M ICROW AVE SITE SURVEY REPORT Customer SUMED Project Name Upgrade of existing microwave telecommunication network Contract No. 19/2014 Quotation list No. Region Cairo Site Name Dahshour Site ID R1 Site Address Dahshour Coordinate Survey Date 1-2-2015 SUMED Systel TEL: TEL: Contact person: Contact person: E-Mail: E-Mail: Date: Date: Signature Signature
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
MICROWAVE SITE SURVEY REPORT
Customer SUMED
Project Name Upgrade of existing microwave telecommunication network
Site Name: Dahshour Site ID: R1 Tower Owner : Summed
Site Type Indoor GF SST: GF MP: Outdoor
RT SST RT MP: RT Pole: Other (Guyed)
Cable Tray Existing cable tray is available New cable tray required
Parthole/Penetration Plate Existing Parthole Space available Existing Parthole Position
New Parthole required Outdoor, no need
IDU/ODU
Item
Far End Site IDU Type
Capacity
ConfigODU Link
FrequencyODU Frame Support
Type Suband Hi,lo Tx Rx Frame type P/N
1 R2 Alcatel 1+1 FDAlcatel
LOW
7561 7463
7722 7624
2 3 4 5
6 7
2. TowerTower
New Tower is Required Existing Tower is AvailableType of Tower
Self-Support Roof Mount
Others (Guyed)
Tower Height : 80 m
Existing Microwave Antenna Load Information (All Existing Antennas)Item
Tower leg Far end site
Antenna Size(m)
Antenna Height
Antenna Freq(GHz)
Antenna Type
Azimuth Operator Configuration Remark
1 R2 1.8 79 7 EP6 281.3 Summed 1+1 FD 2 3 4 5 6
Proposes New Antenna Information for Summed
Item Far end siteAntenna
SizeAntenna Height
New Antenna Space Available
Tower Leg Azimuth Remark
1 R2 1.8 2 3 4 5 6 7
3. Cable Length Information
Item Length (meters / pc) Qty Remark
DC Power Cable from IDU to Rectifier
IF Cable layout from IDU to bottom of Tower(all directions)
2M Trunk Cable from IDU to DDF
E1 jumper from existing DDF to proposed DDF
IDU Grounding Cable to Grounding Point
Optical Patch Cords from IDU to ODF
ODU Grounding Cable to Grounding Point
Remark: The cable length must be measured from Proposed new installation position (Cabinet/19” subrack, IDU,rectifier,DCPDB etc)
(4) MW mounting pole Information
Item Far end site Mounting Pole dia. Mounting Pole HeightMounting Pole
Leg
1
2
3
4
5
6
7
8
9
10
2. Photo Required
(1) IDURemark: If required, pls provide the photo of proposed position of New Outdoor cabinet. Must provide overview photo of cabinet
IDU Rack IDU Rack
IDU Rack(Outdoor) IDU Rack(Outdoor)
2. Photo Required
(1) IDURemark: If required, pls provide the photo of proposed position of New Outdoor cabinet. Must provide overview photo of cabinet
Proposed indoor 19 inch rack (If need) Proposed indoor 19 inch rack (If need)
IDU-1 Installation IDU-1 Factory Label
2. Photo of Existing DDF for Interconnection
3. Photo of Cable Tray, Busbar and Porthole
Photo Busbar Photo OF Porthole Photo of Cable tray
4. Antenna
Far End Site : R2 Antenna Diameter: 1.8 mAntenna Model: EP6 ODU frequency band: 7 GHz
Antenna Total View Antenna Factory Label Antenna Installation Label
Waveguide interface to antenna Waveguide on Tower Overview of the tower
6. Photo of Busbar on TowerOutdoor Busbar on Tower (From down to top)Amount of busbar on tower SetHeight of busbar 1 MeterHeight of busbar 2 MeterHeight of busbar 3 Meter
7. Photo of Busbar 1 Photo of Busbar 2 Photo of Busbar 3