Top Banner
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT
12

MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

Dec 21, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

MICE VIDEO CONFERENCECooling Channel/Detector

Integration

July 30, 2003Edgar L. Black

IIT

Page 2: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

CLAMPED TYPE WINDOWS

FOCUS/ NON WELDED WINDOWS ABSORBERE.L.Black / IIT

7/ 1/03

New modified focus/absorber module

Page 3: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

The layout of the new focusing/hydrogen absorber module was completed for the welded and non welded absorber windows.

Layouts indicate that both cases are feasible for assembly within the constraints specified.

Aspects of safety reliance however, requires a safety verification program for both cases which will be discussed separate from this presentation and it will include procedures, costs and schedule not considered in our original plans.

Page 4: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

Integration findings and concerns:

• During the process of laying out the magnets, discrepancies on the dimensional data were encountered, the data was collected from: B. Palmer documents, the MICE proposal to RAL on January 10, 2003 and M. Green’s papers at Columbia University.

• The magnets parameters need to be verified, to validate the current layouts

• Ones the parameters are verified, the “MICE MAGNET LAYOUT” drawing (see next slide) shall be the core for the MICE elements final design and locations.

Page 5: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

Essential base for the MICE hardware elements design & location

Page 6: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

MICE magnets geometry parametersLength 1 gap dl rad dr

MAGNETS: mm mm mm mm mm

Correction coil 1.1 0 0 180 250 75Spectrometer solenoid 1 210 30 1260 250 40Correction coil 1.2 1500 30 180 250 75Matching coil 1.1 1800 120 200 255 50Matching coil 1.2 2150 150 200 255 50Focus coil 1 2560 210 180 255 90Focus coil 2 3000 260 180 255 90Coupling coil 1 4065 885 360 690 71Focus coil 3 5310 885 180 255 90Focus coil 4 5750 260 180 255 90Coupling coil 2 6815 885 360 690 71Focus coil 5 8060 885 180 255 90Focus coil 6 8500 260 180 255 90Matching coil 2.1 8890 210 200 255 50Matching coil 2.2 9240 150 200 255 50Correction coil 2.1 9560 120 180 250 75Spectrometer solenoid 2 9770 30 1260 250 40Correction coil 2.2 11060 30 180 250 75End to end= 11240Sum of gap+dl-180 11060 5400 5660

Page 7: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

Fig. 3.1 “Layout of the experiment”, on section 3 of the proposal, shall be replaced with the drawing in the next slide, it is based on the new focus/hydrogen module design with the modified parameters.Nomenclature of the MICE elements are copied from table 3.1 and the parameters for the elements position along the beam are interpolated with the data sources mentioned above.(Note the TOF 2 and the Cherenkov are transpose in the table ?)Additional drawings in PDF format are accessible on the web.

Page 8: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

m

Layout of the experiment, total assembly

Page 9: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

Safety issues

• Enclosure integrity, gas barrier continuity up to the detectors vessels need to be analyze

• Additional windows for the detectors, locations and sizes shall be determined

• Connection between the modified modules require new detail design

• Criteria for the test and acceptance for all welded and non welded windows is being developed

Page 10: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

Partial detector cooling channel safety related assembly details

Page 11: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

NOTE : IN THIS LAYOUT THE EXPERIMENT APEARS TO OBEREXTEND BEYOND THE LEVEL GROUND FLOOR ?

Page 12: MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

Preliminary MICE end view in the RAL facility