Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London UNDERGROUND
27

Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Dec 24, 2015

Download

Documents

Theodore Johns
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Mike Brown – Managing Director London Underground & London Rail

Maximizing rail capacity in London

UNDERGROUND

Page 2: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

22

Page 3: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

The day job

3

Page 4: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

4

Page 5: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Record London Underground reliability

Mayor’s 30% target hit early!

5

Page 6: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

London Underground & London Rail Priorities

6

Page 7: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Modern lines

Northern Line

Victoria Line

Jubilee Line

7

Page 8: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

New stations

VictoriaBond Street

Vauxhall

8

Tottenham Court Road

Page 9: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Boosting capacity

Network expansion & Five Car Trains Double Tracking

Double Tracking & New Trams New trains on the District, Circle, and Metropolitan lines

9

Page 10: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

And other stuff

Lift works Ballasted track renewal10

Major escalator works

Page 11: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Our people bring it all together

11

Page 12: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

It’s let us ‘free the night’

12

Page 13: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Why?

13

Page 14: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Becoming a megacity:10m people by 2030

+London Manchester

14

Page 15: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

15

Today’s Budget

Page 16: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

2015 Spending Review

16

Page 17: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

London Underground & London Rail investment in context

Total capital investment during 2014/15: £3.58 billion

This included:

• £1.7 bn gross investment in London Underground and London Rail

• £1.5 bn (approx) gross investment for Crossrail

17

Page 18: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Jobs, growth and manufacturing across the UK

18

Page 19: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

So our next steps

19

Page 20: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Integrating our network

20

Vauxhall Nine Elms24,000 new jobs, 16,000 new homes

Page 21: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Fully open by 201921

10 per cent more capacity

Page 22: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Crossrail 2Ready to start work by 2020

Looking ahead

22

Page 23: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

Expanding the Overground

23

Page 24: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

And we want to do more...

Since 2005 South London Passenger demand has increased twice as fast as

capacity

South London by 2013: 390k more residents and 200k

more jobs

24

Page 25: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

...for South London

25

Page 26: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.

26

What can be achieved?

• More reliable trains, shorter waiting times and increased capacity: getting the most out of existing infrastructure

• New lines to connect poorly served areas and support more homes and jobs

• Better service for customers with integrated fares, ticketing and information, and station staff available to help

Page 27: Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.