Micro-Hydro Application at Quinsam Hatchery Association of Conservation Engineers Conference September 2013 Mark J. Hassebrock, PE 4717 97 th Street NW Gig Harbor, WA 98332 253.858.5674 [email protected]
19

Micro-Hydro Application at Quinsam Hatchery

Nov 20, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Micro-Hydro Application at Quinsam Hatchery

Micro-Hydro Application at Quinsam Hatchery

Association of Conservation Engineers Conference September 2013

Mark J. Hassebrock, PE 4717 97th Street NW Gig Harbor, WA 98332 253.858.5674 [email protected]

Page 2: Micro-Hydro Application at Quinsam Hatchery

Quinsam River Hatchery

Page 3: Micro-Hydro Application at Quinsam Hatchery

Quinsam River Hatchery

Page 4: Micro-Hydro Application at Quinsam Hatchery

Hatchery Water Supply

Page 5: Micro-Hydro Application at Quinsam Hatchery

Cold Creek Pipeline

Total Head = 75 ft Net Head: • 59 ft @ 24 cfs • 66 ft @ 15 cfs

Page 6: Micro-Hydro Application at Quinsam Hatchery

River Water Pumps

Page 7: Micro-Hydro Application at Quinsam Hatchery

Turbine and Induction Generator

Page 8: Micro-Hydro Application at Quinsam Hatchery

Turbine/Generator

River Water Pumps

Page 9: Micro-Hydro Application at Quinsam Hatchery

Existing Headtank Piping

Page 10: Micro-Hydro Application at Quinsam Hatchery

Existing Headtank Piping

Page 11: Micro-Hydro Application at Quinsam Hatchery

Existing Headtank Piping

Page 12: Micro-Hydro Application at Quinsam Hatchery

Headtank Piping Modifications

Page 13: Micro-Hydro Application at Quinsam Hatchery

Headtank Piping Modifications

Page 14: Micro-Hydro Application at Quinsam Hatchery

New Riser Connections

Page 15: Micro-Hydro Application at Quinsam Hatchery

Turbine Piping

Page 16: Micro-Hydro Application at Quinsam Hatchery

Turbine Piping

Page 17: Micro-Hydro Application at Quinsam Hatchery

Bypass Piping

Page 18: Micro-Hydro Application at Quinsam Hatchery

Estimated Benefit

• Facility was using around 480,000 kWh per year

• Microhydro system will produce about 268,000 kWh per year

• At $0.05/kWh, system reduces bill by $13,400 per year

• Projected power cost savings approximately offset the cost of the project over an assumed 40 year operating period

Page 19: Micro-Hydro Application at Quinsam Hatchery