPlEtEd 2012

Lead design role | Managed all exterior, shell and core coordination and detailing, including shop drawing review

and approval | Managed all MEP coordination with engineers | Attended all client meetings with interior

designers throughout design and construction | Managed extensive low-voltage home automation install

Coordinated landscape design and installation

Page 15: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

HALAL GUYS | PAGE 29

HALAL GUYS750 SF REStAURANt, coMPlEtEd 2015

Coordinated restaurant equipment and furnishings | Detailed interior millwork | Expedited building permit

Page 16: Mike Ryan Portolio 10

MIKE RYAN | PORTFOLIO

CRUISE RESIDENCE | PAGE 31

LINCOLN PARK REMODEL 5,200 SF, coMPlEtEd 2007

Conducted energy audit | Detailed extensive interior trim and millwork |

Oversaw intricate remodeling | Coordinated home automation system